Professional Documents
Culture Documents
Bridge Report 1
Bridge Report 1
Bridge Report 1
Page | 3
Detailed Design Consultancy Services for Sahnewal - Pilkhani Section of Bridge Inventory Report
Eastern Dedicated Freight Corridor (Package – 301)
Pilkhani 30.02060o N
Flow 77.43036o E Sahnewal
3m 3m 3m
0.65 m
0.5m
4.1 m
Double
Track 1.3 m
1m 4.1 m
PLAN
Photos
Page | 4
Detailed Design Consultancy Services for Sahnewal - Pilkhani Section of Bridge Inventory Report
Eastern Dedicated Freight Corridor (Package – 301)
Page | 5
Detailed Design Consultancy Services for Sahnewal - Pilkhani Section of Bridge Inventory Report
Eastern Dedicated Freight Corridor (Package – 301)
Page | 6
Detailed Design Consultancy Services for Sahnewal - Pilkhani Section of Bridge Inventory Report
Eastern Dedicated Freight Corridor (Package – 301)
Photos
Page | 7
Detailed Design Consultancy Services for Sahnewal - Pilkhani Section of Bridge Inventory Report
Eastern Dedicated Freight Corridor (Package – 301)
Underside of the Steel Girder Span Underside of the Concrete Girder Span
Page | 8