This document is a drawing from Bharat Heavy Electricals Ltd. providing boiler turbine start up curves for the 2 x 500 MW steam generator with ESP package for NTPC Tamilnadu Energy Company Ltd.'s Vallur Thermal Power Project. The drawing shows 4 pages of start up curves for the combined boiler turbine system and contains approval signatures from various departments at Bharat Heavy Electricals Ltd. and NTPC Tamilnadu Energy Company Ltd.
Sizing, Design, and Installation of An Isolated Wind-Photovoltaic Hybrid Power System With Battery Storage For Laboratory General Illumination in Afyonkarahisar, Turkey
This document is a drawing from Bharat Heavy Electricals Ltd. providing boiler turbine start up curves for the 2 x 500 MW steam generator with ESP package for NTPC Tamilnadu Energy Company Ltd.'s Vallur Thermal Power Project. The drawing shows 4 pages of start up curves for the combined boiler turbine system and contains approval signatures from various departments at Bharat Heavy Electricals Ltd. and NTPC Tamilnadu Energy Company Ltd.
This document is a drawing from Bharat Heavy Electricals Ltd. providing boiler turbine start up curves for the 2 x 500 MW steam generator with ESP package for NTPC Tamilnadu Energy Company Ltd.'s Vallur Thermal Power Project. The drawing shows 4 pages of start up curves for the combined boiler turbine system and contains approval signatures from various departments at Bharat Heavy Electricals Ltd. and NTPC Tamilnadu Energy Company Ltd.
This document is a drawing from Bharat Heavy Electricals Ltd. providing boiler turbine start up curves for the 2 x 500 MW steam generator with ESP package for NTPC Tamilnadu Energy Company Ltd.'s Vallur Thermal Power Project. The drawing shows 4 pages of start up curves for the combined boiler turbine system and contains approval signatures from various departments at Bharat Heavy Electricals Ltd. and NTPC Tamilnadu Energy Company Ltd.
STATUS: CONTRACT VALLUR THERMAL POWER PROJECT DISTRIBUTION 2 x 500 MW STEAM GENERATOR WITH ESP PACKGE TO Dept Name Sign Date Code No. of BHARAT HEAVY ELECTRICALS LTD. DRN SR -Sd- 25.02.11 REV. Date ALTD CHD APPD UNIT : HIGH PRESSURE BOILER PLANT DESN JLJ/AVR -Sd- 25.02.11 TIRUCHIRAPPALLI – 620 014 CHD MA -Sd- 25.02.11 APPD MA/SCS -Sd- 25.02.11 TITLE: COMBINED BOILER TURBINE START UP CURVES DEPT. SCALE DRAWING NO. SIGN. DATE. SHEET 1 OF 4 REV 00Signature CAUTION: NotFOR THIS DRAWING IS THE PROPERTY OF BHARAT HEAVY ELECTRICALS LTD., AND IS NOT TO BE REPRODUCED OR USED TO FURNISH ANY INFORMATION Verified MAKING OF DRAWINGS OR APPARATUS EXCEPT WHERE PROVIDE FOR AGREEMENT WITH SAID COMPANY. Digitally signed by G K Halder Date: 2011.03.10 17:05:26 IST Reason: CAT IV Location: NTPCEOC
Sizing, Design, and Installation of An Isolated Wind-Photovoltaic Hybrid Power System With Battery Storage For Laboratory General Illumination in Afyonkarahisar, Turkey