Pre Qualification Documents

You might also like

Download as docx, pdf, or txt
Download as docx, pdf, or txt
You are on page 1of 95

PRE – QUALIFICATION

DOCUMENTS
CLIMATECH
www.climatechgulf.com

Interior & Fit out |Building Contracting |Turn Key Solution


Contents
Preface
Corporate Overview & Philosophy
Our Social Responsibility
Sectors & Services
Process Flow
Climatech Team
Testimonials
Corporate Client Listing
Accomplished Projects
Commercial License
Contact us

We bring positive change for your


Corporate
Climatech Building Contracting is a part of the
well- diversified Emitech Group established to
focus as a complete turnkey solution for Interiors
and Exteriors. The company provides the client
with a one stop solution of Design, manufacture
and installation. We have capability to carry out
almost all trades of con- struction, interiors,
Joinery & MEP under one um- brella. Thereby
giving our customers edge of single point hassle
free solutions and advantage over other fit out
companies
We collaborate with and work alongside architects, Who are we : Climatech Core Works: AED 500K to 10M
Interior Services: Interior Fit out/Building
interior designers and nominated suppliers to profes-
Employees : 102 Contracting
sionally deliver high quality end-to-end fit out and
Our Location: Al Garhoud Motto: Commitment comes first
refurbishment projects.
Dubai
Working across: U.A.E

We bring ideas into


Corporate

We bring ideas into


Corporate
Our Vision:
To be the leading interior fit-out contracting company in
the region by providing unparalleled quality services
and consistently delivering effective, sustainable, inno-
vative solutions to our valued clients.

Our Mission:
To execute work based on a long term
partnership To faster the innovative and creative
culture.
To encourage the prosperous working environment
and constantly developing operational skills and
pro- fessionalism of our staff.
To differentiate ourselves by employing the best
resources and the latest techniques.

Quality & commitment is our


Our Social
We aim to embrace customer oriented processes,
practices and comply with the standards as the basis
for business excellence.

EHS Policy:
We are committed to provide and maintain a safe and
healthy work environment with a focus on continuous
improvement toward an accident-free workplace
through effective administration, education and train-
ing, in line with the industry standards and legislative
requirements. We shall strive to eliminate any
foresee- able hazards which may cause property
damage, accidents, or personal injury/illness.
Quality Policy:
We are committed in achieving and reinforcing customer
satisfac- tion, by means of continually improving and delivering
high quality services, in order to meet and surpass the customer
expectations and requirements for every facet of our business.

We bring positive change for your


Sector

CORPORATE RETAIL HOSPITALITY


We specialize in interior fit-out - incorporating all
trades and offering a one-stop, hassle-free
service. We collaborate with, and work along-
RESIDENTIAL F&B BANKS
side architects, interior designers and nominated
suppliers to professionally deliver high quality
end-to-end fit out and refurbishment projects for
HEALTHCARE EDUCATION GOVERNMENT all the Sectors

AIRPORT
...We Don’t Limit !

Whatever you need, we will help you


Sector

Whatever you need, we will help you


Design & Build
Furniture & Flooring Procurement
False Ceiling

Services
Painting Joinery & Wood Works

We engage in a variety of construction


services to provide fit out from shell and core,
All category fit-out, strip-outs and Project Management
Steel & Glass Works
refurbish- ments working with the very
fabric of the building - partitioning systems, Climatech
structural modifications, MEP services,
providing bespoke joinery and metalwork,
equipment and furniture. A project program
is created to manage trades and undertake Civil Works Wall Cladding
all aspects of the projects.

Service Wheel- This chart illustrates the range


of services we offer within the 10 key Facility Management Walls & Partitions
market sectors.

IT & Networking
MEP

Transforming spaces, Transforming


Transforming spaces, Transforming
Process Flow
Pre- construction Post- Construction
Preliminary Construction

The interior design and fit out service that


includes everything you need, always. It’s all Finishes & details drawings / Renders approvals
Site mobilisation As built & other docum
Project brief
here. Work- place strategy, building evaluations,
space plan- ning, interior office design and a full
fit out service that includes building, engineering, Preparation of technical drawings
Concept Design After sales Services
technology, furnitures, equipments and authority Execution

approvals. In fact, our office fit out service is so


comprehensive; it delivers everything you need
Design&Cost Approval Authority Approvals Constant Client Interfa
for your new place. To make our all-inclusive Supervision
office fit out service easy for you to manage; we
package all the delivera- bles, based on your
budget into one fixed contract price. Develop Programme Project Completion
& handing over

Simplicity beats complexity, we are meant to be


Simplicity beats complexity, we are meant to be
Our Group

Climatech Climatech Joinery &Electro


wood -works
Mechanical Contracing
(Interior Fit- out Contracing)

Daikin AC Variable Gauzer Specialized Project – Clean room,


Refrigerant Solar Water Heater system
Volume (VRV) System

When you’re building a room, you’re building character,


and character is the strength and wisdom of our
TEAM STRUCTURE BOARD OF DIRECTORS

MANAGING DIRECTOR

GENERAL MANAGER SALES & OPERATIONS FINANCE & ADMIN MANAGER

BUSINESS DEVELOPMENT
PROJECT DESIGN
EXECUTIVE COMMERCIALS HUMAN CAPITAL
MANAGER CONSULTANTS

MARKETING
Civil & ARCHITECTS& PROCUREMENT& PERFORMANCE
EXECUTIVE
MEP DESIGNERS LOGISTIC MANAGEMENT
engineers

QS & ASSISTANTS
Site Supervisors ESTIMATOR QUALITY/EHS

FITOUT SKILLED MEP SKILLED


WORKFORCE WORK FORCE

Helper Helper

People look for a beautiful place , we make place


People look for a beautiful place , we make place
Sr. No Categories No.

OUR TEAM 1
2
Managing Director
General Manager
1
1
3 Project Manager 2
4 Architects 2
5 Project Engineer 2
6 Site Engineer 3
7 Interior Designer 2
8 Quanity Surveyor/ Esimator 1
9 Procurement & Logisics 1
10 Finance & Admin 1
11 PRO 1
12 Foreman/ Supervisor 6
13 Tile Layer 10
14 Gypsum worker 12
15 Stone Mason 3
16 Block work Mason 8
17 Painter 4
18 Electrician 3
19 Carpenter 6
20 HVAC Worker 6
21 Reinforcing Fitter 4
22 Plumbing Technician 3
23 Helper 20

We like creating things out of


It goes with climatech’s tagline “ Sim-
plicity beats complexity” Exceptianlly
Testimonials easy to work with climatech’s project
team - James Mclung, Project
Manager

diversed client base and partner


design agencies
Following extensive redesign, I
couldn’t be more delighted with
outcome - Sultan Taryam (Last
Resort Game Zone)

*More available upon request. We feel Climat-


We knew what we ech is an exten-
wanted, you deliv- sion of our team
ered it to the core -Keith & Colette
-Mohannad Khouri (Arcology Inter-
(Architectural Engi- national)
neering Consultan-
cies) A2Z
S.No Project Title Description of Works Client Consultant

Safa Villa, Interior Renovation Residential Interior Design


1 Abbas Ali Khan Idolise Interiors
Jumeirah Dubai & Build for G+1 Villa
KINGS SCHOOL - Hadeek Sheikh
Hospitality Design & Interior
2 Mohammed Bin Rashid at Al Kings Holding LLC Dubai Consultant
Fit out
Barsha
Megastore Carrefour at DIP, Corporate Design & Interior Fujairah National
3 Renault x partners
Interior Works Fit out Construction
Signature Restaurant of Mr. Restaurent Design & Interior
4 Sanjeev Kapoor KEO Consultant
Sanjeev Kapoor, Abu Dhabi Fit out

Residential Interior Design Climatech Building


5 Villa Ajman, Interior Works Ahmed Sultan
& Build for G+1 Villa Contracting

Apartment Interior Renovation


6 Shadaf 5 - Jumeirah Beach Restrooms Design & Build Yasin Jazaini Mrs. Zoha Talat
Residence
Corporate Client

G + 1 Villa Emirates Hill, Interior Emitech Technical


7 Designing & Consultation Khalid Ahmed
Work Services
Office 3902 - Taziz Office Interior Corporate Design & Interior Taziz Property
8 Easa Saleh AL Gurg
Work Business Bay Fit out Management
Fresenius Medical Care Interior Health Care Design & Fresenius Medical
9 Easa Saleh AL Gurg
Dubai Health Care City Contracting Care
Office 3402, Business Central Commercial Design & Middle East Business Climatech Building
10
Tower Build Interior Fit out Aviation Associatio Contracting
Accacia Avenue Villa Interior Fit Landscaping, Swimming Climatech Building
11 Samer Said
Out and Landscaping Design, Build & Contracting Contracting
Corporate Design, Build & Climatech Building
12 Last Resort Game Zone Sultan Taryam
Interior Fit out Contracting
Commercial Consulting & MEDAD Printing & Arcology
13 MEDAD Sharjah Warehouse R-04
Contracting Packaging LLC International
AL ZAJEL Real Estate, Bay Square- Commercial Design & Climatech Building
14 Yousef Kassem
Building 01, Business Bay Build Interior Fit out Contracting
Shams 3 Apartment Civil Work
15 Hospitality Contracting BIJULAL PRABHAKAR Drawlink Group
Jumeirah Beach Residence
Gulbahar Tobacco Office Interior Commercial Design, Build & Climatech Building
16 Gulbahar Tobacco
Jebel Ali Free Zone Interior Fit out Contracting
Office 304 Interior Work - Blue Commercial Design, Build & Sand Express Climatech Building
17
Tower Interior Fit out Shipping Services Contracting
KAM International at Business Bay, Commercial Design, Build & Climatech Building
18 KAM Trading
Lake Tower Interior Fit out Contracting
Draw Link Group at JBR Shams- Commercial Design, Build BIJULAL Climatech
19
3, dubi & Interior Fit out PRABHAKAR Building
S.No Project Title Description of Works Client Consultant

Climatech
Luxhabitat Office 804 & 806 Commercial Design, Build Luxhabitat Real
20 Building
Interior Work - Arenco Tower & Interior Fit out Estate Contracting
Climatech
Town House - Resident Villa Residential Interior Design
21 Arshad Effendi Building
Golden Mile, Palm Jumeira & Build for G+1 Villa
Contracting
Landscaping, Swimming Climatech
Accacia Avenue Villa Interior
22 Design, Build & Samer Said Building
Fit Out and Landscaping
Contracting Contracting
Climatech
Coffee Lab General Trading - Retail Outlet Design &
23 Venezia Café Building
Arenco Tower Build Contracting
Corporate Design & Taziz Property Easa Saleh AL
24 Taziz Office - Arenco Tower
Interior Fit out Management Gurg
JBR Bathroom Renovation
25 Hospitality Contracting Yasin Jazaini Mrs. Zoha Talat
Jumeriah Beach Residence
Climatech
Corporate Client

Commercial Interior Fit


26 Emitech Office 301 Garhoud Rahul Duragkar Building
Out Design & Build
Contracting
Double A International Climatech
Commercial Contracting APC - Middle East
27 Company, Warehouse Office - Building
& Modifications Office
Interior Works JAFZA Contracting
Siam Spa, Interior Works
28 Joinery & Interior work Siam Spa Keith Elliot
Jumeirah, DubAI
Fresenius Medical Care Interior Health Care Design & Fresenius Medical Easa Saleh AL
29
Dubai Health Care City Contracting Care Gurg
Climatech
Shobah Ivory I - Office Interior Commercial Design, Build
30 GMP Technicals Building
Business Bay & Interior Fit out
Contracting
Climatech
Warehouse House at Jebel Ali Commercial Design, Build APC - Middle East
31 Building
Free Zone & Interior Fit out Office Contracting
Hospitality Consulatation
Skye & Walker Arcology
32 Marroit Resturant Management &
Restaurant International
Contracting
Mac Al Gurg & Al Semsam Commercial Design, Build Easa Saleh AL
33 Mac Al Gurg
Office & Interior Fit out Gurg
MEDAD - JBC 3, Office 1804, Contracting & Joinery MEDAD Printing & Arcology
34
JLT work Packaging LLC International
Design & Build Retail Out Climatech
Al Marjan Island, RAS AL
35 Door Kiosk in RAK AL MARJAN ISLAND Building
KHAIMAH
Corniche area Contracting
Palm Tower, Health Floor,Al Glass work Contracting for PEGASES Travel &
36 Foad Zenaty
Qasba, Sharjah Office Commercial Office Toursism
Exterior Painting &
Climatech
Renovation work - entire
37 DUNES HOTEL APPARTMENTS HAS HOSPITALITY Building
chain of Dunes
Contracting
Hotel Apartments
Accomplished Projects

A starting point for the next leap forward


PALACE GARDEN AT CITYWALK

Scope : Design & Interior work


Area : 1830 Sq. Ft
Status : Completed
Location : Citywalk, Dubai
Client : Chalhoub Group
KINGS' SCHOOL at Al Barsha
Scope: School Design & Interior work
Area: 12000 Sq. Ft
Status: Completed
Location: Al Barsha, Dubai
Client: Kings Holding LLC

Last Resort Game Zone


Scope: Corporate Design, Build
& Interior Fitout
Area: 3600 sq.ft (3000 sq.ft Gaming
Area & 600 sq.ft Kitchen)
Status: Completed
Location: Al Hudaiba (Satwa), Dubai.
Client: Mr. Sultan Taryam

Mac Al Gurg & Al Semsam Office


Scope: Commercial Design, Build
& Interior Fit out
Area: 4304 sq.ft (400 Sqm)
Status: Completed
Location: Mac Al Gurg Showroom,
Etihad Road
Client: EasasalehAlgurg Group (OFIS)
MEDAD Printing & Packaging LLC
Scope: Contracting & Joinery work
Area: 1400sq.ft (130 Sqm)
Status: Completed
Location: JBC 3, Office 1804, JLT
Client: Arcology International

