Download as docx, pdf, or txt
Download as docx, pdf, or txt
You are on page 1of 4

NWSTEEL TECHNOLOGIES, INC.

Chain block testing Report

Date: Jan, 31, 2022 Area: plant side

QC Inspector Assigned: Rodrigo R. Manio

Objective: to assess chain blocks capacity to its maximum. See if it will collapse
due to subjected stress.

Procedure: attaching 5, 3 and 1.5 tons capacity chain block to an I-beam with the
10 tons capacity dynamometer. Assess the chain block every 3 mins with
additional 1 ton.

Result: chain block is in good condition after test

Prepared by: Bimbo Martin

________________________________ ________________________________
Witnessed by: witness by:

________________________________ __________________________________

Checked by: QC Head


Set up:

Set up for 5, 3, & 1.5 tons chain block

Readings:
Chain block 1 (1.5 tons)

Chain block 1 (3 tons)

Page 1 of 43
Chain block 1 (5 tons)

Data:

Chain block 1 Chain block 2 Chain block 3


Tons Mins Sign of Tons Mins Sign of Tons Mins Sign of
applied collapse applie collaps applied collapse
d e
1.13 3mins No. sign 1.27 3mins No. sign 1.13 3mins No. sign
1.49 3mins No. sign 2.15 3mins No. sign 2.13 3mins No. sign
3.15 3mins No. sign 3.13 3mins No. sign
4.08 3mins No. sign
5.20 3mins No. sign

Page 2 of 43
Page 3 of 43

You might also like