I21020 - FIT OUT WORKS FOR QIB VENDOME MALL

MATERIAL APPROVAL SUBMITTAL

To "CONSULTANT": TRUST ENGINEERING CONSULTANCY Date: 16-03-2022


Attention to: Ahmed Hassan Ref. No: ISP/I21020/MAT/MECH/013
Designation: Project Manager Rev. No: 3
"EMPLOYER":
"CONTRACTOR": INTERSPACE
MATERIAL DESCRIPTION : CHILLED WATER FAN COIL UNIT
NAME | TYPE OF MATERIAL: CHILLED WATER FAN COIL UNIT
AREA | LOCATION IN THE WORKS: GROUND FLOOR
MANUFACTURER'S NAME AND ADRESS:
Name: MEKAR
Address: Italy Phone:
Contact Person: Fax
SUPPLIER'S NAME AND ADDRESS:
Name: Mekar Air Handling Unit
Address: DOHA - QATAR Phone:
Contact Person: Fax:
Delivery: 7 DAYS
Country of Origin: QATAR
Availability: Locally Overseas
Estimated time for delivery on site:
DOCUMENTS ENCLOSED:
Sample / Prototype Spec. Ref.: SECTION 22
Technical Documents
Tests Dwg. Ref.: --
Certificates
Others
The above submitted material has been checked for conformance with drawings and specifications for this project
any deviations from plans and specifications have been noted on the material or listed in the remarks above.

Prepared & Submitted by: "CONTRACTOR" Received by: "CONSULTANT"


Representative / Project Manager:
Madhu Narayanan - Project Manager
Signature: Date: 16-03-2022 Signature: Date:
CONSULTANT'S NOTE/S AND COMMENTS:

APP AAN R&R RE


Legends: (Approved) (Approved as Noted / with (Revise & Resubmit) (Rejected)
Comments)

Note** The contractor might proceed to order the material if the status (APP or AAN ) in compliance of the notes
REVIEWED BY "CONSULTANT" RETURNED TO: "CONTRACTOR"
Name: Project Manager: Name:
Designation: Name: Date:
Date Date: Signature:
Signature Signature:
Accepted by: "EMPLOYER/ENGINEER"

Name: Signature: Date:

ISO Doc No:TEC-PRJ-F04; Rev: 00;Date:05/11/2018


REPLY TO CONSULTANT COMMENTS

Mekar Air Handling Units

Office : P.O. Box 10407, Doha, Qatar Tel: +974 441 53742 Fax: +974 444 20609 e-mail:sales@mekar.ae
Corporate Head Office: Viale Caduti sul Lavoro, 25 - 37063 ISOLA DELLA SCALA, Verona, Italy
Tel: +39 045 6630536 Fax: +39 045 6630513 e-mail: info@mekar.it www.mekar.it
REPLY TO CONSULATANT COMMENT
PROJECT : I21020- FIT OUT WORKS FOR QIB VENDOME MALL SUBMITTED BY: Mekar
CLIENT: DATE:
CONSULTANT TRUST ENGINEERING CONSULTANT Ref No: ISP/121020/MAT/MECH/013
MEP CONTRACTOR Nysa Trading & Contracting
PRODUCT: CHILLED WATER FAN COIL UNITS

S/N Consultant Comments Mekar's Reply

1 The attached catalog(highlighted model is wrong) the mentioned flow not matching with the offer one. provide catalogue Noted and Comply
matching with computer selection and offered units

END OF SECTION
CONFIRMATION LETTER

Mekar Air Handling Units

Office : P.O. Box 10407, Doha, Qatar Tel: +974 441 53742 Fax: +974 444 20609 e-mail:sales@mekar.ae
Corporate Head Office: Viale Caduti sul Lavoro, 25 - 37063 ISOLA DELLA SCALA, Verona, Italy
Tel: +39 045 6630536 Fax: +39 045 6630513 e-mail: info@mekar.it www.mekar.it
CONTENTS

1. COMPANY PROFILE

2. CR COPY

3. SPECIFIED VS OFFERED DATA

4. TECHNICAL SELECTION SHEET

5. TECHNICAL CATLOGUE

6. CERTIFICATE

7. SAMPLE COO

8. REFERENCE INSTALLATION LIST

9. APPROVAL COPY OF MAJOR PROJECT

Mekar Air Handling Units

Office : P.O. Box 10407, Doha, Qatar Tel: +974 441 53742 Fax: +974 444 20609 e-mail:sales@mekar.ae
Corporate Head Office: Viale Caduti sul Lavoro, 25 - 37063 ISOLA DELLA SCALA, Verona, Italy
Tel: +39 045 6630536 Fax: +39 045 6630513 e-mail: info@mekar.it www.mekar.it
MANUFACTURER / SUPPLIER PROFILE

Mekar Air Handling Units

Office : P.O. Box 10407, Doha, Qatar Tel: +974 441 53742 Fax: +974 444 20609 e-mail:sales@mekar.ae
Corporate Head Office: Viale Caduti sul Lavoro, 25 - 37063 ISOLA DELLA SCALA, Verona, Italy
Tel: +39 045 6630536 Fax: +39 045 6630513 e-mail: info@mekar.it www.mekar.it
Certification
High Quality Products of Italian Origin Certificazione
Professional Service
Customer Centric

Prodotto di origine italiana di alta qualità


Servizio professionale
Incentrato sul cliente
Factories/Offices/Warehouse In-house Modern
Fabbriche/Uffici/Magazzini
Testing Laboratory
Head Quarters(Venice) Moderni laboratori di prova interni
Includes manufacturing facility for FCUs,Condensing Units,
Roof top and Chillers for special application.

Mekar Factory(Verona)
Manufacturing facility for AHUs and FCUs

CAPABILITY
TO SIMULATE
REAL WORKING
CONDITIONS

Mekar Middle East Distribution Centre


Central warehousing and distribution centre for middle-east and
assembly facility for jumbo AHUs
Installed in
over 1000
prestigious
projects

Oltre 1000
installazioni
Mekar in di prestigio
the World
Mekar nel
Mondo
Modular AHUs Hygienic AHUs N O R M AT I V E R E F E R E N C E S

Unità di Trattamento dell’Aria


RIFERIMENTI NORMATIVI
Unità di Trattamento • EUROPEAN STANDARD EN13053
- Air handling units

dell’Aria igieniche - Ratings and performance for units


- Components and sections

• DIN 1946-4
• VDI 6022

Negative pressure Positive pressure*


23MKH SERIES Pressione negativa Pressione positiva*

23MK SERIES When the use of air handling units are critical
like that for hospitals, high tech industries
(clean rooms), pharmaceutical or food
industries, the requirements for cleaning and
hygiene are mandatory. Mekar has developed
Inspection door Partition plate
Porta ispezione Setto divisorio Construction details solutions, that can be applied on its AHU series
Particolari costruttivi
23MK, and that match these requirements

Quando l’uso delle unità di trattamento dell’aria


Intake dampers
Serrande di aspirazione Supply dampers è critico, come all’interno di ospedali, industrie
Serrande di mandata
ad alta tecnologia (camere bianche), industrie
farmaceutiche o alimentari, i requisiti di pulizia
e di igiene sono tassativi. Mekar ha sviluppato
Intake plenum
Plenum di aspirazione soluzioni che possono essere utilizzate sulle
Fan sections with double fan
sue unità di trattamento dell’aria serie 23MK
Sezioni ventilanti a doppio ventilatore che corrispondono a questi requisiti.
Inspection door
Porta ispezione

Smooth one piece filter frame Frame with internal profile, External rotor motors UVC lamp Side withdrawable
Telaio filtro monoblocco liscio with double gasket Ventilatore con motore a Lampada UVC silencer’s splitters
Telaio e profilo interno con rotore esterno Setti silenziati sfilabili
doppia guarnizione lateralmente

Double Motor Rail arrangement Motor slide adjustment 60mm thick panel arrangement
Doppio motore Su guida Regolazione slitta motore Con pannello da 60mm

Sloped condensate Steam humidifiers Side withreawable Water humidifiers


drain pans Umidificatori a vapore fan-motor assemblies Umidificatori ad acqua
Vasche di raccolta Gruppi motoventilanti
condensa inclinate sfilabili lateralmente

A N T I - A L E R G Y M AT E R I A L S / M A T E R I A L I A N A L L E R G I C I
All mat e rials and components installed Tutti i materiali ed i componenti
are latex free. bordo macchina sono privi di lattice.

Elevated coil
Batterie rialzate su guide
Plug & Play AHUs Unique Design AHUs
Compatible with
Compatibili con

Unità di Trattamento dell’Aria Unità di Trattamento dell’Aria dal


Plug & Play design esclusivo
Low height Ceiling
Suspended AHUs
Unità di Trattamento dell’Aria
As stand-alone system ribassate per controsoffitto
Come impianti indipendenti

PLUG & PLAY, FACTORY BUILT AHU WITH


Switchboard
Sensors and actuators (field elements)
Electronic control
Communication modules

UNITÀ DI TRATTAMENTO DELL’ARIA PLUG & PLAY, 25 mm thick Double Skin Panel
REALIZZATE IN FABBRICA CON Low height Units (400mm and 560mm)
23MK SERIES Quadro elettrico Airflow range from 900CMH to 8200 CMH
Direct drive EC motors
Sensori e attuatori (elementi di campo)
Units with G4 (Pre-filter) & F9 (Bag) Filters
Controllo elettronico Plate type exchanger for heat recovery.
Moduli di comunicazione Inspection panels are at bottom and removable type for maintenance.

The wiring between the different sections,


in which the AHUs are generally split, is made
31 MK SERIES Con pannello a doppia parete da 25 mm
Unità di altezza ridotta (400mm e 560mm)
Wires, switches & cables are fitted inside a
room above the unit
easier with snap-in connectors, to minimize
possible mistakes on site.
SERIE 31 MK Portata d’aria da 900CMH a 8200 CMH
Motori ad azionamento diretto EC
Fili, interruttori e cavi sono montati in un Unità con Filtri G4/M5/M6 (Pre-filtro) e F7-8-9 (a tasche)
Il cablaggio tra le diverse sezioni in cui sono
compartimento al di sopra dell’unità Scambiatore a piastre per il recupero del calore.
generalmente suddivise le Unità di Trattamento I pannelli di ispezione sono nella parte inferiore e rimuovibili per la manutenzione.
dell’Aria è reso più semplice mediante connettori
snap-in, al fine di minimizzare eventuali errori in

Vertical AHUs
cantiere.

Unità di Trattamento
Safety switch
Interruttore
dell’Aria Verticali
di sicurezza
Pressure switch
Pressostato

Flush mounted control panel


Quadro di controllo a incasso

3-WAY VALVE Kit 3-WAY valve kit with by-pass AHU Selection software for Control architecture, Sensors and
Kit Valvola A 3 Vie for maintenance Built-in Electrical drawings
Kit valvola a 3 vie con by-pass Software per la selezione dell’Unità di Trattamento dell’Aria per la Easy filter removal
per la manutenzione logica di Controllo, i Sensori e i Disegni Elettrici incorporati Facile rimozione del filtro
Fan Coil Units Double Skin FCUs
Unità ventilconvettore (fan-coil) with EC motors & UV lamps
Unità fan-coil a doppio pannello
con motori EC e lampade UV
Double Skin Options
- 25mm Thick PUF
- 15mm & 25mm Thick Fiber Glass

770 to 5700 CMH

UTC SERIES DUCTABLE FAN COIL UNITS


Ductable air treatment units available in 7different sizes, cooling capacity starting from 3.2 to 50.6kw.
Airflow range from 670 to 9,250 m3/h
Draw through arrangement.
Units made of heavy gauge galvanized steel.
The blower section is composed by one or two centrifugal fans with statically and dynamically balanced aluminum impellers.
The three speed electric motor is directly coupled to the fans and cushioned with flexible mountings to ensure low noise.
The cooling coils are high grade copper tubes expanded into aluminum fins.
The copper headers have male fitting (GAS threads) and the air vents are easily accessible.
IP44 motors
Perforated acoustic lining
770 to 5700 CMH

UNITA’ FAN-COIL CANALIZZABILI SERIE UTC


Unità di trattamento dell’aria canalizzabili disponibili in 7 misure, potenza frigorifera a partire da 3.2kW fino a 50.6kW.
Portata aria da 678 m3/h a 9,250 m3/h
Tipo ad aspirazione.
Unità in acciaio zincato di forte spessore.
La sezione del ventilatore è composta da uno o due ventilatori centrifughi con giranti in alluminio bilanciate staticamente e dinamicamente.
Il motore elettrico a tre velocità è direttamente accoppiato alle ventole e ammortizzato con supporti flessibili per garantire la silenziosità.
Le batterie di raffreddamento sono con tubi di rame di alta qualità espansi in alette di alluminio.
I collettori in rame hanno raccordo maschio (filettatura GAS) e gli sfiati sono facilmente accessibili.
Overview of FCU Range Motori IP44
Series Rivestimento fonoassorbente traforato
Details
09MK VCE 07MK UTC Slim Air Light Touch
Type Low Static Low Static Med./High Static Med./High Static Ultra Low Height Ultra Luxury Ultra Comfort Hiwall
Models 8 12 9 7 3 10 5 4
Airflow Range(CMH) 320 - 2500 130 - 2000 770 - 5700 670 - 9250 182 - 477 80 - 1600 224 - 760 234 - 620
Max ESP(Pa) 60 70 100 125 40
Nom. Cooling Cap.(kW) 2.2 - 11 0.5 - 11 7 - 33 3 - 39 1.1 - 2.6 0.7 - 9 1.5 - 5.4 1.5 - 4
No of Rows 3/4 3/4 3/4/6 3/4/6 2/3 3/4 2/3 2/3
Single/Double skin SS SS SS / DS SS / DS SS SS SS SS
Std & District Cooling
EC Motors
SS - Single Skin
DS - Double Skin
Versatile Range of FCUs Decorative FCUs
Gamma versatile di unità fan-coil Optional
Ultra Low Height (157mm)
Unità fan-coil decorative
Fan Coil Units

VC SERIES DUCTED & LIGHT ECM, CASSETTE FAN COIL UNIT


DECORATIVE FCUS UNITA’ FAN COIL TIPO CASSETTE CON MOTORE ECM
Compact slim fan coil units
Available in 12 different sizes and 7 Versions to easily suit allinstallation requirements
Air flow range from 130 to 2000 m3/h
1.5 - 5.5
kW - cooling
EC Brushless Motor Integrated valves
Wall mounted or floor mounted type with supporting feet and bottomor front air intake
Horizontal ceiling mounted type with rear or bottom air intake 1.9 - 6.5
kW - heating
Motore EC Valvole Integrate

Vertical wall recessed type with top or front air outlet


Horizontal ceiling concealed type with front air discharge -78% (up to)
low consumption
The units are available in double skin
Automatic louvers Integrated electric heater
EC motors
IP44 motors
224
m /h
3
- 760 Alette motorizzate Resistenza integrate

UNITA’ FAN-COIL CANALIZZATI E 1,5


kW
- 2,5
Low noise level
DECORATIVI SERIE VC COANDA EFFECT Massima silenziosità
Easy installation and maintenance
Facile installazionee manutenzione
The position of the lateral air distribution louvers allows maximum
Unità fan-coil sottili compatte
exploitation of the Coanda effect in summer modality, offering ideal
Disponibili in 12 formati e 7 versioni per soddisfare facilmente ogni esigenza di installazione comfort without any annoying typical cold air flow. Thanks to this
Portata d’aria da 1000 m3/h a 5000 m3/h detail the cold air tends to flow towards the ceiling distributing itself
Tipo a parete o a pavimento con piedini di sostegno e presa d’aria inferiore o frontaleTipo in a regular, gradual way inside the room, guaranteeing ideal
climatic comfort without the unpleasant thermal phenomena
orizzontale a soffitto con presa d’aria posteriore o inferiore COOLING
caused by direct cold air.
Tipo incassato a parete con uscita dell’aria superiore o frontale
Tipo orizzontale a soffitto nascosto con mandata dell’aria frontale La conformazione delle alette laterali permette di sfruttare al
Le unità sono disponibili con doppio pannello Ultra Luxury FCUs massimo l'effetto Coanda in modalità di raffrescamento, offrendo
un comfort ideale privo di fastidiosi getti d'aria fredda. Grazie a
Motori EC
questo dettaglio l'aria fredda tende a fluire radente al soffitto
Motori IP44 andando poi a distribuirsi in maniera uniforme e graduale
all'interno dell'ambiente, garantendo un comfort climatico ideale e
privo di sgradevoli fenomeni termici dovuti alla diffusione diretta di

09MK SERIES LOW STATIC, aria fredda.

