Requirement A - Establishment of a Bottling Plant where UNSOS owns and operates an UNSOS Water Treatment Plant (WTP

Requirement B - Outsourcing water from external commercial sources in the absence of an UNSOS WTP, or at UNSOS reque

Inside the AMISOM-protected area at Aden Adde International Airport (AAIA) Mogadishu
YEAR 1

Unit of Quantity
Measurement per year

Mobilization Cost (one time) - Requirement A


(provision, installation and commissioning of bottling plant) Each 1

Bottled Water including services (including but not limited to bottling,


delivery/cleaning/replacement/distribution of bottles, and
delivery/maintenance/repair/replacement of water dispensers) - Requirement A Liters 567,000

Demobilization Cost (one time) - Requirement A (only if UNSOS requires


deinstallation and disposal of bottling plant, no other demobilization will be paid) Each 0
(Back-up) Bottled Water from external source including services (including but not
limited to bottling, delivery/cleaning/replacement/distribution of bottles, and
delivery/maintenance/repair/replacement of water dispensers) - Requirement B Liters 170,100

TOTAL COST PER YEAR

TOTAL COST FOR MOGADISHU

YEAR 1
YEAR 2
YEAR 3
YEAR 4
YEAR 5
TOTAL 0
Annex E - BID FORM (PRICE LIST)
Provision and delivery of bottled drinking water to UNSOS, UNSOM and AMISOM offices in Somalia

er Treatment Plant (WTP), maintenance of the Bottling Plant, filling of Contractor-provided bottles, and distribution of bottled water to
WTP, or at UNSOS request when the UNSOS WTP is not functional

YEAR 1 YEAR 2 YEAR 3

Quantity per Quantity per


Unit rate Total Rate year Unit rate Total Rate year Unit rate

0 0

0.22 124,740 567,000 567,000

0 0

0.22 37422 170,100 170,100


nd AMISOM offices in Somalia

stribution of bottled water to Contractor-provided water dispensers at UNSOS locations

YEAR 3 YEAR 4 YEAR 5

Quantity per Quantity per


Total Rate year Unit rate Total Rate year Unit rate Total Rate

0 0

567,000 567,000

0 1

170,100 170,100
Requirement A - Establishment of a Bottling Plant where UNSOS owns and operates an UNSOS Water Treatment Plant (WTP
Requirement B - Outsourcing water from external commercial sources in the absence of an UNSOS WTP, or at UNSOS reque

KISMAYO

YEAR 1
Unit of Quantity per
Measurement year Unit rate

Mobilization Cost (one time) - Requirement A


(provision, installation and commissioning of bottling plant) Each 1
Bottled Water including services (including but not limited to
bottling, delivery/cleaning/replacement/distribution of bottles,
and delivery/maintenance/repair/replacement of water
dispensers) - Requirement A Liters 34,020
Demobilization Cost (one time) - Requirement A (only if UNSOS
requires deinstallation and disposal of bottling plant, no other
demobilization will be paid) Each 0
(Back-up) Bottled Water from external source including services
(including but not limited to bottling,
delivery/cleaning/replacement/distribution of bottles, and
delivery/maintenance/repair/replacement of water dispensers) -
Requirement B Liters 10,206

TOTAL COST PER YEAR

YEAR 1
YEAR 2
YEAR 3
YEAR 4
YEAR 5
TOTAL 0
Water Treatment Plant (WTP), maintenance of the Bottling Plant, filling of Contractor-provided bottles, and distribution of bottled wate
OS WTP, or at UNSOS request when the UNSOS WTP is not functional

1 YEAR 2 YEAR 3 YEAR 4


Quantity Quantity Quantity
Total Rate per year Unit rate Total Rate per year Unit rate Total Rate per year

0 0 0

34,020 34,020 34,020

0 0 0

10,206 10,206 10,206


es, and distribution of bottled water to Contractor-provided water dispensers at UNSOS locations

YEAR 4 YEAR 5
Quantity per
Unit rate Total Rate year Unit rate Total Rate

34,020

10,206
Requirement A - Establishment of a Bottling Plant where UNSOS owns and operates an UNSOS Water Treatment Plant (WTP
Requirement B - Outsourcing water from external commercial sources in the absence of an UNSOS WTP, or at UNSOS reque

