TASK RISK ASSESSMENT

Construction of Staff accommodation in Al Dhafra City – Al Ghuwaifat Date: Performer Dept:


Brief Description
(All Activity of the Project)
TASK DETAILS 21.09.2021 CIVIL
Location / Equipment Al Dhafra City – Al Ghuwaifat, UAE
Tag ID
Ahmed R A Review date: TRA No: LAZ-TRA-CSA-002A-
Name: M. Ziad Nissar Ahmed Abdul Rahim
Hamdan 00
TRA TEAM
Project 22-03-2022
MEMEBERS Designation: HSE-Eng. QA/QC Site Foreman
Manager Rev #: 01
Company: LAZOURDAY LAZOURDAY LAZOURDAY LAZOURDAY
BASELINE ADDITIONAL CONTROL RESP. RESIDUAL REFERENCES
RISK MEASURES / ACTIONS PARTY RISK
STEP DESCRIPTION OF CONSEQUENCES CONTROL MEASURES
HAZARDS
NO. TASK STEP
R
S P S P R
R

TASK RISK ASSESSMENT SUMMARY

S: Severity, P: Probability, R: Risk. Risk Rating (High, Medium to Low) 1-Negligible , 2-Marginal, 3-Critical,4-Sever, 5- Catastrophic
A-Improbable , B-Remote , C-Occasional , D-Probable , E-Frequent

Page No. 1 of 25
TASK RISK ASSESSMENT
Construction of Staff accommodation in Al Dhafra City – Al Ghuwaifat Date: Performer Dept:
Brief Description
(All Activity of the Project)
TASK DETAILS 21.09.2021 CIVIL
Location / Equipment Al Dhafra City – Al Ghuwaifat, UAE
Tag ID
Ahmed R A Review date: TRA No: LAZ-TRA-CSA-002A-
Name: M. Ziad Nissar Ahmed Abdul Rahim
Hamdan 00
TRA TEAM
Project 22-03-2022
MEMEBERS Designation: HSE-Eng. QA/QC Site Foreman
Manager Rev #: 01
Company: LAZOURDAY LAZOURDAY LAZOURDAY LAZOURDAY
BASELINE ADDITIONAL CONTROL RESP. RESIDUAL REFERENCES
RISK MEASURES / ACTIONS PARTY RISK
STEP DESCRIPTION OF CONSEQUENCES CONTROL MEASURES
HAZARDS
NO. TASK STEP
R
S P S P R
R

S. No Description of Task steps Remarks


1 Mobilization of Plant / Equipment

2 Offloading / Rigging and Slinging

3 Stacking and storage of material

4 Work at height.
Using of scaffold platform and mobile scaffold tower

5 Hot Work activities

6 Ergonomics and Improper use of Hand / Power tools

7 Manual Handling

8 Housekeeping

9 Excavation work

10 COVID-19 action plan

S: Severity, P: Probability, R: Risk. Risk Rating (High, Medium to Low) 1-Negligible , 2-Marginal, 3-Critical,4-Sever, 5- Catastrophic
A-Improbable , B-Remote , C-Occasional , D-Probable , E-Frequent

Page No. 2 of 25
TASK RISK ASSESSMENT
Construction of Staff accommodation in Al Dhafra City – Al Ghuwaifat Date: Performer Dept:
Brief Description
(All Activity of the Project)
TASK DETAILS 21.09.2021 CIVIL
Location / Equipment Al Dhafra City – Al Ghuwaifat, UAE
Tag ID
Ahmed R A Review date: TRA No: LAZ-TRA-CSA-002A-
Name: M. Ziad Nissar Ahmed Abdul Rahim
Hamdan 00
TRA TEAM
Project 22-03-2022
MEMEBERS Designation: HSE-Eng. QA/QC Site Foreman
Manager Rev #: 01
Company: LAZOURDAY LAZOURDAY LAZOURDAY LAZOURDAY
BASELINE ADDITIONAL CONTROL RESP. RESIDUAL REFERENCES
RISK MEASURES / ACTIONS PARTY RISK
STEP DESCRIPTION OF CONSEQUENCES CONTROL MEASURES
HAZARDS
NO. TASK STEP
R
S P S P R
R

1 Mobilization of  Unauthorized Property damage.  Ensure that all the required 3 C M  Effective and Site 1 C L OSHAD
Plant / access. Personnel injury. permits are received from continuous Engineer/ COP 34.0
Equipment  Collision with supervision to be Authorised Safe use
concerned authory such as Supervisor Lifting
moving vehicles. ensured always.
Etislat, AADC etc. prior to Equipment
 Old and Damaged  Flashing lights shall and Lifting
commence mobilize. be placed suitably to
plant. accessories
 Poor
 Ensure the approval of ACG warn drivers during
communication; and MUS and inform them night
 Untrained work about the mobilization date  All personnel will
wear the Mandatory COP 22.0
force and time. Barricading
PPE (Safety Helmet,
 Un protected  All the permits shall be kept of Hazards,
Safety Glasses,
work force OSHAD.
Heat stress on site. Coverall, and safety
 Ensure the approved shoes) along with PPE
 Manual Handling specific to their task.
 Scattered method statment and risk
materials in the assessment.
area.  Ensure the demarkation of
plot limit.
 Ensure that the equipment
S: Severity, P: Probability, R: Risk. Risk Rating (High, Medium to Low) 1-Negligible , 2-Marginal, 3-Critical,4-Sever, 5- Catastrophic
A-Improbable , B-Remote , C-Occasional , D-Probable , E-Frequent