DUCTED & EXPOSED FCUS Hiwall Water FCU Quality & Attractive desgin
Ultra compact slim units
Robust encapsulated construction with Pre-painted casing Unità fan-coil ad acqua The wall-mounted water fancoil TOUCH With a tangential fan that
offers the maximum acoustic comfort. The modern aesthetics and
Available in 8 sizes and 2 versions to suit the requirements
Airflow range 320 CMH to 2530 CMH and capacity 2.0 kW to 11.5 kW da soffitto the innovative technical features make TOUCH the ideal solution
for quality and room enhancement
Blow through FCUs
Qualità e design:
Easy removal drain pan.
Dotati di ventilatore tangenziale per offrire il maggior comfort
EC motors
acustico i fancoil murali ad acqua della nuovissima serie TOUCH
sono il connubio ideale tra prestazioni e design.
FAN COIL SERIE 09MK A BASSA
Acoustic comfort
PREVALENZA, CANALIZZATI E The dedicated study on the different speed of the units has allowed

A VISTA
to reach very high performances with minimum noise levels
Comfort acustico
Unità fan-coil sottili ultra compatte La progettazione mirata alle diverse velocità dell’unità ha permesso
Costruzione robusta con mobile preverniciato di avere altissime prestazioni con la massima silenziosità.
Disponibile in 9 taglie e 2 versioni per soddisfare i requisiti
Portata d’aria da 538 CMH a 2530 CMH e potenza da 2.0 kW a 11.5 kW Valve included
Unità canalizzate e decorative An innovative solution that allows an easier installation.
Vaschetta di scarico facilmente rimuovibile. Valvola integrata all’interno dell’unità
Motori EC Una soluzione innovativa che previene lo spreco energetico e
permette una maggiore facilità di installazione e manutenzione.
Heat Recovery Units Triple Heat Recovery Units
Unita’ Di Recupero Di Calore Unita’ A Triplo Recupero Di Calore
Fan coil unit with integrated heat recovery
Ventilconvettore con recupero di calore integrato 23MK THR-DOAS 9 sizes from 1600 to 12000 m 3/h
Dedicated Outdoor Air System
9 taglie da 1600 a 12000 m 3/h

410C 250C
31% 55%

COP ≈ 13
EER ≈ 8 460C
30%
330C
43%
130C
95%
190C
60%

DOUBLE è un’unità fan-coil canalizzata per il ricambio dell’aria in DOUBLE è un’unità fan-coil canalizzata con recupero di calore Heat/cool Plug fans
Caldo/freddo Ventilatori tipo Plug
ambienti piccoli e medi, con recupero di calore integrato a flussi integrato a flussi incrociati per il ricambio dell’aria nelle stanze
incrociati. piccole e medie, che consente il recupero energetico. Scroll compressor Electronic expansion valve
Telaio autoportante in acciaio zincato da 1,0 mm coibentato Telaio autoportante in acciaio zincato da 1,0 mm coibentato Compressore Scroll Valvola di espansione elettronica

internamente con materiale isolante fonoassorbente. internamente con materiale isolante fonoassorbente.
R410A refrigerant External installation
300 CMH e 700CMH (2 Taglie) 300 CMH e 700CMH (2 Formati) Installazione esterna
R410A Refrigerante R410A
Motori EC Motori EC
Prevede uno scambiatore di calore ad alta efficienza Composto da uno scambiatore di calore ad alta efficienza
Per applicazioni residenziali e commerciali Per applicazioni residenziali e commerciali L’unità The unit

3 diversi sistemi di recupero calore in una sola unità: 3 different heat recovery systems in a single unit:
Heat Recovery Units with Cross 1. Recupero di calore sensibile e latente “sorption”
2. Recupero di calore termodinamico attivo
1. Sensible and latent “sorption” heat recovery
2. Active thermodynamic heat recovery

Flow Heat Exchangers 3. Recupero del calore di desurriscaldamento 3. Desuperheating heat recovery

- Compressori inverter con motore EC - Inverter compressors with EC motor


Unita’ Con Recupero Di Calore - Ventilatori a velocità variabile con motore EC - Variable speed fans with EC motor

con Scambiatori Di Calore A Flusso Incrociato - Pannelli sandwich da 60mm a taglio termico
- Filtrazione elettronica
- Sandwich panels 60mm with thermal break

- Versioni anche per climi rigidi (-30°C b.s.) - Versions for cold climates (-30°C b.s.)
- Adatto anche per climi torridi (52°C b.s.) - Also suitable for hot climates (52°C b.s.)

Vantaggi

- Rinnovo ed estrazione dell’aria viziata - Renewal and extraction of exhaust air

- Controllo indipendente dell’UR - Independent control of UR

- Controllo e variazione delle portate dell’aria - Control and modulation of supply air
- Controllo della qualità dell’aria ambiente - Ambient air quality control
- Filtrazione spinta dell’aria esterna
- Installazione semplice e veloce - Quick and easy installation
- Riduzione dei costi impiantistici complessivi - Total plant cost reduction

- Importanti risparmi energetici


- Minima quantità di gas refrigerante - Minimum quantity of refrigerant gas
- Minimo impatto ambientale - Minimum environmental impact
Packaged Rooftop Packaged Rooftop
Unita’ Rooftop Unita’ Rooftop
Identità Identity
Identità Identity Tipo unità Unit type
Climatizzatore monoblocco Direct expansion
Tipo unità Unit type
tipo rooftop ad espansione diretta packaged rooftop
Climatizzatore monoblocco Direct expansion
tipo rooftop ad espansione diretta packaged rooftop Struttura e pannellatura Structure and panelling
Telaio portante in alluminio e pannelli Aluminium self supporting frame and san-
Struttura e pannellatura Structure and panelling
di tipo sandwich da 60 mm dwich panels with a thickness of 60 mm
Telaio portante in alluminio e pannelli Aluminium self supporting frame and san-
di tipo sandwich da 60 mm dwich panels with a thickness of 60 mm Scambiatore interno Internal coil
Ad espansione diretta a pacco alettato
Scambiatore interno Internal coil
Ad espansione diretta a pacco alettato Scambiatore esterno External coil
A pacco alettato, ad espansione diretta Finned exchanger, direct expansion
Scambiatore esterno External coil
nella versione pompa di calore for heat pump version
A pacco alettato, ad espansione diretta Finned exchanger, direct expansion
nella versione pompa di calore for heat pump version Installazione Installation
Esterna External
Installazione Installation
Esterna External Refrigerante Refrigerant
R410A R410A
Refrigerante Refrigerant
R410A R410A Ventilatori esterni External fans
Assiali Axial
Ventilatori esterni External fans
Assiali Axial Ventilatori interni Internal fans
Centrifughi a doppia aspirazione Double-inlet centrifugal fans
Ventilatori interni Internal fans
Centrifughi a doppia aspirazione
Compressore
45MK Series Double-inlet centrifugal fans
Compressor
Compressore
45MK Series Compressor

37.2 - 106.2 kW (9 Sizes) 117.2 - 310.4 kW (9 Sizes)


Versioni Versions
Versioni Versions R Solo freddo Cool only R
R Solo freddo Cool only R H Caldo/freddo Heat/cool H
H Caldo/freddo Heat/cool H

A Solo ricircolo aria Only recirculated air A


A Solo ricircolo aria Only recirculated air A B Ricircolo e aria di rinnovo Recirculated and fresh air B
B Ricircolo e aria di rinnovo Recirculated and fresh air B C Ricircolo, aria di rinnovo ed espulsione Recirculated, fresh and exhaust air C
C Ricircolo, aria di rinnovo ed espulsione Recirculated, fresh and exhaust air C D Ricircolo, aria di rinnovo ed espulsione e recupero entalpico Recirculated, fresh and exhaust air and enthalpy wheel D
D Ricircolo, aria di rinnovo ed espulsione e recupero entalpico Recirculated, fresh and exhaust air and enthalpy wheel D E Ricircolo, aria di rinnovo ed espulsione e recuperatore a piastre Recirculated, fresh and exhaust air and heat exchanger recovery E
E Ricircolo, aria di rinnovo ed espulsione e recuperatore a piastre Recirculated, fresh and exhaust air and heat exchanger recovery E
Descrizione unità Unit description
Descrizione unità Unit description Unità autonoma per installazione esterna disponibile in 9 grandezze da 117 Stand-alone unit for outdoor installation available in 9 sizes from 117 to 310
Unità autonoma per installazione esterna disponibile in 9 grandezze da 37 Stand-alone unit for outdoor installation available in 9 sizes from 37 to 106
La struttura è a telaio portante in alluminio. I pannelli di tamponamento sono The casing is self-supporting frame in aluminum. The panels are sandwich
La struttura è a telaio portante in alluminio. I pannelli di tamponamento sono The casing is self-supporting frame in aluminum. The panels are sandwich di tipo sandwich a doppia parete con isolamento iniettato in poliuretano type with double wall insulation injected polyurethane 60 mm thick.
di tipo sandwich a doppia parete con isolamento iniettato in poliuretano type with double wall insulation injected polyurethane 60 mm thick. spessore 60 mm. Electric board in complete control and automatic adjustment of the electro-
spessore 60 mm. Electric board in complete control and automatic adjustment of the electro- Quadro elettrico a bordo completo di controllo e regolazione automatica di nic type with microprocessor. Wide range of accessories and options: with
Quadro elettrico a bordo completo di controllo e regolazione automatica di nic type with microprocessor. Wide range of accessories and options: with tipo elettronico a microprocessore. Ampia serie di accessori e opzioni: con gas burner, with hot water coil or electric coils.
tipo elettronico a microprocessore. Ampia serie di accessori e opzioni: con gas burner, with hot water coil or electric coils. bruciatore a gas, con batteria ad acqua calda o batterie elettriche.
bruciatore a gas, con batteria ad acqua calda o batterie elettriche.

Applicazione Application
Applicazione Application
Suitable for air conditioning “all year round” of medium and large areas:
Suitable for air conditioning “all year round” of medium and large areas: di vendita, ambienti ad alto affollamento e capannoni industriali. commercial areas, highly crowded environments and industrial buildings.
di vendita, ambienti ad alto affollamento e capannoni industriali. commercial areas, highly crowded environments and industrial buildings.
rispondere ad una vasta serie di esigenze applicative e destinazioni d’uso e to a wide variety of application needs and uses, and can also be used in
rispondere ad una vasta serie di esigenze applicative e destinazioni d’uso e to a wide variety of application needs and uses, and can also be used in possono essere utilizzate anche in situazioni climatiche estreme. extreme weather conditions.
possono essere utilizzate anche in situazioni climatiche estreme. extreme weather conditions.
MAX

R410A
4600 MIN
Solo freddo Caldo/freddo Installaz. esterna Compressore Scroll Vent. centrifughi Ventilatori assiali Refrigerante R410A
Valvola di espans. 15800 R410A
15400
elettronica

50500
Valvola di espans.
Solo freddo Caldo/freddo Installaz. esterna Compressore Scroll Vent. centrifughi Ventilatori assiali Refrigerante R410A
MAX elettronica
Electronic expans.
m3/h Cool only Heat/cool External installation Scroll compressor Centrifugal fans Axial fans R410A refrigerant
valve m /h3
MI Electronic expans.
N Cool only Heat/cool External installation Scroll compressor Centrifugal fans Axial fans R410A refrigerant
valve
Condensing Units Air Cooled Liquid Screw Chillers
Unita’ Motocondensanti Refrigeratori Ad Aria Con Compressore A Vite

Identità Identity
Tipo macchina Unit type
Unità motocondensante Condensing unit

Condensazione Condensation
Aria Air
Installazione Installation
Esterna External
Refrigerante Refrigerant
R410A R410A
Ventilatori Fans
Assiali Axials
Compressore Compressor
Scroll Scroll

Green Power Series


MCR Series
Versioni Versions 230 - 1400 kW (18 Sizes)
38 - 260 kW (13 Sizes)
R Unitò motocondensanti Condensing units R

Descrizione unità Unit description


Appartengono a questa serie complessivamente 13 grandezze che copro- This series consists of 13 sizes of condensing units with axial fans with
no la gamma di potenza compresa tra 35 e 280 kW. cooling capacity from 35 to 280 kW.
Il gas refrigerante utilizzato è l’R410A. The refrigerant used is R410A.

Composizione unità standard Standard unit composition


Struttura in lamiera zincata e verniciata con polveri epossidiche; Structure heavy gauge galvanized steel with epoxy spray paint;
Compressori scroll completi di protezione termica interna; Compressors scroll with internal thermal protection;
Condensatore con tubi di rame ed alette in alluminio; Condenser copper tubes and aluminium ns;
Ventilatori assiali direttamente accoppiati al motore elettrico con prote- Fans axial direct coupled complete with thermal overload protection and
zione termica e rete antinfortunistica; safety grills;
Circuito frigorifero realizzato secondo Direttiva 97/23/CE “PED”; Refrigerant circuit made following 97/23/CE “PED” European law;
QD elettrico di potenza in vano protetto dalle intemperie, con sezionato- Electrical control panel in weather proofed housing, with terminal block,
re generale, automatici e contattori compressori; main switch, compressor contactors;
Controllo a microprocessore per una ottimizzata gestione dell’unità. Microprocessor control for a complete management of the unit.

air R410A
Solo freddo Condensaz. aria Compressore Scroll Refrigerante R410A Ventilatori assiali Installazione esterna

Cool only Air condensation Scroll compressor R410A refrigerant Axial fans External installation

Dotazioni di serie Standard accessories


Monitore di fase Phase monitor
Riscaldatore dell’olio, valvola sicurezza e pressostati refrigerante Crankcase heater, safety valve and refrigerant pressostats
Contatti puliti per on/off da remoto On/off from remote free contacts
Contatto pulito allarme generale General alarm free contact

Accessori principali Main accessories


Allestimento acustico silenziato (LN) o super silenziato (XLN) Low noise (LN) and extra low noise (XLN) execution
Valvola di espansione elettronica Electronic expansion valve
Controllo condensazione (a taglio di fase o con ventilatori EC) Condensing control (with cut phase or with EC fans)
Soft starter, Comando remoto e uscita seriale RS485 Soft starter, remote control and RS485 card
Reti di protezione e batterie con trattamenti anticorrosivi Coil protection grills and coils anticorrosive treatments
Antivibranti di base in gomma Rubber antivibrating dampers
Approvals Obtained Contacts
Approvazione Ricevuta Contatti
HEAD QUARTERS MEKAR SRL
A group S.p.A viale Caduti sul Lavoro, 25
From Key Developers / Dalle principali imprese edili Via Montegrappa, 67 37063 Verona
31020 San Zenone degli Ezzelini (Tv) –Italy T: +39 045 6630536
Aldar Dubai Municipality Musanada T: +39 0423 960 037 F: +39 0423 968 197 F: +390456630513

ADNOC Dubai Properties Nakheel

Al Wasl Emaar Oman Airports Management Company


MIDDLE EAST HEAD OFFICE & DUBAI SALES ABU DHABI
Abu Dhabi Company for Onshore Emirates Catering Presidential Guard The Business Center, Suite 203 PO.Box-33763,Level 01
Oil Operations Khalid Bin Waleed Street Union National Bank Bldg, Khalidya Street
Imam University Qatar Diar P.O.Box 24583, Bur Dubai, UAE Abu Dhabi,UAE
Abu Dhabi Education Council T: +9714 3574469, F: +9714 3574479 T: +97124122253, F: +97124122000
Internal Security Force Saudi Railways Organisation
AlFardan Properties
King Saud University SEHA
ASHGHAL QATAR OMAN
Majid Al Futtaim Simon property group
Post Box No.10407, Doha, Qatar Regus Business Centre, Office 216 l 2nd Floor
Aspire
T : 974 44153742, F : +974 44420609 Tamimah Building, Al Nahdah l PO Box 395
Meeras Union Properties
Command of Miltary works PC 118 l Muscat, Sultanate of Oman
Mubadala United Development Company T: +968 24667649 F: +968 24667788
Damac

