Saudi Aramco 2616-ENG (03/99)

PMT OPRNS
KAZ SAUDI ARABIAN OIL COMPANY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
RAZ MAO
ENGG CERT

NFP
ISSUED FOR CONSTRUCTION

REFINING and NGL PROJECTS DEPARTMENT


DESCRIPTION

RT REFINERY and JUAYMAH NGL PROJECTS DIVISION

BI-10-02062

UPGRADE BUILDINGS FOR RISK MITIGATION


09/10/2020 10-02062
JO/EWO

AT RAS TANURA REFINERY


NO. DATE
REV

00

DISCIPLINE
ENGINEER
NFP
09/10 /2020
DATE:
PROJECT
ENGINEER STRUCTURAL CALCULATION
DATE:
MKD
09/10 /2020 OPERATION SHELTER
CERTIFIED
MAO
09/10 /2020
DATE:
CONSTRUCTION
AGENCY
RAZ
09/10 /2020
DATE:
OPERATIONS

KAZ
09/10 /2020
DATE:
Prepared by
CONTROL NUMBER
VERIFICATION
EDSD

DATE:
BY:
REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


00

SEPTEMBER 2020
_____________________
(DCC) NO. 10-02062-0002-001

` STRUCTURAL CALCULATION DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

UPGRADE BUILDING FOR RISK MITIGATION, RAS TANURA DOC


A PE - P20081 1
015
TWO STAGE CRUDE UNIT OF 00
ISSUED FOR CONSTRUCTION (IFC) RAS TANURA SAUDI ARABIA BI / EWO: 10-02062-0002 281
26 JAN 2022 EDSD/2616-0399.doc
CALCULATION SHEET

SNC-LAVALIN FAYEZ ENGINEERING, Al Khobar, Saudi Arabia


PROJECT : Updrade Buildings for Risk Mitigation - RT Refinery
B.I Number : 10-02062-0002-001 Designed : AIA / NFP
Project Code No. : 510008 Checked : AKM
Calc. No. : PE-P20081 Revision : IFC
Subject : Structural Calculation - Operation Shelter - Plant No. 015 Rev. No. : 00

TABLE OF CONTENTS

Description Page Number

1.0 Design Basis ….………………………………………………………………………………………………… 4


1.1 Dictation ….…………………………………………………………………………………………………… 4
1.2 Objective …………………………………………………………………………………….……………… 4
1.3 Structure Description …………………………………………………………………………………… 4
1.4 Structural System ………………………………………………………………………………………… 4
1.4.1 Superstructure ……………………………………………………………………………………… 4
1.4.2 Substructure ……………………………………………………………………………………… 4
1.5 Design Criteria ……………………………………………………………………………………………. 4
1.5.1 Design Codes and References …………………………………………………………………… 4
1.5.2 Material Specifications …………………………………………………………………………….. 5
1.5.3 Soil Parameters ……………………………………………………………………………………. 5
1.5.4 Serviceabilty Requirements ………………………………………………………………………. 5
1.5.5 Design Philosophy & Assumptions ……………………………………………………………….. 6
1.5.6 Structure Load Path (For SDOF Analysis) ………………………………………………………… 6

2.0 Design Loadings ………………………………………………………………………………………………. 7


2.1 Dead Loads ….…………………………………………………………………………………………… 8
2.2 Live Loads ..……………………………………………………………………………………………… 8
2.3 Wind Loads ..……………………………………………………………………………………………… 9
2.4 Seismic Loads ……………………………………………………………………………………………… 10
2.5 Blast Loading …………………………………………………………………………………………… 12
2.6 Load Combination and Load Factors ( For Static Analysis ) 25
2.7 Load Combination and Load Factors ( For Blast Analysis ) 25

3.0 Static Analysis and Design …………………………………………………………………………………… 26


3.1 3D - Model Views ….………………………………………………………………………………………… 27
3.2 ETABS ….…………………………………………………………………………………………………… 31
3.2.1 ETABS Input Sketches….………………………………………………………………………………… 32
3.2.1.1 Loads ….……………………………………………………………………………………………………… 33
3.2.1.2 Sections….…………………………………………………………………………………………………… 38
3.2.1.3 Labels….……………………………………………………………………………………………………… 42
3.2.1.4 Diaphragms….…………………………………………………………………………………………… 45
3.2.2 ETABS Input Report….……………………………………………………………………………………… 47
3.2.3 ETABS Output….…………………………………………………………………………………………… 72
3.2.3.1 Beam Design….…………………………………………………………………………………………… 73
3.2.3.2 Column Design….…………………………………………………………………………………………… 101
3.2.3.3 Base Reactions….…………………………………………………………………………………………… 105
3.2.3.4 Drift….………………………………………………………………………………………………………… 109
3.3 SAFE….……………………………………………………………………………………………………… 112
3.3.1 Slabs….……………………………………………………………………………………………………… 113
3.3.1.1 SAFE Input Report….……………………………………………………………………………………… 114
3.3.1.2 SAFE Input Sketches….…………………………………………………………………………………… 121

ISSUED FOR CONSTRUCTION (IFC)

26 JAN 2022
Calculation Report, OPERATION SHELTER, Plant Plant No. 015 Page 2 of 281
CALCULATION SHEET

SNC-LAVALIN FAYEZ ENGINEERING, Al Khobar, Saudi Arabia


PROJECT : Updrade Buildings for Risk Mitigation - RT Refinery
B.I Number : 10-02062-0002-001 Designed : AIA / NFP
Project Code No. : 510008 Checked : AKM
Calc. No. : PE-P20081 Revision : IFC
Subject : Structural Calculation - Operation Shelter - Plant No. 015 Rev. No. : 00
3.2.1.3 Flexure Design….…………………………………………………………………………………………… 124
3.2.3.4 Deflection (Long Term)….………………………………………………………………………………… 129
3.3.2 Foundations….……………………………………………………………………………………………… 131
3.3.2.1 SAFE Input Report….……………………………………………………………………………………… 132
3.3.2.2 SAFE Input Sketches….…………………………………………………………………………………… 137
3.3.2.3 Flexure Design….…………………………………………………………………………………………… 140
3.3.2.4 Punching Check….………………………………………………………………………………………… 143
3.3.2.5 Base Pressure….…………………………………………………………………………………………… 145

4.0 SDOF Blast Analysis and Design …………………………………………………………………………… 147


4.1 Reinforced Concrete Wall Design ................................................................................................... 148
4.2 CMU Wall Design……………………….……………………..…………………………………...….…... 177
4.3 Roof Slab Design…………………………...……..………….………………………………...….…....... 191
4.4 Roof Beam Design ……………………………...……...……………….……………………………….... 222
4.5 Column Design ……………………………...…...……………...………………………………...….…... 253
4.6 Footing Design ……………………………...…...……………...………………………………...….….... 276

5.0 APPENDICES …………………………………………………………………………..………………………… 278


Appendix - I BDR DataSheets ………………… …………………………………………………….. 279
Appendix - II Design Drawings …………………………………………………………………..………… 280
Appendix - III Structural Design Checklist ……………………………………………………………… 281

ISSUED FOR CONSTRUCTION (IFC)

26 JAN 2022
Calculation Report, OPERATION SHELTER, Plant Plant No. 015 Page 3 of 281
CALCULATION SHEET

SNC-LAVALIN FAYEZ ENGINEERING, Al Khobar, Saudi Arabia


PROJECT : Updrade Buildings for Risk Mitigation - RT Refinery
B.I Number : 10-02062-0002-001 Designed : AIA / NFP
Project Code No. : 510008 Checked : AKM
Calc. No. : PE-P20081 Revision : IFC
Subject : Structural Calculation - Operation Shelter - Plant No. 015 Rev. No. : 00
1.0 DESIGN BASIS
1.1 Dictation :
This calculation shall be read in conjunction with the design codes and references, as stated on Section
1.5 of this document, general notes on general drawings, construction specifications and structural
drawings.

1.2 Objective:
The purpose of this document is to prepare structural design of Operation Shelter Building.
The design of the structure is composed of RCC structural frame system integrated with concrete
foundations, diaphragms (Solid slabs), CMU wall , interior CMU wall and non-structural items such as
dry walls and its serviceability considerations.
1.3 Structure Description :

1.3.1 Structure Name: Operation Shelter


1.3.2 Structure Type: Building and other structures except those listed in Occupancy Category I,III and IV.
1.3.3 Structure Area: (please refer to Architectural Floor Plan Drawing)
1.3.4 Structure Usage: Operation Shelter
1.3.5 Structure Framing: Ordinary RCC Frames
1.3.6 Structure Height: 4.60 m
1.3.7 Structure Length: 36.5 m
1.3.8 Structure Width: 11.60 m
1.3.9 Structure Roofing System: 200 mm thk. Solid Slab .
1.3.10 Structure Wall System: Exterior walls 300mm thick CMU
Interiors walls are composed of dry wall and 200 mm Thick CMU wall partition
1.4 Structural System :

1.4.1 Superstructure:
A single storey building with ordinary moment frames structural system.

1.4.2 Substructure / Foundation:


The foundations are reinforced concrete footings where columns are supported at the base. CMU
walls shall be supported / connected by grade beams or slabs.

1.5 Design Criteria :


1.5.1 Design Code References:
ACI 318M - 2008 - Building Code Requirements for Structural Concrete
ASCE 7-05 - Minimum Design Loads for Buildings and Other Structures
IBC 2009 - International Building Code

Saudi Aramco Engineering Standards:


SAES-A-112 - Meteorological & Seismic Design Data
SAES-A-113 - Geotechnical Engineering Requirements
SAES-M-100 - Saudi Aramco Building Code
SAES-Q-001 - Criteria for Design and Construction of Concrete Structures
SAES-Q-005 - Concrete Foundations
09-SAMSS-097 - Ready-Mixed Concrete

ISSUED FOR CONSTRUCTION (IFC)

26 JAN 2022
Calculation Report, OPERATION SHELTER, Plant Plant No. 015 Page 4 of 281
CALCULATION SHEET

SNC-LAVALIN FAYEZ ENGINEERING, Al Khobar, Saudi Arabia


PROJECT : Updrade Buildings for Risk Mitigation - RT Refinery
B.I Number : 10-02062-0002-001 Designed : AIA / NFP
Project Code No. : 510008 Checked : AKM
Calc. No. : PE-P20081 Revision : IFC
Subject : Structural Calculation - Operation Shelter - Plant No. 015 Rev. No. : 00

1.5.2 Material Specifications:

Minimum compressive strength of concrete @ 28 days f'c = 35 MPa SAES-Q-001


(for structural concrete, e.g. columns, pedestal, footings
slabs and grade beams)

Minimum compressive strength of concrete @ 28 days f'c = 14 MPa SAES-Q-001


(for non-structural concrete, e.g. lean or blinding concrete)

Yield strength of Reinforcing Steel Bars (Grade 60) fy = 420 MPa SAES-Q-001

Unit weight of normal concrete c = 24 KN/m


3

Unit weight of lightweight concrete screed cs = 12 KN/m


3

1.5.3 Soil Parameters (Soil Report, G.F. # 2018/100):


Soil density s = 18 KN/m3
Net Soil Bearing Capacity ( For Static Analysis ) SBC = 200 Kpa
Ultimate Soil Bearing Capacity ( For Blast Analysis ) SBC = 500 Kpa
Angle of friction ϕ = 35 degree

1.5.4 Serviceability Requirements


Maximum allowable vertical deflection shall not exceed;
Beam and Slab deflection = L/240 ACI 318-08 (Table 9.5 (b)

Maximum lateral drift in combinations with seismic in buildings shall not exceed;
All other structures = 0.01H Table 12.12-1, ASCE 7-05

1.5.5 Design Philosophy and Assumptions:

1.5.5.1 The structure will be designed as per IBC 2009, ACI 318M-2008, SAES-M-009 and other relevant
international standards.
1.5.5.2 The building super-structural frame system is modelled, analyzed, and designed in ETABS software for
Static Load Analysis (without Blast Loads). Buildings foundations and roof slab are designed using
SAFE software.
1.5.5.3 For Blast Analysis and design, Structural frame members/components and secondary components will
be analyzed as SDOF system.
1.5.5.4 Transformation Factors as per ASCE-41088 will be applied in the SDOF models. Material non-linear
(Plastic) response is considered in the SDOF model. Critical Framing Members/components (Beams,
Columns, Slabs, Walls) are selected and checked against blast loads and acceptable damage level
(Response Limits) defined in the BDR datasheets.

ISSUED FOR CONSTRUCTION (IFC)

26 JAN 2022
Calculation Report, OPERATION SHELTER, Plant Plant No. 015 Page 5 of 281
CALCULATION SHEET

SNC-LAVALIN FAYEZ ENGINEERING, Al Khobar, Saudi Arabia


PROJECT : Updrade Buildings for Risk Mitigation - RT Refinery
B.I Number : 10-02062-0002-001 Designed : AIA / NFP
Project Code No. : 510008 Checked : AKM
Calc. No. : PE-P20081 Revision : IFC
Subject : Structural Calculation - Operation Shelter - Plant No. 015 Rev. No. : 00

1.5.5.5 Dynamic analysis is performed for SDOF models with time-dependent blast loads using numerical
integration methods as suggested in ASCE-41088, Appendix-6.
1.5.5.6 Peak responses (deformation and/or ductility ratio) from the Dynamic analysis of SDOF model are
checked against response limits defined in BDR datasheets and SAES-M-009. BDR datasheets are
appended in the Basis of Design Report Doc. No. PE-303023.
1.5.5.7 Building foundations are checked for Blast loads based on peak responses of the supporting
member/component (Columns).
1.5.5.8 All soil design parameters are as per Geotechincal Soil Investigation Report , File # 2018/100.

1.5.6 Structure Load-Path (For SDOF Blast Analysis):

1.5.6.1 Front CMU wall (facing the Blast source) supported by slab-on-grade or floor/grade beam at the bottom,
and Roof slab at the top acting as diaphragm.
1.5.6.2 RC Slab/beams (diaphragm) received the reactions loads from the front wall. This load is then
distributed to the columns in proportion to its lateral stiffness. Refer to Column SDOF Calculation. Also,
1.5.6.3 Roof Beams (Roof shield) and Columns are loaded with blast pressure on the roof.
The resulting blast loads are calculated based on the Tributary area. Refer to Column SDOF Calculation.

1.5.6.4
Dynamic reactions (lateral and vertical) from the column are then transferred into the footing foundation.

ISSUED FOR CONSTRUCTION (IFC)

26 JAN 2022
Calculation Report, OPERATION SHELTER, Plant Plant No. 015 Page 6 of 281
CALCULATION SHEET

SNC-LAVALIN FAYEZ ENGINEERING, Al Khobar, Saudi Arabia


PROJECT : Updrade Buildings for Risk Mitigation - RT Refinery
B.I Number : 10-02062-0002-001 Designed : AIA / NFP
Project Code No. : 510008 Checked : AKM
Calc. No. : PE-P20081 Revision : IFC
Subject : Structural Calculation - Operation Shelter - Plant No. 015 Rev. No. : 00

2.0 DESIGN LOADINGS

ISSUED FOR CONSTRUCTION (IFC)

26 JAN 2022
Calculation Report, OPERATION SHELTER, Plant Plant No. 015 Page 7 of 281
CALCULATION SHEET

SNC-LAVALIN FAYEZ ENGINEERING, Al Khobar, Saudi Arabia


PROJECT : Updrade Buildings for Risk Mitigation - RT Refinery
B.I Number : 10-02062-0002-001 Designed : AIA / NFP
Project Code No. : 510008 Checked : AKM
Calc. No. : PE-P20081 Revision : IFC
Subject : Structural Calculation - Operation Shelter - Plant No. 015 Rev. No. : 00

2.1 Dead Load


This includes self weight of structure and all its components per ASCE 7-05, "Minimum Design Loads for
Buildings and Other Structures, refer to Tables C3-1, C3-2 Minimum Loads unless noted otherwise.

