Lasting power with the incredible 10 MW range Jenbacher gas engine

Lasting power with


the incredible 10 MW
range Jenbacher gas engine
A RANGE OF INNOVATIVE SOLUTIONS INNOVATIVE DESIGN FOR EASE,
LEADING TO THE J920 FLEXTRA GAS ENGINE INSTALLATION, AND MAINTAINABILITY

2013 2018
2007

INNIO’s J920 FleXtra gas engine is Power unit
Introduction of Transition to
World’s 1st 24-cylinder J920 FleXtra gas a stand-alone offering outstanding electrical efficiency The J920 FleXtra power unit helps to
1985

4 MW engine, the J624 engine entering energy company and is designed for durability, simple ensure low downtime, as it is easily
the large gas rebranded as Generator Engine Turbocharger
1st Jenbacher* installation, and maintainability. The replaced without major disassembly
engine space
LEANOX* gas engine
2010
and demon- genset consists of three modules – a of the engine.
1957
World’s 1st strating highest
electrical
generator, engine, and turbocharger
1st Jenbacher* 2-stage
efficiency module – that provides a high-quality, Cylinder head
gas engine Jenbacher*
in its class
Divided camshaft
gas engine pre-fabricated, standardized module.
The J920 FleXtra is equipped with a
Each module is factory-tested, then Water jacket
segmented camshaft, allowing easy
shipped separately and plugged
exchange through a maintenance
Liner
together on side, offering reduced
window at the top of the crankcase.
installation time. In addition, the modules Piston
have highly standardized interfaces that
work well with the balance of plant (BoP) Coupling Con rod

systems, and ultimately simplify BoP With the modular engine design,
1997
2015 decoupling the units is a simple process.
installations and total plant construction
Introduction of the J620, the Hansewerk Natur (Stapelfeld) Major engine parts stay in place and are Power unit
1979
world‘s smallest 20-cylinder gas achieves >96% total
time. To increase plant availability,
1st Jenbacher* engine in the 3 MW power range efficiency milestone INNIO’s J920 FleXtra gas engine is easily accessible.
cogeneration designed for smooth operation and
module
2020
maintainability.
Stadtwerke Kiel
20 units J920
with >91% total
efficiency

MAKE THE MOST OUT OF ENERGY SOURCES


goes live

LASTING POWER WITH LESS FUEL


CONSUMPTION AND CO2 EMISSIONS Combustion 2-stage turbocharging Engine management system

Based on the extensive experience of The 2-stage turbocharger design The J920 FleXtra is equipped with INNIO’s
Whether you’re seeking full power at high-efficiency levels or a unit capable of short start-up times, INNIO’s J920 FleXtra gas engine INNIO’s Type 6 gas engine combustion enables improved miller technology well-proven comprehensive Jenbacher
is your ideal solution for reliable lasting power and grid stabilization with a lower carbon footprint. system, the J920 FleXtra unit is equipped and high-power density. Compared gas engine management system with
with an advanced pre-chamber to single-stage turbocharging, INNIO’s a programmable logic unit, handling
combustion system with spark ignition 2-stage turbocharging technology allows engine and plant controls as well as
and advanced conditions for longer part higher cooling water temperatures, visualization. To allow for smooth plant
life. In addition, the individual gas mixing making it an ideal fit for independent operation, the system specifically

J920 FLEXTRA – CUSTOMER BENEFITS: achieved by port injection in combination


with cylinderspecific sensors allows each
power production projects in hot ambient
conditions. Combined heat and power
supports adaptive condition-based
controls, individual cylinder balancing,
cylinder to be controlled to operate at (CHP) applications benefit from the optimization and protection of core
• Excellent electrical efficiency • Quick startup for grid stabilization • Lower water usage optimized performance. The J920 FleXtra use of charge air cooling heat at high controls, and limp homemode. Designed
of up to 48.7 % and a total efficiency mechanical structure is designed to allow temperatures. No deration at higher as part of the entire module system, with
• Fast and easy installation • Designed for high reliability, renewable
of up to 94% (CHP version) high-peak firing pressure. In combination altitudes is another advantage. all core competencies in-house, every
• Simple maintainability backup power, extended maintenance
with the latest miller technology and two- function is developed with a holistic point
• High power density at low intervals
• Full plant flexibility available with stage turbocharging, the J920 FleXtra of view.
investment costs
any multiple-engine installation engine can achieve an excellent
• Stable power output and reliable • Combined heat and power solution electrical efficiency of up to 48.7 % .
efficiency in any ambient condition with more than 90 percent efficiency