SAUDI DISTRIBUTOR (RIYADH) SAUDI DISTRIBUTOR (JEDDAH)


Abdul Latif Jameel, Olay street Abdul Latif Jameel, Door No.10,
From Key Consultants / Dai principali Progettisti PO Box 52661 | Riyadh 11573 Mezzanine Floor, Al Mukhmal Tower
Kingdom of Saudi Arabia Opp. Saudia City Residential Compound
Ae 7 Engineering Dara Engineering Consultant Hill International T: +966 012 272 4002 | F: +966 2 628 3923 Al- Radwah St.Al Khalediah District
PO Box 7997 | Jeddah 21472
AECOM Dewan Architects & Engineers Kling Consult Kingdom of Saudi Arabia
T +966 012 272 4002 | F +966 2 628 3923
Alturath Engineering Consultants Dorsch Gruppe MZ & Partners

Arab Engineering Bureau EHAF Consulting Engineers Omrania & Associates

ARCH Group Engineering Consultant Group QHC Architects & Engineers SAUDI DISTRIBUTOR (DAMAM) KUWAIT DISTRIBUTOR
Abdul Latif Jameel. Bader Al Mulla & Bros. Co. W.L.L.
Architectural Consulting Group ERGA Qatar Ramboll Besides Lexus Showroom. Opposite Dahran Mall Trading & Manufacturing Group
Prince Faisal Street, PO Box 7660 | Dammam 31472 Post Box 177, Safat, 13002, Kuwait
Arif & Bintoak Ghafari Saud Consult Kingdom of Saudi Arabia T.: (+965) 22205111
T +966 13 882 4472 | F +966 13 882 4580 F: (+965) 22205100
Associated Consulting Engineers GHD SSH Design

ATKINS Gulf Engineering Stantec

Buro Happold HOSMAC TYPSA Group

Cowi Larson Hyder Waterman Emirates

Dar Al-handasah Ian Banham & Associates WME Consultants

DAR Consulting Architects & Engineers KEO International Consultants WSP Parsons Brinckerhoff

sales@mekar.ae | info@mekar.ae
www.mekar.it
Middle East Regional Office : Mekar Air Handling Units L.L.C., The Business Centre
Suite 203, Khalid Bin Walid Street, P.O. Box 24583, Dubai, U.A.E.
Tel: +971 4 3574469 Fax: +971 4 3574479 sales@mekar.ae
CR COPY

Mekar Air Handling Units

Office : P.O. Box 10407, Doha, Qatar Tel: +974 441 53742 Fax: +974 444 20609 e-mail:sales@mekar.ae
Corporate Head Office: Viale Caduti sul Lavoro, 25 - 37063 ISOLA DELLA SCALA, Verona, Italy
Tel: +39 045 6630536 Fax: +39 045 6630513 e-mail: info@mekar.it www.mekar.it
‫>‪<Bar Code‬‬
‫‪2021/11/27‬‬ ‫ﺗﺎﺭﻳﺦ ﺍﻟﻄﺒﺎﻋﺔ‪:‬‬
‫‪No 1 of 1‬‬ ‫ﺻﻔﺤﺔ ﺭﻗﻢ‪:‬‬

‫ﺭﺧﺼﺔ ﺗﺠﺎﺭﻳﺔ‬

‫*‪*80440‬‬
‫‪2013/05/23‬‬ ‫ﺗﺎﺭﻳﺦ ﺍﺻﺪﺍﺭ ﺍﻟﺮﺧﺼﺔ‪:‬‬ ‫‪80440‬‬ ‫ﺭﻗﻢ ﺍﻟﺮﺧﺼﺔ‪:‬‬
‫‪2022/12/15‬‬ ‫ﺗﺎﺭﻳﺦ ﺍﻧﺘﻬﺎﺀ ﺍﻟﺮﺧﺼﺔ‪:‬‬ ‫ﻣﻴﻜﺎﺭ ﻻﻋﻤﺎﻝ ﻭﺣﺪﺍﺕ ﺍﻟﺘﻜﻴﻴﻒ‬ ‫ﺍﻷﺳﻢ ﺍﻟﺘﺠﺎﺭﻯ‪:‬‬
‫‪24668/4‬‬ ‫ﺭﻗﻢ ﺍﻟﺴﺠﻞ ﺍﻟﺘﺠﺎﺭﻯ‪:‬‬ ‫ﺷﺮﻛﺔ‬ ‫ﻧﻮﻉ ﺍﻟﻤﻨﺸﺄﺓ ﺍﻟﺘﺠﺎﺭﻳﺔ‪:‬‬
‫ﺍﻟﺴﻤﺔ ﺍﻟﺘﺠﺎﺭﻳﺔ‪:‬‬

‫ﺑﻴﺎﻧﺎﺕ ﺍﻟﻤﺪﻳﺮ ﺍﻟﻤﺴﺆﻭﻝ ‪:‬‬


‫ﺍﻣﻴﺮﺍﻟﺪﻳﻦ ﻛﻮﻧﻬﺎﻣﻴﺪ‬ ‫ﺍﺳﻢ ﺍﻟﻤﺪﻳﺮ ﺍﻟﻤﺴﺌﻮﻝ‪:‬‬
‫ﺍﻟﻬﻨﺪ‬ ‫ﺟﻨﺴﻴﺔ ﺍﻟﻤﺪﻳﺮ ﺍﻟﻤﺴﺌﻮﻝ‪:‬‬ ‫‪26035601472‬‬ ‫ﺭﻗﻢ ﺍﻹﺛﺒﺎﺕ‪:‬‬
‫ﻧﻤﻮﺫﺝ ﺧﺘﻢ ﺍﻟﻤﻨﺸﺄﺓ ﺍﻟﺘﺠﺎﺭﻳﺔ ‪:‬‬ ‫ﺑﻴﺎﻧﺎﺕ ﺍﻟﻤﻮﻗﻊ ‪:‬‬
‫‪88‬‬ ‫ﻋﻘﺎﺭ ﺭﻗﻢ‪:‬‬ ‫ﺗﺠﺎﺭﻱ‬ ‫ﺗﺼﻨﻴﻒ ﺍﻟﻤﻮﻗﻊ‪:‬‬
‫ﺭﻗﻢ ﺍﻟﺪﻭﺭ‪ /‬ﺍﻟﻮﺣﺪﺓ‪:‬‬ ‫ﻣﻜﺘﺐ ﺗﺠﺎﺭﻱ‬ ‫ﻧﻮﻉ ﺍﻟﻤﻮﻗﻊ‪:‬‬
‫ﺍﺣﻤﺪ ﻋﻴﺴﻰ ﺍﻟﺠﺘﺎﻝ‬
‫ﺍﻟﻤﻌﺎﺿﻴﺪ‬
‫ﺍﺳﻢ ﻣﺎﻟﻚ ﺍﻟﻌﻘﺎﺭ ‪:‬‬ ‫‪ 15‬ﺍﻟﺪﻭﺣﺔ ﺍﻟﺠﺪﻳﺪﺓ‬ ‫ﺍﻟﻤﻨﻄﻘﺔ‪:‬‬
‫ﻧﻮﻉ ﺍﻟﺮﺧﺼﺔ ‪:‬‬ ‫ﺍﻟﻄﺮﻳﻖ ﺍﻟﺪﺍﺋﺮﻱ ﺍﻟﺜﺎﻧﻲ‬ ‫ﺍﻟﺸﺎﺭﻉ‪:‬‬
‫ﺑﻠﺪﻳﺔ ﺍﻟﺪﻭﺣﺔ ‪ /‬ﺍﻟﺪﻭﺣﺔ‬
‫ﺍﻟﺠﺪﻳﺪﺓ‬
‫ﻭﺻﻒ ﺍﻟﻌﻨﻮﺍﻥ ‪:‬‬ ‫‪220‬‬ ‫ﺭﻗﻢ ﺍﻟﺸﺎﺭﻉ ‪:‬‬
‫ﺍﻷﻧﺸﻄﺔ ﺍﻟﺘﺠﺎﺭﻳﺔ ‪:‬‬

‫ﺇﺳﻢ ﺍﻟﻨﺸﺎﻁ‬ ‫ﺭﻗﻢ ﺍﻟﻨﺸﺎﻁ‬ ‫ﺇﺳﻢ ﺍﻟﻨﺸﺎﻁ‬ ‫ﺭﻗﻢ ﺍﻟﻨﺸﺎﻁ‬


‫ﺗﺠﺎﺭﺓ ﻣﻜﻴﻔﺎﺕ ﺍﻟﻬﻮﺍﺀ‬ ‫‪2000841‬‬ ‫ﺍﻟﺘﺠﺎﺭﻩ ﻓﻰ ﻗﻄﻊ ﻏﻴﺎﺭ ﺍﻟﻤﻜﻴﻔﺎﺕ ﻭ ﺍﺟﻬﺰﻩ‬ ‫‪1514211‬‬
‫ﺍﻟﺘﺒﺮﻳﺪ‬

‫ﻣﺪﻳﺮ ﺇﺩﺍﺭﺓ ﺍﻟﺘﺴﺠﻴﻞ ﻭﺍﻟﺘﺮﺍﺧﻴﺺ ﺍﻟﺘﺠﺎﺭﻳﺔ‬


MATERIAL EQUIPMENT SCHEDULE

Mekar Air Handling Units

Office : P.O. Box 10407, Doha, Qatar Tel: +974 441 53742 Fax: +974 444 20609 e-mail:sales@mekar.ae
Corporate Head Office: Viale Caduti sul Lavoro, 25 - 37063 ISOLA DELLA SCALA, Verona, Italy
Tel: +39 045 6630536 Fax: +39 045 6630513 e-mail: info@mekar.it www.mekar.it
Project: QIB VENDOME MALL
Contractor : Nysa Trading & Contracting Company W.L.L
Equipment : Fan Coil Units

Specified Data Offered Data


CHW
Cooling Capacity CHW Ro Air Air ON COIL OFF COIL CHW Input DIMENSION
S.No Ref Air Flow Air Flow FLOW ESP Mini Unit Type Selected ESP TCL SCL WPD Maxi SFP
QTY ws Volume Volume Flow Power (
(l/s) (CMH) (Pa) Motor W Model (Pa) (KW) (KW) (Kpa) Motor W (W/LPS) LENGTH WIDTH HEIGHT
(T KW) (S KW) L/S IN OUT (CMH) (LPS) DB WB DB WB (L/s) Watt)
MM MM MM

1 FCU-01 1.9 1.8 156 561.6 0.05 1 6 15 50 79 DUCTED 09MK-906 4 50 618 172 22.50 15.30 13.40 11.16 2.04 1.82 7.1 0.05 118 85 0.50 1031 616 240
1 FCU-02 4.4 3.95 484 1742.4 0.12 2 6 15 50 289 DUCTED 09MK-HS-921 4 50 1274 354 23.00 16.00 13.42 11.88 4.37 3.99 11.3 0.12 286 185 0.52 1034 699 283
1 FCU-03 6.4 6.4 573 2062.8 0.17 1 6 15 50 477 DUCTED 09MK-HS-923 4 50 1850 514 23.00 16.00 13.43 11.90 6.46 5.85 14.6 0.17 396 290 0.56 1194 699 350

Note:
All FCUs are selected at Medium speed
CHW in /out Temp -6 /15 deg c

Page 1
TECHNICAL DATA SHEET

Mekar Air Handling Units

Office : P.O. Box 10407, Doha, Qatar Tel: +974 441 53742 Fax: +974 444 20609 e-mail:sales@mekar.ae
Corporate Head Office: Viale Caduti sul Lavoro, 25 - 37063 ISOLA DELLA SCALA, Verona, Italy
Tel: +39 045 6630536 Fax: +39 045 6630513 e-mail: info@mekar.it www.mekar.it
Customer :
Project Name :
Ref. No :
Date: 28 / February /22

PROJECT DETAILS -
Rev No: 0 Quantity 1 Nos
Unit Location Pressure 101.32 Pa
Unit Tag No FCU-01 Altitude : 0.00 m

UNIT DETAILS
Unit Series 09MK-Ducted DC Coil Rows / Conn. 4 / LHS
Unit Type Ducted Filter Type 22mm Synthetic
Model No. 09MK906HD Unit Weight 30.00 Kgs

UNIT PERFORMANCE
Air Volume 618.00 m³/hr Selection Speed Medium
ESP 50.00 Pa Pipe System Two Pipe
Cooling Heating
Total Capacity 2.04 kW Total Capacity kW
Sensible Capacity 1.82 kW Sensible Capacity kW
Air IN DB 22.50 °C Air IN DB °C
Air IN WB / RH 15.30 / 46.66 °C / % Air OFF DB °C
Air OFF DB 13.40 °C Fluid IN / OUT °C
Air OFF WB / RH 11.16 / 76.79 °C / % Fluid Flow l/s
Fluid IN / OUT 6.00/15.00 °C Fluid Pressure Drop kPa
Fluid Flow 0.05 l/s Electric Heater No
Fluid Pr. Drop 7.05 kPa Heater KW KW
ELECTRICAL & SOUND DATA
Volts / Phase / Hz 230±10% V/ 1 Ph/ 50 Hz. Sound Power(Lw) 55.00 dB(A)
Input Power / Max. Power 85.00 / 118.00 W Sound Pressure(Lp) 43.00 dB(A)

All Dimensions are in mm.


A B L C D H I J K M N

1031 980 870


Mekar FCSelect V4.220.021
Customer :
Project Name :
Ref. No :
Date: 26 / February /22

PROJECT DETAILS -
Rev No: 0 Quantity 1 Nos
Unit Location Pressure 101.32 Pa
Unit Tag No FCU-02 Altitude : 0.00 m

UNIT DETAILS
Unit Series 09MKHS - Ducted DC Coil Rows / Conn. 4 / LHS
Unit Type Ducted Filter Type 22mm Synthetic
Model No. 09MK-HS-921HD Unit Weight 55.00 Kgs

UNIT PERFORMANCE
Air Volume 1273.53 m³/hr Selection Speed Medium
ESP 50.00 Pa Pipe System Two Pipe
Cooling Heating
Total Capacity 4.37 kW Total Capacity kW
Sensible Capacity 3.99 kW Sensible Capacity kW
Air IN DB 23.00 °C Air IN DB °C
Air IN WB / RH 16.00 / 48.57 °C / % Air OFF DB °C
Air OFF DB 13.42 °C Fluid IN / OUT °C
Air OFF WB / RH 11.88 / 83.86 °C / % Fluid Flow l/s
Fluid IN / OUT 6.00/15.00 °C Fluid Pressure Drop kPa
Fluid Flow 0.12 l/s Electric Heater No
Fluid Pr. Drop 11.32 kPa Heater KW KW
ELECTRICAL & SOUND DATA
Volts / Phase / Hz 230±10% V/ 1 Ph/ 50 Hz. Sound Power(Lw) 50.60 dB(A)
Input Power / Max. Power 185.00 / 286.00 W Sound Pressure(Lp) 40.00 dB(A)

All Dimensions are in mm.


A B L I H D

1014 974 894 235 275 690


Mekar FCSelect V3.610.001
Customer :
Project Name :
Ref. No :
Date: 26 / February /22

PROJECT DETAILS -
Rev No: 0 Quantity 1 Nos
Unit Location Pressure 101.32 Pa
Unit Tag No FCU-03 Altitude : 0.00 m

UNIT DETAILS
Unit Series 09MKHS - Ducted DC Coil Rows / Conn. 4 / LHS
Unit Type Ducted Filter Type 22mm Synthetic
Model No. 09MK-HS-923HD Unit Weight 62.00 Kgs

UNIT PERFORMANCE
Air Volume 1850.06 m³/hr Selection Speed Medium
ESP 50.00 Pa Pipe System Two Pipe
Cooling Heating
Total Capacity 6.46 kW Total Capacity kW
Sensible Capacity 5.85 kW Sensible Capacity kW
Air IN DB 23.00 °C Air IN DB °C
Air IN WB / RH 16.00 / 48.57 °C / % Air OFF DB °C
Air OFF DB 13.43 °C Fluid IN / OUT °C
Air OFF WB / RH 11.90 / 84.03 °C / % Fluid Flow l/s
Fluid IN / OUT 6.00/15.00 °C Fluid Pressure Drop kPa
Fluid Flow 0.17 l/s Electric Heater No
Fluid Pr. Drop 14.56 kPa Heater KW KW
ELECTRICAL & SOUND DATA
Volts / Phase / Hz 230±10% V/ 1 Ph/ 50 Hz. Sound Power(Lw) 54.80 dB(A)
Input Power / Max. Power 290.00 / 396.00 W Sound Pressure(Lp) 47.00 dB(A)

All Dimensions are in mm.


A B L I H D

1174 1134 1054 285 325 690


Mekar FCSelect V3.610.001
TECHNICAL CATALOGUE

Mekar Air Handling Units

Office : P.O. Box 10407, Doha, Qatar Tel: +974 441 53742 Fax: +974 444 20609 e-mail:sales@mekar.ae
Corporate Head Office: Viale Caduti sul Lavoro, 25 - 37063 ISOLA DELLA SCALA, Verona, Italy
Tel: +39 045 6630536 Fax: +39 045 6630513 e-mail: info@mekar.it www.mekar.it
FCU CATALOGUE

Mekar Air Handling Units

Office : P.O. Box 10407, Doha, Qatar Tel: +974 441 53742 Fax: +974 444 20609 e-mail:sales@mekar.ae
Corporate Head Office: Viale Caduti sul Lavoro, 25 - 37063 ISOLA DELLA SCALA, Verona, Italy
Tel: +39 045 6630536 Fax: +39 045 6630513 e-mail: info@mekar.it www.mekar.it
PRODUCT AND QUALITY CERTIFICATE

Mekar Air Handling Units

Office : P.O. Box 10407, Doha, Qatar Tel: +974 441 53742 Fax: +974 444 20609 e-mail:sales@mekar.ae
Corporate Head Office: Viale Caduti sul Lavoro, 25 - 37063 ISOLA DELLA SCALA, Verona, Italy
Tel: +39 045 6630536 Fax: +39 045 6630513 e-mail: info@mekar.it www.mekar.it
Certificate of Product Ratings
AHRI Certified Reference Number : 202181301 Date : 07-01-2018 Model Status : Active

Brand Name : MEKAR

Model Number : 09MK HS 921/4R

Series Name : 09MK HS

Motor Type : PSC

Rated as follows in accordance with the latest edition of ANSI/AHRI 440 with Addendum 1: Performance Rating of Room Fan-Coils and
subject to rating accuracy by AHRI-sponsored, independent, third party testing:

Air Flow Rating, scfm : 786

Total Capacity, btuh : 23700

Sensible Capacity, btuh : 17400

Power Input, W : 270

Water Temperature Rise, deg F : 15

†"Active" Model Status are those that an AHRI Certification Program Participant is currently producing AND selling or offering for sale; OR new models that are being

marketed but are not yet being produced.“Production Stopped” Model Status are those that an AHRI Certification Program Participant is no longer producing BUT is still
selling or offering for sale.
Ratings that are accompanied by WAS indicate an involuntary re-rate. The new published rating is shown along with the previous (i.e. WAS) rating.
DISCLAIMER
AHRI does not endorse the product(s) listed on this Certificate and makes no representations, warranties or guarantees as to, and assumes no responsibility for,
the product(s) listed on this Certificate. AHRI expressly disclaims all liability for damages of any kind arising out of the use or performance of the product(s), or the
unauthorized alteration of data listed on this Certificate. Certified ratings are valid only for models and configurations listed in the
directory at www.ahridirectory.org.
TERMS AND CONDITIONS
This Certificate and its contents are proprietary products of AHRI. This Certificate shall only be used for individual, personal and
confidential reference purposes. The contents of this Certificate may not, in whole or in part, be reproduced; copied; disseminated;
entered into a computer database; or otherwise utilized, in any form or manner or by any means, except for the user’s individual,
personal and confidential reference.
CERTIFICATE VERIFICATION
The information for the model cited on this certificate can be verified at www.ahridirectory.org, click on “Verify Certificate” link
and enter the AHRI Certified Reference Number and the date on which the certificate was issued,
which is listed above, and the Certificate No., which is listed at bottom right.
©2018 Air-Conditioning, Heating, and Refrigeration Institute CERTIFICATE NO.: 131749527945219239
Certificate of Product Ratings
AHRI Certified Reference Number : 202181305 Date : 07-01-2018 Model Status : Active

Brand Name : MEKAR

Model Number : 09MK HS 921/6R

Series Name : 09MK HS

Motor Type : PSC

Rated as follows in accordance with the latest edition of ANSI/AHRI 440 with Addendum 1: Performance Rating of Room Fan-Coils and
subject to rating accuracy by AHRI-sponsored, independent, third party testing:

Air Flow Rating, scfm : 747

Total Capacity, btuh : 28300

Sensible Capacity, btuh : 19800

Power Input, W : 260

Water Temperature Rise, deg F : 15

†"Active" Model Status are those that an AHRI Certification Program Participant is currently producing AND selling or offering for sale; OR new models that are being

marketed but are not yet being produced.“Production Stopped” Model Status are those that an AHRI Certification Program Participant is no longer producing BUT is still
selling or offering for sale.
Ratings that are accompanied by WAS indicate an involuntary re-rate. The new published rating is shown along with the previous (i.e. WAS) rating.
DISCLAIMER
AHRI does not endorse the product(s) listed on this Certificate and makes no representations, warranties or guarantees as to, and assumes no responsibility for,
the product(s) listed on this Certificate. AHRI expressly disclaims all liability for damages of any kind arising out of the use or performance of the product(s), or the
unauthorized alteration of data listed on this Certificate. Certified ratings are valid only for models and configurations listed in the
directory at www.ahridirectory.org.
TERMS AND CONDITIONS
This Certificate and its contents are proprietary products of AHRI. This Certificate shall only be used for individual, personal and
confidential reference purposes. The contents of this Certificate may not, in whole or in part, be reproduced; copied; disseminated;
entered into a computer database; or otherwise utilized, in any form or manner or by any means, except for the user’s individual,
personal and confidential reference.
CERTIFICATE VERIFICATION
The information for the model cited on this certificate can be verified at www.ahridirectory.org, click on “Verify Certificate” link
and enter the AHRI Certified Reference Number and the date on which the certificate was issued,
which is listed above, and the Certificate No., which is listed at bottom right.
©2018 Air-Conditioning, Heating, and Refrigeration Institute CERTIFICATE NO.: 131749528528505337
Certificate of Product Ratings
AHRI Certified Reference Number : 202181302 Date : 07-01-2018 Model Status : Active

Brand Name : MEKAR

Model Number : 09MK HS 922/4R

Series Name : 09MK HS

Motor Type : PSC

Rated as follows in accordance with the latest edition of ANSI/AHRI 440 with Addendum 1: Performance Rating of Room Fan-Coils and
subject to rating accuracy by AHRI-sponsored, independent, third party testing:

Air Flow Rating, scfm : 987

Total Capacity, btuh : 28800

Sensible Capacity, btuh : 21300

Power Input, W : 310

Water Temperature Rise, deg F : 15

†"Active" Model Status are those that an AHRI Certification Program Participant is currently producing AND selling or offering for sale; OR new models that are being

marketed but are not yet being produced.“Production Stopped” Model Status are those that an AHRI Certification Program Participant is no longer producing BUT is still
selling or offering for sale.
Ratings that are accompanied by WAS indicate an involuntary re-rate. The new published rating is shown along with the previous (i.e. WAS) rating.
DISCLAIMER
AHRI does not endorse the product(s) listed on this Certificate and makes no representations, warranties or guarantees as to, and assumes no responsibility for,
the product(s) listed on this Certificate. AHRI expressly disclaims all liability for damages of any kind arising out of the use or performance of the product(s), or the
unauthorized alteration of data listed on this Certificate. Certified ratings are valid only for models and configurations listed in the
directory at www.ahridirectory.org.
TERMS AND CONDITIONS
This Certificate and its contents are proprietary products of AHRI. This Certificate shall only be used for individual, personal and
confidential reference purposes. The contents of this Certificate may not, in whole or in part, be reproduced; copied; disseminated;
entered into a computer database; or otherwise utilized, in any form or manner or by any means, except for the user’s individual,
personal and confidential reference.
CERTIFICATE VERIFICATION
The information for the model cited on this certificate can be verified at www.ahridirectory.org, click on “Verify Certificate” link
and enter the AHRI Certified Reference Number and the date on which the certificate was issued,
which is listed above, and the Certificate No., which is listed at bottom right.
©2018 Air-Conditioning, Heating, and Refrigeration Institute CERTIFICATE NO.: 131749528170846098
Certificate of Product Ratings
AHRI Certified Reference Number : 202181303 Date : 07-01-2018 Model Status : Active

Brand Name : MEKAR

Model Number : 09MK HS 923/4R

Series Name : 09MK HS

Motor Type : PSC

Rated as follows in accordance with the latest edition of ANSI/AHRI 440 with Addendum 1: Performance Rating of Room Fan-Coils and
subject to rating accuracy by AHRI-sponsored, independent, third party testing:

Air Flow Rating, scfm : 1174

Total Capacity, btuh : 35600

Sensible Capacity, btuh : 26000

Power Input, W : 404

Water Temperature Rise, deg F : 15

†"Active" Model Status are those that an AHRI Certification Program Participant is currently producing AND selling or offering for sale; OR new models that are being

marketed but are not yet being produced.“Production Stopped” Model Status are those that an AHRI Certification Program Participant is no longer producing BUT is still
selling or offering for sale.
Ratings that are accompanied by WAS indicate an involuntary re-rate. The new published rating is shown along with the previous (i.e. WAS) rating.
DISCLAIMER
AHRI does not endorse the product(s) listed on this Certificate and makes no representations, warranties or guarantees as to, and assumes no responsibility for,
the product(s) listed on this Certificate. AHRI expressly disclaims all liability for damages of any kind arising out of the use or performance of the product(s), or the
unauthorized alteration of data listed on this Certificate. Certified ratings are valid only for models and configurations listed in the
directory at www.ahridirectory.org.
TERMS AND CONDITIONS
This Certificate and its contents are proprietary products of AHRI. This Certificate shall only be used for individual, personal and
confidential reference purposes. The contents of this Certificate may not, in whole or in part, be reproduced; copied; disseminated;
entered into a computer database; or otherwise utilized, in any form or manner or by any means, except for the user’s individual,
personal and confidential reference.
CERTIFICATE VERIFICATION
The information for the model cited on this certificate can be verified at www.ahridirectory.org, click on “Verify Certificate” link
and enter the AHRI Certified Reference Number and the date on which the certificate was issued,
which is listed above, and the Certificate No., which is listed at bottom right.
©2018 Air-Conditioning, Heating, and Refrigeration Institute CERTIFICATE NO.: 131749528283816055
Certificate of Product Ratings
AHRI Certified Reference Number : 202181306 Date : 07-01-2018 Model Status : Active

Brand Name : MEKAR

Model Number : 09MK HS 923/6R

Series Name : 09MK HS

Motor Type : PSC

Rated as follows in accordance with the latest edition of ANSI/AHRI 440 with Addendum 1: Performance Rating of Room Fan-Coils and
subject to rating accuracy by AHRI-sponsored, independent, third party testing:

Air Flow Rating, scfm : 1115

Total Capacity, btuh : 41700

Sensible Capacity, btuh : 29300

Power Input, W : 402

Water Temperature Rise, deg F : 15

†"Active" Model Status are those that an AHRI Certification Program Participant is currently producing AND selling or offering for sale; OR new models that are being

marketed but are not yet being produced.“Production Stopped” Model Status are those that an AHRI Certification Program Participant is no longer producing BUT is still
selling or offering for sale.
Ratings that are accompanied by WAS indicate an involuntary re-rate. The new published rating is shown along with the previous (i.e. WAS) rating.
DISCLAIMER
AHRI does not endorse the product(s) listed on this Certificate and makes no representations, warranties or guarantees as to, and assumes no responsibility for,
the product(s) listed on this Certificate. AHRI expressly disclaims all liability for damages of any kind arising out of the use or performance of the product(s), or the
unauthorized alteration of data listed on this Certificate. Certified ratings are valid only for models and configurations listed in the
directory at www.ahridirectory.org.
TERMS AND CONDITIONS
This Certificate and its contents are proprietary products of AHRI. This Certificate shall only be used for individual, personal and
confidential reference purposes. The contents of this Certificate may not, in whole or in part, be reproduced; copied; disseminated;
entered into a computer database; or otherwise utilized, in any form or manner or by any means, except for the user’s individual,
personal and confidential reference.
CERTIFICATE VERIFICATION
The information for the model cited on this certificate can be verified at www.ahridirectory.org, click on “Verify Certificate” link
and enter the AHRI Certified Reference Number and the date on which the certificate was issued,
which is listed above, and the Certificate No., which is listed at bottom right.
©2018 Air-Conditioning, Heating, and Refrigeration Institute CERTIFICATE NO.: 131749528672725292
Certificate of Product Ratings
AHRI Certified Reference Number : 202181304 Date : 07-01-2018 Model Status : Active

Brand Name : MEKAR

Model Number : 09MK HS 924/4R

Series Name : 09MK HS

Motor Type : PSC

Rated as follows in accordance with the latest edition of ANSI/AHRI 440 with Addendum 1: Performance Rating of Room Fan-Coils and
subject to rating accuracy by AHRI-sponsored, independent, third party testing:

Air Flow Rating, scfm : 1500

Total Capacity, btuh : 42000

Sensible Capacity, btuh : 31400

Power Input, W : 475

Water Temperature Rise, deg F : 15

†"Active" Model Status are those that an AHRI Certification Program Participant is currently producing AND selling or offering for sale; OR new models that are being

marketed but are not yet being produced.“Production Stopped” Model Status are those that an AHRI Certification Program Participant is no longer producing BUT is still
selling or offering for sale.
Ratings that are accompanied by WAS indicate an involuntary re-rate. The new published rating is shown along with the previous (i.e. WAS) rating.
DISCLAIMER
AHRI does not endorse the product(s) listed on this Certificate and makes no representations, warranties or guarantees as to, and assumes no responsibility for,
the product(s) listed on this Certificate. AHRI expressly disclaims all liability for damages of any kind arising out of the use or performance of the product(s), or the
unauthorized alteration of data listed on this Certificate. Certified ratings are valid only for models and configurations listed in the
directory at www.ahridirectory.org.
TERMS AND CONDITIONS
This Certificate and its contents are proprietary products of AHRI. This Certificate shall only be used for individual, personal and
confidential reference purposes. The contents of this Certificate may not, in whole or in part, be reproduced; copied; disseminated;
entered into a computer database; or otherwise utilized, in any form or manner or by any means, except for the user’s individual,
personal and confidential reference.
CERTIFICATE VERIFICATION
The information for the model cited on this certificate can be verified at www.ahridirectory.org, click on “Verify Certificate” link
and enter the AHRI Certified Reference Number and the date on which the certificate was issued,
which is listed above, and the Certificate No., which is listed at bottom right.
©2018 Air-Conditioning, Heating, and Refrigeration Institute CERTIFICATE NO.: 131749528407410669
Certificate of Product Ratings
AHRI Certified Reference Number : 202181307 Date : 07-01-2018 Model Status : Active

Brand Name : MEKAR

Model Number : 09MK HS 924/6R

Series Name : 09MK HS

Motor Type : PSC

Rated as follows in accordance with the latest edition of ANSI/AHRI 440 with Addendum 1: Performance Rating of Room Fan-Coils and
subject to rating accuracy by AHRI-sponsored, independent, third party testing:

Air Flow Rating, scfm : 1470

Total Capacity, btuh : 53300

Sensible Capacity, btuh : 37700

Power Input, W : 460

Water Temperature Rise, deg F : 15

†"Active" Model Status are those that an AHRI Certification Program Participant is currently producing AND selling or offering for sale; OR new models that are being

marketed but are not yet being produced.“Production Stopped” Model Status are those that an AHRI Certification Program Participant is no longer producing BUT is still
selling or offering for sale.
Ratings that are accompanied by WAS indicate an involuntary re-rate. The new published rating is shown along with the previous (i.e. WAS) rating.
DISCLAIMER
AHRI does not endorse the product(s) listed on this Certificate and makes no representations, warranties or guarantees as to, and assumes no responsibility for,
the product(s) listed on this Certificate. AHRI expressly disclaims all liability for damages of any kind arising out of the use or performance of the product(s), or the
unauthorized alteration of data listed on this Certificate. Certified ratings are valid only for models and configurations listed in the
directory at www.ahridirectory.org.
TERMS AND CONDITIONS
This Certificate and its contents are proprietary products of AHRI. This Certificate shall only be used for individual, personal and
confidential reference purposes. The contents of this Certificate may not, in whole or in part, be reproduced; copied; disseminated;
entered into a computer database; or otherwise utilized, in any form or manner or by any means, except for the user’s individual,
personal and confidential reference.
CERTIFICATE VERIFICATION
The information for the model cited on this certificate can be verified at www.ahridirectory.org, click on “Verify Certificate” link
and enter the AHRI Certified Reference Number and the date on which the certificate was issued,
which is listed above, and the Certificate No., which is listed at bottom right.
©2018 Air-Conditioning, Heating, and Refrigeration Institute CERTIFICATE NO.: 131749528774757412
CERTIFICATE
N° 09.04.418
Air Handling Unit / Centrales de traitement d'air
Range Name / Nom de Gamme :
Series 23 MK
Granted on April 2, 2009 - Date 1ère admission 2 avril 2009

This document is valid at the date of issue - Check the current validity on:
Document valable à la date d’émission - Vérifier la validité en cours sur :
www.eurovent-certification.com

Participant/Titulaire

MEKAR s.r.l.
Viale Caduti sul Lavoro, 25 - VR
37063 ISOLA DELLA SCALA, Italy

This product performance certificate is issued by Ce certificat de performance produit est délivré par Eurovent
Eurovent Certita Certification according to the Certita Certification dans les conditions fixées par le
certification rules: référentiel :

ECP AHU - « Air Handling Unit » in force at ECP AHU – « Centrales de traitement d'air » en vigueur à
established date. date d’édition.

Pursuant to the decision notified by Eurovent Certita En vertu de la décision notifiée par Eurovent Certita
Certification, the right to use the mark ECP shall be Certification, le droit d'usage de la marque ECP, est accordé à
granted to the beneficiary company for the above Range la société qui en est bénéficiaire pour la gamme visée ci-
in the conditions defined by the certification program dessus, dans les conditions définies par le programme de
mentioned. certification mentionné.

Unless withdrawn or suspended, this certificate remains Sauf retrait ou suspension, ce certificat demeure valide tant
valid as long as the requirements for the certification que les conditions du référentiel du programme de certification
program framework are met. The validity of the sont respectées. La validité du certificat est à vérifier sur le site
certificate is to be verified on www.eurovent- Internet www.eurovent-certification.com
certification.com
CE CERTIFICAT A ÉTÉ EMIS LE 08/07/2021
THIS CERTIFICATE HAS BEEN ISSUED ON 08/07/2021 CE CERTIFICAT EST VALIDE JUSQU’AU 31/03/2022
THIS CERTIFICATE IS VALID UNTIL 31/03/2022

Paris, 8 juillet 2021


Organisme accrédité n° 5-0517
Certification Produits et Services selon la
norme NF EN ISO/CEI 17065:2012
Portée disponible sur www.cofrac.fr
MANAGING BOARD MEMBER / MEMBRE DIRECTOIRE
Accreditation #5-0517 Products and
Services Certification according to NF EN
ISO/CEI 17065:2012 –
Scope available on www.cofrac.fr

COFRAC est signataire des accords MLA


d’EA et MLA d’IAF,
COFRAC is signatory of EA MLA and IAF
MLA,
list of EA members is available on
www.european-accreditation.org/ea-members
list of IAF members is available on
www.iaf.nu//articles/IAF_MEMBERS_SIGNATORIES/4

1/2
EUROVENT CERTITA CERTIFICATION SAS au capital de 100 000 € - 48-50 rue de la Victoire 75009 Paris - FRANCE
Tel. : 33 (0)1 75 44 71 71 - 513 133 637 RCS Paris - SIRET 513 133 637 000 35 - TVA FR 59513133637
S06D06 TEMPLATE_ECP_RANGE_REV1.1
CERTIFICATE
N° 09.04.418

Appendix / Annexe

Granted on April 2, 2009 - Date 1ère admission 2 avril 2009

This document is valid at the date of issue - Check the current validity on:
Document valable à la date d’émission - Vérifier la validité en cours sur :
www.eurovent-certification.com

List of certified products and characteristics is displayed on:


La liste des références et caractéristiques certifiées est disponible sur le site :
www.eurovent-certification.com
This product performance certificate is valid for the following trade names:
Ce certificat de performance produit est valide pour les marques commerciales suivantes:
Trade Name / Marque Commerciale

EDEN
MEKAR
VENCO
VENTILCLIMA

This product performance certificate is valid for the following manufacturing places:
Ce certificat de performance produit est valide pour les sites de production suivants:
Manufacturing Place / Site de Production

Isola della Scala (VR), Italy

This product performance certificate is valid for the following software:


Ce certificat de performance produt est valide pour les logiciels de sélection suivants:
Software / Logiciel de sélection

Mekar Configurator 23 14.5

2/2
EUROVENT CERTITA CERTIFICATION SAS au capital de 100 000 € - 48-50 rue de la Victoire 75009 Paris - FRANCE
Tel. : 33 (0)1 75 44 71 71 - 513 133 637 RCS Paris - SIRET 513 133 637 000 35 - TVA FR 59513133637
S06D06 TEMPLATE_ECP_RANGE_REV1.1
COUNTRY OF ORIGIN CERTIFICATE

Mekar Air Handling Units

Office : P.O. Box 10407, Doha, Qatar Tel: +974 441 53742 Fax: +974 444 20609 e-mail:sales@mekar.ae
Corporate Head Office: Viale Caduti sul Lavoro, 25 - 37063 ISOLA DELLA SCALA, Verona, Italy
Tel: +39 045 6630536 Fax: +39 045 6630513 e-mail: info@mekar.it www.mekar.it
MAJOR PROJECT LIST

Mekar Air Handling Units

Office : P.O. Box 10407, Doha, Qatar Tel: +974 441 53742 Fax: +974 444 20609 e-mail:sales@mekar.ae
Corporate Head Office: Viale Caduti sul Lavoro, 25 - 37063 ISOLA DELLA SCALA, Verona, Italy
Tel: +39 045 6630536 Fax: +39 045 6630513 e-mail: info@mekar.it www.mekar.it
S.No. Year Project Territory Consultant AHU FCUs

Installation Reference List


Key Project References

Burj Khalifa Dubai Burj Al Arab Dubai


Key Project References

Royal Atlantis - Dubai

Burj Ramla - KSA ISF Camp - Qatar


Key Project References

S.No. Year Project Territory Consultant AHU FCUs S.No. Year Project Territory Consultant AHU FCUs

Meydan Dubai

Wafi Hotel Sofitel Palm Jumeirah Dubai


Key Project References

S.No. Year Project Territory Consultant AHU FCUs S.No. Year Project Territory Consultant AHU FCUs

Handball Stadium Qatar Handball Stadium Qatar

Imperial Avenue, Downtown Dubai Museum of The Future Dubai


Key Project References

S.No. Year Project Territory Consultant AHU FCUs

Marsa Malaz Hotel Qatar

Boulevard Mall - Qatar

North Gate Mall Qatar Westin Hotel – Doha


Key Project References

Twin Tower Qatar Al Thuraya Tower Qatar World Trade Center Qatar
Key Project References

S.No. Year Project Territory Consultant AHU FCUs S.No. Year Project Territory Consultant AHU FCUs

Oasis Hospitl Al Ain Oasis Hospitl Al Ain

Mafraq Hospital Abu Dhabi Al Sila Hospital Abu Dhabi


Key Project References

Ministry of Justice & Federal Courts Abu Dhabi

Ruwais Mall Abu Dhabi

Al Muneera Abu Dhabi Khazna Data Center Dubai


Key Project References

S.No. Year Project Territory Consultant AHU FCUs S.No. Year Project Territory Consultant AHU FCUs

Hilton Riyadh KSA

Oman Airport MC2 Oman Airport MC2


Key Project References

S.No. Year Project Territory Consultant AHU FCUs S.No. Year Project Territory Consultant AHU FCUs

Al Wakra Hospital Qatar

Avani Hotel, Ibn Battuta, Dubai

Al Mutahidah Tower Qatar Vendome Mall Qatar


Key Project References

S.No. Year Project Territory Consultant AHU FCUs

Bin Ghanem Office Building Qatar Burj Marina Qatar

Crown Plaza Qatar Crown Plaza Qatar


Key Project References

S.No. Year Project Territory Consultant AHU FCUs S.No. Year Project Territory Consultant AHU FCUs

Emirates Hanger Dubai Emirates Hanger Dubai

Fairmount Hotel Palm Island Dubai Financial District Gate Dubai


Key Project References

S.No. Year Project Territory Consultant AHU FCUs

Ibn Battuta Moven Pick Dubai Yas Marina Hotel Abu Dhabi

Rose Wood Hotel Abu Dhabi Ibn Battuta Movenpick Dubai


Key Project References

Al Khail Avenue Dubai Bahrain City Centre

Saudi Electricity Company Headquarters KSA Al Rayyan Stadium - Qatar


Key Project References

S.No. Year Project Territory Consultant AHU FCUs

Hospital Infectious Diseases- Kuwait Specialist Rehabilitation Hospital Abu Dhabi

Doha Oasis Dr. Sulaiman Hospital - KSA


Key Project References

Dubai Mall Cityland Mall Dubai

Burjeel Hospita l- Reem Island Abu Dhabi Riu Hotel - Palm Deira Dubai
S.No. Year Project Territory Consultant AHU FCUs S.No. Year Project Territory Consultant AHU FCUs
1 1993 WAFI Residential Complex Dubai Ewbank International 25 400 35 1997 WAFI Planet Hollywood Dubai Kennedy & Donkin 1 112
Dubai Equine Hospital for H H Shk
2 1994 Dubai Ewbank International 6 0 36 1998  JBRD Aqua Park Chalets & Projector Room Dubai W S Atkins 4 115
Mohammed
3 1994 Hilton Beach Club, Jumeirah Dubai Ewbank International 2 250 37 1998 JBRD Staff Accommodation – Phase III Dubai W S Atkins 4 600

4 1994 Beach Centre, Jumeirah (BURGER KING) Dubai Kennedy & Donkin 1 15 38 1998 City Center, Dubai – Fashion Café Dubai Mott MacDonald 20

5 1994 Sharjah TV Studio Dubai Ewbank International 5 0 39 1998 Ajman City Center Ajman Kennedy & Donkin 16 120
C56 Building in Corniche Area, Al Dana
6 1994 Abu Dhabi Syr Consultants 2 600 40 1998 Dubai Airport Free Zone –Phase I Building Dubai Dar Al Handasah 45 0
Tower
Dubai World Trade Centre, Residential Central
7 1995 Dubai Dar Al Handasah 1 20 41 1998 Dubai Airport Free Zone Reception Building Dubai Dar Al Handasah
Plant
Dubai World Trade Centre, 4 New Exhibition
8 1995 Dubai Dar Al Handasah 8 15 42 1998 CBRD Aqua Park Package 5410 Dubai W S Atkins
Halls
Shk. Mana & Shk. Mohd. Hotel - Deira (LORD Ian Banham and
9 1995 Dubai 4 400 43 1998 Al Shola Complex Dubai Khatib & Alami 4 850
HOTEL) Associates
Al Naboodah Commercial & Residential Ian Banham and
10 1995 Emirates Training Centre, Garhoud Dubai RMJM Consultants 15 30 44 1998 Dubai 2 412
Building Associates
Ian Banham and
11 1995 Al Bustan Centre, Al Ghusais Dubai W S Atkins 4 800 45 1998 Al Naboodah Office Tower Dubai 2 415
Associates
12 1995 Al Bustan Centre, Al Ghusais Dubai W S Atkins 2 350 46 1998 Mazaya Center Extension Dubai ARTEC Consultants 12 500

13 1995 Guest Villa, Al Ain Palace Dubai Ewbank International 1 30 47 1998 Safa Park Villa - EO Dubai ARENCO 1 0

14 1995 Al Mas Cinema Dubai Al Mas Consultants 4 15 48 1998 Dr. Juma Khalfan Abdulhoul Building Dubai NUTEK Consultants
New Emirates Coop Society Shopping Centre
15 1995 Dubai Air Show ‘95 Dubai Dept. of Civil Aviation 6 25 49 1998 Dubai Al Hatmy Consultants 15 30
at Al Ghusais
16 1995 New Spinney’s Retail Outlet, Dubai Dubai W S Atkins 50 1999 JBRD Staff Accommodation – Phase IV Dubai W S Atkins 4 900

17 1995 Sea Palace Abu Dhabi Syr Consultants 51 1999 Ajman City Center – Phase II Dubai Kennedy & Donkin 15 200

18 1996 Dubai Economic Building – Al Ramool Dubai Arif & Bintoak 52 1999 Gulf Soap Factory Extension Dubai Al Hatmy Consultants
New Al Abbas Building – ANZ Grindlays Bank, G + 11 Building for Dr. Abdulla Hamadi at
19 1996 Dubai Ewbank International 2 600 53 1999 Dubai NUTEK Consultants
Dubai Sharjah
Ian Banham and
20 1996 Sun & Sand Hotel, Deira Dubai 2 350 54 1999 Emirates Golf Club Extension Dubai CASP - MEP
Associates
Jumeirah Beach Resort Development - Beach
21 1996 Dubai W S Atkins 2 25 55 1999 Shk. Ahmed Building, Zabeel Road Dubai Kennedy & Donkin 4 2200
Restaurant
Ian Banham and
22 1996 Royal Imperial Residence, Bur Dubai Dubai 2 360 56 1999 Business Centre for Qassim Sultan Dubai Kennedy & Donkin 6 550
Associates
Rais Hassan Saddi – Distribution Centre at
23 1996 Welcare Hospital Dubai Chawla Consultants 57 1999 Dubai Kennedy & Donkin
JAFZA
Jumeirah Beach Resort Development –
24 1996 Dubai W S Atkins 15 0 58 1999 Gobash Building Dubai Mott MacDonald 2 450
Conference Center
Shk Mohd Bin Khaled Al Nahyan, Private
25 1996 Abu Dhabi Syr Consultants 59 1999 Gulf & Safa Dairy Dubai W S Atkins
Development
26 1997 BURJ AL ARAB – 7 Star Hotel Dubai W S Atkins 635 1003 60 1999 Al Bayan Printing Press Building Dubai Engineer’s Office 15 35
Comml. Bldg. for Mohammad Bin Masood &
27 1997 Dubai Schuster PP 2 350 61 1999 CBRD Staff Accommodation – Phase III Dubai W S Atkins 4 850
Sons
28 1997 Jebel Ali Hotel Extension Dubai Kennedy & Donkin 4 250 62 1999 Emirates Airline, Al Sawari Tower C Abu Dhabi Syr Consultants
JBRD Staff Accommodation at Al Qoze. Al Shawari Tower B, Mercedez Benz Bldg, Abu
29 1997 Dubai W S Atkins 6 650 63 1999 Abu Dhabi Syr Consultants
Phase I & II Dhabi
30 1997 DUBAL General Amenities Building Dubai Kennedy & Donkin 1 0 64 2000 Al Quoz Industrial Development Dubai Engineer’s Office 2 120

31 1997 WAFI Pyramid Health Club Dubai Kennedy & Donkin 65 2000 DCC Cinema Complex Dubai Farmer Cortese 6 0

32 1997 JBRD Staff Accommodtion - Club House Dubai W S Atkins 4 55 66 2000 Al Owais Building Dubai Kennedy & Donkin 2 800
G+M+3 Bldg for Shk. Mohd Bin Hasher
33 1997 DUBAL Administration Building Dubai Kennedy & Donkin 1 0 67 2000 Dubai PHB 4 400
Maktoum
Management Residency Building - Jumairah
34 1997 Ritz Carlton - Jumeirah (ABJAR Group) Dubai Kennedy & Donkin 45 0 68 2000 Dubai W S Atkins 2 350
International
S.No. Year Project Territory Consultant AHU FCUs S.No. Year Project Territory Consultant AHU FCUs
B+G+ M+3 Comm & Resi Bldg on Oudh Ian Banham and
69 2000 Dubai 103 2003 Wafi Shopping Mall – Anchor Bldg. Extn Dubai Roberts & Partners
Metha Road Associates
Ian Banham and
70 2000 Al Makhawi Building Dubai W S Atkins 104 2003 Siemens Building @ Knowledge Village Dubai 24 117
Associates
Ian Banham and Knowledge Village II, B+G+3(6 Bldgs) for
71 2000 Dubai Poly Film Dubai 105 2004 Dubai DAR Consult 26 463
Associates DTMFZ
Grosvenor House, 45 Storey Bldg for HH
72 2000 Fujairah Resort Dubai Mario Associates 106 2004 Dubai Arcon Consultants 33 1016
Sheikh Ahmed
73 2000 Sharjah City Center Sharjah Kennedy & Donkin 10 112 107 2004 Madinat Jumeirah, Phase 3 Dubai RPW Consultants 92

74 2000 T & B International, Jebel Ali Dubai Model Engineering 108 2004 Arabian Ranches, Club House Dubai RMJM Consultants 16

75 2001 National Bank of Dubai, Sharjah Dubai Kennedy & Donkin 2 400 109 2004 Arabian Ranches, Golf Club Dubai RPW Consultants 57
Ian Banham and
76 2001 Spinney’s Dubai 2 181 110 2004 Zulekha Hospital Dubai Mechwatt Consultants 2
Associates
Ian Banham and
77 2001 Cultural Centre Dubai Kennedy & Donkin 20 295 111 2004 Knowledge Village Dubai 26 48
Associates
Ian Banham and
78 2001 Dubai Media City (TAJ Studio) Dubai 112 2004 Gate Building, DIFC Dubai Roberts & Partners 208
Associates
79 2001 Jumeirah Beach Hotel – Leisure Lounge Dubai W S Atkins 3 50 113 2004 Dubai Metals & Commodities Building Dubai 81 420

80 2001 Dubai World Trade Centre – Hall No.8 Dubai RMJM Consultants 18 10 114 2004 Hilton Beach Club Dubai Roberts & Partners 6 110
Hyatt Regency Hotel, AHU’s & FCU’s
81 2001 Victory Team Relocation Dubai Kennedy & Donkin 12 76 115 2004 Dubai WSP 11 400
replacement
Ian Banham and
82 2001 RAK Cement Factory Dubai 116 2004  Dubai Auto Drome Dubai W S Atkins 11 120
Associates
83 2001 G+4 Building for Mr. Mohd. Saleh Dubai - 117 2004  A22A, Bassam Tower at Dubai Marina Dubai W S Atkins 23 1078
Golden Planners Ian Banham and
84 2001 Audi Showroom Abu Dhabi 118 2004  Emirates New Engineering Center Dubai 36 123
Consultants Associates
Ian Banham and Ian Banham and
85 2002 Emirates Aviation Training Center Dubai 35 102 119 2004  G + 5 Building at Hor Al Anz Dubai
Associates Associates
Elite Design & Ian Banham and
86 2002 Damad Medical Factory Dubai 15 120 2004  G + 38 Building at Al Quoz Dubai
Engineering Consultancy Associates
Ian Banham and
87 2002 Ali Bujsaim Building Dubai Development Board 2 114 121 2004  Mankhool Tower for Sheikh Ahmed Dubai 2 304
Associates
88 2002 Bank Melli Iran Dubai W S Atkins 1 181 122 2005 Gold Crest Residential Tower Dubai W S Atkins
National Engineering
89 2002 Dubai World Trade Centre – Hall No. 1 & 2 Dubai RMJM Consultants 31 176 123 2005 2B+G+6 Plot No 313, Al Hamriya Dubai
Bureau
Ian Banham and
90 2002 G+1 Villa at Al Safa Dubai GEMAC 1 0 124 2005  Knowledge Village – Academy City Dubai 0 0
Associates
Ian Banham and
91 2002 Emirates Hills Dubai 28 125 2005  Magic Planet – Mall of Emirates Dubai WSP
Associates
Ian Banham and Ian Banham and
92 2002 Al Nasr Sport Club Dubai 126 2005  Water Front Apartments Dubai
Associates Associates
Ian Banham and
93 2002 Dubai Islamic Bank Dubai 127 2005  Jumairah English Speaking School Dubai W S Atkins
Associates
94 2002 Madinat Jumeirah Phase 2(Hotel) Dubai RPW Consultants 79 128 2005  Jaddaf Tower Dubai W S Atkins
Dubai Media City – 4 Nos. Residential
95 2002 Dubai Mario Associates 635 190 129 2005  Cine Star Complex – Mall of Emirates Dubai WSP
Building
96 2002 Dubai Media City – Leo Brunnett Dubai Mario Associates 3 76 130 2005  Giant Super Market - Rashidiya Dubai WSP
Ian Banham and Ian Banham and
97 2002 Madinat Jumeirah - Staff Accommodation Dubai 19 1269 131 2005  B + G + 12, Al Barsha Dubai
Associates Associates
Ian Banham and
98 2002 Dubai World Trade Centre – Al Wasl Building Dubai RMJM Consultants 132 2005  Dubai Sky Gardens, Phase II Dubai 12 900
Associates
99 2002 Al Raha Beach Hotel Abu Dhabi DMJM Consultants 133 2005  Al Owais Building Dubai RPW Consultants 4 800
IBIS Hotel Extension – Dubai World Trade Ian Banham and
100 2003 Dubai RMJM Consultants 5 22 134 2005 Commercial Bank of Dubai, Ajman Dubai
Centre Associates
Commercial Building Kasim Modh. Al Khafaji, Ian Banham and
101 2003 Dubai 4 135 2005  G + 3 Building, Um Hurair Dubai DAR Consult
Umm Hurair Associates
Ian Banham and
102 2003 Dubai Air Port Freezone – Phase III Dubai 28 50 136 2005  G + 7 Resi Building at Jaddaf Dubai Arif & Bintoak
Associates
S.No. Year Project Territory Consultant AHU FCUs S.No. Year Project Territory Consultant AHU FCUs
Ian Banham and
137 2005  Dubai City Centre, Bin Hindi Dubai Mott MacDonald 171 2007  Al Rand Tower Dubai
Associates
138 2005  G + 7, Butti Obaid Butti Dubai Totentec 172 2007  Al Naboodah Shopping Centre Dubai ARCH Group
National Engineering
139 2005  Bob Al Shams, Endurance City Dubai RPW Consultants 173 2007  Golf Tower, Phase II Dubai
Bureau
140 2005  Suleiman Al Habib Medical Centre Dubai Arif & Bintoak 37 116 174 2007  Saba Tower, Phase II & III Dubai RMJM Consultants 8 1862
 Shk Ahmed Towers (3 nos) @ Juneirah Lake
141 2005  Old Town Development, Phase 1 Dubai Allied Consultants 16 175 2007 Dubai ARCH Group 6 2222
Towers
Ian Banham and
142 2005  Harvey Nichols @ Mall of Emirates Dubai WSP 176 2007 Salam Industrial Park Dubai
Associates
143 2005  Persian Restaurant @ Meadows Dubai Design Consultants 177 2007  Tecom Office Tower Dubai Al Gurg Consultants

144 2005 Dubai Community Theatre & Arts Centre Dubai WSP 11 178 2007  GCAA New Area Navigation Abu Dhabi RMJM Consultants

145 2005  Shk Zayed Mosque Abu Dhabi Hyder Consulting 210 179 2007 Land Mark shopping mall Qatar Arab Engineering Bureau
Jurong International
146 2006 Green Lakes Residentital Dubai ARCH Group 6 2239 180 2008 RTA Bus Depot at Ruwayah Dubai
Consulting
Ian Banham and
147 2006 Emirates Crew Training College Dubai 32 181 2008 2B+G+12 Comm./Resi. Building Dubai DAR Consult
Associates
Ian Banham and
148 2006 DMCC- Gold & Silver Towers Dubai 76 182 2008 Taj Grandeur Residences Dubai ARCH Group
Associates
Palm District Cooling - Palm Jumeirah Trunk
149 2006 Dubai Hyder Consulting 183 2008 2B+G+M+12 Office & Furnished Apts. Dubai ARCH Group
Project
150 2006 GATE Village @ DIFC Dubai Hyder Consulting 208 184 2008 Meydan Racing district Development Dubai CKR Consulting Engineers

151 2006 Marina View Twin Tower @ Marsa Dubai Adnan Saffarini 185 2008 Gateway Towers & Carpark Podium Project Dubai W S Atkins

152 2006 Allied Superhub & Warehouses Dubai Halcrow Consultants 186 2008 Movenpick Hotel & Spa & Oceana Residences Dubai Dar Al Handasah 3145
Ian Banham and
153 2006  Knowledge Village @ Academic City, Phase 2 Dubai 3 0 187 2008  Anantara Tiara Residences, Palm Jumeirah Dubai Dar Al Handasah 45 3900
Associates
Ian Banham and
154 2006  Emirate Flight Catering Facility Dubai 57 4 188 2008 Al Fattan Hotel & Appartment at Palm Jumeirah Dubai Proleed Consultants
Associates
155 2006  The Dubai Mall Dubai Meinhart consultants 606 189 2008  2B+G+8 Comm Residential Building Dubai SPP
Ian Banham and
156 2006  Emaar Business Park Phase I & II Dubai 91 190 2008  2B+G+16 Comm and Residential Building Dubai Arif & Bintoak
Associates
157 2007 Burj Dubai Project(Burj Khalifa) Dubai Hyder Consulting 5800 191 2008  Dubai Rehabilitation Centre Dubai Schuster PP
Tangram Architects &
158 2007 Dubai Municipality Branch Office at Al Twar Dubai 192 2008 RAK Silicon Oasis Dubai Mario Associates
Consultants
 Business Park at Business Bay, Dubai
159 2007 IBN Batuta Gate Complex(Hotel Building) Dubai Dar Al Handasah 37 1476 193 2008 Dubai Kling Consult 2600
Properties
160 2007 Burj Dubai Lake Hotel(Address Hotel) Dubai W S Atkins 2378 194 2008  Dubai Mall Project-Tenant FitOuts Dubai
G+55 Storey Commercial Office & Residential Ian Banham and
161 2007 Dubai 6 2000 195 2008  Laguna Tower Dubai Al Gurg Consultants
tower & G+8 Car Parking Building Associates
Ian Banham and
162 2007  Dubai World Trade Centre, Residences Dubai Hyder Consulting 10 196 2008  Oceana Heights, Dubai Marina Dubai
Associates
163 2007  Dubai Sky Gardens Dubai W S Atkins 197 2008  One at Business Bay Dubai Spec Consultants
Ian Banham and
164 2007  Sheraton Hotel Staff Accomodation Dubai 198 2008  Bays Water Tower Dubai Dynamic Consultants
Associates
165 2007 Ducto Group Head Quarters Building Dubai Mario Associates 199 2008 3B + G + 6 Commercial Bldg Dubai Mario Associates
Ian Banham and
166 2007  Al Sofouh Tower at TECOM Dubai 200 2008  Fairmont Residences, IFA Dubai RPW Consultants 63
Associates
Ian Banham and
167 2007  Masar Printing Press Dubai 16 201 2008 Salam Studio Dubai Clarke Samadhin
Associates
Ian Banham and
168 2007  Al Nasr Sports Club Dubai 202 2008 First Gulf Bank Dubai -
Associates
Ian Banham and Ian Banham and
169 2007  Al Tayer Tower Dubai 203 2008  2B+G+3 Comm Resi Bldg Dubai
Associates Associates
Ian Banham and
170 2007  Al Rostamani Tower G + 55 Dubai 204 2008  Al Shafar Development Dubai W S Atkins
Associates
S.No. Year Project Territory Consultant AHU FCUs S.No. Year Project Territory Consultant AHU FCUs
Al Ajmi Engineering Meydan Grand Stand Extention 6,7,8,9,10,11
205 2008  2B+G+29 @ Internet city Dubai 239 2010 Dubai Proleed Consultants
Consultants Floors
B + G + 3 University Campus Building,
206 2008  2B+G+M+7 Comm & Resi Bldg Dubai Arif & Bintoak 240 2010 Dubai Proleed Consultants
Academy City
 2B+G+16 Residential Commercial Building at
207 2008 Dubai Schuster PP 241 2010 Dubai Sports City – Stadium Dubai ARUP Consultants
Al Nahda
208 2008 RAK Bank @ RAK Dubai Mario Associates 242 2010 Fairmont Hotel – Palm Jumeirah Dubai Proleed Consultants
B+G+10 Residential Commercial Building at
209 2008 Dubai Arif & Bintoak 243 2010 Oberoi Hotel - Business Bay Dubai Halcrow Consultants
Al Nahda
G + 1 Building, Plot Knowledge Village5, Ian Banham and
210 2008 Vision Tower Dubai Dewan Al Emara 244 2010 Dubai
Academy City Associates
Construction of Married Staff Accommodation,
211 2008 Hotel & Staff Accomodation - Baniyas Island Abu Dhabi Norr Consultants 245 2010 Abu Dhabi ADNOC
Facilities and Related Infrastructure- Package- 6B & 6C
212 2009 Yas Marina Hotel Abu Dhabi Red Engineering 246 2010 Al Muneera- Khol Al Raha- Al Raha Beach Abu Dhabi Waterman Emirates 76

213 2009 Burj Al Salam(Sheraton Hotel & Office) Dubai DAR Consult 40 1200 247 2010 Weatherford Manufacturing & Training Facility Abu Dhabi Spec Consultants
CRHI Consulting
214 2009 Jabel Ali Industrial Bus Depot Dubai 248 2010 Crown Plaza & Business Park Qatar Arab Engineering Bureau 790
Engineer
215 2009 Nad Al Sheba, Race Course Dubai Teo A Kling 249 2010 Regent hotel Qatar KEO International 45 800

216 2009 G + 2, Police Station Dubai Al Fahidi Consulatant 250 2010 Qatar Silhouette Tower Conference Centre Qatar Hill International 17

217 2009 Medical Centre @ Dubai Mall Dubai 251 2010 XK-50 Zikreet Office Building Qatar Halcrow Consultants 5 90

218 2009 Watch Gallery @ Dubai Mall Dubai 252 2010 Inter Continental Hotel & Silhoute Tower Qatar Shaker 55 150
Construction of the New Head Quarter Gulf Engineering
219 2009 Kinukiuya Book Store @ Dubai Mall Dubai 253 2011 Dubai
Building for Ministry of Defence Pension fund Consultants
220 2009 Down Tower, Jebel Ali Dubai Lehr Consultants 254 2011 Residential Tower on Plot no. 50 & 51 Dubai Arif & Bintoak
Ian Banham and QHC Architects &
221 2009 Technopark Head Quarters Dubai 255 2011 Sharjah Beach Resort Hotel Sharjah
Associates Engineers
222 2009 IBN Batuta – Hotel Building Dubai Dar Al Handasah 42 1235 256 2011 Sofitel Staff Accomdation Dubai Mirk

223 2009 Jumeirah Heights Dubai ARENCO 257 2011 Al Shamshi Office Building Dubai Kling Consult
TYPSA Consulting
224 2009 2B+G+M+34 at Tecom Dubai Dubai Consultants 258 2011 Teaching Staff Housing- Ministry (First Stage) Saudi 3431
Engineers & Architects
Ian Banham and Dorsch Gruppe- DC Abu
225 2009 V76, Platinum Tower Dubai 259 2011 Abu Dhabi Airbase Abu Dhabi
Associates Dhabi
Dewan Architects &
226 2009 Marriott Hotel Extension Dubai Proleed Conslutants 260 2011 Abudhabi Future Schools Program- Package-6 Abu Dhabi
Consultants
LACASA Architect & Abudhabi Future Schools Program- Phase 2- Dewan Architects &
227 2009 Sky Courts Apartments Dubai 4717 261 2011 Abu Dhabi
Engineering Consultants Package -2 (Al Ain) Consultants
228 2009 Meydan District Cooling Project Dubai 262 2011 Rosewood Abudhabi Abu Dhabi WSP 47 970

229 2009 Cinestar, Mirdiff City Center Dubai Red Engineering 263 2011 Ruwais Shopping mall Abu Dhabi ADNOC 33 95

230 2009 Fitness First-Mirdiff City Center Dubai Diplomat Engineering 264 2011 Al Wifaq Tower Abu Dhabi Mayer Consultants

231 2009 2B+G+18 Tecom Building Dubai Proleed Consultants 265 2011 Private Villa (BVS-42) B+G+2 Qatar Arab Engineering Bureau
Energy Centre & Multilevel Car Park at Onaiza
232 2009 Nabil Ali Bin Ali Villas Qatar - 266 2011 Qatar Projacs 17 110
Road
233 2009 Al Wakra Hospital Qatar GHD Global 700 267 2011 World Trade Centre Qatar MZ & Partener 154

234 2009 Bahrain City Center Bahrain Mott MacDonald 268 2011 Showroom & office Building Qatar DIWAN

235 2010 Palm Jumeirah Resort & Spa Dubai Mirk 41 269 2011 Aspire Zone Qatar Projacs

236 2010 Al Ghurair City Expansion -II Dubai Arif & Bintoak 270 2011 Al Nassar Showroom Qatar James & Cubit

237 2010 Lagoona Beach Hotel Dubai 271 2011 School Projects Qatar Ministry of Education 34
Engineering Consulting
238 2010 DAMAC Park Tower at DIFC Dubai 272 2011 Jaidha Villa Qatar Arab Engineering Bureau 5 40
Group
S.No. Year Project Territory Consultant AHU FCUs S.No. Year Project Territory Consultant AHU FCUs
273 2011 Ramada Hotel Fit out project Qatar KEO International 307 2013 Caliper Warehouse Extention, DLC Dubai Dynamic Consultants
Emirates Engineering Centre- New light Ian Banham and
274 2012 Dubai Hill International 308 2013 G + 3 Residential Building, Umm Hurair Dubai
maintance hanger Associates
Associated Consulting
275 2012 Kingdom of SHEBA Dubai 309 2013 G+5 Residential Building, Umm Hurair Dubai Adnan Saffarini 4
Engineers
Alkhwajah Engineering Consistent Engineering
276 2012 Warehouse and Shed Dubai 310 2013 DMA Proposed Warehouse Dubai 2
Consultancy Consultants
277 2012 Private Villa @ Al Mizhar Dubai Mario Associates 311 2013 G + 2 School at Qusais Dubai Safeer Engg Consultants 3

278 2012 Lake Side Tower Dubai ZASPAS 312 2013 Commondo of Military Works, 10093-C001 Dubai CMW
Al Haramain High Speed Rail Phase 1 Package
279 2012 Oasis Hospital Al Ain Aurecon, ECDG 313 2013 Saudi Dar Al Handasah
2
Omrania & Associates Architecture
280 2012 Students Accomodation @ Knowledge Village Dubai Proleed Conslutants 314 2013 Hilton Riyadh Hotel & Residence Saudi 1748
& Engineering Consultants
King Saud University- Girls Campus Project-
281 2012 International Holy Quran Building, Dubai ARTEC Consultants 315 2013 Saudi Saud Consult
Riyadh
Abudhabi Future Schools Program- Phase 4-
282 2012 German Embassy Saudi Buro Happold 316 2013 Abu Dhabi KEO International
Package 3 (AL Yahar Aliyah)
283 2012 Akkadian Pent House Abu Dhabi CKR Consulting Engineers 317 2013 Al Silla Community Hospital Abu Dhabi HDP Consultants 27 82
Abudhabi Future Schools Program- Phase 4-
284 2012 Hydra Avenue Abu Dhabi MZ Consultants 2230 318 2013 Abu Dhabi KEO International
Package 5 (Al-Shuwaib-Al-Ain)
Abudhabi Future Schools Program- Phase 4-
285 2012 Southern Sun Abu Dhabi Derby Consultants 525 319 2013 Abu Dhabi W S Atkins
Package 2 (Al Salamat & Al Neima)
Construction of Ghanem Holdings Office
286 2012 Qatar Arab Engineering Bureau 12 90 320 2013 TDC-Tawam Dialysis Centre- Al Ain Abu Dhabi Stantec
Building
Zayed Military City, New Building in Armour
287 2012 Doha Festival City- 7500 Energy Centre Qatar Arab Engineering Bureau 3 36 321 2013 Abu Dhabi CMW 28 256
School Camp
Dara Engineering Ruwais Housing Complex Expansion phase III,
288 2012 Burj Marina 08 Qatar 45 670 322 2013 Abu Dhabi ADNOC
Consultant Bachelor Flats- Package 3
Associated Consulting Abudhabi Future Schools Program- Phase 4-
289 2012 Salwa Resort Phase I Qatar 34 360 323 2013 Abu Dhabi KEO International 60
Engineers Package 3 (Al Yahar Aliyah)
290 2012 North Gate Phase I - Mall & Office Building Qatar GHD Global 62 540 324 2013 Al Mafraq Hospital Abu Dhabi Burthil 113 558
Architectural Consulting Dewan Architects &
291 2012 Twin Towers Project Qatar 54 1470 325 2013 Premier Inn Hotel Abu Dhabi 8 380
Group Consultants
292 2012 City Centre Doha, Reconstruction Phase II Qatar GHD Global 326 2013 IPIC Tower Abu Dhabi W S Atkins 18

293 2012 Al Deeble Tower Qatar Projacs 330 327 2013 Iconic Green House Abu Dhabi MZ Consultants 14 21
Gulf Engineering
294 2012 Court Complex @ Rustag Oman 21 6 328 2013 Universal Hospital Abu Dhabi Society Technical House 4
Consultants
New Head Quarters Building – Ministry of Gulf Engineering
295 2012 Oman 7 329 2013 Al Mafraq Hospital, Annexure Building Abu Dhabi Hill International 6 84
Defense Consultants
Medeor Hospital- 3B + G + M + 5 Floor, Umm
296 2013 Dubai DAR Consult 40 191 330 2013 Ayla Hotel, Al Ain Abu Dhabi Shankland Cox 15 450
Hurair
Associated Consulting
297 2013 Al Fahad-II Residential Tower Dubai 4 858 331 2013 Dubai Studio Abu Dhabi AECOM 29
Engineers
298 2013 Emirates Hangers – Dubai Dubai ADPI 42 102 332 2013 Marsa Malaz Hotel at Pearl Qatar(P-352) Qatar Arab Engineering Bureau 65 630

299 2013 Bourn Hall IVF Centre, Clinic Dubai Hosmac 333 2013 QMA Tower-2 Qatar Arab Engineering Bureau

300 2013 Prime Medical Hospital Dubai Dubai Consultants 31 334 2013 A.F. Palace (LPE 22 to 26) @Pearl Qatar Qatar Arab Engineering Bureau

301 2013 Labour Accomodation Dubai 335 2013 Naufar project Qatar Stantec 88 460

302 2013 Mina Al Fajer – Fairmont Hotel Fujairah ERGA 34 332 336 2013 Sheikh Abdul Rahman Al Thani Villa Qatar ERGA 12 120
Engineering Consulting
303 2013 Binary Tower Dubai Clarke Samadhin 337 2013 CP/14-3 The Pearl Qatar Fire Station Qatar 6 10
Group
304 2013 Distinction Tower Dubai ZASPAS 4 667 338 2013 Hilton Hotel at Salata Qatar ERGA 9 375
VIP Villa at Lusail/ Design & Build of Majlis at EHAF Consulting
305 2013 Suleiman Habib Hospital Dubai Arif & Bintoak 42 65 339 2013 Qatar 20
Lusail Villa Engineers
Consistent Engineering
306 2013 School for United Holdings Dubai 340 2013 GTC-007/12 Seef HQO Fit Out Project Qatar James & Cubit
Consultants
S.No. Year Project Territory Consultant AHU FCUs S.No. Year Project Territory Consultant AHU FCUs
Abudhabi Future Schools Phase 4- Package-6-
341 2013 Ali Al Fardan Palace Qatar Arab Engineering Bureau 375 2014 Abu Dhabi W S Atkins
chinese school
342 2013 Qatar Museum Qatar Arab Engineering Bureau 376 2014 Chinese School Abu Dhabi W S Atkins 17

343 2013 Mscherieb Heart of Doha Qatar Ramboll 7 377 2014 Four Seasons Hotel Abu Dhabi AECOM 1342

344 2013 Muscat Airport Development – MC2 Oman ADPI 23 378 2014 Marina Mix 50 @ Lusail Qatar Arab Engineering Bureau 1 330
3B + GR + 7P + 19 story office building on
345 2014 Dubai ARCH Group 379 2014 Development of ISF Camp- Al Duhall Qatar KEO International 110
plot D-001-004
346 2014 Rajmahal Theatre at Bollywood Parks Dubai Kling Consult 19 146 380 2014 Handball Stadium(Multipurpose Sports Hall) Qatar Hill International 34 366
QHC Architects &
347 2014 Aster Hospital Dubai 19 243 381 2014 Intercontinental Hotel Extension Qatar Dar Al Handasah 45
Engineers
Construction of Accomodation for Officers, warrant
348 2014 Dubai Al Torath Consulting 382 2014 Sinyar Tower- 2B+G+52- Service Apartment Qatar DIWAN 1100
officers, Soldiers & Gym for Khalifa Bin Zayed 2nd bridge
Proposed Hospital Development Building
349 2014 Dubai Arif & Bintoak 42 65 383 2014 Al Thuraya Tower at Al Dafna Qatar DIWAN 11 1234
(3B+G+6+Roof)
350 2014 City Walk (Hotel 1) Dubai WME Consultants 410 384 2014 Burj Marina Com 11 Qatar GHD Global 9 256

351 2014 R-1012 Hotel Mina Port Rashid Dubai Dimensions 3 212 385 2014 Marriot Rebranding Qatar DIWAN 3

352 2014 R-1013 Al Muraqabat Dubai Dimensions 5 210 386 2014 QIB The Gate Qatar DISCO

353 2014 EKFC New Cold Room Stores @ Al Rowaiyah Dubai ARTEC Consultants 6 20 387 2014 Hilton Double Tree Qatar DIWAN 28 190
Associated Consulting
354 2014 Landmark project Dubai ARCH Group 172 388 2014 KPMG Project Qatar
Engineers
Al Ajmi Engineering
355 2014 B+G+12+R Building, Wadi Al Safa Dubai 2 304 389 2014 Grand Majlis Beach Villa Qatar Arab Engineering Bureau
Consultants
356 2014 J490 – Emirates NBD PJSC @ Deira Dubai SPW 2 29 390 2014 Sheikh Tamim Beach Villa Qatar Design & Build

357 2014 Pearl Diving Pool Dubai Halcrow Consultants 13 115 391 2014 BVN Villa at Pearl Qatar Qatar UDC

358 2014 Burj Khalifa Level 125 and 148 Dubai WSP 15 392 2015 Dubai Safari (Safari Village) Dubai Al Torath Consulting 22

359 2014 Medstar Surgical Day Center Dubai Hosmac 7 13 393 2015 New DM Building Dubai Adnan Saffarini
Dewan Architects &
360 2014 Mazaya Center Extension Dubai ARTEC Consultants 4 198 394 2015 River Park RD&E - Structural Package Dubai
Consultants
QHC Architects &
361 2014 B+G+2P+9 Storey Beach Resort Hotel Dubai 11 640 395 2015 Moorfields Hospital Eye Centre Dubai Hosmac
Engineers
QHC Architects &
362 2014 Mixed Used Tower, Sharjah Sharjah 7 386 396 2015 Meeras Outlet Village Dubai WSP 16 85
Engineers
Golden Planners
363 2014 3B + G + M + R Commercial Building Abu Dhabi 397 2015 Maliha Hospital Sharjah AE7 50
Consultants
Construction of Building & Store and Other
364 2014 Abu Dhabi CMW 398 2015 Military Sec. School Sharjah Sharjah CMW 78
Works for Artillary Corps at Camp no (141259)
Abudhabi Future Schools Program- Phase 4-
365 2014 Abu Dhabi W S Atkins 399 2015 Al Rayyan Complex, Sharjah Sharjah Halcrow Consultants 26 6
Package 1 (Al Jimi & Al Muwaiji)
Al Rahba Hospital Renovation Emergency EHAF Consulting Ian Banham and
366 2014 Abu Dhabi 400 2015 Kaloti Refinery Dubai 5 78
Department Expansion Engineers Associates
Construction of Building for the Weapon
367 2014 Abu Dhabi CMW 401 2015 Kuwait International Airport Kuwait Dar Al Handasah 59
Command of General Maintenance at Camp
368 2014 Construction of Building at Liwa Air Base Abu Dhabi CMW 402 2015 JW Marriott Renovation Kuwait - 416
Construction of Accomodation for National
369 2014 Abu Dhabi CMW 403 2015 Emirates Hospital Dubai Hosmac 36
Service at Khawla Bint Al Azar
CV Tech Consulting
370 2014 Sheikh Khalifa Medical City, Dialysis Center Abu Dhabi Leo A Daly 404 2015 Orthopedic Hospital Dubai 15 180
Engineers
371 2014 Arab Bank Renovation Abu Dhabi MIMAR Group 405 2015 Tiarra Hotel Extension Dubai Dar Al Handasah 15 200
EHAF Consulting
372 2014 Construction of Building K3 (1st Phase) Abu Dhabi CMW 406 2015 Centro Rotana Hotel - Riyadh Saudi 15 200
Engineers
EHAF Consulting
373 2014 Zayed Military City / CMW-11041-C004 Abu Dhabi CMW 407 2015 Centro Rotana Hotel - Al Khobar Saudi 19 292
Engineers
PGC (Construction of Accomodation for Officers, Warrant Engineering Consulting
374 2014 Abu Dhabi Al Torath Consulting 20 298 408 2015 Construction of CICPA Camps at Shah Abu Dhabi
Officers, Soldiers & Gym for Khalifa Bin Zayed 2nd Bridge Group
S.No. Year Project Territory Consultant AHU FCUs S.No. Year Project Territory Consultant AHU FCUs
Ruwais Housing complex expansion phase 4
409 2015 Abu Dhabi ADNOC 10 453 443 2016 Centro Rotana Hotel Alkhobar AUH Ehab 34 292
Design & Construction of District Cooling Plant
Construction of Science Building Section & Aref Sadeq Design
410 2015 Abu Dhabi CMW 444 2016 M-157 / Al Salam Hospital Bahrain 35 150
Other Works CMW 13019 Consultants
Orthopedic Specialty and Specialty Clinics CV Tech consulting
411 2015 Al Mamoura School Abu Dhabi AECOM 25 445 2016 Dubai 19 0
Center, Dubai Health Care City engineers
412 2015 National Rehabilitation Center Abu Dhabi HDP Consultants 446 2016 ISF Camp Qatar AEB / KEO 138 5920
Safa Hypermarket LLC at Al Waha Mall-Alain Architectural & Dewan Architects &
413 2015 Abu Dhabi 447 2016 Green Community Dubai 351 3006
UAE Engineering Consultants Consultants
Engineering Consulting
414 2015 Construction of Shah Accomodation Complex Abu Dhabi 448 2016 American Academic School Qatar Sketch Engineering 9 123
Group
415 2015 Chailhoub Yas Mall @ Abu Dhabi Abu Dhabi Bluehaus 449 2016 Mahawi 2 AUH CMW 8 350
Construction of Building in Camp 141276 in
416 2015 Abu Dhabi CMW 450 2016 ISF CPC05 - Traffic Control Center Qatar AEB /KEO 31 117
Zayed Military City
Weathertech
417 2015 Ferrari World Abu Dhabi Phase 2 Abu Dhabi AECOM 11 27 451 2016 Oscar Barari Mall AUH 5 0
Electromechanical Cont.LLC
Construction of Different Facilities at Al Hamra
418 2015 Abu Dhabi CMW 452 2016 Ortus Hospital, Al Garhoud Dubai Dubai Hosmac 2 0
CMW C000-9003
Arkan Architech
419 2015 Emirates Pearl Hotel Abu Dhabi 230 453 2016 Nakheel Mall, Palm Jumeirah, Dubai Dubai WME Consultants 0 372
Consultant
420 2015 Mall of the Emirates VIP Valet EN-3B Abu Dhabi WSP 454 2016 Motion Gate, Meraas Outlet Village Dubai WSP 4 5
Construction of LE Boulevard, Al Saad Street,
421 2015 Qatar Arab Engineering Bureau 450 455 2016 Emirates Hospital Dubai Arif & Bintoak, Hosmac 31 0
Doha
Architectural & Planning
422 2015 Kenzo Shop at Lagoona Mall Qatar 456 2016 Dashen Bank, Ethiopia Dubai Al Futtaim 29 0
Group
Architectural & Planning
423 2015 QNB SHMOUKH Tower Qatar 457 2016 AJ15-0921(ML) Dubai Dynamic Consultants 0 98
Group
424 2015 Physiotherapy & Gym for Al Emadi Clinic Qatar Gulf Consulting Group 458 2016 Aspire Academy Expansion at Aspire Zone Qatar KEO International 71 473
Oman Convention Centre, Package 4- Hotel
425 2015 Majilis Ghanam Al Qubaisi Duhail, Qatar Qatar ERGA 9 19 459 2016 Oman W S Atkins 0 156
1- Marriot
426 2015 QATAR AIRWAYS SIMULATION CENTRE Qatar CEG 460 2016 Le Royal Meridien Hotel Dubai 0 319