Fresenius Medical Care


Scope: Health Care Interior Design &
Contracting
Area: 6500 Sq. Ft
Status: Completed
Location: Dubai Health Care City
Client: EasasalehAlgurg Group (OFIS)

Accacia Avenue Villa Interior Fit Out


Scope: Landscaping, Swimming
Design, Build & Contracting
Area: 2500 Sq. Ft
Status: Completed
Location: Knowledge Village
Client: Samer Said
Office 3902- Taziz Office Interior Work
Scope: Corporate Design & Interior
Fit out
Area: 6800 Sq. Ft
Status: Completed
Location: Aspect Tower Business Bay
Client: EasasalehAlgurg Group (OFIS)

Emitech Office 301


Scope: Corporate Design & Interior
Fit out
Area: 1464 Sq. Ft
Status: Completed
Location: Al Garhoud, Dubai
Client: Emitech Technical Services

Siam Spa, Interior Works


Scope: Joinery & Interior work
Area: 6800 Sq. Ft
Status: Completed
Location: Jumeirah Road, Dubai
Client: Siam Spa
Coffee Lab General Trading L.L.C.
Scope: Retail Outlet Design & Build
Area: 1000 Sq. Ft
Status: Completed
Location: Shop No. 4, Ground Floor
Arenco Tower, Shaikh Zayed
Road, Dubai
Client: Venezia Café

Apartment Interior Renovation Shadaf 5


Scope: Restrooms Design & Build
Area: 2000 Sq. Ft
Status: Completed
Location: Jumeirah Beach Residence
Client: Yasin Jazaini

Gulbahar Tobacco Office Interior


Scope: Commercial Design, Build
& Interior Fit out
Area: 1500 Sq. Ft
Status: Completed
Location: Jebel Ali Free Zone
Client: Gulbahar Tobacco
Office 304 Interior Work - Blue Tower
Scope: Commercial Design, Build
& Interior Fit out
Area: 1500 Sq. Ft
Status: Completed
Location: Shaikh Zayed Road
Client: Sand Express Shipping Services

KAM International at
Business Bay, Lake Tower
Scope: Commercial Design, Build
& Interior Fit out
Area: 1000 Sq. Ft
Status: Completed
Location: Lake Tower
Client: KAM Trading

Luxhabitat Office 804 &


806 Interior Work
Scope: Commercial Design, Build
& Interior Fit out
Area: 1500 Sq. Ft
Status: Completed
Location: Arenco Tower
Client: Sand Express Shipping Services
Shobah Ivory I - Office Interior
Scope: Commercial Design, Build
& Interior Fit out
Area: 1500 Sq. Ft
Status: Completed
Location: Business Bay
Client: GMP Technical

Town House - Resident Villa


Golen Mile
Scope: Residential Interior Design &
Build for G+1 Villa
Area: 2500Sq. Ft
Status: Completed
Location: Palm Jumeira
Client: Arshad Effendi

Middle East Business


Aviation Association (MEBAA)
Scope: Commercial Design, Build
& Interior Fit out
Area: 2600 Sq. Ft
Status: Completed
Location: Business Central Tower "B",
Off 3101, Sheikh Zayed Road
Client: APC- Middle East Office
ONGOING PROJECTS
Safa Villa
Scope: Residential Interior Design
& Build for G+1 Villa
Area: 8200 Sq. Ft
Status: Ongoing
Location: Jumeirah, Dubai
Client: Abbas Ali Khan

Marriott Restaurant

Scope: Hospitality Consultation


Management & Contracting
Area: 4000 Sq. Ft
Status: Ongoing
Location: Jumeirah Road, Dubai
Client: Skye & Walker Restaurant

Al Zajel Real Estate MEDAD Sharjah Warehouse R-04 Al Marjan Island


Scope: Commercial Design, Build Scope: Commercial Consulting & Scope: Design & Build Retail Outdoor
& Interior Fitout Contracting Kiosk in RAK Corniche Area
Area: 7500 Sq. Ft Area: 3000 Sq. Ft Area: 5000 Sq. Ft
Status: Ongoing Status: Ongoing Status: Ongoing
Location: Bay Square- Building 01, Location: Sharjah Location: Ras Al Khaimah
Business Bay Client: MEDAD Printing & Client: Al Marjan Property
Client: Yousef Kassem Packaging LLC
Dunes Hotel Apartments
Scope: Exterior Painting & Renovation
Work –Entire Chain of Dunes Hotel
Apartments
Area: 15000 Sq. Ft
Status: Ongoing
Location: Oud Mehta near to American
Hospital, Muhaisa
Client: Yousef Kassem

Hart Bernstien, Interior Modification Work


Scope: Commercial Design, Build & Interior Fit out
Area: 1250 Sq. Ft
Status: Ongoing
Location: Garhoud Star Building
Client: Hart Bernstien Marketing Management
u a:u
Commercial License

License Details / a:u a


License No. 683694 a:u u

. ..    u 

Company Name
CLIMATECH BUILDING CONTRACTING L.L.C

. ..    u 


Trade Name
CLIMATECH BUILDING CONTRACTING L.L.C

Legal Type
Limited Liability Company(LLC)   y 

Expiry Date
16/02/2016  ¿u Issue Date 17/02/2013 ua ¿u

D&B D-U-N-S ® No. 0  u Main License No 683694  a:u u

Register No. 1110085 u  DCCI No. 214930 u 
u

License Members / u


Share / a Role / a Nationality /  Name /  No./: u
Manager /  India /  RAHUL JAGDISH DURAGKAR / t 427475
  
Commercial

License Activities / u a:u 


Building Contracting  

Address / 
Phone No 971-4-2594081  P.O. Box 117851 u a
Fax No 971-4-2594089  Parcel ID 214541  u
Mobile No 971-50-2572751 u   -  -     109 


Remarks / 
t +   

Print Date 15/04/2015 13:44  ¿u Receipt No. a u

Activitiy   


Owners   
(http://www.dubaided.gov.ae         .          
) (Approved electronic document issued without signature by the Department of Economic Development. To verify the license kindly visit http://www.dubaided.gov.ae
How to reach us
CLIMATECH
Climatech Building Contracting LLC
Office: Al Garhoud Star Building, Suite # 109, 1st Floor,
118 Street, Al Garhoud, Landmark: Near GGICO Metro
Station, Dubai, UAE
P.O.Box: 117851, Dubai
Tel: +971 4 2594081
Fax: +971 4 2594091
Email: info@climatechgulf.com
Website: www.climatechgulf.com

Our Group Company

A SPECIALIST ELECTRO MECHANICAL COMPANY

Emitech Technical Services LLC.


P.O. Box 126340
Tel : +971 4 2641051/2504036
Toll Free Number: (800-EMITECH) 800-3648324
Fax : +971 4 2504089
E-mail : info@emitechgroup.com
Web : www.emitechgroup.com
METHOD STATEMENT
GENERAL FITOUT WORKS

METHOD STATEMENT
TYPICAL PROJECT - OFFICE / RETAIL / LEISURE
FOR INTERIOR WORKS
APPROACH, METHODOLOGY AND
PROGRAMME
METHOD
STATEMENT
INTERIOR FITOUT

TABLE OF CONTENTS

1. INTODUCTION

2. PROJECT ORGANOGRAM (SEPARATE SHEET ATTACHED)

3. COMPANY ORGANOGRAM

4. PROCEDURES / METHODOLOGY
Introduction
Climatech Interiors has been in operation for over a decade and is considered a market leader in
the region. Our Philosophy is simple. We deliver on time and with an uncompromising attitude
toward quality of delivery, both in our site works and project management of our projects. We
operate within globally recognized best practice methods for project administration and
documentation, including, programming, procurement, submittal registers and monitoring,
variation administration and valuations.

Our method statement for fit out works for proposed interior works outlines our approach to our
intended implementation of typical interior fit outs and is generic to our approach to all our interior
works. We have provided key elements within the tables of contents which are detailed further in
our statement and provide the necessary information as to our general and specific approach to
most types of interior works, namely offices, retail and leisure / Hospital projects.

In general terms Climatech interiors has an extensive record, in the local market, of all fit out
works. We have our own Electro Mechanical, Joinery, Marble and stone, Partitions and Ceilings,
Painting and Metal / Glass Works divisions and do not rely on subcontractors for our work. This
gives us a high level of control over our quality and programme of works.

All our Personnel have extensive experience in mid to high end interior works, including many
prestigious and well known venues. A sample list of completed projects is as follows.

Our General approach to implementation of the works is based on tried and tested methodology
and documentation control which has proven successful in the past and includes all aspects of the
works such as statutory approvals and permit from the necessary authorities.

We are experienced in implementation of works within all the statutory precincts in Dubai and Abu
Dhabi, e.g., Tecom Dubai / AD Municipality, JAFZA, EMAAR etc. and are aware of all procedures and
approval processes in implementation of works within Municipalities designed zones, as well as civil
Defense. We have extensive experience in obtaining approvals associated with these designated
authorities and confirm that we are completely familiar with AD/DM/CD procedures which will be
described with in the procedures and methodology section of this method statement.

Further to the above we have a dedicated individual with extensive experience in obtaining Civil
Defense and municipality approvals whose task is to liaise daily with respective authorities.

Our submission includes copy of our corporate license, Insurance documents and location map of
our facilities of we welcome you to visit at your convenience.

We also welcome site visits to any of our previous projects and we are of the feeling that our work
speaks for itself. Our previous and current clients are our best assets for promoting our work.
Procedures and Methodology
Getting Started:

Once appointed statutory approvals and procurement are to commence. For any project statutory
approval is required and site works is dependent on receiving Fit out permit to work. Submission of
drawings and approval is to be expedited. Civil Defense / Municipality approvals can be obtained
whilst mobilization is in progress. We can confirm from previous experience that most authorities
will permit works to start immediately after their approval.

The following Process is applicable:

Step 1: Consultant issue design drawings to contractor who in turn prepares MEP
and Architectural submittals for Landlord engineer approval.

Step 2: Client to issue landlords no objection letter, appointment letter to Climatech,


and copy of lease.

Step 3: Climatech to submit Engineering drawings with Landlord Engineer comments


addressed, for Municipality approval and pay necessary deposits, scrutiny fees
etc.

Step 4: DM, AD/ CD issue commented / approved drawings and issue Climatech Fit out
Permit to commence work.

Step 5: Climatech to Mobilize onto site and commence Civil Defense submission.

Step 6: Climatech to commence material and drawing submittals for consultant

approval. The above process normally takes 2 to 3 weeks.

Mobilization:
Immediately after permit to work is issued Climatech to mobilize into site, conduct site condition
survey and commence site set up. Included in the site set up are the following:
(Site Setting – up Checklists is enclosed)

 Site office and meeting area


 Site storage
 Workers eating area
 Delivery area and rubble removal area site Hoardings
 Drawing and Document files
 Site Signage and General safety signage
 Task Lighting

Documentation:
On Mobilization registers for the following documents are to be set up:

1. Material Submittal Register

2. Drawing Submittal Register

3. Request for information Register

4. Request for Inspection register

5. Confirmation of verbal Instruction Register

6. Engineer / Consultant instruction Register

7. Detailed Construction Programme

8. Detailed Procurement Programme

The above documents are to be kept updated weekly and will be included in weekly reports.

Cost control documents to be used are the contract BOQ, Confirmation of site instructions and
Engineers Instructions. All Variations are to be instructed in writing and costs agreed. Climatech to
issue quotations for EI’s within a week of receipt.

All site operatives are to be safety inducted and manpower records are to be kept on a daily basis
(refer enclosed documents)

With regards submittals of material and drawings, Climatech to expedite the submittals and
conclude the submittal process within 3 weeks form appointment.

Weekly reports are to consist of all registers, site photographs, programme update and Project
overview. The first report is to include the site condition survey with photographs as record of the
site condition at time of handover from landlord to Climatech.

Valuations are to be submitted by 28th of every month and all variation are to be claimed using EI
references by means of an EI schedule addendum to the BOQ claim.
Methodology:
In general, the key to achieving timeous completion and to achieve a high quality of fit out is for
the following key elements to be given the utmost attention from the outset:

1. Through audit of existing services to be relocated and reused is to be done. To understand the
scope of work and the interface between existing services and new works is key to
implementation these works successfully.

2. High quality Protection to be used to eliminate damage to existing items and accurate setting
out for coordination of new and existing site works.

3. Submittals to be done quickly and reviewed / approved immediately. It is expedient to attempt


to close these out at the meetings immediately on submittal.

4. Procurement is to commence immediately on appointment and particular attention is to be


given to long lead time items.

5. Detailed setting out to be done to facilitate site measurements as early as possible.

6. Sequencing of work is to be done in accordance with a detailed construction programme.

7. Factory visits to be conducted to ensure quality is achieved prior to items being delivered to site.

8. Intimate involvement in the project by senior Climatech managers.

9. Correct methodology of site work (no cutting corners).


10. Appropriate resourcing of staff / site personnel.

11. Early involvement of IT and AV specialists to coordinate with MEP.

12. Early involvement of IT rooms to enable data and hardware to commence.


SITE SETTING – UP / DOCUMENTS CHECKLIST

I. SITE SETTING UP

1. TEMPORARY Site Office.


2. Climatech Interiors Sign Board
3. Board showing safety Instructions
4. Meetings table + Chairs
5. Office Table + Chairs
6. Trays for inward documents + stationery
7. Notice Board
8. Drawing stand + Hangers
9. Shelf / Rack for displaying approved samples
10. Box Files
11. Spare Helmets for visitors
12. A/C, Fan (if required)
13. Pantry: (a) Fridge (small)
(b) Water Bottle Cooler + Dispenser
(c) Electric Kettle
(d) Coffee mugs, trays, etc.

14. Cabinet / Box with locking arrangement to keep tools

15. Electrical Distribution Boards with circuit breaker, Outlets, etc.

II. DOCUMENTS

1. Health & safety Plan from Climatech


2. Prequalification Document
3. Fit – Out Manual issued by Tecom / Consultant, etc.
4. Copy of Specifications
5. Copy of bill of Quantities (BOQ)
6. Copy of Permit to work issued by telecom / Municipality, Client, etc.
7. Copy of Work Programme
III. DOCUMENTS IN FILES

1. Copy of permit
2. Copy of Receipt of fees paid for work passes
3. Correspondence to or from Consultants
4. Correspondence to or from Client
5. Correspondence to or from Sub Contractors
6. Correspondence to or from suppliers
7. Blank forms:
i. Site diary & Progress Report
ii. Transmittal of Drawings / Documents
iii. Submittal for approval of Materials
iv. Submittal for approval of shop Drawings
v. Request for Information
vi. Request for Inspection
vii. Confirmation of Verbal Instructions
viii. Procurement Instructions
ix. Blank sheets for sketches
x. Blank sheets for Action List
8. Updated Registers:
a. Request for Inspection
b. Request for Information
c. Material Submission
d. Drawings Submission
9. Copies of Minutes of weekly Meetings
10. Copies of Weekly Progress Reports

IV. DRAWINGS
1. Tender issued drawings (ID, MEP)
2. Drawings approved by idama / Municipality
3. Approved drawings from civil Defense
4. Drawings issued ID / Architectural Consultant
5. Drawings issued by MEP Consultant
6. Approved shop drawings for ID
7. Approved MEP Drawings
8. Superseded drawings from Consultant
9. Superseded Workshop drawings
GOVERNMENT OF DU BAI

DUBAI CENTRAL LABORATORY DEPARTMENT


PRODUCTS CONFORMITY ASSESSMENT SECTION

DM CIRCULAR NO. (183) 2011


CERTIFICATE OF REGISTRATION

In compliance with the above DM Circular on the ’Use of Solar Water Heating
Systems to Supply Hot Water for Buildings Within the Emirate of Dubai”,
Dubai Central Laboratory Department (DCLD) of Dubai Municipality,
hereby issue this certificate to:

EMITECH TECHNICAL SERVICES LLC.


P.O. BOX 126340, DUBAI, U.A.E.

as a registered supplier of approved Solar Water Heating Systems


as per “List of Approved Solar Water Heating Systems and Their Suppliers”
published by Dubai Central Laboratory Department (www.dcl. ae).

ARIF HUSAI AL MARZOOQI


Head, Products Conformity Assessment Section
DCLD, Dubai Municipality

Registration No.
AP12110008 Valid Until: 15- Current Issue Date: 16-May-2016
May-2017 Original Issue Date: 16-May-2012
D ub a i qu aliru Group

Certificate of Partnership
This is to certify that

Emitech Technical Services LLC


is an active supporter of

Dubai's Drive for Quality, and is a

Corporate Partner

of Dubai Quality Group from

January 2016 - December 2016

Fotmo AlMheiri
Chairman

EXPO2O2O
DUBAIUAE
‫نهنــــئ‬

‫إميتيك للخدمات الفنية‬


‫لتصنيفها كأفضل‬
‫شركة صغيرة ومتوسطة في دبـي‪،‬‬ ‫‪100‬‬
‫شركة مرشحة‬ ‫ضمن أكثر من ‪4,500‬‬

‫‪2‬‬ ‫عبدالباسط الجناحي‬


‫المدير التنفيذي مؤسسة‬
‫محمد بن راشد‬
‫لتنمـــية المشــاريع الصغيرة والمتوسطة‬
We Congratulate

Emitech Technical Services


Ranked among the
Top 100 SMEs in Dubai
out of more than 4,500 nominated businesses

21
Abdul Baset Al Janahi
Chief Executive Officer
Dubai SME
CERTIFICATION
Quality Management System
Certificate of Approval
This is to certify that the QMS of

EMITECH TECHNICAL SERVICES LLC.


P.O. Box 126340, Al Qusais, Dubai, United Arab Emirates

Has been assessed and found to meet the requirements


of

ISO 9001:2008
This certificate is valid for the following scope ef operations:
a)Electromechanical Projects,
b) Sales & Service of Air Conditioning & Solar Water
Heating Equipments
c)Facilities Management

Authorised by: RN Cooke


Chief Executive

Date of Certificate Issue: 14 April 2015


Certificate valid Until : 13 April 2016
Recertification audit before 07 March 2017. Certified sinre 14 April
2014. ThiS ceztlficate is the property of QEC Certification and remains
valid subject to satisfactory annua) Surveillance audits.

SN Registrars (Holdings) Limited


Registration House, Certificate Number: QEC 13808667/17/Q
22b Church Street,
Rushden, Northamptonshire,
NN10 9YT, UK.
Tel : +44 (0) 1933 38 3261 ISO II:2008
U KAS
Email: info@qec.co.uk QUAL TY
Web: www.qec.co.uk
Company Number : 07659067
For precise and updated information concerning the present certificate visit at www.qeccert.com
Ar. Ravi S. Kholakiya
Email: rsk444@gmail.com , Mob: +971 50
4745092 Dubai – U.A.E.

Career Goal & Personal Skills

As an experienced Senior Architect with creative design skills and my networking abilities could help your
company to achieve its goals. Active and potential clients will be impressed with my creativity
and innovative product presentations and the meticulous management of their million-dollars
accounts, allowing long-lasting relationships to be formed.”

“If you're seeking for a creative Architect with new ideas to improve the reliability and development
of your company's server, my experience in design, implementation and supervising any project will
prove invaluable. Handling project end-to-end will be as complimenting my overall performance.

 Creative, have lots of unique ideas.


 Expert in designing and formulating the concept for various structures.
 Strong computer skills on designing packages like. Adobe Photoshop & AutoCAD. Also good at
Microsoft Office, Google Sketch up.
 Aim and desire to contribute to an established company or any growing company
 Give high priority to customer satisfaction and try best to deliver over client expectation.
 Have a good flair of interior designing also and have inclination to give complete end to
end solution for any building architecture as well as interiors for home, residential, offices,
commercial buildings.

Added Qualification :

 Registered with the Society Of Engineers, Dubai, U.A.E.


 Registered with the Dubai Municipality for G+1 structures.
 Registered with Dubai Civil Defense
 Have a valid U.A.E driving license.

1
Ar. Ravi S. Kholakiya
Email: rsk444@gmail.com , Mob: +971 50
4745092 Dubai – U.A.E.

Professional Qualification:

April 2013 - Present : As Architect & Project M anager at Climatech Building Contracting LLC, Dubai.

Hired as an Architect, within 6 months was recognized for my designing, Authority Approval (Dubai
Municipality, TECOM, Trakhees) and site managing skills and was moved up the ladder to take up
the responsibility of Project Manager.

 Projects: Interior : Commercial

- NMC hospital extension to existing building at DIP.


- Retail store (Palace Garden) for Disney at Citywalk phase 2.
- Last Resort Game Zone. (Gaming Café and Restaurant) at Al Hudaiba.
- Office for Medaad Printing & Packaging At JBC 3, Jumeirah Lake Towers.
- Office & Training Centre for Fresenius Medical Care at Dubai Health Care City.
- Office for Taziz Property Management Solution at Business Bay.
- Office for Emitech Technical Services at Al Garhoud.
- Siam Spa at Jumeirah Road.
- Office for Luxhabitat Real Estate at Arenco Tower, Media City.
- Skye & Walker Restaurant at Marriott Executive Apartments, Deira.
- Office for Gulbahar Tobacco at Jebel Ali.
- Office for GMP Technical Services at Business Bay.

 Projects: Interior : Residential

- G+1 Villa interior and external (elevational) modification at Al Safa


- Apartment interior at Palm Jumeirah.
- Villa interior and Landscape at Knowledge Village.

Project Scope for all above projects :


o Preparing conceptual design and theme for client approval.
o Coordinating with the MEP consultant for MEP drawings.
o Preparing working drawings and submitting the same for Authority Approval.
o Communicating with the Site Engineer, foreman and labors during the execution of the
project at site.
o Attend periodic site meeting with clients and consultants for efficient completion of
project.

2
Ar. Ravi S. Kholakiya
Email: rsk444@gmail.com , Mob: +971 50
4745092 Dubai – U.A.E.

April 2011- April 2013 : As Architect at Lewis And H ickey, M umbai

Lewis N Hickey India : is a UK based multinational firm that operate in an extensive range of
retail, educational, residential, mixed use, master planning and industrial projects.

Worked as an Architect under the guidance of qualified and talented Associate Architect of the
firm boosted my knowledge and confidence for handling Architectural projects. Was involved in
Architectural design solution and preparing working drawing along with consultants and Site coordination.

 Projects: Architectural : Retail

Project N ame: Bharti Walmart Cash N Carry Project at Indore, Amravati, Aurangabad, Solapur
and Sangli. 50,000 sq.ft PEB and R.C.C structure for wholesale market.

 Projects: Architectural And Interior : Residential

Residential Development of Villas and Row Houses at Kochi, Kerala.


Project N ame: 1)
(Client : Muthoot Estate Investments) 4 Villas, 16 Row Houses and a Club House.

Project N ame: 2) Weekend Homes Development at Rajkot, Gujarat.


95 contemporary Villas and a club house with modern amenities proposed on 4 acre of land.

 Projects: Architectural And Interior : Leisure

Project N ame:Club Privilege at Rajkot, Gujarat.


A High End Club with restaurants, hotels, sports activities, banquets, party lawns, gymnasium
Proposed on 7 acre of land.

Project Scope for all above projects :


o Preparing conceptual design and theme (Architectural and Interior).
o Preparing M.D. presentations and finalizing the proposed design.
o Preparing detailed working drawings (Architectural and Interior) as per the design.
o Communicating to the Site Engineer for drawings and technical requirements.
o Coordinating with structural and MEP consultants.
o Studying and analyzing structural and MEP drawings and BOQ’s.
o Attend periodic site meeting with clients and consultants for efficient completion of
project

3
Ar. Ravi S. Kholakiya
Email: rsk444@gmail.com , Mob: +971 50
4745092 Dubai – U.A.E.

M ay 2010-April 2011: As Jr. Architect at Astitv D esigns, M umbai

Astive Designs : is a firm who has good vision towards various projects for architecture design and
planning. They are having their own niche in the field of architecture.

 Projects: Architectural : Residential

Project N ame: 1) Lemon Tree ( Lokhandwala Builders, at Kandivali, Mumbai)


4 Towers of 19 Storey & 5 Towers of 7 Storey.

Project N ame: 2) Forest Ferns ( Lokhandwala Builders, at Kandivali, Mumbai)


1 Towers of 20 Storey & 5 Towers of 7 Storey.

Project Scope:
o Designing elevation and landscape for residential complex.
o Preparing Elevation with detailing
o Preparing detailed working drawings.

 Projects: Architectural : H ospital

Project N ame: Mhatre Hospital at Panvel, Navi Mumbai.

Project Scope : Preparing detailed working drawing for site execution.

 Projects: Architectural : Sea Port

Project N ame: Pipava Port at Gujarat .

Project Scope : Preparing detailed working drawing for customs house and residential buildings.

4
Ar. Ravi S. Kholakiya
Email: rsk444@gmail.com , Mob: +971 50
4745092 Dubai – U.A.E.

 Projects: Interiors : Office

Project N ame : Diverrsey office at Andheri, Mumbai.

Project Scope : Preparing layout for 10,000 sq. ft. office.


Preparing a detailed Interior Design for the office.
Preparing detailed working drawings as per design for site execution
Site co-ordination.

Internship during Final Y ear of architecture - at Padmaja Enterprise under Ar. Ravindra Sant.

Duration : 4 months

Project N ame : NESCO Complex – Bombay Exhibition Centre, Goregaon East.


Project Scope : Preparing municipal drawings for approval from various authorities like director of
Industries, Assessment Department of M.C.G.M

Personal information

Educational Qualification:

 2005 - 2010: Bachelor of Architecture, I.E.S College of Architecture, Bandra, Mumbai.


 2004- 2005 : H. S. C passed with Distinction from Maharashtra State Board, Mumbai.
 2002 – 2003 : S.S.C passed with Distinction from Maharashtra State Board, Mumbai.

Computer Knowledge:

Microsoft Office, Google Sketch up, Adobe Photoshop & AutoCAD.

H obbies:

Designing, Drawing, Cricket, Eager to know about latest invention, electronic gadgets, new technology in
any field.

Portfolio Link:

http:/ / ravikholakiya.weebly.com/

5
Azeem Ahmad
M: +971504090189,0524568890
M: azeemrana.s@gmail.com Linkedin profile link ae.linkedin.com/pub/azeemahmad/71/10a/80a

Professional summary
09 Years of total design supervision and coordination on interior fit out turnkey, Hospitality, retail projects, Offices and
showrooms working on medium, large with consultant, Architects interior designer and contractors. Have good
experience of “Design and Build projects” including Stages of design development, Shop drawings and Documentation
protocols. Have working knowledge interior, Civil projects and latest applicable technologies. Excellent
coordination/trouble shooting skills with construction team.

Educational Credentials: Civil Engineer 2007 from IIMT (Imperial international institute of management and
Technology New Delhi)

Certification: AutoCAD /Microsoft office programs & related software.

Job Responsibility
Headed team of, site engineers, supervisors, Forman, Draftsmen craftsmen’s and Document controllers for
effective coordination of Architectural, Structural, MEP & Decoration related design issues.
Organizing & conducting technical workshops on critical design issues with Consultant and Engineer, in order to
obtain requisite approvals and expedite work progress.
Conducting workshops for Design Review & Cross trade coordination with various subcontractors. Monitoring
progress and control quality for Design submittals by various subcontractors in order to meet critical path baseline
program controls.
 Preparing Project Progress reports to the management:

 Actively involved in establishing long lead items with procurement for advance planning.

 facilitation with design parameters.


Career Highlights

 Climatech’ Building Contracting LLC - Business Development Manager March 2016 to present..

Climatech’ Building Contracting LLC is one of the well established and emerging MEP contracting having ISO
9001:2008 certification and has carved out a niche for offering full range of Electro-Mechanical services to residential,
industrial and commercial buildings, from conceptual design through design development, installation, testing,
commissioning, operation and maintenance. Our range of projects include Luxury Villas, Industrial ware Houses,
Shopping complexes, Commercial Offices and High Rise towers.

 CUBE wooden work & Interior design LLC. - Project Manager March 2015 to March 2016

CUBE Interiors designs well establish joinery and fit out company in Dubai handling projects in to fit out
like showrooms ,hotels suits, Joinery and furniture design, High-end jewellery showrooms and corporate
offices exhibition stands . Also do the design supervision and consultancy for high end villas, flats.

 A&T Group Interiors.-Project Engineer fit out F&B projects. March 2014 to Feb2015

A&T Group Interiors is one of the best fit out contractors Dubai you can choose from. Our innovative system allows
for work to be delivered on time, while exceeding the expectations of our customers. We focus on all areas such as
the walls, floor, ceiling, decorations and based on the needs of our customers, we begin to create a space that will
work for them. We take the time to use concept designs, mood boards and ensure there are a complete set of
visuals in place to ensure that our customers understand what they are ordering.

 Strokes Interiors LLC.- Project Manager Interior Fit out - May -2013 to Feb2014
Strokes is the leading Exhibits stands Company in UAE– an Exhibition Design & Fabrication designs, fabricates and
deploys exhibition stands that are creative, communicative and cost effective. It is into Exhibition Stand Design,
Exhibition Stand Fabrication, Pavilions & Overseas Solutions, Trade Show Displays., Pavilions & Overseas Solutions,
Trade Show Displays.

 Creative Spaces wll, Doha Qatar - 2011 July – May 2013 Project Manager Interior Fit out - May -2013 to
Feb2014

 Paradigm Design LTD- India – Site Engineer - May -2006 to2011


Projects Highlights

1. F&B, Restaurant Projects


Slider Station Restaurant Galleria Mall, Al Wasl Road, Dubai.
Big Chef, Restaurant, Jumeirah beach resorts, Dubai
Dri Dri Café, Box Park Project, Al Wasl Road,
Dubai Sushi Midori- Luxury restaurant- The Pear
Qatar McDonald- Pan Qatar
Baskin Robbins- Pan Qatar

2. Offices

Al Yousuf Motors UAE –


Al Badad Group –
DP World corporate Office

3. Retails

Level Shoe District- The Dubai Mall (Chalhoub Group)

Disney Palace Garden- The City Walk- Dubai (Chalhoub Group)

Bu Rashid Perfumes Showroom interiors – Deira Gold Souk

Nabeel Perfumes shop , Deira Gold souk

KhadaJ Perfumes ( Oman)

Amwaj Jewellrey chain project across the UAE.

Lacoste Fashion Shop-

Katakeet Fashions

Swaroski Shop

Puma Shop

Repeto Shop

Cristian Louboutin
Projects

3. Hospitality

Fujiarah Hotel- Fujiarah City- UAE

Marriot Hotel- Deira, Dubai

GreenTree Hotel – Deira, Dubai

Fraser Suites- Dubai

3. Residential Villa

Mr. Abbas Grand Villa- Al Safa, Dubai

Mr. Khalfan Villa- RAK

MR. Mohammed Al Suweidi. Villa

Mr. Kalban ,Villa- Kalba

Mr. Mohmmaed Al Zabi ,Villa, Abu Dhabi

Mr. Sultan, Villa Abu Dhabi.

Exhibition Stands & Events

Various Exhibition stands building at WTC Duabi

Various Exhibition stands building at ADNOC

Kisok Counters and booths In all Emirates.

Star of the Emirates stage Show, Dubai

Mall.
Personal Details
Personal Details

NATIONALITY : INDIAN

DATE OF BIRTH : 29-07-1984

SEX : MALE

RELIGION : ISLAM

MARITAL STATUS : Married

LANGUAGES KNOWN : ENGLISH, HINDI URDU

, PASSPORT NO. : J 0054569 (EXP 2020)

Driving Licence : In Progress ( Final Road Tests going on)

Azeem Ahmad
Sanjay ChristianProduction Manager

Royal Building 202, Near Sharjah National Paint, Sharjah, United Arab Emirates, Mob-050 9434969
Lakshmi Metal tech. (Trinity Doors LLC.) Email – sanjaychristian@yahoo.com.
UAE Driving License available.
Seeking a challenging position that should have an opportunity for career development and that may fully utilize
my potentials based on my formal education and experience

. Carrier Overview .
A creative civil Engineer with 12 years of extensive experience in Site Civil Engineer in India Designing
with solid record of accomplishments. Significant experience in Auto Cad and Site Progress like Project
Apartments, Hotels, Hospital, villas …etc.….

A creative Design department with 2 years in Roshan Construction of extensive experience in Civil
and Interior Designing in UAE with solid record of accomplishments. Significant experience in Auto Cad In
civil /Structure and Interior designing like Project Apartments, Hotels, Hospital, villas …etc.….

Still Continue As a Production Manager with 6 years (2 year IN Radiant Int. LLC Abu Dhabi Mussafa
+ 4 year in Trinity Interiors & doors of extensive experience in Joinery fit out for Architecture & Interior
Designing with solid record of accomplishments. Significant experience in Managing for big scale Joinery fit
out production and Handling 60 workers, Material Selection, Making BOM & Cutting list, Paint
section experience , Production planning, knowledge of Carpentry machinery, Knowledge of Auto
cad, Knowledge of Wood, Veneer and furniture Hardware, Knowledge of Fire rated Doors,

Experience includes inception to completion, and Coordinating-Managing Consultant, Factory Supervisor,


Sales & Estimating Department and Design Department.

. Objective
A Production Manager position in an organization seeking extraordinary experienced in Production Joinery fit
out, Auto Cad,

● . Diploma in Civil Engineer Qualification .


● Interior designer
● Civil and Architectural Draughtsman – Ship and Estimation.
● Fluent in English, Gujarati, Hindi.

● Familiar with Indian construction techniques


● . Key Strength
Familiar with UAE construction & Interior fit outs techniques
● Dynamic leadership quality, skilled at managing Interior fit outs Warehouse
● Flexibility to work under pressure and motivate team members to hit the target.

. Technical Skill .
● Auto Cad, MS office, Power Point, Photoshop and Internet Applications.
● Familiar with Wood and Veneers.
● Familiar with Carpentry Machinery.
Work Experience
July 2015- still continue in CLIMATECH JOINERY & WOOD WORKS .HAMARIYAH PH-2
DUBAI, UAE.
 Post- Production Manager.( Working as per Production chart )
 Responsible for FIRE RATED AND NON FIRE doors as per Civil defense manufacture and
JOINERY WORK supervision and making SHOP DRAWINGS in Auto CAD for approval,
QUOTATION, BOQ, CUTTING LIST and Correspondence with supplier and client.
 Meeting with Site engineer and Constant.
 Joinery production / Wood / Veneer experience.
 Handling carpentry section and paint section also.
 Experience in wood machinery like CNC Machine programing. And all type of carpentry
machine.
 Bill of materials.
 All type of Joinery experience.
 Interior designing. AUTO cad

April 2011 to 2015 TRINITY DOORS.(WOODEN DEVISION) DUBAI, UAE.


 Post- Production Manager.( Working as per Production chart )
 Responsible for FIRE RATED doors as per Civil defense manufacture and JOINERY WORK
supervision and making SHOP DRAWINGS in Auto CAD for approval, QUOTATION, BOQ,
CUTTING LIST and Correspondence with supplier and client.
 Meeting with Site engineer and Constant.
 Joinery production / Wood / Veneer experience.
 Handling carpentry section and paint section also.(60 to 70 workers)
 Experience in wood machinery Ilike CNC Machine programing. And all type of carpentry
machine.
 All type of Joinery experience.
 Interior designing. AUTOCAD.
 Site experience in UAE.
 UAE PROJECT AND SITE EXPERIANCE.
 Tawam Hospital –AL AIN (INTERIOR)
 Al Ain University – AL AIN ( INTERIOR & WOODEN DOOR AND LEAF)
 Masdar project – Mussafa-ABU DHABI.(WOODEN DOOR AND LEAF)
 Al Sufouh Tram-DUBAI ( INTERIOR & WOODEN DOOR AND LEAF)
 Dubai Air Port Project- WJ&P – DUBAI (FIRE RATED DOOR AND LEAF)
 His Interior –KUWAIT UNIVERSITY - QATAR
 Cleve Land Clinic-ABU DHABI ( WARDROB & WOODEN DOOR AND LEAF)
 Gems School- AL BARSHA- DUBAI (FIRE RATED DOOR AND LEAF)
 Regent Emirates Pearl Hotel Project-ABUDHABI (SMOKE WOODEN DOOR AND LEAF)
 Bakheet Villa -4 nos. RUWAIS-UAE ( INTERIOR & WOODEN DOOR AND LEAF)
 Al Ain Villas AL AIN ( INTERIOR & WOODEN DOOR AND LEAF)
 Ruwais Housing – RUWAIS - UAE
 Mr Mahesh patel House –AFRICA ( INTERIOR & WOODEN CELING)

April 2008- 2011 RADIANT INTERNATIONAL LLC Abu Dhabi Mussafa


 Post- Production Manager.( Working as per Production chart )
 Responsible for FIRE RATED doors as per Civil defense manufacture and JOINERY WORK
supervision and making SHOP DRAWINGS in Auto CAD for approval, QUOTATION, BOQ,
CUTTING LIST and Correspondence with supplier and client.
 Meeting with Site engineer and Constant.
 Joinery production / Wood / Veneer experience.
 Handling carpentry section and paint section also. (30 workers)
 Experience in wood machinery Ilike CNC Machine programing.
 All type of Joinery experience.
 Interior designing. AUTOCAD.
 Site experience in UAE.
UAE PROJECT AND SITE EXPERIENCE.
 Plazo Verchi Hotel in JADAF-DUBAI (NFR AND FIRE RATED DOOR AND LEAF)
 D1 Tower – JADAF-DUBAI (NFR AND FIRE RATED DOOR AND LEAF

As Interior
April 2006-designer.
2008 Roshan Construction L.L.C ( Dubai )
Responsibilities
 Responsible for Civil, Architectural, Interior furniture drawings, Structural& Electrical plans of
multistoried buildings for Residential, Commercial Apartments & Industrial Sheds and all
working Elevations and sectional details. Like Staircase, Lift, Balcony Railing, Kitchen,
Toilet, Overhead Water Tank, Carpentry, Foundation working plans, Columns center line
plans, Beam framing working plans, Electrical working plans, Plumbing working plan. And i
can work on site according to above mention drawings.
UAE PROJECT AND SITE EXPERIENCE.
 Two Residence Apartment Design and Plans and Elevation as per Civil Defense rules in
DIP.
 Ware House design and drawings for submission.
2004 To 2006 Rastogi Associates Gujrat,India
As Architect Asst.
 Mahesh Public School At Jodhpur,Rajasthan
 Shivdeep factory for snacks at Bickaner,Rajasthan.
 Roop-Rajat township at Jodhpur,Rajasthan.
 Hostel for All Saints School at Nanital,Uttarakhand.
 Residence Bunglow for Mr.Tekwani at Ahmedabad.

As Architect
1996 To 2004Asst.
Architect Hemal Shah Ahmedabad India
 Factory for SurbhiMilkfood and Beverages at Kalol,Gujrat.
 Sukhdham Multi storey Appartment at Nehrunagar,Ahmedabad
 Appartment Complex at Kala Nala, Bhavnagar,Gujrat.
 Building for AkhandJyot Foundation at Paldi,Ahmedabad.
 Interior for Medisearch Hospital,Ahmedabad.

2004 To 2006 Free Lance Projects .


 Jalarm Appartment at SamrutiMandir, Maninagar, Ahmedabad.
 Residence Bunglow for Mr.P.D Pandaya at Memnagar, Ahmedabad.
 Interior design for the office Mr.Himanshu Desai at Ahmedabad.
 Restaurant interior design for Mr.Falgun Mohanti at Ahmedabad.
PersonaDetail .

 Date of birth 20-4-1967


 Nationality : Indian
 Status : Employment
 Marital Status : Maried
 UAE Driving License
References .
References available upon request.

Declaration .
I declare that above facts given by me are true to the best of my knowledge and brief.

Thanking You.
Date-12th May 2016.
PLACE – DUBAI (UAE).
YUSUF TAWIZWALA
RESUME

Job Synopsis :
A competent Designing and Execution experience with over 10 years in varied industry segments.

Career Objective :
Seeking an employment opportunity in Designing and Technical Field which enables me to
utilize my experience and enhance my analytical skills required for the benefit of the
organization and myself in the process of continuous growth and improvement .

Professional Experiences :

Total Work Experience : - 10 Years & 6Months

1) Presently working with : Climatech Building Contracting LLC – Dubai, UAE


 Period of Employment : 2Year & 4 Months. (OCT 2013 Till Date )
 Designation : Project Engineer / Interior Designer
 Job Profile : (i) Executing the Projects as per the Detail Drawings & designs.
(ii) Applying for required NOC from building management &
respective local government authority
(iii) Preparing Detail Drawings & approvals drawings in order to
acquire NOC’s & to execute the given project
(iv) Co-ordination with the Internal Technical Team and Sub-
contractors & managing technicians & labors
(v) Verifying bills of Sub Contractors as per the progress at site
(vi) Timely billing & invoicing to client & consultants.
(vii)Foresee issues at Site for Smooth Functioning.
(viii) To make sure the Jobs Executed as per Standards and Work
Schedule.
(ix) Assuring site health & safety with proper welfare facilities at
site.

2) Presently working with : Al Gurg Office Furniture (Br.of Easa Saleh Al Gurg), Dubai.
 Period of Employment : 4Year & 10 Months. (Nov 2008 to Sept. 2013)
 Designation : Project Engineer / Interior Designer
 Job Profile : (i) Executing the Projects as per the Detail Drawings.
(ii) Preparing Detail Drawings to execute the given project.
(iii) Co-ordination with the Internal Technical Team and Sub-
contractors
(iv) Verifying bills of Sub Contractors as per the progress at site
(v) Foresee issues at Site for Smooth Functioning.
(vi) To make sure the Jobs Executed as per Standards and Work
Schedule.

Contact: 050 – 46 49 021 E-mail:


YUSUF TAWIZWALA
3) Name of the Employer : M/S K.P. Interiors - MUMBAI
 Period of Employment : 1Yrs & 2 Months. (Sep 2007 to Oct. 2008)
 Designation : Interior Designer / Site Engineer
 Job Profile : (i) Preparing Drawings for Interior Works
(ii) Executing the Projects As per the Detail Drawings.
(iii) Preparing Detail Estimate as per Drawings & Details.
(iv) Preparing Running Bills as per Site Progress.
(v) Verify Bills of Sub-Contractors.
(vi) Projects Executed are 61 Luxury Rooms at Taj Lands End,
Suit Rooms at Taj President. Taj BlueDaimond, Pune.

4) Name of the Employer : Architect Dilip Kulkarni & Associates Colaba, Mumbai.
 Period of Employment : 2 years (Aug. 2005 to Aug 2007)
 Designation : Interior Designer & Site Supervisor
 Job Profile : (i) Preparing Drawings for Interior Works for Residential,
Commercial, Corporate, Banks, Etc.
(ii) Designing the Projects As per the Site Requirements
(iii)Preparing Detail Estimate as per Drawings & Details.
(iv) Execute The Entire Site As per Drawings And Details.
(v) Verification of Bills As per Drawings Prepared .
(vi) Executed and Designed Projects such as Reserve Bank of
India, Mantralay, Dena Bank, MMRDA, Mumbai Railway, OBC,
IND Synergy Pvt. Ltd. Etc,

5) Name of the Employer : S.K. Contractors, Mazgoan, Mumbai.


 Period of Employment : 1 Years and 4 Months (April 2003 to July 2005 –Part time)
 Designation : Interior Designer & Site Supervisor
 Job Profile :(i) Preparing Drawings for Interior Works for residential
Projects.
(ii) Supervise Site As per Drawings And Details

Academia:
Diploma in Interior Designing and Decoration, Saboo Siddik Polytechnic, Mumbai.

Additional Qualification: M.S OFFICE, AUTOCAD, Certified Fire Marshall,


Certified First Aider.(UK.) managing safely (IOSH)

Personal information :
Name : Yusuf Tawizwala.
Religion : Muslim (Dawoodi Bohra)
Nationality : Indian
Date of birth : 27th Aug 1987
Marital status : Single
Contact no. : 050 – 46 49 021
E-mail address : Yusuft_19@rediffmail.com
Permanent address : 2/6, Cementwala Bldg, 1St Flr.
Room No. 7, Near Two Tank Mumbai – 400 003.
Languages known : English, Hindi, Marathi, Gujarati

Thanking You

Yusuf A.Tawizwala

Contact: 050 – 46 49 021 E-mail:


MILTON

Mobile No : +971559875665
Email ID : milton@climatechgulf.com

Objective
A capable, result orientated manager with experience of leading teams and successfully
increasing efficiency and productivity while reducing costs and inefficiencies. Ability to keep
a level head at all times, nurture and grow the business, evaluate opportunities and risks
and also deliver innovative new solutions to challenges. Possessing excellent client facing
and configuration skills and highly successful in helping defining & achieving company goals.

 Proven proficiency in Project Management


KEY COMPETENCIES
 Exceptional competence AND PERSONAL
in Vendor Management STRENGTHS
 Core competence in managing the clients, architect, and project execution
partners.
 Good leader and manager.
 Excellent verbal and written communication in English
 Ability to work in sync by good team building.
 Excellent communication and interpersonal skills.
 Multi-tasking abilities, good organizer and monitoring skills.
 Highly self motivated, ambitious and dedicated to providing high standards of
project management.

Qualifications

Higher Qualifications : Post Graduate Diploma in Advanced Construction


Management from NICMAR, PUNE, India
(Year 2003 – 2005)

Academic Qualifications : Bachelor in Civil Engineering from Faculty of Tech. &


Engineering, Maharaja Sayajirao University,
Vadodara, Gujarat, India (Year 1996 – 2000)

Computer Knowledge : Project Planning Software :MS Project


Software Packages : MS Office

Working : Climatech Building Contracting

Locati : Dubai,

Page
MILTON
MACHADO : Project

From : March 2016 – Till date

Projects Completed : Disney Store – City walk

Mall

Responsibilities include

 Monitoring of the day to day progress of the interior fitout projects which includes the
planning of activities and resources, project schedulling, procurement schedule
 Managing the Permits, Approvals and Completion certificates from Dubai Municipality
through online process, Permits from authorities like Dubai Airport Freezone, Nakheel.
 Preparation of the Budgetary Cost of the Project and monitoring of the same.
 Ensure proper documentations are followed during the course of the project.
 To ensure Satisfaction to the Client with better quality and workmanship.
 Vendor and Supplier management
 Ensuring proper Planning is followed to achieve the timely project completion.
 Multi-tasking abilities with good planning, organising and monitoring skills, a good
analyzer of the pros and cons affecting the project and making the decisions and
working towards the same.
 A Good team player with a balance of technical and administrative skills.
 Ensure that the Project completion is achieved with regards to cost, quality, time,
 Management and coordination between the Client, Consultants and the Vendors to
achieve the timely completion of the project.
 Assist the Client throughout the project from Start till the closeout documentation.

Working Experience : HTS Interior Design

Page
MILTON
MACHADO : Project
LLC. Location : Dubai, UAE

Page
MILTON
MACHADO : Project

From : February 2015 – March 2016

Projects Completed : AW Rostamani Office – Deira


Boeing Office – Dubai Airport Freezone
AW Rostamani Showroom Office-SZR
French Consulate Villa Modification
Onform Uniform LLC
Noor Bank – Abu Dhabi
Noor Bank – Burjuman
ADCB Data Centre – Abu Dhabi & Dubai

Responsibilities include

 Monitoring of the day to day progress of the interior fitout projects.


 Working towards the timely execution of Interior Fit-out for offices of Corporate Clients.
 Managing to get the Permits, Approvals and Completion certificates from Dubai
Municipality through online process, Permits from authorities like Dubai Airport
Freezone, Nakheel.
 Preparation of the Budgetary Cost of the Project
 Ensure proper documentations are followed during the course of the project.
 To ensure Satisfaction to the Client with better quality and workmanship.
 Finalization of Vendor and Suppliers in order to ensure a smooth functioning and
continual progress of the projects.
 Ensuring proper Planning of the projects is followed to achieve the targets
 Multi-tasking abilities with good planning, organising and monitoring skills, a good
analyzer of the pros and cons affecting the project and making the decisions and
working towards the same.
 A Good team player with a balance of technical and administrative skills.
 Ensure that the Project completion is achieved with regards to cost, quality, time,
 Management and coordination between the Client, Consultants and the Vendors to
achieve the timely completion of the project.
 Assist the Client throughout the project from Start till the closeout documentation.

Working Experience : Progetto India Projects Pvt.

Ltd. Location : India

Page
MILTON
MACHADO : Project

From : January 2014 – February 2015

Projects Completed : Unicef (3000sft),Mumbai


Hyundai(8000sft), Mumbai

Responsibilities include

 Overlooking of the day-to-day progress for Civil & Interior Fit-out Projects.
 Working towards the execution of Interior Fit-out for offices of Corporate Clients.
 Ensure proper documentations are followed during the course of the project.
 Being a partner with the Client to ensure that the project is completed within the
timeline/schedule.
 Working on Microsoft-Projects to ensure that the Project Schedule is followed and
avoiding of any project slippages by working on the Critical Path activities.
 Satisfaction to the Client with better quality and workmanship.
 Working with the Director in formulation of operational/projects strategies and the
review of the same from time to time
 Finalization of operational budgets and monitoring the same.
 Finalization of Vendor and Suppliers in order to ensure a smooth functioning and
progress of the projects.
 Major involvement in the functioning of departments like Estimation & Tendering,
Procurement, Vendor Management, Execution & Billing.
 Ensuring proper Planning & Scheduling of the projects keeping in sync with the target
completion and also the quality standards at the same time.
 Being more of a Multi-tasker having the technical and commercial background.
 Multi-tasking abilities with good planning, organising and monitoring skills, a good
analyzer of the pros and cons affecting the project and making the decisions and
working towards the same.
 A Good team player with a balance of technical, commercial and administrative skills.
 Ensure that the Project processes and procedures with regards to cost, quality, time,
EHS and client satisfaction are executed in an efficient, cost effective manner and
according to the full requirements of the Company and the Client as per the contract.
 Management and coordination between appropriate stakeholders to facilitate on time
execution of work per the requirements.
 Raise non-compliance issues (specs, mock-ups, drawings) with proposed solutions and
recommended actions.
 Assist the Client throughout the project from Start till the closeout documentation.
 Projects Completed Include Civil & Interiors, Electrical, Fire Alarm Systems, Public
Address System and Networking Systems.

Working Experience : Property Solution (I) Pvt. Ltd.


(A Kalpataru Group Company)

Location : India
Page
MILTON

Designation : Project Manager (Projects- Interiors)

From : November 2007 till October 2013

Projects Completed (INDIA) : Indofil Chemical Co. Ltd (30,000 sft), Mumbai
: Medtronic (20,000 sft), Mumbai
: Torm Shipping (20,000 sft), Mumbai
: Ingersoll Rand (20,000 sft), Mumbai
: Watson Pharma (35,000 sft), Mumbai
: Samsung C & T ( 8,000 sft), Mumbai
: CIMB (13,000 sft), Mumbai
: Bennett & Coleman Ltd. (8,000 sft), Kolkota
: Honda (20,000 sft), Pan India
: Weatherford (25,000 sft), Mumbai
: Siemens Ltd. (1,00,000 sft), Gurgaon
: Nirmal Lifestyle. (1,08,000 sft), Mumbai
: Yash Pharma (7,000 sft), Mumbai
: Newbridge Offices (20,000 sft), Mumbai
: Cyberoam Tech. (20,000 sft), Ahmedabad
: Omron (7,000 sft), Mumbai
: Mitsui (20,000 sft), Mumbai
: Bluestar Ltd. (6,600 sft), Ahmedabad

Responsibilities include

 Responsible for the performance, budgets and people management to enhance the
development of the division and business.
 Played a pivotal role towards the setting up of the project management and interior
turnkey contracting division for enhancing business growth and alignment with the
other functions to achieve operational synergies within the organization.
 Overlooking of the day-to-day progress for Civil & Interior Fitout Projects for offices of
Corporate Clients.
 Worked on the execution of Interior Fitouts for MNC’s Corporate Offices.
 Satisfaction to the Client with better quality and workmanship.
 Optimizing operational efficiencies to achieve better productivity.
 Working with the Directors in formulation of operational/ projects strategies and the
review of the same from time to time
 Finalizations of operational budgets and monitoring the same.
 Finalization of Vendor and Suppliers in order to ensure a smooth functioning and
progress of the projects.

 Major involvement in the functioning of departments like Estimation & Tendering,


Procurement, Vendor Management, Sub-Contracting, Execution & Billing.
 Ensuring proper Planning & Scheduling of the projects keeping in sync with the target
completion and also the quality standards at the same time.

Page
MILTON
 Plans to maximize profit keeping in sync with the quality standards
 Budgetary control.
 Team managing and team building.
 Conduct periodic projects review along with the Management.
 Conducting periodic MIS meetings with the Management to review the progress of the
project.
 Conducting periodic review meeting with the internal site staff to analyse the project
status.
 Conducting Project Management Audits with regards to quality, cost and time
 Maintaining excellent relations with the Client and Suppliers.
 Reporting to the AVP-Projects
 Integral Part of the Core SAP Sales Development Team
 Projects Completed Include Civil & Interiors, Electrical, Fire Alarm Systems, Public
Address System and Networking Systems.
 Projects Completed Include Civil & Interiors, HVAC, Electrical, Fire Alarm Systems,
Sprinkler Systems, Public Address System and Networking Systems.

Working Experience : Shapoorji Pallonji Construction Material Group

Designation : Planning Engineer - Interiors

From : November 2005 - November 2007

Responsibilities include

 Ensuring proper Planning & Scheduling of the projects keeping in sync


with the target completion and achieving quality at the same time.
 Vendor Management
 Material & Manpower Management
 Quantification of Materials
 To ensure that the critical activities are highlighted to the seniors
 Client Billing and Vendor Bill Checking
 Ensure proper tracking of activities
 Preparation of Reports for Management Review
 Standardization of Rates for Estimation Department
 Tracking of Payments to Vendors

Working Experience : MC – Bauchemie (I) Pvt.

Ltd. Designation : Civil Engineer

Page
MILTON
From : January 2002 – February 2003

Responsibilities include

 Day-to-day dealing with the dealer network in India.


 Getting project orders from construction companies.
 Giving Technical Assistance.
 Attending customer queries.
 Responsible for implementing ISO Quality Management Systems.
 Internal Auditor and Management Representative
 Reporting to Managing director.

