Download as xlsx, pdf, or txt
Download as xlsx, pdf, or txt
You are on page 1of 86

DENAH PERHITUNGAN LUASAN

K
L M

H
F G

E
D

C
A

RAB 2007
RALNO_ @ CVL
RAB 2007
RALNO_ @ CVL
RAB 2007
RALNO_ @ CVL
PERHITUNGAN LUASAN
LANTAI 1
A = 4.50 x 2.50 = 11.250 m2 x 50% = 5.63 m2
B = 4.50 x 3.00 = 13.500 m2
C = 4.50 x 3.50 = 15.750 m2
D = 2.00 x 1.50 = 3.000 m2
E = 2.50 x 2.00 = 5.000 m2
F = 3.50 x 3.00 = 10.500 m2
G = 5.00 x 2.50 = 12.500 m2
H = 4.00 x 2.00 = 8.000 m2 x 50% = 4 m2
I = 8.50 x 1.50 = 12.750 m2
J = 5.00 x 1.50 = 7.500 m2
K = 5.00 x 1.50 = 7.500 m2 x 50% = 3.75 m2
L = 3.00 x 1.50 = 4.500 m2
M = 4.00 x 3.00 = 12.000 m2 +
Jumlah (100 % ) Teras = 123.750 m2 Jumlah (50% ) Teras = 110.375 m2

Luas Total Bangunan :


100 % Teras = 123.750 m2
50 % Teras = 110.375 m2

Luas Bangunan :
a. Bangunan Induk = 97.000 m2
b. Bangunan Teras :
100% = 26.750 m2
50% = 13.375 m2
PERHITUNGAN VOLUME
LANTAI DASAR - LANTAI 2
NO. SKETS GAMBAR URAIAN PEKERJAAN DAN PERHITUNGAN VOLUME SAT.
I PEKERJAAN PERSIAPAN : 1. Pembersihan Lahan
L (m) B (m) A = (L + 4) x (B + 4)

16.00 9.00
= 260.000 m2

L 2. Pemasangan Bowplank + Vitzet


L (m) B (m) K = 2 x (( L + 2 ) + ( B + 2 ))

16.00 9.00
= 58.000 m
b
3. Penyediaan Air Kerja 1.000 LS

II PEKERJAAN TANAH DAN URUGAN 1. Galian Tanah Pondasi


a. Pondasi Bangunan Induk
b (m) h (m) L (m) V = (bxh)xL

1.00 0.80 71.75


h h = 57.400 m3

b. Pondasi Tapak Beton


b (m) h (m) L (m) Jumlah V = (bxh)xL

1.00 1.50 1.00 9


= 13.500 m3

b c. Pondasi Teras
b b (m) h (m) L (m) V = (bxh)xL

0.80 0.60 5.50


= 2.640 m3
Volume Total Galian Tanah Pondasi 73.540 m3

2. Urugan Tanah Kembali


Vgalian (m) 1
V = x VG
4
73.540
= 18.385 m3

3. Urugan Pasir Di Bawah Pondasi

b (m) h (m) L (m) V = (bxh)xL


h h
B. Induk 1.00 0.10 71.75
b b = 7.175 m3
b b
B. Teras 0.60 0.10 5.50
= 0.330 m3

V total = 7.505 m3

3. Urugan Pasir Di Bawah Pondasi


b (m) h (m) L (m) jmlh V = (bxh)xL
Pondasi Tapak 1.00 0.10 1.00 9
= 0.900 m3

4. Urugan Pasir Peninggi Lantai

h h A (m2) L (m) b (m) h (m) V = [ A - (L x b )] x h


B. induk 32.500 71.750 0.150 0.200 = 4.348 m3
B. teras 5.000 7.000 0.150 0.150 = 0.593 m3
KM/WC 1.500 4.500 0.150 0.150 = 0.124
V total = 5.064 m3
PERHITUNGAN VOLUME

NO. SKETS GAMBAR URAIAN PEKERJAAN DAN PERHITUNGAN VOLUME SAT.


III PEKERJAAN PASANGAN DAN PLESTERAN 1. Pasangan Aanstamping Batu Karang/ Kali

b (m) h (m) L (m) V = (bxh)xL

B. Induk 1.00 0.20 71.75


= 14.350 m3

B. Teras 0.60 0.20 5.50


= 0.660 m3

b Volume Total Pasangan Aanstamping Batu Karang/ Kali 15.010 m3


b
2. Pasangan Pondasi Batu Karang/ Kali
a a. Pondasi Bangunan Induk
a+b
V = xh xL
a (m) b (m) h (m) L (m) 2

0.25 0.80 0.85 71.75


h = 32.018 m3
b
b b. Pondasi Teras

b b b (m) h(m) L(m) V = (bxh)xL

0.40 0.55 5.50


= 1.210 m3

Volume Total Pasangan Pondasi Batu Karang/ Kali 33.228 m3

h1 h2 3. Pasangan Tembok Trasraam


a. Tembok Trasraam untuk WC/ KM (1 pc : 3 psr)

Lw (m) P (m) h1 (m) VT = [( Lw - P ) x h1 ]

4.50 1.60 1.50


= 4.350 m2

b. Tembok Trasraam untuk B. Induk (1 pc : 3 psr)

L (m) h2 (m) VT = [ L x h2 ]

28.50 0.50
= 14.250 m2
Volume Total Pasangan Tembok Trasraam 18.600 m2

4. Pasangan Tembok Biasa (1 pc : 5 psr)


a. Tembok Bangunan Induk

L (m) h (m) AK (m2) ATK (m2) VT (m) V = [( L x h ) - AK - ATK ] - LT


T. inti 32.000 3.000 48.700 2.000 18.600
= 26.700 m2
PERHITUNGAN VOLUME

NO. SKETS GAMBAR URAIAN PEKERJAAN DAN PERHITUNGAN VOLUME SAT.


b. Tembok Gewel
1
V = x a x h - Ak
h a (m) h (m) t (m) Ak (m2) 2
gewel 1 = 3.804
8.00 1.00 0.12 0.20
1
V = x a x h - Ak x 2
gewel 2 2
7.50 1.00 0.12 0.20
= 7.100 m2
a Volume Total Pasangan Tembok Biasa 37.604 m2
5. Plesteran Tembok Trasraam (1 pc : 3 psr)
a. Tembok KM/ WC (1.50 m)

Lw (m) P (m) h (m) A = [ ( Lw - P ) x h ] x 2

4.50 1.600 1.50


= 8.700 m2
b. Tembok Bangunan Induk (0.50 m)

L (m) P (m) h (m) A = [ ( Lw - P ) x h ] x 2

28.50 0.000 0.50


= 28.500 m2
Luas Total Plesteran Tembok Trasraam 37.200 m2

6. Plesteran Tembok Biasa (1 pc : 5 psr)


a. Tembok Bangunan Induk

L (m) h (m) AT (m2) Agwl (m2) AK (m2) ATK (m2) A = [ ( L x h ) x2 - AT - Ak - ATK ] + Agwl

32.000 3.000 37.200 7.354 48.700 2.0000


= 111.454 m2

7. Plesteran Pondasi Tepi Luar (1 pc : 4 psr)

b (m) h (m) L (m) A = (b+h)xL

B. Induk 0.050 0.350 28.500


= 11.400 m2
Teras
dan 0.125 0.500 5.000
taman = 3.125 m2
A total = 14.525
Luas Total Plesteran Tembok ( Apl ) 125.979 m2

8. Acian Tembok

Apl (m2) AAC = APl


125.979
125.979
= 125.979 m2
PERHITUNGAN VOLUME

NO. SKETS GAMBAR URAIAN PEKERJAAN DAN PERHITUNGAN VOLUME SAT.


IV PEKERJAAN BETON 1. Cor Beton Sloof (1 pc : 3 psr : 5 Krl)
V = (bxh)xL
b (m) h (m) L (m) = 0.960
B. induk 0.150 0.200 32.000 = 0.150 m3
B. teras 0.150 0.200 5.000 V total = 1.110 m3

2. Cor Beton Kolom Praktis (1 pc : 3 Psr : 5 Krl)

b1 h a (m) a' (m) h (m) n (Buah) V = [( b x b' ) x h ] x n

0.12 0.12 3.00 24


b b = 1.037 m3
3. Cor Beton Kolom Teras (1 pc : 3 psr : 5 Krl)

a (m) a' (m) h (m) n (Buah) V = [( b x b' ) x h ] x n

0.20 0.20 3.00 2


= 0.240 m3

4. Cor Beton Ringbalk (1 pc : 3 psr : 5 Krl) V = (bxh)xL


L2 = 2.57
b (m) h (m) L (m) = 0.165
b B. induk 0.15 0.20 85.50 m3
L1 B. teras 0.15 0.20 5.50 Vtotal = 2.730 m3

5. Cor Beton Meja Dapur (1 pc : 3 Psr : 5 Krl)


a. Plat Meja :
L1 (m) L2 (m) b (m) t (m) V = [( L1 x b ) + (L2 x b )] x t
t
1.50 1.50 0.60 0.10
h = 0.180 m3

b b. Kaki Meja :
b (m) h (m) t (m) n (buah) V = [( b x h ) x t ] x n

0.60 0.60 0.10 6


= 0.216 m3

Volume Total Cor Meja Dapur 0.396 m3

6. Cor Beton Neut (1 pc : 3 psr : 5 Krl)

b (m) h (m) t (m) n (buah) V = [( b x h ) x t ] x n

0.12 0.10 0.05 16


= 0.010 m3
PERHITUNGAN VOLUME

NO. SKETS GAMBAR URAIAN PEKERJAAN DAN PERHITUNGAN VOLUME SAT.


V PEKERJAAN KAYU DAN KACA 1. Pasangan Kayu Kosen Klas I (5/12)

Type b (m) h (m) L (m) n (unit) V = [( b x h ) x L ] x n

PJ 1 0.05 0.12 22.05 2


= 0.265 m3

P1 0.05 0.12 7.20 1


= 0.043 m3

P2 0.05 0.12 7.00 3


= 0.126 m3

P3 0.05 0.12 6.80 2


= 0.082 m3

J2 0.05 0.12 10.30 4


= 0.247 m3

BV 1 0.05 0.12 3.05 3


= 0.055 m3
PJ1
Volume Total Kayu Kosen Klas I ( 6/12 ) 0.818 m3

2. Pasangnan Daun Pintu Panil Kayu

b (m) h (m) n (unit) A = (bxh)xn

0.920 2.000 3
= 5.520 m2
3. Pasangan Daun Pintu Double Teacwood 3 mm

b (m) h (m) n (unit) A = (( b1 + b2) x h ) x n


P1 P2
0.820 2.000 3
= 4.920 m2
P3
4. Pasangan Daun Pintu Double Teacwood Lapis Alluminium

b (m) h (m) n (unit) A = (bxh)xn

0.720 2.000 2
= 2.880 m2

5. Pasangan Daun Jendela Kaca 3 mm dan ventilasi


BV1 a. Type PJ1
b (m) h (m) n (Buah) A = (bxh)xn
J1 Ventilasi P 0.92 0.42 2 = 0.773
Ventilasi J 0.82 0.42 6 = 2.066
Jendela 0.82 1.82 6 = 8.954 m2
PERHITUNGAN VOLUME

NO. SKETS GAMBAR URAIAN PEKERJAAN DAN PERHITUNGAN VOLUME SAT.


b. Type P 1
ventilasi 0.92 0.42 1 = 0.386 m2

c. Type J 2
b (m) h (m) n (lubang) A = (bxh)xn

ventilasi J 0.72 0.42 8


= 2.419 m2

Jendela 0.72 1.22 8


= 7.027 m2

d. Type BV
b (m) h (m) n (lubang) A = (bxh)xn

BV 0.62 0.42 4
= 1.042 m2

Total Luas Pasangan Daun Jendela Dan Ventilasi ( Kaca 3 mm ) 22.668 m2


8. Pasangan Kayu Kap dan Gording
a. Pasangan Kuda - Kuda 1 ( KK I )
b (m) h (m) L (m) n (Jlh) V = [( b x h ) x L ] x n

Tiang Nok 0.08 0.12 2.95 2


= 0.057 m3

Kaki Kuda 0.08 0.12 6.90 4


= 0.265 m3

Blk. Tarik 0.08 0.12 11.40 2


= 0.219 m3

Blk. Penyokong 0.08 0.12 4.35 8


= 0.334 m3

Blk. Pangapit 0.04 0.12 2.40 4


= 0.046 m3

Blk. Pengunci 0.08 0.12 1.00 8


= 0.077 m3
V total = 0.997 m3
b. Pasangan Kuda - Kuda 2 ( KK II )
b (m) h (m) L (m) n (Jlh) V = [( b x h ) x L ] x n

Tiang Nok 0.08 0.12 2.45 2


= 0.0470 m3

Kaki Kuda 0.08 0.12 5.68 4


= 0.2181 m3

Blk. Tarik 0.08 0.12 8.12 2


= 0.1559 m3

Blk. Penyokong 0.08 0.12 2.80 8


= 0.2150 m3

Blk. Pengapit 0.04 0.12 2.08 4


= 0.0399 m3

Blk. Pengunci 0.08 0.12 1.00 8


= 0.0768 m3
V total = 0.7528 m3
PERHITUNGAN VOLUME

NO. SKETS GAMBAR URAIAN PEKERJAAN DAN PERHITUNGAN VOLUME SAT.

e. Balok gewel KK I (8/12)

b (m) h (m) L (m) n(m) V = [( b x h ) x L ] x n

0.08 0.12 13.80 2


= 0.2650 m3

f. Balok gewel KK II (8/12)

b (m) h (m) L (m) n(m) V = [( b x h ) x L ] x n

0.08 0.12 11.36 2


= 0.2181

g. Balok Bubungan (6/12)

b (m) h (m) L (m) V = (bxh)xL

0.06 0.12 15.50


= 0.1116 m3

h. Balok Gording (6/12)

b (m) h (m) L (m) V = (bxh)xL

0.06 0.12 284.50


= 2.048 m3

Volume Total Pasangan Kayu Kap (8/12) 4.3933 m3

9. Pasangan Listplank Papan (3/20)

L (m) n (uit) L' = Lxn

64.50 2.00
= 129.000 m1
PERHITUNGAN VOLUME

NO. SKETS GAMBAR URAIAN PEKERJAAN DAN PERHITUNGAN VOLUME SAT.


VI PASANGAN ATAP DAN PLAFOND 1. Pasangan Atap Seng Gelombang BJLS 0.30
b. Daerah persegi
Daerah b (m) L (m) h(L/cos30) A = b x h
A 6 5.50 6.35 = 38.100 m2
B 6 5.50 6.35 = 38.100 m2
C D C 9.5 6.25 7.22 = 68.590 m2
D 9.5 6.25 7.22 = 68.590 m2
Luas Total Pasangan Atap Gelombang Seng BJLS 0,30mm A total = 213.380 m2
2. Pasangan atap seng licin BJLS 0,30mm

A B L bubungan (m) L = L
14.5 = 14.500 m1

3. Pasangan Plafond Tripleks dan rangka

AB (m2) AE (m2) APl = ( AB + AE )

114.270 47.870
= 162.140 m2

4. Pasangan List Plafond Profil

L (m) L' = L B. induk + L emperan

B. Induk 139.600
= 239.600 m1

Emperan 100.000

Panjang Total List Plafond Profil 239.600 m1


VII PEKERJAAN LANTAI
1. Pasangan Tegel Keramik 30/30

AB (m2) Aw (m2) L (m) b (m) A = ( AB - AW )-( Lx b)

123.750 7.500 95.500 0.150


= 101.925 m2
PERHITUNGAN VOLUME

NO. SKETS GAMBAR URAIAN PEKERJAAN DAN PERHITUNGAN VOLUME SAT.

2. Pasangan Tegel Mozaik (KM/ WC) 20/20


AW (m2) b (m) L (m) A = Aw - ( b x L )

7.500 0.150 16.000


= 5.100 m2

3. Pasangan Tegel Porselin 10/20


a. Meja Dapur :
L1 (m) L2 (m) b (m) h (m) A = ( L 1 + L2 ) x b
= 1.800 m2
1.50 1.50 0.60 0.60

As = ( b samping x h ) x n
a. Kaki Meja Dapur : = 0.72 m2
b samping (m) b depan (m) h (m) n (jml)
samping depan Ad = ( b depan x h ) x n
0.60 0.10 0.60
2.00 3.00 = 0.18 m2

b. KM/ WC :
Lw (m) P (m) h (m) A = ( Lw - P ) x h

16.00 1.54 1.50


= 21.690 m2

Luas Total Pasangan Tegel Porselin 24.390 m2


4. Pasangan Tegel Plint 10/30

L (m) LTK (m) LK (m) A = [ L - LK - LTK)

95.50 1.00 7.10


= 87.400 m1

VIII PEKERJAAN INSTALASI LISTRIK DAN AIR 1 Pasangan Titik Lampu = 19 Buah
2 Pasangan Lampu TL 40 Watt = 2 Buah
3 Pasangan Lampu spiral 25 Watt = 9 Buah
4 Pasangan Lampu spiral 15 Watt = 2 Buah
5 Pasangan Saklar Tunggal = 6 Buah
6 Pasangan SaklarGanda = 3 Buah
7 Pasangan Stop Kontak = 7 Buah
8 Pasangan Sekring Cast = 1 Buah
9 Pasangan Arde Pembumian = 1 Buah
10 Pasangan Wastafel = 1 Buah
11 Pasangan Bak Air Porselin = 2 Buah
12 Pasangan Closed Jongkok = 2 Buah
13 Pasangan Septic Tank dan Peresapan = 2 Buah
14 Pasangan Instalasi Air Bersih = 1 Buah
15 Pasangan Instalasi Air Kotor = 1 Buah
16 Pasangan Floor Drain = 3 Buah
17 Pasangan Kran Air = 4 Buah
PERHITUNGAN VOLUME

NO. SKETS GAMBAR URAIAN PEKERJAAN DAN PERHITUNGAN VOLUME SAT.


IX PEKERJAAN FINISHING 1. Cat Tembok
AAC (m2) A = AAC

125.979
= 125.979 m2

2. Cat Plafond
Apl (m2) A = APl

162.140
= 162.140 m2
3. Menie Kayu
a. Untuk Kosen :

Type b (m) h (m) L (m) n (unit) Am = [ 2 x ( b + h )] x L x n

PJ 1 0.05 0.12 21.85 2


= 14.858 m2

P1 0.05 0.12 7.00 1


= 2.380 m2

P2 0.05 0.12 6.80 3


= 6.936 m2

P3 0.05 0.12 6.60 2


= 4.488 m2

J2 0.05 0.12 9.90 4


= 13.464 m2

BV 1 0.05 0.12 4.20 3


= 4.284 m2

b. Untuk Listplank :

h (m) L (m) b (m) n A = ( 2 x ( b + h )) x L x n

0.200 64.500 0.02 2


= 56.760 m2

Luas Total Menie Kayu (Kosen & Listplank) 103.170 m2


PERHITUNGAN VOLUME

NO. SKETS GAMBAR URAIAN PEKERJAAN DAN PERHITUNGAN VOLUME SAT.


4. Cat Kayu
a. Untuk Kusen

Type Am (m2) LL (m) h (m) n (m) Ac = Am -((LL x h) x n)

PJ 1 14.858 21.85 0.12 2


A = 9.614 m2

P1 2.380 7 0.12 1
A = 1.540 m2

P2 6.936 6.8 0.12 3


A = 4.488 m2

P3 4.488 6.6 0.12 2


A = 2.904 m2

J2 13.464 9.9 0.12 4


A = 8.712 m2

BV 1 4.284 4.2 0.12 3


A = 2.772 m2

b. Untuk List Plank

Am (m2) b (m) h (m) L (m) Ac = Am- (( b + h ) x L )

56.760 0.020 0.200 64.500


= 42.570 m2

Luas Total Cat Kayu 72.600 m2


5. Cat Seng
As (m2) A = As

213.380
= 213.380 m2

6. Teac oil
Apn (m2) A = Apn x 2

5.520
= 11.040 m2

X PEKERJAAN PENGGANTUNG DAN PENGUNCI 1 Pasangan Kunci Double Slaag = 6


2 Pasangan Kunci KM/ WC = 2
3 Pasangan Grendel = 31
4 Pasangan Engsel = 86
5 Pasangan Kait Angin = 31
6 Pasangan Anker Doc = 68
7 Pasangan Mur, Baut dan Beugel U = 1

XI PEKERJAAN LAIN - LAIN 1. Pasangan Saluran Keliling Bangunan (Buis Beton U 30 cm) = 46.000 m1

2. Pembersihan Kembali = 1 LS
REKAPITULASI VOLUME

NO. URAIAN PEKERJAAN VOLUME SATUAN


I PEKERJAAN PERSIAPAN
1 Pembersihan Lahan 260.0000 m2
2 Pemasangan Bowplank 58.0000 m1
3 Penyediaan Air Kerja 1.0000 LS

II PEKERJAAN TANAH DAN URUGAN


1 Galian Tanah Pondasi 73.5400 m3
2 Urugan Tanah Kembali 18.3850 m3
3 Urugan Pasir di Bawah Pondasi 7.5050 m3
4 Urugan Pasir Peninggi Lantai 5.0638 m3

III PEKERJAAN PASANGAN DAN PLESTERAN


1 Pekerjaan Anstamping 15.0100 m3
2 Pasangan Pondasi Batu Karang (1 pc : 5 psr) 33.2284 m3
3 Pasangan Tembok Trasraam (1 pc : 3 psr) 18.6000 m2
4 Pasangan Tembok Biasa (1 pc : 5 psr) 37.6038 m2
5 Plesteran Tembok Trasraam (1 pc : 3 psr) 37.2000 m2
6 Plesteran Tembok Biasa (1 pc : 5 psr) 111.4538 m2
7 Plesteran Pondasi Tepi Luar (1 pc : 5 psr) 14.5250 m2
8 Acian Tembok 125.9788 m2

IV PEKERJAAN BETON
1 Cor Beton Sloof (1pc : 2psr : 3krl) 1.1100 m3
2 Cor Beton Kolom Praktis (1pc : 2psr : 3krl) 1.0368 m3
3 Cor Beton Kolom Teras (1pc : 2psr : 3krl) 0.2400 m3
4 Cor Beton Ringbalk (1pc : 2psr : 3krl) 2.7300 m3
5 Cor Beton Meja Dapur (1pc : 2psr : 3krl) 0.3960 m3
6 Cor Beton Neut (1pc : 2psr : 3krl) 0.0096 m3

V PEKERJAAN KAYU DAN KACA


1 Pasangan Kayu Kusen Klas I 0.8175 m3
2 Pasangan Daun Pintu Panil Kayu 5.5200 m2
3 Pas. Daun Pintu Double Teacwood 3 mm 4.9200 m2
4 Pas. Daun Pintu Double Teacwood 3 mm lapis seng 2.8800 m2
5 Pas. Daun Jendela Kaca dan Ventilasi 3 mm 22.6680 m2
6 Pas. Kayu Kap dan Gording 4.3933 m3
7 Pasangan Lisplank Papan 129.0000 m1