427 2015 Al Khor Project Qatar Arab Engineering Bureau 461 2016 Fort Bldgs & Infrastructure Package 2 E&M Qatar AEB / AECOM  0 69
Aspire Academy Expansion at Aspire Zone
428 2015 QIB AL RAYYAN PROJECT Qatar Arab Engineering Bureau 462 2016 Qatar KEO International 22 92
- E&M
429 2015 West Bay Medical Centre Qatar MZ & Partener 463 2016 Dar Al Kamal Hospital Dubai Hosmac 19 50
Port Buildings & Infrastructure Package 2 -
430 2015 Oman Airport - MC 12 Oman Gafari Consultant 100 464 2016 Qatar AEB /AECOM 40 177
NPP0064 - E&M
Port Buildings & Infrastructure Package 2 -
431 2015 Oman Convention Centre Hotel 1 Oman W S Atkins 536 465 2016 Qatar AEB /AECOM 10 177
NPP0064 - E&M
432 2015 Oman Convention Exhibition centre, Hotel-2 Oman W S Atkins 445 466 2016 Kempinski Zengo Restaurant Qatar AEB  4 0
Construction, Completion, & Maintenance of
433 2015 3 S Facility by Zubai Group Oman Intersoal Consultant 4 467 2016 Qatar KEO International 23 0
Aspire Academy
434 2015 Al Salam Hospital Bahrain Arif Sadeq Consultants 36 200 468 2016 Dubai World Trade Center - CP 02 Dubai WSP 34 594

435 2015 AL Fardan Bike Showroom Qatar Arab Engineering Bureau 469 2016 QNB Al Saad-M-MRS 1 Qatar APG 0 23
Construction of New Secondary School at Architectural & Planning
436 2016 Abu Dhabi 470 2016 Boulevard Mall Qatar DARA 67 0
Ruwais Group
Makan Consulting
437 2016 Toyoto 3S Facilities- Wave Building Abu Dhabi 471 2016 VOX Cinema at Doha Festival City Qatar Qatar APG 22 14
Engineers LLC
438 2016 Al Meera NBCS @ Um Slal Ali Qatar Arab Engineering Bureau 472 2016 CMW 13025 AUH CMW 0 119
B+G+3P+19 BUSINESBAY, PLOT NO -BB. DEVELOPMENT
439 2016 Dubai 2 520 473 2016 CMW-13016-C002 AUH CMW 6 10
B01.062 AT DUBAI CONSULTING ENGINEERS
440 2016 CMW AUH CMW-14036 20 121 474 2016 Taiba Hospital Dubai Jaber Jamal Engineering 0 109
Doha Oasis Mixed Use Development, Doha
441 2016 CMW AUH CMW 14034 0 180 475 2016 Qatar AECOM 151 209
(DOMUD) - Qatar
442 2016 Oman Convention Centre, Package 4 Oman W S Atkins 0 537 476 2016 Aspire Academy Qatar KEO International 16 28
S.No. Year Project Territory Consultant AHU FCUs S.No. Year Project Territory Consultant AHU FCUs
Al Waha Engineering
477 2016 Maria 3 & Al Jaddaf Residential Towers AUH 1 159 511 2016 Al Salaam Compound Saudi Arabtech Jardaneh 3 0
Consultant
478 2016 CMW 13025 AUH CMW 19 119 512 2017 CMW-15086 C001 AUH CMW 10 74
Al Meera Convenience Store at Rawdat Aba El Golden Sands Laundry At Dubai Investment
479 2016 Qatar Arab Engineering Bureau 3 55 513 2017 Dubai Arenco 6 43
Heran PJ29 Park, Dubai On Plot # 598-1120
480 2016 Burjeel Day Care Center AUH STH 16 27 514 2017 Al Waab & Mshereib Offices Qatar Design Build 7 0
MIXED USE COMPLEX AT SHATTI AL
481 2016 Burjeel Speciality Hospital, Sharjah Dubai Al Rowadh Al Tasmeem 18 153 515 2016 Oman SEMAC 8 0
QURUM-WATER FRONT SITE
Orian Engineering
482 2016 Downtown Jabel Ali Dubai Bel Yoahah 0 311 516 2017 Labour Accommodation at DIP AUH 1 202
Consultant
483 2016 Energy Center at Khalifa Stadium Qatar Dar Al Handasah 8 54 517 2017 CMW 15124 AUH CMW 8 8

484 2016 Premier Inn Hotel Qatar Arab Engineering Bureau 5 0 518 2017 CMW 13093 C001 AUH CMW 8 208
Residential Tower for Mr. Mohamed Salem Al Pioneer Engineering
485 2016 AUH 2 575 519 2017 Specialist Rehabilitation Hospital-(SRH) AUH Hoare leo 31 367
Menhali Consultant
486 2016 Tiara Hotel Dubai ECO 9 547 520 2017 LA MER WATER PARK Dubai Dynamic Consultants 14 67

487 2016 Providence Tower @ Jufffair Dubai Areh 2 245 521 2017 Kindergarteb @ Altawwar Second Dubai Althurath Engineering 3 0
Dimension Engineering 0010 Deyaar - Barsha Hotel by Deyaar Devt.
488 2016 Al Naqi Center, Fox Hills Lusail Qatar 5 35 522 2017 Dubai Meinhart consultants 0 137
Consultant PJSC
Dimension Engineering Emirates Engineer
489 2016 Andulus School Qatar 107 590 523 2017 G + 2 Staff Accomodation Dubai 0 339
Consultant Consulting Engineering LLC
Ian Banham and
490 2016 OIA G+5 Residential Development Dubai 8 901 524 2017 MCC Seeb Oman Nil 4 0
Associates
Architecture & Planning
491 2016 Wafi Hotel Complex & Mall Expansion Dubai The Hidi Group 169 1331 525 2017 Vox Cinemas @ Nakheel Mall Dubai 22 0
Group
492 2016 Nozul Qatar NA 10 0 526 2017 Sheikh Abdul Aziz Villa Qatar NA 3 0

493 2016 Address Hotel Dubai WME Consultants 0 1004 527 2017 Vendom Mall Qatar MZ & Partener 30 110

494 2016 ISF-SPS-02 Qatar DAR AL HANDASAH 42 0 528 2017 GALLERIES LAFAYETTE Qatar ERGA 57 71
Doha Oasis Mixed Use Development, Doha EHAF Consulting
495 2017 Qatar AECOM 8 232 529 2017 Lusial Office Tower Qatar 12 206
(DOMUD) - Qatar Engineers
GV-11, 5B+Services+concourse+8 story Ian Banham and HVAC refurbishment work @ new lab building
496 2016 Dubai 0 151 530 2017 Dubai Dubai Municipality 6 0
commercial DIFC Associates in DCL
OIA G+5 residential develpoment, motor city, Ian Banham and
497 2016 Dubai 8 0 531 2017 Lubna Villa @ Al Khawaneej, Dubai Dubai ECG 2 62
Dubai Associates
Staff accomodation, Hatta (PJ-10084) - Plot #
498 2016 Dubai Al Burj Consultant 4 566 532 2017 ISF-CPC-07b Qatar KEO International 63 1849
8913043
H.A.K Arch’l & Eng’g
499 2016 Al Muhaidb BQ Saudi 6 356 533 2017 OFFICE BUILDING KHALIFA STADIUM Qatar DAR AL HANDASAH 16 1
Consultant
500 2016 CMW 14109 Diafa Air Base AUH CMW 11 0 534 2017 Doha Oasis Hotel Tower Qatar AECOM 34 241
Sharjah Engineering Specialized Rehabilitation Hospital Project
501 2016 Al Mamzar 147 Sharjah AUH 0 846 535 2017 AUH HOARE LEA 31 0
Consultant ,Abudhabi
LACASA Architect & Conin Incorporated
502 2016 Badr Phase -1 im Muhaisnah - 1st, Dubai Dubai 14 0 536 2017 HSBC Headquarters Dubai 4 0
Engineering Consultants Consultants
503 2017 Wafi Hotel Complex & Mall Expansion Dubai The Hidi Group 0 40 537 2017 Almouj wave Plaza Hotel Oman Parsons 4 20
Development of Internal Security Forces (ISF)
504 2016 Le Mirage Hotel Qatar Arab Engineering Bureau 11 0 538 2017 Qatar DAR AL HANDASAH 3 61
Camp at Al Duhail
H.A.K Arch’l & Eng’g
505 2017 497/15-M Club Villas the palm jumeirah Dubai Dubai ACE 0 83 539 2017 Al Muhaidb BQ Saudi 0 240
Consultant
Ministry of Justice and Federal Courts Complex
506 2016 AUH DEC & Hills 67 0 540 2017 Private Villa (92,93,94), Al Gurm, Abu Dhabi AUH MZ Architect 19 93
, Abu Dhabi
Jumeirah Village, Al Khail Avenue And Hotel,
507 2016 ISF-TCC-05 Qatar KEO International 4 0 541 2017 Dubai DAR AL HANDASAH 66 640
Dms 145192
G+20 Single Tower, G+20 Twin Tower Left Al Boniyan Consulting
508 2016 Perlita Garden Qatar James Cubit and Partners 0 658 542 2017 Dubai 0 1057
Side,G+20 Twin Tower Right Side Engineers
563/17-C P076 Secondary Technical School Elite Design &
509 2017 Al Jaddaf AUH Kling Consult 1 160 543 2017 AUH 30 308
(Sts) Banyas North Engineering Consultancy
B+G+10+R Hotel Bldg @ Dubai Biotech & Dubai Trade Centre District Phase 1A6-Dubai
510 2017 Dubai ARC 1 377 544 2017 Dubai WSP 46 685
Research Park (DTCD)
S.No. Year Project Territory Consultant AHU FCUs S.No. Year Project Territory Consultant AHU FCUs
545 2017 Tiara Hotel Dubai ECC 30 12 579 2018 Deira Waterfront Plot 13 Dubai AE7 16
Ruwais Housing complex Phase IV- Central park
546 2017 Al Rayyan Stadium, Energy Centre Qatar AECOM 5 50 580 2018 AUH AMAR Goldendesign LLC 4
& Villa Community

547 2017 Proposed Trilogy Logistic Mega Distribution Center Dubai DCM International 41 26 581 2018 RIU Hotel Dubai DAR AL HANDASAH 27 1176
Al Wasl Al Jadeed
548 2017 G+P+4 Residential Building (Eaton Place), JVC Dubai 2 0 582 2018 Doha Oasis AHUs Qatar AECOM 9 190
Consultants
2B+G+M+10 KHALIDIYA HOTEL ON PLOT Architecture Corner
549 2018 Dubai 14 428 583 2018 Mobil Jamuna Bangladesh - 2 139
NO. 1240578 AT MURAQQABAT Engineering Consultants
Cityland Mall Develpoment on Plot
550 2018 IMPERIAL AVENUE @DOWNTOWN Dubai ARCH Group 11 2495 584 2018 Dubai MBA Anarchistic 80 189
No.6468108 @ Wadi Al Safa
National Engineering
551 2018 B+G+8F (Gateway) RAK 2 585 2018 Musherieb Properties Phase -4 Qatar CEG 11 99
Bureau
Hotel Staff Accommodation G+ 4 Al Warsan (35 Consistent Engineering
552 2018 RBW3-C4 AT AL RAHA AUH MZ Architects 1 120 586 2018 Dubai 61
Bld) Consultants
Consistent Engineering
553 2018 Commercial & Res. Building "G+4P+17+R" Dubai 2 277 587 2018 Vendom Hotel-FCUs Qatar Salfo consultant 0 281
Consultants
554 2018 Ramla Tower Saudi ERGA 8 946 588 2018 18K Agility Global Logistics warehouse Dubai Agility 31
Dubai Creek Harbour -Harbour Gate project
555 2018 Le mirage Downtown Qatar Arab Engineering Bureau 3 589 2018 AUH Group Consultant 0 1743
P3080
Proposed B+G+2P+15+Gym Commercial & FUTURE ART
556 2018 Al Rayyan stadium part 3 Qatar AECOM 21 590 2018 Dubai 1 316
Residential building ENGINEERING
G+2F+R+UR Residential Commercial Building_ National Engineering
557 2018 THE MUSEUM OF FUTURE Dubai BAM Higgs & Hills L.L.C 59 132 591 2018 Dubai 6
UAE Bureau
558 2018 RBW7-20 AUH MZ Architects 1 243 592 2018 GOLD CREST MALL PAK SEM Engineering 42 90
Godwin Austen Johnson
559 2018 Vida Hotel, Dubai Creek Dubai 26 444 593 2018 Khawaaneej Community Mall Dubai Engineering Office 14 24
Architects
560 2018 Ibn Battuta Mall Expansion - Avani Hotel Dubai DAR AL HANDASAH 8 518 594 2018 The Pulse - Mixed use Project - Parcel 4 Dubai W S Atkins 5 399

561 2018 Dolmen City Tower, A&B Clifton PAK Fahim Ninja Disouza 140 595 2018 The Pulse - Mixed use Project - Parcel 1 Dubai W S Atkins 12 498
PROTECTIVE SYSTEM BUILDING G+4+R @
562 2018 Dubai Bel Yoahah 11 141
MUHAISANAH
KIA Showroom and Office Building at Al Quoz Design Centre Architects &
563 2018 Dubai 14
-1 Engineers Consultants
Royal Atlantis staff accommodation in Plot No. LACASA Architect &
564 2018 Dubai 15
JVC 17 TCP 0121 & 013 At Jumeira Village Engineering Consultants
565 2018 Dragon City Hotel Dubai DAR AL HANDASAH 5 353
HIDI RAE Consulting
566 2018 LUXURY HOTEL @ JADAF Dubai 9 1109
Engineers Inc
Sharjah Engineering
567 2018 AL MAMZAR BUILDING AUH 2 87
Consultant

568 2018 CMW 17040- C001 AUH CMW 15 121

569 2018 Askari Tower, Lahore PAK SEM Engineering 51


Architecture & Planning
570 2018 Vox Cinemas @ Al Jimmi mall- Al Ain AUH 14
Group
571 2018 Royal Atlantis Dubai WSP 0 4180

572 2018 ISF -CPC-07a Qatar Arab Engineering Bureau 10

573 2018 ISF CPC 07B FCU Qatar KEO International 0 107
Khazna Data Center POD 4, 5 & 6 in Abu
574 2018 AUH WSP 7 102
Dhabi
575 2018 Khazna Data Center POD 4, 5 & 6 in Dubai Dubai WSP 7 102

576 2018 ISF-CPC-07A-Substation Qatar KEO International 9

577 2018 Doha Oasis Cinema Qatar AECOM 34


HOLFORDS
578 2018 Valiant Clinic Refurbishment Dubai 6
CONSULTANTS
2019/R2
S.No. Year Project Territory Consultant AHU FCUs

MEKAR s.r.l. Viale Caduti sul Lavoro, 25 37063 ISOLA DELLA SCALA (VR)
Tel. +39 045 6630536 Fax +39 045 6630513 info@mekar.it www.mekar.it
Middle East Regional Office : Mekar Air Handling Units L.L.C., The Business Centre
Suite 203, Khalid Bin Walid Street, P.O. Box 24583, Dubai, U.A.E.
Tel: +971 4 3574469 Fax: +971 4 3574479 sales@mekar.ae
PREVIOUS APPROVAL COPY

Mekar Air Handling Units

Office : P.O. Box 10407, Doha, Qatar Tel: +974 441 53742 Fax: +974 444 20609 e-mail:sales@mekar.ae
Corporate Head Office: Viale Caduti sul Lavoro, 25 - 37063 ISOLA DELLA SCALA, Verona, Italy
Tel: +39 045 6630536 Fax: +39 045 6630513 e-mail: info@mekar.it www.mekar.it

You might also like