Working Experience : Associated Cement Companies

Ltd. Designation : Quality Control Engineer

From : August 2000 – June 2001

Responsibilities include

 Quality Control at RMC Plant and on site


 Design mix of Concrete
 Testing to be done at site
 Logistics

Trainings Attended

Thesis (NICMAR)
April 2004 – June 2004
As a Construction Management Trainee in Tecnimont ICB Engineers & Contractors at
the Hazira Port & LNG Receiving Terminal, Surat (Gujarat) for the construction of the
LNG Receiving terminal

Achievement’s and Certifications

 Certified Internal Auditor for the Quality Management Systems ISO 9000:2000
 Presented Paper on “Planning, Development and Management of Ground and
Surface Water” at the National Technical Symposium at R.E.C, Kurukshetra and B.I.T.S
Pilani.

 Presented Paper on “Integrated Water Management”at Techo-fusion 2000 held


at Maharaja Sayajirao University, Vadodara in B.E- Final Year.

Page
MILTON
Personal Details

Page
MILTON
Date of Birth : 07th October 1978
Nationality : Indian
Marital Status : Married
Languages Known : English, Hindi, Marathi &
Konkani Pass Port# : K 6978195
Date of Issue : 15/10/2012
Visa type : Employment
Driving License : UAE Valid Driving License

Page
 Design and Build
 Residential designs
 Corporate interiors
 Hotels and
 restaurants Joinery

JOINERY MACHINERY LIST

SCM – MINIMAX - ITALY CIRCULAR SAW MOD S400 W /SC


40P
Casadei
Max.squaring stroke 2660 mm

2 saw blade rotating speed 3500/5000rmp

Max.saw blade diameter with scoring 400mm


blade installed

Saw blade tilting 90÷45(degrees-


grade)

Max.saw blade projection from table at 138mm,98mm


90°,45°

Saw speed 4000 rmp-U/min

Squaring stroke 2600 mm

Scoring blade diameter 120mm

Scoring blade speed 9200-U/min

Cutting width on rip fence 1270mm

Three face motor 5.5kw 7.5HP 50Hz

Single phase motor 3,6kW 4,8HP 60Hz

Cast iron work table dimension 560×940mm

Exhaust hood behind the base, diam, 120mm

Weight 820Kg

www.climatechgulf.co

Climatech Building Contracting LLC


PO Box :117851, Dubai, UAE.Tel: +971 4 2594081 Fax: +971 4259 4091 Email:
 Design and Build
 Residential designs
 Corporate interiors
 Hotels and
 restaurants Joinery

COMBINED MACHINE(3Operation) MINIMAX Mod.FS41-CLASSIC/ PFS 41 Casadei

Max: working width 410mm

Total length of surfacing worktables 1800mm

Max: stock removal 4mm

Thickness table dimensions 605x420mm

Tilt able surface fence (degree) 90-45

Spindle speed 5200rpm

Min: or Max: working height on thicknesses 3/230

Feed speed on thickness 7m/min

Exhaust hoods on operating groups diameter 120mm

Motor power 4hp

Planner protection

Surface planner table with opening opposite to the operator side

Surface fence (1670x150mm dimensions) equipped with support

Cutter block with no.3 knives HSS 410x30x3mm

KUFO -TAIWAN DUST COLLECTOR3HP 2bags

Motor 3HP

Impeller diameter 13’’

Air volume 1925CFM

Bag volume 0.59m3 (20.97ft3)

Packing 48 x 23 x 23

Net weight 170/180Ibs

Gross weight 165 kgs (363 lbs)

www.climatechgulf.co

Climatech Building Contracting LLC


PO Box :117851, Dubai, UAE.Tel: +971 4 2594081 Fax: +971 4259 4091 Email:
 Design and Build
 Residential designs
 Corporate interiors
 Hotels and
 restaurants Joinery

CHAIN MORTISE MACHINE


Specification of Chain Mortising Machine

High quality Chain Mortising Machine are made from very high quality raw
meterial which ensures hasile free work performance at its user end. These
Chain Mortising Machine planner machine widely finds its applications in
various wood working industries.

www.climatechgulf.co

Climatech Building Contracting LLC


PO Box :117851, Dubai, UAE.Tel: +971 4 2594081 Fax: +971 4259 4091 Email:
 Design and Build
 Residential designs
 Corporate interiors
 Hotels and
 restaurants Joinery

AIR COMPRESSOR - Makita AC1350 2.0HP Air Compressor

BAND SAW MACHINE - FOR WOOD CUTTING & SIZING

www.climatechgulf.co

Climatech Building Contracting LLC


PO Box :117851, Dubai, UAE.Tel: +971 4 2594081 Fax: +971 4259 4091 Email:
Orient Insurance

CONTRACTOR'S ALL RISK INSURANCE


THE SCHEDULE
Policy No. Customer Code : 2002000
P/01/4012/2015/112
Insured
CLIMATECH BUILDING CONTRACTING L.L.C
POST BOX - 117851
DUBAI, U.A.E

Title of contract INTERIOR FIT-OUT / BUILDING CONTRACTING / RENOVATION &


MODIFICATION OF RESIDENCES
Site of Construction : U.A.E

SECTION I - MATERIAL DAMAGE


Insured Items Sum Insured (AED) DeductibIes(AED)
Each and Every Loss
1 - Contract Work MAJOR (AOG) PERILS /
(Permanent and Temporary DESIGN / FIRE / TESTING
works, including all materials to be / MAINTENANCE-
incorporated herein) AED 10,000.00
1.1 - Contract Price 1,000,000.00
1.2 - Materials or Items Supplied by NOT INSURED
the Principal(s) OTHERS - AED 7,500.00
2 - Construction PIani, Equipment NOT INSURED
/ Construction Machinery
3 - Clearance of Debris INCLUDED IN 1.1
4 - Professional Fees INCLUDED IN
5 - Existing / Surrounding Property 1.1 NOT
6 - Temporary Facilities INSURED NOT
7 - Uplift INSURED
Total Sum Insured Under Section I : NOT INSURED
AED 1,000,000.00
Risk DeductibIes(AED)
” Limit of Indemnity (AED) Each and Every Loss
Earthquake, Volcanism and Tsunami 10,000.00
Storm, Cyclone, Flood, 1,000,000.00 10,000.00
1,000,000.00
Inundation,LandsIide
” Limit of indemnity in respect of each and every loss or damage and/or series of losses or damages arising
out of any one event.

SECTION -II : THIRD PARTY LIABILITY

Insured Items * Limit of Indemni AED Deductibles (AED)


1 - Bodily Injury
1.1 - Any One Person
1.2 - Total 1,000,000.00 10,000.00
2 - F'roperty Damage
* Limit of indemnity in respect of any one accident or series of accidents arising out of any one event.

Period of insurance
(Subject to the Provisions concerning the period of cover)
From 03/06/2015 00:00 To 02/06/2016 23:59
Orient Insurance

POLICY NO. P/01/4012/2015/112 Policy Schedule(Continued)

The policy is subject to:

Conditions & Clauses

INCLUDING LOSS OR DAMAGE DUE TO STRIKE, RIOT AND CIVIL COMMOTION (MRE 001)

CROSS LIABILtTY CLAUSE (MRE 002)

EXTENDED MAINTENANCE CLAU SE (MRE 004) - 6 MONTHS ANY ONE CONTRACT

OFF-S ITE STORAG E (MRE 013) - LIMIT : AED 250,000/-

d NDERGROUN D SERV ICES CLAUSE (MRE 102 ) - 25% CLAUSE FOR PROJECTS OUTSIDE DUBAi.
DE DUCTIBLE: 10% OF CLAIM SUBJ ECT TO MINIMUM AED. 10,000/

CONSTRUCTION MATERIAL (MRE 1 09)

SAFETY MEASURES (MRE 110)

FIRE- FIGHTING FAC ILILIES & FIRE SAKETY ON CONSTRUCTION SITES (MRE 112)

PROPERTY IN TRANS I+ INCLUDING LOADING AND UNLOADING (MRE 113) - AED. 200,000/- PER
CONVEYANCE

COVER FOR VIBRATION, REMOVAL OR WEAKENING O* SUPPORT (MRE 120)


DEDUCTIBLE 10% OF CLAIM SUBJECT TO MINIMUM AED. 10,000/-

72 HOURS CLAUSE

PROFESSIONAL FEES CLAUSE 10% OF CLAIM AMOUNT SUBJECT TO MAXIMUM AED. 200,000/-
(PART OF CONTRACT VALUE SUM INSURED)

DEB RIS REMOVAL CLAUSE- 5% 0 F CLAIM AMOU NT SUBJECT TO MAXIMUM AED 200,000/- (PART
OF CONTRACT VALUE SUM INSURED)

COST ESCALATION CLAUSE - 110%

PLANT & DOGUM ENTS CLAUSE - LIMIT AED . 50,000

AUTOMATI C REINSTATEMENT OF SUMS INSURED AT PRORATE ADDITIONAL PREMIUM

LOCAL AUTHOR ITI ES CLAUSE 15% OF CLAIM AMOUNT

TEMPORARY REPAIRS LIMIT AED 50,000/- SUBJECT TO PART OF FINAL REPAIR INVOICE OF AN
ADMISS IBLE CLAIM UNDER THE POLICY

FREE ISSUE MATERIALS COVER PART OF SUM INSURED

ADDITIONAL COST OF WORKING EXPENSES / EXTRA CHARGES MRE 006 10% OF CLAIM
SUBJECT TO MAXIMUM AED 100,000/

COSTS & EXPENSES WITHIN TO LIMIT OF INDEMNITY

INDEMNITY TO EMPLOYEES EXCLU DING WC/ EL

WAIVER OF SUBROGATION AGAINST JOINT INSURED

LOSS ADJUSTERS - TO BE AGREED

RUN-OFF CLAUSE
Orient Insurance

POLICY N 0. P/01/401 Z/2015/11 2


Policy Schedule(Continued)

DECLARATION PRIOR TO COMMENCEMENT OF PROJECT

DEWATE RING CLAUSE

MAXIMU M. CO NTRAC7 VALU E ANY ONE CONTRACT - AED 1,000,000/-

TOTAL ESTIMATED ANNUAL TURNOVER - AED 7,000,000/-

MAXIMUM DURATJ ON ANY ONE CONTRACT - 5 MONTHS

MINIMUM & DEPOSIT PREMIUM : AED. 7,000/- ADJUSTABLE @ 1.25%o ON ACTUAL ANNUAL
TURNOVER SUBJECT TO MINIMUM AED. 400/- PER PROJECT

SUBJ ECT TO NO LOSS FOR THE LAST 3 YEARS

Exclusions
EXCLUDING HORIZONTAL DIR ECTIONAL DRNLING

EXCLU DING +ERROR ISM AND SABOTAGE

IT CLARI *INATION CLAUS E

FULL NUCLEAR EXGLUS ION CLAUSE

TOTAL USBES+OS EXCLUSION CLAUSE

POLLUT ION & CONTAMINATION EXCLUSION CLAUSE

EXCLUDING PRINCIPALS EXISTING / SURROUNDING PROPERTY


Political Risks Exclusion Clause
Notwithstanding any provision to the contrary within the Insurance Agreement or any Endorsement thereto
this agreement does not cover loss or damage or cost or expenses of whatsoever nature directly or
indirectly occasioned by, happening through or in consequence of War, invasion, acts of Foreign Enemies,
hostilities or war-like operations (whether war to be declared or not), civil war , mutiny, civil commotion
assuming the proportions of or amounting to a popular rising, military rising, insurrection, rebellion,
revolution, military or usurped power, material law, confscation or nationalization or requisition or
destruction of damage to property by or under the order of any government or public or local authority. In
any action suit or other proceedings where the Insurer alleges that by reason of this exclusion a loss,
damage, cost or expenses is not covered by this agreement, the burden of proving that such toss,
damage, cost or expense is covered shall be upon the Insured.

Premium Payment Warranty


It is warranted under this Contract of insurance that the premium due must be paid to and received by
Orient Insurance Company, no later than 90 days from the date of inception of this insurance cover

If this Warranty is not complied with then this Contract of insurance shall lapse from the date of this breach
at midnight u'ith a pro-rata premium being due from the Insured.

In the eve nt of breach of Premium Ra yment Warran ty, we will provisionally accept your offer of settlement
of prem ium on a "Without Prejudice" basis and further subject to the condition that continuity of cover and
the admissibility of claims, whether prior to OR after the settlement, shall be subject to approval by our
reinsurers"

5aiJctions / EnJbargoes Clause


This Policy does not provide coverage related to any business, including but not limited to this Insurance
and fulfillment of any obligation thereunder, to the extent it would violate any applicable economic or trade
Orient Insurance

POLICY NO. P/01/4012/2015/112 Policy Schedule(Continued)

sanctions law or regulations under United Nations resolutions or the trade or economic sanctions, laws or
regulations of the European Union, United Kingdom or United States of America.

Total Premium : As Agreed


(Inclusive of extra premiums for the above
mentioned endorsements)
Paid Up Capital: Dhs. 500,000,000
Registered under Federal Law No. (6) of
2007 Certificate No. 14 dated zg• December
1gs‹ Commercial Registration 51814

Date: May 24, 2015

WORKMEN'S COMPENSATION INSURANCE


TO WHOMSOEVER IT MAY CONCERN

We confirm that M/S. CLIMATECH BUILDING CONTRACTING L.L.C is insured with us


under Workmen's Compensation Insurance as per the following details:

Insured's Name: M/S. CLIMATECH BUILDING CONTRACTING L.L.C


P.O. Box 117851, Dubai, U.A.E.

Policy No.: P/01/6010/201S/164

Period of Insurance: From: 24/05/2015 To: 23/05/2016

Cover: As per UAE Federal Labour Law No.8 of 1980 and subsequent
amendments thereto &/or common law &/or Sharia Law

Employer's Liability: Dhs. i,000,000/- any one occurrence and in the aggregate

Jurisdiction: United Arab Emirates

Territorial Limit: United Arab Emirates

All other Terms, Conditions, Exceptions as per the original Policy issued to the Insured.

This Certificate is issued as per the request of the Insured.

