Professional Documents
Culture Documents
Caso de Estudio WCM, Parte 1 (Estructura Organizacional)
Caso de Estudio WCM, Parte 1 (Estructura Organizacional)
Planta de Tepotzotlan
Tepotzotlan Plant in Magneti Marelli Group
MAGNETI
MARELLI
ALDE - RT ALMX - JU
ALDE - BD ALMX - TE
JUárez (Mx)
HL,RL
ALCZ - JI ALMY - PE
Tepotzotlan
(Mx) RL
ALPL - SO ALRU - RY
Toluca(Mx) Pulaski(US)
ALRF - SJ ALTR - BU HL, RL HL, RL
ALES - LL ALBR - CO
ALIT - VE ALUS - PU
ALIT - TZ ALCN - WH
2
Plant and Business Overview – Key Figures
600
Assembly Rear Lamps 1.5
500
3
Plant and Business Overview – Site Profile
Plant start up on March 2010 (6 years of operation)
Labor Union (Federación de Trabajadores de Vanguardia Obrera)
Gender
42% Male
58% Female
Average age:
37.5 yrs.
Scholarship
65% WC (Univ.)
61% BC (Middle)
4
Technological Product Evolution
80% Laser Welding
Complexity
RL - Raise of complexity and 20% Vibration Welding
additional tasks ca. 200 parts
100% Vibration Welding
ca. 30 parts >55000h
>45000h
FULL LED
100% Vibration Welding
ca. 20 parts
>20000h
100% Vibration
• Full Led lamps
Rear Lamp Welding
• Lightguide technology
with ca. 15 parts
• Traceability
complexity • new PCB – new LEDs
• Thin film applications
geometric >12000h •Traceability
• Homogenious design
(BULB+LED) • Optical simulation
• Laser welding technology
• Halogen Bulbs • Aesthetical components high
• Very complex assenbly due
• Thermal simulation complexity
to appearance requirements
• Mould flow • Dimensional requirements
• 1 st trials with laser welding
components • 3K mould injection
• Aesthetical
Rear Lamp components
with simple • Bulb
geometric • Increase of
(BULB) aesthetical
requirement
• Test handling
5
Plant and Business Overview – Product
JETTA VW 362 GP T2
ECE Gasket 1 Rear Lamp
Bulb
Holder 30 Parts
Wireharness
FOG PCB
2K Tail Inner
Lens
Outer Lens
Screws
Housing
Bezel
Side Panel
Tail/Reverse
Reflector
Bottom Panel
6
Finish Product on the Road - Rear Lamps
215 Km 100%
Truck
100 %
Air Consol
Outbound 0%
Vessel
0%
8
Plant & Business Overview – Supplier Locations
USA
5 suppliers
APV ($ 3.37 Mio MXP) – 34% Europe
4,475 Km 2 suppliers
APV ($ 2.53 Mio MXP) – 26%
10,330 Km
Asia
1 suppliers
APV ($ 0.13 Mio MXP) – 1%
12,910 Km
Mexico
15 suppliers
APV ($ 3.90 Mio MXP) –
39%
1,823 Km
9
Plant and Business Overview – Plant Layout
Pre-Production Area
• Molding Tool shop
Administration
• Metalizing Area
Lab/
Assembly Area Photometrics
• WIP/Supermarket
Warehouse Area
• Assembly
• Incoming
• Final Inspect and
• Shipping
Pack
10
Material flow
METALIZING
ASSEMBLY
KANBAN
PROD
PRE-
WAREHOUS
MOLDING E
FG RAW
OUT
Work Station (Ergonomic Bench)
MMES
MM ES
IN
LOG
EEM
WO AM
11
Core Processes overview
12
Core Processes overview
Molding:
10 Plastic Injection machines
Monocolor & Multicolor
Capacity 330 Tons - 1,500 Tons
Metalizing:
3 metalizing machines
Reflectors & Housings
13
Core Processes overview
Assembly:
2 Assembly lines
4 Subassembly stations
14
ORGANIGRAMA DE MAGNETI MARELLI
AUTOMOTIVE LIGHTING
GERENTE DE PLANTA
BL Nafta AL BL BL
BL ICT Purshasing
HR MM PM
CFO
BL
PD SAF
AL
CD QUALITY VAVE
NAFTA
WCM
ENV
INGENIERIA DE INGENIERIA DE
WCM SOPORTE DE MANTENIMIENTO CALIDAD
PRODUCCIÓN LOGISTICA DESARROLLO DE
PLANTA MANUFACTURA
NUEVOS PRODUCTOS
PM AM QC LCS EEM
Por sus siglas en inglés significa World Class Es una forma de trabajar
Manufacturing, Manufactura de Clase Mundial.
No es un proyecto
[Without] [With]
re t
et ke
ar
k ar
m fm
lo
f lo
ve ve
le le
e e
Th Th
22