Roof Loads :

200 mm thk. Solid slab selfweight = 4.80 KPa (derived value)


50 mm thk. Gravel = 1.25 KPa (derived value)
140 mm avg. thickness of Lightweight Lean Concrete = 1.68 KPa (derived value)
Roof insulation Layers (Refer to Arch.) = 1.00 KPa Assumed Conservatively
Ceiling = 0.3 kPa Assumed Conservatively
Electrical lighting system = 0.05 KPa ASCE 7-05
Duct Allowance = 0.20 KPa ASCE 7-05
Fire Sprinkler System = 0.15 KPa ASCE 7-05

Total superimposed load of Roof Slab = 9.43 KPa

External CMU Walls (Fully Grouted):


300 mm thk. concrete masonry wall = 6.40 kPa SABP-Q-008, Sec. Table 1
50 mm thk insulation = 0.20 kPa
Total superimposed load of CMU wall (internal) = 6.60 KPa

Internal CMU Walls (Fully Grouted):


200 mm thk concrete masonry wall = 4.00 kPa SABP-Q-008, Sec. Table 1
50 mm thk insulation = 0.20 kPa
Total superimposed load of CMU wall (internal) = 4.20 KPa

2.2 Live Load on Roof


Ordinary flat, pitched, and curved roofs = 20 psf = 1.0 KPa ASCE 07-05, Table 4-1

ISSUED FOR CONSTRUCTION (IFC)

26 JAN 2022
Calculation Report, OPERATION SHELTER, Plant Plant No. 015 Page 8 of 281
CALCULATION SHEET

SNC-LAVALIN FAYEZ ENGINEERING, Al Khobar, Saudi Arabia


PROJECT : Updrade Buildings for Risk Mitigation - RT Refinery
B.I Number : 10-02062-0002-001 Designed : AIA / NFP
Project Code No. : 510008 Checked : AKM
Calc. No. : PE-P20081 Revision : IFC
Subject : Structural Calculation - Operation Shelter - Plant No. 015 Rev. No. : 00

2.3 Wind Load


The building will be designed as per Main Wind Force Resisting System.
Location : Ras Tanura, Kingdom of Saudi Arabia

V = Basic Wind Speed ( 3-Sec. Gust ) = 145.00 km/hr SAES-A-112


90.08 mph
Exposure Factor = Exposure C
P = Design Wind Pressure
P = [qz*G*Cp] - [qh*Gcpi]
G = Gust Effect Factor = 0.85 ASCE 7-2005
CpW = external wall pressure coefficient for windward wall = 0.80 ASCE 7-2005
CpL = external wall pressure coefficient for leeward wall = 0.50 ASCE 7-2005
Kzt = Topographic Factor = 1.00 ASCE 7-2005
Kd = Wind Directionality Factor = 0.85 ASCE 7-2005
I = Wind Importance Factor Occupancy Risk Category III = 1.15 ASCE 7-2005

ISSUED FOR CONSTRUCTION (IFC)

26 JAN 2022
Calculation Report, OPERATION SHELTER, Plant Plant No. 015 Page 9 of 281
CALCULATION SHEET

SNC-LAVALIN FAYEZ ENGINEERING, Al Khobar, Saudi Arabia


PROJECT : Updrade Buildings for Risk Mitigation - RT Refinery
B.I Number : 10-02062-0002-001 Designed : AIA / NFP
Project Code No. : 510008 Checked : AKM
Calc. No. : PE-P20081 Revision : IFC
Subject : Structural Calculation - Operation Shelter - Plant No. 015 Rev. No. : 00

2.4 Seismic Load

As per SAES-A-112, TABLE-1 Design Data:


Ss = Short Period Acceleration (Ss) in % g = 8.80 = 0.088 < 0.25
S1 = Short Period Acceleration (S1) in % g = 3.20 = 0.032 < 0.10

Site Class = C SAES-A-112


Fa = values of site coefficient = 1.20 Table 11.4-1 ASCE 7-2005
Fv = values of site coefficient = 1.70 Table 11.4-2 ASCE 7-2005

E = Seismic importance factor (Category IV) = 1.25 Table 11.5-2 ASCE 7-2005

Adjusted Maximum Considered Earthquake Spectral Response Acceleration Parameters


S ms = FaSs = 1.20 x 0.09 = 0.106 (equation 11.4-1) ASCE 7-2005
S m1 = FvS1 = 1.70 x 0.032 = 0.054 (equation 11.4-2) ASCE 7-2005

Design Spectral Response Acceleration Parameters


S ds = 2/3 S ms = 0.070 (equation 11.4-3) ASCE 7-2005
S d1 = 2/3 S m1 = 0.036 (equation 11.4-4) ASCE 7-2005

ISSUED FOR CONSTRUCTION (IFC)

26 JAN 2022
Calculation Report, OPERATION SHELTER, Plant Plant No. 015 Page 10 of 281
CALCULATION SHEET

SNC-LAVALIN FAYEZ ENGINEERING, Al Khobar, Saudi Arabia


PROJECT : Updrade Buildings for Risk Mitigation - RT Refinery
B.I Number : 10-02062-0002-001 Designed : AIA / NFP
Project Code No. : 510008 Checked : AKM
Calc. No. : PE-P20081 Revision : IFC
Subject : Structural Calculation - Operation Shelter - Plant No. 015 Rev. No. : 00

S1 = 0.032 < 0.04 hence, SDC A


Ss = 0.088 < 0.15 hence, SDC A

11.7 DESIGN REQUIREMENTS FOR SEISMIC DESIGN CATEGORY A


11.7.1 Applicability of Seismic Requirements for Seismic Design Category A Structures.
Structures assigned to Seismic Design Category A need only to comply with the requirements of
Section 11.7.

ISSUED FOR CONSTRUCTION (IFC)

26 JAN 2022
Calculation Report, OPERATION SHELTER, Plant Plant No. 015 Page 11 of 281
CALCULATION SHEET

SNC-LAVALIN FAYEZ ENGINEERING, Al Khobar, Saudi Arabia


PROJECT : Upgrade Buildings for Risk Mitigation - RT Refinery
B.I Number : BI-10-02062-0002-001 Designed : NFP
Project Code No. : 510008 Checked : AKM
Calc. No. : PE-P20081 Revision : IFC SUB
Subject : Blast Load Calculation - Plant # 15, PIB Building (Bldg-A9) Rev. No. : 00

2.5 BLAST LOADING


[Ref. Design of Blast Resistant Building in Petrochemical Facilities (DBRBPF), ASCE - 41088 2nd Edition]

Reflected Wall = East [BDR Datasheet]


North-South Span, Fwʟ = 36.40 m
East-WestSpan, Swʟ = 11.55 m
Height, H = 5.40 m

North BLAST
5.40 m East

West
36.40 m
South

11.55 m

Side-on Pressure and Duration [BDR Datasheet]


Reflected Wall Overpressure ( PSO ) Duration ( td )
millibar Psi Kpa millisec. Sec.
Eastern
723.9495 10.50 72.40 41.6 0.0416

Building Reflected Overpressure Summary


Overpressure Duration
Component Type Remarks
Kpa Sec.

Eastern Wall Front Wall Pr = 183.07 0.039


Western Wall Rear Wall Pb = 51.86 0.054
Northern Wall Side Wall Pas = 65.69 0.044 For 1-meter strip range from front wall
Southern Wall Side Wall Pas = 65.69 0.044 For 1-meter strip range from front wall
Roof Roof Par = 36.29 0.068 From East to West range
(Refer following calculation for the blast load computation)

ISSUED FOR CONSTRUCTION (IFC)

26 JAN 2022
Calculation Report, OPERATION SHELTER, Plant Plant No. 015 Page 12 of 281
CALCULATION SHEET

SNC-LAVALIN FAYEZ ENGINEERING, Al Khobar, Saudi Arabia


PROJECT : Upgrade Buildings for Risk Mitigation - RT Refinery
B.I Number : BI-10-02062-0002-001 Designed : NFP
Project Code No. : 510008 Checked : AKM
Calc. No. : PE-P20081 Revision : IFC SUB
Subject : Blast Load Calculation - Plant # 15, PIB Building (Bldg-A9) Rev. No. : 00

Blast Load (Bt) Calculations

Blast wave has been given and will be applied normal to the LONGER Side of the building

Blast wave parameters are as follows:

PSO , Peak Side-on overpressure

Pso = 72.40 Kpa [BDR Datasheet]

td , Duration

td = 0.042 Sec [BDR Datasheet]

U , Shock front velocity

U = 345 x √(1+0.0083 x Pso) [Eq. 3.5 - DBRBPF]

U = 345 x √(1+0.0083 x 72.40)

= 436.52 m/s

LW , Length of pressure wave

LW = U x td [Eq. 3.6 - DBRBPF]

= 436.52 x 0.042

= 18.16 m

qo , Peak dynamic wind pressure

qo = 0.0032 x (PSO )² [Eq. 3.4 - DBRBPF]

= 0.0032 x (72.40)²

= 16.77 Kpa

ISSUED FOR CONSTRUCTION (IFC)

26 JAN 2022
Calculation Report, OPERATION SHELTER, Plant Plant No. 015 Page 13 of 281
CALCULATION SHEET

SNC-LAVALIN FAYEZ ENGINEERING, Al Khobar, Saudi Arabia


PROJECT : Upgrade Buildings for Risk Mitigation - RT Refinery
B.I Number : BI-10-02062-0002-001 Designed : NFP
Project Code No. : 510008 Checked : AKM
Calc. No. : PE-P20081 Revision : IFC SUB
Subject : Blast Load Calculation - Plant # 15, PIB Building (Bldg-A9) Rev. No. : 00

Front (East) Wall Loading

Design is for typical 1 m wide segment

Pr , Reflected overpressure,
Pr = (2 + (0.0073 Pso)) x Pso [Eq. 3.3 - DBRBPF]
= (2 + (0.0073 x 72.40)) x 72.40
= 183.07 Kpa

S , Clearing distance,
S = Minimum of H or (Fwʟ/2) = [Sec 3.5.1 - DBRBPF]
S = Minimum of (5.4 , 36.4/2) = 5.40 m

tc , Reflected overpressure clearing time,


tc = Minimum of (td & 3.(S/U)) [Eq. 3.8 - DBRBPF]
tc = Minimum of (0.042, 3 x 5.40/436.52)
tc = 0.037 Sec

Cd, Drag coefficient


Cd = 1.00 for rectangular bldg, front wall, [Sec 3.3.3 - DBRBPF]

PS , Stagnation pressure,
PS = PSO + Cd (qo ) [Eq. 3.7 - DBRBPF]
= 72.40 + 1.00 x 16.77
= 89.18 Kpa

Iw , Front wall impulse,


Iw = 0.50 ( Pr - Ps ) tc + 0.50( Ps td ) [Eq. 3.9 - DBRBPF]
= 0.5 x (183.07 - 89.18) x (0.0371) + 0.5 x (89.1778 x 0.04)
= 3.60 Kpa.Sec
te , Effective duration,
te = 2.Iw / Pr [Eq. 3.10 - DBRBPF]
= 0.039 Sec

ISSUED FOR CONSTRUCTION (IFC)

26 JAN 2022
Calculation Report, OPERATION SHELTER, Plant Plant No. 015 Page 14 of 281
CALCULATION SHEET

SNC-LAVALIN FAYEZ ENGINEERING, Al Khobar, Saudi Arabia


PROJECT : Upgrade Buildings for Risk Mitigation - RT Refinery
B.I Number : BI-10-02062-0002-001 Designed : NFP
Project Code No. : 510008 Checked : AKM
Calc. No. : PE-P20081 Revision : IFC SUB
Subject : Blast Load Calculation - Plant # 15, PIB Building (Bldg-A9) Rev. No. : 00

Side (North & South) Wall Loading

Design will be for typical 1 m wide segment,

L1 = 1.00 m strip,

Cd , Drag coefficient
Cd = -0.40 for rectangular bldg, Side wall, [Sec 3.3.3 - DBRBPF]

Lw/L1 , Equivalent load coefficient,


= 18.16 / 1.00 = 18.16
Ce = 1.00 [Fig. 3.9 - DBRBPF]

Pas , Equivalent peak overpressure,


Pas = Ce Pso + Cd qo [[Eq.
q 3.11 - DBRBPF]]
= 1.00 x 72.40 + (-0.4) x 16.77
= 65.69 Kpa

tr , Rise time
= L1 / U [Fig. 3.8 - DBRBPF]
= 1.00 / 436.52
= 0.002 Sec

to , Total positive phase duration


= tr + td
= 0.002 + 0.042
= 0.044 Sec

ISSUED FOR CONSTRUCTION (IFC)

26 JAN 2022
Calculation Report, OPERATION SHELTER, Plant Plant No. 015 Page 15 of 281
CALCULATION SHEET

SNC-LAVALIN FAYEZ ENGINEERING, Al Khobar, Saudi Arabia


PROJECT : Upgrade Buildings for Risk Mitigation - RT Refinery
B.I Number : BI-10-02062-0002-001 Designed : NFP
Project Code No. : 510008 Checked : AKM
Calc. No. : PE-P20081 Revision : IFC SUB
Subject : Blast Load Calculation - Plant # 15, PIB Building (Bldg-A9) Rev. No. : 00

Rear (West) Wall Loading

Design will be for typical 1 m wide segment,

Cd , Drag coefficient
Cd = -0.40 for rectangular bldg, Rear wall, [Sec 3.3.3 - DBRBPF]

S = 5.40 m [See Above Calculations]

Lw/S , Equivalent load coefficient


= 18.16 / 5.40 = 3.36
Ce = 0.81 [Fig. 3.9 - DBRBPF]

Pb , Equivalent peak overpressure,


Pb = Ce Pso + Cd qo [[Eq.
q 3.11 - DBRBPF]]
= 0.81 x 72.40 + (-0.4) x 16.77
= 51.86 Kpa

ta , Time of arrival
ta = BL / U [Sec 3.5.4 - DBRBPF]
= .55000 / 436
= 0.026 Sec

tr , Rise time
tr = S/ U [TM 5 - 1300]
= 5.40 / 436.52
= 0.012 Sec

to , Total positive phase duration


to = tr + td
= 0.012 + 0.042
= 0.054 Sec

ISSUED FOR CONSTRUCTION (IFC)

26 JAN 2022
Calculation Report, OPERATION SHELTER, Plant Plant No. 015 Page 16 of 281
CALCULATION SHEET

SNC-LAVALIN FAYEZ ENGINEERING, Al Khobar, Saudi Arabia


PROJECT : Upgrade Buildings for Risk Mitigation - RT Refinery
B.I Number : BI-10-02062-0002-001 Designed : NFP
Project Code No. : 510008 Checked : AKM
Calc. No. : PE-P20081 Revision : IFC SUB
Subject : Blast Load Calculation - Plant # 15, PIB Building (Bldg-A9) Rev. No. : 00

Roof Loading

Condition for dimension "L1"


L1 = the span of Roof element, when the Roof element spanning parallel to the direction of blast wave.
L1= 1 m, when the Roof element spanning perpendicular to the direction of blast wave.
(Refer to, Explanation on Appendix - 3, page - 33, Roof loading of ASCE-41088,

L1 = 11.55 m

Cd , Drag coefficient
Cd = -0.40 for rectangular bldg, Roof, [Sec 3.3.3 - DBRBPF]

Lw/L1 , Equivalent load coefficient,


= 18.16 / 11.55 = 1.57
Ce = 0.59 [Fig. 3.9 - DBRBPF]

Par , Equivalent peak overpressure,


Par = Ce Pso + Cd qo [Eq. 3.11 - DBRBPF]
= 0.59 x 72.40 + (-0.4) x 16.77
= 36.29 Kpa

tr , Rise time
= L1 / U [Fig. 3.8 - DBRBPF]
= 11.55 / 436.52
= 0.026 Sec

to , Total positive phase duration


= tr + td
= 0.026 + 0.042
= 0.068 Sec

Arrival times in proportion to Span of building from East to West


tar0 = 0.00 sec At the face of front wall
At Mid-Span
tar₁ = L1 / U = 5.78 / 436.52 = 0.013 Sec Where L₁ = Swʟ/2
At Rear End
tar₂ = L1 / U = 11.55 / 436.52 = 0.026 Sec Where L₁ = Swʟ

ISSUED FOR CONSTRUCTION (IFC)

26 JAN 2022
Calculation Report, OPERATION SHELTER, Plant Plant No. 015 Page 17 of 281
CALCULATION SHEET

SNC-LAVALIN FAYEZ ENGINEERING, Al Khobar, Saudi Arabia


PROJECT : Upgrade Buildings for Risk Mitigation - RT Refinery
B.I Number : BI-10-02062-0002-001 Designed : NFP
Project Code No. : 510008 Checked : AKM
Calc. No. : PE-P20081 Revision : IFC SUB
Subject : Blast Load Calculation - Plant # 15, PIB Building (Bldg-A9) Rev. No. : 00

BLAST LOADING
[Ref. Design of Blast Resistant Building in Petrochemical Facilities (DBRBPF), ASCE - 41088 2nd Edition]

Reflected Wall = South [BDR Datasheet]


East-West Span, Fwʟ = 11.55 m
North-SouthSpan, Swʟ = 36.40 m
Height, H = 5.40 m

BLAST
South
East

West
5.40 m
North

11.55 m 36.40 m

Side-on Pressure and Duration [BDR Datasheet]


Reflected Wall Overpressure ( PSO ) Duration ( td )
millibar Psi Kpa millisec. Sec.
Southern
723.9495 10.64 73.38 41.6 0.0416

Building Reflected Overpressure Summary


Overpressure Duration
Component Type Remarks
Kpa Sec.

