S.

No Ordered MPCB's Relay QTY Size Qty


1 3RV20111CA10 1.8-2.5 3 S00
2 3RV20111EA10 2.8-4 6 S00
3 3RV20111GA10 4.5-6.3 8 S00
4 3RV20111JA10 7.0-10.0 2 S00
5 3RV20111KA10 9-12.5 32 S00 113
6 3RV20214AA10 10.0-16 31 S0
7 3RV20214DA10 18-25 19 S0
8 3RV20214EA10 27-32 6 S0
9 3RV20214FA10 34-40 6 S0
10 3RV10414JA10 45-63 18 S3
11 3RV10414MA10 80-100 49 S3 78
12 3RV10414HA10 36-50 11 S3
13 3VA11165ED320AA0 160 3 3VA11 3
14 3VA12255EF320AA0 250 11 3VA12 11
15 3VA23405HL320AA0 400 12 3VA23 12
16
17
18
19
20
21
22
23
ROM 8UC Type ABB Model Existing Dia 8UC dia
3RV19261BZ 8UC62
3RV19261BZ
3RV19261BZ
3RV19261BZ
3RV19261BZ
3RV19261BZ
3RV19261BZ
3RV19261BZ
3RV19261BZ
3RV19461BZ
3RV19461BZ
3RV19461BZ
3VA91570FK23
3VA92570FK51
3VA94670FK54
SNO ABB MPCB MODEL 2.5 4 6.3 10
1 MO325 3 6 6
2 MO496
3 MS116 2
4 MS325 2
5 MS450
6 MS495
7 MS496
8 MS497
9 SACE S4H
10 SACE S5H
11 Tmax
Grand Total 3 6 8 2

22.5
12.5 16 25 32 40 50 63
18 23 5
5 2 9 9

14 8 13
2 2
4
1 2 5
1

32 31 19 6 6 11 18
100 160 250 400 Grand Total
1 62
12 37
2
37
4
3 7
10 18
4 5
3 9 12
12 12
19 2 21
49 3 11 12 217
Shut Down 10 Days

Total Available ManHours Per Head = 80


Total 10 Members + 1 Supervisors
Total Team = 5 (2 per feeder)
Team manhour/day 40
Estimated no. of days

Conveynces

Total 14 Members + 1 Supervisor


Per Day 10 Days
Hotel 0
Food (B+L+D) @ 250 0
Local Conveyances @ 600
Travel @ 250

Material
Total Qty 30 no.s 20 10
Per ACB Per MCCB
Estimated Hours 5-6 Hrs 2-3 Hours
Total hours required 100 20 120

SIEMENS Aditional cost, if quoted directly

2 Supervisiors costing @9500/day