The document provides a carpentry activities schedule from January 31 to February 3. It lists 12 items needing carpentry work including declogging a toilet pipeline, fabricating signage, repainting ceilings, relocating exhaust, installing drywall and tiles, repairing doors, and applying waterproofing. The schedule assigns tasks to carpenters JB, Roger, and Lineto on specific dates.
The document provides a carpentry activities schedule from January 31 to February 3. It lists 12 items needing carpentry work including declogging a toilet pipeline, fabricating signage, repainting ceilings, relocating exhaust, installing drywall and tiles, repairing doors, and applying waterproofing. The schedule assigns tasks to carpenters JB, Roger, and Lineto on specific dates.
The document provides a carpentry activities schedule from January 31 to February 3. It lists 12 items needing carpentry work including declogging a toilet pipeline, fabricating signage, repainting ceilings, relocating exhaust, installing drywall and tiles, repairing doors, and applying waterproofing. The schedule assigns tasks to carpenters JB, Roger, and Lineto on specific dates.
ITEMS DESCRIPTION MANPOWER 29-Jan 31-Jan 1-Feb 2-Feb 3-Feb ACTIVITIES 1 Declogge pipeline of toilet at Building A Cr Jb, Roger, Lineto 2 Fabricate Acrylic Signage Label of Vegetable Farm Jb, Lineto 3 Repainting of female locker ceiling due to leak from CR Jb, Lineto 4 Relocation of Exhaust at Machining Area Roger, JB 5 Installation of Gypsum Board at Cleanroom 2 JB, Lineto 6 Painting of wall at FDB Roger 7 Repair of Double Door at Cleanroom 1 Roger, JB, Lineto 8 Replacement of damage vinyl tile at BCR 1 JB, Lineto 9 Installation of Tiles at Machining at CR 11 and 12 JB, Lineto 10 Applied sahara water proofing of Mb1 Wall Crack due to leak at Warehouse Area Roger, JB, Lineto 11 Installation of Biometric at New Cold Storage Area Roger 12 Repair double door hinge at Cold Storage 1 Roger, JB, Lineto
0.000% 0.000%
0.000%
0.000%
0.000% 0.000%
#REF! #REF! #REF! #REF!
PROJECTED MONTHLY ACCOMPLISHMENT (%)
Amount Php Actual Monthly Accomplishment (%) Cummulative Monthly Accomplishment (%)