Reply Sheet - VA2-UC02-P0HBC-320030 - INSULATION - LAGGING DETAILS OF INTEGRAL A PIPE (1 of 3)

You might also like

Download as docx, pdf, or txt
Download as docx, pdf, or txt
You are on page 1of 2

Vung Ang 2 Thermal Power Project Document Review Sheet

Drawing No. Revision Purpose Drawing Title Status


VA2-UC02-P0HBC-320030 A FI INSULATION _ LAGGING DETAILS OF INTEGRAL A PIPE (1 Approved
☐ Disapproved

Transmittal No. of 3) Approved with
Comments
☐ Information

T-VA2-DSC-VAP-22-0129
Sheet
Number
VA2 DRS MEC xxxx

No. Related Contract Owner's Comments / Recommendation Contractor's Response Resolution


Clause Status
1 Date: 16th Mar 2022

The insulation and lagging support shall be installed the same as


vertical pipe where the pipe is inclined over 45 degrees, is it
correct? How about under 45 degrees?
2 Date: 16th Mar 2022

Please add a note for measurement units


3 Date: 16th Mar 2022
The “REFERENCE DWG” stated that this drawing refers to VA2-
UC02-P0HBC-320001~320017. The drawing from VA2-UC02-
P0HBC-320005~320017 were not included in this transmittal.
Please provide.
4 Date: 16th Mar 2022

Please clarify in detail “30E”, the “R5” is radius of what?


5 Date: 16th Mar 2022

Please add a note for abbreviations. If not really necessary,


please don’t use abbreviation.
6 Date: 16th Mar 2022

Please add a note for mineral fiber bulk specification and how to
apply.

Reviewed Contractual Related Clause

Commented by: Fumio Takayama, Naoto Commented by: Tran Quang Minh Response by:
TOKODA Date: 16th Mar 2022 Date:
Date: