Professional Documents
Culture Documents
Pre Qualification Documents
Pre Qualification Documents
Pre Qualification Documents
DOCUMENTS
CLIMATECH
www.climatechgulf.com
Our Mission:
To execute work based on a long term
partnership To faster the innovative and creative
culture.
To encourage the prosperous working environment
and constantly developing operational skills and
pro- fessionalism of our staff.
To differentiate ourselves by employing the best
resources and the latest techniques.
EHS Policy:
We are committed to provide and maintain a safe and
healthy work environment with a focus on continuous
improvement toward an accident-free workplace
through effective administration, education and train-
ing, in line with the industry standards and legislative
requirements. We shall strive to eliminate any
foresee- able hazards which may cause property
damage, accidents, or personal injury/illness.
Quality Policy:
We are committed in achieving and reinforcing customer
satisfac- tion, by means of continually improving and delivering
high quality services, in order to meet and surpass the customer
expectations and requirements for every facet of our business.
AIRPORT
...We Don’t Limit !
Services
Painting Joinery & Wood Works
IT & Networking
MEP
MANAGING DIRECTOR
BUSINESS DEVELOPMENT
PROJECT DESIGN
EXECUTIVE COMMERCIALS HUMAN CAPITAL
MANAGER CONSULTANTS
MARKETING
Civil & ARCHITECTS& PROCUREMENT& PERFORMANCE
EXECUTIVE
MEP DESIGNERS LOGISTIC MANAGEMENT
engineers
QS & ASSISTANTS
Site Supervisors ESTIMATOR QUALITY/EHS
Helper Helper
OUR TEAM 1
2
Managing Director
General Manager
1
1
3 Project Manager 2
4 Architects 2
5 Project Engineer 2
6 Site Engineer 3
7 Interior Designer 2
8 Quanity Surveyor/ Esimator 1
9 Procurement & Logisics 1
10 Finance & Admin 1
11 PRO 1
12 Foreman/ Supervisor 6
13 Tile Layer 10
14 Gypsum worker 12
15 Stone Mason 3
16 Block work Mason 8
17 Painter 4
18 Electrician 3
19 Carpenter 6
20 HVAC Worker 6
21 Reinforcing Fitter 4
22 Plumbing Technician 3
23 Helper 20
Climatech
Luxhabitat Office 804 & 806 Commercial Design, Build Luxhabitat Real
20 Building
Interior Work - Arenco Tower & Interior Fit out Estate Contracting
Climatech
Town House - Resident Villa Residential Interior Design
21 Arshad Effendi Building
Golden Mile, Palm Jumeira & Build for G+1 Villa
Contracting
Landscaping, Swimming Climatech
Accacia Avenue Villa Interior
22 Design, Build & Samer Said Building
Fit Out and Landscaping
Contracting Contracting
Climatech
Coffee Lab General Trading - Retail Outlet Design &
23 Venezia Café Building
Arenco Tower Build Contracting
Corporate Design & Taziz Property Easa Saleh AL
24 Taziz Office - Arenco Tower
Interior Fit out Management Gurg
JBR Bathroom Renovation
25 Hospitality Contracting Yasin Jazaini Mrs. Zoha Talat
Jumeriah Beach Residence
Climatech
Corporate Client
KAM International at
Business Bay, Lake Tower
Scope: Commercial Design, Build
& Interior Fit out
Area: 1000 Sq. Ft
Status: Completed
Location: Lake Tower
Client: KAM Trading
Marriott Restaurant
Company Name
CLIMATECH BUILDING CONTRACTING L.L.C
Legal Type
Limited Liability Company(LLC) y
Expiry Date
16/02/2016 ¿u Issue Date 17/02/2013 ua ¿u
D&B D-U-N-S ® No. 0 u Main License No 683694 a:u u
Register No. 1110085 u DCCI No. 214930 u
u
Address /
Phone No 971-4-2594081 P.O. Box 117851 u a
Fax No 971-4-2594089 Parcel ID 214541 u
Mobile No 971-50-2572751 u - - 109
Remarks /
t +
Print Date 15/04/2015 13:44 ¿u Receipt No. a u
METHOD STATEMENT
TYPICAL PROJECT - OFFICE / RETAIL / LEISURE
FOR INTERIOR WORKS
APPROACH, METHODOLOGY AND
PROGRAMME
METHOD
STATEMENT
INTERIOR FITOUT
TABLE OF CONTENTS
1. INTODUCTION
3. COMPANY ORGANOGRAM
4. PROCEDURES / METHODOLOGY
Introduction
Climatech Interiors has been in operation for over a decade and is considered a market leader in
the region. Our Philosophy is simple. We deliver on time and with an uncompromising attitude
toward quality of delivery, both in our site works and project management of our projects. We
operate within globally recognized best practice methods for project administration and
documentation, including, programming, procurement, submittal registers and monitoring,
variation administration and valuations.
Our method statement for fit out works for proposed interior works outlines our approach to our
intended implementation of typical interior fit outs and is generic to our approach to all our interior
works. We have provided key elements within the tables of contents which are detailed further in
our statement and provide the necessary information as to our general and specific approach to
most types of interior works, namely offices, retail and leisure / Hospital projects.
In general terms Climatech interiors has an extensive record, in the local market, of all fit out
works. We have our own Electro Mechanical, Joinery, Marble and stone, Partitions and Ceilings,
Painting and Metal / Glass Works divisions and do not rely on subcontractors for our work. This
gives us a high level of control over our quality and programme of works.
All our Personnel have extensive experience in mid to high end interior works, including many
prestigious and well known venues. A sample list of completed projects is as follows.
Our General approach to implementation of the works is based on tried and tested methodology
and documentation control which has proven successful in the past and includes all aspects of the
works such as statutory approvals and permit from the necessary authorities.
