Professional Documents
Culture Documents
Foam Protection System Specification
Foam Protection System Specification
SPECIFICATION 3223-82-3-FG
Project No.: 212 Doc. No.: SIRB-00-SA-SP-0008 Rev: 2 Date: Nov.12/04 Page 1 of 7
This document contains confidential and proprietary information and shall not be used except by the
expressed written permission of Iranian Offshore Oil Company
\\Ngl-Haeri\TDE\12 Nov\SIRB-00-SA-SP-0008-2.Doc
Sirri Island Gas Gathering & NGL Recovery Project
Oil Industries’ Engineering
and Construction Iranian Offshore Oil Company
Contract Number:
FOAM PROTECTION SYSTEM SPECIFICATION
3223-82-3-FG
Project No.: 212 Doc. No.: SIRB-00-SA-SP-0008 Rev: 2 Date: Nov.12/04 Page 2 of 7
\\Ngl-Haeri\TDE\12 Nov\SIRB-00-SA-SP-0008-2.Doc
Sirri Island Gas Gathering & NGL Recovery Project
Oil Industries’ Engineering
and Construction Iranian Offshore Oil Company
Contract Number:
FOAM PROTECTION SYSTEM SPECIFICATION
3223-82-3-FG
Project No.: 212 Doc. No.: SIRB-00-SA-SP-0008 Rev: 2 Date: Nov.12/04 Page 3 of 7
TABLE OF CONTENTS
1 INTRODUCTION.............................................................................................................4
1.1 Scope..................................................................................................................................................... 4
1.2 Definition Of Contracting Parties ........................................................................................................... 4
1.3 General Equipment Requirements ........................................................................................................ 4
2 APPLICABLE CODES AND REFERENCE DOCUMENTS ............................................5
2.1 Applicable Codes and Standards .......................................................................................................... 5
2.2 Reference Documents........................................................................................................................... 5
2.3 Abbreviations ......................................................................................................................................... 5
3 General Requirements ..................................................................................................6
3.1 Foam...................................................................................................................................................... 6
3.2 Bladder Tank ......................................................................................................................................... 7
3.3 Proportioner ........................................................................................................................................... 7
3.4 Strainer .................................................................................................................................................. 7
\\Ngl-Haeri\TDE\12 Nov\SIRB-00-SA-SP-0008-2.Doc
Sirri Island Gas Gathering & NGL Recovery Project
Oil Industries’ Engineering
and Construction Iranian Offshore Oil Company
Contract Number:
FOAM PROTECTION SYSTEM SPECIFICATION
3223-82-3-FG
Project No.: 212 Doc. No.: SIRB-00-SA-SP-0008 Rev: 2 Date: Nov.12/04 Page 4 of 7
1 INTRODUCTION
The Iranian Offshore Oil Company (IOOC) is planning for expansion of the existing onshore Sirri
Island complex located in the South East of Sirri Island in the Persian Gulf, Iran. The Sirri Island Gas
Gathering and NGL Recovery Project involves expansion of existing reception facilities and addition
of new gas and condensate transmission lines, gas compression and processing facilities, with
associated utilities.
1.1 SCOPE
This Specification covers the minimum requirement for the foam system equipment, type and design
for this project.
All equipment must offer a high degree of reliability under all weather conditions and require minimum
maintenance for this reliability.
All equipment shall be listed for its use and meet international codes and standards.
All equipment shall be readily available and able to withstand a highly saline onshore environment.
All materials used in the manufacture of the equipment shall be vendors proven onshore standard.
All equipment shall be provided with manufactures data sheets including maintenance periods,
commissioning requirements, operational spare requirements and manufactures instructions.
All commissioning and operational spare requirements shall be fully specified by the supplier and full
details provided of all necessary maintenance periods and work involved within each period.
Compliance by Vendor with the provisions of this specification and Contractor’s approval do not
relieve them of responsibility to furnish equipment and their accessories of proper design and
mechanically suited to meet the operation requirements of the specified service conditions.
\\Ngl-Haeri\TDE\12 Nov\SIRB-00-SA-SP-0008-2.Doc
Sirri Island Gas Gathering & NGL Recovery Project
Oil Industries’ Engineering
and Construction Iranian Offshore Oil Company
Contract Number:
FOAM PROTECTION SYSTEM SPECIFICATION
3223-82-3-FG
Project No.: 212 Doc. No.: SIRB-00-SA-SP-0008 Rev: 2 Date: Nov.12/04 Page 5 of 7
Fire fighting engineering shall be generally based on the requirements of this specification. In
addition reference can be made to the below indicated standards for development of detailed
engineering of specific Fire fighting systems and equipment.