Page No. 3 of 25
TASK RISK ASSESSMENT
Construction of Staff accommodation in Al Dhafra City – Al Ghuwaifat Date: Performer Dept:
Brief Description
(All Activity of the Project)
TASK DETAILS 21.09.2021 CIVIL
Location / Equipment Al Dhafra City – Al Ghuwaifat, UAE
Tag ID
Ahmed R A Review date: TRA No: LAZ-TRA-CSA-002A-
Name: M. Ziad Nissar Ahmed Abdul Rahim
Hamdan 00
TRA TEAM
Project 22-03-2022
MEMEBERS Designation: HSE-Eng. QA/QC Site Foreman
Manager Rev #: 01
Company: LAZOURDAY LAZOURDAY LAZOURDAY LAZOURDAY
BASELINE ADDITIONAL CONTROL RESP. RESIDUAL REFERENCES
RISK MEASURES / ACTIONS PARTY RISK
STEP DESCRIPTION OF CONSEQUENCES CONTROL MEASURES
HAZARDS
NO. TASK STEP
R
S P S P R
R

intended to mobilize are


according to the
requirements of Musanada
and comply the HSE
requirments.
 The plant shall be inspected
by competent logistic and HSE
personnel prior to commence
on site.
 All personnel must be
inducted.
 Ensure the scope of work and
specific risk assessment are
communicated through Tool
Box Talk.
 Correct PPE must be used for
the job (hard hat, high visibility

S: Severity, P: Probability, R: Risk. Risk Rating (High, Medium to Low) 1-Negligible , 2-Marginal, 3-Critical,4-Sever, 5- Catastrophic
A-Improbable , B-Remote , C-Occasional , D-Probable , E-Frequent

Page No. 4 of 25
TASK RISK ASSESSMENT
Construction of Staff accommodation in Al Dhafra City – Al Ghuwaifat Date: Performer Dept:
Brief Description
(All Activity of the Project)
TASK DETAILS 21.09.2021 CIVIL
Location / Equipment Al Dhafra City – Al Ghuwaifat, UAE
Tag ID
Ahmed R A Review date: TRA No: LAZ-TRA-CSA-002A-
Name: M. Ziad Nissar Ahmed Abdul Rahim
Hamdan 00
TRA TEAM
Project 22-03-2022
MEMEBERS Designation: HSE-Eng. QA/QC Site Foreman
Manager Rev #: 01
Company: LAZOURDAY LAZOURDAY LAZOURDAY LAZOURDAY
BASELINE ADDITIONAL CONTROL RESP. RESIDUAL REFERENCES
RISK MEASURES / ACTIONS PARTY RISK
STEP DESCRIPTION OF CONSEQUENCES CONTROL MEASURES
HAZARDS
NO. TASK STEP
R
S P S P R
R

vest, and safety shoes).


 Ensure close supervision and
competent team while
offloading and stacking of
materials.
 Driver must have valid UAE
license.
 Adequate light shall be
provided if work in night.
 Sufficient & suitable safe
methods of access and egress
for the delivery vehicles.
 Ensure lifting permit and
Appointed person and rigger
while offloading with crane.
 Storage areas shall be
barricaded and display the

S: Severity, P: Probability, R: Risk. Risk Rating (High, Medium to Low) 1-Negligible , 2-Marginal, 3-Critical,4-Sever, 5- Catastrophic
A-Improbable , B-Remote , C-Occasional , D-Probable , E-Frequent

Page No. 5 of 25
TASK RISK ASSESSMENT
Construction of Staff accommodation in Al Dhafra City – Al Ghuwaifat Date: Performer Dept:
Brief Description
(All Activity of the Project)
TASK DETAILS 21.09.2021 CIVIL
Location / Equipment Al Dhafra City – Al Ghuwaifat, UAE
Tag ID
Ahmed R A Review date: TRA No: LAZ-TRA-CSA-002A-
Name: M. Ziad Nissar Ahmed Abdul Rahim
Hamdan 00
TRA TEAM
Project 22-03-2022
MEMEBERS Designation: HSE-Eng. QA/QC Site Foreman
Manager Rev #: 01
Company: LAZOURDAY LAZOURDAY LAZOURDAY LAZOURDAY
BASELINE ADDITIONAL CONTROL RESP. RESIDUAL REFERENCES
RISK MEASURES / ACTIONS PARTY RISK
STEP DESCRIPTION OF CONSEQUENCES CONTROL MEASURES
HAZARDS
NO. TASK STEP
R
S P S P R
R

signages.
 Ensure suitbale access / egress.

2 Offloading /  Incompetent - Fall of materials  Ensure the crane is approved 3 C M  Mandatory and Site 2 A L OSHAD
Rigging and operator, rigger, by HSE and logistic team of optional PPE’s shall Engineer/ COP 34.0
- Personal Injury
Slinging Flagman. main contractor and be used at all times. Authorized Safe use
- Property damage  Continuous Supervisor Lifting
(Use of Mobile  Unsuitable consultant.
Crane) - Fatality monitoring is Equipment
selection of lifting  Ensure the lifting plan and required and Lifting
equipment like lifting permits. accessories
mobile crane,  Ensure the clear distance and
Boom loader etc. anti-collision system in crane OSHAD-
 Unstable and to avoid the contact between SF_COP 36
improper ground two cranes in case of using two Plant &
Equipment.
conditions fall of crane. Check the overhead line
materials, sharp  Ensure the Red Helmet and
objects of vest for Rigger and clearly
material, mention on the vest “RIGGER” COP 22.0
Barricading
ergonomics, slip  TOOL BOX TALK and pre-
of Hazards,
trip fall. adverse starting briefing prior to start
S: Severity, P: Probability, R: Risk. Risk Rating (High, Medium to Low) 1-Negligible , 2-Marginal, 3-Critical,4-Sever, 5- Catastrophic
A-Improbable , B-Remote , C-Occasional , D-Probable , E-Frequent

Page No. 6 of 25
TASK RISK ASSESSMENT
Construction of Staff accommodation in Al Dhafra City – Al Ghuwaifat Date: Performer Dept:
Brief Description
(All Activity of the Project)
TASK DETAILS 21.09.2021 CIVIL
Location / Equipment Al Dhafra City – Al Ghuwaifat, UAE
Tag ID
Ahmed R A Review date: TRA No: LAZ-TRA-CSA-002A-
Name: M. Ziad Nissar Ahmed Abdul Rahim
Hamdan 00
TRA TEAM
Project 22-03-2022
MEMEBERS Designation: HSE-Eng. QA/QC Site Foreman
Manager Rev #: 01
Company: LAZOURDAY LAZOURDAY LAZOURDAY LAZOURDAY
BASELINE ADDITIONAL CONTROL RESP. RESIDUAL REFERENCES
RISK MEASURES / ACTIONS PARTY RISK
STEP DESCRIPTION OF CONSEQUENCES CONTROL MEASURES
HAZARDS
NO. TASK STEP
R
S P S P R
R

environment the activities. OSHAD.