We are experienced in implementation of works within all the statutory precincts in Dubai and Abu
Dhabi, e.g., Tecom Dubai / AD Municipality, JAFZA, EMAAR etc. and are aware of all procedures and
approval processes in implementation of works within Municipalities designed zones, as well as civil
Defense. We have extensive experience in obtaining approvals associated with these designated
authorities and confirm that we are completely familiar with AD/DM/CD procedures which will be
described with in the procedures and methodology section of this method statement.
Further to the above we have a dedicated individual with extensive experience in obtaining Civil
Defense and municipality approvals whose task is to liaise daily with respective authorities.
Our submission includes copy of our corporate license, Insurance documents and location map of
our facilities of we welcome you to visit at your convenience.
We also welcome site visits to any of our previous projects and we are of the feeling that our work
speaks for itself. Our previous and current clients are our best assets for promoting our work.
Procedures and Methodology
Getting Started:
Once appointed statutory approvals and procurement are to commence. For any project statutory
approval is required and site works is dependent on receiving Fit out permit to work. Submission of
drawings and approval is to be expedited. Civil Defense / Municipality approvals can be obtained
whilst mobilization is in progress. We can confirm from previous experience that most authorities
will permit works to start immediately after their approval.
Step 1: Consultant issue design drawings to contractor who in turn prepares MEP
and Architectural submittals for Landlord engineer approval.
Step 4: DM, AD/ CD issue commented / approved drawings and issue Climatech Fit out
Permit to commence work.
Step 5: Climatech to Mobilize onto site and commence Civil Defense submission.
Mobilization:
Immediately after permit to work is issued Climatech to mobilize into site, conduct site condition
survey and commence site set up. Included in the site set up are the following:
(Site Setting – up Checklists is enclosed)
Documentation:
On Mobilization registers for the following documents are to be set up:
The above documents are to be kept updated weekly and will be included in weekly reports.
Cost control documents to be used are the contract BOQ, Confirmation of site instructions and
Engineers Instructions. All Variations are to be instructed in writing and costs agreed. Climatech to
issue quotations for EI’s within a week of receipt.
All site operatives are to be safety inducted and manpower records are to be kept on a daily basis
(refer enclosed documents)
With regards submittals of material and drawings, Climatech to expedite the submittals and
conclude the submittal process within 3 weeks form appointment.
Weekly reports are to consist of all registers, site photographs, programme update and Project
overview. The first report is to include the site condition survey with photographs as record of the
site condition at time of handover from landlord to Climatech.
Valuations are to be submitted by 28th of every month and all variation are to be claimed using EI
references by means of an EI schedule addendum to the BOQ claim.
Methodology:
In general, the key to achieving timeous completion and to achieve a high quality of fit out is for
the following key elements to be given the utmost attention from the outset:
1. Through audit of existing services to be relocated and reused is to be done. To understand the
scope of work and the interface between existing services and new works is key to
implementation these works successfully.
2. High quality Protection to be used to eliminate damage to existing items and accurate setting
out for coordination of new and existing site works.
7. Factory visits to be conducted to ensure quality is achieved prior to items being delivered to site.
I. SITE SETTING UP
II. DOCUMENTS
1. Copy of permit
2. Copy of Receipt of fees paid for work passes
3. Correspondence to or from Consultants
4. Correspondence to or from Client
5. Correspondence to or from Sub Contractors
6. Correspondence to or from suppliers
7. Blank forms:
i. Site diary & Progress Report
ii. Transmittal of Drawings / Documents
iii. Submittal for approval of Materials
iv. Submittal for approval of shop Drawings
v. Request for Information
vi. Request for Inspection
vii. Confirmation of Verbal Instructions
viii. Procurement Instructions
ix. Blank sheets for sketches
x. Blank sheets for Action List
8. Updated Registers:
a. Request for Inspection
b. Request for Information
c. Material Submission
d. Drawings Submission
9. Copies of Minutes of weekly Meetings
10. Copies of Weekly Progress Reports
IV. DRAWINGS
1. Tender issued drawings (ID, MEP)
2. Drawings approved by idama / Municipality
3. Approved drawings from civil Defense
4. Drawings issued ID / Architectural Consultant
5. Drawings issued by MEP Consultant
6. Approved shop drawings for ID
7. Approved MEP Drawings
8. Superseded drawings from Consultant
9. Superseded Workshop drawings
GOVERNMENT OF DU BAI
In compliance with the above DM Circular on the ’Use of Solar Water Heating
Systems to Supply Hot Water for Buildings Within the Emirate of Dubai”,
Dubai Central Laboratory Department (DCLD) of Dubai Municipality,
hereby issue this certificate to:
Registration No.
AP12110008 Valid Until: 15- Current Issue Date: 16-May-2016
May-2017 Original Issue Date: 16-May-2012
D ub a i qu aliru Group
Certificate of Partnership
This is to certify that
Corporate Partner
Fotmo AlMheiri
Chairman
EXPO2O2O
DUBAIUAE
نهنــــئ
21
Abdul Baset Al Janahi
Chief Executive Officer
Dubai SME
CERTIFICATION
Quality Management System
Certificate of Approval
This is to certify that the QMS of
ISO 9001:2008
This certificate is valid for the following scope ef operations:
a)Electromechanical Projects,
b) Sales & Service of Air Conditioning & Solar Water
Heating Equipments
c)Facilities Management
As an experienced Senior Architect with creative design skills and my networking abilities could help your
company to achieve its goals. Active and potential clients will be impressed with my creativity
and innovative product presentations and the meticulous management of their million-dollars
accounts, allowing long-lasting relationships to be formed.”
“If you're seeking for a creative Architect with new ideas to improve the reliability and development
of your company's server, my experience in design, implementation and supervising any project will
prove invaluable. Handling project end-to-end will be as complimenting my overall performance.
Added Qualification :
1
Ar. Ravi S. Kholakiya
Email: rsk444@gmail.com , Mob: +971 50
4745092 Dubai – U.A.E.
Professional Qualification:
April 2013 - Present : As Architect & Project M anager at Climatech Building Contracting LLC, Dubai.
Hired as an Architect, within 6 months was recognized for my designing, Authority Approval (Dubai
Municipality, TECOM, Trakhees) and site managing skills and was moved up the ladder to take up
the responsibility of Project Manager.
2
Ar. Ravi S. Kholakiya
Email: rsk444@gmail.com , Mob: +971 50
4745092 Dubai – U.A.E.
Lewis N Hickey India : is a UK based multinational firm that operate in an extensive range of
retail, educational, residential, mixed use, master planning and industrial projects.
Worked as an Architect under the guidance of qualified and talented Associate Architect of the
firm boosted my knowledge and confidence for handling Architectural projects. Was involved in
Architectural design solution and preparing working drawing along with consultants and Site coordination.
Project N ame: Bharti Walmart Cash N Carry Project at Indore, Amravati, Aurangabad, Solapur
and Sangli. 50,000 sq.ft PEB and R.C.C structure for wholesale market.
3
Ar. Ravi S. Kholakiya
Email: rsk444@gmail.com , Mob: +971 50
4745092 Dubai – U.A.E.
Astive Designs : is a firm who has good vision towards various projects for architecture design and
planning. They are having their own niche in the field of architecture.
Project Scope:
o Designing elevation and landscape for residential complex.
o Preparing Elevation with detailing
o Preparing detailed working drawings.
Project Scope : Preparing detailed working drawing for customs house and residential buildings.
4
Ar. Ravi S. Kholakiya
Email: rsk444@gmail.com , Mob: +971 50
4745092 Dubai – U.A.E.
Internship during Final Y ear of architecture - at Padmaja Enterprise under Ar. Ravindra Sant.
Duration : 4 months
Personal information
Educational Qualification:
Computer Knowledge:
H obbies:
Designing, Drawing, Cricket, Eager to know about latest invention, electronic gadgets, new technology in
any field.
Portfolio Link:
http:/ / ravikholakiya.weebly.com/
5
Azeem Ahmad
M: +971504090189,0524568890
M: azeemrana.s@gmail.com Linkedin profile link ae.linkedin.com/pub/azeemahmad/71/10a/80a
Professional summary
09 Years of total design supervision and coordination on interior fit out turnkey, Hospitality, retail projects, Offices and
showrooms working on medium, large with consultant, Architects interior designer and contractors. Have good
experience of “Design and Build projects” including Stages of design development, Shop drawings and Documentation
protocols. Have working knowledge interior, Civil projects and latest applicable technologies. Excellent
coordination/trouble shooting skills with construction team.
Educational Credentials: Civil Engineer 2007 from IIMT (Imperial international institute of management and
Technology New Delhi)
Job Responsibility
Headed team of, site engineers, supervisors, Forman, Draftsmen craftsmen’s and Document controllers for
effective coordination of Architectural, Structural, MEP & Decoration related design issues.
Organizing & conducting technical workshops on critical design issues with Consultant and Engineer, in order to
obtain requisite approvals and expedite work progress.
Conducting workshops for Design Review & Cross trade coordination with various subcontractors. Monitoring
progress and control quality for Design submittals by various subcontractors in order to meet critical path baseline
program controls.
Preparing Project Progress reports to the management:
Actively involved in establishing long lead items with procurement for advance planning.
Career Highlights
Climatech’ Building Contracting LLC - Business Development Manager March 2016 to present..
Climatech’ Building Contracting LLC is one of the well established and emerging MEP contracting having ISO
9001:2008 certification and has carved out a niche for offering full range of Electro-Mechanical services to residential,
industrial and commercial buildings, from conceptual design through design development, installation, testing,
commissioning, operation and maintenance. Our range of projects include Luxury Villas, Industrial ware Houses,
Shopping complexes, Commercial Offices and High Rise towers.
CUBE wooden work & Interior design LLC. - Project Manager March 2015 to March 2016
CUBE Interiors designs well establish joinery and fit out company in Dubai handling projects in to fit out
like showrooms ,hotels suits, Joinery and furniture design, High-end jewellery showrooms and corporate
offices exhibition stands . Also do the design supervision and consultancy for high end villas, flats.
A&T Group Interiors.-Project Engineer fit out F&B projects. March 2014 to Feb2015
A&T Group Interiors is one of the best fit out contractors Dubai you can choose from. Our innovative system allows
for work to be delivered on time, while exceeding the expectations of our customers. We focus on all areas such as
the walls, floor, ceiling, decorations and based on the needs of our customers, we begin to create a space that will
work for them. We take the time to use concept designs, mood boards and ensure there are a complete set of
visuals in place to ensure that our customers understand what they are ordering.
Strokes Interiors LLC.- Project Manager Interior Fit out - May -2013 to Feb2014
Strokes is the leading Exhibits stands Company in UAE– an Exhibition Design & Fabrication designs, fabricates and
deploys exhibition stands that are creative, communicative and cost effective. It is into Exhibition Stand Design,
Exhibition Stand Fabrication, Pavilions & Overseas Solutions, Trade Show Displays., Pavilions & Overseas Solutions,
Trade Show Displays.
Creative Spaces wll, Doha Qatar - 2011 July – May 2013 Project Manager Interior Fit out - May -2013 to
Feb2014
2. Offices
3. Retails
Katakeet Fashions
Swaroski Shop
Puma Shop
Repeto Shop
Cristian Louboutin
Projects
3. Hospitality
3. Residential Villa
Mall.
Personal Details
Personal Details
NATIONALITY : INDIAN
SEX : MALE
RELIGION : ISLAM
Azeem Ahmad
Sanjay ChristianProduction Manager
Royal Building 202, Near Sharjah National Paint, Sharjah, United Arab Emirates, Mob-050 9434969
Lakshmi Metal tech. (Trinity Doors LLC.) Email – sanjaychristian@yahoo.com.
UAE Driving License available.
Seeking a challenging position that should have an opportunity for career development and that may fully utilize
my potentials based on my formal education and experience
. Carrier Overview .
A creative civil Engineer with 12 years of extensive experience in Site Civil Engineer in India Designing
with solid record of accomplishments. Significant experience in Auto Cad and Site Progress like Project
Apartments, Hotels, Hospital, villas …etc.….
A creative Design department with 2 years in Roshan Construction of extensive experience in Civil
and Interior Designing in UAE with solid record of accomplishments. Significant experience in Auto Cad In
civil /Structure and Interior designing like Project Apartments, Hotels, Hospital, villas …etc.….
Still Continue As a Production Manager with 6 years (2 year IN Radiant Int. LLC Abu Dhabi Mussafa
+ 4 year in Trinity Interiors & doors of extensive experience in Joinery fit out for Architecture & Interior
Designing with solid record of accomplishments. Significant experience in Managing for big scale Joinery fit
out production and Handling 60 workers, Material Selection, Making BOM & Cutting list, Paint
section experience , Production planning, knowledge of Carpentry machinery, Knowledge of Auto
cad, Knowledge of Wood, Veneer and furniture Hardware, Knowledge of Fire rated Doors,
. Objective
A Production Manager position in an organization seeking extraordinary experienced in Production Joinery fit
out, Auto Cad,
. Technical Skill .
● Auto Cad, MS office, Power Point, Photoshop and Internet Applications.
● Familiar with Wood and Veneers.
● Familiar with Carpentry Machinery.
Work Experience
July 2015- still continue in CLIMATECH JOINERY & WOOD WORKS .HAMARIYAH PH-2
DUBAI, UAE.
Post- Production Manager.( Working as per Production chart )
Responsible for FIRE RATED AND NON FIRE doors as per Civil defense manufacture and
JOINERY WORK supervision and making SHOP DRAWINGS in Auto CAD for approval,
QUOTATION, BOQ, CUTTING LIST and Correspondence with supplier and client.
Meeting with Site engineer and Constant.
Joinery production / Wood / Veneer experience.
Handling carpentry section and paint section also.
Experience in wood machinery like CNC Machine programing. And all type of carpentry
machine.
Bill of materials.
All type of Joinery experience.
Interior designing. AUTO cad
As Interior
April 2006-designer.
2008 Roshan Construction L.L.C ( Dubai )
Responsibilities
Responsible for Civil, Architectural, Interior furniture drawings, Structural& Electrical plans of
multistoried buildings for Residential, Commercial Apartments & Industrial Sheds and all
working Elevations and sectional details. Like Staircase, Lift, Balcony Railing, Kitchen,
Toilet, Overhead Water Tank, Carpentry, Foundation working plans, Columns center line
plans, Beam framing working plans, Electrical working plans, Plumbing working plan. And i
can work on site according to above mention drawings.
UAE PROJECT AND SITE EXPERIENCE.
Two Residence Apartment Design and Plans and Elevation as per Civil Defense rules in
DIP.
Ware House design and drawings for submission.
2004 To 2006 Rastogi Associates Gujrat,India
As Architect Asst.
Mahesh Public School At Jodhpur,Rajasthan
Shivdeep factory for snacks at Bickaner,Rajasthan.
Roop-Rajat township at Jodhpur,Rajasthan.
Hostel for All Saints School at Nanital,Uttarakhand.
Residence Bunglow for Mr.Tekwani at Ahmedabad.
As Architect
1996 To 2004Asst.
Architect Hemal Shah Ahmedabad India
Factory for SurbhiMilkfood and Beverages at Kalol,Gujrat.
Sukhdham Multi storey Appartment at Nehrunagar,Ahmedabad
Appartment Complex at Kala Nala, Bhavnagar,Gujrat.
Building for AkhandJyot Foundation at Paldi,Ahmedabad.
Interior for Medisearch Hospital,Ahmedabad.
Declaration .
I declare that above facts given by me are true to the best of my knowledge and brief.
Thanking You.
Date-12th May 2016.
PLACE – DUBAI (UAE).
YUSUF TAWIZWALA
RESUME
Job Synopsis :
A competent Designing and Execution experience with over 10 years in varied industry segments.
Career Objective :
Seeking an employment opportunity in Designing and Technical Field which enables me to
utilize my experience and enhance my analytical skills required for the benefit of the
organization and myself in the process of continuous growth and improvement .
Professional Experiences :
2) Presently working with : Al Gurg Office Furniture (Br.of Easa Saleh Al Gurg), Dubai.
Period of Employment : 4Year & 10 Months. (Nov 2008 to Sept. 2013)
Designation : Project Engineer / Interior Designer
Job Profile : (i) Executing the Projects as per the Detail Drawings.
(ii) Preparing Detail Drawings to execute the given project.
(iii) Co-ordination with the Internal Technical Team and Sub-
contractors
(iv) Verifying bills of Sub Contractors as per the progress at site
(v) Foresee issues at Site for Smooth Functioning.
(vi) To make sure the Jobs Executed as per Standards and Work
Schedule.
4) Name of the Employer : Architect Dilip Kulkarni & Associates Colaba, Mumbai.
Period of Employment : 2 years (Aug. 2005 to Aug 2007)
Designation : Interior Designer & Site Supervisor
Job Profile : (i) Preparing Drawings for Interior Works for Residential,
Commercial, Corporate, Banks, Etc.
(ii) Designing the Projects As per the Site Requirements
(iii)Preparing Detail Estimate as per Drawings & Details.
(iv) Execute The Entire Site As per Drawings And Details.
(v) Verification of Bills As per Drawings Prepared .
(vi) Executed and Designed Projects such as Reserve Bank of
India, Mantralay, Dena Bank, MMRDA, Mumbai Railway, OBC,
IND Synergy Pvt. Ltd. Etc,
Academia:
Diploma in Interior Designing and Decoration, Saboo Siddik Polytechnic, Mumbai.
Personal information :
Name : Yusuf Tawizwala.
Religion : Muslim (Dawoodi Bohra)
Nationality : Indian
Date of birth : 27th Aug 1987
Marital status : Single
Contact no. : 050 – 46 49 021
E-mail address : Yusuft_19@rediffmail.com
Permanent address : 2/6, Cementwala Bldg, 1St Flr.
Room No. 7, Near Two Tank Mumbai – 400 003.
Languages known : English, Hindi, Marathi, Gujarati
Thanking You
Yusuf A.Tawizwala
Mobile No : +971559875665
Email ID : milton@climatechgulf.com
Objective
A capable, result orientated manager with experience of leading teams and successfully
increasing efficiency and productivity while reducing costs and inefficiencies. Ability to keep
a level head at all times, nurture and grow the business, evaluate opportunities and risks
and also deliver innovative new solutions to challenges. Possessing excellent client facing
and configuration skills and highly successful in helping defining & achieving company goals.
Qualifications
Locati : Dubai,
Page
MILTON
MACHADO : Project
Mall
Responsibilities include
Monitoring of the day to day progress of the interior fitout projects which includes the
planning of activities and resources, project schedulling, procurement schedule
Managing the Permits, Approvals and Completion certificates from Dubai Municipality
through online process, Permits from authorities like Dubai Airport Freezone, Nakheel.
Preparation of the Budgetary Cost of the Project and monitoring of the same.
Ensure proper documentations are followed during the course of the project.
To ensure Satisfaction to the Client with better quality and workmanship.
Vendor and Supplier management
Ensuring proper Planning is followed to achieve the timely project completion.
Multi-tasking abilities with good planning, organising and monitoring skills, a good
analyzer of the pros and cons affecting the project and making the decisions and
working towards the same.
A Good team player with a balance of technical and administrative skills.
Ensure that the Project completion is achieved with regards to cost, quality, time,
Management and coordination between the Client, Consultants and the Vendors to
achieve the timely completion of the project.
Assist the Client throughout the project from Start till the closeout documentation.
Page
MILTON
MACHADO : Project
LLC. Location : Dubai, UAE
Page
MILTON
MACHADO : Project
Responsibilities include
Page
MILTON
MACHADO : Project
Responsibilities include
Overlooking of the day-to-day progress for Civil & Interior Fit-out Projects.
Working towards the execution of Interior Fit-out for offices of Corporate Clients.
Ensure proper documentations are followed during the course of the project.
Being a partner with the Client to ensure that the project is completed within the
timeline/schedule.
Working on Microsoft-Projects to ensure that the Project Schedule is followed and
avoiding of any project slippages by working on the Critical Path activities.
Satisfaction to the Client with better quality and workmanship.
Working with the Director in formulation of operational/projects strategies and the
review of the same from time to time
Finalization of operational budgets and monitoring the same.
Finalization of Vendor and Suppliers in order to ensure a smooth functioning and
progress of the projects.
Major involvement in the functioning of departments like Estimation & Tendering,
Procurement, Vendor Management, Execution & Billing.
Ensuring proper Planning & Scheduling of the projects keeping in sync with the target
completion and also the quality standards at the same time.
Being more of a Multi-tasker having the technical and commercial background.
Multi-tasking abilities with good planning, organising and monitoring skills, a good
analyzer of the pros and cons affecting the project and making the decisions and
working towards the same.
A Good team player with a balance of technical, commercial and administrative skills.
Ensure that the Project processes and procedures with regards to cost, quality, time,
EHS and client satisfaction are executed in an efficient, cost effective manner and
according to the full requirements of the Company and the Client as per the contract.
Management and coordination between appropriate stakeholders to facilitate on time
execution of work per the requirements.
Raise non-compliance issues (specs, mock-ups, drawings) with proposed solutions and
recommended actions.
Assist the Client throughout the project from Start till the closeout documentation.
Projects Completed Include Civil & Interiors, Electrical, Fire Alarm Systems, Public
Address System and Networking Systems.
Location : India
Page
MILTON
Projects Completed (INDIA) : Indofil Chemical Co. Ltd (30,000 sft), Mumbai
: Medtronic (20,000 sft), Mumbai
: Torm Shipping (20,000 sft), Mumbai
: Ingersoll Rand (20,000 sft), Mumbai
: Watson Pharma (35,000 sft), Mumbai
: Samsung C & T ( 8,000 sft), Mumbai
: CIMB (13,000 sft), Mumbai
: Bennett & Coleman Ltd. (8,000 sft), Kolkota
: Honda (20,000 sft), Pan India
: Weatherford (25,000 sft), Mumbai
: Siemens Ltd. (1,00,000 sft), Gurgaon
: Nirmal Lifestyle. (1,08,000 sft), Mumbai
: Yash Pharma (7,000 sft), Mumbai
: Newbridge Offices (20,000 sft), Mumbai
: Cyberoam Tech. (20,000 sft), Ahmedabad
: Omron (7,000 sft), Mumbai
: Mitsui (20,000 sft), Mumbai
: Bluestar Ltd. (6,600 sft), Ahmedabad
Responsibilities include
Responsible for the performance, budgets and people management to enhance the
development of the division and business.