VI PASANGAN ATAP DAN PLAFOND


1 Pas. Atap Seng BJLS 0.30 mm 213.3800 m2
2 Pas. Atap Bubungan Seng Licin 0.30 mm 14.5000 m1
3 Pas. Plafond Tripleks 3 mm & Rangka 162.1400 m2
4 Pas. List Penutup Plafond (Berprofil) 239.6000 m1
NO. URAIAN PEKERJAAN VOLUME SATUAN
VII PEKERJAAN LANTAI
1 Pasangan Tegel Keramik 30/30 101.9250 m2
2 Pasangan Tegel Mozaik 30/30 5.1000 m2
3 Pasangan Tegel Plint 10/20 87.4000 m1
4 Pasangan Tegel Porselen 20/20 24.3900 m2
VIII PEKERJAAN INSTALASI LISTRIK DAN AIR
1 Pasangan Titik Lampu 19 Buah
2 Pasangan Lampu TL 40 Watt 2 Buah
3 Pasangan Lampu TL 20 Watt 9 Buah
4 Pasangan Lampu Pijar 25 Watt 2 Buah
5 Pasangan Saklar Tunggal 6 Buah
6 Pasangan SaklarGanda 3 Buah
7 Pasangan Stop Kontak 7 Buah
8 Pasangan Sekring Cast 1 Buah
9 Pasangan Arde Pembumian 1 Buah
10 Pasangan Wastafel 1 Buah
11 Pasangan Bak Air Porselin 2 Buah
12 Pasangan Closed Jongkok 2 Buah
13 Pasangan Septic Tank dan Peresapan 2 Buah
14 Pasangan Instalasi Air Bersih 1 LS
15 Pasangan Instalasi Air Kotor 1 LS
16 Pasangan Floor Drain 3 Buah
17 Pasangan Kran Air 4 Buah

IX PEKERJAAN FINISHING
1 Cat Tembok 125.9788 m2
2 Cat Plafond 162.1400 m2
4 Cat Kayu 72.6000 m2
5 Cat Seng 213.3800 m2
6 Teak Oil 11.0400 m2

X PEKERJAAN PENGGANTUNG DAN PENGUNCI


1 Pasangan Kunci Double Slaag 6 Buah
2 Pasangan Kunci KM/ WC 2 Buah
3 Pasangan Grendel 31 Buah
4 Pasangan Engsel 86 Buah
5 Pasangan Kait Angin 31 Buah
6 Pasangan Anker Doc 68 Buah
7 Pasangan Mur, Baut dan Beughel U 1 LS

XI PEKERJAAN LAIN - LAIN


1 Pasangan Saluran Keliling Bangunan (Buis Beton U 30 cm) 46.0000 m1
2 Pembersihan Kembali 1 LS
DAFTAR HARGA UPAH BANGUNAN

Kualitas / merek
No Jenis Barang / Upah SATUAN HARGA 2021
/ Spesifikasi
A UPAH
1 Pekerja / buruh 8 Jam / Hari Org / Hari 50,000.00
2 Tukang Batu 8 Jam / Hari Org / Hari 80,000.00
3 Tukang Kayu 8 Jam / Hari Org / Hari 80,000.00
4 Tukang Besi 8 Jam / Hari Org / Hari 80,000.00
5 Tukang Cat 8 Jam / Hari Org / Hari 70,000.00
6 Tukang Listrik 8 Jam / Hari Org / Hari 75,000.00
7 Tukang Pipa 8 Jam / Hari Org / Hari 75,000.00
8 Tukang Las 8 Jam / Hari Org / Hari 75,000.00
9 Mandor 8 Jam / Hari Org / Hari 120,000.00
10 Mekanik 8 Jam / Hari Org / Hari 115,000.00
11 Pembatu Mekanik 8 Jam / Hari Org / Hari 70,000.00
12 Operator 8 Jam / Hari Org / Hari 105,000.00
13 Pembantu Operator 8 Jam / Hari Org / Hari 80,000.00
14 Supir 8 Jam / Hari Org / Hari 90,000.00
15 Pembantu Supir 8 Jam / Hari Org / Hari 85,000.00
16 Kepala Tukang 8 Jam / Hari Org / Hari 90,000.00

B BAHAN BANGUNAN
1 Agregat Kasar Bulat 2/3 Ret m3 187,500.00
2 Agregat Base Kls A Ret m3 208,333.33
3 Air bersih 3000 L Tangki liter 40,000.00
4 Air bersih 4000 L Tangki liter 47,500.00
5 Air bersih 5000 L Tangki liter 65,000.00
6 Angker Dok - - 10,000.00
7 Arde Pembumian - - 100,000.00
8 Atap Multiroof Sakura lbr 92,500.00
9 Atap Genteng Beton Pabrikan Bh 7,375.00
10 Bak cuci piring Stainless Steel Pabrikan Set 184,500.00
11 Bak air fiber Pabrikan Set 270,000.00
12 Bata Merah Pabrikan Bh 500.00
13 Batu Karang 5 / 7 Ret m3 51,667.00
14 Batuh Kali pecah 3 / 5 cm Ret m3 155,000.00
15 Batu kali Pecah 2 - 3 cm Ret m3 175,000.00
16 Batu Kali Pecah 1 / 2 (split) Ret m3 191,667.00
17 Batu Kali Ret m3 79,167.00
18 Batu Karang Ret m3 71,667.00
19 Batu Roster / Krawang Pabrikan Bh 30,000.00
20 Baut + Moer Kuda - kuda 0.12 mm Pabrikan Kg 10,000.00
21 Baut + Moer Angker f 12 mm Pabrikan Kg 10,000.00
22 Baut Sudut 0.16 f 16 mm Pabrikan Kg 10,000.00
23 Besi Beton Polos Ø 6 mm - Kg 6,695.00
24 Besi Beton Polos Ø 8 mm - Kg 6,130.00
25 Besi Beton Polos Ø10 mm - Kg 5,938.00
Kualitas / merek
No Jenis Barang / Upah SATUAN HARGA 2007
/ Spesifikasi
26 Besi Beton Polos Ø 12 mm - Kg 5,919.00
27 Besi Beton Polos Ø 16 mm - Kg 15,471.00
28 Besi Beton Ulir o 10 mm - Kg 34,125.00
29 Besi Beton Ulir o 12 mm - Kg 70,875.00
30 Besi Beton Ulir o 16 mm - Kg 117,375.00
31 Box sekring f 4" Pabrikan Bh 15,000.00
32 BRC T (90, 120, 150) 3m lbr 227,500.00
33 Bubungan Multiroof Sakura lbr 27,000.00
34 Bubungan Genteng Beton Pabrikan Bh 7,500.00
35 Cat Kayu Dasar Altex Kg 15,500.00
36 Cat Kayu Mengkilap Altex Kg 25,750.00
37 Cat Tembok merk Bell Mas Bell Mas Kg 26,000.00
38 Cat Tembok merk Altex Altex Kg 7,000.00
39 Dolken Ø 8 mm/4 m - Btg 2,000.00
40 Dumpul Altex Kg 46,500.00
41 Embol Box Pabrikan Bh 625.00
42 Engsel Pintu Merk Everbst Pabrikan Bh 11,875.00
43 Expagnolet/grendel pintu tanam Pabrikan Bh 25,000.00
44 Filer abu batu Pabrikan m3 475,000.00
45 Fitting tempel biasa Pabrikan Bh 2,250.00
46 Floor Drain Stainles Steel Pabrikan Set 18,750.00
47 Grendel pintu Pabrikan Bh 17,500.00
48 Grendel Jendela Pabrikan psg 12,250.00
49 Isolasi Listrik Pabrikan roll 3,000.00
50 Kabel NYY 1.5 mm Pabrikan m1 3,375.00
51 Kaca Bening 3 mm Pabrikan m2 47,500.00
52 Kaca Bening 5 mm Pabrikan m2 61,250.00
53 Kaca Bening 8 mm Pabrikan m2 165,000.00
54 Kaca Es 3 mm Pabrikan m2 40,250.00
55 Kaca Rayband 3 mm 60% m2 55,000.00
56 Kaca Rayband 5 mm 60% m2 68,750.00
57 Kait angin jendela Pabrikan Bh 8,250.00
58 Kait angin pintu Pabrikan Bh 22,500.00
59 Kapur padam - m3 300,000.00
60 Kawat Anyaman 5 cm Pabrikan Kg 10,000.00
61 Kawat Beton Pabrikan Kg 11,250.00
62 Kayu kls I Balok (Bayam) f 2" Bayam m3 4,625,000.00
63 Kayu kls I Usuk (Bayam) f3" Bayam m3 5,500,000.00
64 Kayu kls I Reng (Bayam) f 4" Bayam m3 5,500,000.00
65 Kayu kls I Papan Tipis (Bayam) f6" Bayam m3 5,750,000.00
66 Kayu kls I Papan Tebal (Bayam) Bayam m3 6,000,000.00
67 Kayu kls II Balok f4" - m3 1,825,000.00
68 Kayu kls II Usuk f6" - m3 1,825,000.00
69 Kayu kls II Reng - m3 1,900,000.00
Kualitas / merek
No Jenis Barang / Upah SATUAN HARGA 2007
/ Spesifikasi
70 Kayu kls II papan tipis - m3 1,775,000.00
71 Kayu kls II papan tebal - m3 2,350,000.00
72 Keramik putih 40 x 40 cm m2 Bh 6,700.00
73 Keramik putih 30 x 30 cm m2 Bh 2,835.00
74 Keramik putih 20 x 20 cm m2 Bh 1,580.00
75 Kertas Pasir Besi Pabrikan lbr 2,750.00
76 Kertas Pasir Kayu Pabrikan lbr 2,250.00
77 Klem Kabel Pabrikan Bh 8,000.00
78 Kloset Jongkok Merk INA f 20 mm Pabrikan Bh 97,500.00
79 Kran air Stainlesstel f 25 mm Pabrikan Unit 42,500.00
80 Kunci Pintu Merk Top Pabrikan Bh 35,000.00
81 Kunci Pintu Merk Valencia 2x putar Pabrikan Bh 92,500.00
82 Kunci Pintu Merk Yuri 2x putar Pabrikan Bh 137,500.00
83 Kunci lemari dinding Pabrikan Bh 5,000.00
84 Kunci Alfa Pabrikan Bh 67,500.00
85 Kwas Pabrikan Bh 4,500.00
86 Lampu TL 40 watt merk Philips Philips Bh 14,000.00
87 Lampu TL 40 watt merk Philips Lengkap Philips Bh 64,000.00
88 Lampu TL 20 watt merk Philips Lengkap Philips Bh 56,500.00
89 Lampu TL Bundar 20 watt Pabrikan Bh 28,000.00
90 Lampu Pijar 40/60 watt merk Philips Philips Bh 3,900.00
91 Lampu Pijar 25 watt Pabrikan Bh 3,250.00
92 Lem Weber putih Kg 20,000.00
93 Lem Weber kuning Kg 30,000.00
94 List profil kayu Pabrikan m1 17,500.00
95 List Kaca Pabrikan m1 2,000.00
96 List Plafond Multipleks 6 mm Pabrikan m1 6,250.00
97 List Profil Gypsum Pabrikan m1 23,000.00
98 L Joint PVC Ǿ 2 " Pabrikan Bh 9,000.00
99 L Joint PVC Ǿ 3 " Pabrikan Bh 25,000.00
100 L Joint PVC Ǿ 4 " Pabrikan Bh 30,000.00
101 MCB Pabrikan Bh 27,500.00
102 Menie Kayu / Seng Altex Kg 46,750.00
103 Minyak Cat Super liter 6,750.00
104 Minyak Tanah - liter 2,500.00
105 Nako Lengkap ( 7 ssr ) Pabrikan set 92,750.00
106 Oli - liter 13,000.00
107 Paku halus (2-5 cm) Pabrikan Kg 12,500.00
108 Paku 5s /d 12 cm Pabrikan Kg 8,500.00
109 Paku Beton Halus (2 - 5 cm) Pabrikan Kg 16,250.00
110 Paku Seng Pabrikan Kg 28,250.00
111 Paku Beton 5 s / d 12 cm Pabrikan Kg 14,450.00
112 Paku Tripleks Pabrikan Kg 14,750.00
113 Paku Alumanium Pabrikan Kg 14,550.00
Kualitas / merek
No Jenis Barang / Upah SATUAN HARGA 2007
/ Spesifikasi
114 Paku Skrup Halus Pabrikan Kg 3,000.00
115 Paku Skrup Kasar Pabrikan Kg 10,000.00
116 Papan Gypsum Pabrikan lbr 49,000.00
117 Pasir Pasang - m3 95,833.00
118 Pasir Beton - m3 125,333.00
119 Pasir Urugan - m3 75,000.00
120 Paving Stone warna Pabrikan Bh 1,050.00
121 Pegangan Pintu Pabrikan Bh 75,000.00
122 Pegangan Jendela Pabrikan Bh 10,000.00
123 Pipa GIP MEDIUM B Ø 1/2 " 6m m 66,550.00
124 Pipa GIP MEDIUM B Ø 3/4 " 6m m 81,300.00
125 Pipa GIP MEDIUM B Ø 1" 6m m 116,450.00
126 Pipa GIP MEDIUM B Ø 1 1/2 " 6m m 365,300.00
127 Pipa GIP MEDIUM B Ø 2" 6m m 237,850.00
128 Pipa GIP MEDIUM B Ø 3 " 6m m 369,800.00
129 Pipa GIP MEDIUM B Ø 4 " 6m m 730,250.00
130 Pipa PVC Ǿ 2 " Pabrikan Btg 27,500.00
131 Pipa PVC Ǿ 3 " Pabrikan Btg 42,500.00
132 Pipa PVC Ǿ 4 " Pabrikan Btg 75,000.00
133 Pipa PVC 0.5" untuk listrik Pabrikan m1 4,500.00
134 Pipa Penguras Bak Mandi f 40 mm Pabrikan Unit 17,500.00
135 Plamuur Pabrikan Kg 33,500.00
136 Plamuur Tembok Pedang Pabrikan Kg 25,000.00
137 Plat Jepit 2 x 50.5 Pabrikan Kg 11,250.00
138 Plat inventarisasi jembatan (Marmer) - Bh 775,000.00
139 Plint Keramik 10 x 30 cm - Bh 1,350.00
140 Politur Pabrikan liter 32,500.00
141 Rangka Nako Pabrikan m2 7,750.00
142 Reducer Ǿ 4"3" Pabrikan Bh 7,500.00
143 Residu/Teer Pabrikan liter 75,000.00
144 Rool cat Pabrikan Bh 13,750.00
145 Saklar Tunggal merk Broco f 20 mm Broco Bh 10,750.00
146 Saklar Ganda merk Broco f 40 mm Broco Bh 14,250.00
147 Saklar Triple merk KJ Pabrikan Bh 13,250.00
148 Sekring cast 3 grup f 15 mm Pabrikan Bh 14,000.00
149 Semen Kupang (portland) - Kg 650.00
150 Semen Tonasa - Kg 706.00
151 Semen Bosowa - Kg 706.00
152 Semen Warna Kg Kg 2,050.00
153 Seng Gelombang BJLS 0.30 mm Gajahcalisco lbr 54,000.00
154 Seng Bubungan BJLS 0.30 mm Gajahcalisco lbr 33,750.00
155 Seng Plat BJLS 0.30 mm (60 cm) 60 cm lbr 21,500.00
156 Seng Plat BJLS 0.30 mm (90 cm) 90 cm lbr 30,000.00
157 Seng Gelombang BJLS 0.20 mm Gajahcalisco lbr 33,750.00
Kualitas / merek
No Jenis Barang / Upah SATUAN HARGA 2007
/ Spesifikasi
158 Seng Bubungan BJLS 0.20 mm Gajahcalisco lbr 28,250.00
159 Seng Plat BJLS 0.20 mm (60 cm) 60 cm lbr 11,675.00
160 Seng Plat BJLS 0.20 mm (90 cm) 90 cm lbr 13,650.00
161 Sirtu - m3 79,167.00
162 Socket Ǿ 3" Pabrikan Bh 6,750.00
163 Socket Ǿ 4" Pabrikan Bh 8,000.00
164 Stop Kontak merk Broco Broco Bh 12,750.00
165 Tanah Urug - m3 65,000.00
166 Tangki Fibre Glass 2.2 m3 Pabrikan Bh 1,150,000.00
167 Teakwood 3.8 mm Pabrikan lbr 82,250.00
168 Teakwood 2.8 mm Pabrikan lbr 70,000.00
169 Tegel Porselin - Buah 2,909.00
170 Tegel Mozaik - Buah 3,750.00
171 T Joint PVC Ǿ 2 " Pabrikan Bh 5,500.00
172 T Joint PVC Ǿ 3" Pabrikan Bh 8,750.00
173 T Joint PVC Ǿ 4 " Pabrikan Bh 12,500.00
174 Tripleks 9 mm Pabrikan lbr 108,750.00
175 Tripleks 2.8 mm Pabrikan lbr 44,500.00
176 Tripleks 3.8 mm Pabrikan lbr 56,250.00
177 Tripleks 6.0 mm Pabrikan lbr 77,500.00
178 Tripleks lapis aluminium foil Pabrikan lbr 70,000.00
179 Tripleks lapis melamine Pabrikan lbr 70,000.00
180 Wastafel f 75 mm Pabrikan Unit 162,500.00
ANALISA HARGA SATUAN
1). 1 m1 Pengukuran & Pemasangan Bowplank
a. Bahan
Kayu 5/7 0.012 M3 x Rp. 1,825,000.00 ,- = Rp. 21,900.00 ,-
Paku biasa 0.020 Kg x Rp. 8,500.00 ,- = Rp. 170.00 ,-
Kayu papan 3/20 0.007 M3 x Rp. 1,775,000.00 ,- = Rp. 12,425.00 ,-
Sub Jumlah (1) ,- = Rp. 34,495.00 ,-

b. Tenaga
Pekerja 0.100 Oh x Rp. 50,000.00 ,- = Rp. 5,000.00 ,-
Tukang kayu 0.100 Oh x Rp. 80,000.00 ,- = Rp. 8,000.00 ,-
Kepala tukang 0.010 Oh x Rp. 90,000.00 ,- = Rp. 900.00 ,-
Mandor 0.005 Oh x Rp. 120,000.00 ,- = Rp. 600.00 ,-
Sub Jumlah (2) ,- = Rp. 14,500.00 ,-
Jumlah (1) + (2) ,- = Rp. 48,995.00 ,-

2). 1 m3 Galian Tanah Cadas


Tenaga
Pekerja 1.250 Oh x Rp. 50,000.00 ,- = Rp. 62,500.00 ,-
Mandor 0.062 Oh x Rp. 120,000.00 ,- = Rp. 7,440.00 ,-
Jumlah = Rp. 69,940.00 ,-

3). 1 m3 Urugan Tanah


Tenaga
Pekerja 0.192 Oh x Rp. 50,000.00 ,- = Rp. 9,600.000 ,-
Mandor 0.019 Oh x Rp. 120,000.00 ,- = Rp. 2,280.000 ,-
Jumlah = Rp. 11,880.000 ,-

4). 1 m3 Urugan Pasir


a. Bahan
Pasir urug 1.200 M3 x Rp. 75,000.00 ,- = Rp. 90,000.00 ,-
Sub Jumlah (1) = Rp. 90,000.00 ,-

b. Tenaga
Pekerja 0.300 Oh x Rp. 50,000.00 ,- = Rp. 50,000.30 ,-
Mandor 0.010 Oh x Rp. 120,000.00 ,- = Rp. 120,000.01 ,-
Sub Jumlah (2) = Rp. 170,000.31 ,-
Jumlah (1) + (2) = Rp. 260,000.31 ,-

5). 1 m3 Pasangan Pondasi Batu Kali (1 Pc : 5 Ps)


a. Bahan
Batu belah 15/20 cm 1.100 M3 x Rp. 71,667.00 ,- = Rp. 78,833.70 ,-
Semen portland 136.000 Kg x Rp. 650.00 ,- = Rp. 88,400.00 ,-
Pasir pasang 0.544 M3 x Rp. 95,833.00 ,- = Rp. 52,133.15 ,-
Sub Jumlah (1) ,- = Rp. 219,366.85 ,-

b. Tenaga
Pekerja 1.500 Oh x Rp. 50,000.00 ,- = Rp. 75,000.00 ,-
Tukang batu 0.600 Oh x Rp. 80,000.00 ,- = Rp. 48,000.00 ,-
Kepala tukang 0.060 Oh x Rp. 90,000.00 ,- = Rp. 5,400.00 ,-
Mandor 0.075 Oh x Rp. 120,000.00 ,- = Rp. 9,000.00 ,-
Sub Jumlah (2) = Rp. 137,400.00 ,-
Jumlah (1) + (2) = Rp. 356,766.85 ,-
6). 1 m3 Pasangan Pondasi Batu Kosong (Aanstamping)
a. Bahan
Batu belah 15/20 cm 1.200 M3 x Rp. 71,667.00 ,- = Rp. 86,000.40 ,-
Pasir urug 0.300 M3 x Rp. 75,000.00 ,- = Rp. 22,500.00 ,-
Sub Jumlah (1) ,- = Rp. 108,500.40 ,-

b. Tenaga
Pekerja 0.780 Oh x Rp. 50,000.00 ,- = Rp. 39,000.00 ,-
Tukang batu 0.390 Oh x Rp. 80,000.00 ,- = Rp. 31,200.00 ,-
Kepala tukang 0.039 Oh x Rp. 90,000.00 ,- = Rp. 3,510.00 ,-
Mandor 0.039 Oh x Rp. 120,000.00 ,- = Rp. 4,680.00 ,-
Sub Jumlah (2) = Rp. 78,390.00 ,-
Jumlah (1) + (2) = Rp. 186,890.40 ,-

7). 1 m2 Pasangan bata merah tebal 1/2 bata (Tembok Trasraam), 1 Pc : 3 Ps


a. Bahan
Bata merah 5 x 11 x 22 cm 70.000 Bh x Rp. 500.00 ,- = Rp. 35,000.00 ,-
Semen portland 14.370 Kg x Rp. 650.00 ,- = Rp. 9,340.50 ,-
Pasir pasang 0.040 M3 x Rp. 95,833.00 ,- = Rp. 3,833.32 ,-
Sub Jumlah (1) ,- = Rp. 48,173.82 ,-

b. Tenaga
Pekerja 0.320 Oh x Rp. 50,000.00 ,- = Rp. 16,000.00 ,-
Tukang batu 0.100 Oh x Rp. 80,000.00 ,- = Rp. 8,000.00 ,-
Kepala tukang 0.010 Oh x Rp. 90,000.00 ,- = Rp. 900.00 ,-
Mandor 0.015 Oh x Rp. 120,000.00 ,- = Rp. 1,800.00 ,-
Sub Jumlah (2) = Rp. 26,700.00 ,-
Jumlah (1) + (2) = Rp. 74,873.82 ,-

8). 1 m3 Pasangan bata merah tebal 1/2 bata (Tembok Biasa), 1 Pc : 5 Ps


a. Bahan
Bata merah 5 x 11 x 22 cm 70.000 Bh x Rp. 500.00 ,- = Rp. 35,000.00 ,-
Semen portland 9.680 Kg x Rp. 650.00 ,- = Rp. 6,292.00 ,-
Pasir pasang 0.045 M3 x Rp. 95,833.00 ,- = Rp. 4,312.49 ,-
Sub Jumlah (1) ,- = Rp. 45,604.49 ,-

b. Tenaga
Pekerja 0.320 Oh x Rp. 50,000.00 ,- = Rp. 16,000.000 ,-
Tukang batu 0.100 Oh x Rp. 80,000.00 ,- = Rp. 8,000.000 ,-
Kepala tukang 0.010 Oh x Rp. 90,000.00 ,- = Rp. 900.000 ,-
Mandor 0.015 Oh x Rp. 120,000.00 ,- = Rp. 1,800.000 ,-
Sub Jumlah (2) = Rp. 26,700.000 ,-
Jumlah (1) + (2) = Rp. 72,304.49 ,-