2 *Indicates a trademark ** Tolerance on fuel consumption according ISO 3046


REVOLUTIONARY THREE-MODULES CONCEPT

GENERATOR 20-CYLINDER POWER MODULE TURBOCHARGER MODULE


• Integrated module design and assembly • Up to 48.7 % electrical efficiency * • 2-stage turbocharging technology
• High-efficiency, air-cooled generator • High-power density • Increased efficiency
• Digital regulator unit • Easy maintenance power unit concept • No derating at high ambient
temperatures or altitudes

KEY PERFORMANCE DATA CHP VERSION INSTALLED DIMENSIONS

Performance Data CHP+ Version* J920 FleXtra (50Hz / 1,000 rpm) Length Width Height Weight

Electrical output 10,400 kW Engine 8.4 m 3.0 m 3.5 m 91 t

Electrical efficiency 48.7 % Generator 4.0 m 3.0 m 3.2 m 45 t

7,393 kJ/kWh TC Module 3.2 m 3.8 m 5.8 m 30 t


Heat rate
7,007 BTU/kWhe

Thermal output 9,620+ kWth

Total efficiency ~ 94 %

Output and efficiency at generator terminals, ISO 3046 with 5% tolerance for energy input, Natural Gas MN >80,
Power Factor 1.0, 500 mg/Nm3 (@ 5 % O2) all Efficiency at LHV

* CHP+ Version (C101) dedicated engine version for max. total efficiency @ 70/90°C water circuit, full recovery of low temperature intercooler other versions on request

4
KIEL, GER
SW Kiel

SOLVING MORE THAN J920 FLEXTRA CHP & Peaking


20 Units
STAPELFELD, GER
CHP & Peaking
SIMPLE ELECTRICITY NEEDS REFERENCES MERHEIM, GER
CHP & Peaking
1 Unit

3 Units

INNIO’s J920 FleXtra gas engine is SAARBRÜCKEN, GER** GERMANY


engineered to support a broad variety CHP & Peaking
COTTBUS, GER**
of multiple-engine power plant 5 Units
CHP & Peaking
solutions – from remote power supply
5 Units
to combined heat and power (CHP)
generation.
PFORZHEIM, GER**
CHP & Peaking ROSENHEIM, GER
5 Units
ITALY SW Rosenheim
Powerhouse solutions CHP & Peaking
1 Unit
INNIO’s J920 FleXtra is specially adapted
to large gas engine power plants. It
offers a highly standardized powerhouse
plant concept with fast delivery times ULM, GER**
and low installation costs. While the CHP & Peaking
size of the plant, actual plant design, 2 Units
and layout depend on your specific USA
customer needs and site requirements,
CASSINO, ITA
the J920 FleXtra plant solution is 20 Jenbacher J920 FleXtra gas engines make up the heart of the coastal power plant, generating
Metaenergia
developed as a modular system with 190 megawatts of electrical power for the German city of Kiel. "Photo Copyright -Stadtwerke Kiel" ROMA, ITA Trigen
a minimal footprint. This design allows 2 Units
Acea
for seamless installation with any CHP district heating
multiple-engine configuration, and, 2 Units
therefore, offers flexible size options for a Reducing life-cycle costs
multiple 10 MW system at constant high and environmental impact HOUSTON, USA
electrical efficiency levels. Combining Created to achieve excellent electrical With more than 90 % overall efficiency Sky Global Partners
the multiple-engine concept with a efficiency levels, INNIO’s J920 FleXtra compared to the separate production Peaking Power
6 Units
5-minute engine start-up time provides solutions allow you to benefit from low of heat and electricity, a J920 FleXtra as
flexible power – from baseload to cyclic fuel consumption, operating costs, and a CHP solution achieves over the course
and peak operations. CO2 emissions. Operating a J920 FleXtra of a year1:
at 48.7 % electrical efficiency for 50 Hz or
• Over 130 millions kWh primary energy Operation Service benefits
has the capacity to produce more than Our contractual service agreements fleet of Jenbacher gas engines. • Longer lifetime service
Combined heat and power savings, equivalent to the energy
83 million kWh of electricity, enough to are designed to provide flexible, The myPlant 2.0 technology transmits
contained in more than 76,000 barrels • Advanced service design for
The simple use of jacket water heat and power over 20,000 European households
of oil advanced care for your plant during sensor data back to our enterprise
heat from oil and charge air coolers,
easier maintainability and
for a year. operation. Through our global service servers so that we can calculate your
combined with heat from the gas engine • Emission reduction of more than 7,800 shorter downtime
By offering a high electrical efficiency, network, you’ll have dedicated plant’s operational state, predict
exhaust makes CHP in combination with metric tons of CO2, equivalent to the • Easy access to consumable parts
the J920 FleXtra gas engine avoids: personnel who can help to ensure faults and analyze any issues. All
the J920 FleXtra gas engine a favorable CO2 emissions of over 4,100 cars on
predictable operating costs and risk maintenance work on your J920 • Remote Monitoring & Diagnostics
solution. When the heating water circle • The consumption of more than European roads
mitigation. INNIO’s online monitoring FleXtra gas engine system–including cut costs and boost equipment
is designed to include return water at 6.4 million kWh of natural gas
and diagnostic tool provides you upgrade, repair and overhauls– availability
70°C and hot water at 90°C or more a per year
with online access to your plant and is performed at your plant, saving
high total efficiency is achieved. The
• Sensors that monitor vital engine
• The emission of approximately 1,500 J920 FleXtra equipment. In addition, you time while updating your engine
2-stage turbocharging technology has
parts
metric tons of CO2 per year, equivalent myPlant* technology enables us to to the latest technology.
the ability to increase the total efficiency to the annual CO2 emissions of about • Excellent engine operations
monitor and control your global
for providing power and heat to more 800 cars on European roads through fleet comparison
than 90 % – about 3 % – 4 % points
better than that of a single-stage
turbocharging gas engine.

