BQ (3) Pasoh
BQ (3) Pasoh
Item
A. PRELIMINARIES
A.1 Insurance
Provide necessary insurances required under contract:-
a) Contractor All Risk
b) Third Party Liability
c) Workmen Compensation
(Insured Period : Construction period + 1 year defect. Liability period + 6 months)
E CONTIGENCY
CONTI
GRAN
NG, MENGUJIJALAN DAN LAIN-LAIN KEPERLUAN BAGI KERJA
SIMPANG PERTANG, NEGERI SEMBILAN
TOTAL 850,000.00
CONTIGENCIES -
GRAND TOTAL 850,000.00
aterials-prices.html
aterials-prices.html
aterials-prices.html
aterials-prices.html
aterials-prices.html
aterials-prices.html
aterials-prices.html
aterials-prices.html
aterials-prices.html
aterials-prices.html
aterials-prices.html
Item
A. PRELIMINARIES
A.1 Insurance
A.8 AGT
TOTAL SECTION B
E CONTIGENCY
E.1 Replace Bottom Plate (Settling Tank)
E.2 Replace 2nd Bottom Plate
E.3 (Settling Tank)C-Channel (reactor 1)
Replace Tank
E.4 Clear Dumping Site
Description Qty
Provide, maintain and remove Portable Office Cabin for site office usage, document storage 1
and management.
Establish worker's living quarters, stores, site facilities and removal upon completion work. 1
This include survey and first aid outfit.
- Quarters / homestay / hotel (RM40/night @ 30 days) 6
- Travel daily (RM0.15 @ 20km/day @ 25working days) 6
Allow for mobilization and demobilization of transport to and from site to all plant, 1
equipments and labour necessary for the execution of the works including all duties and
insurances, etc. and providing for the temporary crossing and drainage necessary for proper
execution of works.
Provide safety precautions to ensure the health and safety of Contractor's staff and labour. 1
This include providing personal protection equipment (PPE), medical kit, portable fire
extinguisher etc. based on HIRARC assessment.
The employment of competent Site Safety and Health Supervisor for the entire duration of 9
the construction period to be stationed at site. This include report to summarize occurences,
accidents and safety performance.
The employment of competent authorized gas tester to ensure tank in safe condition to work. 1
This include carry out air testing for toxic, flammable gas and fumes and oxygen adequacy
before access to the confined area of work.
Provide test to verify welding condition and check leakage for each unit tank. 3
TOTAL SECTION A
Cut, remove and terminate Reactor 1 gas pipeline till main gas pipeline. The gas pipeline 1
terminate
Dispose any using 8 inch
liquid, ID stud
sludge, solidend flange
or any for HDPE
content c/wthe
inside accessories.
3,600mt tank to assigned area with 1
radius of 300 meter from site.
Erect, maintain and dismantle suitable scarffolding for temporary working platform including 1,200
access
Provideand egress
1 unit around
20tonne tank.
crane for demolish & installation work. The price include 14
-transportation,
Tank Dimension : ID X
insurance,Height : 19.1m
driver, dieselXand
12.8m
other related item. and demolish rooftop & top
-Prepare
Scaffoldworkforces,
vol. : L X Wequipments
X H : 60m X and
1.5mtransportations
X 12.8m to remove 1
portion bioreactor 1 to the designed area with radius of 500 meter from site.
- Lorry with driver, 6 wheels 8 tonne; with driver 14
- Worker; RM100.00/man.day (6 worker) 14
To supply, fabricate, transport and replace MS 1 portion tank plate from top. Any facilities 1
mount
MS plate on top late will install back. Tank spesification: 5,107
-- Material :: MS
πD =plate (6mm=thk) c/w 3 layer anti rust paint
- Ukur
Tank
lilit RM95.00/man.day
Worker;
Diameter
π(19.2m)
: 19.2m
60.3186m
(6 worker) 30
- Plate height & thk : 1.8m X 6mm
-- 1 portion
Plate weight tank: 60.3186m
plate height = 6ft XSECTION
XTOTAL
1.8m B
6mm X 7840kg/m3 = 5,107.29kg
Refer to drawing ………
Dispose any liquid, sludge, solid or any content inside the 800mt tank to assigned area with 1
radius of 300 meter
Erect, maintain from site. suitable scarffolding for temporary working platform including
and dismantle 525
access
Provideand 1 unitegress around
20tonne tank.
crane for demolish & installation work. The price include 14
-transportation,
Tank Dimension : ID X Height
insurance, : 15.54m
driver, X 7.1m
diesel and other related item. and demolish top portion &
-Prepare
Scaffoldworkforces,
vol. : L X Wequipments
X H : 50m X and 1.5mtransportations
X 7m to remove 1
20ft
- Lorry X 6ft
with bottom
driver,plate at holding
6 wheels tankwith
8 tonne; (HT)driver
to the designed area within radius of 500 meter 14
from site.
- Worker; RM100.00/man.day (6 worker) 14
To supply, fabricate, transport and replace MS 2 portion tank plate from top. Tank 2
spesification:
MS plate (1 portion) 10,214
-- Material :: MS
πD =plate
Ukur lilitRM95.00/man.day (6mm=thk)
π(15.5m) 50m c/w 3 layer anti rust paint
Worker;
-- Dimension (6 worker) 30
Plate height & thk : 1.8m X 6mm22ft
Tank : D X h = 50ft X
-To
-1 portion
supply,
Plate weight tank: 50m
plateXtransport
fabricate, height
1.8m X=6mm6ft
and replace 2" X 4"=MS
X 7840kg/m3 C-channel around top plate tank.
5,107.29kg 50
Refer
Refer to
to
-ToPortion drawing
drawing
replace : ………
………
2 portion
supply, fabricate, transport and replace 20ft X 6fft X 9mm MS plate at bottom tank. Tank 2
spesification: TOTAL SECTION C
- Material : MS plate (9mm thk) c/w 3 layer anti rust paint
- Dimension Tank : D X h = 50ft X 22ft
Refer to drawing ………
Dispose any liquid, sludge, solid or any content inside the 560mt tank to assigned area with 1
radius of 300 meter
Erect, maintain from site. suitable scarffolding for temporary working platform including
and dismantle 525
access
Provideand 1 unitegress around
20tonne tank.
crane for demolish & installation work. The price include 14
-transportation,
Tank Dimension : ID X
insurance, Height : 15.54m
driver, X 7.1m
diesel and other related item. and demolish rooftop & top
-Prepare
Scaffoldworkforces,
vol. : L X Wequipments
X H : 50m X and1.5mtransportations
X 7m to remove 1
portion bioreactor 2 to the designed
- Lorry with driver, 6 wheels 8 tonne; with driver area with radius of 500 meter from site. 14
- Worker; RM95.00/man.day (6 worker) 14
To supply, fabricate, transport and replace MS 2 portion tank plate from top. Tank 3
spesification:
MS plate (1 portion) 15,321
-- Material :: MS
πD =plate
Ukur lilitRM95.00/man.day (6mm=thk)
π(15.5m) 50m c/w 3 layer anti rust paint
Worker;
-- Dimension (6 worker) 30
Plate height & thk : 1.8m X 6mm22ft
Tank : D X h = 50ft X
-- 1
To portion
supply,
Plate weight tank: 50m
plateXtransport
fabricate, height
1.8m X=6mm6ft
and replace 2" X 4"=MS
X 7840kg/m3 C-channel around top plate tank.
5,107.29kg 50
Refer
Refer to
to drawing
drawing
- Portionfabricate, ………
………
replace : transport
2 portion and replace 1.5m height spiral stair mount on top plate as per
Supply, 4
drawing ………..
To supply, fabricate, transport and install 6 inch ID HDPE overflow pipe c/w accessories & pipe 10
Material
holder for: GI expanded
each 1.0m. mesh (3' width)
TOTAL SECTION E
TOTAL
To supply, fabricate, transport and replace 20ft X 6fft X 9mm MS plate at bottom tank. Tank 8
spesification:
To supply, fabricate, transport and replace 20ft X 6fft X 9mm MS plate at bottom tank. Tank 8
-spesification:
Material : MS plate (9mm thk) c/w 3 layer anti rust paint
-To
-Refer
supply, fabricate,
Dimension
Material Tank
: MS : D transport
plate X h = 50ft
(9mm
and
thk)Xc/w
replace 2" X 4" MS C-channel around top plate tank.
22ft
3 layer anti rust paint
50
--Clear to
Total drawing
plate (1 ………
portion)
and transfer : (50m X 7.6m)/ = 380to the deisgned area.
Dimension Tank :solid
D X hin=the
50ftdumping
X 22ft pond 24,150
Refer to drawing ………
- Total plate (1 portion) : (50m X 7.6m)/ = 380 CONTIGENCIES
Refer to drawing ………
GRAND TOTAL
Unit Amount
Rate [RM]
[RM]
L.Sum http://quantitysurveyoronline.com.my/materials-prices.html
90,950.00
TOTAL 564,090.00
SCAFFOLDING
D= 15.2 m a. Price = RM35,000.00
g. Up Stairs = 64 step
h. height = 64 m
i. Weight = 599.04 kg
j. Price = RM4,792.32
k. Pipe handrill = RM2,295.52
RAILING
MS plate
1m 2 mm
19.1 m
Vertical
a. Point = 60
b. Volume (1) = 0.001 m3
Volume = 0.061 m3
c. Weight = 478.57 kg
d. Price = RM3,828.57
Handrill
a. Price = RM6,600