BILL NO.C-10.

0 CATLE TROUGHS
Item
BILL NO.G.1Description Unit Qty Unit Rate Total Amount
Earth
.C.10.1 Work
530.00

Site clearing
up to a depth 26.5
of 20cm to
remove top
vegetated
.C.10.2 soil m2 20.0
360.80
Excavation
for 88.0
foundation
up to 25cm
.C.10.3 depth m3 4.1
Cart away 213.20
excavated
material to 52.0
100m
.C.10.4 distance m3 4.1
1,330.00

Back Fill
excavated
area above 133.0
the concrete
cover over
filter media
.C.10.5 with clay m3 10.0
Masonry -
.C.10.6 work
Basaltic or 2,079.00
equivalent
hard core 189.0
filling 25cm
.C.10.7 thick m3 11.0
3,661.00

Semi
dressed
stone
pavement 523.0
pointed with
cement
mortar 1:3
all round the
.C.10.8 cattle trough m2 7.0
Concrete -
.C.10.9 work

Pouring
10cm thick
lean
concrete
over hard 15.5 335.8 5,204.47
core in with
class C-15
Minimum
cement
content of
.C.10.10 150kg/m3, m2
1,710.00

External and
internal 114.0
plastering of
the body of
the cattle
.C.10.11 trough m2 15.0
2,812.50
Construction
of 50*50cm 4,500.0
HCB
chamber
.C.10.12 with cover m2 0.6
Form work 11,362.50
wooden or 500.0
.C.10.13 Steel m2 22.7
Provide cut,
and fix in
position
reinforced
steel bar all
according
to
structural
drawing,
Price shall
include
.C.10.14 tying wires
Diametr 6 3,764.00
.C.10.15 mm Kg 40.0 94.1
Diametr 10 8,150.64
.C.10.16 mm Kg 122.0 66.8
Finishing -
.C.10.17 work
3cm thick 970.10
finish
cement 109.0
screed in 1:3
.C.10.18 mix m2 8.9
14,590.00
Install water
14,590.0
meter DN 63
.C.10.19 mm No 1.0
15,543.33
Install other
fittings as 15,543.3
per Design
.C.10.20 Drawing LS 1.0
Total for
One Cattle
Trough 72,281.54