For ORIENT INSURANCE PJSC

Auth tory

Onent insurance PJSC tHead Office) Dubai Festival City


P.O. Box fl7966, Dubai, UAE.
tel -971 4 253 1300 . fax 971 4 853 1500
e-ma+ I or+ent alfuttaim.ae www.lnsuraneeuae.corrj
Orient insurance

POLICY SCHEDULE
WORKMEN'S COMPEhISATION INSURANCE
Policy No.
P/01/601 0/2015/164 Customer Code : 2002000
Name of Insured
C LIMATEC H BUILDING CONTRACTING L.L.C
Address
P. 0. BOX 1178 51,
DUBAI.
U.A.E.
Law(s)/Applicable : Workmen's Compensation in accordance with United Arab Emirated Federal Labour
Law Cover No. 8 of 1980
Period of Insurance : (a) From 24/05/2015 00:00 To 23/05/2016 23:59 (ooth dates inclusive)
(b) Any subsequent 'eriod for which the insured shal] pay and the Company shall agree
to accept a renewal premium.
Min imum and Deposit ; As Agreed
Prem ium(AED)

Special Conditions : Subject to adjustment in terms of Condition 6


The estimated amount of wages and salaries and other earning on which Minimum and
Deposit Premium is based on AED 1,438,200.00
Details of Employees :

Estimated Occupation
Estimated Other Estd.Total Place(s) of
No.of Earnings Employment
Annual Wages Allowances
employees AED | AED AED

40 EMPLOYEES OF 1,438,200.00 1,438, 200.00 U.A.E.


0 THE INSURED
(AS PER

ATTACHED LIST) ' I

The fo IIowing Con ditions/Clauses atta ched to and form part of the policy :

Policy Terms & Clauses

” TER RITOR PAL LIM IT - UNITED ARAB EMIRATES

*JURIS DICTION - UNITED ARAB EMIRATES

”MEDICAL EXPN ESES DUE TO WORK RELATED ACCIDENT PER PERSON PER AC CIDEN R
SUBJECT TO +REA+MENT CONFINED TO U.A.E GOVT. HOSPITALS/CLINICS &/OR PRIVATE
HOSPITAL ONLY AE D 15,000/-.

”REPATRIATION EX PENSE SIN CASE OF DEATH AS A RESULT OF WORK ACCIDENT, EACH PERSON
AED 15,000/-

*EM P LOYERS LIABILITS LIMIT AN ONCE OCC URENCE AND/OR IN THE AGGREGATE AED
1:000, 000/-

“EMP LOY EE TO EMP LOYEE LIABILITY EXTENSION CLAUSE

”2^ HOURS ON/OFF DUTY GOVER FOR DATH AND PERMANET DISABI LITY

Page Nn 1 / 3
Orient Insurance
Policy No : r'/01/6010/2015/164 Contd...

*INLCUDING COVER *OR S UN STROKE AND HERNIA AS PER CONDITION

*TRAN SPORTAION CLAUS E

*COVER ONLY EMPLOYEES WHO ARE UNDER THE SPONSORSHIP OF THE INSURED OR WAGE
ROLL,

*EXCESS : 1 DAY FOR TEMPORARY TOTAL DISABLEMENT BENEFIT

Exclusion Clauses

Political Risks Exclusion Clause - Notwithstanding any provision to the contrary within the Insurance
Agreement or any Endorsement thereto this agreement does not cover I oss or damage or cost or expenses
of whatsoever nature directly or indirectly occasioned by, happening through or in consequence of War,
invasion. acts of Foreign Enemies, hostilities or war-like operations (whether war to be declared or not), civil
war , mutiny, civil commotion assuming the proportions of or amounting to a popular rising, military rising,
insuzection , rebellion, revolution, military or usurped power, material law, confiscation or nationalization or
reo uisition or destruction of damage to property by or under the order of any government or public or local
authority. In any action suit or other proceedings where the Insurer alleges that by reason of this exclusion a
loss, damage, cost or expenses is not covered by this agreement, the burden of proving that such loss,
damage, cost or expense is covered shall be upon the Insured.

I CLVRIFICAT] ON A GR EEMENT

*EXCLUDING SABOTAGE AND TERRORISM

*FULL NUCLEAR EXCLUSION CLAUSE

*EXCLUDING LOSS OR DAMAGE ARISING OUT OF OLLUTION AND CONTAMINATION ABSOLUTELY

*TOTAL AS BESTOS EXCLUSION CLAUSE

”EXCLUDING ANY EXPOSURE FROM EMERGING RISKS BEING


- ELECTRO MAGNETS C Ft ELDS (EMF)
- GENETICALLY MODIFIED ORGANISMS (GM O)
- TRANSM ISSIBLE SPONGIFORM ENCEPHALOPATHY (TSE)
- TOXIC M OLD

*EXC LUDING CLAIM S ARISING OUT OF AIDS

*EXC LUDING OFFS HORE WORKS


Premium Payment Warranty

It is warranted under this Contract of insurance that the premium due must be paid to and received by Orient
Insurance Company, no later than 90 days from the date of inception of this insurance cover.

I f this Warranty is not complied with then this Contract insurance shall lapse from the date of this breach at
midnight with a pro-rata premium being due from the Insured.
Sanctions / Em bargoes Clause

This Policy does not provide coverage related to any business, including but not limited to this Insurance and
fulfillment of any obligation thereunder, to the extent it would violate any applicable economic or trade
sanctions law or regulations under United Nations resolutions or the trade or economic sanctions, laws or
regulations of the European Union, United Kingdom or United States of America.

Pag e No 2 / 3
Orient Insurance
Policy No : P/01/6010/2015/164 Contd...

Signed on behalf of Od NT INSURANCE PJSC


this Monda f June 201d

Page No. 3 / 3
Arya Insurance Brokerage Co. (L.L.C.) DEBIT
N€}TE NO.
D/N000046628
Registered unar Instsrance Aunonty - U.A E tCeñlle No Sd)
DATE 23/08/2015

Head Office : Redisson BLU,19 floor 19 A, Plaza Building Deira Creak,


P.O.Box :8811, Dubai-U.A.E ,TEL (971 4) 2212838 FAX (871 4) 2238951 DEBIT NOTE
Branch : Lob 16,1st Floor, Office#126,JebeI Ali Free Zone, TEL (971 4) 8811227, Fax (971 4)-
8811535 E-Mail: aryains@emirates.net.ae, Website: www.aryainsuranoe.com

DEBITED TO CC-8862 CREDITED TO 1-0009


INSURED CLIMATECH BUILDING CONTRACTING LLC AL FUJAIRAH NATIONAL INSURANCE CO

ADDRESS P.O.BOX:117851,DUBAI,UAE

TEL NO. +971 4 2594081


MOBILE NO. +971 52 6424767
FAX NO. *971 4 2594091
E-MAIL. zufisha@climatechgulf.com

Please Note that your account has been debited as follows:


PARTICULARS INCEPTioN ExeiRY AMOUNT (AED)

BEING PREMIUM CHARGED ON 05/08/2015 04/08/2016 36,136.00


Policy No. P/3101/02/15/1003054

AS PER POLICY ATTACHMENT

Remarks

Total Amount Payable By Client 36,136.00


THE SUM OF DIRHAMS THIRTY SIX THOUSAND ONE HUNDRED THIRTY SIX ONLY.

For Arya Ins ranc ge Co.(L.L.C)


Prepared By : jerbe|
B-0032
AUTHORIS SI NATORY Broker .
Printed On 23/08/2015 2:49.28 PM

1. Your settlement within 30 days of this debit will be highly appreciated.


2. All Payments should be made payable to Arya Insurance Broke>ee Co.(L.L.C) By cheque/Cash.
payments should be strictly made against official stamped and signed receipt.

3. The Debit Note shall be deemed accepted by you, unless we hear from you any
discrepancies within 7 days from Insurance
.\ L FU jAl kAH NATIONAL I N S U RANC E CO
Public Share Holding Co.
Paid-up Capital Dhs I 00,000,000
Registered Under Insurance Companies Registration No. I I
Registered Under Federal Law to. (8) 1984 Registration to. 40 Page 1 of 3

Policy No : P/3 101/02/15/1 003054


Insured Namc : Mls. Emitech Technical Services LLC &/or
M/s. Cliinatech Building Contracting LLC &/or
M/s. Climatech Joinery and Wood Works FZE
C/o. Arya Insurance I3rokerage Co LLC
Address : DUBAI, UAE
Period of Insurance : From 05/08/20 15 To 04/08/2016
Premium : As agreed
Sum Insured(AED)
Interest Insured and : * Location l ’ Sum Insured - Dhs.
1,743,000/-
Description of 1. Furniturc, Fixtures & Fittings 500,000.00
I'ropcrty 2. 1.oss of rent (12 months) 243,000.00
3. Third Party Liability 1,000,000.00

* Location 2 : Sum Insured - Dhs. 1,319,100/-


1 .Furniture, Fixtures & Fittings 250,000.00
2. Loss of Rent (12 months) 69,100.00
3. "I“hird party liability 1,000,000.00

* I ocation 3 : Sum Insured Dhs.2,071,500/-


l.Stock of building materials 1,000,000.00
2.Loss of rent (12 months) 71,500.00
3."I hird party liability 1,000,000.00

* Location 4 : Sum Insured Dhs.2,093,500/-


1.Stock of ply wood, M DF 500,000.00
l.I urniture, Fixtures & Fittings 50,000.00
2.Plant and Machinery 450,000.00
3.Loss of rent (12 months) 93,500.00
4.Third party liability 1,000,000.00

The above interest/property belonging to the Insured &/or


held by them in trust or on commission or for which they are
responsible in the event of loss and or damage by any of the
pcrils herein insured against whilst lying &/or contained in
the Insured's premises situated at below mentioned locations

Total 7,227,100.00
Total Sum : SEVEN MILLION TWO HMDRED TWENTY-SEVhN THOUSAND ONE HUNDRED
I nsured(AED)
Location of the Risk
Construction of : Location l: Emitech Technical Services, Unit 301, Garhoud Star, Al Garhoud, Dubai.
the Premises Construction: RCC
Location 2: Climatech t3uilding Contracting, Unit 109, Garhoud Star, Al Garhoud, Dubai.
Construction: RCC
l.ocation 3 : Einitech Technical Services, Warehouse No.3, Industrial,j8, Sharjah
. H N/\TI ONAL IN S U RANC E CO
- - z - .holding Co.
?'.al Dhs I 00,000,000
—— - under Insurance Companies Registration No. I I
Page 2 of 3

Construction : Cement Bloch walls with aluminum sheet roof


Location 4 :Climatech Joinery & wood works FZE, Warehouse No. W2-01 Hamariya FZE -
Sharjah.
Construction : Cement Block walss with aluminum sheet roof
Perils Insured Fire & Lightning
Explosion, Aircraft or articles dropped therefrom, Earthquake, Riot & Strike, Malicious
Damage, Stonn, Tempest, Flood, bursting and or overflowing of water tanks, pipes or
apparatus, impact damage(including impact due to own vehicles but excluding damage to the
vehicles)
Burglary due to violent and forcible entry to or exit from the locked and closcd premises
subject to our standard policy wording and its attached Clauses/Endorsements
Recommendation: In addition to the detachable padlocks, we recommend built-in lochs fixed
within the DOOR(S) and SHUTTERES as additional support locking system
I •a•ge and : Location 1 & 2 :- Office
1/lc c u pancy Location 3 & 4 :- Warehouse
Deductible(AED) : AED 5000 /- each and every loss for
Warehouse Each and Every AED 2500 /- each and
every loss for office
L..›s› l

THIS POLIC Y IS SUBJECT TO THE A TTS CHED POLICY W ORDING, ITS GE/VERA I- AND SPECIAL
i18 DITIONS, CLA USES, ENDORSEMENTS, EXCLUSIONS etc. WHICH FORM Ph RT OF THIS
P‹.i L IC Y SCHEDULE:

*PECIAL CONDI"I“IONS:
” .- sdiction Clause: UAE Jurisdiction only
>:ock Book Warranty
” —. zardous Coods Warranty
.'. zrranted all kinds of wastes shall be removed from the premises on daily basis without allowing for accumulation
'. arranted smoke detectors and automatic fire alarms are installed and maintained in the premises
arranted adequate number of fire extinguishers and fire water hose reels with dedicated water tanks and pumps are
- :z.led in the premises and maintained in good order through out the policy period
‘ Excluding water damage arising from or caused by lack of maintenance defective design &/or
damage e to ingress of rain watcr due to accumulation at roof gutter or resultant overflowing or
such nature
‘ e Insured premises shall have sprinlcler installation & its working condition properly maintained
:'u3hout the Policy Period
.'. arranted clean loss rccoi-d for the past 5 years
.'. arranted the insured premises comply with the Civil Defense requirements and shall be valid throughout
e policy period and shall submit a copy of the Civil Defense Approval Certificate in compliance
:h Rules promulgated by the UAE Ministry of Interior at the time of inception of cover
• PECI AI. CI.A USES:
‘ ‘2 Hours Clause
'. tired Perils Clause
‘ ctrical Clause
ha*e Recognition Clause
° !it’ 1 Risk Exclusion Clause
'
. . N \T I O NAL IN S U RANCE CO