Southern Wall Front Wall Pr = 186.07 0.039


Northern Wall Rear Wall Pb = 52.51 0.054
Eastern Wall Side Wall Pas = 66.49 0.044 For 1-meter strip range from front wall
Western Wall Side Wall Pas = 66.49 0.044 For 1-meter strip range from front wall
Roof Roof Par = 13.68 0.125 From East to West range
(Refer following calculation for the blast load computation)

ISSUED FOR CONSTRUCTION (IFC)

26 JAN 2022
Calculation Report, OPERATION SHELTER, Plant Plant No. 015 Page 18 of 281
CALCULATION SHEET

SNC-LAVALIN FAYEZ ENGINEERING, Al Khobar, Saudi Arabia


PROJECT : Upgrade Buildings for Risk Mitigation - RT Refinery
B.I Number : BI-10-02062-0002-001 Designed : NFP
Project Code No. : 510008 Checked : AKM
Calc. No. : PE-P20081 Revision : IFC SUB
Subject : Blast Load Calculation - Plant # 15, PIB Building (Bldg-A9) Rev. No. : 00

Blast Load (Bt) Calculations

Blast wave has been given and will be applied normal to the SHORTER Side of the building

Blast wave parameters are as follows:

PSO , Peak Side-on overpressure

Pso = 73.38 Kpa [BDR Datasheet]

td , Duration

td = 0.042 Sec [BDR Datasheet]

U , Shock front velocity

U = 345 x √(1+0.0083 x Pso) [Eq. 3.5 - DBRBPF]

U = 345 x √(1+0.0083 x 73.38)

= 437.63 m/s

LW , Length of pressure wave

LW = U x td [Eq. 3.6 - DBRBPF]

= 437.63 x 0.042

= 18.21 m

qo , Peak dynamic wind pressure

qo = 0.0032 x (PSO )² [Eq. 3.4 - DBRBPF]

= 0.0032 x (73.38)²

= 17.23 Kpa

ISSUED FOR CONSTRUCTION (IFC)

26 JAN 2022
Calculation Report, OPERATION SHELTER, Plant Plant No. 015 Page 19 of 281
CALCULATION SHEET

SNC-LAVALIN FAYEZ ENGINEERING, Al Khobar, Saudi Arabia


PROJECT : Upgrade Buildings for Risk Mitigation - RT Refinery
B.I Number : BI-10-02062-0002-001 Designed : NFP
Project Code No. : 510008 Checked : AKM
Calc. No. : PE-P20081 Revision : IFC SUB
Subject : Blast Load Calculation - Plant # 15, PIB Building (Bldg-A9) Rev. No. : 00

Front (South) Wall Loading

Design is for typical 1 m wide segment

Pr , Reflected overpressure,
Pr = (2 + (0.0073 Pso)) x Pso [Eq. 3.3 - DBRBPF]
= (2 + (0.0073 x 73.38)) x 73.38
= 186.07 Kpa

S , Clearing distance,
S = Minimum of H or (Fwʟ/2) = [Sec 3.5.1 - DBRBPF]
S = Minimum of (5.4 , 11.55/2) = 5.40 m

tc , Reflected overpressure clearing time,


tc = Minimum of (td & 3.(S/U)) [Eq. 3.8 - DBRBPF]
tc = Minimum of (0.042, 3 x 5.40/437.63)
tc = 0.037 Sec

Cd, Drag coefficient


Cd = 1.00 for rectangular bldg, front wall, [Sec 3.3.3 - DBRBPF]

PS , Stagnation pressure,
PS = PSO + Cd (qo ) [Eq. 3.7 - DBRBPF]
= 73.38 + 1.00 x 17.23
= 90.61 Kpa

Iw , Front wall impulse,


Iw = 0.50 ( Pr - Ps ) tc + 0.50( Ps td ) [Eq. 3.9 - DBRBPF]
= 0.5 x (186.07 - 90.61) x (0.0370) + 0.5 x (90.6142 x 0.04)
= 3.65 Kpa.Sec
te , Effective duration,
te = 2.Iw / Pr [Eq. 3.10 - DBRBPF]
= 0.039 Sec

ISSUED FOR CONSTRUCTION (IFC)

26 JAN 2022
Calculation Report, OPERATION SHELTER, Plant Plant No. 015 Page 20 of 281
CALCULATION SHEET

SNC-LAVALIN FAYEZ ENGINEERING, Al Khobar, Saudi Arabia


PROJECT : Upgrade Buildings for Risk Mitigation - RT Refinery
B.I Number : BI-10-02062-0002-001 Designed : NFP
Project Code No. : 510008 Checked : AKM
Calc. No. : PE-P20081 Revision : IFC SUB
Subject : Blast Load Calculation - Plant # 15, PIB Building (Bldg-A9) Rev. No. : 00

Side (East & West) Wall Loading

Design will be for typical 1 m wide segment,

L1 = 1.00 m strip,

Cd , Drag coefficient
Cd = -0.40 for rectangular bldg, Side wall, [Sec 3.3.3 - DBRBPF]

Lw/L1 , Equivalent load coefficient,


= 18.21 / 1.00 = 18.21
Ce = 1.00 [Fig. 3.9 - DBRBPF]

Pas , Equivalent peak overpressure,


Pas = Ce Pso + Cd qo [[Eq.
q 3.11 - DBRBPF]]
= 1.00 x 73.38 + (-0.4) x 17.23
= 66.49 Kpa

tr , Rise time
= L1 / U [Fig. 3.8 - DBRBPF]
= 1.00 / 437.63
= 0.002 Sec

to , Total positive phase duration


= tr + td
= 0.002 + 0.042
= 0.044 Sec

ISSUED FOR CONSTRUCTION (IFC)

26 JAN 2022
Calculation Report, OPERATION SHELTER, Plant Plant No. 015 Page 21 of 281
CALCULATION SHEET

SNC-LAVALIN FAYEZ ENGINEERING, Al Khobar, Saudi Arabia


PROJECT : Upgrade Buildings for Risk Mitigation - RT Refinery
B.I Number : BI-10-02062-0002-001 Designed : NFP
Project Code No. : 510008 Checked : AKM
Calc. No. : PE-P20081 Revision : IFC SUB
Subject : Blast Load Calculation - Plant # 15, PIB Building (Bldg-A9) Rev. No. : 00

Rear (North) Wall Loading

Design will be for typical 1 m wide segment,

Cd , Drag coefficient
Cd = -0.40 for rectangular bldg, Rear wall, [Sec 3.3.3 - DBRBPF]

S = 5.40 m [See Above Calculations]

Lw/S , Equivalent load coefficient


= 18.21 / 5.40 = 3.37
Ce = 0.81 [Fig. 3.9 - DBRBPF]

Pb , Equivalent peak overpressure,


Pb = Ce Pso + Cd qo [[Eq.
q 3.11 - DBRBPF]]
= 0.81 x 73.38 + (-0.4) x 17.23
= 52.51 Kpa

ta , Time of arrival
ta = BL / U [Sec 3.5.4 - DBRBPF]
= .40000 / 437
= 0.083 Sec

tr , Rise time
tr = S/ U [TM 5 - 1300]
= 5.40 / 437.63
= 0.012 Sec

to , Total positive phase duration


to = tr + td
= 0.012 + 0.042
= 0.054 Sec

ISSUED FOR CONSTRUCTION (IFC)

26 JAN 2022
Calculation Report, OPERATION SHELTER, Plant Plant No. 015 Page 22 of 281
CALCULATION SHEET

SNC-LAVALIN FAYEZ ENGINEERING, Al Khobar, Saudi Arabia


PROJECT : Upgrade Buildings for Risk Mitigation - RT Refinery
B.I Number : BI-10-02062-0002-001 Designed : NFP
Project Code No. : 510008 Checked : AKM
Calc. No. : PE-P20081 Revision : IFC SUB
Subject : Blast Load Calculation - Plant # 15, PIB Building (Bldg-A9) Rev. No. : 00

Roof Loading

Condition for dimension "L1"


L1 = the span of Roof element, when the Roof element spanning parallel to the direction of blast wave.
L1= 1 m, when the Roof element spanning perpendicular to the direction of blast wave.
(Refer to, Explanation on Appendix - 3, page - 33, Roof loading of ASCE-41088,

L1 = 36.40 m

Cd , Drag coefficient
Cd = -0.40 for rectangular bldg, Roof, [Sec 3.3.3 - DBRBPF]

Lw/L1 , Equivalent load coefficient,


= 18.21 / 36.40 = 0.50
Ce = 0.28 [Fig. 3.9 - DBRBPF]

Par , Equivalent peak overpressure,


Par = Ce Pso + Cd qo [Eq. 3.11 - DBRBPF]
= 0.28 x 73.38 + (-0.4) x 17.23
= 13.68 Kpa

tr , Rise time
= L1 / U [Fig. 3.8 - DBRBPF]
= 36.40 / 437.63
= 0.083 Sec

to , Total positive phase duration


= tr + td
= 0.083 + 0.042
= 0.125 Sec

Arrival times in proportion to Span of building from South to North


tar0 = 0.00 sec At the face of front wall
At Mid-Span
tar₁ = L1 / U = 18.20 / 437.63 = 0.042 Sec Where L₁ = Swʟ/2
At Rear End
tar₂ = L1 / U = 36.40 / 437.63 = 0.083 Sec Where L₁ = Swʟ

ISSUED FOR CONSTRUCTION (IFC)

26 JAN 2022
Calculation Report, OPERATION SHELTER, Plant Plant No. 015 Page 23 of 281
CALCULATION SHEET

SNC-LAVALIN FAYEZ ENGINEERING, Al Khobar, Saudi Arabia


PROJECT : Upgrade Buildings for Risk Mitigation - RT Refinery
B.I Number : BI-10-02062-0002-001 Designed : NFP
Project Code No. : 510008 Checked : AKM
Calc. No. : PE-P20081 Revision : IFC SUB
Subject : Blast Load Calculation - Plant # 15, PIB Building (Bldg-A9) Rev. No. : 00

BLAST LOADING ENVELOPE

Case: Reflected Wall = East


Overpressure Duration Impulse
Component Type
Kpa Sec KN/(m²‐Sec)
Eastern Wall Front Wall 183.07 0.039 3.597
Western Wall Rear Wall 51.86 0.054 1.399
Northern Wall Side Wall 65.69 0.044 1.442
Southern Wall Side Wall 65.69 0.044 1.442
Roof Roof 36.29 0.068 1.235

Case: Reflected Wall = South


Overpressure Duration Impulse
Component Type
Kpa Sec KN/(m²‐Sec)
Eastern Wall Side Wall 66.49 0.044 1.459
Western Wall Side Wall 66 49
66.49 0 044
0.044 1 459
1.459
Northern Wall Rear Wall 52.51 0.054 1.416
Southern Wall Front Wall 186.07 0.039 3.652
Roof Roof 13.68 0.125 0.854

Building Reflected Overpressure Envelope Summary


Overpressure Duration
Component Type
Kpa Sec.

Eastern Wall Front Wall Pr = 183.07 0.039


Western Wall Side Wall Pb = 66.49 0.044
Northern Wall Side Wall Pas = 65.69 0.044 Note:
Load case with high impulse
Southern Wall Front Wall Pas = 186.07 0.039
value is selected as
Roof Roof Par = 36.29 0.068 governing case

ISSUED FOR CONSTRUCTION (IFC)

26 JAN 2022
Calculation Report, OPERATION SHELTER, Plant Plant No. 015 Page 24 of 281
CALCULATION SHEET

SNC-LAVALIN FAYEZ ENGINEERING, Al Khobar, Saudi Arabia


PROJECT : Updrade Buildings for Risk Mitigation - RT Refinery
B.I Number : 10-02062-0002-001 Designed : AIA / NFP
Project Code No. : 510008 Checked : AKM
Calc. No. : PE-P20081 Revision : IFC
Subject : Structural Calculation - Operation Shelter - Plant No. 015 Rev. No. : 00

2.6 Load Combination and Load Factors ( For Static Analysis )

Service Load Combinations as per IBC 2009


S1 = DL IBC 2009, Eq. 16-8
S2 = DL + L + T IBC 2009, Eq. 16-9
S3 = DL + 0.75T + 0.75L IBC 2009, Eq. 16-11
S4 = DL + W IBC 2009, Eq. 16-12
S5 = DL + 0.7E IBC 2009, Eq. 16-12
S6 = DL + 0.75L + 0.75W IBC 2009, Eq. 16-13
S7 = DL + 0.75L + 0.525E IBC 2009, Eq. 16-13
S8 = 0.6DL + W IBC 2009, Eq. 16-14
S9 0.6DL + 0.7E IBC 2009, Eq. 16-15

Factord Load Combinations as per IBC 2009


U1 = 1 . 4 D L IBC 2009, Eq. 16-1
U2 = 1.2DL + 1.2T + 1.6L IBC 2009, Eq. 16-2
U3 = 1.2DL + 1.6L + 0.8W IBC 2009, Eq. 16-3
U4 = 1.2DL + L + 1.6W IBC 2009, Eq. 16-4
U5 = 1.2DL + L + E IBC 2009, Eq. 16-5
U6 = 0.9DL + 1.6W IBC 2009, Eq. 16-6
U7 = 0.9DL + 1.0E IBC 2009, Eq. 16-7

2.7 Load Combination ( For Blast Analysis )


B1 = 1.0DL + 1.0 BL

where:
DL = dead load L = live load E = earthquake load
W = wind load T = temperature
BL = Blast load

Note :
1- Temperature load application is not applicable for the building which is satisfying the governing standards (ACI
224.3 , Table 1.2 & PCA, Building Movement and Joint, Fig. 56) in terms of maximum building length.
2- Temperature and shrinkage reinforcement already provided to slabs as per (ACI 318-08, 7.12.2.1)
requirement.

ISSUED FOR CONSTRUCTION (IFC)

26 JAN 2022
Calculation Report, OPERATION SHELTER, Plant Plant No. 015 Page 25 of 281
CALCULATION SHEET

SNC-LAVALIN FAYEZ ENGINEERING, Al Khobar, Saudi Arabia


PROJECT : Updrade Buildings for Risk Mitigation - RT Refinery
B.I Number : 10-02062-0002-001 Designed
Desi ned : : AIA
Project Code No. : 510008 Checked
Ch ed : : NFP / AKM
Calc. No. : PE-P20081 Revision
Re on : : IFC
Subject : Structural Calculation - Operation Shelter - Plant No. 015 Rev.No.
Re No. : : 00

3.0 STATIC ANALYSIS AND DESIGN

ISSUED FOR CONSTRUCTION (IFC)

26 JAN 2022
Calculation Report, OPERATION SHELTER, Plant Plant No. 015 Page 26 of 281
CALCULATION SHEET

SNC-LAVALIN FAYEZ ENGINEERING, Al Khobar, Saudi Arabia


PROJECT : Updrade Buildings for Risk Mitigation - RT Refinery
B.I Number : 10-02062-0002-001 Designed
Desi ned : : AIA
Project Code No. : 510008 Checked
Ch ed : : NFP / AKM
Calc. No. : PE-P20081 Revision
Re on : : IFC
Subject : Structural Calculation - Operation Shelter - Plant No. 015 Rev.No.
Re No. : : 00

3.1 3D‐Model Views

ISSUED FOR CONSTRUCTION (IFC)

26 JAN 2022
Calculation Report, OPERATION SHELTER, Plant Plant No. 015 Page 27 of 281
ETABS 18.0.2
Calculation Report, OPERATION SHELTER, Plant Plant No. 015 3/9/2020

Y Z X
Page 28 of 281

ISSUED FOR CONSTRUCTION (IFC)

26 JAN 2022

A9-R1.EDB 3-D View


ETABS 18.0.2
Calculation Report, OPERATION SHELTER, Plant Plant No. 015 3/9/2020

Y X
Page 29 of 281

ISSUED FOR CONSTRUCTION (IFC)

26 JAN 2022

A9-R1.EDB 3-D View


ETABS 18.0.2
Calculation Report, OPERATION SHELTER, Plant Plant No. 015 3/9/2020

X Y
Page 30 of 281

ISSUED FOR CONSTRUCTION (IFC)

26 JAN 2022

A9-R1.EDB 3-D View


CALCULATION SHEET

SNC-LAVALIN FAYEZ ENGINEERING, Al Khobar, Saudi Arabia


PROJECT : Updrade Buildings for Risk Mitigation - RT Refinery
B.I Number : 10-02062-0002-001 Designed
Desi ned : : AIA
Project Code No. : 510008 Checked
Ch ed : : NFP / AKM
Calc. No. : PE-P20081 Revision
Re on : : IFC
Subject : Structural Calculation - Operation Shelter - Plant No. 015 Rev.No.
Re No. : : 00

3.2 ETABS

ISSUED FOR CONSTRUCTION (IFC)

