Saudi Aramco Inspection Checklist
Saudi Aramco Inspection Checklist
EQUIPMENT ID NUMBER(S) EQUIPMENT DESCRIPTION EQPT CODE SYSTEM ID. PLANT NO.
LAYOUT DRAWING NUMBER REV. NO. PURCHASE ORDER NUMBER EC / PMCC / MCC NO.
SCHEDULED INSPECTION DATE & TIME ACTUAL INSPECTION DATE & TIME QUANTITY INSP. MH's SPENT TRAVEL TIME
SAUDI ARAMCO USE ONLY
SAUDI ARAMCO TIP NUMBER SAUDI ARAMCO ACTIVITY NUMBER WORK PERMIT REQUIRED?
ITEM
ACCEPTANCE CRITERIA REFERENCE PASS FAIL N/A RE-INSP DATE
No.
A General Requirements
All column base plates have a minimum of four anchor bolts. SAES-M-001, sect
A4
Note: This excludes posts that weigh less than 300 lbs/136 kg. 7.1.9(a)
The top of bearing surfaces and the bottom of base plates shall be cleaned
12-SAMSS-008
A8 and shall set the shim column base plates to correct positions elevation and
Sec. 1
locations as showm on erection drawings. (PIP STS05130, Para. 6.4.1)
Thread length and bolt projection of anchor bolt comformed with the
dimensions indicated in Std. Dwg-AA-036322, Rev 08. SAES-Q-005,
B2
(Note: Actual projection length should allow for complete thread Para. 4.8.1
engagement after considering the thickness of grout & baseplate.)
Equipment IFC
B3 Number of bolts matches the number holes on the equipment /structure.
Drawing
Anchor bolt spacing and bolt circle diameter matched the actual bolt holes Equipment IFC
B4
of the equipment/structure base plate. Drawing
Minimum clear distance from anchor bolts or anchor bolt sleeves to edge of
SAES-Q-005
B5 concrete shall be 100 mm. Metallic sleeves are not allowed and anchor
Para 4.8.8
bolts shall not be in contact with reinforcing steel.
Variation in dimensions between the centers of any two anchor bolts within
an anchor bolt group shall be equal to or less than 1/8" (3mm). (AISC Code 12-SAMSS-008,
B6
of Standard Practice for Steel Buildings and Bridges, Para. 7.5.1a and PIP Sec. I
STS05130, Para. 6.2.1)
Page 1 of 14
QR NUMBER
CONTRACTOR / SUBCONTRACTOR
PLANT NO.
TRAVEL TIME
SAUDI ARAMCO USE ONLY
WORK PERMIT REQUIRED?
RE-INSP DATE
Page 2 of 14
SAUDI ARAMCO ID/PID - 18-MAY-05 - REV 0 (Standards Cutoff - March 2012) Rev 6 31-Mar-12
ITEM
ACCEPTANCE CRITERIA REFERENCE PASS FAIL N/A RE-INSP DATE
No.
C EVALUATE ANCHOR & TEMPLATE CONDITION AFTER CONCRETE PLACEMENT (PROCEDURE ITEM ... CPI REQUIREMENT)
REMARKS:
' Support foundation is released for structural or equipment installation
' Support foundation is not released for structural or equipment installation.
ATTACHMENTS: 12-SAMSS-007, Attachment 1 - ASTM A780 Repair of Damaged & Uncoated Areas on Hot-Dip Galvanized Coatings
NOTES: Use the Attachment for any Galvanized repairs
1. PERFORM ANY REQUIRED GALVANIZED COATING REPAIRS BEFORE INSTALLATION PER SAIC-M-2004 ATTACHMENT PROCEDURE.
2. THREAD DAMAGE (MASHED THREADS, ETC) IS CAREFULLY REPAIRED (MINIMIZE GALVANIZE REMOVAL) USING A KNIFE EDGE FILE.
3. NUTS SPIN FREELY & PROPERLY AFTER REPAIRS. PERFORM "COLD" COATING REPAIR OF REPAIRED THREADS. CURE. NUT TEST.
REFERENCE DOCUMENTS:
1- SAES-M-001 -- Structural Design Criteria for Non-Building Structures,19 December 2010
2- SAES-Q-001 -- Criteria for Design and Construction of Concrete Structures, 15 May 2010
3- SAES-Q-005 -- Concrete Foundations, 28 June 2009
4- PIP STS03600 -- Nonshrink Cementitious Grout Specification, June 2002
5- PIP STS03601 -- Epoxy Grout Specification, October 2001
6-12-SAMSS-008 -- Erection of Structural and Miscellaneous Steel, 09 May 2011
7- PIP STS05130 -- Erection of Structural and Miscellaneous Steel Specification, February 2002
8- AISC -- Code of Standard Practice for Steel Buildings and Bridges, 7 March 2000
9- IFC Drawings (Plan Drawings and Structural or Equipment drawings)
Page 3 of 14
QR NUMBER
CONTRACTOR / SUBCONTRACTOR
RE-INSP DATE
quipment installation
or equipment installation.
June 2002
Saudi Aramco
PMT Representative
Work Verified
PID Representative
Work Verified
Y = YES N = NO F = FAILED
Page 4 of 14
SAUDI ARAMCO ID/PID - 18-MAY-05 - REV 0 (Standards Cutoff - March 2012) Rev 6 31-Mar-12
Page 5 of 14
SAUDI ARAMCO ID/PID - 18-MAY-05 - REV 0 (Standards Cutoff - March 2012) Rev 6 31-Mar-12
Page 6 of 14
SAUDI ARAMCO ID/PID - 18-MAY-05 - REV 0 (Standards Cutoff - March 2012) Rev 6 31-Mar-12
Metallizing Method (Hot Repair for difficult access by flame spray) ... Use Final Zinc Rich Coating layer.
Page 7 of 14
SAUDI ARAMCO ID/PID - 18-MAY-05 - REV 0 (Standards Cutoff - March 2012) Rev 6 31-Mar-12
Page 8 of 14
SAUDI ARAMCO ID/PID - 18-MAY-05 - REV 0 (Standards Cutoff - March 2012) Rev 6 31-Mar-12
Page 9 of 14
QR NUMBER
Page 10 of 14
QR NUMBER
Page 11 of 14
QR NUMBER
access by flame spray) ... Use Final Zinc Rich Coating layer.
Page 12 of 14
QR NUMBER
Page 13 of 14
QR NUMBER
Page 14 of 14