Requirments Template

You might also like

Download as xlsx, pdf, or txt
Download as xlsx, pdf, or txt
You are on page 1of 12

Sr No Description

1 Bare Shell Area

1.1 Proximity -ref from ACIL Dapodi - witin 3km

1.2 Carpert Area actual as per approved drawings

1.3 Office working hours


2  Bare Shell Rent

2.1 Refundable Security Deposit ?

2.2 Escalation - Bare shell rent ?

3  Maintainence Charges - common facilities ?

3.1 Energy Meter ?


4.1 2 wheeler parking

4.2 4 Wheeler parking

4.2.1 Chargeable parking 4 wheeler ?

4.2.2 Chargeable parking 2 wheeler ?

4.4 Notice Period

5 Liscense term

5.1 Lock in period

6 Power Backup- DG if any ?

6.1 Legal charges

6.2 Stamp Duty and registration charges

6.3 STPI /DIC Registration

6.4 Shops act Liscense requirement ?


7 Interior Fitouts

Final NOC , Occupany certificate , waste disposal


arrangements , Security , CCTV , Structural
stability , Emergency team support ,Mock drills ,
8 Form B Compliance ,Electrical Safety rules
compliances , Emergency exits , Fire Signages ,
Fire extinguishers ,

9 Dedicated washroom facility


Requirements Unit

9000 SQFT

9000

24x7 - 365 days


9000 SQFT

months

Every Year

9000 SQFT

1 Nos
25 - 30 NOS

24 NOS

NOS

NOS

Months

5 years

3 years

charges/unit

To be borne by owners

Not Applicable
Rates
Remarks

Diatnace from our dapodi facility - less than within


3km as mentioned by Abhishek

SQFT
Security and safety - of the premises by owners
during these hours
Per Square Feet

Mention no of months

Mnetion % PA

Specify the services -exclusions and inclusions

Charges based on a sub meter or separate meter


to be obtained , the owner should provide the
same in both cases
Not chargeable

Not chargeable
Charges/vechicle

Charges/vehicle

mention the mode of charges and measurement

ACIL should not have the obligation of obtaining a


DIC /STPI/Non STPI certificate as we are a
engineering industry. (To be evaluated at the
beginning of the proposal)
Shall be done by ACIL, on end of the liscense term
client will take away all installed assets . Owners to
provide free electricity and water during the fitout
period .

EHS checklist to be complied and documents to be


provided by owners - Attcahed for ref

Separate washroom facility required as per our


head count - 80-100 nos .Gents /Ladies

You might also like