CARPENTRY ACTIVITIES SCHEDULE

Jan 31- Feb 3


ITEMS DESCRIPTION MANPOWER
29-Jan 31-Jan 1-Feb 2-Feb 3-Feb
ACTIVITIES
1 Declogge pipeline of toilet at Building A Cr Jb, Roger, Lineto
2 Fabricate Acrylic Signage Label of Vegetable Farm Jb, Lineto
3 Repainting of female locker ceiling due to leak from CR Jb, Lineto
4 Relocation of Exhaust at Machining Area Roger, JB
5 Installation of Gypsum Board at Cleanroom 2 JB, Lineto
6 Painting of wall at FDB Roger
7 Repair of Double Door at Cleanroom 1 Roger, JB, Lineto
8 Replacement of damage vinyl tile at BCR 1 JB, Lineto
9 Installation of Tiles at Machining at CR 11 and 12 JB, Lineto
10 Applied sahara water proofing of Mb1 Wall Crack due to leak at Warehouse Area Roger, JB, Lineto
11 Installation of Biometric at New Cold Storage Area Roger
12 Repair double door hinge at Cold Storage 1 Roger, JB, Lineto

0.000% 0.000%

0.000%

0.000%

0.000% 0.000%

#REF! #REF! #REF! #REF!

PROJECTED MONTHLY ACCOMPLISHMENT (%)


Amount Php
Actual Monthly Accomplishment (%)
Cummulative Monthly Accomplishment (%)

NTP Date: Oct--[$-3409]15--2010

Start Date: Oct--[$-3409]20--2010

Finish Date: Jun--[$-3409]20--2011

Run Date:

Page No.