Download as pdf or txt
Download as pdf or txt
You are on page 1of 2

Since 1985

No.127/4, Kempaiah Garden, Peenya 4th Phase, Bangalore 560058 Mob:9886718746/7510544345

Ph : 080-41179480/ 08041171293
Email- sales@metalimpacts.in Website www.metalimpacts.in
GST : 29ABMFM8091J1ZG HSN CODE : 73089090

To: M/s. RDP WORKSTATIONS PVT LTD Offer No : 09/ HDR/0322


Kind Attn. : Mr. Date : 16-03-2022
Hand Phone :- Project Name :
Project Location :

Sub: Quotation for the heavy duty shelving racks

Dear Sir/ Madam,


We Thank for your enquiry , Please find our best prices for the same as under:-

Sl No Description Qty Unit Rate AMOUNT


Heavy Duty Shelving Racking System
LOADING LEVELS & LOADING CAPCITY : 3 Levels & 500 kg UDL/LEVEL
a Main Module - A : 2680 mm L x 1400 mm D x 3600 mm H 14 Each 47850 669900

b Add on Module - A1 : 2590 mm L x 1400 mm D x 3600 mm H 91 Each 40800 3712800

TOTAL BASIC VALUE 43,82,700.00


GST @ 18% 7,88,886.00
Total Amount including GST 51,71,586.00

Photo of the product

TECHNICAL SPECIFICATIONS
Components/ Misc Item HDR
Verticals C SECTION : 20x45x90x45x20x1.6 mm
Bracers C Section-20x40x20x1.6 mm
Cross beam Step type : 80 x 45 x 1.6 mm thk
Cross beam Box type : 70 x 40 x 1.6 mm thk
Decking panel 170 w x 1 mm thk 6 folded panel
Make of Steel JSW, TATA
Design Codes 801:1974, Indian standard code
800: 1984/2007 Indian standard code (Steel structure)
Finishing Powder coating , 7 tank process
Pepsi blue for upright frame, Deep orange for the
Colour
crossbeam & decking panel
Other terms & conditions
Prices quoted are subject to receipt and acceptance of order within 15 days of the date of the quotation unless otherwise noted on quote.

Payment Terms
50% Advance along with Purchase order.
50% Against delivery of material.

Installation Charges
5% Extra on basic value
Transportation Charges : Extra at actual
DELIVERY : Within 4-5 weeks from the date of receipt of your approved Purchase order and advance payment
Warranty
Metal Impacts warrants all goods of our manufacture to be free from defects in material and workmanship under normal use and service for 12 months from date of supply.

Unloading Shall be in scope of purchaser . ( if required from our end, on additional cost)

Thanking you,

For Metal Impacts

Sharmila H P
CREATE SPACE BEYOND LIMITS

You might also like