9). 1 m2 Plesteran Tembok Trasraam 1 Pc : 3 Ps, tebal 15 mm


a. Bahan
Semen portland 6.480 Kg x Rp. 650.00 ,- = Rp. 4,212.00 ,-
Pasir pasang 0.019 M3 x Rp. 95,833.00 ,- = Rp. 1,820.83 ,-
Sub Jumlah (1) ,- = Rp. 6,032.83 ,-

b. Tenaga
Pekerja 0.200 Oh x Rp. 50,000.00 ,- = Rp. 10,000.000 ,-
Tukang batu 0.150 Oh x Rp. 80,000.00 ,- = Rp. 12,000.000 ,-
Kepala tukang 0.015 Oh x Rp. 90,000.00 ,- = Rp. 1,350.000 ,-
Mandor 0.010 Oh x Rp. 120,000.00 ,- = Rp. 1,200.000 ,-
Sub Jumlah (2) = Rp. 24,550.000 ,-
Jumlah (1) + (2) = Rp. 30,582.827 ,-
10). 1 m2 Plesteran Tembok Biasa 1 Pc : 5 Ps, tebal 15 mm
a. Bahan
Semen portland 4.320 Kg x Rp. 650.00 ,- = Rp. 2,808.00 ,-
Pasir pasang 0.022 M3 x Rp. 95,833.00 ,- = Rp. 2,108.33 ,-
Sub Jumlah (1) ,- = Rp. 4,916.33 ,-

b. Tenaga
Pekerja 0.200 Oh x Rp. 50,000.00 ,- = Rp. 10,000.00 ,-
Tukang batu 0.150 Oh x Rp. 80,000.00 ,- = Rp. 12,000.00 ,-
Kepala tukang 0.015 Oh x Rp. 90,000.00 ,- = Rp. 1,350.00 ,-
Mandor 0.010 Oh x Rp. 120,000.00 ,- = Rp. 1,200.00 ,-
Sub Jumlah (2) = Rp. 24,550.00 ,-
Jumlah (1) + (2) = Rp. 29,466.33 ,-

11). 1 m2 Plesteran 1Kp : 1Sm : 1Ps, tebal 15 mm (Acian)


a. Bahan
Semen merah 0.009 Kg x Rp. 2,050.00 ,- = Rp. 18.45 ,-
Kapur padam 0.009 M3 x Rp. 300,000.00 ,- = Rp. 2,700.00 ,-
Pasir pasang 0.009 M3 x Rp. 95,833.00 ,- = Rp. 862.50 ,-
Sub Jumlah (1) ,- = Rp. 3,580.95 ,-

b. Tenaga
Pekerja 0.200 Oh x Rp. 50,000.00 ,- = Rp. 10,000.00 ,-
Tukang batu 0.150 Oh x Rp. 80,000.00 ,- = Rp. 12,000.00 ,-
Kepala tukang 0.015 Oh x Rp. 90,000.00 ,- = Rp. 1,350.00 ,-
Mandor 0.010 Oh x Rp. 120,000.00 ,- = Rp. 1,200.00 ,-
Sub Jumlah (2) = Rp. 24,550.00 ,-
Jumlah (1) + (2) = Rp. 28,130.95 ,-

12). 1 m2 Plesteran Pondasi Tepi Luar 1 Pc : 5 Ps, tebal 15 mm


a. Bahan
Semen portland 4.320 Kg x Rp. 650.00 ,- = Rp. 2,808.00 ,-
Pasir pasang 0.022 M3 x Rp. 95,833.00 ,- = Rp. 2,108.33 ,-
Sub Jumlah (1) ,- = Rp. 4,916.33 ,-

b. Tenaga
Pekerja 0.200 Oh x Rp. 50,000.00 ,- = Rp. 10,000.00 ,-
Tukang batu 0.150 Oh x Rp. 80,000.00 ,- = Rp. 12,000.00 ,-
Kepala tukang 0.015 Oh x Rp. 90,000.00 ,- = Rp. 1,350.00 ,-
Mandor 0.010 Oh x Rp. 120,000.00 ,- = Rp. 1,200.00 ,-
Sub Jumlah (2) = Rp. 24,550.00 ,-
Jumlah (1) + (2) = Rp. 29,466.33 ,-

13). 1m3 Membuat sloof & Ringbalk beton bertulang (150 kg besi + bekesting)
a. Bahan
Kayu terentang 0.270 M3 x Rp. 1,775,000.00 ,- = Rp. 479,250.00 ,-
Paku biasa 2"-5" 2.000 Kg x Rp. 8,500.00 ,- = Rp. 17,000.00 ,-
Minyak bekesting 0.600 lt x Rp. 13,000.00 ,- = Rp. 7,800.00 ,-
Besi beton polos 150.000 Kg x Rp. 5,919.00 ,- = Rp. 887,850.00 ,-
Kawat beton 3.000 Kg x Rp. 11,250.00 ,- = Rp. 33,750.00 ,-
Semen portland 323.000 Kg x Rp. 650.00 ,- = Rp. 209,950.00 ,-
Pasir beton 0.520 M3 x Rp. 125,333.00 ,- = Rp. 65,173.16 ,-
Koral beton 0.780 M3 x Rp. 187,500.00 ,- = Rp. 146,250.00 ,-
Sub Jumlah (1) = Rp. 1,847,023.16 ,-

b. Tenaga
Pekerja 4.850 Oh x Rp. 50,000.00 ,- = Rp. 242,500.00 ,-
Tukang batu 0.350 Oh x Rp. 80,000.00 ,- = Rp. 28,000.00 ,-
Tukang kayu 1.560 Oh x Rp. 80,000.00 ,- = Rp. 124,800.00 ,-
Tukang besi 1.400 Oh x Rp. 80,000.00 ,- = Rp. 112,000.00 ,-
Kepala tukang 0.331 Oh x Rp. 90,000.00 ,- = Rp. 29,790.00 ,-
Mandor 0.175 Oh x Rp. 120,000.00 ,- = Rp. 21,000.00 ,-
Sub Jumlah (2) = Rp. 558,090.00 ,-
Jumlah (1) + (2) = Rp. 2,405,113.16 ,-
14). 1m3 Membuat kolom beton bertulang (200 kg besi + bekesting)
a. Bahan
Kayu terentang 0.400 M3 x Rp. 1,775,000.00 ,- = Rp. 710,000.00 ,-
Paku biasa 2"-5" 4.000 Kg x Rp. 8,500.00 ,- = Rp. 34,000.00 ,-
Minyak bekesting 2.000 lt x Rp. 13,000.00 ,- = Rp. 26,000.00 ,-
Besi beton polos 200.000 Kg x Rp. 5,919.00 ,- = Rp. 1,183,800.00 ,-
Kawat beton 4.500 Kg x Rp. 11,250.00 ,- = Rp. 50,625.00 ,-
Semen portland 323.000 Kg x Rp. 650.00 ,- = Rp. 209,950.00 ,-
Pasir beton 0.520 M3 x Rp. 125,333.00 ,- = Rp. 65,173.16 ,-
Koral beton 0.780 M3 x Rp. 187,500.00 ,- = Rp. 146,250.00 ,-
Kayu borneo balok 0.150 M3 x Rp. 1,825,000.00 ,- = Rp. 273,750.00 ,-
Tripleks 2.8 mm 3.500 lbr x Rp. 44,500.00 ,- = Rp. 155,750.00 ,-
Dolken Ø 8cm/4m 20.000 btg x Rp. 2,000.00 ,- = Rp. 40,000.00 ,-
Sub Jumlah (1) = Rp. 2,895,298.16 ,-

b. Tenaga
Pekerja 7.300 Oh x Rp. 50,000.00 ,- = Rp. 365,000.00 ,-
Tukang batu 0.350 Oh x Rp. 80,000.00 ,- = Rp. 28,000.00 ,-
Tukang kayu 3.300 Oh x Rp. 80,000.00 ,- = Rp. 264,000.00 ,-
Tukang besi 2.100 Oh x Rp. 80,000.00 ,- = Rp. 168,000.00 ,-
Kepala tukang 0.570 Oh x Rp. 90,000.00 ,- = Rp. 51,300.00 ,-
Mandor 0.250 Oh x Rp. 120,000.00 ,- = Rp. 30,000.00 ,-
Sub Jumlah (2) = Rp. 906,300.00 ,-
Jumlah (1) + (2) = Rp. 3,801,598.16 ,-

15). 1m3 Membuat meja dapur


a. Bahan
Kayu terentang 0.250 M3 x Rp. 1,775,000.00 ,- = Rp. 443,750.00
Paku biasa 2"-5" 3.000 Kg x Rp. 8,500.00 ,- = Rp. 25,500.00 ,-
Minyak bekesting 1.200 lt x Rp. 13,000.00 ,- = Rp. 15,600.00 ,-
Besi beton polos 200.000 Kg x Rp. 5,919.00 ,- = Rp. 1,183,800.00 ,-
Kawat beton 3.000 Kg x Rp. 11,250.00 ,- = Rp. 33,750.00 ,-
Semen portland 323.000 Kg x Rp. 650.00 ,- = Rp. 209,950.00
Pasir beton 0.520 M3 x Rp. 125,333.00 ,- = Rp. 65,173.16
Koral beton 0.780 M3 x Rp. 187,500.00 ,- = Rp. 146,250.00 ,-
Kayu borneo balok 0.105 M3 x Rp. 1,825,000.00 ,- = Rp. 191,625.00 ,-
Tripleks 2.8 mm 2.500 lbr x Rp. 44,500.00 ,- = Rp. 111,250.00 ,-
Dolken Ø 8cm/4m 14.000 btg x Rp. 2,000.00 ,- = Rp. 28,000.00 ,-
Sub Jumlah (1) = Rp. 2,454,648.16 ,-

b. Tenaga
Pekerja 5.600 Oh x Rp. 50,000.00 ,- = Rp. 280,000.00
Tukang batu 0.350 Oh x Rp. 80,000.00 ,- = Rp. 28,000.00
Tukang kayu 2.300 Oh x Rp. 80,000.00 ,- = Rp. 184,000.00 ,-
Tukang besi 1.400 Oh x Rp. 80,000.00 ,- = Rp. 112,000.00 ,-
Kepala tukang 0.405 Oh x Rp. 90,000.00 ,- = Rp. 36,450.00 ,-
Mandor 0.202 Oh x Rp. 120,000.00 ,- = Rp. 24,240.00 ,-
Sub Jumlah (2) = Rp. 664,690.00 ,-
Jumlah (1) + (2) = Rp. 3,119,338.16 ,-

16). 1m3 Membuat beton tumbuk 1Pc : 3Psr :5Kr (Neut)


a. Bahan
Semen portland 218.000 Kg x Rp. 650.00 ,- = Rp. 141,700.00 ,-
Pasir beton 0.520 M3 x Rp. 125,333.00 ,- = Rp. 65,173.16 ,-
Koral beton 0.870 M3 x Rp. 187,500.00 ,- = Rp. 163,125.00 ,-
Sub Jumlah (1) 369,998.16
b. Tenaga
Pekerja 1.650 Oh x Rp. 50,000.00 ,- = Rp. 82,500.00 ,-
Tukang batu 0.250 Oh x Rp. 80,000.00 ,- = Rp. 20,000.00 ,-
Kepala tukang 0.025 Oh x Rp. 90,000.00 ,- = Rp. 2,250.00 ,-
Mandor 0.080 Oh x Rp. 120,000.00 ,- = Rp. 9,600.00 ,-
Sub Jumlah (2) = Rp. 114,350.00 ,-
Jumlah (1) + (2) = Rp. 484,348.16 ,-
17). 1 m3 Pasang kusen pintu dan jendela kayu jati
a. Bahan
Kayu jati, balok 1.1000 M3 x Rp. 4,625,000.00 ,- = Rp. 5,087,500.00 ,-
Sub Jumlah (1) ,- = Rp. 5,087,500.00 ,-

b. Tenaga
Pekerja 6.000 Oh x Rp. 50,000.00 ,- = Rp. 300,000.00 ,-
Tukang kayu 20.000 Oh x Rp. 80,000.00 ,- = Rp. 1,600,000.00 ,-
Kepala tukang 2.000 Oh x Rp. 90,000.00 ,- = Rp. 180,000.00 ,-
Mandor 0.300 Oh x Rp. 120,000.00 ,- = Rp. 36,000.00 ,-
Sub Jumlah (2) = Rp. 2,116,000.00 ,-
Jumlah (1) + (2) = Rp. 7,203,500.00 ,-

18. 1 m2 Pasang pintu teakwood rangkap (3 mm), rangka kayu kamper


a. Bahan
Kayu kamper, papan 0.0196 M3 x Rp. 2,350,000.00 ,- = Rp. 46,060.00 ,-
Paku biasa 1/2" - 1" 0.3000 Kg x Rp. 12,500.00 ,- = Rp. 3,750.00 ,-
Lem kayu 0.3000 Lt x Rp. 30,000.00 ,- = Rp. 9,000.00 ,-
Teakwood 0.3470 Lbr x Rp. 82,250.00 ,- = Rp. 28,540.75 ,-
Sub Jumlah (1) ,- = Rp. 87,350.75 ,-

b. Tenaga
Pekerja 0.600 Oh x Rp. 50,000.00 ,- = Rp. 30,000.00 ,-
Tukang kayu 2.000 Oh x Rp. 80,000.00 ,- = Rp. 160,000.00 ,-
Kepala tukang 0.200 Oh x Rp. 90,000.00 ,- = Rp. 18,000.00 ,-
Mandor 0.030 Oh x Rp. 120,000.00 ,- = Rp. 3,600.00 ,-
Sub Jumlah (2) = Rp. 211,600.00 ,-
Jumlah (1) + (2) = Rp. 298,950.75 ,-

19). 1 m2 Pasang pintu teakwood lapis seng rangkap kayu kamper


a. Bahan
Kayu kamper, papan 0.0196 M3 x Rp. 2,350,000.00 ,- = Rp. 46,060.00 ,-
Paku biasa 1/2" - 1" 0.3000 Kg x Rp. 12,500.00 ,- = Rp. 3,750.00 ,-
Lem kayu 0.3000 Lt x Rp. 30,000.00 ,- = Rp. 9,000.00 ,-
Teakwood 4" x 8" x 4 mm 0.3470 Lbr x Rp. 82,250.00 ,- = Rp. 28,540.75 ,-
Seng plat BJLS 0.20 mm 0.3470 Lbr x Rp. 13,650.00 ,- = Rp. 4,736.55 ,-
Sub Jumlah (1) ,- = Rp. 92,087.30 ,-

b. Tenaga
Pekerja 0.600 Oh x Rp. 50,000.00 ,- = Rp. 30,000.00 ,-
Tukang kayu 2.000 Oh x Rp. 80,000.00 ,- = Rp. 160,000.00 ,-
Kepala tukang 0.200 Oh x Rp. 90,000.00 ,- = Rp. 18,000.00 ,-
Mandor 0.030 Oh x Rp. 120,000.00 ,- = Rp. 3,600.00 ,-
Sub Jumlah (2) = Rp. 211,600.00 ,-
Jumlah (1) + (2) = Rp. 303,687.30 ,-

20. 1 m2 Pasang pintu panel kayu jati


a. Bahan
Kayu jati, papan 0.0400 M3 x Rp. 6,000,000.00 ,- = Rp. 240,000.00 ,-
Sub Jumlah (1) ,- = Rp. 240,000.00 ,-

b. Tenaga
Pekerja 1.000 Oh x Rp. 50,000.00 ,- = Rp. 50,000.00 ,-
Tukang kayu 2.500 Oh x Rp. 80,000.00 ,- = Rp. 200,000.00 ,-
Kepala tukang 0.250 Oh x Rp. 90,000.00 ,- = Rp. 22,500.00 ,-
Mandor 0.050 Oh x Rp. 120,000.00 ,- = Rp. 6,000.00 ,-
Sub Jumlah (2) = Rp. 278,500.00 ,-
Jumlah (1) + (2) = Rp. 518,500.00 ,-
21). 1 m3 Pasang konstruksi kuda - kuda/ kayu kelas II
a. Bahan
Kayu borneo 1.1000 M3 x Rp. 1,825,000.00 ,- = Rp. 2,007,500.00 ,-
Besi strip 15.0000 Kg x Rp. 10,000.00 ,- = Rp. 150,000.00 ,-
Paku baisa 2" - 5" 0.8000 Kg x Rp. 8,500.00 ,- = Rp. 6,800.00 ,-
Sub Jumlah (1) ,- = Rp. 2,164,300.00 ,-

b. Tenaga
Pekerja 4.000 Oh x Rp. 50,000.00 ,- = Rp. 200,000.00 ,-
Tukang kayu 12.000 Oh x Rp. 80,000.00 ,- = Rp. 960,000.00 ,-
Kepala tukang 1.200 Oh x Rp. 90,000.00 ,- = Rp. 108,000.00 ,-
Mandor 0.200 Oh x Rp. 120,000.00 ,- = Rp. 24,000.00 ,-
Sub Jumlah (2) = Rp. 1,292,000.00 ,-
Jumlah (1) + (2) = Rp. 3,456,300.00 ,-

22). 1 m1 Listplank ukuran (3 x 20) cm, kayu jati


a. Bahan
Kayu jati, papan 0.0072 M3 x Rp. 2,350,000.00 ,- = Rp. 16,920.00 ,-
Paku biasa 2" - 5" 0.0500 Kg x Rp. 8,500.00 ,- = Rp. 425.00 ,-
Sub Jumlah (1) ,- = Rp. 17,345.00 ,-

b. Tenaga
Pekerja 0.100 Oh x Rp. 50,000.00 ,- = Rp. 5,000.00 ,-
Tukang kayu 0.200 Oh x Rp. 80,000.00 ,- = Rp. 16,000.00 ,-
Kepala tukang 0.025 Oh x Rp. 90,000.00 ,- = Rp. 2,250.00 ,-
Mandor 0.005 Oh x Rp. 120,000.00 ,- = Rp. 600.00 ,-
Sub Jumlah (2) = Rp. 23,850.00 ,-
Jumlah (1) + (2) = Rp. 41,195.00 ,-

23). 1 m2 Pasang daun jendela kaca 3 mm


1). 1m2 Pasang jendela kaca kayu jati
a. Bahan
Kayu jati, papan 0.0350 M3 x Rp. 6,000,000.00 ,- = Rp. 210,000.00 ,-
Sub Jumlah (1a) ,- = Rp. 210,000.00 ,-

b. Tenaga
Pekerja 0.800 Oh x Rp. 50,000.00 ,- = Rp. 40,000.00 ,-
Tukang kayu 2.000 Oh x Rp. 80,000.00 ,- = Rp. 160,000.00 ,-
Kepala tukang 0.200 Oh x Rp. 90,000.00 ,- = Rp. 18,000.00 ,-
Mandor 0.040 Oh x Rp. 120,000.00 ,- = Rp. 4,800.00 ,-
Sub Jumlah (1b) = Rp. 222,800.00 ,-
Sub Jumlah (1) + (2) = Rp. 432,800.00 ,-

24) . 1 m2 Pasang kaca , tebal 3 mm


a. Bahan
kaca 1.100 M2 x Rp. 55,000.00 ,- = Rp. 60,500.00 ,-
Sub Jumlah (1) ,- = Rp. 60,500.00 ,-

b. Tenaga
Pekerja 0.015 Oh x Rp. 50,000.00 ,- = Rp. 750.00 ,-
Tukang ka yu 0.150 Oh x Rp. 80,000.00 ,- = Rp. 12,000.00 ,-
Kepala tukang 0.015 Oh x Rp. 90,000.00 ,- = Rp. 1,350.00 ,-
Mandor 0.00075 Oh x Rp. 90,000.00 ,- = Rp. 67.50 ,-
Sub Jumlah (2) = Rp. 14,167.50 ,-
Sub Jumlah (1) + (2) = Rp. 74,667.50 ,-
Jumlah (1) + (2) = Rp. 507,467.50 ,-
25). 1 m2 Memasang Atap Seng Gelombang BJLS 0.30 mm
a. Bahan
Seng gelombang 3" x 6" bjls 28 0.7000 Lbr x Rp. 54,000.00 ,- = Rp. 37,800.00 ,-
Paku biasa 1/2" - 1" 0.0200 Kg x Rp. 28,250.00 ,- = Rp. 565.00 ,-
Sub Jumlah (1) ,- = Rp. 38,365.00 ,-

b. Tenaga
Pekerja 0.120 Oh x Rp. 50,000.00 ,- = Rp. 6,000.00 ,-
Tukang kayu 0.060 Oh x Rp. 80,000.00 ,- = Rp. 4,800.00 ,-
Kepala tukang 0.006 Oh x Rp. 90,000.00 ,- = Rp. 540.00 ,-
Mandor 0.006 Oh x Rp. 120,000.00 ,- = Rp. 720.00 ,-
Sub Jumlah (2) = Rp. 12,060.00 ,-
Jumlah (1) + (2) = Rp. 50,425.00 ,-

26). 1 m1 Memasang Bubungan Atap Seng Gelombang BJLS 0.30 mm


a Bahan
Seng plat 3" x 6" bjls 28 0.300 Lbr x Rp. 33,750.00 ,- = Rp. 10,125.00 ,-
Paku biasa 1/2" - 1" 0.040 Kg x Rp. 28,250.00 ,- = Rp. 1,130.00 ,-
Sub Jumlah (1) ,- = Rp. 11,255.00 ,-

b Tenaga
Pekerja 0.150 Oh x Rp. 50,000.00 ,- = Rp. 7,500.00 ,-
Tukang kayu 0.070 Oh x Rp. 80,000.00 ,- = Rp. 5,600.00 ,-
Kepala tukang 0.008 Oh x Rp. 90,000.00 ,- = Rp. 720.00 ,-
Mandor 0.008 Oh x Rp. 90,000.00 ,- = Rp. 720.00 ,-
Sub Jumlah (2) = Rp. 14,540.00 ,-
Jumlah (1) + (2) = Rp. 25,795.00 ,-

27). 1 m2 Memasang Plafond tripleks (60 x 120) cm, tebal 4 mm


1). 1m2 Pasang rangka langit - langit (30 x 60) cm, kayu borneo
a Bahan
Kayu borneo, balok 0.0230 M3 x Rp. 1,825,000.00 ,- = Rp. 41,975.00 ,-
Paku biasa 2" - 5" 0.1500 Kg x Rp. 8,500.00 ,- = Rp. 1,275.00 ,-
Sub Jumlah (1a) ,- = Rp. 43,250.00 ,-

b Tenaga
Pekerja 0.150 Oh x Rp. 50,000.00 ,- = Rp. 7,500.00 ,-
Tukang kayu 0.070 Oh x Rp. 80,000.00 ,- = Rp. 5,600.00 ,-
Kepala tukang 0.008 Oh x Rp. 90,000.00 ,- = Rp. 720.00 ,-
Mandor 0.008 Oh x Rp. 90,000.00 ,- = Rp. 720.00 ,-
Sub Jumlah (1b) = Rp. 14,540.00 ,-
Jumlah (1) = Rp. 57,790.00 ,-

2). 1m2 Pasang langit - langit tripleks (30 x 60) cm, tebal 4 mm
a. Bahan
Tripleks 4 mm 0.3600 Lbr x Rp. 56,250.00 ,- = Rp. 20,250.00 ,-
Paku 0.0300 Kg x Rp. 12,500.00 ,- = Rp. 375.00 ,-
Sub Jumlah (1) ,- = Rp. 20,625.00 ,-

b. Tenaga
Pekerja 0.0700 Oh x Rp. 50,000.00 ,- = Rp. 3,500.00 ,-
Tukang kayu 0.1000 Oh x Rp. 80,000.00 ,- = Rp. 8,000.00 ,-
Kepala tukang 0.0100 Oh x Rp. 90,000.00 ,- = Rp. 900.00 ,-
Mandor 0.0035 Oh x Rp. 120,000.00 ,- = Rp. 420.00 ,-
Sub Jumlah (2) = Rp. 12,820.00 ,-
Jumlah (1) + (2) = Rp. 33,445.00 ,-
Jumlah (1) + (2) = Rp. 91,235.00 ,-
28). 1 m1 List plafond - kayu profil
a. Bahan
Kayu profil 1.050 M x Rp. 6,250.00 ,- = Rp. 6,562.50 ,-
Sub Jumlah (1) ,- = Rp. 6,562.50 ,-

b. Tenaga
Pekerja 0.021 Oh x Rp. 50,000.00 ,- = Rp. 1,050.00 ,-
Tukang kayu 0.021 Oh x Rp. 80,000.00 ,- = Rp. 1,680.00 ,-
Kepala tukang 0.002 Oh x Rp. 90,000.00 ,- = Rp. 180.00 ,-
Mandor 0.001 Oh x Rp. 120,000.00 ,- = Rp. 120.00 ,-
Sub Jumlah (2) = Rp. 3,030.00 ,-
Jumlah (1) + (2) = Rp. 9,592.50 ,-

