LEGEND & ABBREVIATIONS:

ACCESS DOOR
-500mm(H) x 500mm(V) IN TUBE WALLS AND ECO. CASING(28 Nos.)
-610mm(H) x 762mm(V) IN FURNACE HOPPER(2 Nos.)
-500mm(H) x 450mm(V) IN DUCTS.

610mm x 610mm ACCESS DOOR IN SIDE /TOP OF ROOF ENCLOSURE.(10 Nos.)

OBSERVATION DOOR
- 90mm x 160mm IN BURNER ZONE(16 Nos.)
- 100mm x 300mm OTHER LOCATION(43 Nos.)

WALL BLOWER, 62 Nos. (F: FUTURE, NO BENT TUBE, 56 Nos.)

RETRACTABLE SOOTBLOWER-DOUBLE SIDE, 52 Nos. (F: FUTURE, NO BENT TUBE, 20 Nos.)

FURNACE TEMPERATURE PROBE(2 Nos.)


E12 FURNACE AND FLAME VIEWING CAMERA (CCTV, 4 Nos.)

ACOUSTIC PYROMETER FOR FURNACE TEMP. MONITRING (FTMS, 16 Nos.)

"08" "08" ACOUSTIC STEAM LEAK DETECTOR LOCATION(30 Nos.)

E ELEVATOR STOPS

MS, ID305 MS, ID305


DAMPER

EXPANSION JOINT
E11

HR, ID630 HR, ID630 INSTRUMENT INSERT LOCATION


PP : PRESSURE TEST POINT TT/TE : TEMPERATURE TRANSMITTER
PT : PRESSURE TRANSMITTER TI : TEMPERATURE INDICATOR
: TEST POINT(PRE/TEMP)
"07" "07" PI
PDT
: PRESSURE INDICATOR
: PRESSURE DIFF.TRANS
TP
AT : ANALYZER TRANSMITTER
PDI : PRESSURE DIFF.INDICATOR AP : ANALYZER TEST POINT
DUST DUST FT : FLOW TRANSMITTER
COLLECTOR COLLECTOR
T.O.P. : TOP OF PLATFORM (GRATING OR CHK'D PLATE)
T.O.S. : TOP OF STEEL B.O.S. : BOTTOM OF STEEL
T.O.C. : TOP OF CONCRETE F.O.F. : FACE OF FLANGE
C.O.P. : CENTER OF PIPE T.O.G. : TOP OF GROUT
E10
B.L. : BEND LINE LS/RS : LEFT SIDE/RIGHT SIDE
BS : BOTH SIDES FS/NS : FAR SIDE/NEAR SIDE
FR/RR : FRONT SIDE/REAR SIDE

E9 COAL C
COAL
TRIPPER ROOM TRIPPER ROOM

"06" "06"
F F F F F F

HR MS MS HR

F F

E8
COAL COAL
BUNKER CR, ID675
F F
BUNKER

K1 K2 K3 K4 K5 K6

E7
CR CR

"05" E6 G1 G2 G3 G4 "05"

E5 E1 E2 E3 E4

E4 FW C1 C2 C3 C4

1TON 1TON

제 인 조 대 리

JO J. I. 보일러Lay-out팀

COAL COAL
대 리 조 인 제
보일러Lay-out팀 I. J. JO

E3 FEEDER A1 A2 A3 A4 FEEDER

"04" "04"

E2
G.A
I.J

BOTTOM ASH HOPPER

Digitally signed
Signature Not UTTAR PRADESH RAJYA VIDYUT
by MVerified
S RAMESH
Date: 2018.08.06 UTPADAN NIGAM LIMITED
11:09:45 IST
"03" "03" Reason: CAT I
Location:
(A UP GOVERNMENT UNDERTAKING)
NTPCEOC
E1 EL.-200
TRUCK
EL.00 EL.-200 EL.00
TRUCK
EL.-200 DEVELOPMENT CONSULTANTS
PRIVATE LIMITED, KOLKATA
MILLS MILLS
DOOSAN POWER SYSTEMS
INDIA PVT. LTD

OBRA'C' 2x660 MW THERMAL POWER


EXTENSION PROJECT

BOILER FRONT ELEV. VIEW "09-09"


NTPC COMMENTS RESPONSE SHEET

Project: OBRA C 2 x 660 MW THERMAL POWER EXTENSION PROJECT

Contractor DOOSAN POWER SYSTEMS INDIA, Gurgaon

Owner UTTAR PRADESH RAJYA VIDYUT UTPADAN NIGAM LIMITED, Lucknow

Owner's Consultant DEVELOPMENT CONSULTANTS PRIVATE LIMITED, Kolkata

Review Engineering Consultant NATIONAL THERMAL POWER CORPORATION, Noida

DPSI Correspondence No. DP16004-UC08-10ZEN-320004 Date:


NTPC Doc No. 9878-UC08-10ZEN-320004 Date: 2018-07-03

Document / Drawing Number Document / Drawing Title Revision Assigned Approval Category*
BOILER GENERAL ARRANGEMENT
DP16004-UC08-10ZEN-320004 04 II
BOILER FRONT ELEV. VIEW "09-09"

No. NTPC Comment DPSI Response NTPC Resolution


General Comment
1 PE Mech SG Comment : Noted.
1.0 Subjected to the approval of the document Each document has been submitted for approval, and some have already been
a) Mill GA and foundation drawing approved.
b) various Tank sizing In addition, the information for the Boiler GA design has already been confirmed,
c) Various Pump sizing and in case of any change in related information, this drawing will also be indicate
d) APH sizing as per final information.
e) SCAPH sizing. Therefore we request approval of this drawing.
Drawing Comment
1 No comment
Response sheet Comment
1 No comment

* NTPC Approval Categories:


1 = Approved
2 = Approved, subject to incorporation of comments /modifications as noted. Resubmit revised drawing / documents after incorporation for final approval.
3 = Not Approved. Resubmit revised drawing/ documents after incorporation of comments for approval