Electrical Design & Implementation Engineer CV Word

You might also like

Download as pdf or txt
Download as pdf or txt
You are on page 1of 6

Ars alan Ali Khan

Al Mursalat Riyadh.
Cell: +966.509321798.
E-mail: Akhan.309@gmail.com
PROFILE
A self-motivated and highly enthusiastic individual. Able to work on own initiative & as
a part of a team. Expertise in problem solving and achieving goals. Dedicated at
Maintaining high quality standards.

Objectives:
I am looking for challenging opportunities in a growing organization, Especially in Electronics and Power
to utilize my skills to enhance self-Growth

Professional Summary:-

Position Organization Tenure

1.Sr Electrical Engineer Ericsson AB Company Nov 2019 to Present


2.EM Engineer Huawei Investment Tech May 2019 to Nov 2019
3.Project Engineer Nokia Siemens Network March 2017 to April 2019
4.Electrical Engineer Awnas Contracting Co January 2016 to Dec 2016
5.Electrical Engineer Fenda holding company January 2015 to Dec 2015
6.Assistant Manager Union Board Mills Nov-2013 to Nov-2014
7.Resident Engineer Inbox business Technology Feb-2013 to oct-2013

Experience Details: Sr Electrical Engineer

Key Responsibilities:
Review project scope of work and specifications Single Line Diagrams, Load Schedules, Calculations,
Schematics and Layouts for Electrical and Mechanical.

 Co-ordinate with client Team leads for daily Site assignments and updates
 Co-ordinate with internal field teams for their mobilization, Quality checks, Data Collections,
Report Review
 Record Keeping of all Site Documentations, Site Folder Preparation, and uploading of data in
Customer online tools
 Take complete responsibility for assigned project from delivery standpoint to ensure zero
escalation delivery to clients.
 Update internal management with daily Progress and week and monthly reporting structure
 Guide and Train Contractor teams Technically on quality Installation Standards and Practice
 New Sites: (STC) which include the following items:
 Electrical Design in review FDEDs for most of Green field, Roof Top, Sites.
 Review the DC Power Analysis to calculate the required DC Power Units. ( Rectifiers and
Battery Strings)

 Review of the new electrical power supply of a new equipment


 Buildings and analysis of electrical power distribution (feeder cable and breakers) for new Ericsson
ODU.
 Review the design of the grounding system of the new equipment room and roof top sites ,
 Review the Bill of Quantity (BOQ) and implementation according to approved BOQ.
 Review the DC Power Analysis to check the existing DC Power System.
 Review the required electrical reports and drawings as built for the grounding and electrical
requirements at the site during handover phase.
 Involved in different projects with different contractors.
 Such as:
 STC Projects: Aspiration and 5G
 TAWAL : Aspiration and 5G
 Vendors: Ericsson

Experience Details: Electromechanical Engineer


Key Responsibilities:
Implemented 6 sites ISP and install new model for HUAWEI Shelter.

 Setup the project plans & process in order to achieve the projects objective
 Implementation Solution in order to support company’s
 Assure the Quality & Safety measures being implemented and followed.
 Monitoring Site Acceptance and Snag clearances
 Staging Overseeing quality control and health and safety matters on site.
 Take complete responsibility for assigned project from delivery standpoint to ensure zero
escalation delivery to clients.
 Update internal management with daily Progress and week and monthly reporting structure
 Guide and Train internal teams technically on quality Installation Standards and Practice.
 PAT procedure and progress reporting with the integrated sites.
 New Sites: (MOI) which include the following items:
 Electrical Design in review FDEDs for most of Mobile Sites.
Implementing the design of the new electrical power supply of a new equipment
(Rectifiers, Battery Strings, UPS, Genset, and Civil Works)
 Supervising the design of the grounding system of the new equipment room and roof top sites ,
 Review the Bill of Quantity (BOQ) and implementation according to approved BOQ.
 Preparing the required electrical reports and drawings as built for the grounding and electrical
requirements at the site duringhandover phase.
 Buildings and analysis of electrical power distribution (feeder cable and breakers) for new MOI
Equipment shelter.
 Supervise the site activity including equipment installation with commissioning.
 Managing the team of technician and site discussions and follow up closely for implementation as per
design.
 Involved in different projects in HUAWEI
 Such as:
 Ministry of Interior Projects: MIFON
Experience Details: Project Engineer

Key Responsibilities:

More than 30+ Projects done with perfect quality and soft PAT results.
NOKIA Western on IBS Installations and handovers.

