0260-101-01-TR-PVM-U-021-00 Boiler Startup Curves

You might also like

Download as pdf or txt
Download as pdf or txt
You are on page 1of 4

NTPC Drg No:0260-101-01-TR-PVM-U-021

JOB NO : NTPC TAMILNADU ENERGY COMPANY LTD.


STATUS: CONTRACT
VALLUR THERMAL POWER PROJECT
DISTRIBUTION
2 x 500 MW
STEAM GENERATOR WITH ESP PACKGE
TO Dept Name Sign Date
Code
No. of BHARAT HEAVY ELECTRICALS LTD. DRN SR -Sd- 25.02.11
REV. Date ALTD CHD APPD UNIT : HIGH PRESSURE BOILER PLANT DESN JLJ/AVR -Sd- 25.02.11
TIRUCHIRAPPALLI – 620 014 CHD MA -Sd- 25.02.11
APPD MA/SCS -Sd- 25.02.11
TITLE:
COMBINED BOILER TURBINE START UP CURVES
DEPT. SCALE DRAWING NO.
SIGN.
DATE. SHEET 1 OF 4 REV 00Signature
CAUTION: NotFOR
THIS DRAWING IS THE PROPERTY OF BHARAT HEAVY ELECTRICALS LTD., AND IS NOT TO BE REPRODUCED OR USED TO FURNISH ANY INFORMATION Verified
MAKING OF DRAWINGS OR APPARATUS EXCEPT WHERE PROVIDE FOR AGREEMENT WITH SAID COMPANY.
Digitally signed by G
K Halder
Date: 2011.03.10
17:05:26 IST
Reason: CAT IV
Location: NTPCEOC

You might also like