29). 1 m2 Pasang keramik warna ukuran 30 x 30 cm


a. Bahan
Keramik 30x30 cm 11.000 Bh x Rp. 2,835.00 ,- = Rp. 31,185.00 ,-
Semen portland 8.360 Kg x Rp. 650.00 ,- = Rp. 5,434.00 ,-
Pasir pasang 0.023 M3 x Rp. 95,833.00 ,- = Rp. 2,204.16 ,-
Semen warna 0.900 Kg x Rp. 2,050.00 ,- = Rp. 1,845.00 ,-
Sub Jumlah (1) ,- = Rp. 40,668.16 ,-

b. Tenaga
Pekerja 0.2500 Oh x Rp. 50,000.00 ,- = Rp. 12,500.00 ,-
Tukang batu 0.1200 Oh x Rp. 80,000.00 ,- = Rp. 9,600.00 ,-
Kepala tukang 0.0120 Oh x Rp. 90,000.00 ,- = Rp. 1,080.00 ,-
Mandor 0.0125 Oh x Rp. 120,000.00 ,- = Rp. 1,500.00 ,-
Sub Jumlah (2) = Rp. 24,680.00 ,-
Jumlah (1) + (2) = Rp. 65,348.16 ,-

30). 1 m2 Pasang ubin mozaik 30 x 30 cm


a. Bahan
Mozaik 30x30 cm 11.000 Bh x Rp. 3,750.00 ,- = Rp. 41,250.00 ,-
Semen portland 8.360 Kg x Rp. 650.00 ,- = Rp. 5,434.00 ,-
Pasir pasang 0.023 M3 x Rp. 95,833.00 ,- = Rp. 2,204.16 ,-
Semen warna 0.900 Kg x Rp. 2,050.00 ,- = Rp. 1,845.00 ,-
Sub Jumlah (1) ,- = Rp. 50,733.16 ,-

b. Tenaga
Pekerja 0.2500 Oh x Rp. 50,000.00 ,- = Rp. 12,500.00 ,-
Tukang batu 0.1200 Oh x Rp. 80,000.00 ,- = Rp. 9,600.00 ,-
Kepala tukang 0.0120 Oh x Rp. 90,000.00 ,- = Rp. 1,080.00 ,-
Mandor 0.0125 Oh x Rp. 120,000.00 ,- = Rp. 1,500.00 ,-
Sub Jumlah (2) = Rp. 24,680.00 ,-
Jumlah (1) + (2) = Rp. 75,413.16 ,-

31). 1 m1 Pasang plint keramik artistik 10 x 20 cm


a. Bahan
Plint ubin granito 10x30 cm 5.000 Bh x Rp. 1,350.00 ,- = Rp. 6,750.00 ,-
Semen portland 1.650 Kg x Rp. 650.00 ,- = Rp. 1,072.50 ,-
Pasir pasang 0.0032 M3 x Rp. 95,833.00 ,- = Rp. 306.67 ,-
Semen warna 0.100 Kg x Rp. 2,050.00 ,- = Rp. 205.00 ,-
Sub Jumlah (1) ,- = Rp. 8,334.17 ,-

b. Tenaga
Pekerja 0.0900 Oh x Rp. 50,000.00 ,- = Rp. 4,500.00 ,-
Tukang batu 0.0900 Oh x Rp. 80,000.00 ,- = Rp. 7,200.00 ,-
Kepala tukang 0.0090 Oh x Rp. 90,000.00 ,- = Rp. 810.00 ,-
Mandor 0.0045 Oh x Rp. 120,000.00 ,- = Rp. 540.00 ,-
Sub Jumlah (2) = Rp. 13,050.00 ,-
Jumlah (1) + (2) = Rp. 21,384.17 ,-
32). 1 m2 Memasang Tegel Porselin 20 x 20 cm, warna
a. Bahan
Porselin 20x20 cm warna 25.000 Bh x Rp. 1,580.00 ,- = Rp. 39,500.00 ,-
Semen abu-abu 9.300 Kg x Rp. 650.00 ,- = Rp. 6,045.00 ,-
Pasir pasang 0.018 M3 x Rp. 95,833.00 ,- = Rp. 1,724.99 ,-
Semen warna 1.500 Kg x Rp. 2,050.00 ,- = Rp. 3,075.00 ,-
Sub Jumlah (1) ,- = Rp. 50,344.99 ,-

b. Tenaga
Pekerja 0.0900 Oh x Rp. 50,000.00 ,- = Rp. 4,500.00 ,-
Tukang batu 0.0900 Oh x Rp. 80,000.00 ,- = Rp. 7,200.00 ,-
Kepala tukang 0.0090 Oh x Rp. 90,000.00 ,- = Rp. 810.00 ,-
Mandor 0.0045 Oh x Rp. 120,000.00 ,- = Rp. 540.00 ,-
Sub Jumlah (2) = Rp. 13,050.00 ,-
Jumlah (1) + (2) = Rp. 63,394.99 ,-

33). 1 Bh Kloset jongkok porselin


a. Bahan
Kloset jongkok porselin 1.000 Bh x Rp. 97,500.00 ,- = Rp. 97,500.00 ,-
Semen portland 6.000 Kg x Rp. 650.00 ,- = Rp. 3,900.00 ,-
Pasir pasang 0.010 M3 x Rp. 95,833.00 ,- = Rp. 958.33 ,-
Sub Jumlah (1) ,- = Rp. 102,358.33

b. Tenaga
Pekerja 1.000 Oh x Rp. 50,000.00 ,- = Rp. 50,000.00 ,-
Tukang batu 1.500 Oh x Rp. 80,000.00 ,- = Rp. 120,000.00 ,-
Kepala tukang 1.500 Oh x Rp. 90,000.00 ,- = Rp. 135,000.00 ,-
Mandor 0.160 Oh x Rp. 120,000.00 ,- = Rp. 19,200.00 ,-
Sub Jumlah (2) = Rp. 324,200.00 ,-
Jumlah (1) + (2) = Rp. 426,558.33 ,-

34). 1 Bh Wastafel
a. Bahan
Wastafel 1.000 Bh x Rp. 162,500.00 ,- = Rp. 162,500.00 ,-
Semen abu-abu 6.000 Kg x Rp. 650.00 ,- = Rp. 3,900.00 ,-
Pasir pasang 0.010 M3 x Rp. 95,833.00 ,- = Rp. 958.33 ,-
Sub Jumlah (1) ,- = Rp. 167,358.33

b. Tenaga
Pekerja 1.200 Oh x Rp. 50,000.00 ,- = Rp. 60,000.00 ,-
Tukang batu 1.450 Oh x Rp. 80,000.00 ,- = Rp. 116,000.00 ,-
Kepala tukang 0.150 Oh x Rp. 90,000.00 ,- = Rp. 13,500.00 ,-
Mandor 0.100 Oh x Rp. 120,000.00 ,- = Rp. 12,000.00 ,-
Sub Jumlah (2) = Rp. 201,500.00 ,-
Jumlah (1) + (2) = Rp. 368,858.33 ,-

35). 1 Bh Bak air porselin


a. Bahan
Bak teraso 1.000 Bh x Rp. 270,000.00 ,- = Rp. 270,000.00 ,-
Semen Portland 6.000 Kg x Rp. 650.00 ,- = Rp. 3,900.00 ,-
Pasir pasang 0.010 M3 x Rp. 95,833.00 ,- = Rp. 958.33 ,-
Sub Jumlah (1) ,- = Rp. 274,858.33

b. Tenaga
Pekerja 2.100 Oh x Rp. 50,000.00 ,- = Rp. 105,000.00 ,-
Tukang batu 0.750 Oh x Rp. 80,000.00 ,- = Rp. 60,000.00 ,-
Kepala tukang 0.070 Oh x Rp. 90,000.00 ,- = Rp. 6,300.00 ,-
Mandor 0.110 Oh x Rp. 120,000.00 ,- = Rp. 13,200.00 ,-
Sub Jumlah (2) = Rp. 184,500.00 ,-
Jumlah (1) + (2) = Rp. 459,358.33 ,-
36). 1 Bh Kran air
a. Bahan
Kran air 1.000 Bh x Rp. 42,500.00 ,- = Rp. 42,500.00 ,-
Seal tape 0.025 Bh x Rp. 6,000.00 ,- = Rp. 150.00 ,-
Sub Jumlah (1) ,- = Rp. 42,650.00 ,-

b. Tenaga
Pekerja 0.010 Oh x Rp. 50,000.00 ,- = Rp. 500.00 ,-
Tukang batu 0.100 Oh x Rp. 80,000.00 ,- = Rp. 8,000.00 ,-
Kepala tukang 0.010 Oh x Rp. 90,000.00 ,- = Rp. 900.00 ,-
Mandor 0.005 Oh x Rp. 120,000.00 ,- = Rp. 600.00 ,-
Sub Jumlah (2) = Rp. 10,000.00 ,-
Jumlah (1) + (2) = Rp. 52,650.00 ,-
37). 1 Bh Floor drain
a. Bahan
Floor drain 1.000 Bh x Rp. 18,750.00 ,- = Rp. 18,750.00 ,-
Sub Jumlah (1) ,- = Rp. 18,750.00 ,-

b. Tenaga
Pekerja 0.010 Oh x Rp. 50,000.00 ,- = Rp. 500.00 ,-
Tukang batu 0.100 Oh x Rp. 80,000.00 ,- = Rp. 8,000.00 ,-
Kepala tukang 0.010 Oh x Rp. 90,000.00 ,- = Rp. 900.00 ,-
Mandor 0.005 Oh x Rp. 120,000.00 ,- = Rp. 600.00 ,-
Sub Jumlah (2) = Rp. 10,000.00 ,-
Jumlah (1) + (2) = Rp. 28,750.00 ,-

38). 1 m2 Pengecatan tembok baru ( 1 plamir, 1 lapis cat dasar, 2 lapis cat penutup)
a Bahan
Plamir 0.100 Kg x Rp. 25,000.00 ,- = Rp. 2,500.00 ,-
Cat dasar 0.100 Kg x Rp. 15,500.00 ,- = Rp. 1,550.00 ,-
Cat penutup 2 x 0.26 Kg x Rp. 25,750.00 ,- = Rp. 6,695.00 ,-
Sub Jumlah (1) ,- = Rp. 10,745.00 ,-

b Tenaga
Pekerja 0.0200 Oh x Rp. 50,000.00 ,- = Rp. 1,000.00 ,-
Tukang cat 0.0630 Oh x Rp. 70,000.00 ,- = Rp. 4,410.00 ,-
Kepala tukang 0.0063 Oh x Rp. 90,000.00 ,- = Rp. 567.00 ,-
Mandor 0.0025 Oh x Rp. 120,000.00 ,- = Rp. 300.00 ,-
Sub Jumlah (2) = Rp. 6,277.00 ,-
Jumlah (1) + (2) = Rp. 17,022.00 ,-

39). 1 m2 Pengecatan bidang kayu baru (1 lapis plamir), 1 lapis cat dasar, 2 lapis cat penutup
a. Bahan
Cat meni 0.200 Kg x Rp. 46,750.00 ,- = Rp. 9,350.00 ,-
Plamir 0.150 Kg x Rp. 25,000.00 ,- = Rp. 3,750.00 ,-
Cat dasar 0.17 Kg x Rp. 15,500.00 ,- = Rp. 2,635.00 ,-
Cat penutup 2 x 0.26 Kg x Rp. 25,750.00 ,- = Rp. 6,695.00 ,-
Sub Jumlah (1) ,- = Rp. 22,430.00 ,-

b. Tenaga
Pekerja 0.0700 Oh x Rp. 50,000.00 ,- = Rp. 3,500.00 ,-
Tukang cat 0.0090 Oh x Rp. 70,000.00 ,- = Rp. 630.00 ,-
Kepala tukang 0.0060 Oh x Rp. 90,000.00 ,- = Rp. 540.00 ,-
Mandor 0.0025 Oh x Rp. 120,000.00 ,- = Rp. 300.00 ,-
Sub Jumlah (2) = Rp. 4,970.00 ,-
Jumlah (1) + (2) = Rp. 27,400.00 ,-
40). 1 m2 Pelaburan bidang kayu dengan teak oil
a. Bahan
Teak oil 0.360 Ltr x Rp. 13,000.00 ,- = Rp. 4,680.00 ,-
Sub Jumlah (1) ,- = Rp. 4,680.00 ,-

b. Tenaga
Pekerja 0.0400 Oh x Rp. 50,000.00 ,- = Rp. 2,000.00 ,-
Tukang cat 0.0630 Oh x Rp. 70,000.00 ,- = Rp. 4,410.00 ,-
Kepala tukang 0.0630 Oh x Rp. 90,000.00 ,- = Rp. 5,670.00 ,-
Mandor 0.0025 Oh x Rp. 120,000.00 ,- = Rp. 300.00 ,-
Sub Jumlah (2) = Rp. 12,380.00 ,-
Jumlah (1) + (2) = Rp. 17,060.00 ,-

41) 1 m2 Pengecatan permukaan baja lapis seng (galbani) secara manual sistem 1 lapis cat muktahir
dengan tebal 200um
a. Bahan
Cat 0.300 Kg x Rp. 26,000.00 ,- = Rp. 7,800.00 ,-
Sub Jumlah (1) ,- = Rp. 7,800.00 ,-

b. Tenaga
Pekerja 0.0060 Oh x Rp. 50,000.00 ,- = Rp. 300.00 ,-
Tukang cat 0.0600 Oh x Rp. 70,000.00 ,- = Rp. 4,200.00 ,-
Kepala tukang 0.0120 Oh x Rp. 90,000.00 ,- = Rp. 1,080.00 ,-
Mandor 0.0060 Oh x Rp. 120,000.00 ,- = Rp. 720.00 ,-
Sub Jumlah (2) = Rp. 6,300.00 ,-
Jumlah (1) + (2) = Rp. 14,100.00 ,-

42). 1 Bh Pasang engsel


a. Bahan
Engsel pintu 1.000 Bh x Rp. 11,875.00 ,- = Rp. 11,875.00 ,-
Sub Jumlah (1a) ,- = Rp. 11,875.00 ,-

b. Tenaga
Pekerja 0.0150 Oh x Rp. 50,000.00 ,- = Rp. 750.00 ,-
Tukang kayu 0.1500 Oh x Rp. 80,000.00 ,- = Rp. 12,000.00 ,-
Kepala tukang 0.0150 Oh x Rp. 90,000.00 ,- = Rp. 1,350.00 ,-
Mandor 0.00075 Oh x Rp. 120,000.00 ,- = Rp. 90.00 ,-
Sub Jumlah (1b) = Rp. 14,190.00 ,-
Sub Jumlah (1) = Rp. 26,065.00 ,-
43). 1 Bh Pasang kait angin
a. Bahan
kait angin 1.000 Bh x Rp. 8,250.00 ,- = Rp. 8,250.00 ,-
Sub Jumlah (1) ,- = Rp. 8,250.00 ,-

b. Tenaga
Pekerja 0.0150 Oh x Rp. 50,000.00 ,- = Rp. 750.00 ,-
Tukang kayu 0.1500 Oh x Rp. 80,000.00 ,- = Rp. 12,000.00 ,-
Kepala tukang 0.0150 Oh x Rp. 90,000.00 ,- = Rp. 1,350.00 ,-
Mandor 0.00075 Oh x Rp. 120,000.00 ,- = Rp. 90.00 ,-
Sub Jumlah (1) = Rp. 14,190.00 ,-
Jumlah (1) + (2) = Rp. 22,440.00 ,-
44). 1 buah pasang Grendel

a. Bahan
Grendel Ekspagnolet 1.000 Bh x Rp. 25,000.00 ,- = Rp. 25,000.00 ,-
Sub Jumlah (1) = Rp. 25,000.00 ,-

b. Tenaga
Pekerja 0.0050 Oh x Rp. 50,000.00 ,- = Rp. 250.00 ,-
Tukang kayu 0.5000 Oh x Rp. 80,000.00 ,- = Rp. 40,000.00 ,-
Kepala tukang 0.0050 Oh x Rp. 90,000.00 ,- = Rp. 450.00 ,-
Mandor 0.0025 Oh x Rp. 120,000.00 ,- = Rp. 300.00 ,-
Sub Jumlah (2) ,- = Rp. 41,000.00 ,-
Jumlah (1) + (2) = Rp. 66,000.00 ,-

45). 1 buah pasang kunci tanam kamar mandi

a. Bahan
kunci tanam kamar mandi 1.000 Bh x Rp. 35,000.00 ,- = Rp. 35,000.00 ,-
Sub Jumlah (1) = Rp. 35,000.00 ,-

b. Tenaga
Pekerja 0.0050 Oh x Rp. 50,000.00 ,- = Rp. 250.00 ,-
Tukang kayu 0.5000 Oh x Rp. 80,000.00 ,- = Rp. 40,000.00 ,-
Kepala tukang 0.0050 Oh x Rp. 90,000.00 ,- = Rp. 450.00 ,-
Mandor 0.0025 Oh x Rp. 120,000.00 ,- = Rp. 300.00 ,-
Sub Jumlah (2) ,- = Rp. 41,000.00 ,-
Jumlah (1) + (2) = Rp. 76,000.00 ,-

46). 1 buah pasang kunci tanam biasa

a. Bahan
kunci tanam biasa 1.000 Bh x Rp. 92,500.00 ,- = Rp. 92,500.00 ,-
Sub Jumlah (1) ,- = Rp. Rp 92,500.00 ,-

b. Tenaga
Pekerja 0.0100 Oh x Rp. 50,000.00 ,- = Rp. 500.00 ,-
Tukang kayu 0.5000 Oh x Rp. 80,000.00 ,- = Rp. 40,000.00 ,-
Kepala tukang 0.0100 Oh x Rp. 90,000.00 ,- = Rp. 900.00 ,-
Mandor 0.0050 Oh x Rp. 120,000.00 ,- = Rp. 600.00 ,-
Sub Jumlah (2) = Rp. 42,000.00 ,-
Jumlah (1) + (2) = Rp. 134,500.00 ,-
47). 1 m1 Memasang Pipa Beton, diameter 30 cm - 100 cm
a. Bahan
Pipa beton 1.100 Bh x Rp. 35,000.00 ,- = Rp. 38,500.00 ,-
Batu bata 0.550 Bh x Rp. 500.00 ,- = Rp. 275.00 ,-
Sement portland 10.300 Kg x Rp. 650.00 ,- = Rp. 6,695.00 ,-
Pasir pasang 0.061 Bh x Rp. 95,833.00 ,- = Rp. 5,845.81 ,-
Pasir urug 0.069 Bh x Rp. 75,000.00 ,- = Rp. 5,175.00 ,-
Sub Jumlah (1) = Rp. 56,490.81 ,-
b. Tenaga
Pekerja 0.380 Oh x Rp. 50,000.00 ,- = Rp. 19,000.00 ,-
Tukang batu 0.190 Oh x Rp. 80,000.00 ,- = Rp. 15,200.00 ,-
Kepala tukang 0.019 Oh x Rp. 90,000.00 ,- = Rp. 1,710.00 ,-
Mandor 0.019 Oh x Rp. 120,000.00 ,- = Rp. 2,280.00 ,-
Sub Jumlah (2) ,- = Rp. 38,190.00 ,-
Jumlah (1) + (2) = Rp. 94,680.81 ,-
REKAPITULASI

Bobot
No. Uraian Pekerjaan Harga
%
LANTAI 1
I. Pekerjaan Persiapan Rp 3,401,710.00 1.914
II. Pekerjaan Tanah dan Urugan Rp 8,629,680.30 4.855
III. Pekerjaan Pasangan dan Plesteran Rp 27,165,316.40 15.283
IV. Pekerjaan Beton Rp 15,329,422.72 8.624
V. Pekerjaan Kayu dan Kaca Rp 43,098,581.52 24.247
VI. Pekerjaan Atap dan Plafond Rp 28,224,919.90 15.879
VII. Pekerjaan Lantai Rp 10,460,398.19 5.885
VIII. Pekerjaan Instalasi Listrik dan Air Rp 19,923,541.65 11.209
IX. Pekerjaan Finishing Rp 10,090,597.76 5.677
X. Pekerjaan Penggantung dan Pengunci Rp 6,822,230.00 3.838
LANTAI 2
I. Pekerjaan Pasangan dan Plesteran
II. Pekerjaan Beton
III. Pekerjaan Kayu dan Kaca
IV. Pekerjaan Atap dan Plafond
V. Pekerjaan Lantai
VI. Pekerjaan Instalasi Listrik dan Air
VII. Pekerjaan Finishing
VIII. Pekerjaan Penggantung dan Pengunci
LANTAI 3
I. Pekerjaan Pasangan dan Plesteran
II. Pekerjaan Beton
III. Pekerjaan Kayu dan Kaca
IV. Pekerjaan Atap dan Plafond
V. Pekerjaan Lantai
VI. Pekerjaan Instalasi Listrik dan Air
VII. Pekerjaan Finishing
VIII. Pekerjaan Penggantung dan Pengunci
XI. Pekerjaan Lain - Lain Rp 4,605,317.40 2.591
Total = Rp 177,751,715.84 100.000
PPN 10 % = Rp 17,775,171.58
Jumlah = Rp 195,526,887.42
Pembulatan = Rp 197,013,000.00