Played a pivotal role towards the setting up of the project management and interior
turnkey contracting division for enhancing business growth and alignment with the
other functions to achieve operational synergies within the organization.
Overlooking of the day-to-day progress for Civil & Interior Fitout Projects for offices of
Corporate Clients.
Worked on the execution of Interior Fitouts for MNC’s Corporate Offices.
Satisfaction to the Client with better quality and workmanship.
Optimizing operational efficiencies to achieve better productivity.
Working with the Directors in formulation of operational/ projects strategies and the
review of the same from time to time
Finalizations of operational budgets and monitoring the same.
Finalization of Vendor and Suppliers in order to ensure a smooth functioning and
progress of the projects.
Page
MILTON
Plans to maximize profit keeping in sync with the quality standards
Budgetary control.
Team managing and team building.
Conduct periodic projects review along with the Management.
Conducting periodic MIS meetings with the Management to review the progress of the
project.
Conducting periodic review meeting with the internal site staff to analyse the project
status.
Conducting Project Management Audits with regards to quality, cost and time
Maintaining excellent relations with the Client and Suppliers.
Reporting to the AVP-Projects
Integral Part of the Core SAP Sales Development Team
Projects Completed Include Civil & Interiors, Electrical, Fire Alarm Systems, Public
Address System and Networking Systems.
Projects Completed Include Civil & Interiors, HVAC, Electrical, Fire Alarm Systems,
Sprinkler Systems, Public Address System and Networking Systems.
Responsibilities include
Page
MILTON
From : January 2002 – February 2003
Responsibilities include
Responsibilities include
Trainings Attended
Thesis (NICMAR)
April 2004 – June 2004
As a Construction Management Trainee in Tecnimont ICB Engineers & Contractors at
the Hazira Port & LNG Receiving Terminal, Surat (Gujarat) for the construction of the
LNG Receiving terminal
Certified Internal Auditor for the Quality Management Systems ISO 9000:2000
Presented Paper on “Planning, Development and Management of Ground and
Surface Water” at the National Technical Symposium at R.E.C, Kurukshetra and B.I.T.S
Pilani.
Page
MILTON
Personal Details
Page
MILTON
Date of Birth : 07th October 1978
Nationality : Indian
Marital Status : Married
Languages Known : English, Hindi, Marathi &
Konkani Pass Port# : K 6978195
Date of Issue : 15/10/2012
Visa type : Employment
Driving License : UAE Valid Driving License
Page
Design and Build
Residential designs
Corporate interiors
Hotels and
restaurants Joinery
Weight 820Kg
www.climatechgulf.co
Planner protection
Motor 3HP
Packing 48 x 23 x 23
www.climatechgulf.co
High quality Chain Mortising Machine are made from very high quality raw
meterial which ensures hasile free work performance at its user end. These
Chain Mortising Machine planner machine widely finds its applications in
various wood working industries.
www.climatechgulf.co
www.climatechgulf.co
Period of insurance
(Subject to the Provisions concerning the period of cover)
From 03/06/2015 00:00 To 02/06/2016 23:59
Orient Insurance
INCLUDING LOSS OR DAMAGE DUE TO STRIKE, RIOT AND CIVIL COMMOTION (MRE 001)
d NDERGROUN D SERV ICES CLAUSE (MRE 102 ) - 25% CLAUSE FOR PROJECTS OUTSIDE DUBAi.
DE DUCTIBLE: 10% OF CLAIM SUBJ ECT TO MINIMUM AED. 10,000/
FIRE- FIGHTING FAC ILILIES & FIRE SAKETY ON CONSTRUCTION SITES (MRE 112)
PROPERTY IN TRANS I+ INCLUDING LOADING AND UNLOADING (MRE 113) - AED. 200,000/- PER
CONVEYANCE
72 HOURS CLAUSE
PROFESSIONAL FEES CLAUSE 10% OF CLAIM AMOUNT SUBJECT TO MAXIMUM AED. 200,000/-
(PART OF CONTRACT VALUE SUM INSURED)
DEB RIS REMOVAL CLAUSE- 5% 0 F CLAIM AMOU NT SUBJECT TO MAXIMUM AED 200,000/- (PART
OF CONTRACT VALUE SUM INSURED)
TEMPORARY REPAIRS LIMIT AED 50,000/- SUBJECT TO PART OF FINAL REPAIR INVOICE OF AN
ADMISS IBLE CLAIM UNDER THE POLICY
ADDITIONAL COST OF WORKING EXPENSES / EXTRA CHARGES MRE 006 10% OF CLAIM
SUBJECT TO MAXIMUM AED 100,000/
RUN-OFF CLAUSE
Orient Insurance
MINIMUM & DEPOSIT PREMIUM : AED. 7,000/- ADJUSTABLE @ 1.25%o ON ACTUAL ANNUAL
TURNOVER SUBJECT TO MINIMUM AED. 400/- PER PROJECT
Exclusions
EXCLUDING HORIZONTAL DIR ECTIONAL DRNLING
If this Warranty is not complied with then this Contract of insurance shall lapse from the date of this breach
at midnight u'ith a pro-rata premium being due from the Insured.
In the eve nt of breach of Premium Ra yment Warran ty, we will provisionally accept your offer of settlement
of prem ium on a "Without Prejudice" basis and further subject to the condition that continuity of cover and
the admissibility of claims, whether prior to OR after the settlement, shall be subject to approval by our
reinsurers"
sanctions law or regulations under United Nations resolutions or the trade or economic sanctions, laws or
regulations of the European Union, United Kingdom or United States of America.