BAIDOA

YEAR 1
Unit of Quantity
Measurement per year Unit rate Total Rate
Mobilization Cost (one time) - Requirement A
(provision, installation and commissioning of bottling
plant) Each 1
Bottled Water including services (including but not
limited to bottling,
delivery/cleaning/replacement/distribution of
bottles, and
delivery/maintenance/repair/replacement of water
dispensers) - Requirement A Liters 39,690

Demobilization Cost (one time) - Requirement A


(only if UNSOS requires deinstallation and disposal of
bottling plant, no other demobilization will be paid) Each 0
(Back-up) Bottled Water from external source
including services (including but not limited to
bottling, delivery/cleaning/replacement/distribution
of bottles, and
delivery/maintenance/repair/replacement of water
dispensers) - Requirement B Liters 11,907
TOTAL COST PER YEAR

TOTAL COST FOR BAIDOA

YEAR 1
YEAR 2
YEAR 3
YEAR 4
YEAR 5
TOTAL 0
ater Treatment Plant (WTP), maintenance of the Bottling Plant, filling of Contractor-provided bottles, and distribution of bottled water t
S WTP, or at UNSOS request when the UNSOS WTP is not functional

YEAR 2 YEAR 3 YEAR 4


Quantity Quantity Quantity
per year Unit rate Total Rate per year Unit rate Total Rate per year Unit rate

0 0 0

39,690 39,690 39,690

0 0 0

11,907 11,907 11,907


and distribution of bottled water to Contractor-provided water dispensers at UNSOS locations

YEAR 4 YEAR 5
Quantity per
Total Rate year Unit rate Total Rate

39,690

11,907
Requirement A - Establishment of a Bottling Plant where UNSOS owns and operates an UNSOS Water Treatment
Requirement B - Outsourcing water from external commercial sources in the absence of an UNSOS WTP, or at UN

BELETWEYNE

YEAR 1
Unit of Quantity per
Measurement year Unit rate
Mobilization Cost (one time) - Requirement A
(provision, installation and commissioning of bottling
plant) Each 1

Bottled Water including services (including but not


limited to bottling,
delivery/cleaning/replacement/distribution of bottles,
and delivery/maintenance/repair/replacement of water
dispensers) - Requirement A Liters 34,020
Demobilization Cost (one time) - Requirement A (only if
UNSOS requires deinstallation and disposal of bottling
plant, no other demobilization will be paid) Each 0

(Back-up) Bottled Water from external source including


services (including but not limited to bottling,
delivery/cleaning/replacement/distribution of bottles,
and delivery/maintenance/repair/replacement of water
dispensers) - Requirement B Liters 10,206

TOTAL COST PER YEAR

TOTAL COST FOR BELETWEYNE

YEAR 1
YEAR 2
YEAR 3
YEAR 4
YEAR 5
TOTAL 0
UNSOS Water Treatment Plant (WTP), maintenance of the Bottling Plant, filling of Contractor-provided bottles, and distribution of bottle
an UNSOS WTP, or at UNSOS request when the UNSOS WTP is not functional

YEAR 2 YEAR 3 YEAR 4


Quantity per Quantity per Quantity
Total Rate year Unit rate Total Rate year Unit rate Total Rate per year

0 0 0

34,020 34,020 34,020

0 0 0

10,206 10,206 10,206


ed bottles, and distribution of bottled water to Contractor-provided water dispensers at UNSOS locations

YEAR 4 YEAR 5
Quantity per
Unit rate Total Rate year Unit rate Total Rate

34,020

10,206
Requirement A - Establishment of a Bottling Plant where UNSOS owns and operates an UNSOS Water Treatment Plant (WTP
Requirement B - Outsourcing water from external commercial sources in the absence of an UNSOS WTP, or at UNSOS reque

JOHWAR

YEAR 1
Unit of Quantity per
Measurement year Unit rate
Mobilization Cost (one time) - Requirement A
(provision, installation and commissioning of bottling plant) Each 1

Bottled Water including services (including but not limited to


bottling, delivery/cleaning/replacement/distribution of
bottles, and delivery/maintenance/repair/replacement of
water dispensers) - Requirement A Liters 22,680

Demobilization Cost (one time) - Requirement A (only if


UNSOS requires deinstallation and disposal of bottling plant,
no other demobilization will be paid) 0