Luas Total Bangunan = Luas Bangunan Utama + 1/2 Luas Teras


= 110.375 m2

Total Harga
Harga/ m2 bangunan =
Luas Bangunan

Rp 177,751,715.84
=
110.375

= Rp 1,610,434.57 /m2
RENCANA ANGGARAN BIAYA
No. Jenis Pekerjaan Sat. Volume Harga Satuan Total Harga Bobot
1 2 3 4 5 6 7
LANTAI 1
I PEKERJAAN PERSIAPAN
1 Pembersihan Lahan m2 260.000 Rp 1,000.00 Rp 260,000.00 0.146
2 Pemasangan Bowplank m1 58.000 Rp 48,995.00 Rp 2,841,710.00 1.599
3 Penyediaan Air Kerja LS 1 Rp 300,000.00 Rp 300,000.00 0.169
Rp 3,401,710.00 1.914
II PEKERJAAN TANAH DAN URUGAN
1 Galian Tanah Pondasi m3 73.540 Rp 69,940.00 Rp 5,143,387.60 2.894
2 Urugan Tanah Kembali m3 18.385 Rp 11,880.00 Rp 218,413.80 0.123
3 Urugan Pasir di Bawah Pondasi m3 7.505 Rp 260,000.31 Rp 1,951,302.33 1.098
4 Urugan Pasir Peninggi Lantai m3 5.064 Rp 260,000.31 Rp 1,316,576.57 0.741
TOTAL Rp 8,629,680.30 4.855
III PEKERJAAN PASANGAN DAN PLESTERAN
1 Pekerjaan Anstamping m3 15.010 Rp 186,890.40 Rp 2,805,224.90 1.578
2 Pasangan Pondasi Batu Karang (1 pc : 5 psr) m3 33.228 Rp 356,766.85 Rp 11,854,805.04 6.669
3 Pasangan Tembok Trasraam (1 pc : 3 psr) m2 18.600 Rp 74,873.82 Rp 1,392,653.05 0.783
4 Pasangan Tembok Biasa (1 pc : 5 psr) m2 37.604 Rp 72,304.49 Rp 2,718,919.78 1.530
5 Plesteran Tembok Trasraam (1 pc : 3 psr) m2 37.200 Rp 30,582.83 Rp 1,137,681.16 0.640
6 Plesteran Tembok Biasa (1 pc : 5 psr) m2 111.454 Rp 29,466.33 Rp 3,284,132.53 1.848
7 Plesteran Pondasi Tepi Luar (1 pc : 5 psr) m2 14.525 Rp 29,466.33 Rp 427,998.39 0.241
8 Acian Tembok m2 125.979 Rp 28,130.95 Rp 3,543,901.54 1.994
TOTAL Rp 27,165,316.40 15.283
IV PEKERJAAN BETON
1 Cor Beton Sloof (1pc : 2psr : 3krl) m3 1.110 Rp 2,405,113.16 Rp 2,669,675.61 1.502
2 Cor Beton Kolom Praktis (1pc : 2psr : 3krl) m3 1.037 Rp 3,801,598.16 Rp 3,941,496.97 2.217
3 Cor Beton Kolom Teras (1pc : 2psr : 3krl) m3 0.240 Rp 3,801,598.16 Rp 912,383.56 0.513
4 Cor Beton Ringbalk (1pc : 2psr : 3krl) m3 2.730 Rp 2,405,113.16 Rp 6,565,958.93 3.694
5 Cor Beton Meja Dapur (1pc : 2psr : 3krl) m3 0.396 Rp 3,119,338.16 Rp 1,235,257.91 0.695
6 Cor Beton Neut (1pc : 2psr : 3krl) m3 0.010 Rp 484,348.16 Rp 4,649.74 0.003
TOTAL Rp 15,329,422.72 8.624
V PEKERJAAN KAYU DAN KACA
1 Pasangan Kayu Kusen Klas I m3 0.818 Rp 7,203,500.00 Rp 5,888,861.25 3.313
2 Pasangan Daun Pintu Panil Kayu m2 5.520 Rp 518,500.00 Rp 2,862,120.00 1.610
3 Pas. Daun Pintu Double Teacwood 3 mm m2 4.920 Rp 298,950.75 Rp 1,470,837.69 0.827
4 Pas. Daun Pintu Double Teacwood 3 mm lapis seng m2 2.880 Rp 303,687.30 Rp 874,619.42 0.492
5 Pas. Daun Jendela Kaca dan Ventilasi 3 mm m2 22.668 Rp 507,467.50 Rp 11,503,273.29 6.472
6 Pas. Kayu Kap dan Gording m3 4.393 Rp 3,456,300.00 Rp 15,184,714.87 8.543
7 Pasangan Lisplank Papan m1 129.000 Rp 41,195.00 Rp 5,314,155.00 2.990
TOTAL Rp 43,098,581.52 24.247
VI PEKERJAAN ATAP DAN PLAFOND
1 Pas. Atap Seng BJLS 0.30 mm m2 213.380 Rp 50,425.00 Rp 10,759,686.50 6.053
2 Pas. Atap Bubungan Seng Licin 0.30 mm m1 14.500 Rp 25,795.00 Rp 374,027.50 0.210
3 Pas. Plafond Tripleks 3 mm & Rangka m2 162.140 Rp 91,235.00 Rp 14,792,842.90 8.322
4 Pas. List Penutup Plafond (Berprofil) m1 239.600 Rp 9,592.50 Rp 2,298,363.00 1.293
TOTAL Rp 28,224,919.90 15.879
VII PEKERJAAN LANTAI
1 Pasangan Tegel Keramik 30/30 m2 101.925 Rp 65,348.16 Rp 6,660,611.11 3.747
2 Pasangan Tegel Mozaik 30/30 m2 5.100 Rp 75,413.16 Rp 384,607.11 0.216
3 Pasangan Tegel Plint 10/20 m1 87.400 Rp 21,384.17 Rp 1,868,976.07 1.051
4 Pasangan Tegel Porselen 20/20 m2 24.390 Rp 63,394.99 Rp 1,546,203.90 0.870
TOTAL Rp 10,460,398.19 5.885
VIII PEKERJAAN INSTALASI LISTRIK DAN AIR
1 Pasangan Titik Lampu Buah 19 Rp 17,500.00 Rp 332,500.00 0.187
2 Pasangan Lampu TL 40 Watt Buah 2 Rp 64,000.00 Rp 128,000.00 0.072
3 Pasangan Lampu TL 20 Watt Buah 9 Rp 56,500.00 Rp 508,500.00 0.286
4 Pasangan Lampu Pijar 25 Watt Buah 2 Rp 3,250.00 Rp 6,500.00 0.004
5 Pasangan Saklar Tunggal Buah 6 Rp 10,750.00 Rp 64,500.00 0.036
6 Pasangan SaklarGanda Buah 3 Rp 14,250.00 Rp 42,750.00 0.024
7 Pasangan Stop Kontak Buah 7 Rp 12,750.00 Rp 89,250.00 0.050
8 Pasangan Sekring Cast Buah 1 Rp 14,000.00 Rp 14,000.00 0.008
9 Pasangan Arde Pembumian Buah 1 Rp 100,000.00 Rp 100,000.00 0.056
10 Pasangan Wastafel Buah 1 Rp 368,858.33 Rp 368,858.33 0.208
11 Pasangan Bak Air Porselin Buah 2 Rp 459,358.33 Rp 918,716.66 0.517
12 Pasangan Closed Jongkok Buah 2 Rp 426,558.33 Rp 853,116.66 0.480
13 Pasangan Septic Tank dan Peresapan Buah 2 Rp 7,500,000.00 Rp 15,000,000.00 8.439
14 Pasangan Instalasi Air Bersih LS 1 Rp 600,000.00 Rp 600,000.00 0.338
15 Pasangan Instalasi Air Kotor LS 1 Rp 600,000.00 Rp 600,000.00 0.338
16 Pasangan Floor Drain Buah 3 Rp 28,750.00 Rp 86,250.00 0.049
17 Pasangan Kran Air Buah 4 Rp 52,650.00 Rp 210,600.00 0.118
TOTAL Rp 19,923,541.65 11.209
IX PEKERJAAN FINISHING
1 Cat Tembok m2 125.979 Rp 17,022.00 Rp 2,144,410.28 1.206
2 Cat Plafond m2 162.140 Rp 17,022.00 Rp 2,759,947.08 1.553
4 Cat Kayu m2 72.60 Rp 27,400.00 Rp 1,989,240.00 1.119
5 Cat Seng m2 213.380 Rp 14,100.00 Rp 3,008,658.00 1.693
6 Teak Oil m2 11.04 Rp 17,060.00 Rp 188,342.40 0.106
TOTAL Rp 10,090,597.76 5.677
X PEKERJAAN PENGGANTUNG DAN PENGUNCI
1 Pasangan Kunci Double Slaag Buah 6 Rp 134,500.00 Rp 807,000.00 0.454
2 Pasangan Kunci KM/ WC Buah 2 Rp 76,000.00 Rp 152,000.00 0.086
3 Pasangan Grendel Buah 31 Rp 66,000.00 Rp 2,046,000.00 1.151
4 Pasangan Engsel Buah 86 Rp 26,065.00 Rp 2,241,590.00 1.261
5 Pasangan Kait Angin Buah 31 Rp 22,440.00 Rp 695,640.00 0.391
6 Pasangan Anker Doc Buah 68 Rp 10,000.00 Rp 680,000.00 0.383
7 Pasangan Mur, Baut dan Beughel U LS 1 Rp 200,000.00 Rp 200,000.00 0.113
TOTAL Rp 6,822,230.00 3.838
LANTAI 2
I PEKERJAAN PASANGAN DAN PLESTERAN
1 Pekerjaan Anstamping m3 Rp - 0.000
2 Pasangan Pondasi Batu Karang (1 pc : 5 psr) m3 Rp - 0.000
3 Pasangan Tembok Trasraam (1 pc : 3 psr) m2 Rp - 0.000
4 Pasangan Tembok Biasa (1 pc : 5 psr) m2 Rp - 0.000
5 Plesteran Tembok Trasraam (1 pc : 3 psr) m2 Rp - 0.000
6 Plesteran Tembok Biasa (1 pc : 5 psr) m2 Rp - 0.000
7 Plesteran Pondasi Tepi Luar (1 pc : 5 psr) m2 Rp - 0.000
8 Acian Tembok m2 Rp - 0.000
TOTAL Rp - 0.000
II PEKERJAAN BETON
1 Cor Beton Sloof (1pc : 2psr : 3krl) m3 Rp - 0.000
2 Cor Beton Kolom Praktis (1pc : 2psr : 3krl) m3 Rp - 0.000
3 Cor Beton Kolom Teras (1pc : 2psr : 3krl) m3 Rp - 0.000
4 Cor Beton Ringbalk (1pc : 2psr : 3krl) m3 Rp - 0.000
5 Cor Beton Meja Dapur (1pc : 2psr : 3krl) m3 Rp - 0.000
6 Cor Beton Neut (1pc : 2psr : 3krl) m3 Rp - 0.000
TOTAL Rp - 0.000
III PEKERJAAN KAYU DAN KACA
1 Pasangan Kayu Kusen Klas I m3 Rp - 0.000
2 Pasangan Daun Pintu Panil Kayu m2 Rp - 0.000
3 Pas. Daun Pintu Double Teacwood 3 mm m2 Rp - 0.000
4 Pas. Daun Pintu Double Teacwood 3 mm lapis seng m2 Rp - 0.000
5 Pas. Daun Jendela Kaca dan Ventilasi 3 mm m2 Rp - 0.000
6 Pas. Kayu Kap dan Gording m3 Rp - 0.000
7 Pasangan Lisplank Papan m1 Rp - 0.000
TOTAL Rp - 0.000
IV PEKERJAAN ATAP DAN PLAFOND
1 Pas. Atap Seng BJLS 0.30 mm m2 Rp - 0.000
2 Pas. Atap Bubungan Seng Licin 0.30 mm m1 Rp - 0.000
3 Pas. Plafond Tripleks 3 mm & Rangka m2 Rp - 0.000
4 Pas. List Penutup Plafond (Berprofil) m1 Rp - 0.000
TOTAL Rp - 0.000
V PEKERJAAN LANTAI
1 Pasangan Tegel Keramik 30/30 m2 Rp - 0.000
2 Pasangan Tegel Mozaik 30/30 m2 Rp - 0.000
3 Pasangan Tegel Plint 10/20 m1 Rp - 0.000
4 Pasangan Tegel Porselen 20/20 m2 Rp - 0.000
TOTAL Rp - 0.000
VI PEKERJAAN INSTALASI LISTRIK DAN AIR
1 Pasangan Titik Lampu Buah Rp - 0.000
2 Pasangan Lampu TL 40 Watt Buah Rp - 0.000
3 Pasangan Lampu TL 20 Watt Buah Rp - 0.000
4 Pasangan Lampu Pijar 25 Watt Buah Rp - 0.000
5 Pasangan Saklar Tunggal Buah Rp - 0.000
6 Pasangan SaklarGanda Buah Rp - 0.000
7 Pasangan Stop Kontak Buah Rp - 0.000
8 Pasangan Sekring Cast Buah Rp - 0.000
9 Pasangan Arde Pembumian Buah Rp - 0.000
10 Pasangan Wastafel Buah Rp - 0.000
11 Pasangan Bak Air Porselin Buah Rp - 0.000
12 Pasangan Closed Jongkok Buah Rp - 0.000
13 Pasangan Septic Tank dan Peresapan Buah Rp - 0.000
14 Pasangan Instalasi Air Bersih LS Rp - 0.000
15 Pasangan Instalasi Air Kotor LS Rp - 0.000
16 Pasangan Floor Drain Buah Rp - 0.000
17 Pasangan Kran Air Buah Rp - 0.000
TOTAL Rp - 0.000
VII PEKERJAAN FINISHING
1 Cat Tembok m2 Rp - 0.000
2 Cat Plafond m2 Rp - 0.000
4 Cat Kayu m2 Rp - 0.000
5 Cat Seng m2 Rp - 0.000
6 Teak Oil m2 Rp - 0.000
TOTAL Rp - 0.000
VIII PEKERJAAN PENGGANTUNG DAN PENGUNCI
1 Pasangan Kunci Double Slaag Buah Rp - 0.000
2 Pasangan Kunci KM/ WC Buah Rp - 0.000
3 Pasangan Grendel Buah Rp - 0.000
4 Pasangan Engsel Buah Rp - 0.000
5 Pasangan Kait Angin Buah Rp - 0.000
6 Pasangan Anker Doc Buah Rp - 0.000
7 Pasangan Mur, Baut dan Beughel U LS Rp - 0.000
TOTAL Rp - 0.000
LANTAI 3
I PEKERJAAN PASANGAN DAN PLESTERAN
1 Pekerjaan Anstamping m3 Rp - 0.000
2 Pasangan Pondasi Batu Karang (1 pc : 5 psr) m3 Rp - 0.000
3 Pasangan Tembok Trasraam (1 pc : 3 psr) m2 Rp - 0.000
4 Pasangan Tembok Biasa (1 pc : 5 psr) m2 Rp - 0.000
5 Plesteran Tembok Trasraam (1 pc : 3 psr) m2 Rp - 0.000
6 Plesteran Tembok Biasa (1 pc : 5 psr) m2 Rp - 0.000
7 Plesteran Pondasi Tepi Luar (1 pc : 5 psr) m2 Rp - 0.000
8 Acian Tembok m2 Rp - 0.000
TOTAL Rp - 0.000
II PEKERJAAN BETON
1 Cor Beton Sloof (1pc : 2psr : 3krl) m3 Rp - 0.000
2 Cor Beton Kolom Praktis (1pc : 2psr : 3krl) m3 Rp - 0.000
3 Cor Beton Kolom Teras (1pc : 2psr : 3krl) m3 Rp - 0.000
4 Cor Beton Ringbalk (1pc : 2psr : 3krl) m3 Rp - 0.000
5 Cor Beton Meja Dapur (1pc : 2psr : 3krl) m3 Rp - 0.000
6 Cor Beton Neut (1pc : 2psr : 3krl) m3 Rp - 0.000
TOTAL Rp - 0.000
III PEKERJAAN KAYU DAN KACA
1 Pasangan Kayu Kusen Klas I m3 Rp - 0.000
2 Pasangan Daun Pintu Panil Kayu m2 Rp - 0.000
3 Pas. Daun Pintu Double Teacwood 3 mm m2 Rp - 0.000
4 Pas. Daun Pintu Double Teacwood 3 mm lapis seng m2 Rp - 0.000
5 Pas. Daun Jendela Kaca dan Ventilasi 3 mm m2 Rp - 0.000
6 Pas. Kayu Kap dan Gording m3 Rp - 0.000
7 Pasangan Lisplank Papan m1 Rp - 0.000
TOTAL Rp - 0.000
IV PEKERJAAN ATAP DAN PLAFOND
1 Pas. Atap Seng BJLS 0.30 mm m2 Rp - 0.000
2 Pas. Atap Bubungan Seng Licin 0.30 mm m1 Rp - 0.000
3 Pas. Plafond Tripleks 3 mm & Rangka m2 Rp - 0.000
4 Pas. List Penutup Plafond (Berprofil) m1 Rp - 0.000
TOTAL Rp - 0.000
V PEKERJAAN LANTAI
1 Pasangan Tegel Keramik 30/30 m2 Rp - 0.000
2 Pasangan Tegel Mozaik 30/30 m2 Rp - 0.000
3 Pasangan Tegel Plint 10/20 m1 Rp - 0.000
4 Pasangan Tegel Porselen 20/20 m2 Rp - 0.000
TOTAL Rp - 0.000
VI PEKERJAAN INSTALASI LISTRIK DAN AIR
1 Pasangan Titik Lampu Buah Rp - 0.000
2 Pasangan Lampu TL 40 Watt Buah Rp - 0.000
3 Pasangan Lampu TL 20 Watt Buah Rp - 0.000
4 Pasangan Lampu Pijar 25 Watt Buah Rp - 0.000
5 Pasangan Saklar Tunggal Buah Rp - 0.000
6 Pasangan SaklarGanda Buah Rp - 0.000
7 Pasangan Stop Kontak Buah Rp - 0.000
8 Pasangan Sekring Cast Buah Rp - 0.000
9 Pasangan Arde Pembumian Buah Rp - 0.000
10 Pasangan Wastafel Buah Rp - 0.000
11 Pasangan Bak Air Porselin Buah Rp - 0.000
12 Pasangan Closed Jongkok Buah Rp - 0.000
13 Pasangan Septic Tank dan Peresapan Buah Rp - 0.000
14 Pasangan Instalasi Air Bersih LS Rp - 0.000
15 Pasangan Instalasi Air Kotor LS Rp - 0.000
16 Pasangan Floor Drain Buah Rp - 0.000
17 Pasangan Kran Air Buah Rp - 0.000
TOTAL Rp - 0.000
VII PEKERJAAN FINISHING
1 Cat Tembok m2 Rp - 0.000
2 Cat Plafond m2 Rp - 0.000
4 Cat Kayu m2 Rp - 0.000
5 Cat Seng m2 Rp - 0.000
6 Teak Oil m2 Rp - 0.000
TOTAL Rp - 0.000
VIII PEKERJAAN PENGGANTUNG DAN PENGUNCI
1 Pasangan Kunci Double Slaag Buah Rp - 0.000
2 Pasangan Kunci KM/ WC Buah Rp - 0.000
3 Pasangan Grendel Buah Rp - 0.000
4 Pasangan Engsel Buah Rp - 0.000
5 Pasangan Kait Angin Buah Rp - 0.000
6 Pasangan Anker Doc Buah Rp - 0.000
7 Pasangan Mur, Baut dan Beughel U LS Rp - 0.000
TOTAL Rp - 0.000
XI PEKERJAAN LAIN - LAIN
1 Pasangan Saluran Keliling Bangunan (Buis Beton U 30 cm m1 46.000 Rp 94,680.81 Rp 4,355,317.40 2.450
2 Pembersihan Kembali LS 1 Rp 250,000.00 Rp 250,000.00 0.141
TOTAL Rp 4,605,317.40 2.591
TIME SCHEDULLE & KURVA S
Bobot MINGGU
No. JENIS PEKERJAAN % 1 2 3 4 5 6 7 8 9 10 11 12 13
I PEKERJAAN PERSIAPAN
1 Pembersihan Lahan 0.146 0.146 Chart Title
2 Pemasangan Bowplank 1.599 1.599
3 Penyediaan Air Kerja 0.169 0.032 0.130 0.008
II PEKERJAAN TANAH DAN URUGAN
1 Galian Tanah Pondasi 2.894 2.894
2 Urugan Tanah Kembali 0.123 0.049 0.074
3 Urugan Pasir di Bawah Pondasi 1.098 1.098
4 Urugan Pasir Peninggi Lantai 0.741 0.370 0.370
III PEKERJAAN PASANGAN DAN PLESTERAN
1 Pekerjaan Anstamping 1.578 1.578
2 Pasangan Pondasi Batu Karang (1 pc : 5 psr) 6.669 2.786 3.884
3 Pasangan Tembok Trasraam (1 pc : 3 psr) 0.783 0.431 0.353
4 Pasangan Tembok Biasa (1 pc : 5 psr) 1.530 0.728 0.546 0.256
5 Plesteran Tembok Trasraam (1 pc : 3 psr) 0.640 0.640
6 Plesteran Tembok Biasa (1 pc : 5 psr) 1.848 1.179 0.668
7 Plesteran Pondasi Tepi Luar (1 pc : 5 psr) 0.241 0.241
8 Acian Tembok 1.994 0.682 0.835 0.477
IV PEKERJAAN BETON
1 Cor Beton Sloof (1pc : 2psr : 3krl) 1.502 0.135 0.704 0.662
2 Cor Beton Kolom Praktis (1pc : 2psr : 3krl) 2.217 0.610 1.200 0.408
3 Cor Beton Kolom Teras (1pc : 2psr : 3krl) 0.513 0.513
4 Cor Beton Ringbalk (1pc : 2psr : 3krl) 3.694 0.497 3.021 0.176
5 Cor Beton Meja Dapur (1pc : 2psr : 3krl) 0.695 0.695
6 Cor Beton Neut (1pc : 2psr : 3krl) 0.003 0.003
V PEKERJAAN KAYU DAN KACA
1 Pasangan Kayu Kusen Klas I 3.313 0.729 0.790 1.795
2 Pasangan Daun Pintu Panil Kayu 1.610 1.610
3 Pas. Daun Pintu Double Teacwood 3 mm 0.827 0.827
4 Pas. Daun Pintu Double Teacwood 3 mm lapis seng 0.492 0.492
5 Pas. Daun Jendela Kaca dan Ventilasi 3 mm 6.472 4.320 1.275 0.877
7 Pas. Kayu Kap dan Gording 8.543 0.965 1.956 5.621
8 Pasangan Lisplank Papan 2.990 2.634 0.356
VI PEKERJAAN ATAP DAN PLAFOND
1 Pas. Atap Seng BJLS 0.30 mm 6.053 5.179 0.874
2 Pas. Atap Bubungan Seng Licin 0.30 mm 0.210 0.210
3 Pas. Plafond Tripleks 3 mm & Rangka 8.322 6.456 0.494 1.372
4 Pas. List Penutup Plafond (Berprofil) 1.293 1.293
VII PEKERJAAN LANTAI
1 Pasangan Tegel Keramik 30/30 3.747 2.275 0.689 0.783
2 Pasangan Tegel Mozaik 30/30 0.216 0.216
3 Pasangan Tegel Plint 10/20 1.051 1.051
4 Pasangan Tegel Porselen 20/20 0.870 0.102 0.768
VIII PEKERJAAN INSTALASI LISTRIK & AIR
1 Pasangan Titik Lampu 0.187 0.187
2 Pasangan Lampu TL 40 Watt 0.072 0.072
3 Pasangan Lampu TL 20 Watt 0.286 0.286
4 Pasangan Lampu Pijar 25 Watt 0.004 0.004
5 Pasangan Saklar Tunggal 0.036 0.036
6 Pasangan SaklarGanda 0.024 0.024
7 Pasangan Stop Kontak 0.050 0.050
8 Pasangan Sekring Cast 0.008 0.008
9 Pasangan Arde Pembumian 0.056 0.056
10 Pasangan Wastafel 0.208 0.208
11 Pasangan Bak Air Porselin 0.517 0.517
12 Pasangan Closed Jongkok 0.480 0.480
13 Pasangan Septic Tank dan Peresapan 8.439 1.578 3.375 3.485
14 Pasangan Instalasi Air Bersih 0.338 0.338
15 Pasangan Instalasi Air Kotor 0.338 0.338
16 Pasangan Floor Drain 0.049 0.049
17 Pasangan Kran Air 0.118 0.118
IX PEKERJAAN FINISHING
1 Cat Tembok 1.206 0.754 0.108 0.344
2 Cat Plafond 1.553 1.553
4 Cat Kayu 1.119 1.063 0.056
5 Cat Seng 1.693 1.693
6 Teak Oil 0.106 0.106
X PEKERJAAN PENGGANTUNG DAN PENGUNCI
1 Pasangan Kunci Double Slaag 0.454 0.454
2 Pasangan Kunci KM/ WC 0.086 0.086
3 Pasangan Grendel 1.151 1.151
4 Pasangan Engsel 1.261 1.261
5 Pasangan Kait Angin 0.391 0.391
6 Pasangan Anker Doc 0.383 0.054 0.186 0.143
7 Pasangan Mur, Baut dan Beughel U 0.113 0.047 0.066
XI PEKERJAAN LAIN - LAIN
1 Pasangan Saluran Keliling Bangunan (Buis Beton U 30 cm) 2.450 2.450
2 Pembersihan Kembali 0.141 0.141
Parsil 100.000 5.635 5.645 5.033 3.583 6.487 9.001 9.790 10.470 10.502 10.508 8.609 9.199 5.538
RENCANA Kumulatif 0.000 5.635 11.281 16.313 19.897 26.383 35.384 45.175 55.645 66.147 76.654 85.263 94.462 100.000
Chart Title
ANALISA TENAGA KERJA
I. PEKERJAAN PERSIAPAN
1. 1 m1 Pemasangan Bowplank koef Vol. day week
pekerja = 0.1000 x 58.000 / 6 x 1 = 0.967 orang
tukang kayu = 0.1000 x 58.000 / 6 x 1 = 0.967 orang
kepala tukang = 0.0100 x 58.000 / 6 x 1 = 0.097 orang
mandor = 0.0050 x 58.000 / 6 x 1 = 0.048 orang