1
Compared to the separate production of heat by a natural gas-fired boiler and delivery of electricity on the EU grid **
going live soon
6
INNIO* is a leading solutions provider of gas engines, power equipment, a digital platform and related services for power generation
and gas compression at or near the point of use. With our Jenbacher* and Waukesha* product brands, INNIO pushes beyond the
possible and looks boldly toward tomorrow. Our diverse portfolio of reliable, economical and sustainable industrial gas engines
generates 200 kW to 10 MW of power for numerous industries globally. We can provide life cycle support to the more than 50,000
delivered gas engines worldwide. And, backed by our service network in more than 100 countries, INNIO connects with you locally
for rapid response to your service needs. Headquartered in Jenbach, Austria, the business also has primary operations in Welland,
Ontario, Canada, and Waukesha, Wisconsin, US.

Follow INNIO on Twitter and LinkedIn.

For more information, visit the company's website at www.innio.com


or contact your local representative:

AUSTRIA ITALY SINGAPORE


Achenseestraße 1-3 Via Staffali 1 Level 9, The Metropolis Tower 2
6200 Jenbach, Austria 37062 Dossobuono (VR) Italy 11 North Buona Vista Drive
T +43 5244 600 T +39 045 6760211 Singapore 138589
T +65 326 2014
CANADA LEBANON
200 Buchner Road Central Building, 1st floor SPAIN
Welland, Ontario, Canada L3B 5N4 Section 12, lot 2381 Josefa Valcarcel 26
T +1 289 932 3537 Dimitri Hayek Street Edificio Merrimack III
Sin El Fil - Horsh Tabet 28027 Madrid, Spain
CHINA T +34 91 587 05 00
No.1 Hua Tuo Rd. MEXICO
Zhangjiang Hi-Tech Park Antonio Dovali Jaime 70 USA
Shanghai 201203, China Piso 4, Torre B Westway Plaza,
T +86 21 38771888 Ciudad de Mexico 11330 Clay Road
CP 01210, Mexico Houston, TX 77041, USA
DENMARK T +1 713 408 6930
Samsøvej 31 NETHERLANDS
8382 Hinnerup, Denmark Kelvinring 58 1101 West St. Paul Avenue
T +45 86966 788 2952 BG Alblasserdam Waukesha, WI 53188-4999, USA
The Netherlands T +1 262 547 3311
GERMANY T +31 88 0019700
Carl-Benz-Str. 25
67227 Frankenthal, Germany RUSSIA
T +49 6233 5110 150 Presnenskaya Naberezhnaya 10A
1233112 Moscow, Russia
T +7 495 933 0187

TOMORROW BELONGS
TO THE BOLD.
I JB-120012-EN

Find your local support online:


© Copyright 2020 INNIO. Information provided is subject to change without notice.
www.innio.com/en/company/providers *Indicates a trademark

You might also like