(Back-up) Bottled Water from external source including


services (including but not limited to bottling,
delivery/cleaning/replacement/distribution of bottles, and
delivery/maintenance/repair/replacement of water
dispensers) - Requirement B Liters 6,804

TOTAL COST PER YEAR

TOTAL COST FOR JOHWAR

YEAR 1
YEAR 2
YEAR 3
YEAR 4
YEAR 5
TOTAL 0
Water Treatment Plant (WTP), maintenance of the Bottling Plant, filling of Contractor-provided bottles, and distribution of bottled wate
SOS WTP, or at UNSOS request when the UNSOS WTP is not functional

YEAR 2 YEAR 3 YEAR 4


Quantity per Quantity per Quantity per
Total Rate year Unit rate Total Rate year Unit rate Total Rate year

0 0 0

22,680 22,680 22,680

0 0 0

6,804 6,804 6,804


nd distribution of bottled water to Contractor-provided water dispensers at UNSOS locations

YEAR 4 YEAR 5
Quantity per
Unit rate Total Rate year Unit rate Total Rate

22,680

6,804
Requirement A - Establishment of a Bottling Plant where UNSOS owns and operates an UNSOS Water Treatment Plant (WTP
Requirement B - Outsourcing water from external commercial sources in the absence of an UNSOS WTP, or at UNSOS reque

DHOBLEY

YEAR 1

Unit of Quantity per


Measurement year
Mobilization Cost (one time) - Requirement A
(provision, installation and commissioning of bottling plant) Each 1

Bottled Water including services (including but not limited to bottling,


delivery/cleaning/replacement/distribution of bottles, and
delivery/maintenance/repair/replacement of water dispensers) -
Requirement A Liters 17,010

Demobilization Cost (one time) - Requirement A (only if UNSOS requires


deinstallation and disposal of bottling plant, no other demobilization will
be paid) Each 0

(Back-up) Bottled Water from external source including services


(including but not limited to bottling,
delivery/cleaning/replacement/distribution of bottles, and
delivery/maintenance/repair/replacement of water dispensers) -
Requirement B Liters 5,103

TOTAL COST PER YEAR

TOTAL COST FOR DHOBLEY

YEAR 1
YEAR 2
YEAR 3
YEAR 4
YEAR 5

TOTAL 0
SOS Water Treatment Plant (WTP), maintenance of the Bottling Plant, filling of Contractor-provided bottles, and distribution of bottled w
UNSOS WTP, or at UNSOS request when the UNSOS WTP is not functional

YEAR 1 YEAR 2 YEAR 3 YEAR 4

Quantity per Quantity Quantity


Unit rate Total Rate year Unit rate Total Rate per year Unit rate Total Rate per year

0 0 0

17,010 17,010 17,010

0 0 0

5,103 5,103 5,103


nd distribution of bottled water to Contractor-provided water dispensers at UNSOS locations

YEAR 4 YEAR 5

Quantity
Unit rate Total Rate per year Unit rate Total Rate

17,010

5,103
Requirement A - Establishment of a Bottling Plant where UNSOS owns and operates an UNSOS Water Treatment Plant (WTP
Requirement B - Outsourcing water from external commercial sources in the absence of an UNSOS WTP, or at UNSOS reque

GAROWE

YEAR 1
Unit of
Measurement Quantity per year Unit rate
Mobilization Cost (one time) - Requirement A
(provision, installation and commissioning of bottling
plant) Each 1

Bottled Water including services (including but not


limited to bottling,
delivery/cleaning/replacement/distribution of bottles,
and delivery/maintenance/repair/replacement of
water dispensers) - Requirement A Liters 13,608
Demobilization Cost (one time) - Requirement A (only
if UNSOS requires deinstallation and disposal of
bottling plant, no other demobilization will be paid) Each
(Back-up) Bottled Water from external source
including services (including but not limited to
bottling, delivery/cleaning/replacement/distribution
of bottles, and
delivery/maintenance/repair/replacement of water
dispensers) - Requirement B Liters 4,083

TOTAL COST PER YEAR

TOTAL COST FOR GAROWE

YEAR 1
YEAR 2
YEAR 3
YEAR 4
YEAR 5
TOTAL 0
SOS Water Treatment Plant (WTP), maintenance of the Bottling Plant, filling of Contractor-provided bottles, and distribution of bottled w
UNSOS WTP, or at UNSOS request when the UNSOS WTP is not functional