26 JAN 2022
Calculation Report, OPERATION SHELTER, Plant Plant No. 015 Page 31 of 281
CALCULATION SHEET

SNC-LAVALIN FAYEZ ENGINEERING, Al Khobar, Saudi Arabia


PROJECT : Updrade Buildings for Risk Mitigation - RT Refinery
B.I Number : 10-02062-0002-001 Designed
Desi ned : : AIA
Project Code No. : 510008 Checked
Ch ed : : NFP / AKM
Calc. No. : PE-P20081 Revision
Re on : : IFC
Subject : Structural Calculation - Operation Shelter - Plant No. 015 Rev.No.
Re No. : : 00

3.2.1 ETABS Input Sketches

ISSUED FOR CONSTRUCTION (IFC)

26 JAN 2022
Calculation Report, OPERATION SHELTER, Plant Plant No. 015 Page 32 of 281
CALCULATION SHEET

SNC-LAVALIN FAYEZ ENGINEERING, Al Khobar, Saudi Arabia


PROJECT : Updrade Buildings for Risk Mitigation - RT Refinery
B.I Number : 10-02062-0002-001 Designed
Desi ned : : AIA
Project Code No. : 510008 Checked
Ch ed : : NFP / AKM
Calc. No. : PE-P20081 Revision
Re on : : IFC
Subject : Structural Calculation - Operation Shelter - Plant No. 015 Rev.No.
Re No. : : 00

3.2.1.1 Loads

ISSUED FOR CONSTRUCTION (IFC)

26 JAN 2022
Calculation Report, OPERATION SHELTER, Plant Plant No. 015 Page 33 of 281
ETABS 18.0.2
Calculation Report, OPERATION SHELTER, Plant Plant No. 015 3/9/2020

1 2 3 4 5 6 7 8 9

30 30 30 30 30 30 30 30
A

20 30

30 20 20 20

B
30

20 20 20 20 20 20
C

30 20 20 20 20 20 20 30

30 30 30 30 30 30 30 30 30
D X
Page 34 of 281

ISSUED FOR CONSTRUCTION (IFC)

26 JAN 2022

A9-R1.EDB Plan View - GROUND - Z = 0 (m) Tributary Frame Span Loads (WALL)
ETABS 18.0.2
Calculation Report, OPERATION SHELTER, Plant Plant No. 015 3/9/2020

1 2 3 4 5 6 7 8 9

5 5 5 5 5 5 5 5
A

B
5

5 5

5 5 5 5 5 5 5 5
D X
Page 35 of 281

ISSUED FOR CONSTRUCTION (IFC)

26 JAN 2022

A9-R1.EDB Plan View - ROOF - Z = 4.6 (m) Frame Span Loads (WALL)
ETABS 18.0.2
Calculation Report, OPERATION SHELTER, Plant Plant No. 015 3/9/2020

1 2 3 4 5 6 7 8 9

C 4.65

D X
Page 36 of 281

ISSUED FOR CONSTRUCTION (IFC)

26 JAN 2022

A9-R1.EDB Plan View - ROOF - Z = 4.6 (m) Uniform Loads Gravity (SDL)
ETABS 18.0.2
Calculation Report, OPERATION SHELTER, Plant Plant No. 015 3/9/2020

1 2 3 4 5 6 7 8 9

C 1

D X
Page 37 of 281

ISSUED FOR CONSTRUCTION (IFC)

26 JAN 2022

A9-R1.EDB Plan View - ROOF - Z = 4.6 (m) Uniform Loads Gravity (LIVE)
CALCULATION SHEET

SNC-LAVALIN FAYEZ ENGINEERING, Al Khobar, Saudi Arabia


PROJECT : Updrade Buildings for Risk Mitigation - RT Refinery
B.I Number : 10-02062-0002-001 Designed
Desi ned :: AIA
Project Code No. : 510008 Checked
Ch ed : : NFP / AKM
Calc. No. : PE-P20081 Revision
Re on :: IFC
Subject : Structural Calculation - Operation Shelter - Plant No. 015 Re No.
Rev. No. :: 00

3.2.1.2 Sections

ISSUED FOR CONSTRUCTION (IFC)

26 JAN 2022
Calculation Report, OPERATION SHELTER, Plant Plant No. 015 Page 38 of 281
ETABS 18.0.2
Calculation Report, OPERATION SHELTER, Plant Plant No. 015 3/9/2020

1 2 3 4 5 6 7 8 9

GB - 35X60 GB - 35X60 GB - 35X60 GB - 35X60 GB - 35X60 GB - 35X60 GB - 35X60 GB - 35X60


A

GB - 35X60

GB - 35X60
GB - 35X60

GB - 35X60

GB - 35X60

GB - 35X60

GB - 35X60

GB - 35X60

GB - 35X60
B

GB - 35X60
GB - 35X60 GB - 35X60 GB - 35X60 GB - 35X60 GB - 35X60 GB - 35X60 GB - 35X60 GB - 35X60
C

GB - 35X60
GB - 35X60

GB - 35X50

GB - 35X60

GB - 35X60

GB - 35X60

GB - 35X60

GB - 35X60

GB - 35X60
Y

GB - 35X60 GB - 35X60 GB - 35X60 GB - 35X60 GB - 35X60 GB - 35X60 GB - 35X60 GB - 35X60


D X
Page 39 of 281

ISSUED FOR CONSTRUCTION (IFC)

26 JAN 2022

A9-R1.EDB Plan View - GROUND - Z = 0 (m)


ETABS 18.0.2
Calculation Report, OPERATION SHELTER, Plant Plant No. 015 3/9/2020

1 2 3 4 5 6 7 8 9

B - 40X60 B - 40X60 B - 40X60 B - 40X60 B - 40X60 B - 40X60 B - 40X60 B - 40X60


A

B - 40X60
B - 40X60

B - 40X60

B - 40X60

B - 40X60

B - 40X60

B - 40X60

B - 40X60

B - 40X60
B

B - 40X60 B - 40X60 B - 40X60 B - 40X60 B - 40X60 B - 40X60 B - 40X60 B - 40X60


C S20

B - 40X60
B - 40X60

B - 40X60

B - 40X60

B - 40X60

B - 40X60

B - 40X60

B - 40X60

B - 40X60
Y

B - 40X60 B - 40X60 B - 40X60 B - 40X60 B - 40X60 B - 40X60 B - 40X60 B - 40X60


D X
Page 40 of 281

ISSUED FOR CONSTRUCTION (IFC)

26 JAN 2022

A9-R1.EDB Plan View - ROOF - Z = 4.6 (m)


3/9/2020

0
12T2
X55 -
C - 55 20
55 - 12T
C - 55X
12T20
X55 -
C - 55 20
55 - 12T
C - 55X
T20
55 - 12
20 T C - 55X
55 - 12 20
55 - 12T
C - 55X 0

C - 55X
5 - 12T2
C - 55X5
- 12T20 0
C - 55X55 5 - 12T2
C - 55X5
0
5 - 12T2
C - 55X5
5 - 12T20
C - 55X5
- 12T20
C - 55X55
- 12T20
- 12T20
C - 55X55
C - 55X55 - 12T20
C - 55X55
12T20
C - 55X55 - 12T20
20 C - 55X55 -
C - 55X55 - 12T C - 55X55 - 12T20
C - 55X55 - 12T20 C - 55X55 - 12T20
C - 55X55 - 12T20 C - 55X55 - 12T20
C - 55X55 - 12T20 C - 55X55 - 12T20
C - 55X55 - 12T20 C - 55X55 - 12T20
C - 55X55 - 12T20 C - 55X55 - 12T20
C - 55X55 - 12T20 C - 55X55 - 12T20

3-D View
T20 C - 55X55 - 12T20
C - 55X55 - 12
T20 C - 55X55 - 12T20
C - 55X55 - 12
5 - 12T20
- 12T20
C - 55X5
C - 55X55 55 - 12T
20
20
C - 55X 20
5 5 - 12 T
55 - 12T
C - 55X
C - 55 X 12T20
X5 5 -
C - 55

X
T20
55 - 12
C - 55X
12T20
X55 -
C - 55 C - 55
X55
- 12T2
0
20
- 12T
5 X5 5
C-5 C-
55X5
5 - 12
T20
20
12T
55 -
55X

Z
C-

Y
T20
- 12
X55
C - 55
0
2T 2
5-1
5X 5
C-5
T20
- 12
55
55X
C-
T20
- 12
55
55X
C-
T 20
- 12
55
55X
C-
T20
- 12
55
55X
C-

ISSUED FOR CONSTRUCTION (IFC)


ETABS 18.0.2

A9-R1.EDB
26 JAN 2022
Calculation Report, OPERATION SHELTER, Plant Plant No. 015 Page 41 of 281
CALCULATION SHEET

SNC-LAVALIN FAYEZ ENGINEERING, Al Khobar, Saudi Arabia


PROJECT : Updrade Buildings for Risk Mitigation - RT Refinery
B.I Number : 10-02062-0002-001 Desi ned : : AIA
Designed
Project Code No. : 510008 Checked : : NFP / AKM
Ch ed
Calc. No. : PE-P20081 Re on : :
Revision IFC
Subject : Structural Calculation - Operation Shelter - Plant No. 015 Re No. : :
Rev. No. 00

3.2.1.3 Labels

ISSUED FOR CONSTRUCTION (IFC)

26 JAN 2022
Calculation Report, OPERATION SHELTER, Plant Plant No. 015 Page 42 of 281
ETABS 18.0.2
Calculation Report, OPERATION SHELTER, Plant Plant No. 015 3/9/2020

1 2 3 4 5 6 7 8 9

A C1 B3 C4 B4 C7 B5 C12 B6 C13 B7 C19 B8 C23 B9 C27 B10 C31

B29

B22
B28

B42

B41

B40

B34

B35
B2

B C14

B20
C C2 B25 C5 B26 C8 B27 C11 B21 B36 C17 B31 C21 B32 C25 B33 C29

B37
B43

B23

B24

B30

B38

B39

B19
B1

D C3
XB11
C6 B12 C9 B13 C10 B14 C15 B15 C16 B16 C20 B17 C24 B18 C28
Page 43 of 281

ISSUED FOR CONSTRUCTION (IFC)

26 JAN 2022

A9-R1.EDB Plan View - GROUND - Z = 0 (m)


ETABS 18.0.2
Calculation Report, OPERATION SHELTER, Plant Plant No. 015 3/9/2020

1 2 3 4 5 6 7 8 9

A C1 B3 C4 B4 C7 B5 C12 B6 C13 B7 C19 B8 C23 B9 C27 B10 C31

B29
B28

B42

B41

B40

B34

B35

B44
B2

B C14

F3
C C2 B25 C5 B26 C8 B27 C11 B21 B36 C17 B31 C21 B32 C25 B33 C29

B37
B43

B23

B24

B30

B38

B39

B19
B1

D C3
XB11
C6 B12 C9 B13 C10 B14 C15 B15 C16 B16 C20 B17 C24 B18 C28
Page 44 of 281

ISSUED FOR CONSTRUCTION (IFC)

26 JAN 2022

A9-R1.EDB Plan View - ROOF - Z = 4.6 (m)


CALCULATION SHEET

SNC-LAVALIN FAYEZ ENGINEERING, Al Khobar, Saudi Arabia


PROJECT : Updrade Buildings for Risk Mitigation - RT Refinery
B.I Number : 10-02062-0002-001 Designed
Desi ned :: AIA
Project Code No. : 510008 Checked
Ch ed : : NFP / AKM
Calc. No. : PE-P20081 Revision
Re on :: IFC
Subject : Structural Calculation - Operation Shelter - Plant No. 015 Rev. No.
Re No. :: 00

3.2.1.4 Diaphragms

ISSUED FOR CONSTRUCTION (IFC)

26 JAN 2022
Calculation Report, OPERATION SHELTER, Plant Plant No. 015 Page 45 of 281
ETABS 18.0.2
Calculation Report, OPERATION SHELTER, Plant Plant No. 015 3/9/2020

1 2 3 4 5 6 7 8 9

D1
C

D X
Page 46 of 281

ISSUED FOR CONSTRUCTION (IFC)

26 JAN 2022

A9-R1.EDB Plan View - ROOF - Z = 4.6 (m)


CALCULATION SHEET

SNC-LAVALIN FAYEZ ENGINEERING, Al Khobar, Saudi Arabia


PROJECT : Updrade Buildings for Risk Mitigation - RT Refinery
B.I Number : 10-02062-0002-001 Designed
Desi ned :: AIA
Project Code No. : 510008 Checked
Ch ed : : NFP / AKM
Calc. No. : PE-P20081 Revision
Re on :: IFC
Subject : Structural Calculation - Operation Shelter - Plant No. 015 Rev. No.
Re No. :: 00

3.2.2 ETABS Input Report

ISSUED FOR CONSTRUCTION (IFC)

26 JAN 2022
Calculation Report, OPERATION SHELTER, Plant Plant No. 015 Page 47 of 281
Operation Shelter

ISSUED FOR CONSTRUCTION (IFC)

26 JAN 2022
Calculation Report, OPERATION SHELTER, Plant Plant No. 015 Page 48 of 281
Table of Contents

1. Structure Data 4

1.1 Story Data 4


1.2 Mass 4
1.3 Groups 5

2. Properties 6

2.1 Materials 6
2.2 Frame Sections 6
2.3 Shell Sections 6

3. Loads 8

3.1 Load Patterns 8


3.2 Auto Wind Loading 8
3.3 Auto Seismic Loading 18
3.4 Load Cases 22
3.5 Load Combinations 22

4. Design Data 27

4.1 Concrete Frame Design 27

ISSUED FOR CONSTRUCTION (IFC)

26 JAN 2022
Calculation Report, OPERATION SHELTER, Plant Plant No. 015 Page 49 of 281
List of Tables
Table 1.1 Program Control 4
Table 1.2 Story Definitions 4
Table 1.3 Mass Source Definition 4
Table 1.4 Centers Of Mass And Rigidity 4
Table 1.5 Mass Summary by Diaphragm 4
Table 1.6 Mass Summary by Story 4
Table 1.7 Mass Summary by Group 5
Table 1.8 Group Definitions 5
Table 2.1 Material Properties - General 6
Table 2.2 Frame Section Property Definitions - Summary 6
Table 2.3 Area Section Property Definitions - Summary 7
Table 3.1 Load Pattern Definitions 8
Table 3.2 Load Pattern Definitions - Auto Wind - ASCE 7-05 8
Table 3.4 Load Pattern Definitions - Auto Seismic - ASCE 7-05 18
Table 3.6 Load Case Definitions - Summary 22
Table 3.7 Load Combination Definitions 22
Table 4.1 Concrete Frame Design Preferences - ACI 318-08 27

ISSUED FOR CONSTRUCTION (IFC)

26 JAN 2022
Calculation Report, OPERATION SHELTER, Plant Plant No. 015 Page 50 of 281
1 Structure Data
This chapter provides model geometry information, including items such as story levels, point coordinates, and
element connectivity.