conditions.  The ground should be suitable
for the task.
 The operator and rigger
(flagman man) should be
competent and third party
certified.
 Co-ordination between riggers
and crane operator.
 Lifting must be stopped if the
load exceeds the admissible
limits.
 The equipment used for the
operation should be third party
certified.
 The area should be barricaded
and un authorized entry to the
area must be restricted and

S: Severity, P: Probability, R: Risk. Risk Rating (High, Medium to Low) 1-Negligible , 2-Marginal, 3-Critical,4-Sever, 5- Catastrophic
A-Improbable , B-Remote , C-Occasional , D-Probable , E-Frequent

Page No. 7 of 25
TASK RISK ASSESSMENT
Construction of Staff accommodation in Al Dhafra City – Al Ghuwaifat Date: Performer Dept:
Brief Description
(All Activity of the Project)
TASK DETAILS 21.09.2021 CIVIL
Location / Equipment Al Dhafra City – Al Ghuwaifat, UAE
Tag ID
Ahmed R A Review date: TRA No: LAZ-TRA-CSA-002A-
Name: M. Ziad Nissar Ahmed Abdul Rahim
Hamdan 00
TRA TEAM
Project 22-03-2022
MEMEBERS Designation: HSE-Eng. QA/QC Site Foreman
Manager Rev #: 01
Company: LAZOURDAY LAZOURDAY LAZOURDAY LAZOURDAY
BASELINE ADDITIONAL CONTROL RESP. RESIDUAL REFERENCES
RISK MEASURES / ACTIONS PARTY RISK
STEP DESCRIPTION OF CONSEQUENCES CONTROL MEASURES
HAZARDS
NO. TASK STEP
R
S P S P R
R

sign boards
 Specific Lifting plan to be
prepared and submitted to
consultant for approval.
 Work should be stopped in the
adverse weather conditions
such as rain, fog and more than
38 kilometers wind speed.
 Proper PPEs should be used for
the task.
 The area must be free from
scattered materials and proper
housekeeping must be
ensured at the site.
 Ensure proper Tag Line for
lifting of load.
 Ensure the availibility of
Appointed perosn and rigger

S: Severity, P: Probability, R: Risk. Risk Rating (High, Medium to Low) 1-Negligible , 2-Marginal, 3-Critical,4-Sever, 5- Catastrophic
A-Improbable , B-Remote , C-Occasional , D-Probable , E-Frequent

Page No. 8 of 25
TASK RISK ASSESSMENT
Construction of Staff accommodation in Al Dhafra City – Al Ghuwaifat Date: Performer Dept:
Brief Description
(All Activity of the Project)
TASK DETAILS 21.09.2021 CIVIL
Location / Equipment Al Dhafra City – Al Ghuwaifat, UAE
Tag ID
Ahmed R A Review date: TRA No: LAZ-TRA-CSA-002A-
Name: M. Ziad Nissar Ahmed Abdul Rahim
Hamdan 00
TRA TEAM
Project 22-03-2022
MEMEBERS Designation: HSE-Eng. QA/QC Site Foreman
Manager Rev #: 01
Company: LAZOURDAY LAZOURDAY LAZOURDAY LAZOURDAY
BASELINE ADDITIONAL CONTROL RESP. RESIDUAL REFERENCES
RISK MEASURES / ACTIONS PARTY RISK
STEP DESCRIPTION OF CONSEQUENCES CONTROL MEASURES
HAZARDS
NO. TASK STEP
R
S P S P R
R

all the time while using crane.


 Ensure the flash on the boom
of crane.
 Always follow OSHAD COP 34.0
safey use of lifting and lifting
accessories.

3 Stacking and  Improper  Personal Injury  Lazourdy will off-load and 2 D L  Continuous Site 1 C L OSHAD
Storage of stacking and store its material at Arabtech Engineer/ COP 49.
 Property monitoring is required
Materials Authorized Compressed
storing on damage designated.
Supervisor Gass and Air
unstable ground  Ensure the exclusion zone once
area. stacked the material to stop
OSHAD
 Scattered the the unauthorized access. COP 34.0
material on the  Stacking and storing of Safe use
way material must be done as per Lifting
 Stacking with Consultant and Eployor Equipment
and Lifting
more then requirements. accessories
required height.  Ensure suitable plants for

S: Severity, P: Probability, R: Risk. Risk Rating (High, Medium to Low) 1-Negligible , 2-Marginal, 3-Critical,4-Sever, 5- Catastrophic
A-Improbable , B-Remote , C-Occasional , D-Probable , E-Frequent

Page No. 9 of 25
TASK RISK ASSESSMENT
Construction of Staff accommodation in Al Dhafra City – Al Ghuwaifat Date: Performer Dept:
Brief Description
(All Activity of the Project)
TASK DETAILS 21.09.2021 CIVIL
Location / Equipment Al Dhafra City – Al Ghuwaifat, UAE
Tag ID
Ahmed R A Review date: TRA No: LAZ-TRA-CSA-002A-
Name: M. Ziad Nissar Ahmed Abdul Rahim
Hamdan 00
TRA TEAM
Project 22-03-2022
MEMEBERS Designation: HSE-Eng. QA/QC Site Foreman
Manager Rev #: 01
Company: LAZOURDAY LAZOURDAY LAZOURDAY LAZOURDAY
BASELINE ADDITIONAL CONTROL RESP. RESIDUAL REFERENCES
RISK MEASURES / ACTIONS PARTY RISK
STEP DESCRIPTION OF CONSEQUENCES CONTROL MEASURES
HAZARDS
NO. TASK STEP
R
S P S P R
R

 Stacking on stacking of steel materials.


uneven surface.  Proper Crane and boom loader
to be used for stacking and
storing of materials.

