such notice by Authority.

In case of inspection/direction by the Authority


within 7 days the work may be commenced earlier.
7.2.1 Other Facilities to be provided during construction on site: - The notice
shall also be accompanied by an undertaking from the owner/developer
/contractor to the effect that during the period of construction facilities like
day-care centre, crèche, adult-literacy and non-formal education programmes
for the construction workers will be made available directly by him or through
a voluntary agency.

7.3 Documents at Site:-


7.3.1 Where tests of any materials are made to ensure conformity with the
requirements of the regulations, records of the test data shall be kept available
for inspection during the construction of the building and for such a period
thereafter as required by the Authority.
7.3.2 The person to whom a building permission is issued shall during construction
keep;
(a) Displayed on board (pasted) in a conspicuous place on the site,
information in respect of which the permission was issued.
(b) A copy of the approved drawing & specifications and other
information as directed by the Authority.

7.4 Checking of Plinth/Column up to Plinth Level – The owner shall give


notice in prescribed form given in Appendix G to the Authority after the
completion of work upto plinth level with a view to enable the Authority to
ensure that the work is carried out in accordance with the sanctioned plans.
The Authority shall carry out inspection jointly with Architect / liaisoning
technical person within 7 days from the receipt of such notice and give
permission, for carrying out further construction work as per sanctioned plans
in prescribed Proforma given in Appendix H. Within the above period if the
permission is not refused, the permission shall be deemed to have been given.
Alternatively, if within such period of seven days the permission from the
Authority is not granted, then the Checking of Plinth / Column up to plinth
level may be checked and certified by the Licensed Architect, who should be
registered with the Council of Architects, Delhi and he shall submit his report,

31