Table 1.1 - Program Control


Program ProgLev CurrUnit StlFrmC CompBm CompCol StlJstCo ConcFrm ConcSlb ShrWall
Version LicenseNum
Name el s ode Code Code de Code Code Code
2010-
AISC 360- AISC 360- AISC 360- ACI 318-
ETABS 18.0.2 Ultimate *1XDU9L5PCC84 kip, in, F SJI-2010 ACI 318-08 ACI 318-08
05 05 10 08
BR8

1.1 Story Data

Table 1.2 - Story Definitions


Height Master Splice
Tower Name Similar To Color
m Story Story
T1 ROOF 4.6 No None No Magenta
T1 GROUND 1.5 No None No Gray8Dark

1.2 Mass

Table 1.3 - Mass Source Definition


Include Include Source Source Source Move
Lump Load
Name Is Default Lateral Vertical Self Added Load Mass Multiplier
Mass? Pattern
Mass? Mass? Mass? Mass? Patterns? Centroid?
MsSrc1 Yes Yes Yes No No No Yes No DEAD 1
MsSrc1 SDL 1
MsSrc1 WALL 1

Table 1.4 - Centers Of Mass And Rigidity


Cum Cum
Diaphrag Mass X Mass Y XCM YCM XCCM YCCM XCR YCR
Story Mass X Mass Y
m kg kg m m m m m m
kg kg
ROOF D1 0 0 17.9885 5.507 0 0 0 0

Table 1.5 - Mass Summary by Diaphragm


Mass
X Mass Y Mass
Diaphrag Mass X Mass Y Moment
Story Center Center
m kg kg of Inertia
m m
ton-m2
ROOF D1 0 0 0 17.9885 5.507

Table 1.6 - Mass Summary by Story


UX UY UZ
Story
kg kg kg
ROOF 582553.5 582553.5 582553.5
GROUND 601510.66 601510.66 601510.66
Base 14991.36 14991.36 14991.36

Table 1.7 - Mass Summary by Group


Self
Self Mass Mass X Mass Y Mass Z
Group Weight
kg kg kg kg
kN
All 0 5080.056 1199055.51 1199055.51 1199055.51

ISSUED FOR CONSTRUCTION (IFC)

26 JAN 2022
Calculation Report, OPERATION SHELTER, Plant Plant No. 015 Page 51 of 281
 

1.3 Groups

Table 1.8 - Group Definitions


Steel Concrete Composit
Name Color
Design? Design? e Design?
All Yellow No No No
 

 
ISSUED FOR CONSTRUCTION (IFC)

26 JAN 2022
Calculation Report, OPERATION SHELTER, Plant Plant No. 015 Page 52 of 281
 

2 Properties
This chapter provides property information for materials, frame sections, shell sections, and links.

2.1 Materials

Table 2.1 - Material Properties - General


Material Type SymType Grade Color Notes
35MPA Concrete Isotropic Unknown Red
A416Gr270 Tendon Uniaxial Unknown Blue
A615Gr60 Rebar Uniaxial Unknown Yellow
CONC Concrete Isotropic Unknown Gray8Dark
OTHER Other Isotropic Unknown Green
STEEL Steel Isotropic Unknown Magenta
 
2.2 Frame Sections

Table 2.2 - Frame Section Property Definitions - Summary (Part 1 of 3)


Area J I33 I22 As2 As3 S33Pos S33Neg
Name Material Shape Color
cm2 cm4 cm4 cm4 cm2 cm2 cm3 cm3
Concrete
B - 40X60 35MPA Magenta 2400 751249.4 720000 320000 2000 2000 24000 24000
Rectangular
Concrete
B - 40X80 35MPA 4259584 3200 1171866.7 1706666.7 426666.7 2666.7 2666.7 42666.7 42666.7
Rectangular
C - 55X55 - Concrete
35MPA Blue 3025 1288713 762552.1 762552.1 2520.8 2520.8 27729.2 27729.2
12T20 Rectangular
Concrete
GB - 35X50 35MPA Red 1750 405757.3 364583.3 178645.8 1458.3 1458.3 14583.3 14583.3
Rectangular
Concrete
GB - 35X60 35MPA Yellow 2100 545409.5 630000 214375 1750 1750 21000 21000
Rectangular
 
Table 2.2 - Frame Section Property Definitions - Summary (Part 2 of 3)
CG CG PNA PNA
S22Pos S22Neg Z33 Z22 R33 R22 Area As2 As3
Offset 3 Offset 2 Offset 3 Offset 2
cm3 cm3 cm3 cm3 mm mm Modifier Modifier Modifier
mm mm mm mm
16000 16000 36000 24000 173.2 115.5 0 0 0 0 1 1 1
21333.3 21333.3 64000 32000 230.9 115.5 0 0 0 0 1 1 1
27729.2 27729.2 41593.8 41593.8 158.8 158.8 0 0 0 0 1 1 1
10208.3 10208.3 21875 15312.5 144.3 101 0 0 0 0 1 1 1
12250 12250 31500 18375 173.2 101 0 0 0 0 1 1 1
 
Table 2.2 - Frame Section Property Definitions - Summary (Part 3 of 3)
I33 I22 Mass Weight
J Modifier
Modifier Modifier Modifier Modifier
1 1 1 1 1
1 1 1 1 1
1 1 1 1 1
1 1 1 1 1
1 1 1 1 1
 
2.3 Shell Sections

Table 2.3 - Area Section Property Definitions - Summary


Total
Element
Name Type Material Thickness
Type
mm
S20 Slab Shell-Thin 35MPA 200
W35 Wall Shell-Thin 35MPA 350
 
     
ISSUED FOR CONSTRUCTION (IFC)

26 JAN 2022
Calculation Report, OPERATION SHELTER, Plant Plant No. 015 Page 53 of 281
     

3 Loads
This chapter provides loading information as applied to the model.

3.1 Load Patterns

Table 3.1 - Load Pattern Definitions


Self
Is Auto
Name Type Weight Auto Load
Load
Multiplier
DEAD No Dead 1
LIVE No Live 0
SDL No Super Dead 0
SEISMIC No Seismic 0 ASCE 7-05
SEISMIC(1/6) Yes Seismic 0 ASCE 7-05
SEISMIC(2/6) Yes Seismic 0 ASCE 7-05
SEISMIC(3/6) Yes Seismic 0 ASCE 7-05
SEISMIC(4/6) Yes Seismic 0 ASCE 7-05
SEISMIC(5/6) Yes Seismic 0 ASCE 7-05
SEISMIC(6/6) Yes Seismic 0 ASCE 7-05
WALL No Dead 0
WIND No Wind 0 ASCE 7-05
WIND(1/12) Yes Wind 0 ASCE 7-05
WIND(10/12) Yes Wind 0 ASCE 7-05
WIND(11/12) Yes Wind 0 ASCE 7-05
WIND(12/12) Yes Wind 0 ASCE 7-05
WIND(2/12) Yes Wind 0 ASCE 7-05
WIND(3/12) Yes Wind 0 ASCE 7-05
WIND(4/12) Yes Wind 0 ASCE 7-05
WIND(5/12) Yes Wind 0 ASCE 7-05
WIND(6/12) Yes Wind 0 ASCE 7-05
WIND(7/12) Yes Wind 0 ASCE 7-05
WIND(8/12) Yes Wind 0 ASCE 7-05
WIND(9/12) Yes Wind 0 ASCE 7-05
 
3.2 Auto Wind Loading

Table 3.2 - Load Pattern Definitions - Auto Wind - ASCE 7-05 (Part 1 of 2)
Is Parapet
Exposure Top Bottom Include User User ASCE
Name Auto Height User Cpl e1 Ratio e2 Ratio
Source Story Story Parapet Cp? Cpw Case
Load m
WIND No Diaphragms ROOF GROUND Yes 1 Yes 0.8 0.5 Create All 0.15 0.15
WIND(1/12) Yes Diaphragms ROOF GROUND Yes 1 Yes 0.8 0.5 1 0 0
WIND(10/12) Yes Diaphragms ROOF GROUND Yes 1 Yes 0.8 0.5 4 -0.15 -0.15
WIND(11/12) Yes Diaphragms ROOF GROUND Yes 1 Yes 0.8 0.5 4 0.15 0.15
WIND(12/12) Yes Diaphragms ROOF GROUND Yes 1 Yes 0.8 0.5 4 -0.15 -0.15
WIND(2/12) Yes Diaphragms ROOF GROUND Yes 1 Yes 0.8 0.5 1 0 0
WIND(3/12) Yes Diaphragms ROOF GROUND Yes 1 Yes 0.8 0.5 2 0.15 0
WIND(4/12) Yes Diaphragms ROOF GROUND Yes 1 Yes 0.8 0.5 2 -0.15 0
WIND(5/12) Yes Diaphragms ROOF GROUND Yes 1 Yes 0.8 0.5 2 0.15 0
WIND(6/12) Yes Diaphragms ROOF GROUND Yes 1 Yes 0.8 0.5 2 -0.15 0
WIND(7/12) Yes Diaphragms ROOF GROUND Yes 1 Yes 0.8 0.5 3 0 0
WIND(8/12) Yes Diaphragms ROOF GROUND Yes 1 Yes 0.8 0.5 3 0 0
WIND(9/12) Yes Diaphragms ROOF GROUND Yes 1 Yes 0.8 0.5 4 0.15 0.15
 

   
ISSUED FOR CONSTRUCTION (IFC)

26 JAN 2022
Calculation Report, OPERATION SHELTER, Plant Plant No. 015 Page 54 of 281
     

Table 3.2 - Load Pattern Definitions - Auto Wind - ASCE 7-05 (Part 2 of 2)
Wind Directio
Exposu Importa Gust Width Diaphra Width Depth X Y
Speed kzt Kd n Angle Story
re Type nce Factor Type gm m m m m
mph deg
91 C 1.15 1 0.85 0.85 Auto 0 ROOF D1 11 35.88 17.94 5.5
91 C 1.15 1 0.85 0.85 Auto 0 ROOF D1 11 35.88 17.94 5.5
91 C 1.15 1 0.85 0.85 Auto 0 ROOF D1 11 35.88 17.94 5.5
91 C 1.15 1 0.85 0.85 Auto 90 ROOF D1 35.88 11 17.94 5.5
91 C 1.15 1 0.85 0.85 Auto 90 ROOF D1 35.88 11 17.94 5.5
91 C 1.15 1 0.85 0.85 Auto 90 ROOF D1 35.88 11 17.94 5.5
91 C 1.15 1 0.85 0.85 Auto 0 ROOF D1 11 35.88 17.94 5.5
91 C 1.15 1 0.85 0.85 Auto 0 ROOF D1 11 35.88 17.94 5.5
91 C 1.15 1 0.85 0.85 Auto 90 ROOF D1 35.88 11 17.94 5.5
91 C 1.15 1 0.85 0.85 Auto 90 ROOF D1 35.88 11 17.94 5.5
91 C 1.15 1 0.85 0.85 Auto 0 ROOF D1 11 35.88 17.94 5.5
91 C 1.15 1 0.85 0.85 Auto 90 ROOF D1 35.88 11 17.94 5.5
91 C 1.15 1 0.85 0.85 Auto 0 ROOF D1 11 35.88 17.94 5.5
 

   
ISSUED FOR CONSTRUCTION (IFC)

26 JAN 2022
Calculation Report, OPERATION SHELTER, Plant Plant No. 015 Page 55 of 281
     

ASCE 7-05 Auto Wind Load Calculation


This calculation presents the automatically generated lateral wind loads for load pattern WIND according to ASCE
7-05, as calculated by ETABS.

Exposure Parameters

Exposure From = Diaphragms

Exposure Category = C

Wind Direction = 0 degrees

Basic Wind Speed, V [ASCE 6.5.4] V 91 mph


Windward Coefficient, Cp,wind [ASCE
Cp,wind 0.8
6.5.11.2.1]
Leeward Coefficient, Cp,lee [ASCE 6.5.11.2.1] Cp,lee 0.5
 
Wind Case = All Cases

Top Story = ROOF

Bottom Story = GROUND

Include Parapet = Yes, Parapet Height = 1

Factors and Coefficients

Gradient Height, zg [ASCE Table 6-2] zg 900


Emperical Exponent, α [ASCE Table 6-2] α 9.5
Velocity Pressure Exposure Coefficient, Kz; z
Kz 2.01 zg for15ft z zg
[ASCE Table 6-3]
15
Kz 2.01 zg for z 15ft
Topographical Factor, Kzt [ASCE 6.5.7.2] Kzt 1
Directionality Factor, Kd [ASCE 6.5.4.4] Kd 0.85
Importance Factor, I [ASCE 6.5.5] I 1.15
Gust Effect Factor, G [ASCE 6.5.8] G 0.85
 
Lateral Loading

Velocity Pressure, qz [ASCE 6.5.10 Eq. 6-15] qz 0.00256Kz Kzt Kd V2 I


Design Wind Pressure, p [ASCE 6.5.12.2.1
p qGCp,wind qh GCp,lee
Eq. 6-17]
 

   
ISSUED FOR CONSTRUCTION (IFC)

26 JAN 2022
Calculation Report, OPERATION SHELTER, Plant Plant No. 015 Page 56 of 281
     

Applied Story Forces

Story Elevation X-Dir Y-Dir Story Elevation X-Dir Y-Dir


m kN kN m kN kN
ROOF 4.6 47.6777 0 ROOF 4.6 0 155.5161
GROUND 0 0 0 GROUND 0 0 0
Base -1.5 0 0 Base -1.5 0 0

   
ISSUED FOR CONSTRUCTION (IFC)

26 JAN 2022
Calculation Report, OPERATION SHELTER, Plant Plant No. 015 Page 57 of 281
     

Story Elevation X-Dir Y-Dir Story Elevation X-Dir Y-Dir


m kN kN m kN kN
ROOF 4.6 35.7583 0 ROOF 4.6 35.7583 0
GROUND 0 0 0 GROUND 0 0 0
Base -1.5 0 0 Base -1.5 0 0

   
ISSUED FOR CONSTRUCTION (IFC)

26 JAN 2022
Calculation Report, OPERATION SHELTER, Plant Plant No. 015 Page 58 of 281
     

Story Elevation X-Dir Y-Dir Story Elevation X-Dir Y-Dir


m kN kN m kN kN
ROOF 4.6 0 116.637 ROOF 4.6 0 116.637
GROUND 0 0 0 GROUND 0 0 0
Base -1.5 0 0 Base -1.5 0 0

   
ISSUED FOR CONSTRUCTION (IFC)

26 JAN 2022
Calculation Report, OPERATION SHELTER, Plant Plant No. 015 Page 59 of 281
     

Story Elevation X-Dir Y-Dir Story Elevation X-Dir Y-Dir


m kN kN m kN kN
ROOF 4.6 35.7583 -116.637 ROOF 4.6 35.7583 116.637
GROUND 0 0 0 GROUND 0 0 0
Base -1.5 0 0 Base -1.5 0 0

   
ISSUED FOR CONSTRUCTION (IFC)

26 JAN 2022
Calculation Report, OPERATION SHELTER, Plant Plant No. 015 Page 60 of 281
     

Story Elevation X-Dir Y-Dir Story Elevation X-Dir Y-Dir


m kN kN m kN kN
ROOF 4.6 26.8426 -87.5555 ROOF 4.6 26.8426 -87.5555
GROUND 0 0 0 GROUND 0 0 0
Base -1.5 0 0 Base -1.5 0 0

   
ISSUED FOR CONSTRUCTION (IFC)

26 JAN 2022
Calculation Report, OPERATION SHELTER, Plant Plant No. 015 Page 61 of 281
     

Story Elevation X-Dir Y-Dir Story Elevation X-Dir Y-Dir


m kN kN m kN kN
ROOF 4.6 26.8426 87.5555 ROOF 4.6 26.8426 87.5555
GROUND 0 0 0 GROUND 0 0 0
Base -1.5 0 0 Base -1.5 0 0

   
ISSUED FOR CONSTRUCTION (IFC)

26 JAN 2022
Calculation Report, OPERATION SHELTER, Plant Plant No. 015 Page 62 of 281
     

3.3 Auto Seismic Loading

Table 3.4 - Load Pattern Definitions - Auto Seismic - ASCE 7-05 (Part 1 of 3)
X Dir X Dir Y Dir Y Dir
Is Auto Ecc Top Bottom Period
Name X Dir? Plus Minus Y Dir? Plus Minus Ct and X
Load Ratio Story Story Type
Ecc? Ecc? Ecc? Ecc?
Program
SEISMIC No Yes Yes Yes Yes Yes Yes 0.05 ROOF Base 0.016; 0.9
Calculated
Program
SEISMIC(1/6) Yes Yes No No No No No 0.05 ROOF Base 0.016; 0.9
Calculated
Program
SEISMIC(2/6) Yes No No No Yes No No 0.05 ROOF Base 0.016; 0.9
Calculated
Program
SEISMIC(3/6) Yes No Yes No No No No 0.05 ROOF Base 0.016; 0.9
Calculated
Program
SEISMIC(4/6) Yes No No No No Yes No 0.05 ROOF Base 0.016; 0.9
Calculated
Program
SEISMIC(5/6) Yes No No Yes No No No 0.05 ROOF Base 0.016; 0.9
Calculated
Program
SEISMIC(6/6) Yes No No No No No Yes 0.05 ROOF Base 0.016; 0.9
Calculated
 
Table 3.4 - Load Pattern Definitions - Auto Seismic - ASCE 7-05 (Part 2 of 3)
Ss And S1 TL Site
Ss S1 Fa Fv SDS SD1 R Omega Cd I
From sec Class
User Defined 0.088 0.032 8 C 1.2 1.7 0.0704 0.036267 3 3 2.5 1.25
User Defined 0.088 0.032 8 C 1.2 1.7 0.0704 0.036267 3 3 2.5 1.25
User Defined 0.088 0.032 8 C 1.2 1.7 0.0704 0.036267 3 3 2.5 1.25
User Defined 0.088 0.032 8 C 1.2 1.7 0.0704 0.036267 3 3 2.5 1.25
User Defined 0.088 0.032 8 C 1.2 1.7 0.0704 0.036267 3 3 2.5 1.25
User Defined 0.088 0.032 8 C 1.2 1.7 0.0704 0.036267 3 3 2.5 1.25
User Defined 0.088 0.032 8 C 1.2 1.7 0.0704 0.036267 3 3 2.5 1.25
 
Table 3.4 - Load Pattern Definitions - Auto Seismic - ASCE 7-05 (Part 3 of 3)
Period Weight Base
Coeff
Used Used Shear
Used
sec kN kN
0.1 0.029333 0 0
0.1 0.029333 11611.703 340.61
0.1 0.029333 11611.703 340.61
0.1 0.029333 11611.703 340.61
0.1 0.029333 11611.703 340.61
0.1 0.029333 11611.703 340.61
0.1 0.029333 11611.703 340.61
 

   
ISSUED FOR CONSTRUCTION (IFC)

26 JAN 2022
Calculation Report, OPERATION SHELTER, Plant Plant No. 015 Page 63 of 281
     

ASCE 7-05 Auto Seismic Load Calculation


This calculation presents the automatically generated lateral seismic loads for load pattern SEISMIC according to
ASCE 7-05, as calculated by ETABS.

