SPARK-EASTERN PERIPHERAL ROAD PROJECT

NON-CONFORMANCE REPORT – CONSTRUCTION PHASE


Contract: 6600044021
China Communications Construction Co. Ltd. Doc. No. QAOP10-F1NCR-209
P.O. Box: 1977, Al Khobar – 31952, Kingdom Of
Discipline : Civil
Saudi Arabia. Tel: 03 882 7505; Fax: 03 882 0965
Date : 05-10-2021
REFERENCE OF THE NCR
MOT Spec. Section 1.04.6
STATEMENT OF DEFICIENCY
During Site Surveillance on Site# 01, Part# 03 at Precast yard it was observed that Non-Shrink Cementitious
Grout was not storage in a proper way, as per manufacturer storage recommendation the grout shall not be
stored in direct sunlight and shall be stored in dry at 4-35 Cͦ . It is violation of MOT Spec. Section 1.04.6 Which
States that, Materials shall be so stored as to assure the preservation of their quality and fitness for the Work..
ROOTCAUSE OF NON-CONFORMANCE

CORRECTIVE ACTION

PREVENTIVE ACTION

INITIATOR DEFICIENT
Name & Signature of Deficient :
Date of QCI Name: Abdulla Alshehri
OPEN Sha Liangtao
Discrepancy Signature:_______________
DEFICIENT LOCATION AND TARGET DATE TO CLOSE NCR : Site# 01 , Part# 03 at Pridge-02, 05-04-2021
VERIFICATION OF COMPLETION:

CLOSED Date of Completion : QC Signature:
QC Supervisor: Deficient Location Manager/Supervisor:
Name: M.Malik Imran Name: (Crew Signature)
If included
Signature: Signature:
Date: Date:
QC Manager:
Name: Mr.Shabbar Abass Signature:
Date:
ACTUAL IMPROVEMENT DONE
*TRAINING PROVIDED  *RESOURCES IMPROVED 
*PROCEDURE IMPROVED / NEW PROCEDURE ADOPTED 
Noted to Saudi Aramco Concurrence
(SAPMT Acknowledgement Signature : Mr.Dwight/Oscar
___________________)
Date of NCR raised by CCCC QC to Subcontractor / Construction Personnel (SAPID Signature. Mr. Jason_______________________)
(SAPID Signature_ Mr. Jason
Date of NCR closed by CCCC QC to Subcontractor / Construction Personnel _______________________)