Cover: As per UAE Federal Labour Law No.8 of 1980 and subsequent
amendments thereto &/or common law &/or Sharia Law
Employer's Liability: Dhs. i,000,000/- any one occurrence and in the aggregate
All other Terms, Conditions, Exceptions as per the original Policy issued to the Insured.
Auth tory
POLICY SCHEDULE
WORKMEN'S COMPEhISATION INSURANCE
Policy No.
P/01/601 0/2015/164 Customer Code : 2002000
Name of Insured
C LIMATEC H BUILDING CONTRACTING L.L.C
Address
P. 0. BOX 1178 51,
DUBAI.
U.A.E.
Law(s)/Applicable : Workmen's Compensation in accordance with United Arab Emirated Federal Labour
Law Cover No. 8 of 1980
Period of Insurance : (a) From 24/05/2015 00:00 To 23/05/2016 23:59 (ooth dates inclusive)
(b) Any subsequent 'eriod for which the insured shal] pay and the Company shall agree
to accept a renewal premium.
Min imum and Deposit ; As Agreed
Prem ium(AED)
Estimated Occupation
Estimated Other Estd.Total Place(s) of
No.of Earnings Employment
Annual Wages Allowances
employees AED | AED AED
The fo IIowing Con ditions/Clauses atta ched to and form part of the policy :
”MEDICAL EXPN ESES DUE TO WORK RELATED ACCIDENT PER PERSON PER AC CIDEN R
SUBJECT TO +REA+MENT CONFINED TO U.A.E GOVT. HOSPITALS/CLINICS &/OR PRIVATE
HOSPITAL ONLY AE D 15,000/-.
”REPATRIATION EX PENSE SIN CASE OF DEATH AS A RESULT OF WORK ACCIDENT, EACH PERSON
AED 15,000/-
*EM P LOYERS LIABILITS LIMIT AN ONCE OCC URENCE AND/OR IN THE AGGREGATE AED
1:000, 000/-
”2^ HOURS ON/OFF DUTY GOVER FOR DATH AND PERMANET DISABI LITY
Page Nn 1 / 3
Orient Insurance
Policy No : r'/01/6010/2015/164 Contd...
*COVER ONLY EMPLOYEES WHO ARE UNDER THE SPONSORSHIP OF THE INSURED OR WAGE
ROLL,
Exclusion Clauses
Political Risks Exclusion Clause - Notwithstanding any provision to the contrary within the Insurance
Agreement or any Endorsement thereto this agreement does not cover I oss or damage or cost or expenses
of whatsoever nature directly or indirectly occasioned by, happening through or in consequence of War,
invasion. acts of Foreign Enemies, hostilities or war-like operations (whether war to be declared or not), civil
war , mutiny, civil commotion assuming the proportions of or amounting to a popular rising, military rising,
insuzection , rebellion, revolution, military or usurped power, material law, confiscation or nationalization or
reo uisition or destruction of damage to property by or under the order of any government or public or local
authority. In any action suit or other proceedings where the Insurer alleges that by reason of this exclusion a
loss, damage, cost or expenses is not covered by this agreement, the burden of proving that such loss,
damage, cost or expense is covered shall be upon the Insured.
I CLVRIFICAT] ON A GR EEMENT
It is warranted under this Contract of insurance that the premium due must be paid to and received by Orient
Insurance Company, no later than 90 days from the date of inception of this insurance cover.
I f this Warranty is not complied with then this Contract insurance shall lapse from the date of this breach at
midnight with a pro-rata premium being due from the Insured.
Sanctions / Em bargoes Clause
This Policy does not provide coverage related to any business, including but not limited to this Insurance and
fulfillment of any obligation thereunder, to the extent it would violate any applicable economic or trade
sanctions law or regulations under United Nations resolutions or the trade or economic sanctions, laws or
regulations of the European Union, United Kingdom or United States of America.
Pag e No 2 / 3
Orient Insurance
Policy No : P/01/6010/2015/164 Contd...
Page No. 3 / 3
Arya Insurance Brokerage Co. (L.L.C.) DEBIT
N€}TE NO.
D/N000046628
Registered unar Instsrance Aunonty - U.A E tCeñlle No Sd)
DATE 23/08/2015
ADDRESS P.O.BOX:117851,DUBAI,UAE
Remarks
3. The Debit Note shall be deemed accepted by you, unless we hear from you any
discrepancies within 7 days from Insurance
.\ L FU jAl kAH NATIONAL I N S U RANC E CO
Public Share Holding Co.
Paid-up Capital Dhs I 00,000,000
Registered Under Insurance Companies Registration No. I I
Registered Under Federal Law to. (8) 1984 Registration to. 40 Page 1 of 3
Total 7,227,100.00
Total Sum : SEVEN MILLION TWO HMDRED TWENTY-SEVhN THOUSAND ONE HUNDRED
I nsured(AED)
Location of the Risk
Construction of : Location l: Emitech Technical Services, Unit 301, Garhoud Star, Al Garhoud, Dubai.
the Premises Construction: RCC
Location 2: Climatech t3uilding Contracting, Unit 109, Garhoud Star, Al Garhoud, Dubai.
Construction: RCC
l.ocation 3 : Einitech Technical Services, Warehouse No.3, Industrial,j8, Sharjah
. H N/\TI ONAL IN S U RANC E CO
- - z - .holding Co.