Direction and Eccentricity

Direction = Multiple

Eccentricity Ratio = 5% for all diaphragms

Structural Period

Period Calculation Method = Program Calculated

Coefficient, Ct [ASCE Table 12.8-2] Ct 0.016ft


Coefficient, x [ASCE Table 12.8-2] x 0.9
Structure Height Above Base, hn hn 6.1 m
Long-Period Transition Period, TL [ASCE
TL 8 sec
11.4.5]
 
Factors and Coefficients

Response Modification Factor, R [ASCE


R 3
Table 12.2-1]
System Overstrength Factor, Ω0 [ASCE Table
Ω0 3
12.2-1]
Deflection Amplification Factor, Cd [ASCE
Cd 2.5
Table 12.2-1]
Importance Factor, I [ASCE Table 11.5-1] I 1.25
 
Ss and S1 Source = User Specified

Mapped MCE Spectral Response


Ss 0.088g
Acceleration, Ss [ASCE 11.4.1]
Mapped MCE Spectral Response
S1 0.032g
Acceleration, S1 [ASCE 11.4.1]
Site Class [ASCE Table 20.3-1] = C - Very
Dense Soil and Soft Rock
Site Coefficient, Fa [ASCE Table 11.4-1] Fa 1.2
Site Coefficient, Fv [ASCE Table 11.4-2] Fv 1.7
 
Seismic Response

MCE Spectral Response Acceleration, SMS


SMS Fa SS SMS 0.1056g
[ASCE 11.4.3, Eq. 11.4-1]
MCE Spectral Response Acceleration, SM1
SM1 Fv S1 SM1 0.0544g
[ASCE 11.4.3, Eq. 11.4-2]
Design Spectral Response Acceleration, SDS 2
SDS S SDS 0.0704g
[ASCE 11.4.4, Eq. 11.4-3] 3 MS
Design Spectral Response Acceleration, SD1 2
SD1 S SD1 0.036267g
[ASCE 11.4.4, Eq. 11.4-4] 3 M1
 
Equivalent Lateral Forces
 
ISSUED FOR CONSTRUCTION (IFC)

26 JAN 2022
Calculation Report, OPERATION SHELTER, Plant Plant No. 015 Page 64 of 281
     

SDS
Seismic Response Coefficient, CS [ASCE CS
12.8.1.1, Eq. 12.8-2] R
I
SD1
[ASCE 12.8.1.1, Eq. 12.8-3] CS,max
R
T
I
[ASCE 12.8.1.1, Eq. 12.8-5] CS,min 0.01
S1
[ASCE 12.8.1.1, Eq. 12.8-6] CS,min 0.5 forS1 0.6g
R
I
CS,min Cs CS,max
 
Calculated Base Shear

Period
W V
Direction Used Cs
(kN) (kN)
(sec)
X 0.1 0.029333 11611.703 340.61
Y 0.1 0.029333 11611.703 340.61
X + Ecc. Y 0.1 0.029333 11611.703 340.61
Y + Ecc. X 0.1 0.029333 11611.703 340.61
X - Ecc. Y 0.1 0.029333 11611.703 340.61
Y - Ecc. X 0.1 0.029333 11611.703 340.61

 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 

 
ISSUED FOR CONSTRUCTION (IFC)

26 JAN 2022
Calculation Report, OPERATION SHELTER, Plant Plant No. 015 Page 65 of 281
     

Applied Story Forces

Story Elevation X-Dir Y-Dir Story Elevation X-Dir Y-Dir


m kN kN m kN kN
ROOF 4.6 271.6397 0 ROOF 4.6 0 271.6397
GROUND 0 68.9703 0 GROUND 0 0 68.9703
Base -1.5 0 0 Base -1.5 0 0

 
ISSUED FOR CONSTRUCTION (IFC)

26 JAN 2022
Calculation Report, OPERATION SHELTER, Plant Plant No. 015 Page 66 of 281
 

3.4 Load Cases

Table 3.6 - Load Case Definitions - Summary


Name Type
DEAD Linear Static
LIVE Linear Static
SDL Linear Static
WALL Linear Static
WIND Linear Static
SEISMIC Linear Static
 
3.5 Load Combinations

Table 3.7 - Load Combination Definitions


Load
Name Type Is Auto SF Notes
Name
DCon1 Linear Add Yes DEAD 1.4 Dead [Strength]
DCon1 SDL 1.4
DCon1 WALL 1.4
DCon2 Linear Add Yes DEAD 1.2 Dead + Live [Strength]
DCon2 LIVE 1.6
DCon2 SDL 1.2
DCon2 WALL 1.2
Dead + Live + Wind + Snow
DCon3 Linear Add Yes DEAD 1.2
[Strength]
DCon3 LIVE 1
DCon3 SDL 1.2
DCon3 WALL 1.2
DCon3 WIND 1.6
Dead + Live - Wind + Snow
DCon4 Linear Add Yes DEAD 1.2
[Strength]
DCon4 LIVE 1
DCon4 SDL 1.2
DCon4 WALL 1.2
DCon4 WIND -1.6
DCon5 Linear Add Yes DEAD 1.2 Dead + Wind [Strength]
DCon5 SDL 1.2
DCon5 WALL 1.2
DCon5 WIND 0.8
DCon6 Linear Add Yes DEAD 1.2 Dead - Wind [Strength]
DCon6 SDL 1.2
DCon6 WALL 1.2
DCon6 WIND -0.8
DCon7 Linear Add Yes DEAD 0.9 Dead (min) + Wind [Strength]
DCon7 SDL 0.9
DCon7 WALL 0.9
DCon7 WIND 1.6
DCon8 Linear Add Yes DEAD 0.9 Dead (min) - Wind [Strength]
DCon8 SDL 0.9
DCon8 WALL 0.9
DCon8 WIND -1.6
Dead + Live + Static
DCon9 Linear Add Yes DEAD 1.2
Earthquake [Strength]
DCon9 LIVE 1
DCon9 SDL 1.2
DCon9 WALL 1.2
DCon9 SEISMIC 1
Dead + Live - Static
DCon10 Linear Add Yes DEAD 1.2
Earthquake [Strength]

 
ISSUED FOR CONSTRUCTION (IFC)

26 JAN 2022
Calculation Report, OPERATION SHELTER, Plant Plant No. 015 Page 67 of 281
 

Load
Name Type Is Auto SF Notes
Name
DCon10 LIVE 1
DCon10 SDL 1.2
DCon10 WALL 1.2
DCon10 SEISMIC -1
Dead + Static Earthquake
DCon11 Linear Add Yes DEAD 1.2
[Strength]
DCon11 SDL 1.2
DCon11 WALL 1.2
DCon11 SEISMIC 1
Dead - Static Earthquake
DCon12 Linear Add Yes DEAD 1.2
[Strength]
DCon12 SDL 1.2
DCon12 WALL 1.2
DCon12 SEISMIC -1
Dead (min) + Static
DCon13 Linear Add Yes DEAD 0.9
Earthquake [Strength]
DCon13 SDL 0.9
DCon13 WALL 0.9
DCon13 SEISMIC 1
Dead (min) - Static Earthquake
DCon14 Linear Add Yes DEAD 0.9
[Strength]
DCon14 SDL 0.9
DCon14 WALL 0.9
DCon14 SEISMIC -1
ENV - Service Envelope No UDStlS1 1
ENV - Service UDStlS2 1
ENV - Service UDStlS3 1
ENV - Service UDStlS4 1
ENV - Service UDStlS5 1
ENV - Service UDStlS6 1
ENV - Service UDStlS7 1
ENV - Service UDStlS8 1
ENV - Service UDStlS9 1
ENV - Service UDStlS10 1
ENV - Service UDStlS11 1
ENV - Service UDStlS12 1
ENV - Service UDStlS13 1
ENV - Service UDStlS14 1
ENV - Service UDStlS15 1
ENV - Service UDStlS16 1
ENV - Service UDStlS17 1
ENV - Service UDStlS18 1
ENV - Service UDStlS19 1
ENV - Service UDStlS20 1
ENV - Service UDStlS21 1
ENV - Service UDStlS22 1
UDStlD1 Linear Add No DEAD 1 Dead [Deflections]
UDStlD1 SDL 1
UDStlD1 WALL 1
UDStlD2 Linear Add No DEAD 1 Dead + Live [Deflections]
UDStlD2 LIVE 1
UDStlD2 SDL 1
UDStlD2 WALL 1
UDStlS1 Linear Add No DEAD 1 Dead [Strength]
UDStlS1 SDL 1
UDStlS1 WALL 1
UDStlS2 Linear Add No DEAD 1 Dead + Roof Live [Strength]

 
ISSUED FOR CONSTRUCTION (IFC)

26 JAN 2022
Calculation Report, OPERATION SHELTER, Plant Plant No. 015 Page 68 of 281
 

Load
Name Type Is Auto SF Notes
Name
UDStlS2 SDL 1
UDStlS2 WALL 1
UDStlS3 Linear Add No DEAD 1 Dead + Snow [Strength]
UDStlS3 SDL 1
UDStlS3 WALL 1
UDStlS4 Linear Add No DEAD 1 Dead + Live [Strength]
UDStlS4 LIVE 1
UDStlS4 SDL 1
UDStlS4 WALL 1
Dead + Live + Wind + Snow
UDStlS5 Linear Add No DEAD 1
[Strength]
UDStlS5 LIVE 0.75
UDStlS5 SDL 1
UDStlS5 WALL 1
UDStlS5 WIND 0.75
Dead + Live - Wind + Snow
UDStlS6 Linear Add No DEAD 1
[Strength]
UDStlS6 LIVE 0.75
UDStlS6 SDL 1
UDStlS6 WALL 1
UDStlS6 WIND -0.75
Dead + Live + Wind + Snow
UDStlS7 Linear Add No DEAD 1
[Strength]
UDStlS7 LIVE 0.75
UDStlS7 SDL 1
UDStlS7 WALL 1
Dead + Live - Wind + Snow
UDStlS8 Linear Add No DEAD 1
[Strength]
UDStlS8 LIVE 0.75
UDStlS8 SDL 1
UDStlS8 WALL 1
UDStlS9 Linear Add No DEAD 1 Dead + Wind [Strength]
UDStlS9 SDL 1
UDStlS9 WALL 1
UDStlS9 WIND 1
UDStlS10 Linear Add No DEAD 1 Dead - Wind [Strength]
UDStlS10 SDL 1
UDStlS10 WALL 1
UDStlS10 WIND -1
UDStlS11 Linear Add No DEAD 1 Dead + Wind [Strength]
UDStlS11 SDL 1
UDStlS11 WALL 1
UDStlS12 Linear Add No DEAD 1 Dead - Wind [Strength]
UDStlS12 SDL 1
UDStlS12 WALL 1
UDStlS13 Linear Add No DEAD 0.6 Dead (min) + Wind [Strength]
UDStlS13 SDL 0.6
UDStlS13 WALL 0.6
UDStlS13 WIND 1
UDStlS14 Linear Add No DEAD 0.6 Dead (min) - Wind [Strength]
UDStlS14 SDL 0.6
UDStlS14 WALL 0.6
UDStlS14 WIND -1
UDStlS15 Linear Add No DEAD 0.6 Dead (min) + Wind [Strength]
UDStlS15 SDL 0.6
UDStlS15 WALL 0.6
UDStlS16 Linear Add No DEAD 0.6 Dead (min) - Wind [Strength]

 
ISSUED FOR CONSTRUCTION (IFC)

26 JAN 2022
Calculation Report, OPERATION SHELTER, Plant Plant No. 015 Page 69 of 281
 

Load
Name Type Is Auto SF Notes
Name
UDStlS16 SDL 0.6
UDStlS16 WALL 0.6
Dead + Live + Static
UDStlS17 Linear Add No DEAD 1
Earthquake [Strength]
UDStlS17 LIVE 0.75
UDStlS17 SDL 1
UDStlS17 WALL 1
UDStlS17 SEISMIC 0.525
Dead + Live - Static
UDStlS18 Linear Add No DEAD 1
Earthquake [Strength]
UDStlS18 LIVE 0.75
UDStlS18 SDL 1
UDStlS18 WALL 1
UDStlS18 SEISMIC -0.525
Dead + Static Earthquake
UDStlS19 Linear Add No DEAD 1
[Strength]
UDStlS19 SDL 1
UDStlS19 WALL 1
UDStlS19 SEISMIC 0.7
Dead - Static Earthquake
UDStlS20 Linear Add No DEAD 1
[Strength]
UDStlS20 SDL 1
UDStlS20 WALL 1
UDStlS20 SEISMIC -0.7
Dead (min) + Static
UDStlS21 Linear Add No DEAD 0.6
Earthquake [Strength]
UDStlS21 SDL 0.6
UDStlS21 WALL 0.6
UDStlS21 SEISMIC 0.7
Dead (min) - Static Earthquake
UDStlS22 Linear Add No DEAD 0.6
[Strength]
UDStlS22 SDL 0.6
UDStlS22 WALL 0.6
UDStlS22 SEISMIC -0.7
 

 
ISSUED FOR CONSTRUCTION (IFC)

26 JAN 2022
Calculation Report, OPERATION SHELTER, Plant Plant No. 015 Page 70 of 281
 

4 Design Data
This chapter provides design data and results.

4.1 Concrete Frame Design

Table 4.1 - Concrete Frame Design Preferences - ACI 318-08


Item Value
Step-by-Step -
Multi-Response Design
All
# Interaction Curves 24
# Interaction Points 11
Minimum Eccentricity? Yes
Design for BCCR? Yes
Seismic Design Category A
Design System Rho 1
Design System Sds 0
Phi (Tension) 0.9
Phi (Compression Tied) 0.65
Phi (Compression Spiral) 0.75
Phi (Shear and Torsion) 0.75
Phi (Shear Seismic) 0.6
Phi (Shear Joint) 0.85
Pattern Live Load Factor 0.75
Utlization Factor Limit 1
 

 
ISSUED FOR CONSTRUCTION (IFC)

26 JAN 2022
Calculation Report, OPERATION SHELTER, Plant Plant No. 015 Page 71 of 281
CALCULATION SHEET

SNC-LAVALIN FAYEZ ENGINEERING, Al Khobar, Saudi Arabia


PROJECT : Updrade Buildings for Risk Mitigation - RT Refinery
B.I Number : 10-02062-0002-001 Designed
Desi ned :: AIA
Project Code No. : 510008 Checked
Ch ed : : NFP / AKM
Calc. No. : PE-P20081 Revision
Re on :: IFC
Subject : Structural Calculation - Operation Shelter - Plant No. 015 Rev. No.
Re No. :: 00

3.2.3 ETABS Output

ISSUED FOR CONSTRUCTION (IFC)

26 JAN 2022
Calculation Report, OPERATION SHELTER, Plant Plant No. 015 Page 72 of 281
CALCULATION SHEET

SNC-LAVALIN FAYEZ ENGINEERING, Al Khobar, Saudi Arabia


PROJECT : Updrade Buildings for Risk Mitigation - RT Refinery
B.I Number : 10-02062-0002-001 Designed
Desi ned :: AIA / NFP
Project Code No. : 510008 Checked
Ch ed : : NFP / AKM
Calc. No. : PE-P20081 Revision
Re on :: IFC
Subject : Structural Calculation - Operation Shelter - Plant No. 015 Rev. No.
Re No. :: 00

3.2.3.1 Beam Design

ISSUED FOR CONSTRUCTION (IFC)

26 JAN 2022
Calculation Report, OPERATION SHELTER, Plant Plant No. 015 Page 73 of 281
A9 ‐ RC BEAMS DESIGN.xlsx
Calculation Report, OPERATION SHELTER, Plant Plant No. 015