 Materials not to block the


access or egress.
 Proper signage to avoid
unwanted contact with other
site users.
 Supervision to be informed
when materials arrive to the
work place and to dictate
where materials will be
stacked/stored.
 Ensure proper storage of
acetylene, propane and oxygen
as per OSHAD – COP 49.0
Compressed Gases and Air.
 Store the chemical in
S: Severity, P: Probability, R: Risk. Risk Rating (High, Medium to Low) 1-Negligible , 2-Marginal, 3-Critical,4-Sever, 5- Catastrophic
A-Improbable , B-Remote , C-Occasional , D-Probable , E-Frequent

Page No. 10 of 25
TASK RISK ASSESSMENT
Construction of Staff accommodation in Al Dhafra City – Al Ghuwaifat Date: Performer Dept:
Brief Description
(All Activity of the Project)
TASK DETAILS 21.09.2021 CIVIL
Location / Equipment Al Dhafra City – Al Ghuwaifat, UAE
Tag ID
Ahmed R A Review date: TRA No: LAZ-TRA-CSA-002A-
Name: M. Ziad Nissar Ahmed Abdul Rahim
Hamdan 00
TRA TEAM
Project 22-03-2022
MEMEBERS Designation: HSE-Eng. QA/QC Site Foreman
Manager Rev #: 01
Company: LAZOURDAY LAZOURDAY LAZOURDAY LAZOURDAY
BASELINE ADDITIONAL CONTROL RESP. RESIDUAL REFERENCES
RISK MEASURES / ACTIONS PARTY RISK
STEP DESCRIPTION OF CONSEQUENCES CONTROL MEASURES
HAZARDS
NO. TASK STEP
R
S P S P R
R

designated area and shall


be under the shade.

4 Work at height.  Fall of person,  Personal serious  Ensure competent supervision 4 D H Ensure design drawing for Operation 1 C M OSHAD-SF-
 fall of scaffolding injuries, is available always. scaffold if the height is team COP 23.0
Using of scaffold work at
structure,  Property damage,  Lazourdy must use the more than 10 meters.
and mobile height
 Electrocution, scaffolding erected by
scaffold tower  fall of material, Follow.
fatality. competent scaffolders and
 overhead power OSHAD-SF-
lines inspected by competent COP-26.0
scaffold inspector. Scaffolding
 Inspection shall be repeated at
OSHAD-SF-
least every 7 days and also COP 37.0
following any alteration / Ladders
change.
 Supervisor will remove the
green tag once the scaffolding
is not in use and will keep the
S: Severity, P: Probability, R: Risk. Risk Rating (High, Medium to Low) 1-Negligible , 2-Marginal, 3-Critical,4-Sever, 5- Catastrophic
A-Improbable , B-Remote , C-Occasional , D-Probable , E-Frequent

Page No. 11 of 25
TASK RISK ASSESSMENT
Construction of Staff accommodation in Al Dhafra City – Al Ghuwaifat Date: Performer Dept:
Brief Description
(All Activity of the Project)
TASK DETAILS 21.09.2021 CIVIL
Location / Equipment Al Dhafra City – Al Ghuwaifat, UAE
Tag ID
Ahmed R A Review date: TRA No: LAZ-TRA-CSA-002A-
Name: M. Ziad Nissar Ahmed Abdul Rahim
Hamdan 00
TRA TEAM
Project 22-03-2022
MEMEBERS Designation: HSE-Eng. QA/QC Site Foreman
Manager Rev #: 01
Company: LAZOURDAY LAZOURDAY LAZOURDAY LAZOURDAY
BASELINE ADDITIONAL CONTROL RESP. RESIDUAL REFERENCES
RISK MEASURES / ACTIONS PARTY RISK
STEP DESCRIPTION OF CONSEQUENCES CONTROL MEASURES
HAZARDS
NO. TASK STEP
R
S P S P R
R

red tag.
 All scaffolders must be clearly
identifiable and the wording
‘SCAFFOLDER’ must be clearly
printed on their coveralls
 Full body harness with double
lanyard is used for the job shall
be inspected on monthly basis
and ensure the colour code.
 Ensure the register log of
Safety harness and scaffold
and maintained regulalry.
 Ensure the daily TOOL BOX
TALK & Pre-start briefing prior
to commence the work and
shall sign by all workers.
 The inspection must be
recorded in a scaffold register
which must be kept onsite &
S: Severity, P: Probability, R: Risk. Risk Rating (High, Medium to Low) 1-Negligible , 2-Marginal, 3-Critical,4-Sever, 5- Catastrophic
A-Improbable , B-Remote , C-Occasional , D-Probable , E-Frequent

Page No. 12 of 25
TASK RISK ASSESSMENT
Construction of Staff accommodation in Al Dhafra City – Al Ghuwaifat Date: Performer Dept:
Brief Description
(All Activity of the Project)
TASK DETAILS 21.09.2021 CIVIL
Location / Equipment Al Dhafra City – Al Ghuwaifat, UAE
Tag ID
Ahmed R A Review date: TRA No: LAZ-TRA-CSA-002A-
Name: M. Ziad Nissar Ahmed Abdul Rahim
Hamdan 00
TRA TEAM
Project 22-03-2022
MEMEBERS Designation: HSE-Eng. QA/QC Site Foreman
Manager Rev #: 01
Company: LAZOURDAY LAZOURDAY LAZOURDAY LAZOURDAY
BASELINE ADDITIONAL CONTROL RESP. RESIDUAL REFERENCES
RISK MEASURES / ACTIONS PARTY RISK
STEP DESCRIPTION OF CONSEQUENCES CONTROL MEASURES
HAZARDS
NO. TASK STEP
R
S P S P R
R

the area down should be


barricaded.
 Ensure the permit to work
from main contractor and
trained workers for work at
height
 Trespassers are restricted for
entry into the working area.
 The ground conditions must be
stable for erection of
scaffolding.
 Overhead lines / obstructions
are considered while erection
of scaffolding.
 The scaffolding must be tied up
with a stable structure.
 All the necessary PPEs such as
Full body safety’s harness,
helmet, safety shoes and
S: Severity, P: Probability, R: Risk. Risk Rating (High, Medium to Low) 1-Negligible , 2-Marginal, 3-Critical,4-Sever, 5- Catastrophic
A-Improbable , B-Remote , C-Occasional , D-Probable , E-Frequent