 Co-ordinate with client Team leads for daily Site assignments and updates
 Equipment professional user.
- ABB equipment full knowledge.
- MDB HVAC Panels Rectifier CAB Full knowledge.
 Monitoring Site Acceptance including Hand Over
 Responsible for complete site installation end to end including Civil Works
 Take complete responsibility for assigned project from delivery standpoint to ensure zero
escalation delivery to clients.
 Responsible for procure the material based on the approved BOQ
 Guide and Train internal teams Technically on quality Installation Standards and Practice
 New Sites which include the following items:
 Electrical Design in review PCD
Preparing technical specifications for equipment used in IBS designs.
Responsible for requirements gathering and site survey properly.
Prepare all project plans considering time, quality and cost of each step of the project.

 ( Rectifiers and Battery Strings)


 Implementing the design of the new electrical power supply of a new equipment
 Buildings and analysis of electrical power distribution (feeder cable and breakers) for new STC
Equipment Room ( IBS)
 Supervising the design of the grounding system of the new equipment shelter.
 Review the Bill of Quantity (BOQ) and implementation according to approved BOQ.
 Link power budget calculation and bill of quantity arrangement.
 Preparing the required electrical reports and drawings as built for the grounding and electrical
requirements at the site duringhandover phase.
 Responsible to success of project execution, satisfaction of customers, and meeting
target
Managing the team of technician and site discussions and follow up closely for implementation as
per design.
 Involved in different projects with different contractors and vendors.
 Such as:
 STC Sites.
Vendors: Nokia Solution Networks
Experience Details: Electrical Engineer

Key Responsibilities:
Prepare technical matters of a job from the preliminary design upon the preparation of as-manufactured
product.
Review project scope of work and specifications.
 Preparation of Single Line Diagrams, Load Schedules, Calculations, Schematics and Layouts for
Electrical Design in preparing FDEDs for most of Mobile Sites
 New Sites: (Greenfield Sites & Rooftop Sites) which include the following items:
 Preparing the DC Power Analysis to calculate the required DC Power Units
 ( Rectifiers and Battery Strings)
 Preparing the design of the new electrical power supply of a new equipment
 Shelter and analysis of electrical power distribution (feeder cable and breakers) for new GSM shelter.
 Preparing the design of the grounding system of the new equipment shelter,
 new cable gantry in Greenfield sites and new cable tray in Rooftop sites,
 Grounding and lightning protection of the new tower.
 Finalizing the Bill Of Quantity (BOQ)
 Expansion Sites: (Greenfield Sites & Rooftop Sites for both equipment shelters and exchange
Buildings) which include the following items:
 Preparing the DC Power Analysis to check the existing DC Power System.
 Preparing the required electrical reports and drawings for the grounding and electrical requirements at
the site.
 Managing the electrical surveyors and AutoCAD draftsmen.
 Involved in different projects with different contractors and vendors.
 Such as:
 STC Projects: GSM
Vendors: WI connect, Ericsson, Huawei, and Nokia.

Experience Details: Electrical Engineer

Key Responsibilities:
Prepare technical matters of a job from the preliminary design upon the preparation of as-manufactured
product.
Review project scope of work and specifications.
 Preparation of Single Line Diagrams, Load Schedules, Calculations, Schematics and Layouts for
Electrical Design in preparing FDEDs for most of Mobile Sites
 New Sites: (Greenfield Sites & Rooftop Sites) which include the following items:
 Preparing the DC Power Analysis to calculate the required DC Power Units
 ( Rectifiers and Battery Strings)
 Preparing the design of the new electrical power supply of a new equipment
 Shelter and analysis of electrical power distribution (feeder cable and breakers) for new GSM shelter.
 Preparing the design of the grounding system of the new equipment shelter,
 new cable gantry in Greenfield sites and new cable tray in Rooftop sites,
 Grounding and lightning protection of the new tower.
 Finalizing the Bill Of Quantity (BOQ)
 Expansion Sites: (Greenfield Sites & Rooftop Sites for both equipment shelters and exchange
Buildings) which include the following items:
 Preparing the DC Power Analysis to check the existing DC Power System.
 Preparing the required electrical reports and drawings for the grounding and electrical requirements at
the site.
 Managing the electrical surveyors and AutoCAD draftsmen.
 Involved in different projects with different contractors and vendors.
 Such as:
 STC Projects: GSM
Vendors: Ericsson, Nokia, Siemens, Huawei and ZTE.