II. PEKERJAAN TANAH DAN URUGAN


1. Galian Tanah pondasi
pekerja = 1.2500 x 73.540 / 6 x 1 = 15.321 orang
mandor = 0.0620 x 73.540 / 6 x 1 = 0.760 orang
2. Urugan Tanah Kembali
pekerja = 0.1920 x 18.385 / 6 x 2 = 1.177 orang
mandor = 0.0190 x 18.385 / 6 x 2 = 0.116 orang
3. Urugan Pasir Di Bawah Pondasi
pekerja = 0.3000 x 7.505 / 6 x 1 = 0.375 orang
mandor = 0.0100 x 7.505 / 6 x 1 = 0.013 orang
4. Urugan Pasir Peninggi Lantai
pekerja = 0.3000 x 5.064 / 6 x 2 = 0.506 orang
mandor = 0.0100 x 5.064 / 6 x 2 = 0.017 orang
TOTAL :
pekerja = 18.3458 orang
Tukang kayu = 0.9667 orang
kepala tukang = 0.0967 orang
mandor = 0.9541 orang

III. PEKERJAAN PASANGAN DAN PLESTERAN


1. 1 m3 Pasangan Aanstamping
pekerja = 0.7800 x 15.010 / 6 x 1 = 1.951 orang
tukang batu = 0.3900 x 15.010 / 6 x 1 = 0.976 orang
kepala tukang = 0.0390 x 15.010 / 6 x 1 = 0.098 orang
mandor = 0.0390 x 15.010 / 6 x 1 = 0.098 orang
2. 1 m3 Pasangan Pondasi Batu Karang (1pc : 5psr)
pekerja = 1.5000 x 33.228 / 6 x 2 = 16.614 orang
mandor = 0.0750 x 33.228 / 6 x 2 = 0.831 orang
tukang batu = 0.6000 x 33.228 / 6 x 2 = 6.646 orang
kepala tukang = 0.0600 x 33.228 / 6 x 2 = 0.665 orang
3. 1 m2 Pasangan Tembok Trasraam (1pc : 3psr)
pekerja = 0.3200 x 18.600 / 6 x 2 = 1.984 orang
mandor = 0.0150 x 18.600 / 6 x 2 = 0.093 orang
tukang batu = 0.1000 x 18.600 / 6 x 2 = 0.620 orang
kepala tukang = 0.0100 x 18.600 / 6 x 2 = 0.062 orang
4. 1 m2 Pasangan Tembok Biasa (1pc : 5psr)
pekerja = 0.3200 x 37.604 / 6 x 3 = 6.017 orang
mandor = 0.0150 x 37.604 / 6 x 3 = 0.282 orang
tukang batu = 0.1000 x 37.604 / 6 x 3 = 1.880 orang
kepala tukang = 0.0100 x 37.604 / 6 x 3 = 0.188 orang
5. 1 m2 Plesteran Tembok Trasraam (1pc : 3psr)
pekerja = 0.2000 x 37.200 / 6 x 1 = 1.240 orang
mandor = 0.0100 x 37.200 / 6 x 1 = 0.062 orang
tukang batu = 0.1500 x 37.200 / 6 x 1 = 0.930 orang
kepala tukang = 0.0150 x 37.200 / 6 x 1 = 0.093 orang
6. 1 m2 Plesteran Tembok Biasa (1pc : 5psr)
pekerja = 0.2000 x 111.454 / 6 x 2 = 7.430 orang
mandor = 0.0100 x 111.454 / 6 x 2 = 0.372 orang
tukang batu = 0.1500 x 111.454 / 6 x 2 = 5.573 orang
kepala tukang = 0.0150 x 111.454 / 6 x 2 = 0.557 orang
7. 1 m2 Plesteran Pondasi Tepi Luar (1pc : 4psr)
pekerja = 0.2000 x 14.525 / 6 x 1 = 0.484 orang
mandor = 0.0100 x 14.525 / 6 x 1 = 0.024 orang
tukang batu = 0.1500 x 14.525 / 6 x 1 = 0.363 orang
kepala tukang = 0.0150 x 14.525 / 6 x 1 = 0.036 orang
8. 1 m2 Acian Tembok
pekerja = 0.2000 x 125.979 / 6 x 3 = 12.598 orang
mandor = 0.0100 x 125.979 / 6 x 3 = 0.630 orang
tukang batu = 0.1500 x 125.979 / 6 x 3 = 9.448 orang
kepala tukang = 0.0150 x 125.979 / 6 x 3 = 0.945 orang

TOTAL :
pekerja = 48.3184 orang
mandor = 2.3909 orang
tukang batu = 26.4357 orang
kepala tukang = 2.6436 orang

IV. PEKERJAAN BETON :


1. 1 m3 Pasangan Beton Sloof (1pc : 2psr : 3krl)
pekerja = 4.8500 x 1.110 / 6 x 3 = 2.692 orang
mandor = 0.1750 x 1.110 / 6 x 3 = 0.097 orang
tukang batu = 0.3500 x 1.110 / 6 x 3 = 0.194 orang
tukang besi = 1.4000 x 1.110 / 6 x 3 = 0.777 orang
tukang kayu = 1.5600 x 1.110 / 6 x 3 = 0.866 orang
kepala tukang batu = 0.3310 x 1.110 / 6 x 3 = 0.184 orang
kepala tukang besi = 0.3310 x 1.110 / 6 x 3 = 0.184 orang
kepala tukang kayu = 0.3310 x 1.110 / 6 x 3 = 0.184 orang
2. 1 m3 Pasangan Beton Kolom Praktis (1pc : 2psr : 3krl)
pekerja = 7.3000 x 1.037 / 6 x 3 = 3.784 orang
mandor = 0.2500 x 1.037 / 6 x 3 = 0.130 orang
tukang batu = 0.3500 x 1.037 / 6 x 3 = 0.181 orang
tukang besi = 2.1000 x 1.037 / 6 x 3 = 1.089 orang
tukang kayu = 3.3000 x 1.037 / 6 x 3 = 1.711 orang
kepala tukang batu = 0.5700 x 1.037 / 6 x 3 = 0.295 orang
kepala tukang besi = 0.5700 x 1.037 / 6 x 3 = 0.295 orang
kepala tukang kayu = 0.5700 x 1.037 / 6 x 3 = 0.295 orang
3 1 m3 Pasangan Beton Kolom Teras (1pc : 2psr : 3krl)
pekerja = 7.3000 x 0.240 / 6 x 1 = 0.292 orang
mandor = 0.2500 x 0.240 / 6 x 1 = 0.010 orang
tukang batu = 0.3500 x 0.240 / 6 x 1 = 0.014 orang
tukang besi = 2.1000 x 0.240 / 6 x 1 = 0.084 orang
tukang kayu = 3.3000 x 0.240 / 6 x 1 = 0.132 orang
kepala tukang batu = 0.5700 x 0.240 / 6 x 1 = 0.023 orang
kepala tukang besi = 0.5700 x 0.240 / 6 x 1 = 0.023 orang
kepala tukang kayu = 0.5700 x 0.240 / 6 x 1 = 0.023 orang
4 1 m3 Pasangan Beton Ringbalk (1pc : 2psr : 3krl)
pekerja = 4.8500 x 2.730 / 6 x 3 = 6.620 orang
mandor = 0.1750 x 2.730 / 6 x 3 = 0.239 orang
tukang batu = 0.3500 x 2.730 / 6 x 3 = 0.478 orang
tukang besi = 1.4000 x 2.730 / 6 x 3 = 1.911 orang
tukang kayu = 1.5600 x 2.730 / 6 x 3 = 2.129 orang
kepala tukang batu = 0.3310 x 2.730 / 6 x 3 = 0.452 orang
kepala tukang besi = 0.3310 x 2.730 / 6 x 3 = 0.452 orang
kepala tukang kayu = 0.3310 x 2.730 / 6 x 3 = 0.452 orang
5 1 m3 Pasangan Beton Meja Dapur (1pc : 2psr : 3krl)
pekerja = 5.6000 x 0.396 / 6 x 1 = 0.370 orang
mandor = 0.2020 x 0.396 / 6 x 1 = 0.013 orang
tukang batu = 0.3500 x 0.396 / 6 x 1 = 0.023 orang
tukang besi = 1.4000 x 0.396 / 6 x 1 = 0.092 orang
tukang kayu = 2.3000 x 0.396 / 6 x 1 = 0.152 orang
kepala tukang batu = 0.4050 x 0.396 / 6 x 1 = 0.027 orang
kepala tukang besi = 0.4050 x 0.396 / 6 x 1 = 0.027 orang
kepala tukang kayu = 0.4050 x 0.396 / 6 x 1 = 0.027 orang
6 1 m3 Pasangan Beton Neut (1pc : 2psr : 3krl)
pekerja = 1.6500 x 0.010 / 6 x 1 = 0.0026 orang
mandor = 0.0800 x 0.010 / 6 x 1 = 0.0001 orang
tukang batu = 0.2500 x 0.010 / 6 x 1 = 0.0004 orang
kepala tukang batu = 0.0250 x 0.010 / 6 x 1 = 0.00004 orang

TOTAL :
pekerja = 13.7606 orang
mandor = 0.4891 orang
tukang batu = 0.8909 orang
tukang besi = 3.9530 orang
tukang kayu = 4.9897 orang
kepala tukang batu = 0.9806 orang
kepala tukang besi = 0.9805 orang
kepala tukang kayu = 0.9805 orang

V. PEKERJAAN KAYU DAN KACA :


1. 1 m3 Pasangan Kayu Kosen Klas I (Bayam)
pekerja = 0.6000 x 0.818 / 6 x 3 = 0.245 orang
mandor = 0.0300 x 0.818 / 6 x 3 = 0.012 orang
tukang kayu = 2.0000 x 0.818 / 6 x 3 = 0.818 orang
kepala tukang kayu = 0.2000 x 0.818 / 6 x 3 = 0.082 orang
2. 1 m2 Pasangan Daun Pintu Panil Kayu
pekerja = 1.0000 x 5.520 / 6 x 1 = 0.920 orang
mandor = 0.0500 x 5.520 / 6 x 1 = 0.046 orang
tukang kayu = 2.5000 x 5.520 / 6 x 1 = 2.300 orang
kepala tukang kayu = 0.2500 x 5.520 / 6 x 1 = 0.230 orang
3. 1 m2 Pasangan Daun Pintu Double Teacwood
pekerja = 0.6000 x 4.920 / 6 x 1 = 0.492 orang
mandor = 0.0300 x 4.920 / 6 x 1 = 0.025 orang
tukang kayu = 2.0000 x 4.920 / 6 x 1 = 1.640 orang
kepala tukang kayu = 0.2000 x 4.920 / 6 x 1 = 0.164 orang
4. 1 m2 Pasangan Daun Pintu Double Teacwood Lapis Seng
pekerja = 0.6000 x 2.880 / 6 x 1 = 0.288 orang
mandor = 0.0300 x 2.880 / 6 x 1 = 0.014 orang
tukang kayu = 2.0000 x 2.880 / 6 x 1 = 0.960 orang
kepala tukang kayu = 0.2000 x 2.880 / 6 x 1 = 0.096 orang
5. 1 m2 Pasangan Daun Jendela Kaca & Ventilasi 3mm
pekerja = 0.8150 x 22.668 / 6 x 3 = 9.237 orang
mandor = 0.0408 x 22.668 / 6 x 3 = 0.462 orang
tukang kayu = 2.1500 x 22.668 / 6 x 3 = 24.368 orang
kepala tukang kayu = 0.2150 x 22.668 / 6 x 3 = 2.437 orang
6. 1 m1 Pasangan Papan Listplank
pekerja = 0.1000 x 129.000 / 6 x 2 = 4.300 orang
mandor = 0.0050 x 129.000 / 6 x 2 = 0.215 orang
tukang kayu = 0.2000 x 129.000 / 6 x 2 = 8.600 orang
kepala tukang kayu = 0.0250 x 129.000 / 6 x 2 = 1.075 orang
7. 1 m3 Pasangan Kayu Kap dan Gording
pekerja = 4.0000 x 4.393 / 6 x 3 = 8.787 orang
mandor = 0.2000 x 4.393 / 6 x 3 = 0.439 orang
tukang kayu = 12.0000 x 4.393 / 6 x 3 = 26.360 orang
kepala tukang kayu = 1.2000 x 4.393 / 6 x 3 = 2.636 orang

TOTAL :
pekerja = 24.2691 orang
mandor = 1.2135 orang
tukang kayu = 65.0457 orang
kepala tukang kayu = 6.7196 orang

VI. PEKERJAAN ATAP DAN PLAFOND :


1. 1 m2 Pasangan Atap Seng BJLS 0.30 mm
pekerja = 0.1200 x 213.380 / 6 x 2 = 8.535 orang
tukang kayu = 0.0600 x 213.380 / 6 x 2 = 4.268 orang
kepala tukang kayu = 0.0060 x 213.380 / 6 x 2 = 0.427 orang
mandor = 0.0060 x 213.380 / 6 x 2 = 0.427 orang
2. 10 m1 Pasangan Bubungan Atap Seng Licin BJLS 0.30 mm
pekerja = 0.1500 x 14.500 / 6 x 1 = 0.363 orang
mandor = 0.0080 x 14.500 / 6 x 1 = 0.019 orang
tukang kayu = 0.0700 x 14.500 / 6 x 1 = 0.169 orang
kepala tukang kayu = 0.0080 x 14.500 / 6 x 1 = 0.019 orang
3. 1 m2 Pasangan Plafond Tripleks & Rangka
pekerja = 0.2200 x 162.140 / 6 x 3 = 17.835 orang
mandor = 0.0115 x 162.140 / 6 x 3 = 0.932 orang
tukang kayu = 0.1700 x 162.140 / 6 x 3 = 13.782 orang
kepala tukang kayu = 0.0100 x 162.140 / 6 x 3 = 0.811 orang
4. 1 m1 List Plafond Profil
pekerja = 0.0210 x 239.600 / 6 x 1 = 0.839 orang
mandor = 0.0010 x 239.600 / 6 x 1 = 0.040 orang
tukang kayu = 0.0210 x 239.600 / 6 x 1 = 0.839 orang
kepala tukang kayu = 0.0020 x 239.600 / 6 x 1 = 0.080 orang

TOTAL :
pekerja = 27.5717 orang
mandor = 1.4183 orang
tukang kayu = 19.0573 orang
kepala tukang kayu = 1.3367 orang

VII. PEKERJAAN LANTAI


1. 1 m2 Pasangan Tegel Keramik 30 x 30 cm
pekerja = 0.2500 x 101.925 / 6 x 3 = 12.741 orang
mandor = 0.0125 x 101.925 / 6 x 3 = 0.637 orang
tukang batu = 0.1200 x 101.925 / 6 x 3 = 6.116 orang
kepala tukang batu = 0.0120 x 101.925 / 6 x 3 = 0.612 orang
2. 1 m2 Pasangan Tegel Mozaik 30 x 30 cm
pekerja = 0.2500 x 5.100 / 6 x 1 = 0.213 orang
mandor = 0.0125 x 5.100 / 6 x 1 = 0.011 orang
tukang batu = 0.1200 x 5.100 / 6 x 1 = 0.102 orang
kepala tukang batu = 0.0120 x 5.100 / 6 x 1 = 0.010 orang
3. 1 m1 Pasangan Tegel Plint 10 x 30 cm
pekerja = 0.0900 x 87.400 / 6 x 1 = 1.311 orang
mandor = 0.0045 x 87.400 / 6 x 1 = 0.066 orang
tukang batu = 0.0900 x 87.400 / 6 x 1 = 1.311 orang
kepala tukang batu = 0.0090 x 87.400 / 6 x 1 = 0.131 orang
4. 1 m2 Pasangan Tegel Porselin 10 x 20 cm
pekerja = 0.0900 x 24.390 / 6 x 2 = 0.732 orang
mandor = 0.0045 x 24.390 / 6 x 2 = 0.037 orang
tukang batu = 0.0900 x 24.390 / 6 x 2 = 0.732 orang
kepala tukang batu = 0.0090 x 24.390 / 6 x 2 = 0.073 orang

TOTAL :
pekerja = 14.9958 orang
mandor = 0.7498 orang
tukang batu = 8.2602 orang
kepala tukang batu = 0.8260 orang
VIII. PEKERJAAN INSTALASI LISTRIK DAN AIR
1. 1 Buah kloset Jongkok
pekerja = 1.0000 x 2.000 / 6 x 1 = 0.333 orang
mandor = 0.1600 x 2.000 / 6 x 1 = 0.053 orang
tukang batu = 1.5000 x 2.000 / 6 x 1 = 0.500 orang
kepala tukang batu = 1.5000 x 2.000 / 6 x 1 = 0.500 orang
2. 1 Buah Wastavel
pekerja = 1.2000 x 1.000 / 6 x 1 = 0.200 orang
mandor = 0.1000 x 1.000 / 6 x 1 = 0.017 orang
tukang batu = 1.4500 x 1.000 / 6 x 1 = 0.242 orang
kepala tukang batu = 0.1500 x 1.000 / 6 x 1 = 0.025 orang
3. 1 Buah Bak Air Porselin
pekerja = 2.1000 x 2.000 / 6 x 1 = 0.700 orang
mandor = 0.1100 x 2.000 / 6 x 1 = 0.037 orang
tukang batu = 0.7500 x 2.000 / 6 x 1 = 0.250 orang
kepala tukang batu = 0.0700 x 2.000 / 6 x 1 = 0.023 orang
4. 1 Buah Kran Air
pekerja = 0.0100 x 4.000 / 6 x 1 = 0.007 orang
mandor = 0.0050 x 4.000 / 6 x 1 = 0.003 orang
tukang batu = 0.1000 x 4.000 / 6 x 1 = 0.067 orang
kepala tukang batu = 0.0100 x 4.000 / 6 x 1 = 0.007 orang
5. 1 Buah Floor Drain
pekerja = 0.0100 x 3.000 / 6 x 1 = 0.005 orang
mandor = 0.0050 x 3.000 / 6 x 1 = 0.003 orang
tukang batu = 0.1000 x 3.000 / 6 x 1 = 0.050 orang
kepala tukang batu = 0.0100 x 3.000 / 6 x 1 = 0.005 orang

TOTAL :
pekerja = 1.2450 orang
mandor = 0.1125 orang
tukang batu = 1.1083 orang
kepala tukang batu = 0.5600 orang

IX. PEKERJAAN FINISHING


1. 1 m2 Cat Tembok + Plamir
pekerja = 0.0200 x 125.979 / 6 x 3 = 1.260 orang
mandor = 0.0025 x 125.979 / 6 x 3 = 0.157 orang
tukang cat = 0.0630 x 125.979 / 6 x 3 = 3.968 orang
kepala tukang cat = 0.0063 x 125.979 / 6 x 3 = 0.397 orang
2. 1 m2 Cat Plafond
pekerja = 0.0200 x 162.140 / 6 x 1 = 0.540 orang
mandor = 0.0025 x 162.140 / 6 x 1 = 0.068 orang
tukang cat = 0.0630 x 162.140 / 6 x 1 = 1.702 orang
kepala tukang cat = 0.0063 x 162.140 / 6 x 1 = 0.170 orang
3. 10 m2 Mengecat Kayu Kilap
pekerja = 0.0700 x 72.600 / 6 x 2 = 1.694 orang
mandor = 0.0025 x 72.600 / 6 x 2 = 0.061 orang
tukang cat = 0.0090 x 72.600 / 6 x 2 = 0.218 orang
kepala tukang cat = 0.0060 x 72.600 / 6 x 2 = 0.145 orang
4. 1 m2 Teak Oil
pekerja = 0.0400 x 11.040 / 6 x 1 = 0.074 orang
mandor = 0.0025 x 11.040 / 6 x 1 = 0.005 orang
tukang cat = 0.0630 x 11.040 / 6 x 1 = 0.116 orang
kepala tukang cat = 0.0630 x 11.040 / 6 x 1 = 0.116 orang
5. 1 m2 Mengecat Seng
pekerja = 0.0060 x 213.380 / 6 x 1 = 0.213 orang
mandor = 0.0060 x 213.380 / 6 x 1 = 0.213 orang
tukang cat = 0.0600 x 213.380 / 6 x 1 = 2.134 orang
kepala tukang cat = 0.0120 x 213.380 / 6 x 1 = 0.427 orang

TOTAL :
pekerja = 3.7812 orang
mandor = 0.5035 orang
tukang cat = 8.1383 orang
kepala tukang cat = 1.2550 orang

X. PEKERJAAN PENGGANTUNG DAN PENGUNCI


1. 1 Buah Engsel
pekerja = 0.0150 x 86.000 / 6 x 1 = 0.215 orang
mandor = 0.0008 x 86.000 / 6 x 1 = 0.011 orang
tukang kayu = 0.1500 x 86.000 / 6 x 1 = 2.150 orang
kepala tukang kayu = 0.0150 x 86.000 / 6 x 1 = 0.215 orang
2. 1 Buah Kait Angin
pekerja = 0.0150 x 31.000 / 6 x 1 = 0.078 orang
mandor = 0.0008 x 31.000 / 6 x 1 = 0.004 orang
tukang kayu = 0.1500 x 31.000 / 6 x 1 = 0.775 orang
kepala tukang kayu = 0.0150 x 31.000 / 6 x 1 = 0.078 orang
3. 1 Buah Pasang Grendel
pekerja = 0.0050 x 31.000 / 6 x 1 = 0.026 orang
mandor = 0.0025 x 31.000 / 6 x 1 = 0.013 orang
tukang kayu = 0.5000 x 31.000 / 6 x 1 = 2.583 orang
kepala tukang kayu = 0.0050 x 31.000 / 6 x 1 = 0.026 orang
4. 1 Buah Kunci KM/WC
pekerja = 0.0050 x 2.000 / 6 x 1 = 0.002 orang
mandor = 0.0025 x 2.000 / 6 x 1 = 0.001 orang
tukang kayu = 0.5000 x 2.000 / 6 x 1 = 0.167 orang
kepala tukang kayu = 0.0050 x 2.000 / 6 x 1 = 0.002 orang
5. 1 Buah Kunci Double Slag
pekerja = 0.0100 x 6.000 / 6 x 1 = 0.010 orang
mandor = 0.0050 x 6.000 / 6 x 1 = 0.005 orang
tukang kayu = 0.5000 x 6.000 / 6 x 1 = 0.500 orang
kepala tukang kayu = 0.0100 x 6.000 / 6 x 1 = 0.010 orang

TOTAL :
pekerja = 0.3300 orang
mandor = 0.0334 orang
tukang kayu = 6.1750 orang
kepala tukang kayu = 0.3300 orang
IX. PEKERJAAN LAIN - LAIN
1 m1 Saluran Keliling
pekerja = 0.3800 x 46.000 / 6 x 1 = 2.913 orang
mandor = 0.0190 x 46.000 / 6 x 1 = 0.146 orang
tukang batu = 0.1900 x 46.000 / 6 x 1 = 1.457 orang
kepala tukang batu = 0.0190 x 46.000 / 6 x 1 = 0.146 orang

TOTAL :
pekerja = 2.913 orang
mandor = 0.146 orang
tukang batu = 1.457 orang
kepala tukang batu = 0.146 orang
TABEL KEBUTUHAN TENAGA KERJA

