PROJECT : CARPARK SLAB


SITE : PERMATANG PAUH, PENANG
STRUCTURE : FLOOR SLAB
DEVELOPER : ANAS CONSTRUCTION SDN BHD
MESH TYPE : STANDARD SHEET (2.2m x 6.0m)
CONTRACTOR :
QUOATION NO : QUO000C50
DATE : 24 NOV 2021

PRICE (RM) / TOTAL AMOUNT


PIECES UNIT TOTAL PCS
STRUCTURE MESH PIECES (RM)
(b) (c') (d) = (b) x (c')
(a) (e') = (a) x (d)

FLOOR SLAB

A6 82.48 214.30 1 214 17,675.46


LEVEL GROUND (TOP AND BOTTOM) A8 141.86 208.70 1 209 29,606.18
A9 179.95 49.24 1 49 8,860.74
A10 221.82 31.11 1 31 6,900.82

A6 82.48 424.20 1 424 34,988.02


LEVEL FIRST (TOP AND BOTTOM) A7 108.53 7.64 1 8 829.17
A8 141.86 52.00 1 52 7,376.72

A6 82.48 408.13 1 408 33,662.56


LEVEL 2-6 (TOP AND BOTTOM) A7 108.53 7.64 1 8 829.17
A8 141.86 5.75 1 6 815.70

TRANSPORTATION 2200 4 8,800.00

Subtotal 150,344.54

TERMS AND CONDITIONS


1) This price quoted including transportation WITHOUT wastages
2) Payment term: 60 days
2) Cash Payment: 3% Discount
3) All cheques should be crossed A/C payee only “NOT NEGOTIABLE"
made payment to:
CRT Manufacturing Sdn Bhd (Hong Leong Bank Berhad: 35600087507)
4) This quotation quantity is MoQ inclusive logistic
5) Price validity : 2 weeks from date of quotation
6) CRTM shall not be liable for any cost/quantity dispute at any time.
7) The quantity is for reference and shall be checked and verified by both parties
8) The user should estimate necessary wastages in the usage
9) The company reserves the right to charge interest on overdue account.