Checklist - Occupational Health and Safety
Checklist - Occupational Health and Safety
Checklist - Occupational Health and Safety
A B C D E F G H I
MP H&R – ME Template Date of Audit: Follow up
OBJECTIVES B. Occupational Health& Safety Done Recorder Rating Score Comments Yes No
1 Working with Electricity 50 0
2 Is there an identification procedure to authorize the hotel
employees to operate, maintain or repair electrical 10 0
installation?
3 Is the lock – out procedure in place and enforced? 5 0
4 Are medium voltage areas locks –out and warning sings
5 0
posted?
5 Are electrical hand – tools and power extensions
5 0
inspected per Manuals?
6 Are temporary installation prohibited? 5 0
7 Are site power installations provided ELSB or GFI
5 0
protection?
8 Are personal protective equipment provided and utilized? 5 0
9 Are all electrical installation in wet areas protected
5 0
with ELCB (30MAor less)?
10 Is the underwater electrical installation 24 volts or
5 0
less and protected with isolated transformers?
11 Plant and Machinery 20 0
12 Are all rotating machines protected with safety guards?? 5 0
13 Is access to the plant rooms restricted to unauthorized
5 0
person?
14 Are the plant room clean and tidy? 5 0
15 Ladder Safety 20 0
16 Are all hotel ladders inventoried and inspected monthly? 5 0
17 Are all hotel ladders inspected, tested and maintained in 10 0
12
months?
54 Are the guestroom shower heads cleaned and disinfected
5 0
quarterly?
55 Are the softener tanks cleaned and disinfected annually? 5 0
56 Are the spa pools drained and clean quarterly? 5 0
57 Mechanical plant and equipment 36 0
58 Elevators and Escalators 36 0
59 Are the elevators and escalator covered under a
10 0
comprehensive maintenance contract?
60 Are the elevators and escalators licenses up – to date? 10 0
61 Is there an elevator entrapment procedure in place? 5 0
62 Is the elevator machine room clean and tidy? 5 0
63 Is there an emergency stop switch for the escalators? 3 0
64 Is there a side foot – step protector along the sides of the
3 0
steps?
65 Business Continuity plans Readiness 20 0
66 Crisis Management plan Readiness 20 0
67 Are Crisis Management plans prepared for the 16
7 0
scenarios identified in the policy?
68 Are the scenarios tested and documented as per the OSM
10 0
policy?
69 Are the member of the Crisis Management team clearly
3 0
Identified and communicated to all colleagues?
70 Swimming Pool General Safety 99
71 Is the swimming pool depth well marked? 3 0
72 If pool is at a multi- depth level, is all depths is clearly
3 0
marked.
73 Are life – saving – rings are placed around the pool in a
5 0
sufficient number, with easy access.
ID: Checklist - occupational health and safety / 1160502 Page 4 of 6
85 Chlorine level: 5 0
Free chlorine = 1.5 ppm (never less than 0.5 ppm)
5 0
- For Spa = 4 ppm
86 Plant room Safety Equipment:
Are the following equipment exist.
Apron
Boots
Gloves
Gauntlets
Eyes protection
Eyes wash
Respirator (nos 2 – one at the reception)
Distress alarm 1.5 m from floor at exit door.
chimecal dosing failure alarm
ventelation
Locks
Labeling of cylinder, drums, containers
Emergency light and exit signs
Sprinklers and fire detection.
Telephone
87 Total Health and Safety 251 0