ANALISA HARGA SATUAN PEKERJAAN PENGECORAN RIGID

PERE
PERERJ
RJAA
AAN
N : RIGI
RIGID
D 30cm
LOKASI :

1 1M
M2
2 PEM
PEMA
ASA
SANGA
NGAN
N WI
WIREM
REMESH
ESH D 10-
10-15
150
0 ( SIN
SINGLE
GLE ) :
  1,0000 m2 wire mesh D10-150 ( single ) @ Rp.   106.481,48 Rp
R p.   106.481,48
  0,8252 Kg besi korset dia. 10 @ Rp.   9.550,00 Rp
R p.   7.880,66
  0,0020 Org Mandor @ Rp.   150.000,00 Rp
R p.   300,00
  0,0040 Org Kepala tukang @ Rp.   135.000,00 Rp
R p.   540,00
  0,0500 Org Tu
Tukang besi @ Rp.   125.000,00 Rp
R p.   6.250,00
  0,0500 Org pekerja @ Rp.   90.000,00 Rp
R p.   4.500,00
  1,0000 m2 Alat bantu @ Rp.   1.500,00 Rp
R p.   1.500,00
Jumlah Rp.   127.452,14
PEMBULATAN Rp.   127.452,00

2 1M
M2
2 PEK
PEKERJ
ERJA
AAN B
BEGI
EGIST
STIN
ING
G BESI
BESI :
  24,1900 Kg Besi siku 40x40x3 @ Rp.   22.636,40 Rp
R p.   547.574,52
  12,1530 Kg Pelat besi tebal 1,5 mm @ Rp.   22.636,40 Rp
R p.   275.100,17
  0,5000 ltr Minyak begisting @ Rp.   25.000,00 Rp
Rp.   12.500,00
  0,0500 Org Mandor @ Rp.   150.000,00 Rp
R p.   7.500,00
  0,1000 Org Tukang kayu @ Rp.   125.000,00 Rp
Rp.   12.500,00
  0,2000 Org Pembantu tukang @ Rp.   95.000,00 Rp
Rp.   19.000,00

Jumlah Rp.   874.174,69


 Asumsi pemakaian
pemakaian begisting
begisting 5 kali Rp.   174.834,94
PEMBULATAN Rp.   174.834,00

3 1M
M3
3CCOR
OR BE
BETO
TON
N K-4
K-400
00 fa
  1,0500 m3 Ready mix concrete K - 400 @ Rp.   981.750,00 Rp.   1.030.837,50
  0,0250 Hari Mandor @ Rp.   150.000,00 Rp
R p.   3.750,00
  0,0500 Hari Kepala tukang @ Rp.   135.000,00 Rp
R p.   6.750,00
  0,2500 Hari Tukang batu @ Rp.   125.000,00 Rp
Rp.   31.250,00
  0,7500 Hari Pekerja @ Rp.   90.000,00 Rp
Rp.   67.500,00
  0,3330 Jam Concrete vibrator @ Rp.   30.000,00 Rp
R p.   9.990,00
  2,8570 m2 Plastik @ Rp.   2.500,00 Rp
R p.   7.142,50
  4,7230 Bh Beton decking tebal 5 cm @ Rp.   2.150,00 Rp
Rp.   10.154,45

  17,7300 Kg
K g Dowel @ Rp.   13.000,00 R
Rpp.   230.490,00
  1,2500 m' Grease dan pipa PVC type C dia. 1" @ Rp.   25.000,00 Rp
Rp.   31.250,00
  0,4500 m2 Begisting @ Rp.   174.834,00 Rp
Rp.   78.675,30
  2,8570 m2 Curing beton @ Rp.   15.000,00 Rp
Rp.   42.855,00
  1,0000 m3 Test benda uji silinder dan core drill beton @ Rp.   19.563,00 Rp
Rp.   19.563,00
Jumlah Rp.   1.570.207,75
1 m2   471.062,33
PEMBULATAN Rp.   471.062,00
 

4 1 M3 CO
COR
R BE
BETO
TON
N K-
K-30
300
0 fa
  1,0500 m3 Ready mix concrete K - 400 @ Rp.   900.900,00 Rp
R p.   945.945,00
  0,0250 Hari Mandor @ Rp.   150.000,00 Rp
R p.   3.750,00
  0,0500 Hari Kepala tukang @ Rp.   135.000,00 Rp
R p.   6.750,00
  0,2500 Hari Tukang batu @ Rp.   125.000,00 Rp
Rp.   31.250,00
  0,7500 Hari Pekerja @ Rp.   90.000,00 Rp
Rp.   67.500,00
  0,3330 Jam Concrete vibrator @ Rp.   30.000,00 Rp
R p.   9.990,00
  2,8570 m2 Plastik @ Rp.   2.500,00 Rp
R p.   7.142,50
  4,7230 Bh Beton decking tebal 5 cm @ Rp.   2.150,00 Rp
Rp.   10.154,45
  17,7300 Kg Besi
Besi sloo
slooff ( tu
tul.
l.utama 4Ø12,beugel Ø10-200) dan besi dowel Ø @
utama Rp.   13.000,00 Rp
R p.   230.490,00
  1,2500 m' Grease dan pipa PVC type C dia. 1" @ Rp.   25.000,00 Rp
Rp.   31.250,00
  0,4500 m2 Begisting @ Rp.   174.834,00 Rp
Rp.   78.675,30

  2,8570 m2 Curing beton @ Rp.   15.000,00 R


Rp
p.   42.855,00
  1,0000 m3 Test benda uji silinder dan core drill beton @ Rp.   19.563,00 Rp
Rp.   19.563,00
Jumlah Rp.   1.485.315,25
1 m2   445.594,58
PEMBULATAN Rp.   445.594,00

5 1 M2 FI
FINI
NISHI
SHING
NG & GR
GROO
OOVI
VING
NG :
  0,0100 Org Mandor @ Rp.   150.000,00 Rp
R p.   1.500,00
  0,0400 Org Tukang batu @ Rp.   125.000,00 Rp
R p.   5.000,00
  0,0200 Org Pekerja @ Rp.   90.000,00 Rp
R p.   1.800,00
  1,0000 m2 Alat bantu @ Rp.   750,00 Rp
R p.   750,00
Jumlah Rp.   9.050,00
PEMBULATAN Rp.   9.050,00

PEKERJAAN COR RIGID K-400 = Rp 782.398,00 /M2