Page No. 13 of 25
TASK RISK ASSESSMENT
Construction of Staff accommodation in Al Dhafra City – Al Ghuwaifat Date: Performer Dept:
Brief Description
(All Activity of the Project)
TASK DETAILS 21.09.2021 CIVIL
Location / Equipment Al Dhafra City – Al Ghuwaifat, UAE
Tag ID
Ahmed R A Review date: TRA No: LAZ-TRA-CSA-002A-
Name: M. Ziad Nissar Ahmed Abdul Rahim
Hamdan 00
TRA TEAM
Project 22-03-2022
MEMEBERS Designation: HSE-Eng. QA/QC Site Foreman
Manager Rev #: 01
Company: LAZOURDAY LAZOURDAY LAZOURDAY LAZOURDAY
BASELINE ADDITIONAL CONTROL RESP. RESIDUAL REFERENCES
RISK MEASURES / ACTIONS PARTY RISK
STEP DESCRIPTION OF CONSEQUENCES CONTROL MEASURES
HAZARDS
NO. TASK STEP
R
S P S P R
R

gloves etc., must be used


during the job.
 Ensure exclusion zone and
assign a sppoter man to stop
unauthorised acceess
5 Hot Work (Using  Oxygen  Fire and  Lazourdy will inspect all the 4 D H Ensure close and regular Engineers 1 C M OSHAD-SF-
the welding deficiency. explosion. tools such as welding supervision. COP-28.0
Supervisor Hot work
machine,  Molten particles  electrocution machine / gas cutting set and
Ensure refresh training for operation
Grinder and  Unskilled grinders etc. with main HSE
 injury to the welders and fire watchers (e.g. welding
Oxygen and workers. personnel prior to use on site.
personnel  Ensure suitable storage of and cutting
Acetylene  Working near
combustible involved in the cylinders and shall not be
cylinders
materials activity. esposed to direct sun light.
 Ergonomics.  Skin burns.  Ensure the the exclusion zone
 Poor cable  Spot on skin due at hot work area and Hot work
management. to grinder permit to be issued prior to
 Environmental start the work.
particles.
Impact.  All the welding machines to be
certified by 3rd party.
 Ensure the dailt TBT & PSB.

S: Severity, P: Probability, R: Risk. Risk Rating (High, Medium to Low) 1-Negligible , 2-Marginal, 3-Critical,4-Sever, 5- Catastrophic
A-Improbable , B-Remote , C-Occasional , D-Probable , E-Frequent

Page No. 14 of 25
TASK RISK ASSESSMENT
Construction of Staff accommodation in Al Dhafra City – Al Ghuwaifat Date: Performer Dept:
Brief Description
(All Activity of the Project)
TASK DETAILS 21.09.2021 CIVIL
Location / Equipment Al Dhafra City – Al Ghuwaifat, UAE
Tag ID
Ahmed R A Review date: TRA No: LAZ-TRA-CSA-002A-
Name: M. Ziad Nissar Ahmed Abdul Rahim
Hamdan 00
TRA TEAM
Project 22-03-2022
MEMEBERS Designation: HSE-Eng. QA/QC Site Foreman
Manager Rev #: 01
Company: LAZOURDAY LAZOURDAY LAZOURDAY LAZOURDAY
BASELINE ADDITIONAL CONTROL RESP. RESIDUAL REFERENCES
RISK MEASURES / ACTIONS PARTY RISK
STEP DESCRIPTION OF CONSEQUENCES CONTROL MEASURES
HAZARDS
NO. TASK STEP
R
S P S P R
R

 The welders will have certified


and fire watcher shall be
trained.
 Ensure hot work is in place
prior to commence hot work
operation.
 LCGM will clean any
combustible material in the
distance of 11 meters of hot
work area.
 Ensure to provide PPEs such as
clear safety googles filter lens
number 12 and 14. (cover spec
type, tint lens.
 Ensure the welding helmet,
gloves and safety shoes. And
follow the requirement of
OSHAD-SF-COP-28.0 Hot Work
 Cylinders will handle in upright
position and will tie with
trolley.

S: Severity, P: Probability, R: Risk. Risk Rating (High, Medium to Low) 1-Negligible , 2-Marginal, 3-Critical,4-Sever, 5- Catastrophic
A-Improbable , B-Remote , C-Occasional , D-Probable , E-Frequent

Page No. 15 of 25
TASK RISK ASSESSMENT
Construction of Staff accommodation in Al Dhafra City – Al Ghuwaifat Date: Performer Dept:
Brief Description
(All Activity of the Project)
TASK DETAILS 21.09.2021 CIVIL
Location / Equipment Al Dhafra City – Al Ghuwaifat, UAE
Tag ID
Ahmed R A Review date: TRA No: LAZ-TRA-CSA-002A-
Name: M. Ziad Nissar Ahmed Abdul Rahim
Hamdan 00
TRA TEAM
Project 22-03-2022
MEMEBERS Designation: HSE-Eng. QA/QC Site Foreman
Manager Rev #: 01
Company: LAZOURDAY LAZOURDAY LAZOURDAY LAZOURDAY
BASELINE ADDITIONAL CONTROL RESP. RESIDUAL REFERENCES
RISK MEASURES / ACTIONS PARTY RISK
STEP DESCRIPTION OF CONSEQUENCES CONTROL MEASURES
HAZARDS
NO. TASK STEP
R
S P S P R
R

 Ensure the flash back arrestor


on both ends of the hoses.
 For cable management,
wooden stand and hanger will
use for proper cables
management.
 Supervisor will ensure the RPM
of grinding machine and disc
that are matching.
 Fire blanket and fire watcher
are mandatory for hot work.
 Welding activity shall be
stopped if the weather is rainy
or adverse situation.
 Ensure maintenance and using
of good quality of electrode to
minimize the environmental
impact.
 Ensure the fire blanket and
trained fire watcher shall stay 1
hour after completion of hot

S: Severity, P: Probability, R: Risk. Risk Rating (High, Medium to Low) 1-Negligible , 2-Marginal, 3-Critical,4-Sever, 5- Catastrophic
A-Improbable , B-Remote , C-Occasional , D-Probable , E-Frequent

Page No. 16 of 25
TASK RISK ASSESSMENT
Construction of Staff accommodation in Al Dhafra City – Al Ghuwaifat Date: Performer Dept:
Brief Description
(All Activity of the Project)
TASK DETAILS 21.09.2021 CIVIL
Location / Equipment Al Dhafra City – Al Ghuwaifat, UAE
Tag ID
Ahmed R A Review date: TRA No: LAZ-TRA-CSA-002A-
Name: M. Ziad Nissar Ahmed Abdul Rahim
Hamdan 00
TRA TEAM
Project 22-03-2022
MEMEBERS Designation: HSE-Eng. QA/QC Site Foreman
Manager Rev #: 01
Company: LAZOURDAY LAZOURDAY LAZOURDAY LAZOURDAY
BASELINE ADDITIONAL CONTROL RESP. RESIDUAL REFERENCES
RISK MEASURES / ACTIONS PARTY RISK
STEP DESCRIPTION OF CONSEQUENCES CONTROL MEASURES
HAZARDS
NO. TASK STEP
R
S P S P R
R

work to ensure that area is


clear and no any risk of fire.
 Ensure safe procedure of
cylinder handling, using and
store.
 Oxygen cylinder must be
separated from acetylene
cylinder – at least 6 meters.
 All workers are to be trained
about the handling and storage
of welding machine and
cylinders.

6 Ergonomics &  Use of tools  Property  Provide awareness on the 2 B M  Continuous Engineers I C L OSHAD-SF-
Improper use of during damage and proper use of tools and monitoring and and COP 20.0
Supervisors Safety in
hand tools installation Personal harm ergonomic issues. supervision of
design.
activity  •Stress  Worn out tools shall not be activities to be
 Exposure to used & damaged tools must performed
vibration be replaced
 Ensure that workers shall be

S: Severity, P: Probability, R: Risk. Risk Rating (High, Medium to Low) 1-Negligible , 2-Marginal, 3-Critical,4-Sever, 5- Catastrophic
A-Improbable , B-Remote , C-Occasional , D-Probable , E-Frequent

Page No. 17 of 25
TASK RISK ASSESSMENT
Construction of Staff accommodation in Al Dhafra City – Al Ghuwaifat Date: Performer Dept:
Brief Description
(All Activity of the Project)
TASK DETAILS 21.09.2021 CIVIL
Location / Equipment Al Dhafra City – Al Ghuwaifat, UAE
Tag ID
Ahmed R A Review date: TRA No: LAZ-TRA-CSA-002A-
Name: M. Ziad Nissar Ahmed Abdul Rahim
Hamdan 00
TRA TEAM
Project 22-03-2022
MEMEBERS Designation: HSE-Eng. QA/QC Site Foreman
Manager Rev #: 01
Company: LAZOURDAY LAZOURDAY LAZOURDAY LAZOURDAY
BASELINE ADDITIONAL CONTROL RESP. RESIDUAL REFERENCES
RISK MEASURES / ACTIONS PARTY RISK
STEP DESCRIPTION OF CONSEQUENCES CONTROL MEASURES
HAZARDS
NO. TASK STEP
R
S P S P R
R

 Noise and dust closely monitored and


supervised by supervisor.
 Frequent rotation of work in
any vibrating equipment.
 Wear safety gloves to reduce
the vibration of equipment,
dust mask and eye goggles to
be worn.

7 Manual Handling  Slip of object  Personnel harm  Ensure to use the kerb lifter 3 C M  Close supervision is Site 1 B L OSHAD
 Heavier loads while fixing the kerbstone and maintained. Engineers COP 14.0
 Back injury and Manual
than your lifting shall be lift with tw0 Ensure to
Supervisors Handling
capacity use the cotton gloves while  First Aid and
mixing the mortar 3/8 with certified First Aider
 Improper hold /
cement. will be present
grip
 Always follow the manual
handling procedures.
 T.B.T will be conducted before
starting the task.

S: Severity, P: Probability, R: Risk. Risk Rating (High, Medium to Low) 1-Negligible , 2-Marginal, 3-Critical,4-Sever, 5- Catastrophic
A-Improbable , B-Remote , C-Occasional , D-Probable , E-Frequent

Page No. 18 of 25
TASK RISK ASSESSMENT
Construction of Staff accommodation in Al Dhafra City – Al Ghuwaifat Date: Performer Dept:
Brief Description
(All Activity of the Project)
TASK DETAILS 21.09.2021 CIVIL
Location / Equipment Al Dhafra City – Al Ghuwaifat, UAE
Tag ID
Ahmed R A Review date: TRA No: LAZ-TRA-CSA-002A-
Name: M. Ziad Nissar Ahmed Abdul Rahim
Hamdan 00
TRA TEAM
Project 22-03-2022
MEMEBERS Designation: HSE-Eng. QA/QC Site Foreman
Manager Rev #: 01
Company: LAZOURDAY LAZOURDAY LAZOURDAY LAZOURDAY
BASELINE ADDITIONAL CONTROL RESP. RESIDUAL REFERENCES
RISK MEASURES / ACTIONS PARTY RISK
STEP DESCRIPTION OF CONSEQUENCES CONTROL MEASURES
HAZARDS
NO. TASK STEP
R
S P S P R
R