A9 :  Concrete Beam Summary ‐ ACI 318‐08
Design  As Top  As Top As Bottom  As Bottom At Shear Torsion Long  Al Torsion Torsion Tran  At Torsion
Story Label V Combo Warnings Errors
Section Combo cm² Combo cm² cm²/cm Combo cm² Combo cm²/cm
ROOF B1 B ‐ 40X60 DCon10 4 DCon14 0 DCon14 0 DCon14 0 DCon14 0 No Message No Message
ROOF B1 B ‐ 40X60 DCon10 2 DCon13 1 DCon14 0 DCon14 0 DCon14 0 No Message No Message
ROOF B1 B ‐ 40X60 DCon14 1 DCon13 1 DCon14 0 DCon14 0 DCon14 0 No Message No Message
ROOF B1 B ‐ 40X60 DCon14 1 DCon9 2 DCon14 0 DCon14 0 DCon14 0 No Message No Message
ROOF B1 B ‐ 40X60 DCon14 0 DCon9 3 DCon14 0 DCon14 0 DCon14 0 No Message No Message
ROOF B1 B ‐ 40X60 DCon14 0 DCon9 3 DCon14 0 DCon14 0 DCon14 0 No Message No Message
ROOF B1 B ‐ 40X60 DCon14 0 DCon9 3 DCon14 0 DCon14 0 DCon14 0 No Message No Message
ROOF B1 B ‐ 40X60 DCon14 0 DCon9 3 DCon14 0 DCon14 0 DCon14 0 No Message No Message
ROOF B1 B ‐ 40X60 DCon14 0 DCon1 3 DCon14 0 DCon14 0 DCon14 0 No Message No Message
ROOF B1 B ‐ 40X60 DCon8 0.01859 DCon1 3 DCon14 0 DCon14 0 DCon14 0 No Message No Message
ROOF B1 B ‐ 40X60 DCon8 0.01859 DCon1 3 DCon14 0 DCon14 0 DCon14 0 No Message No Message
ROOF B1 B ‐ 40X60 DCon8 0.01859 DCon10 2 DCon14 0 DCon14 0 DCon14 0 No Message No Message
ROOF B1 B ‐ 40X60 DCon8 0.04074 DCon10 2 DCon14 0 DCon14 0 DCon14 0 No Message No Message
ROOF B1 B ‐ 40X60 DCon13 0.3516 DCon10 1 DCon14 0 DCon14 0 DCon14 0 No Message No Message
ROOF B1 B ‐ 40X60 DCon9 2 DCon14 0.1644 DCon14 0 DCon14 0 DCon14 0 No Message No Message
ROOF B1 B ‐ 40X60 DCon9 2 DCon14 0.1395 DCon14 0 DCon14 0 DCon14 0 No Message No Message
ROOF B1 B ‐ 40X60 DCon9 4 DCon8 0.06084 DCon9 0.04 DCon14 0 DCon14 0 No Message No Message
ROOF B1 B ‐ 40X60 DCon9 6 DCon8 0.06084 DCon11 0.04 DCon14 0 DCon14 0 No Message No Message
ROOF B2 B ‐ 40X60 DCon10 5 DCon14 0 DCon10 0.04 DCon14 0 DCon14 0 No Message No Message
ROOF B2 B ‐ 40X60 DCon10 4 DCon14 0 DCon14 0 DCon14 0 DCon14 0 No Message No Message
ROOF B2 B ‐ 40X60 DCon10 2 DCon13 0.4119 DCon14 0 DCon14 0 DCon14 0 No Message No Message
ROOF B2 B ‐ 40X60 DCon10 2 DCon13 0.4252 DCon14 0 DCon14 0 DCon14 0 No Message No Message
ROOF B2 B ‐ 40X60 DCon14 0.06805 DCon9 1 DCon14 0 DCon14 0 DCon14 0 No Message No Message
ROOF B2 B ‐ 40X60 DCon14 0 DCon9 2 DCon14 0 DCon14 0 DCon14 0 No Message No Message
ROOF B2 B ‐ 40X60 DCon14 0 DCon9 2 DCon14 0 DCon14 0 DCon14 0 No Message No Message
ROOF B2 B ‐ 40X60 DCon14 0 DCon1 3 DCon14 0 DCon14 0 DCon14 0 No Message No Message
ROOF B2 B ‐ 40X60 DCon14 0 DCon1 3 DCon14 0 DCon14 0 DCon14 0 No Message No Message
ROOF B2 B ‐ 40X60 DCon14 0 DCon10 3 DCon14 0 DCon14 0 DCon14 0 No Message No Message
ROOF B2 B ‐ 40X60 DCon14 0 DCon10 3 DCon14 0 DCon14 0 DCon14 0 No Message No Message
ROOF B2 B ‐ 40X60 DCon14 0 DCon10 3 DCon14 0 DCon14 0 DCon14 0 No Message No Message
ROOF B2 B ‐ 40X60 DCon14 0 DCon10 3 DCon14 0 DCon14 0 DCon14 0 No Message No Message
ROOF B2 B ‐ 40X60 DCon13 0.1271 DCon10 2 DCon14 0 DCon14 0 DCon14 0 No Message No Message
ROOF B2 B ‐ 40X60 DCon13 1 DCon14 1 DCon14 0 DCon14 0 DCon14 0 No Message No Message
ROOF B2 B ‐ 40X60 DCon13 1 DCon14 1 DCon14 0 DCon14 0 DCon14 0 No Message No Message
ROOF B2 B ‐ 40X60 DCon9 3 DCon14 1 DCon14 0 DCon14 0 DCon14 0 No Message No Message
ROOF B2 B ‐ 40X60 DCon9 4 DCon14 0.1271 DCon14 0 DCon14 0 DCon14 0 No Message No Message
ROOF B3 B ‐ 40X60 DCon10 2 DCon13 1 DCon14 0 DCon14 0 DCon14 0 No Message No Message
ROOF B3 B ‐ 40X60 DCon12 1 DCon13 1 DCon14 0 DCon14 0 DCon14 0 No Message No Message
ROOF B3 B ‐ 40X60 DCon14 0.4766 DCon9 2 DCon14 0 DCon14 0 DCon14 0 No Message No Message
Page 74 of 281

ROOF B3 B ‐ 40X60 DCon14 1 DCon9 2 DCon14 0 DCon14 0 DCon14 0 No Message No Message


ROOF B3 B ‐ 40X60 DCon8 0.108 DCon9 2 DCon14 0 DCon14 0 DCon14 0 No Message No Message
ROOF B3 B ‐ 40X60 DCon8 0.108 DCon9 2 DCon14 0 DCon14 0 DCon14 0 No Message No Message

ISSUED FOR CONSTRUCTION (IFC)

26 JAN 2022
A9 ‐ RC BEAMS DESIGN.xlsx
Calculation Report, OPERATION SHELTER, Plant Plant No. 015

Design  As Top  As Top As Bottom  As Bottom At Shear Torsion Long  Al Torsion Torsion Tran  At Torsion
Story Label V Combo Warnings Errors
Section Combo cm² Combo cm² cm²/cm Combo cm² Combo cm²/cm
ROOF B3 B ‐ 40X60 DCon8 0.103 DCon9 2 DCon14 0 DCon14 0 DCon14 0 No Message No Message
ROOF B3 B ‐ 40X60 DCon8 0.103 DCon1 2 DCon14 0 DCon14 0 DCon14 0 No Message No Message
ROOF B3 B ‐ 40X60 DCon8 0.103 DCon4 2 DCon14 0 DCon14 0 DCon14 0 No Message No Message
ROOF B3 B ‐ 40X60 DCon8 0.09038 DCon10 2 DCon14 0 DCon14 0 DCon14 0 No Message No Message
ROOF B3 B ‐ 40X60 DCon8 0.09038 DCon10 1 DCon14 0 DCon14 0 DCon14 0 No Message No Message
ROOF B3 B ‐ 40X60 DCon9 1 DCon14 1 DCon14 0 DCon14 0 DCon14 0 No Message No Message
ROOF B3 B ‐ 40X60 DCon9 1 DCon14 1 DCon14 0 DCon14 0 DCon14 0 No Message No Message
ROOF B3 B ‐ 40X60 DCon9 2 DCon14 0.2863 DCon14 0 DCon14 0 DCon14 0 No Message No Message
ROOF B3 B ‐ 40X60 DCon9 3 DCon8 0.05972 DCon14 0 DCon14 0 DCon14 0 No Message No Message
ROOF B4 B ‐ 40X60 DCon10 3 DCon8 0.07775 DCon14 0 DCon14 0 DCon14 0 No Message No Message
ROOF B4 B ‐ 40X60 DCon10 2 DCon13 0.3083 DCon14 0 DCon14 0 DCon14 0 No Message No Message
ROOF B4 B ‐ 40X60 DCon10 1 DCon13 1 DCon14 0 DCon14 0 DCon14 0 No Message No Message
ROOF B4 B ‐ 40X60 DCon10 1 DCon13 1 DCon14 0 DCon14 0 DCon14 0 No Message No Message
ROOF B4 B ‐ 40X60 DCon13 0.1021 DCon9 1 DCon14 0 DCon14 0 DCon14 0 No Message No Message
ROOF B4 B ‐ 40X60 DCon13 0.1021 DCon9 1 DCon14 0 DCon14 0 DCon14 0 No Message No Message
ROOF B4 B ‐ 40X60 DCon13 0.1067 DCon9 1 DCon14 0 DCon14 0 DCon14 0 No Message No Message
ROOF B4 B ‐ 40X60 DCon13 0.1067 DCon1 1 DCon14 0 DCon14 0 DCon14 0 No Message No Message
ROOF B4 B ‐ 40X60 DCon13 0.1067 DCon10 1 DCon14 0 DCon14 0 DCon14 0 No Message No Message
ROOF B4 B ‐ 40X60 DCon13 0.09123 DCon10 2 DCon14 0 DCon14 0 DCon14 0 No Message No Message
ROOF B4 B ‐ 40X60 DCon13 0.09123 DCon10 1 DCon14 0 DCon14 0 DCon14 0 No Message No Message
ROOF B4 B ‐ 40X60 DCon9 1 DCon14 1 DCon14 0 DCon14 0 DCon14 0 No Message No Message
ROOF B4 B ‐ 40X60 DCon9 1 DCon14 1 DCon14 0 DCon14 0 DCon14 0 No Message No Message
ROOF B4 B ‐ 40X60 DCon9 2 DCon14 0.3973 DCon14 0 DCon14 0 DCon14 0 No Message No Message
ROOF B4 B ‐ 40X60 DCon9 3 DCon8 0.05515 DCon14 0 DCon14 0 DCon14 0 No Message No Message
ROOF B5 B ‐ 40X60 DCon10 3 DCon13 0.1287 DCon14 0 DCon14 0 DCon14 0 No Message No Message
ROOF B5 B ‐ 40X60 DCon10 2 DCon13 1 DCon14 0 DCon14 0 DCon14 0 No Message No Message
ROOF B5 B ‐ 40X60 DCon14 1 DCon9 1 DCon14 0 DCon14 0 DCon14 0 No Message No Message
ROOF B5 B ‐ 40X60 DCon14 1 DCon9 1 DCon14 0 DCon14 0 DCon14 0 No Message No Message
ROOF B5 B ‐ 40X60 DCon9 0.156 DCon9 1 DCon14 0 DCon14 0 DCon14 0 No Message No Message
ROOF B5 B ‐ 40X60 DCon9 0.156 DCon9 2 DCon14 0 DCon14 0 DCon14 0 No Message No Message
ROOF B5 B ‐ 40X60 DCon9 0.1693 DCon9 2 DCon14 0 DCon14 0 DCon14 0 No Message No Message
ROOF B5 B ‐ 40X60 DCon9 0.1693 DCon9 1 DCon14 0 DCon14 0 DCon14 0 No Message No Message
ROOF B5 B ‐ 40X60 DCon9 0.1693 DCon10 1 DCon14 0 DCon14 0 DCon14 0 No Message No Message
ROOF B5 B ‐ 40X60 DCon9 0.1612 DCon10 1 DCon14 0 DCon14 0 DCon14 0 No Message No Message
ROOF B5 B ‐ 40X60 DCon9 1 DCon12 1 DCon14 0 DCon14 0 DCon14 0 No Message No Message
ROOF B5 B ‐ 40X60 DCon9 2 DCon9 0.1612 DCon14 0 DCon14 0 DCon14 0 No Message No Message
ROOF B5 B ‐ 40X60 DCon9 2 DCon9 0.154 DCon14 0 DCon14 0 DCon14 0 No Message No Message
ROOF B5 B ‐ 40X60 DCon9 3 DCon9 0.154 DCon14 0 DCon14 0 DCon14 0 No Message No Message
ROOF B5 B ‐ 40X60 DCon9 4 DCon9 0.154 DCon14 0 DCon14 0 DCon14 0 No Message No Message
ROOF B6 B ‐ 40X60 DCon10 6 DCon13 0.05931 DCon12 0.04 DCon11 12 DCon9 0.01 No Message No Message
Page 75 of 281

ROOF B6 B ‐ 40X60 DCon10 4 DCon13 0.05931 DCon12 0.04 DCon11 12 DCon9 0.01 No Message No Message
ROOF B6 B ‐ 40X60 DCon10 2 DCon13 0.05931 DCon12 0.04 DCon11 12 DCon9 0.01 No Message No Message
ROOF B6 B ‐ 40X60 DCon10 2 DCon13 0.09825 DCon14 0 DCon14 0 DCon14 0 No Message No Message

ISSUED FOR CONSTRUCTION (IFC)

26 JAN 2022
A9 ‐ RC BEAMS DESIGN.xlsx
Calculation Report, OPERATION SHELTER, Plant Plant No. 015

Design  As Top  As Top As Bottom  As Bottom At Shear Torsion Long  Al Torsion Torsion Tran  At Torsion
Story Label V Combo Warnings Errors
Section Combo cm² Combo cm² cm²/cm Combo cm² Combo cm²/cm
ROOF B6 B ‐ 40X60 DCon14 0.1138 DCon9 1 DCon14 0 DCon14 0 DCon14 0 No Message No Message
ROOF B6 B ‐ 40X60 DCon13 0.09825 DCon9 3 DCon14 0 DCon14 0 DCon14 0 No Message No Message
ROOF B6 B ‐ 40X60 DCon13 0.1069 DCon9 3 DCon14 0 DCon14 0 DCon14 0 No Message No Message
ROOF B6 B ‐ 40X60 DCon13 0.1069 DCon2 4 DCon14 0 DCon14 0 DCon14 0 No Message No Message
ROOF B6 B ‐ 40X60 DCon13 0.1069 DCon1 5 DCon14 0 DCon14 0 DCon14 0 No Message No Message
ROOF B6 B ‐ 40X60 DCon13 0.1046 DCon1 5 DCon14 0 DCon14 0 DCon14 0 No Message No Message
ROOF B6 B ‐ 40X60 DCon13 0.1046 DCon1 5 DCon14 0 DCon14 0 DCon14 0 No Message No Message
ROOF B6 B ‐ 40X60 DCon13 0.1046 DCon1 5 DCon14 0 DCon14 0 DCon14 0 No Message No Message
ROOF B6 B ‐ 40X60 DCon13 0.0878 DCon1 5 DCon14 0 DCon14 0 DCon14 0 No Message No Message
ROOF B6 B ‐ 40X60 DCon13 0.0878 DCon2 4 DCon14 0 DCon14 0 DCon14 0 No Message No Message
ROOF B6 B ‐ 40X60 DCon13 0.0878 DCon10 2 DCon14 0 DCon14 0 DCon14 0 No Message No Message
ROOF B6 B ‐ 40X60 DCon13 0.0686 DCon10 2 DCon14 0 DCon14 0 DCon14 0 No Message No Message
ROOF B6 B ‐ 40X60 DCon13 0.2427 DCon10 1 DCon14 0 DCon14 0 DCon14 0 No Message No Message
ROOF B6 B ‐ 40X60 DCon9 2 DCon13 0.0686 DCon14 0 DCon14 0 DCon14 0 No Message No Message
ROOF B6 B ‐ 40X60 DCon9 2 DCon13 0.03069 DCon1 0.04 DCon9 12 DCon9 0.01 No Message No Message
ROOF B6 B ‐ 40X60 DCon9 4 DCon13 0.03069 DCon1 0.04 DCon9 12 DCon9 0.01 No Message No Message
ROOF B6 B ‐ 40X60 DCon9 6 DCon13 0.03069 DCon11 0.04 DCon9 12 DCon9 0.01 No Message No Message
ROOF B7 B ‐ 40X60 DCon10 4 DCon9 0.1895 DCon14 0 DCon14 0 DCon14 0 No Message No Message
ROOF B7 B ‐ 40X60 DCon10 3 DCon9 0.1895 DCon14 0 DCon14 0 DCon14 0 No Message No Message
ROOF B7 B ‐ 40X60 DCon10 2 DCon9 0.1895 DCon14 0 DCon14 0 DCon14 0 No Message No Message
ROOF B7 B ‐ 40X60 DCon10 2 DCon9 0.172 DCon14 0 DCon14 0 DCon14 0 No Message No Message
ROOF B7 B ‐ 40X60 DCon10 1 DCon13 1 DCon14 0 DCon14 0 DCon14 0 No Message No Message
ROOF B7 B ‐ 40X60 DCon9 0.172 DCon9 1 DCon14 0 DCon14 0 DCon14 0 No Message No Message
ROOF B7 B ‐ 40X60 DCon9 0.1731 DCon9 1 DCon14 0 DCon14 0 DCon14 0 No Message No Message
ROOF B7 B ‐ 40X60 DCon9 0.1731 DCon9 1 DCon14 0 DCon14 0 DCon14 0 No Message No Message
ROOF B7 B ‐ 40X60 DCon9 0.1731 DCon10 1 DCon14 0 DCon14 0 DCon14 0 No Message No Message
ROOF B7 B ‐ 40X60 DCon9 0.1685 DCon10 2 DCon14 0 DCon14 0 DCon14 0 No Message No Message
ROOF B7 B ‐ 40X60 DCon9 0.1685 DCon10 1 DCon14 0 DCon14 0 DCon14 0 No Message No Message
ROOF B7 B ‐ 40X60 DCon13 1 DCon10 1 DCon14 0 DCon14 0 DCon14 0 No Message No Message
ROOF B7 B ‐ 40X60 DCon13 1 DCon14 1 DCon14 0 DCon14 0 DCon14 0 No Message No Message
ROOF B7 B ‐ 40X60 DCon9 2 DCon14 1 DCon14 0 DCon14 0 DCon14 0 No Message No Message
ROOF B7 B ‐ 40X60 DCon9 3 DCon13 0.1446 DCon14 0 DCon14 0 DCon14 0 No Message No Message
ROOF B8 B ‐ 40X60 DCon10 3 DCon13 0.09194 DCon14 0 DCon14 0 DCon14 0 No Message No Message
ROOF B8 B ‐ 40X60 DCon10 2 DCon13 0.387 DCon14 0 DCon14 0 DCon14 0 No Message No Message
ROOF B8 B ‐ 40X60 DCon14 1 DCon13 1 DCon14 0 DCon14 0 DCon14 0 No Message No Message
ROOF B8 B ‐ 40X60 DCon14 1 DCon9 1 DCon14 0 DCon14 0 DCon14 0 No Message No Message
ROOF B8 B ‐ 40X60 DCon13 0.1117 DCon9 1 DCon14 0 DCon14 0 DCon14 0 No Message No Message
ROOF B8 B ‐ 40X60 DCon13 0.1117 DCon9 2 DCon14 0 DCon14 0 DCon14 0 No Message No Message
ROOF B8 B ‐ 40X60 DCon13 0.1254 DCon9 2 DCon14 0 DCon14 0 DCon14 0 No Message No Message
ROOF B8 B ‐ 40X60 DCon13 0.1254 DCon1 2 DCon14 0 DCon14 0 DCon14 0 No Message No Message
Page 76 of 281