YEAR 2 YEAR 3 YEAR 4


Quantity per Quantity per Quantity per
Total Rate year Unit rate Total Rate year Unit rate Total Rate year

0 0 0

13,608 13,608 13,608

4,083 4,083 4,083


ttles, and distribution of bottled water to Contractor-provided water dispensers at UNSOS locations

YEAR 4 YEAR 5
Quantity per
Unit rate Total Rate year Unit rate Total Rate

13,608

4,083
NO UNSOS WPT at this location
Requirement B - Outsourcing water from external commercial sources in the absence of an UNSOS WTP, or at UNSOS reque

HARGESIA

YEAR 1
Unit of
Measurement Quantity per year Unit rate

Bottled Water from external source including services


(including but not limited to bottling,
delivery/cleaning/replacement/distribution of bottles,
and delivery/maintenance/repair/replacement of water
dispensers) - Requirement B Liters 9,072

TOTAL COST PER YEAR

YEAR 1
YEAR 2
YEAR 3
YEAR 4
YEAR 5
TOTAL 0
OS WTP, or at UNSOS request when the UNSOS WTP is not functional

YEAR 2 YEAR 3 YEAR 4


Quantity per Quantity per Quantity per
Total Rate year Unit rate Total Rate year Unit rate Total Rate year Unit rate

9,072 9,072 9,072


YEAR 4 YEAR 5
Quantity per
Total Rate year Unit rate Total Rate

9,072
NO UNSOS WPT at this location
Requirement B - Outsourcing water from external commercial sources in the absence of an UNSOS WTP, or at UNSOS reque

DHUSAMAREB

YEAR 1
Unit of Quantity
Measurement per year Unit rate Total Rate

Bottled Water from external source including


services (including but not limited to bottling,
delivery/cleaning/replacement/distribution of
bottles, and
delivery/maintenance/repair/replacement of
water dispensers) - Requirement B Liters 11,340

TOTAL COST PER YEAR

TOTAL COST FOR DHUSAMAREB

YEAR 1
YEAR 2
YEAR 3
YEAR 4
YEAR 5
TOTAL 0
NSOS WTP, or at UNSOS request when the UNSOS WTP is not functional

YEAR 2 YEAR 3 YEAR 4


Quantity Quantity Quantity
per year Unit rate Total Rate per year Unit rate Total Rate per year Unit rate Total Rate

11,340 11,340 11,340


YEAR 5
Quantity
per year Unit rate Total Rate

11,340
SUMMARY

TOTAL COST FOR 5 YEARS PER LOCATION


TOTAL COST FOR MOGADISHU
TOTAL COST FOR KISMAYO
TOTAL COST FOR BAIDOA
TOTAL COST FOR BELETWEYNE
TOTAL COST FOR JOHWAR
TOTAL COST FOR DHOBLEY
TOTAL COST FOR GAROWE
TOTAL COST FOR HARGEISA
TOTAL COST FOR DHUSAMAREB

GRAND TOTAL FOR 5 YEARS 0

IMPORTANT TO NOTE:

1. Proposers are requested to provide rates exclusive of VAT and other taxes as the UN is tax excempte
2. All unit and total rates above must be all inclusive, being mindful of the quantity of dispensers requi
entire Contract duration.
3. The quantities indicated are projected/ estimated for purposes of calculation of Contract price and t

Proposal validity days: ____________________________________Acceptance of UNGCC Terms:..........

Company name: ___________ Date:................................. Currency

Name, Title of Vendor's Authorised Official: ____________________________________________

Signature of Vendor's Authorised Official: ____________________________________________

Email/tel.: _____________________

Please provide the breakdown as follows

1. Breakdown of Mobilization Cost:


2. Breakdown delivery and maintainance:
RS PER LOCATION

f VAT and other taxes as the UN is tax excempted.


eing mindful of the quantity of dispensers required per location as per SOR Section 1.2.7 (b). The rates will remain fixed for the

r purposes of calculation of Contract price and thus are not the actual quantities to be ordered under the subsequent Contract.

__________Acceptance of UNGCC Terms:.................

Date:................................. Currency of proposal: ..........................

___________________________________

_________________________________