 Correct lifting and carrying


position is to be followed
 Use lifting appliance when
lifting awkward loads.
 Ensure the team work instead
of individual work.
 Avoid lone working

8 Housekeeping Slip, trip & fall  Personal Injury  Ensure to keep the waste 2 D L  Continuous Engineers 1 C L OSHAD
Manual handling BINS on site and shall be and COP 14.0
monitoring is required
supervisors Manual
disposed with approved
Handling
center of waste management
OSHAD_SF
contractor. _COP-54
 Separate BINS to be kept for waste
food waste and conduct the management
awareness training for .
workers for disposal of
different waste.
 Ensure trained and
S: Severity, P: Probability, R: Risk. Risk Rating (High, Medium to Low) 1-Negligible , 2-Marginal, 3-Critical,4-Sever, 5- Catastrophic
A-Improbable , B-Remote , C-Occasional , D-Probable , E-Frequent

Page No. 19 of 25
TASK RISK ASSESSMENT
Construction of Staff accommodation in Al Dhafra City – Al Ghuwaifat Date: Performer Dept:
Brief Description
(All Activity of the Project)
TASK DETAILS 21.09.2021 CIVIL
Location / Equipment Al Dhafra City – Al Ghuwaifat, UAE
Tag ID
Ahmed R A Review date: TRA No: LAZ-TRA-CSA-002A-
Name: M. Ziad Nissar Ahmed Abdul Rahim
Hamdan 00
TRA TEAM
Project 22-03-2022
MEMEBERS Designation: HSE-Eng. QA/QC Site Foreman
Manager Rev #: 01
Company: LAZOURDAY LAZOURDAY LAZOURDAY LAZOURDAY
BASELINE ADDITIONAL CONTROL RESP. RESIDUAL REFERENCES
RISK MEASURES / ACTIONS PARTY RISK
STEP DESCRIPTION OF CONSEQUENCES CONTROL MEASURES
HAZARDS
NO. TASK STEP
R
S P S P R
R

experienced workers,
 Ensure to use slip resistant
chemical for floor cleaning.
 Waste should be segregated
 Waste should be removed on
a daily basis & housekeeping
should be done before after
and whenever required
9 Excavation work  Overhead  Damaged of  Contractor shall ensure to 4 D H Ensure site lighting and Engineers 2 C M OSHAD-SF-
power line. underground or asssess the excavation work by suitable access. and COP 29.0
 Unsuaitable competent person prior to supervisors Excavation
overhead poer
ground. commence. work.
line.
 Underground  Ensure the exclusion zone and
 Electric shock. suitable signage prior to
services.
 Inadequate  Personal injury commence the work.
equipment and  Insufficient  Conduct the daily TBT & PSB
plant. ogygenc before the work and sign by all
 Unskilled and involved people.
experience  Ensure to receive all required
operator. permits from concerned

S: Severity, P: Probability, R: Risk. Risk Rating (High, Medium to Low) 1-Negligible , 2-Marginal, 3-Critical,4-Sever, 5- Catastrophic
A-Improbable , B-Remote , C-Occasional , D-Probable , E-Frequent

Page No. 20 of 25
TASK RISK ASSESSMENT
Construction of Staff accommodation in Al Dhafra City – Al Ghuwaifat Date: Performer Dept:
Brief Description
(All Activity of the Project)
TASK DETAILS 21.09.2021 CIVIL
Location / Equipment Al Dhafra City – Al Ghuwaifat, UAE
Tag ID
Ahmed R A Review date: TRA No: LAZ-TRA-CSA-002A-
Name: M. Ziad Nissar Ahmed Abdul Rahim
Hamdan 00
TRA TEAM
Project 22-03-2022
MEMEBERS Designation: HSE-Eng. QA/QC Site Foreman
Manager Rev #: 01
Company: LAZOURDAY LAZOURDAY LAZOURDAY LAZOURDAY
BASELINE ADDITIONAL CONTROL RESP. RESIDUAL REFERENCES
RISK MEASURES / ACTIONS PARTY RISK
STEP DESCRIPTION OF CONSEQUENCES CONTROL MEASURES
HAZARDS
NO. TASK STEP
R
S P S P R
R

 Confined space. authorities.


 Poor  Ensure documented safe
communication system is in place prior to start
and supervision. the work.
 The contractor shall ensure
that all services searches are
conducted aand these are
validated.
 Ensure competent supervision
and certified operator.
 Use the cable detector for
underground services and shall
arrange gantry posts while
working under the overhead
lines.
 OSHAD COP 29 and clause 3.5
temporary slope shall follow to
avoid collapse of excavation.
 Ensure the permit of
contractor and approved
MSRA.

S: Severity, P: Probability, R: Risk. Risk Rating (High, Medium to Low) 1-Negligible , 2-Marginal, 3-Critical,4-Sever, 5- Catastrophic
A-Improbable , B-Remote , C-Occasional , D-Probable , E-Frequent

Page No. 21 of 25
TASK RISK ASSESSMENT
Construction of Staff accommodation in Al Dhafra City – Al Ghuwaifat Date: Performer Dept:
Brief Description
(All Activity of the Project)
TASK DETAILS 21.09.2021 CIVIL
Location / Equipment Al Dhafra City – Al Ghuwaifat, UAE
Tag ID
Ahmed R A Review date: TRA No: LAZ-TRA-CSA-002A-
Name: M. Ziad Nissar Ahmed Abdul Rahim
Hamdan 00
TRA TEAM
Project 22-03-2022
MEMEBERS Designation: HSE-Eng. QA/QC Site Foreman
Manager Rev #: 01
Company: LAZOURDAY LAZOURDAY LAZOURDAY LAZOURDAY
BASELINE ADDITIONAL CONTROL RESP. RESIDUAL REFERENCES
RISK MEASURES / ACTIONS PARTY RISK
STEP DESCRIPTION OF CONSEQUENCES CONTROL MEASURES
HAZARDS
NO. TASK STEP
R
S P S P R
R