Experience Details: - Assistant Manager

Key Responsibilities:
Worked in Paper industry as an Assistant Manager and Electrical Engineer with responsibilities of:-
• Calculating required power and load for Mains Distribution Panels, breakers and Motor ratings.
• Locating fault and troubleshooting the fault in shortest time possible
• Installation and Commissioning of machineries such as: - Rollers, synthesizers and pulp extraction
machinery.
• Managing all tasks and issues related to Civil Department, Security Department, Sales Department
& Electrical Department during the Erection process of the mill that includes the purchasing of the
machines and hiring external contractors.
• To keep up to date the cash flow of the industry on Excel including payments.
• Aware of single line riser diagram for medium voltage, low voltage, layout of cable routing, Panel
board schedule drawings, Builders work drawings and their implementation of motors &generators
&ups installation and commissioning.
• Single line riser diagram for Low current system such as Fire Alarm, security system & CCTV
Implement and maintain the safety system in accordance with company safety policy and manual.

• Experience: - Resident Engineer

Key Responsibilities:
I have worked as a resident engineer in Inbox Business Technologies My work is to Deal with all
software and hardware problems which suddenly occurs on Station. We have to troubleshoot all
problems as a team as quickly as we could. Trouble shooting in network infrastructure for transportation
facilities. Which included working with:-

Devices which we used in this projects are:


• PDA
• OBU
• TVMs
• Turnstiles
• Validators
• Mother Boards
Trouble shooting in network infrastructure for transportation facilities. Which included working with:-

1) Responsible for
2) Electrical maintenance as well as mechanical.
3) Electricity issues solve on station manage the electrical devices
4) Maintenance in mechanical instrument
5) Circuit breaker wiring and switching system in devices
6) Networking protocols to keep surveillance of all the switches and router status (CISCO).
7) Configuration of Zexel.
8) PTCL BIB configuration for network access points.
9) Monitoring the online tracking system of all the devices on KENTKART
Miscellaneous:

Knowledge of:
Power Systems, Analysis, Protection & Plants, Mechanical, Electrical & Power Labs Equipment’s
Converter & Inverter, Electronic Devices and Circuits ,Digital Clock using PWM, Digital System
Design CDMA Technique in Matlab, Analysis with AWGN in CDMA, AutoCAD, Diagrammatic
Electrical and Mechanical Engineering Solutions, Designed a Library Management Program, C/C++
Distance Measurement using Ultrasonic Sensors, Instrumentation & Measurement Tap Changer,
Power Electronics, Electronic Voting Machine and Embedded System Design

Academics:

2008-2012 B-SC (Hons) Electronics & Communication Engineering


The Department of Electrical Engineering Specialized Electives in Power
Thoroughly studied Micro-Electronics and Power Electronics
The University of Lahore, Lahore.
2006-2008 F-SC Pre Engineering
Government Islamia College, Lahore
2006 Matriculation (Science)
Green Land High School, Lahore
Final Project:
An Intelligent GSM Router

Skills:

Languages: English -Fluent


Urdu -Native
Professional: Diploma in human resource management

Area of interest Project designing and Implementation.

Computer: Software: Microsoft Office, Matlab, Simulink’s, Network Simulator, Keil,


Proteus, Microsoft Visual Studio, Schematic, Eagle, PCB Designer, Cygwin
AutoCAD, PSpice and Multisim
Programming: C/C++, VHDL, Assembly, HTML, Iframe, PHP (Beginner),
NS-2,
Operating System: Windows XP, Windows 7, Mac, Linux, Ubuntu Graphical
User Interface
Additional Skills: PhotoScape, Adobe Photoshop, Corel Draw, Video Editing,
Microsoft Visio,

Reference can be provided upon request

You might also like