1. Existing water for tapping from SYABAS 1.Calculated PE (get details for flow water, pressure) 2. Proposed bulk meter 2. Proposed Manhole (Refer excel template) -Fire-fighting bulk meter -Domestic Bulk meter 3. Proposed fire hydrant 3. Proposed Manhole 4. Node component 4. Sewerage pipe VCP / class B bending 5. Air valve 5. Proposed discharge to existing public sewerage manhole. Applicable when IF more, discharge to neareast STP. / Upgrade size STP.. if tak mencukupi. 6. Scour valve 6. Internal chamber- Inspection chamber 7. Sluice valve 7. Proposed Septic tank. (Risiko rendah) less than 150 PE. , 8. Storange Tank 2 days 8.Pump stations
ROAD AND DRAINAGE EARTHWORK-TERA-ALPHA SOFTWARE FOR
(MASMA AND ARAHAN TEKNIK JALAN) CUT AND FILL- GUIDELINE (MASMA) 1. Kerb Line 1.Silt trap/sediment basin 2. Scurpper Drain Pipe 2.Proposed cut and fill 3. M.S Grating 3.Proposed Wash Through 4. Railing Bandar Selamat/ Handrill 4.Proposed Temporary Earth drain/checkdam 5. Invert Level for culvert, drain, sump 5.Proposed Sediment fence 6. Proposed Sump 6.Earth stockpile area, Vehicle and Eqiupment area, material storage area 7. Drain – Box culvert w/o DWF /U- 7.Proposd Temporary access earthramp to drain/Precast drain , Top Wideth of earthwork area. drain with half round salt glazed wire (with brickwall) and etc included length and gradients 8. OSD Tank 8.Proposed heavy duty interlocking concrete paving on existing road at entrance 9. Proposed Opening 6m each 9.Proposed high pressure water jet to was all vechicle construction before exiting the site 10. Proposed Premix Road 10.Project Signboard 11. Proposed Drain node label 11.Earthwork section for cut and fill area. 12. Walkway 13. Proposed Landscape Area 14. Proposed Road Marking