2.3 ABBREVIATIONS
\\Ngl-Haeri\TDE\12 Nov\SIRB-00-SA-SP-0008-2.Doc
Sirri Island Gas Gathering & NGL Recovery Project
Oil Industries’ Engineering
and Construction Iranian Offshore Oil Company
Contract Number:
FOAM PROTECTION SYSTEM SPECIFICATION
3223-82-3-FG
Project No.: 212 Doc. No.: SIRB-00-SA-SP-0008 Rev: 2 Date: Nov.12/04 Page 6 of 7
3 GENERAL REQUIREMENTS
Foam systems shall consist of foam concentrate, suitable proportioning equipment, distribution piping,
and discharge devices designed to adequately distribute the foam over the hazard.
The required fire water will be supplied from connections to the underground fire main network.
System design shall be based on the protecting the most remote area/tank requiring the largest foam
solution flow, including supplementary hose streams if required.
Where protecting tanks, fixed or semi-fixed discharge piping and outlets will be utilized to protect the
rim or both rim and surface area fires on the tank.
Fixed foam systems shall be equipped with diaphragm type (bladder) tank complete with integral
foam proportioning (foam mixing) device, an initial supply of foam concentrate, foam discharge
devices, deluge & foam valves and associated trims, OS&Y gate valves, deluge valve solenoids and
associated trims, water flow pressure switches, check valves and strainers.
Semi-fixed foam system systems shall be equipped with suitable connections and line proportioners
to permit the required foam solution to be delivered through a piping system and discharge devices to
adequately protect the hazard.
In a fixed or semi-fixed system, the water supply will pressurize the foam concentrate storage tank.
At the same time, water flowing through the proportioner will create a pressure differential. The
difference between the water supply pressure and this lower pressure area will force the foam
concentrate to flow through a fixed or metering orifice into the water stream. The water/foam solution
will discharge into the delivery piping network.
See Mobile Fire Fighting Systems Specification # SIRB-00-SA-SP-0009 for mobile foam systems.
3.1 FOAM
Low expansion foam concentrate shall be used to protect the surface of flammable liquid fires.
1 Depending on the hazard, foam shall be applied though fixed foam discharge outlets, portable hose
streams or large capacity monitor nozzles.
Monitor nozzles shall be considered as primary means of protection for fixed roof tanks up to 18 m
diameter.
Foam hand lines shall be considered as primary means of protection for fixed roof tanks up to 9 m in
diameter or up to 6 m in height.
Semi-fixed foam systems shall be utilized for tanks exceeding the above limitations and for all floating
roof tanks.
Fire protection of floating roof tanks will be based on rim fires only, because this type of tanks has an
excellent fire record and if maintained properly, the possibility of a large fire is remote. Also, overfilling
of the tank shall be avoided under all circumstances.
Where applicable, in addition to the primary semi-fixed foam system, supplementary protection from
mobile foam equipment complete with suitable foam producing devices and/or hydrant mounted
foam/water monitors shall be provided. Fir hydrants installed throughout the site shall provide fire
water to both equipments.
Additional tank shell cooling shall be provided to avoid failure of the shell by prolonged burning.
\\Ngl-Haeri\TDE\12 Nov\SIRB-00-SA-SP-0008-2.Doc
Sirri Island Gas Gathering & NGL Recovery Project
Oil Industries’ Engineering
and Construction Iranian Offshore Oil Company
Contract Number:
FOAM PROTECTION SYSTEM SPECIFICATION
3223-82-3-FG
Project No.: 212 Doc. No.: SIRB-00-SA-SP-0008 Rev: 2 Date: Nov.12/04 Page 7 of 7
3.3 PROPORTIONER
Proportioner shall consist of a body, inlet nozzle, and metering orifice, all of which will be corrosion-
resistant such as brass. The metering orifice shall be sized according to the type and percentage of
concentrate used and secured with a stainless steel retaining ring.
The proportioner body, inlet nozzle, and foam orifice shall be of ASTM 85-5-5-5 brass. The nozzle
and foam orifice retaining rings shall be of stainless steel.
3.4 STRAINER
A listed strainer suitable for use with the proportioner and foam devices shall be provided in the water
line upstream of the water valve. Supplemental strainers shall be permitted to be used as
recommended by the foam equipment manufacturer.
\\Ngl-Haeri\TDE\12 Nov\SIRB-00-SA-SP-0008-2.Doc