MINGGU KE
NO. TENAGA KERJA
1 2 3 4 5 6 7 8 9 10 11 12 13
I PEKERJAAN PERSIAPAN
1 Pemasangan Bowplank
Pekerja 0.967 0.967
Tukang kayu 0.967 0.967
Kepala Tukang 0.097 0.097
Mandor 0.048 0.048
TOTAL pekerja 0.967
Tukang kayu 0.967
Kepala Tukang 0.097
mandor 0.048
II PEKERJAAN TANAH DAN URUGAN
1 Galian Tanah Pondasi
Pekerja 15.321 15.321
Mandor 0.760 0.760
2 Urugan Tanah kembali
Pekerja 1.177 1.177 1.177
Mandor 0.116 0.116 0.116
3 Urugan Pasir di Bawah Pondasi
Pekerja 0.375 0.375
Mandor 0.013 0.013
4 Urugan Pasir Peninggi Lantai
Pekerja 0.506 0.506 0.506
Mandor 0.017 0.017 0.017
TOTAL pekerja 15.321 1.552 1.683 0.506
mandor 0.760 0.129 0.133 0.017
III PEKERJAAN PASANGAN DAN PLESTERAN
1 1 m3 Pasangan Aanstamping
pekerja 1.951 1.951
Tukang Batu 0.976 0.976
kepala tukang batu 0.098 0.098
mandor 0.098 0.098
2 1 m3 Pasangan Pondasi Batu Karang (1pc : 5psr)
pekerja 16.614 16.614 16.614
mandor 0.831 0.831 0.831
tukang batu 6.646 6.646 6.646
kepala tukang batu 0.665 0.665 0.665
3 1 m2 Pasangan Tembok Trasraam (1pc : 3psr)
pekerja 1.984 1.984 1.984
mandor 0.093 0.093 0.093
tukang batu 0.620 0.620 0.620
kepala tukang batu 0.062 0.062 0.062
4 1 m2 Pasangan Tembok Biasa (1pc : 5psr)
pekerja 6.017 6.017 6.017 6.017
mandor 0.282 0.282 0.282 0.282
tukang batu 1.880 1.880 1.880 1.880
kepala tukang batu 0.188 0.188 0.188 0.188
5 1 m2 Plesteran Tembok Trasraam (1pc : 3psr)
pekerja 1.240 1.240
mandor 0.062 0.062
tukang batu 0.930 0.930
kepala tukang batu 0.093 0.093
6 1 m2 Plesteran Tembok Biasa (1pc : 5psr)
pekerja 7.430 7.430 7.430
mandor 0.372 0.372 0.372
tukang batu 5.573 5.573 5.573
kepala tukang batu 0.557 0.557 0.557
7 1 m2 Plesteran Pondasi Tepi Luar (1pc : 5psr)
pekerja 0.484 0.484
mandor 0.024 0.024
tukang batu 0.363 0.363
kepala tukang batu 0.036 0.036
8 1 m2 Acian Tembok
pekerja 12.598 12.598 12.598 12.598
mandor 0.630 0.630 0.630 0.630
tukang batu 9.448 9.448 9.448 9.448
kepala tukang batu 0.945 0.945 0.945 0.945
TOTAL pekerja 16.614 16.614 6.017 6.017 6.017 12.598 12.598 12.598
mandor 0.831 0.831 0.282 0.282 0.282 0.630 0.630 0.630
tukang batu 6.646 6.646 1.880 1.880 1.880 9.448 9.448 9.448
kepala tukang batu 0.665 0.665 0.188 0.188 0.188 0.945 0.945 0.945
IV. PEKERJAAN BETON
1 1 m3 Pasangan Beton Sloof (1pc : 2psr : 3krl)
pekerja 2.692 2.692 2.692 2.692
mandor 0.097 0.097 0.097 0.097
tukang batu 0.194 0.194 0.194 0.194
tukang besi 0.777 0.777 0.777 0.777
tukang kayu 0.866 0.866 0.866 0.866
kepala tukang batu 0.184 0.184 0.184 0.184
kepala tukang besi 0.184 0.184 0.184 0.184
kepala tukang kayu 0.184 0.184 0.184 0.184
2 1 m3 Pasangan Beton Kolom Praktis (1pc : 2psr : 3krl)
pekerja 3.784 3.784 3.784 3.784
mandor 0.130 0.130 0.130 0.130
tukang batu 0.181 0.181 0.181 0.181
tukang besi 1.089 1.089 1.089 1.089
tukang kayu 1.711 1.711 1.711 1.711
kepala tukang batu 0.295 0.295 0.295 0.295
kepala tukang besi 0.295 0.295 0.295 0.295
kepala tukang kayu 0.295 0.295 0.295 0.295
3 1 m3 Pasangan Beton Kolom Teras (1pc : 2psr : 3krl)
pekerja 0.292 0.292
mandor 0.010 0.010
tukang batu 0.014 0.014
tukang besi 0.084 0.084
tukang kayu 0.132 0.132
kepala tukang batu 0.023 0.023
kepala tukang besi 0.023 0.023
kepala tukang kayu 0.023 0.023
4 1 m3 Pasangan Beton Ringbalk (1pc : 2psr : 3krl)
pekerja 6.620 6.620 6.620 6.620
mandor 0.239 0.239 0.239 0.239
tukang batu 0.478 0.478 0.478 0.478
tukang besi 1.911 1.911 1.911 1.911
tukang kayu 2.129 2.129 2.129 2.129
kepala tukang batu 0.452 0.452 0.452 0.452
kepala tukang besi 0.452 0.452 0.452 0.452
kepala tukang kayu 0.452 0.452 0.452 0.452
5 1 m3 Pasangan Beton Meja Dapur (1pc : 2psr : 3krl)
pekerja 0.370 0.370
mandor 0.013 0.013
tukang batu 0.023 0.023
tukang besi 0.092 0.092
tukang kayu 0.152 0.152
kepala tukang batu 0.027 0.027
kepala tukang besi 0.027 0.027
kepala tukang kayu 0.027 0.027
6 1 m3 Pasangan Beton Neut (1pc : 2psr : 3krl)
pekerja 0.003 0.003
mandor 0.000 0.000
tukang batu 0.0004 0.0004
kepala tukang batu 0.0000 0.0000
TOTAL pekerja 2.692 2.692 3.784 6.620 6.620 6.620
mandor 0.097 0.097 0.130 0.239 0.239 0.239
tukang batu 0.194 0.194 0.194 0.478 0.478 0.478
tukang besi 0.777 0.777 1.089 1.911 1.911 1.911
tukang kayu 0.866 0.866 1.711 2.129 6.620 2.129
kepala tukang batu 0.184 0.184 0.295 0.452 0.452 0.452
kepala tukang besi 0.184 0.184 0.295 0.452 0.478 0.452
kepala tukang kayu 0.184 0.184 0.295 0.452 1.911 0.452
V. PEKERJAAN KAYU DAN KACA
1 1 m3 Pasangan Kayu Kosen Klas I (Bayam)
pekerja 0.245 0.245 0.245 0.245
mandor 0.012 0.012 0.012 0.012
tukang kayu 0.818 0.818 0.818 0.818
kepala tukang kayu 0.082 0.082 0.082 0.082
2 1 m2 Pasangan Daun Pintu Panil Kayu
pekerja 0.920 0.920
mandor 0.046 0.046
tukang kayu 2.300 2.300
kepala tukang kayu 0.230 0.230
3 1 m2 Pasangan Daun Pintu Double Teacwood
pekerja 0.492 0.492
mandor 0.025 0.025
tukang kayu 1.640 1.640
kepala tukang kayu 0.164 0.164
4 1 m2 Pasangan Daun Pintu Double Teacwood Lapis Seng
pekerja 0.288 0.288
mandor 0.014 0.014
tukang kayu 0.960 0.960
kepala tukang kayu 0.096 0.096
5 1 m2 Pasangan Daun Jendela Kaca & Ventilasi
pekerja 9.237 9.237 9.237 9.237
mandor 0.462 0.462 0.462 0.462
tukang kayu 24.368 24.368 24.368 24.368
kepala tukang kayu 2.437 2.437 2.437 2.437
6 1 m3 Pasangan Kayu Kap dan Gording
pekerja 8.787 8.787 8.787 8.787
mandor 0.439 0.439 0.439 0.439
tukang kayu 26.360 26.360 26.360 26.360
kepala tukang kayu 2.636 2.636 2.636 2.636
7 1 m1 Pasangan Papan Listplank
pekerja 4.300 4.300 4.300
mandor 0.215 0.215 0.215
tukang kayu 8.600 8.600 8.600
kepala tukang kayu 1.075 1.075 1.075
TOTAL pekerja 8.787 0.245 0.245 0.245 8.787 8.787 9.237 9.237 9.237
mandor 0.439 0.012 0.012 0.012 0.439 0.439 0.462 0.462 0.462
tukang kayu 26.360 0.818 0.818 0.818 26.360 26.360 24.368 24.368 24.368
kepala tukang kayu 2.636 0.082 0.082 0.082 2.636 2.636 2.437 2.437 2.437
VI. PEKERJAAN ATAP DAN PLAFOND
1 1 m2 Pasangan Atap Seng BJLS 0.30 mm
pekerja 8.535 8.535 8.535
tukang kayu 4.268 4.268 4.268
kepala tukang kayu 0.427 0.427 0.427
mandor 0.427 0.427 0.427
2 1 m1 Pasangan Bubungan Atap Seng Licin BJLS 0.30 mm
pekerja 0.363 0.363
tukang kayu 0.169 0.169
kepala tukang kayu 0.019 0.019
mandor 0.019 0.019
3 1 m2 Pasangan Plafond Tripleks & Rangka
pekerja 17.835 17.835 17.835 17.835
mandor 0.932 0.932 0.932 0.932
tukang kayu 13.782 13.782 13.782 13.782
kepala tukang kayu 0.811 0.811 0.811 0.811
4 1 m1 List Plafond Profil
pekerja 0.839 0.839
mandor 0.040 0.040
tukang kayu 0.839 0.839
kepala tukang kayu 0.080 0.080
TOTAL pekerja 8.535 17.835 17.835 17.835
mandor 0.427 0.932 0.932 0.932
tukang kayu 4.268 13.782 13.782 13.782
kepala tukang kayu 0.427 0.811 0.811 0.811
VII. PEKERJAAN LANTAI
1 1 m2 Pasangan Tegel Keramik 30 x 30 cm
pekerja 12.741 12.741 12.741 12.741
mandor 0.637 0.637 0.637 0.637
tukang batu 6.116 6.116 6.116 6.116
kepala tukang batu 0.612 0.612 0.612 0.612
2 1 m2 Pasangan Tegel Mozaik 30 x30 cm
pekerja 0.213 0.213
mandor 0.011 0.011
tukang batu 0.102 0.102
kepala tukang batu 0.010 0.010
3 1 m2 Pasangan Tegel Plint 10 x 30 cm
pekerja 1.311 1.311
mandor 0.066 0.066
tukang batu 1.311 1.311
kepala tukang batu 0.131 0.131
4 1 m2 Pasangan Tegel Porselin 10 x 20 cm
pekerja 0.732 0.732 0.732
mandor 0.037 0.037 0.037
tukang batu 0.732 0.732 0.732
kepala tukang batu 0.073 0.073 0.073
TOTAL pekerja 12.741 12.741 12.741
mandor 0.637 0.637 0.637
tukang batu 6.116 6.116 6.116
kepala tukang batu 0.612 0.612 0.612
VIII. PEKERJAAN INSTALASI LITRIK DAN AIR
1 1 Buah Pasangan Kloset Jongkok
pekerja 0.333 0.333
mandor 0.053 0.053
tukang batu 0.500 0.500
kepala tukang batu 0.500 0.500
2 1 Buah Pasangan Waxtavel
pekerja 0.200 0.200
mandor 0.017 0.017
tukang batu 0.242 0.242
kepala tukang batu 0.025 0.025
3 1 Buah Pasangan Bak Air Porselin
pekerja 0.700 0.700
mandor 0.037 0.037
tukang batu 0.250 0.250
kepala tukang batu 0.023 0.023
4 1 Buah Pasangan Kran Air
pekerja 0.007 0.007
mandor 0.003 0.003
tukang batu 0.067 0.067
kepala tukang batu 0.007 0.007
5 1 Buah Pasangan Floor Drain
pekerja 0.005 0.005
mandor 0.003 0.003
tukang batu 0.050 0.050
kepala tukang batu 0.005 0.005
TOTAL pekerja 0.700 0.007 0.200
mandor 0.053 0.003 0.017
tukang batu 0.500 0.067 0.242
kepala tukang batu 0.500 0.007 0.025
IX. PEKERJAAN FINISHING
1 1 m2 Cat Tembok
pekerja 1.260 1.260 1.260 1.260
mandor 0.157 0.157 0.157 0.157
tukang cat 3.968 3.968 3.968 3.968
kepala tukang cat 0.397 0.397 0.397 0.397
2 1 m2 Cat Plafond
pekerja 0.540 0.540
mandor 0.068 0.068
tukang cat 1.702 1.702
kepala tukang cat 0.170 0.170
3 1 m2 Mengecat Kayu Kilap
pekerja 1.694 1.694 1.694
mandor 0.061 0.061 0.061
tukang cat 0.218 0.218 0.218
kepala tukang cat 0.145 0.145 0.145
4 1 m2 Mengecat Seng
pekerja 0.213 0.213
mandor 0.213 0.213
tukang cat 2.134 2.134
kepala tukang cat 0.427 0.427
5 1 m2 Teak Oil
pekerja 0.074 0.074
mandor 0.005 0.005
tukang cat 0.116 0.116
kepala tukang cat 0.116 0.116
TOTAL pekerja 0.074 0.213 1.694 1.694 1.260
mandor 0.005 0.213 0.157 0.157 0.157
tukang cat 0.116 2.134 3.968 3.968 3.968
kepala tukang cat 0.116 0.427 0.397 0.397 0.397
X. PEKERJAAN PENGGANTUNG DAN PENGUNCI
1 1 Buah Pasang Engsel
pekerja 0.215 0.215
mandor 0.011 0.011
tukang kayu 2.150 2.150
kepala tukang kayu 0.215 0.215
2 1 Buah Pasang Kait Angin
pekerja 0.078 0.078
mandor 0.004 0.004
tukang kayu 0.775 0.775
kepala tukang kayu 0.078 0.078
3 1 Buah Pasang Grendel
pekerja 0.026 0.026
mandor 0.013 0.013
tukang kayu 2.583 2.583
kepala tukang kayu 0.026 0.026
4 1 Buah Pasang Kunci KM/WC
pekerja 0.002 0.002
mandor 0.001 0.001
tukang kayu 0.167 0.167
kepala tukang kayu 0.002 0.002
5 1 Buah Pasang Kunci Double Slag
pekerja 0.010 0.010
mandor 0.005 0.005
tukang kayu 0.500 0.500
kepala tukang kayu 0.010 0.010
TOTAL pekerja 0.215
mandor 0.013
tukang kayu 2.583
kepala tukang kayu 0.215
IX PEKERJAAN LAIN - LAIN
1 1 m1 Pasangan Saluran Keliling Bangunan (Buis Beton U30)
pekerja 2.913 2.913
mandor 0.146 0.146
tukang batu 1.457 1.457
kepala tukang batu 0.146 0.146
TOTAL pekerja 2.913
mandor 0.146
tukang batu 1.457
kepala tukang batu 0.146
PERHITUNGAN DAN KONTROL TENAGA KERJA

MINGGU KE
NO. TENAGA KERJA JUMLAH
1 2 3 4 5 6 7 8 9 10 11 12 13
1 PEKERJA 15.321 16.614 16.614 6.017 6.620 6.620 12.598 12.598 12.598 17.835 17.835 17.835 12.741 171.847
2 MANDOR 0.760 0.831 0.831 0.282 0.282 0.282 0.630 0.630 0.630 0.932 0.932 0.932 0.637 8.591
3 TUKANG BATU 6.646 6.646 1.880 1.880 1.880 9.448 9.448 9.448 6.116 6.116 6.116 65.624
4 TUKANG BESI 0.777 0.777 1.089 1.911 1.911 1.911 2.636 11.012
5 TUKANG KAYU 26.360 0.866 0.866 1.711 2.129 6.620 26.360 26.360 24.368 24.368 24.368 13.782 178.158
6 TUKANG CAT 0.116 2.134 3.968 3.968 3.968 14.155
7 KEPALA TUKANG BATU 0.665 0.665 0.295 0.452 0.452 0.945 9.448 0.945 0.612 0.612 0.612 15.701
8 KEPALA TUKANG BESI 0.184 0.184 0.295 1.911 0.478 0.452 3.503
9 KEPALA TUKANG KAYU 2.636 0.184 0.184 0.295 0.452 1.911 2.636 2.636 2.437 2.437 2.437 0.811 19.055
10 KEPALA TUKANG CAT 0.116 0.427 0.397 0.397 0.397 1.733
KONTROL TENAGA KERJA

PEKERJA = 172 x Rp 50,000.00 = Rp 8,600,000.00


MANDOR = 9 x Rp 120,000.00 = Rp 1,080,000.00
TUKANG BATU = 66 x Rp 80,000.00 = Rp 5,280,000.00
TUKANG BESI = 12 x Rp 80,000.00 = Rp 960,000.00
TUKANG KAYU = 179 x Rp 80,000.00 = Rp 14,320,000.00
TUKANG CAT = 15 x Rp 70,000.00 = Rp 1,050,000.00
KEPALA TUKANG = 40 x Rp 90,000.00 = Rp 3,600,000.00

Rp 34,890,000.00
MINGGU KE
PEKERJAAN
1

PEKERJAAN PERSIAPAN
1 Pemasangan Bowplank

PEKERJAAN TANAH DAN URUGAN


1 Galian Tanah Pondasi
2
3
4
PEKERJAAN PASANGAN DAN PLESTERAN
1

7
8

PEKERJAAN BETON
1

6
PEKERJAAN KAYU DAN KACA
1

6 1 m3 Pasangan Kayu Kap dan


Gording
7
PEKERJAAN ATAP DAN PLAFOND
1

PEKERJAAN LANTAI
1

PEKERJAAN INSTALASI LITRIK DAN AIR


1

5
PEKERJAAN FINISHING
1

PEKERJAAN PENGGANTUNG DAN PENGUNCI

5
PEKERJAAN LAIN - LAIN
2 3 4

Urugan Tanah kembali Urugan Tanah kembali


Urugan Pasir di Bawah Pondasi
Urugan Pasir Peninggi Lantai Urugan Pasir Peninggi Lantai

1 m3 Pasangan Aanstamping
1 m3 Pasangan Pondasi Batu 1 m3 Pasangan Pondasi Batu
Karang (1pc : 5psr) Karang (1pc : 5psr)
1 m2 Pasangan Tembok
Trasraam (1pc : 3psr)
1 m2 Pasangan Tembok Biasa
(1pc : 5psr)

1 m3 Pasangan Beton Sloof 1 m3 Pasangan Beton Sloof 1 m3 Pasangan Beton Sloof (1pc
(1pc : 2psr : 3krl) (1pc : 2psr : 3krl) : 2psr : 3krl)

1 m3 Pasangan Beton Kolom


Praktis (1pc : 2psr : 3krl)

1 m3 Pasangan Kayu Kosen


Klas I (Bayam)
5 6 7

1 m2 Pasangan Tembok
Trasraam (1pc : 3psr)
1 m2 Pasangan Tembok Biasa 1 m2 Pasangan Tembok Biasa
(1pc : 5psr) (1pc : 5psr)
1 m2 Plesteran Tembok
Trasraam (1pc : 3psr)
1 m2 Plesteran Tembok Biasa
(1pc : 5psr)

1 m2 Acian Tembok

1 m3 Pasangan Beton Kolom 1 m3 Pasangan Beton Kolom


Praktis (1pc : 2psr : 3krl) Praktis (1pc : 2psr : 3krl)
1 m3 Pasangan Beton Kolom
Teras (1pc : 2psr : 3krl)
1 m3 Pasangan Beton Ringbalk 1 m3 Pasangan Beton Ringbalk 1 m3 Pasangan Beton Ringbalk
(1pc : 2psr : 3krl) (1pc : 2psr : 3krl) (1pc : 2psr : 3krl)
1 m3 Pasangan Beton Meja
Dapur (1pc : 2psr : 3krl)
1 m3 Pasangan Beton Neut
(1pc : 2psr : 3krl)

1 m3 Pasangan Kayu Kosen 1 m3 Pasangan Kayu Kosen Klas


Klas I (Bayam) I (Bayam)

1 m3 Pasangan Kayu Kap dan


Gording
1 Buah Pasangan Kloset
Jongkok

1 Buah Pasangan Bak Air


Porselin
8 9 10

1 m2 Plesteran Tembok Biasa


(1pc : 5psr)
1 m2 Plesteran Pondasi Tepi
Luar (1pc : 5psr)
1 m2 Acian Tembok 1 m2 Acian Tembok

1 m2 Pasangan Daun Jendela 1 m2 Pasangan Daun Jendela


Kaca & Ventilasi Kaca & Ventilasi
1 m3 Pasangan Kayu Kap dan
Gording
1 m1 Pasangan Papan
1 m1 Pasangan Papan Listplank Listplank

1 m2 Pasangan Atap Seng 1 m2 Pasangan Atap Seng BJLS


BJLS 0.30 mm 0.30 mm
1 m1 Pasangan Bubungan Atap
Seng Licin BJLS 0.30 mm

1 m2 Pasangan Plafond Tripleks


& Rangka

1 Buah Pasangan Kran Air

1 m2 Mengecat Seng

1 m2 Teak Oil
11 12 13

1 m2 Pasangan Daun Pintu


Panil Kayu
1 m2 Pasangan Daun Pintu
Double Teacwood
1 m2 Pasangan Daun Pintu
Double Teacwood Lapis Seng
1 m2 Pasangan Daun Jendela
Kaca & Ventilasi
1 m2 Pasangan Plafond Tripleks 1 m2 Pasangan Plafond Tripleks
& Rangka & Rangka
1 m1 List Plafond Profil

1 m2 Pasangan Tegel Keramik 1 m2 Pasangan Tegel Keramik 30 1 m2 Pasangan Tegel Keramik


30 x 30 cm x 30 cm 30 x 30 cm
1 m2 Pasangan Tegel Mozaik 30
x30 cm
1 m2 Pasangan Tegel Plint 10 x
30 cm
1 m2 Pasangan Tegel Porselin 10 1 m2 Pasangan Tegel Porselin
x 20 cm 10 x 20 cm

1 Buah Pasangan Waxtavel

1 Buah Pasangan Floor Drain

1 m2 Cat Tembok 1 m2 Cat Tembok 1 m2 Cat Tembok

1 m2 Cat Plafond

1 m2 Mengecat Kayu Kilap 1 m2 Mengecat Kayu Kilap

1 Buah Pasang Engsel

1 Buah Pasang Kait Angin

1 Buah Pasang Grendel

1 Buah Pasang Kunci KM/WC

1 Buah Pasang Kunci Double


Slag
1 m1 Pasangan Saluran Keliling
Bangunan (Buis Beton U30)
PERHITUNGAN KEBUTUHAN MATERIAL
I. PEKERJAAN PERSIAPAN
1 m2 Pasangan Bowplank
papan kayu klas II = 0.0070 x 58.0000 = 0.4060 m3
usuk klas II = 0.0120 x 58.0000 = 0.6960 m3
paku biasa = 0.0200 x 58.0000 = 1.1600 kg

II. PEKERJAAN TANAH & URUGAN


3 1 m3 Urugan Pasir Di Bawah Pondasi
pasir urug = 1.2000 x 7.5050 = 9.0060 m3
4 1 m3 Urugan Pasir Peninggi Lantai
pasir urug = 1.2000 x 5.0638 = 6.0765 m3