?'.al Dhs I 00,000,000
—— - under Insurance Companies Registration No. I I
Page 2 of 3
THIS POLIC Y IS SUBJECT TO THE A TTS CHED POLICY W ORDING, ITS GE/VERA I- AND SPECIAL
i18 DITIONS, CLA USES, ENDORSEMENTS, EXCLUSIONS etc. WHICH FORM Ph RT OF THIS
P‹.i L IC Y SCHEDULE:
*PECIAL CONDI"I“IONS:
” .- sdiction Clause: UAE Jurisdiction only
>:ock Book Warranty
” —. zardous Coods Warranty
.'. zrranted all kinds of wastes shall be removed from the premises on daily basis without allowing for accumulation
'. arranted smoke detectors and automatic fire alarms are installed and maintained in the premises
arranted adequate number of fire extinguishers and fire water hose reels with dedicated water tanks and pumps are
- :z.led in the premises and maintained in good order through out the policy period
‘ Excluding water damage arising from or caused by lack of maintenance defective design &/or
damage e to ingress of rain watcr due to accumulation at roof gutter or resultant overflowing or
such nature
‘ e Insured premises shall have sprinlcler installation & its working condition properly maintained
:'u3hout the Policy Period
.'. arranted clean loss rccoi-d for the past 5 years
.'. arranted the insured premises comply with the Civil Defense requirements and shall be valid throughout
e policy period and shall submit a copy of the Civil Defense Approval Certificate in compliance
:h Rules promulgated by the UAE Ministry of Interior at the time of inception of cover
• PECI AI. CI.A USES:
‘ ‘2 Hours Clause
'. tired Perils Clause
‘ ctrical Clause
ha*e Recognition Clause
° !it’ 1 Risk Exclusion Clause
'
. . N \T I O NAL IN S U RANCE CO
SPECIAL EXCLUSIONS:
E XTEN SIONS:
I n u itness whereof the Undersigned being duly authorized by the Insurers and on behalf of the Insurers has/have
fie reunto set his/their hand(s)
I:•›ued at Dubai on 16/08/2015
TH E INS U RED F TH
رخصة تجارية
Commercial License
Company Name
CLIMATECH BUILDING CONTRACTING L.L.C
Legal Type
Company(LLC) Liability Limited ذات مسئولية محدودة الشكل القانونىـ
Expiry Date
16/02/2017 تاريخ النتهاء Issue Date 17/02/2013 تاريخ الصدار
D&B D-U-N-S ® No. 0 الرقم العالمي Main License No 683694 رقم الرخصة الم
No. Register 1110085 رقم السجل التجارى DCCI No. 214930 عضوية الغرفة
) وثيقة إلكترونية معتمدة وصادرة بدون توقيع من دائرة التنمية القتصادية .لمراجعة صحة البيانات الواردة في الرخصة برجاء زيارة الموقع ( http://www.dubaided.gov.ae
(Approved electronic document issued without signature by the Department of Economic Development. To verify the license kindly visit
http://www.dubaided.gov.ae
Print Date 10/02/2016 18:17 تاريخ الطباعة No. Receipt رقم اليصال
http://www.dubaided.gov.ae ( لمراجعة صحة البيانات الواردة في الرخصة برجاء زيارة الموقع. ) وثيقة إلكترونية معتمدة وصادرة بدون توقيع من دائرة التنمية القتصادية
(Approved electronic document issued without signature by the Department of Economic Development. To verify the license kindly visit
http://www.dubaided.gov.ae
ملحق الشركاء
Partners
Details License / تفاصيل الرخصة
D&B D-U-N-S ® الرقم العالمي رقم الرخصة
0 License No.
No. 683694
Print Date 10/02/2016 18:17 تاريخ الطباعة No. Receipt رقم اليصال
http://www.dubaided.gov.ae ( لمراجعة صحة البيانات الواردة في الرخصة برجاء زيارة الموقع. ) وثيقة إلكترونية معتمدة وصادرة بدون توقيع من دائرة التنمية القتصادية
(Approved electronic document issued without signature by the Department of Economic Development. To verify the license kindly visit
http://www.dubaided.gov.ae
شهادة شهر قيد شركة فى السجل التجارى
Commercial Register
تفاصيل القــيد Details Register /
Main Lice. Nr
683694 رقم الرخصة الم Register No. 1110085 رقم القيد
Company
كليماتيك للمقاولت البناء ش.ذ.م.م
Name CLIMATECH BUILDING CONTRACTING L.L.C
Legal Type الشكل القانونىـ
Company(LLC) Liability Limited ذات مسئولية محدودة
Expiry Date 16/02/2017 تاريخ النتهاء Reg. Date 17/02/2013 تاريخ الصدار
D&B D-U-N-S ® الرقم العالمي
No. 0
- Addressالقرهود
Commerceالسلمي -ديرة
ملك مصرف المارات رقم 109
التجاري / عنوانمكتب
السجل
Contracting Building مقاولت البناء
أنشطة السجل Activities Register /
Print Date
10/02/2016 18:17 تاريخ الطباعة No. Receipt رقم اليصال
) وثيقة إلكترونية معتمدة وصادرة بدون توقيع من دائرة التنمية القتصادية .لمراجعة صحة البيانات الواردة في الرخصة برجاء زيارة الموقع ( http://www.dubaided.gov.ae
(Approved electronic document issued without signature by the Department of Economic Development. To verify the license kindly visit
http://www.dubaided.gov.ae
Dear Trader, :عزيزي التاجر
Kindly take into consideration the
following instructions نرجو أخذ التعليمات التالية بعين العتبار
Print Date 10/02/2016 18:17 تاريخ الطباعة No. Receipt رقم اليصال
http://www.dubaided.gov.ae ( لمراجعة صحة البيانات الواردة في الرخصة برجاء زيارة الموقع. ) وثيقة إلكترونية معتمدة وصادرة بدون توقيع من دائرة التنمية القتصادية
(Approved electronic document issued without signature by the Department of Economic Development. To verify the license kindly visit
http://www.dubaided.gov.ae