. --z z Dhs I 00,000,000


- —.- -- z - ze- Insurance Companies Registration No. I I
Page 3 of 3

P blic Authorities Clause


‘ T mporary Removal Clause - I imit 5% of the loss amount subject to the maximum of Dhs.10,000/-
” ^. aromatic Re-instateirent of sum insured at additional premium to be agreed
* heri nation of Property Clause
-'. orLnen Maintenance Clause
H arulay Clause (excluding infidelity of employees)
' ':re Fighting & Extinguishing expenses 10% of the claim - Limit Dhs.
10,000/- ' 'i cro Organism Exclusion(MAP)(Absolute)-2791MAP00001
-. oestos Exclusion Clause
'. clear Energy Rislbs Exclusion C lause-N MA 1975(a)
- >i'tute Radioactive Contamination Chemical, Biological, Bio-Chemical and Electromagnetic
.\ eapons Exclusion Clause-CL 370
- :sctronic Data Endorsement B-NMA 2915
fi'. ar and Terrorism Exclusion Clause- NMA 2919
. er Risk Exclusion Clause
-. z-. Civil War, Political War, Sabotage and Terrorism Exclusion Clause
z'ms Co-operation Clause-NMA 2737
' › .ction Limitation and Exclusion Clause-LMA3100
‘ :o*ical or Chemical Materials Exclusion-NMA 2962
.-proactive Contamination and Expl osive Nuclear Assemblies Exclusion Clause-NMA 1 622
‘ - formation I echnol ogy Hazards Clarification Clause-NMA 2912
' -ansmission and Distribution Lines Exclusion
- fiustries, Seepage, Pollution and Contamination Exclusion Clause N°. 3-1685

SPECIAL EXCLUSIONS:
E XTEN SIONS:

I n u itness whereof the Undersigned being duly authorized by the Insurers and on behalf of the Insurers has/have
fie reunto set his/their hand(s)
I:•›ued at Dubai on 16/08/2015

TH E INS U RED F TH
‫رخصة تجارية‬
‫‪Commercial License‬‬

‫تفاصيل الرخصة ‪Details License /‬‬


‫‪License No.‬‬ ‫‪683694‬‬ ‫رقم الرخصة‬

‫كليماتيك للمقاولت البناء ش‪.‬ذ‪.‬م‪.‬م‬ ‫اسم الشركة‬

‫‪Company Name‬‬
‫‪CLIMATECH BUILDING CONTRACTING L.L.C‬‬

‫كليماتيك للمقاولت البناء ش‪.‬ذ‪.‬م‪.‬م‬ ‫السم التجارى‬


‫‪Trade Name‬‬
‫‪CLIMATECH BUILDING CONTRACTING L.L.C‬‬

‫‪Legal Type‬‬
‫‪Company(LLC) Liability Limited‬‬ ‫ذات مسئولية محدودة‬ ‫الشكل القانونىـ‬

‫‪Expiry Date‬‬
‫‪16/02/2017‬‬ ‫تاريخ النتهاء‬ ‫‪Issue Date‬‬ ‫‪17/02/2013‬‬ ‫تاريخ الصدار‬

‫‪D&B D-U-N-S ® No.‬‬ ‫‪0‬‬ ‫الرقم العالمي‬ ‫‪Main License No‬‬ ‫‪683694‬‬ ‫رقم الرخصة الم‬

‫‪No. Register‬‬ ‫‪1110085‬‬ ‫رقم السجل التجارى‬ ‫‪DCCI No.‬‬ ‫‪214930‬‬ ‫عضوية الغرفة‬

‫الطراف ‪License Members /‬‬


‫رقم الشخص‪/.No‬‬ ‫السم ‪Name /‬‬ ‫الجنسية ‪Nationality /‬‬ ‫الصفة ‪Role /‬‬ ‫الحصص ‪Share /‬‬
‫‪427475‬‬ ‫راهول ‪RAHUL JAGDISH DURAGKAR /‬‬ ‫الهند ‪India /‬‬ ‫مدير ‪Manager /‬‬
‫جاجديش دور اجكار‬

‫نشاط الرخصة التجارية ‪Activities License /‬‬


‫‪Contracting Building‬‬ ‫مقاولت البناء‬

‫العنوان ‪Address /‬‬


‫‪Phone No‬‬
‫‪971-4-2594081‬‬ ‫تليفون‬ ‫‪P.O. Box‬‬ ‫‪117851‬‬ ‫صندوق بريد‬
‫‪Fax No‬‬
‫‪971-4-2594089‬‬ ‫فاكس‬ ‫‪Parcel ID‬‬ ‫‪214541‬‬ ‫رقم القطعة‬
‫‪Mobile No‬‬ ‫‪971-50-2572751‬‬ ‫هاتف متحرك‬
‫مكتب رقم ‪ 109‬ملك مصرف المارات السلمي ‪ -‬ديرة ‪ -‬القرهود‬

‫الملحظات ‪Remarks /‬‬


‫مقاولت البناء أرضي ‪ +‬أول‬

‫‪Activi‬‬ ‫الجهات التي‬


‫‪tiy‬‬ ‫لها صلحية متابعة‬

‫) وثيقة إلكترونية معتمدة وصادرة بدون توقيع من دائرة التنمية القتصادية ‪.‬لمراجعة صحة البيانات الواردة في الرخصة برجاء زيارة الموقع ( ‪http://www.dubaided.gov.ae‬‬
‫‪(Approved electronic document issued without signature by the Department of Economic Development. To verify the license kindly visit‬‬
‫‪http://www.dubaided.gov.ae‬‬
Print Date 10/02/2016 18:17 ‫تاريخ الطباعة‬ No. Receipt ‫رقم اليصال‬

Activi ‫الجهات التي‬


tiy ‫لها صلحية متابعة‬

http://www.dubaided.gov.ae ( ‫لمراجعة صحة البيانات الواردة في الرخصة برجاء زيارة الموقع‬. ‫) وثيقة إلكترونية معتمدة وصادرة بدون توقيع من دائرة التنمية القتصادية‬
(Approved electronic document issued without signature by the Department of Economic Development. To verify the license kindly visit
http://www.dubaided.gov.ae
‫ملحق الشركاء‬
Partners
Details License / ‫تفاصيل الرخصة‬
D&B D-U-N-S ® ‫الرقم العالمي‬ ‫رقم الرخصة‬
0 License No.
No. 683694

Partners License / ‫اصحاب الرخصة‬

Share / ‫الحصص‬ .No./ Sr‫مسلسل الشخص‬ Nationality / ‫الجنسية‬ Name / ‫السم‬


51.0000000 % 438030 ‫ المارات‬/ United Arab Emirates ‫ عبدا عمر‬/ Omar Abdulla Sultan Abdulla Bumaid
‫سلطان عبدا بوميد‬
25.0000000 % 427475 ‫ الهند‬/ India ‫ راهول جاجديش دور‬/ DURAGKAR JAGDISH RAHUL
‫اجكار‬
24.0000000 % 376043 ‫ الهند‬/ India ‫رينكي راهول دوراجكار‬

Print Date 10/02/2016 18:17 ‫تاريخ الطباعة‬ No. Receipt ‫رقم اليصال‬

Activi ‫الجهات التي‬


tiy ‫لها صلحية متابعة‬

http://www.dubaided.gov.ae ( ‫لمراجعة صحة البيانات الواردة في الرخصة برجاء زيارة الموقع‬. ‫) وثيقة إلكترونية معتمدة وصادرة بدون توقيع من دائرة التنمية القتصادية‬
(Approved electronic document issued without signature by the Department of Economic Development. To verify the license kindly visit
http://www.dubaided.gov.ae
‫شهادة شهر قيد شركة فى السجل التجارى‬
‫‪Commercial Register‬‬
‫تفاصيل القــيد ‪Details Register /‬‬
‫‪Main Lice. Nr‬‬
‫‪683694‬‬ ‫رقم الرخصة الم‬ ‫‪Register No.‬‬ ‫‪1110085‬‬ ‫رقم القيد‬
‫‪Company‬‬
‫كليماتيك للمقاولت البناء ش‪.‬ذ‪.‬م‪.‬م‬
‫‪Name‬‬ ‫‪CLIMATECH BUILDING CONTRACTING L.L.C‬‬
‫‪Legal Type‬‬ ‫الشكل القانونىـ‬
‫‪Company(LLC) Liability Limited‬‬ ‫ذات مسئولية محدودة‬
‫‪Expiry Date‬‬ ‫‪16/02/2017‬‬ ‫تاريخ النتهاء‬ ‫‪Reg. Date‬‬ ‫‪17/02/2013‬‬ ‫تاريخ الصدار‬
‫‪D&B D-U-N-S‬‬ ‫®‬ ‫الرقم العالمي‬
‫‪No.‬‬ ‫‪0‬‬

‫تفاصيل راس المال ‪Details Capital /‬‬


‫‪Nominated‬‬
‫‪0‬‬ ‫السمى‬
‫‪Paid‬‬
‫‪300,000‬‬ ‫المدفوع‬
‫‪No. of Shares‬‬
‫‪0‬‬ ‫عدد السهم‬
‫‪Currency‬‬
‫‪Dirhams UAE‬‬ ‫درهم اماراتي‬ ‫العملة‬

‫عنوان الرخصة ‪Address License /‬‬

‫مكتب رقم ‪ 109‬ملك مصرف المارات السلمي ‪ -‬ديرة ‪ -‬القرهود‬

‫‪ - Address‬القرهود‬
‫‪ Commerce‬السلمي ‪ -‬ديرة‬
‫ملك مصرف المارات‬ ‫رقم ‪109‬‬
‫التجاري ‪/‬‬ ‫عنوانمكتب‬
‫السجل‬
‫‪Contracting Building‬‬ ‫مقاولت البناء‬
‫أنشطة السجل ‪Activities Register /‬‬

‫‪Print Date‬‬
‫‪10/02/2016‬‬ ‫‪18:17‬‬ ‫تاريخ الطباعة‬ ‫‪No. Receipt‬‬ ‫رقم اليصال‬

‫‪Activi‬‬ ‫الجهات التي‬


‫‪tiy‬‬ ‫لها صلحية متابعة‬

‫) وثيقة إلكترونية معتمدة وصادرة بدون توقيع من دائرة التنمية القتصادية ‪.‬لمراجعة صحة البيانات الواردة في الرخصة برجاء زيارة الموقع ( ‪http://www.dubaided.gov.ae‬‬
‫‪(Approved electronic document issued without signature by the Department of Economic Development. To verify the license kindly visit‬‬
‫‪http://www.dubaided.gov.ae‬‬
Dear Trader, :‫عزيزي التاجر‬
Kindly take into consideration the
following instructions ‫نرجو أخذ التعليمات التالية بعين العتبار‬

1. Do not practice a business activity without a license


.‫ عدم مزاولة النشاط في موقع بدون ترخيص أو تصريح‬1 .
or permit.
2. Do not change the license location or relocate to ‫ عدم القيام بتغيير موقع الترخيص والنتقال إلى موقع آخر دون‬2 .
another site without getting DED approval. 3 . .‫الحصول على موافقة الدائرة‬
3. Make sure of having a trade name compliant to the ‫ضرورة أن يكون السم التجاري المدون على اللفتة مطابق للسم‬
name mentioned in the license. 4 . .‫المدون بالرخصة‬
4. Do not place sales, discounts or special offers without
‫عدم إجراء التنزيلت أو التصفيات أو العروض الخاصة بدون‬
permission.
5. Do not make any amendments or changes in the 5 . .‫تصريح‬
license information unless you request DED approval. ‫عدم إجراء أي تعديل أو تغيير بيانات الترخيص إل بعد الرجوع‬
6. Make sure of putting down prices on goods and .‫للدائرة‬
commodities.
.‫ اللتزام بكتابة السعار على السلع والبضائع‬6 .
7. Make sure of putting down the date of production and
expiry. .‫ اللتزام بكتابة تاريخ النتاج والنتهاء على السلع‬7 .
8. The consumer has the right to receive an invoice. .‫ للمستهلك الحق في الحصول على فاتورة الشراء‬8 .
9. Announce the sale and purchase policy to the ‫ العلن عن سياسة البيع للمستهلك عبر وسيلة إعلن مناسبة شاملة‬9 .
customer using suitable media (noting the replacement,
‫ عدم القيام‬10 . (.‫)لعملية السترجاع أو الستبدال أو الصلح للسلع‬
repair and recovery policy)
10. Do not promote or sell or offer any counterfeited or ‫بالترويج أو البيع أو العرض لية بضائع مقلدة أو‬
fake goods. . .‫مغشوشة‬
11. Make sure of registering your trade mark at the ‫ الحرص على تسجيل العلمة التجارية بوزارة القتصاد بهدف‬11
Ministry of Economy for protection. . .‫حمايتها‬
12. Report to the Department of Economic Development
‫ إبلغ الدائرة في حالة وجود أي منتج أو بضائع مقلدة في السوق‬12
incidents regarding any counterfeited goods in the local
market. .‫المحلي‬
13. In the case of warehouse or store related to the ‫ في حال وجـود مخـزن أو مسـتودع تـابع للرخصة فـيرجى التكـرم بزيـارة قسم‬-13
licenses, kindly visit Permits section in our branches ‫التصاريح في فرع قرية العمال أو الطوار أو دبي مول‬
(Business Village, AlTowar or Dubai Mall) to get the .‫للحصول على التصريح اللزم‬
necessary permission. ‫ على جميع‬،2012 ‫ لعام‬323 ‫ بناء على قرار معالي وزير العمل رقم‬14.
14. According to the decision no. 323 of 2012 issued by ‫المنشآت التي توظف مواطنين من دولة المارات و دول مجلس التعاون أن تقوم‬
His Excellency the Minister of Labor all enterprises that ‫بتسجيلهم لدى وزارة العمل خلل مدة أقصاها ثلثة‬
employ UAE and GCC nationals have up to a maximum
‫شهور‬
period of three months to register them with the Ministry
of Labor.

Print Date 10/02/2016 18:17 ‫تاريخ الطباعة‬ No. Receipt ‫رقم اليصال‬

Activi ‫الجهات التي‬


tiy ‫لها صلحية متابعة‬

http://www.dubaided.gov.ae ( ‫لمراجعة صحة البيانات الواردة في الرخصة برجاء زيارة الموقع‬. ‫) وثيقة إلكترونية معتمدة وصادرة بدون توقيع من دائرة التنمية القتصادية‬
(Approved electronic document issued without signature by the Department of Economic Development. To verify the license kindly visit
http://www.dubaided.gov.ae

You might also like