III. PEKERJAAN PASANGAN & PLESTERAN


1 1 m3 Pasangan Aanstamping Batu Karang
batu karang = 1.2000 x 15.0100 = 18.0120 m3
pasir urug = 0.3000 x 15.0100 = 4.5030 m3
2 1 m Pasangan Pondasi Batu Karang (1pc : 5psr)
3

pasir pasang = 0.5440 x 33.2284 = 18.0763 m3


batu kali/ karang = 1.1000 x 33.2284 = 36.5513 m3
semen Kupang = 136.0000 x 33.2284 = 4,519.0675 / 40
= 112.9767 zak
3 1 m2 Pasangan Tembok Trasraam (1pc : 3psr)
pasir pasang = 0.0400 x 18.6000 = 0.7440 m3
bata merah = 70.0000 x 18.6000 = 1,302.0000 buah
semen Kupang = 14.3700 x 18.6000 = 267.2820 / 40
= 6.6821 zak
4 1 m2 Pasangan Tembok Biasa (1pc : 5psr)
pasir pasang = 0.0450 x 37.6038 = 1.6922 m3
bata merah = 70.0000 x 37.6038 = 2,632.2625 buah
semen Kupang = 9.6800 x 37.6038 = 364.0043 / 40
= 9.1001 zak
5 1 m2 Plesteran Tembok Trasraam (1pc : 3psr)
pasir pasang = 0.0190 x 37.2000 = 0.7068 m3
semen Kupang = 6.4800 x 37.2000 = 241.0560 / 40
= 6.0264 zak
6 1 m2 Plesteran Tembok Biasa (1pc : 5psr)
pasir pasang = 0.0220 x 111.4538 = 2.4520 m3
semen Kupang = 4.3200 x 111.4538 = 481.4802 / 40
= 12.0370 Zak
7 1 m2 Plesteran Pondasi Bagian Luar (1pc : 4psr)
pasir pasang = 0.0220 x 14.5250 = 0.3196 m3
semen Kupang = 4.3200 x 14.5250 = 62.7480 / 40
= 1.5687 Zak
8 1 m2 Acian Tembok
semen merah = 0.0090 x 125.9788 = 1.1338 kg
Kapur padam = 0.0090 x 125.9788 = 1.1338 m3
pasir pasang = 0.0090 x 125.9788 = 1.1338 m3

IV. PEKERJAAN BETON


1 1 m2 Pasangan Beton Sloof (1pc : 2psr : 3krl)
pasir cor = 0.5200 x 1.1100 = 0.5772 m3
batu pecah 2/3 cm = 0.7800 x 1.1100 = 0.8658 m3
semen Kupang = 323.0000 x 1.1100 = 358.5300 / 40
= 8.9633 Zak
besi beton = 150.0000 x 1.1100 = 166.5000 kg
kawat ikat = 3.0000 x 1.1100 = 3.3300 kg
papan klas II lokal = 0.2700 x 1.1100 = 0.2997 m3
paku biasa = 2.0000 x 1.1100 = 2.2200 kg
Minyak bekesting = 0.6000 x 1.1100 = 0.6660 lt

RAB 2007
RALNO_ @ CVL
2 1 m2 Pasangan Beton Kolom Praktis (1pc : 2psr : 3krl)
pasir cor = 0.5200 x 1.0368 = 0.5391 m3
batu pecah 2/3 cm = 0.7800 x 1.0368 = 0.8087 m3
semen Kupang = 323.0000 x 1.0368 = 334.8864 / 40
= 8.3722 Zak
besi beton = 200.0000 x 1.0368 = 207.3600 kg
kawat ikat = 4.5000 x 1.0368 = 4.6656 kg
papan klas II lokal = 0.4000 x 1.0368 = 0.4147 m3
paku biasa = 4.0000 x 1.0368 = 4.1472 kg
Minyak bekesting = 2.0000 x 1.0368 = 2.0736 lt
Dolken = 200.0000 x 1.0368 = 207.3600 btg
3 1 m2 Pasangan Beton Kolom Teras (1pc : 2psr : 3krl)
pasir cor = 0.5200 x 0.2400 = 0.1248 m3
batu pecah 2/3 cm = 0.7800 x 0.2400 = 0.1872 m3
semen Kupang = 323.0000 x 0.2400 = 77.5200 / 40
= 1.9380 Zak
besi beton = 200.0000 x 0.2400 = 48.0000 kg
kawat ikat = 4.5000 x 0.2400 = 1.0800 kg
papan klas II lokal = 0.4000 x 0.2400 = 0.0960 m3
paku biasa = 4.0000 x 0.2400 = 0.9600 kg
Minyak bekesting = 2.0000 x 0.2400 = 0.4800 lt
Dolken = 200.0000 x 0.2400 = 48.0000 btg
4 1 m2 Pasangan Beton Ringbalk (1pc : 2psr : 3krl)
pasir cor = 0.5200 x 2.7300 = 1.4196 m3
batu pecah 2/3 cm = 0.7800 x 2.7300 = 2.1294 m3
semen Kupang = 323.0000 x 2.7300 = 881.7900 / 40
= 22.0448 Zak
besi beton = 150.0000 x 2.7300 = 409.5000 kg
kawat ikat = 3.0000 x 2.7300 = 8.1900 kg
papan klas II lokal = 0.2700 x 2.7300 = 0.7371 m3
paku biasa = 2.0000 x 2.7300 = 5.4600 kg
Minyak bekesting = 0.6000 x 2.7300 = 1.6380 lt
Tripleks = 3.5000 x 2.7300 = 9.5550 lbr
5 1 m2 Pasangan Beton Meja Dapur (1pc : 2psr : 3krl)
pasir cor = 0.5200 x 0.3960 = 0.2059 m3
batu pecah 2/3 cm = 0.7800 x 0.3960 = 0.3089 m3
semen Kupang = 323.0000 x 0.3960 = 127.9080 / 40
= 3.1977 Zak
besi beton = 200.0000 x 0.3960 = 79.2000 kg
kawat ikat = 3.0000 x 0.3960 = 1.1880 kg
papan klas II lokal = 0.2500 x 0.3960 = 0.0990 m3
paku biasa = 3.0000 x 0.3960 = 1.1880 kg
Tripleks = 2.5000 x 0.3960 = 0.9900 lbr
6 1 m2 Pasangan Beton Neut (1pc : 2psr : 3krl)
pasir cor = 0.5200 x 0.0096 = 0.0050 m3
batu pecah 2/3 cm = 0.8700 x 0.0096 = 0.0084 m3
semen Kupang = 218.0000 x 0.0096 = 2.0928 / 40
= 0.0523 Zak
V. PEKERJAAN KAYU
1 1 m3 Pasangan Kayu Kosen Klas I (Bayam)
kayu klas I (Bayam) = 1.1000 x 0.8175 = 0.8993 m3
2 1 m2 Pasangan Daun Pintu Panil Kayu
papan kayu klas I = 0.0400 x 5.5200 = 0.2208 m3
3 1 m2 Pasangan Daun Pintu Double Teacwood
lembar teacwood 3 mm = 0.3470 x 4.9200 = 1.7072 lembar
lem kayu = 0.3000 x 4.9200 = 1.4760 kg
paku halus = 0.3000 x 4.9200 = 1.4760 kg
papan kayu klas I = 0.0196 x 4.9200 = 0.0964 m3

RAB 2007
RALNO_ @ CVL
4 1 m2 Pasangan Daun Pintu Double Teacwood Lapis Seng
lembar tripleks 3 mm lapis seng = 0.3470 x 2.8800 = 0.9994 lembar
lembar teacwood 3 mm = 0.3470 x 2.8800 = 0.9994 lembar
lem kayu = 0.3000 x 2.8800 = 0.8640 kg
paku halus = 0.3000 x 2.8800 = 0.8640 kg
papan kayu klas I = 0.0196 x 2.8800 = 0.0564 m3
5 1 m2 Pasangan Daun Jendela Kaca Dan Ventilasi
kaca 3 mm = 1.1000 x 22.6680 = 24.9348 m2
papan kayu klas I = 0.0350 x 22.6680 = 0.7934 m3
6 1 m3 Pasangan Kayu Kap dan Gording
kayu klas II = 1.1000 x 4.3933 = 4.8327 m3
paku biasa = 0.8000 x 4.3933 = 3.5147 kg
Besi Strip = 15.0000 x 4.3933 = 65.9002 kg
7 1 m1 Pasangan Listplank Papan kayu jati
papan kayu jati = 0.0072 x 129.0000 = 0.9288 m3
paku biasa = 0.0500 x 129.0000 = 6.4500 kg

VI. PEKERJAAN ATAP DAN PLAFOND


1 1 m2 Pasangan Atap Seng BJLS 0.30 mm
seng gelombang BJLS 0.30 mm = 0.7000 x 213.3800 = 149.3660 lembar
paku seng = 0.0200 x 213.3800 = 4.2676 kg
2 1 m1 Pasangan Bubungan Atap Seng Licin BJLS 0.30 mm
seng licin BJLS 0.30 mm = 0.3000 x 14.5000 = 4.3500 lembar
paku seng = 0.0400 x 14.5000 = 0.5800 kg

3 1 m2 Pasangan Plafond Tripleks + Rangka


tripleks 3 mm = 0.3600 x 162.1400 = 58.3704 lembar
kayu usuk 5/7 cm klas II = 0.0230 x 162.1400 = 3.7292 m3
paku biasa = 0.1500 x 162.1400 = 24.3210 kg
paku tripleks = 0.0300 x 162.1400 = 4.8642 kg
4 1 m1 Pasangan List Plafond Berprofil
list plafond profil = 1.0500 x 239.6000 = 251.5800 m1
paku biasa = 0.0300 x 239.6000 = 7.1880 kg

VII. PEKERJAAN LANTAI


1 1 m2 Pasangan Tegel Keramik 30 x 30 cm
pasir pasang = 0.0230 x 101.9250 = 2.3443 m3
semen warna = 0.9000 x 101.9250 = 91.7325 kg
ubin keramik = 11.0000 x 101.9250 = 1,121.1750 / 11
= 101.9250 dos
semen Kupang = 8.3600 x 101.9250 = 852.0930 / 40
= 21.3023 Zak
2 1 m2 Pasangan Tegel Mozaik 30 x 30 cm
pasir pasang = 0.0230 x 5.1000 = 0.1173 m3
semen warna = 0.9000 x 5.1000 = 4.5900 kg
ubin keramik = 11.0000 x 5.1000 = 56.1000 / 11
= 5.1000 dos
semen Kupang = 8.3600 x 5.1000 = 42.6360 / 40
= 1.0659 Zak
3 1 m1 Pasangan Tegel Plint 10 x 20 cm
pasir pasang = 0.0032 x 87.4000 = 0.2797 m3
semen warna = 0.1000 x 87.4000 = 8.7400 kg
ubin keramik = 5.0000 x 87.4000 = 437.0000 / 50
= 8.7400 dos
semen Kupang = 1.6500 x 87.4000 = 144.2100 / 40
= 3.6053 / Zak
4 1 m2 Pasangan Tegel Porselin 20 x 20 cm
pasir pasang = 0.0180 x 24.3900 = 0.4390 m3
semen warna = 1.5000 x 24.3900 = 36.5850 kg
ubin keramik = 25.0000 x 24.3900 = 609.7500 / 25
= 24.3900 dos
semen Kupang = 9.3000 x 24.3900 = 226.8270 / 40
= 5.670675 zak

RAB 2007
RALNO_ @ CVL
VIII. PASANGAN INSTALASI LISTRIK DAN AIR
1 Pasangan Titik Lampu = 19 buah
2 Pasangan Lampu TL 40 Watt = 2 buah
3 Pasangan Lampu TL 20 Watt = 9 buah
4 Pasangan Lampu Pijar 25 Watt = 2 buah
5 Pasangan Saklar Tunggal = 6 buah
6 Pasangan Saklar Ganda = 3 buah
7 Pasangan Stop kontak = 7 buah
8 Pasangan Sekring Cast = 1 buah
9 Pasangan Arde pembumian = 1 buah
10 Pasangan Wastafel = 1 buah
11 Pasangan Bak Air Porselin = 2 buah
12 Pasangan Closed Jongkok = 2 buah
13 Pasangan Septic Tank dan Peresapan = 2 buah
14 Pasangan Instalasi Air Bersih = 1 LS
15 Pasangan Instalasi Air Kotor = 1 LS
16 Pasangan Floor Drain = 3 buah
17 Pasangan Kran Air = 4 buah

IX. PEKERJAAN FINISHING


1 1 m2 Cat Tembok
cat tembok = 0.2600 x 125.9788 = 32.7545 kg
Cat dasar = 0.1000 x 125.9788 = 12.5979 kg
plamir = 0.1000 x 125.9788 = 12.5979 kg
2 1 m2 Cat Plafond
cat plafond = 0.2600 x 162.1400 = 42.1564 kg
Cat dasar = 0.1000 x 162.1400 = 16.2140 kg
plamir = 0.1000 x 162.1400 = 16.2140 kg
4 1 m2 Mengecat Kayu
cat dasar = 0.1700 x 72.6000 = 12.3420 kg
cat kilap = 0.2600 x 72.6000 = 18.8760 kg
Plamir = 0.1500 x 72.6000 = 10.8900 kg
Meni kayu = 0.2000 x 72.6000 = 14.5200 kg

5 1 m2 Teak Oil
teak oil = 0.3600 x 11.0400 = 3.9744 liter
6 1 m2 Cat Seng
cat seng = 0.3000 x 213.3800 = 64.0140 kg

X. PASANGAN PENGGANTUNG DAN PENGUNCI


1 Pasangan Kunci Double Slaag = 6 buah
2 Pasangan Kunci KM/ WC = 2 buah
3 Pasangan Grendel = 31 buah
4 Pasangan Engsel = 86 buah
5 Pasangan Kait Angin = 31 buah
6 Pasangan Anker Doc = 68 buah
7 Pasangan Mur, Baut dan Beugel U = 1 LS

XI. PEKERJAAN LAIN - LAIN


1 1 m1 Saluran Keliling Bangunan
Pipa beton = 1.1000 x 46.0000 = 50.6000 m3
Batu bata = 0.5500 x 46.0000 = 25.3000 m3
Sement portland = 10.3000 x 46.0000 = 473.8000 / 40
= 11.8450 zak
Pasir pasang = 0.0610 x 46.0000 = 2.8060 m1
Pasir urug = 0.0690 x 46.0000 = 3.1740 m2

RAB 2007
RALNO_ @ CVL
Papan Kayu kayu
Usuk Papan
Kayu Klas II (Bayam)
No. JENIS PEKERJAAN Volume
Klas II Klas II lokal Klas I Klas I
m3 m3 m3 m3 m3
I PEKERJAAN PERSIAPAN
1 Pemasangan Bowplank 58.000 m1 0.4060 0.6960
II PEKERJAAN TANAH DAN URUGAN
1 Urugan Pasir di Bawah Pondasi 7.505 m3
2 Urugan Pasir Peninggi Lantai 5.064 m3
III PEKERJAAN PASANGAN DAN PLESTERAN
1 Pekerjaan Aanstamping 15.010 m3
2 Pasangan Pondasi Batu Karang (1 pc : 5 psr) 33.228 m3
3 Pasangan Tembok Trasraam (1 pc : 3 psr) 18.600 m2
4 Pasangan Tembok Biasa (1 pc : 5 psr) 37.604 m2
5 Plesteran Tembok Trasraam (1 pc : 3 psr) 37.200 m2
6 Plesteran Tembok Biasa (1 pc : 5 psr) 111.454 m2
7 Plesteran Pondasi Tepi Luar (1 pc : 5 psr) 14.525 m2
8 Acian Tembok 125.979 m2
IV PEKERJAAN BETON
1 Cor Beton Sloof (1pc : 2psr : 3krl) 1.110 m3 0.2997
2 Cor Beton Kolom Praktis (1pc : 2psr : 3krl) 1.037 m3 0.4147
3 Cor Beton Kolom Teras (1pc : 2psr : 3krl) 0.240 m3 0.0960
4 Cor Beton Ringbalk (1pc : 2psr : 3krl) 2.730 m3 0.7371
5 Cor Beton Meja Dapur (1pc : 2psr : 3krl) 0.396 m3 0.0990
6 Cor Beton Neut (1pc : 2psr : 3krl) 0.010 m3
V PEKERJAAN KAYU DAN KACA
1 Pasangan Kayu Kusen Klas I 0.818 m3 0.8993
2 Pasangan Daun Pintu Panil Kayu 5.520 m2 0.2208
3 Pas. Daun Pintu Double Teacwood 3 mm 4.920 m2 0.0964
4 Pas. Daun Pintu Double Teacwood 3 mm lapis Alluminium 2.880 m2 0.0564
5 Pas. Daun Jendela Kaca dan Ventilasi 3 mm 22.668 m2 0.7934
6 Pas. Kayu Kap dan Gording 4.393 m3 4.8327
7 Pasangan Lisplank Papan 129.000 m1 0.9288
VI PEKERJAAN ATAP DAN PLAFOND
1 Pas. Atap Seng BJLS 0.30 mm 213.380 m2
2 Pas. Atap Bubungan Seng Licin 0.30 mm 14.500 m1
3 Pas. Plafond Tripleks 3 mm & Rangka 162.140 m2 3.7292
4 Pas. List Penutup Plafond (Berprofil) 239.600 m1
VII PEKERJAAN LANTAI
1 Pasangan Tegel Keramik 30/30 101.925 m2
2 Pasangan Tegel Mozaik 30/30 5.100 m2
3 Pasangan Tegel Plint 10/30 87.400 m2
4 Pasangan Tegel Porselen 10/20 24.390 m2
VIII PEKERJAAN INSTALASI LISTRIK & AIR
1 Pasangan Titik Lampu 19 Buah
2 Pasangan Lampu TL 40 Watt 2 Buah
3 Pasangan Lampu TL 20 Watt 9 Buah
4 Pasangan Lampu Pijar 25 Watt 2 Buah
5 Pasangan Saklar Tunggal 6 Buah
6 Pasangan Saklar Ganda 3 Buah
7 Pasangan Stop kontak 7 Buah
8 Pasangan Sekring Cast 1 Buah
9 Pasangan Arde pembumian 1 Buah
10 Pasangan Wastafel 1 Buah
11 Pasangan Bak Air Porselin 2 Buah
12 Pasangan Closed Jongkok 2 Buah
13 Pasangan Septic Tank dan Peresapan 2 Buah
14 Pasangan Floor Drain 3 Buah
15 Pasangan Kran Air 4 Buah
IX PEKERJAAN FINISHING
1 Cat Tembok 125.979 m2
2 Cat Plafond 162.140 m2
4 Cat Kayu 72.600 m2
5 Cat Seng 213.380 m2
6 Teak Oil 11.040 m2
X PEKERJAAN PENGGANTUNG DAN PENGUNCI
1 Pasangan Kunci Double Slaag 6 Buah
2 Pasangan Kunci KM/ WC 2 Buah
3 Pasangan Grendel 31 Buah
4 Pasangan Engsel 86 Buah
5 Pasangan Kait Angin 31 Buah
6 Pasangan Anker Doc 68 Buah
XI PEKERJAAN LAIN - LAIN
1 Pasangan Saluran Keliling Bangunan (Buis Beton U 30 cm) 46.000 m1
2.0525 4.4252 4.8327 0.8993 2.0959
3.0 5.0 5.0 1.0 2.5

RAB 2007
RALNO_ @ CVL
Teac Tripleks Pasir Pasir Pasir Batu Batu Semen Semen
Tripleks Bata merah
Wood Lapis Urug Cor Pasang Karang Pecah Kupang Warna
seng 2/3 cm
Lembar Lembar m3 m3 m3 m3 Buah Zak Kg
Lembar m3

9.0060
6.0765

5.3100 18.0120
18.0763 36.5513 112.9767
0.7440 1,302.0000 6.6821
1.6922 2,632.2625 9.1001
0.7068 6.0264
2.4520 12.0370
0.3196 1.5687
1.1338

0.5772 0.8658 8.9633


0.5391 0.8087 8.3722
0.1248 0.1872 1.9380
9.5550 1.4196 2.1294 22.0448
0.2059 0.3089 3.1977
0.0050 0.0084 0.0523

1.7072
0.9994 0.9994

58.3704

2.3443 21.3023 91.7325


0.1173 1.0659 4.5900
0.2797 3.6053 8.7400
0.4390 5.6707 36.5850

3.1740 50.6000 25.3000 11.8450


2.7066 0.9994 67.9254 23.5665 2.8716 77.7710 54.5633 4.3083 3959.5625 237.5821 141.6475
3.0 1.0 68.0 24.0 3.0 78.0 55.0 5.0 3960.0 238.0 142.0

RAB 2007
RALNO_ @ CVL
Besi Kawat Paku Paku Paku Lem Kaca Seng Seng List Tegel
Beton Ikat Biasa Seng Halus Kayu 3 mm BJLS licin Plafond Keramik
0.3 mm 0.3 mm Profil 30/30
Kg m3 Kg Kg Kg Kg m2
lembar lembar m dos

1.1600

166.5000 3.3300 2.2200


207.3600 4.6656 4.1472
48.0000 1.0800 0.9600
409.5000 8.1900 5.4600
79.2000 1.1880 1.1880

1.4760 1.4760
0.8640 0.8640
24.9348
3.5147
6.4500

4.2676 149.3660
0.5800 4.3500
24.3210 4.8642
7.1880 251.5800

101.9250

910.5600 18.4536 49.4209 4.8476 14.3922 2.3400 24.9348 149.3660 4.3500 251.5800 101.9250
911.0 19.0 50.0 5.0 15.0 3.0 25.0 150.0 5.0 252.0 102.0

RAB 2007
RALNO_ @ CVL
TABEL REKAPITULASI MATERIAL
Tegel Tegel Tegel Cat Cat Cat Cat Cat Teak
Plamir Menie
Mozaik Plint Porselin Tembok Plafond Dasar Seng Kayu Oil
30/30 10/30 10/20
Kg Kg Kg Kg Kg Kg Kg Liter
dos dos dos

5.1000
8.7400
24.3900

12.5979 32.7545 12.5979


16.2140 42.1564 16.2140
10.8900 12.3420 14.5200 18.8760
64.0140
3.9744

5.1000 8.7400 24.3900 39.7019 32.7545 42.1564 41.1539 64.0140 14.5200 18.8760 3.9744
6.0 9.0 25.0 40.0 33.0 43.0 42.0 65.0 15.0 19.0 4.0

RAB 2007
RALNO_ @ CVL
Buis Titik Lampu Lampu Lampu Saklar Saklar Stop Sekring Arde
Wastafel
Beton Lampu TL TL Pijar Tunggal Ganda Kontak Cast Pembumian
40 Watt 20 Watt 25 Watt
m1 Buah Buah Buah Buah Buah Buah Buah
Buah Buah Buah

19
2
9
2
6
3
7
1
1
1

50.6000
50.6000 19 2 9 2 6 3 7 1 1 1
51.0 19 2 9 2 6 3 7 1 1 1

RAB 2007
RALNO_ @ CVL
Bak Closed Septic Floor Kran Kunci Kunci Kait Angker
Grendel Engsel
Air Jongkok Tank Drain Air Double KM/ WC Angin Doc
Porselin Slaag
Buah Buah Buah Buah Buah Buah Buah Buah Buah
Buah Buah

2
2
2
3
4

6
2
31
86
31
68

2 2 2 3 4 6 2 31 86 31 68
2 2 2 3 4 6 2 31 86 31 68

RAB 2007
RALNO_ @ CVL
Minyak Dolken Besi
bekesting Strip

Liter Btg Kg

0.6660
2.0736 207.3600
0.4800 48.0000
1.6380 207.3600

65.9002

5 463 66
5 463 66

RAB 2007
RALNO_ @ CVL

You might also like