 Monitore the oxygen if the


excavation is deep and ensure
the emergency arrangement.
10 COVID-19  Not using the  Cough  Ensure to check the 4 D H Try to work from home Everyone in 2 C M ADPHC
mask and gloves. temperature of all employees ALARP and always use the the project instruction.
 Fever
continuously. mask and hand gloves OSHAD-
 Gathering.  Headache  Ensure the COVID- vaccine to COP-5.0
 Direct or indirect  Fatality all employees. Occupationa
contact.  Ensure the PCR of all l Health
 Breathing issue
 Meeting in employees at regular interval screening
workplace. as per SEHA guidelines. and Medical
 Ensure to provide the safe Surveillance.
 Congested
offices. accommodation,
 Ensure Mask and Hand
 Unhygienic Gloves.
environment.  transportation and workplace
 Transportation to be kept hygienic,
and congested  Conduct the meeting only
accommodation with Microsoft or other way
from remote to avoid the
gathering.

S: Severity, P: Probability, R: Risk. Risk Rating (High, Medium to Low) 1-Negligible , 2-Marginal, 3-Critical,4-Sever, 5- Catastrophic
A-Improbable , B-Remote , C-Occasional , D-Probable , E-Frequent

Page No. 22 of 25
TASK RISK ASSESSMENT
Construction of Staff accommodation in Al Dhafra City – Al Ghuwaifat Date: Performer Dept:
Brief Description
(All Activity of the Project)
TASK DETAILS 21.09.2021 CIVIL
Location / Equipment Al Dhafra City – Al Ghuwaifat, UAE
Tag ID
Ahmed R A Review date: TRA No: LAZ-TRA-CSA-002A-
Name: M. Ziad Nissar Ahmed Abdul Rahim
Hamdan 00
TRA TEAM
Project 22-03-2022
MEMEBERS Designation: HSE-Eng. QA/QC Site Foreman
Manager Rev #: 01
Company: LAZOURDAY LAZOURDAY LAZOURDAY LAZOURDAY
BASELINE ADDITIONAL CONTROL RESP. RESIDUAL REFERENCES
RISK MEASURES / ACTIONS PARTY RISK
STEP DESCRIPTION OF CONSEQUENCES CONTROL MEASURES
HAZARDS
NO. TASK STEP
R
S P S P R
R

 Always keep social distance.


 Report immediately if
someone has symptoms.
 Monitor the temperature
regularly and ensure the
isolation and quarantine
facility for crew.
 Always follow the Ministry of
Health instructions.
 Ensure to keep the record of
employees those who are
infected or have a close
contact with patient.
 Ensure the quarantine of those
who come from abroad and
follow the updated SEHA
guidelines.
 Display the COVID-19 signage
at workplace and also in
offices.
 Ensure the healty food of
their employees.
S: Severity, P: Probability, R: Risk. Risk Rating (High, Medium to Low) 1-Negligible , 2-Marginal, 3-Critical,4-Sever, 5- Catastrophic
A-Improbable , B-Remote , C-Occasional , D-Probable , E-Frequent

Page No. 23 of 25
TASK RISK ASSESSMENT
Construction of Staff accommodation in Al Dhafra City – Al Ghuwaifat Date: Performer Dept:
Brief Description
(All Activity of the Project)
TASK DETAILS 21.09.2021 CIVIL
Location / Equipment Al Dhafra City – Al Ghuwaifat, UAE
Tag ID
Ahmed R A Review date: TRA No: LAZ-TRA-CSA-002A-
Name: M. Ziad Nissar Ahmed Abdul Rahim
Hamdan 00
TRA TEAM
Project 22-03-2022
MEMEBERS Designation: HSE-Eng. QA/QC Site Foreman
Manager Rev #: 01
Company: LAZOURDAY LAZOURDAY LAZOURDAY LAZOURDAY
BASELINE ADDITIONAL CONTROL RESP. RESIDUAL REFERENCES
RISK MEASURES / ACTIONS PARTY RISK
STEP DESCRIPTION OF CONSEQUENCES CONTROL MEASURES
HAZARDS
NO. TASK STEP
R
S P S P R
R

Preparation by: Lazourdy Approval by:


Prepared by: HSE-Eng Reviewed by Contractor: PM Approved by: Consultant/ HSE Engineer

Name: Nisar Ahmed Name: M. Ziad Abbadi Name:

S: Severity, P: Probability, R: Risk. Risk Rating (High, Medium to Low) 1-Negligible , 2-Marginal, 3-Critical,4-Sever, 5- Catastrophic
A-Improbable , B-Remote , C-Occasional , D-Probable , E-Frequent

Page No. 24 of 25
TASK RISK ASSESSMENT
Construction of Staff accommodation in Al Dhafra City – Al Ghuwaifat Date: Performer Dept:
Brief Description
(All Activity of the Project)
TASK DETAILS 21.09.2021 CIVIL
Location / Equipment Al Dhafra City – Al Ghuwaifat, UAE
Tag ID
Ahmed R A Review date: TRA No: LAZ-TRA-CSA-002A-
Name: M. Ziad Nissar Ahmed Abdul Rahim
Hamdan 00
TRA TEAM
Project 22-03-2022
MEMEBERS Designation: HSE-Eng. QA/QC Site Foreman
Manager Rev #: 01
Company: LAZOURDAY LAZOURDAY LAZOURDAY LAZOURDAY
BASELINE ADDITIONAL CONTROL RESP. RESIDUAL REFERENCES
RISK MEASURES / ACTIONS PARTY RISK
STEP DESCRIPTION OF CONSEQUENCES CONTROL MEASURES
HAZARDS
NO. TASK STEP
R
S P S P R
R

Sign: Sign: Sign:

S: Severity, P: Probability, R: Risk. Risk Rating (High, Medium to Low) 1-Negligible , 2-Marginal, 3-Critical,4-Sever, 5- Catastrophic
A-Improbable , B-Remote , C-Occasional , D-Probable , E-Frequent

Page No. 25 of 25