The bill of materials is for a 189.9 sqm residential property in Provance Malolos for Angelita and Michael Capulong. It includes costs for general requirements, earthworks, structural frame, masonry works, roof assembly, plumbing, electrical, architectural works, interior works, carpentry, and lanai improvements. The total material cost is 2,274,483.92 pesos and total labor cost is 902,034.06 pesos, for a grand total project cost of 3,176,517.98 pesos.
The bill of materials is for a 189.9 sqm residential property in Provance Malolos for Angelita and Michael Capulong. It includes costs for general requirements, earthworks, structural frame, masonry works, roof assembly, plumbing, electrical, architectural works, interior works, carpentry, and lanai improvements. The total material cost is 2,274,483.92 pesos and total labor cost is 902,034.06 pesos, for a grand total project cost of 3,176,517.98 pesos.
The bill of materials is for a 189.9 sqm residential property in Provance Malolos for Angelita and Michael Capulong. It includes costs for general requirements, earthworks, structural frame, masonry works, roof assembly, plumbing, electrical, architectural works, interior works, carpentry, and lanai improvements. The total material cost is 2,274,483.92 pesos and total labor cost is 902,034.06 pesos, for a grand total project cost of 3,176,517.98 pesos.