ROOF B8 B ‐ 40X60 DCon13 0.1254 DCon10 2 DCon14 0 DCon14 0 DCon14 0 No Message No Message
ROOF B8 B ‐ 40X60 DCon13 0.1189 DCon10 2 DCon14 0 DCon14 0 DCon14 0 No Message No Message
ROOF B8 B ‐ 40X60 DCon13 0.1189 DCon10 1 DCon14 0 DCon14 0 DCon14 0 No Message No Message

ISSUED FOR CONSTRUCTION (IFC)

26 JAN 2022
A9 ‐ RC BEAMS DESIGN.xlsx
Calculation Report, OPERATION SHELTER, Plant Plant No. 015

Design  As Top  As Top As Bottom  As Bottom At Shear Torsion Long  Al Torsion Torsion Tran  At Torsion
Story Label V Combo Warnings Errors
Section Combo cm² Combo cm² cm²/cm Combo cm² Combo cm²/cm
ROOF B8 B ‐ 40X60 DCon9 1 DCon14 1 DCon14 0 DCon14 0 DCon14 0 No Message No Message
ROOF B8 B ‐ 40X60 DCon9 1 DCon14 1 DCon14 0 DCon14 0 DCon14 0 No Message No Message
ROOF B8 B ‐ 40X60 DCon9 2 DCon14 0.3274 DCon14 0 DCon14 0 DCon14 0 No Message No Message
ROOF B8 B ‐ 40X60 DCon9 3 DCon13 0.08675 DCon14 0 DCon14 0 DCon14 0 No Message No Message
ROOF B9 B ‐ 40X60 DCon10 3 DCon13 0.03803 DCon14 0 DCon14 0 DCon14 0 No Message No Message
ROOF B9 B ‐ 40X60 DCon10 2 DCon13 0.3571 DCon14 0 DCon14 0 DCon14 0 No Message No Message
ROOF B9 B ‐ 40X60 DCon10 1 DCon13 1 DCon14 0 DCon14 0 DCon14 0 No Message No Message
ROOF B9 B ‐ 40X60 DCon10 1 DCon13 1 DCon14 0 DCon14 0 DCon14 0 No Message No Message
ROOF B9 B ‐ 40X60 DCon14 0.1052 DCon9 1 DCon14 0 DCon14 0 DCon14 0 No Message No Message
ROOF B9 B ‐ 40X60 DCon13 0.076 DCon9 1 DCon14 0 DCon14 0 DCon14 0 No Message No Message
ROOF B9 B ‐ 40X60 DCon13 0.08874 DCon9 1 DCon14 0 DCon14 0 DCon14 0 No Message No Message
ROOF B9 B ‐ 40X60 DCon13 0.08874 DCon1 1 DCon14 0 DCon14 0 DCon14 0 No Message No Message
ROOF B9 B ‐ 40X60 DCon13 0.08874 DCon10 1 DCon14 0 DCon14 0 DCon14 0 No Message No Message
ROOF B9 B ‐ 40X60 DCon13 0.08068 DCon10 2 DCon14 0 DCon14 0 DCon14 0 No Message No Message
ROOF B9 B ‐ 40X60 DCon13 0.08068 DCon10 1 DCon14 0 DCon14 0 DCon14 0 No Message No Message
ROOF B9 B ‐ 40X60 DCon9 1 DCon14 1 DCon14 0 DCon14 0 DCon14 0 No Message No Message
ROOF B9 B ‐ 40X60 DCon9 1 DCon14 1 DCon14 0 DCon14 0 DCon14 0 No Message No Message
ROOF B9 B ‐ 40X60 DCon9 2 DCon14 0.3978 DCon14 0 DCon14 0 DCon14 0 No Message No Message
ROOF B9 B ‐ 40X60 DCon9 3 DCon14 0.08387 DCon14 0 DCon14 0 DCon14 0 No Message No Message
ROOF B10 B ‐ 40X60 DCon10 3 DCon13 0.3294 DCon14 0 DCon14 0 DCon14 0 No Message No Message
ROOF B10 B ‐ 40X60 DCon10 1 DCon13 1 DCon14 0 DCon14 0 DCon14 0 No Message No Message
ROOF B10 B ‐ 40X60 DCon14 0.4775 DCon9 1 DCon14 0 DCon14 0 DCon14 0 No Message No Message
ROOF B10 B ‐ 40X60 DCon14 1 DCon9 1 DCon14 0 DCon14 0 DCon14 0 No Message No Message
ROOF B10 B ‐ 40X60 DCon7 0.03273 DCon9 1 DCon14 0 DCon14 0 DCon14 0 No Message No Message
ROOF B10 B ‐ 40X60 DCon7 0.03273 DCon10 2 DCon14 0 DCon14 0 DCon14 0 No Message No Message
ROOF B10 B ‐ 40X60 DCon14 0.04391 DCon10 2 DCon14 0 DCon14 0 DCon14 0 No Message No Message
ROOF B10 B ‐ 40X60 DCon14 0.04391 DCon10 2 DCon14 0 DCon14 0 DCon14 0 No Message No Message
ROOF B10 B ‐ 40X60 DCon13 0.3479 DCon10 2 DCon14 0 DCon14 0 DCon14 0 No Message No Message
ROOF B10 B ‐ 40X60 DCon13 0.2762 DCon10 2 DCon14 0 DCon14 0 DCon14 0 No Message No Message
ROOF B10 B ‐ 40X60 DCon13 1 DCon10 1 DCon14 0 DCon14 0 DCon14 0 No Message No Message
ROOF B10 B ‐ 40X60 DCon9 2 DCon14 1 DCon14 0 DCon14 0 DCon14 0 No Message No Message
ROOF B11 B ‐ 40X60 DCon10 2 DCon13 1 DCon14 0 DCon14 0 DCon14 0 No Message No Message
ROOF B11 B ‐ 40X60 DCon14 1 DCon13 1 DCon14 0 DCon14 0 DCon14 0 No Message No Message
ROOF B11 B ‐ 40X60 DCon14 0.4706 DCon9 2 DCon14 0 DCon14 0 DCon14 0 No Message No Message
ROOF B11 B ‐ 40X60 DCon14 1 DCon9 2 DCon14 0 DCon14 0 DCon14 0 No Message No Message
ROOF B11 B ‐ 40X60 DCon8 0.2259 DCon9 2 DCon14 0 DCon14 0 DCon14 0 No Message No Message
ROOF B11 B ‐ 40X60 DCon8 0.2259 DCon9 2 DCon14 0 DCon14 0 DCon14 0 No Message No Message
ROOF B11 B ‐ 40X60 DCon8 0.2026 DCon9 2 DCon14 0 DCon14 0 DCon14 0 No Message No Message
ROOF B11 B ‐ 40X60 DCon8 0.2026 DCon4 2 DCon14 0 DCon14 0 DCon14 0 No Message No Message
ROOF B11 B ‐ 40X60 DCon8 0.2026 DCon4 2 DCon14 0 DCon14 0 DCon14 0 No Message No Message
Page 77 of 281

ROOF B11 B ‐ 40X60 DCon8 0.1762 DCon4 2 DCon14 0 DCon14 0 DCon14 0 No Message No Message
ROOF B11 B ‐ 40X60 DCon8 0.1762 DCon10 1 DCon14 0 DCon14 0 DCon14 0 No Message No Message
ROOF B11 B ‐ 40X60 DCon9 1 DCon14 1 DCon14 0 DCon14 0 DCon14 0 No Message No Message

ISSUED FOR CONSTRUCTION (IFC)

26 JAN 2022
A9 ‐ RC BEAMS DESIGN.xlsx
Calculation Report, OPERATION SHELTER, Plant Plant No. 015

Design  As Top  As Top As Bottom  As Bottom At Shear Torsion Long  Al Torsion Torsion Tran  At Torsion
Story Label V Combo Warnings Errors
Section Combo cm² Combo cm² cm²/cm Combo cm² Combo cm²/cm
ROOF B11 B ‐ 40X60 DCon9 1 DCon14 1 DCon14 0 DCon14 0 DCon14 0 No Message No Message
ROOF B11 B ‐ 40X60 DCon9 2 DCon14 0.2715 DCon14 0 DCon14 0 DCon14 0 No Message No Message
ROOF B11 B ‐ 40X60 DCon9 3 DCon8 0.1352 DCon14 0 DCon14 0 DCon14 0 No Message No Message
ROOF B12 B ‐ 40X60 DCon10 3 DCon8 0.09978 DCon14 0 DCon14 0 DCon14 0 No Message No Message
ROOF B12 B ‐ 40X60 DCon10 2 DCon13 0.2877 DCon14 0 DCon14 0 DCon14 0 No Message No Message
ROOF B12 B ‐ 40X60 DCon10 1 DCon13 1 DCon14 0 DCon14 0 DCon14 0 No Message No Message
ROOF B12 B ‐ 40X60 DCon10 1 DCon13 1 DCon14 0 DCon14 0 DCon14 0 No Message No Message
ROOF B12 B ‐ 40X60 DCon8 0.1269 DCon9 1 DCon14 0 DCon14 0 DCon14 0 No Message No Message
ROOF B12 B ‐ 40X60 DCon8 0.1269 DCon9 1 DCon14 0 DCon14 0 DCon14 0 No Message No Message
ROOF B12 B ‐ 40X60 DCon8 0.1327 DCon9 1 DCon14 0 DCon14 0 DCon14 0 No Message No Message
ROOF B12 B ‐ 40X60 DCon8 0.1327 DCon4 1 DCon14 0 DCon14 0 DCon14 0 No Message No Message
ROOF B12 B ‐ 40X60 DCon8 0.1327 DCon10 2 DCon14 0 DCon14 0 DCon14 0 No Message No Message
ROOF B12 B ‐ 40X60 DCon8 0.1254 DCon10 2 DCon14 0 DCon14 0 DCon14 0 No Message No Message
ROOF B12 B ‐ 40X60 DCon8 0.1254 DCon10 1 DCon14 0 DCon14 0 DCon14 0 No Message No Message
ROOF B12 B ‐ 40X60 DCon9 1 DCon14 1 DCon14 0 DCon14 0 DCon14 0 No Message No Message
ROOF B12 B ‐ 40X60 DCon9 1 DCon14 1 DCon14 0 DCon14 0 DCon14 0 No Message No Message
ROOF B12 B ‐ 40X60 DCon9 2 DCon14 0.227 DCon14 0 DCon14 0 DCon14 0 No Message No Message
ROOF B12 B ‐ 40X60 DCon9 4 DCon8 0.09875 DCon14 0 DCon14 0 DCon14 0 No Message No Message
ROOF B12 B ‐ 40X60 DCon10 4 DCon14 0.106 DCon14 0 DCon14 0 DCon14 0 No Message No Message
ROOF B12 B ‐ 40X60 DCon10 4 DCon14 0.106 DCon14 0 DCon14 0 DCon14 0 No Message No Message
ROOF B13 B ‐ 40X60 DCon10 3 DCon14 0.106 DCon14 0 DCon14 0 DCon14 0 No Message No Message
ROOF B13 B ‐ 40X60 DCon10 2 DCon13 0.387 DCon14 0 DCon14 0 DCon14 0 No Message No Message
ROOF B13 B ‐ 40X60 DCon14 1 DCon9 1 DCon14 0 DCon14 0 DCon14 0 No Message No Message
ROOF B13 B ‐ 40X60 DCon14 1 DCon9 1 DCon14 0 DCon14 0 DCon14 0 No Message No Message
ROOF B13 B ‐ 40X60 DCon14 0.1371 DCon9 1 DCon14 0 DCon14 0 DCon14 0 No Message No Message
ROOF B13 B ‐ 40X60 DCon14 0.1371 DCon9 2 DCon14 0 DCon14 0 DCon14 0 No Message No Message
ROOF B13 B ‐ 40X60 DCon14 0.1419 DCon9 2 DCon14 0 DCon14 0 DCon14 0 No Message No Message
ROOF B13 B ‐ 40X60 DCon14 0.1419 DCon10 1 DCon14 0 DCon14 0 DCon14 0 No Message No Message
ROOF B13 B ‐ 40X60 DCon14 0.1419 DCon10 1 DCon14 0 DCon14 0 DCon14 0 No Message No Message
ROOF B13 B ‐ 40X60 DCon14 0.127 DCon10 1 DCon14 0 DCon14 0 DCon14 0 No Message No Message
ROOF B13 B ‐ 40X60 DCon9 1 DCon14 1 DCon14 0 DCon14 0 DCon14 0 No Message No Message
ROOF B13 B ‐ 40X60 DCon9 2 DCon14 0.127 DCon14 0 DCon14 0 DCon14 0 No Message No Message
ROOF B13 B ‐ 40X60 DCon9 2 DCon8 0.117 DCon14 0 DCon14 0 DCon14 0 No Message No Message
ROOF B13 B ‐ 40X60 DCon9 3 DCon8 0.117 DCon14 0 DCon14 0 DCon14 0 No Message No Message
ROOF B13 B ‐ 40X60 DCon9 4 DCon8 0.117 DCon14 0 DCon14 0 DCon14 0 No Message No Message
ROOF B14 B ‐ 40X60 DCon10 6 DCon14 0 DCon7 0.01 DCon14 12 DCon10 0.02 No Message No Message
ROOF B14 B ‐ 40X60 DCon10 4 DCon14 0 DCon7 0.01 DCon14 12 DCon10 0.02 No Message No Message
ROOF B14 B ‐ 40X60 DCon10 2 DCon14 0 DCon7 0.01 DCon14 12 DCon10 0.02 No Message No Message
ROOF B14 B ‐ 40X60 DCon10 2 DCon14 0.05024 DCon11 0.01 DCon12 12 DCon1 0.02 No Message No Message
ROOF B14 B ‐ 40X60 DCon14 0.1199 DCon9 1 DCon11 0.01 DCon12 12 DCon1 0.02 No Message No Message
Page 78 of 281

ROOF B14 B ‐ 40X60 DCon14 0.05024 DCon9 3 DCon11 0.01 DCon12 12 DCon1 0.02 No Message No Message
ROOF B14 B ‐ 40X60 DCon14 0.05781 DCon9 3 DCon14 0 DCon14 0 DCon14 0 No Message No Message
ROOF B14 B ‐ 40X60 DCon14 0.05781 DCon2 4 DCon14 0 DCon14 0 DCon14 0 No Message No Message

ISSUED FOR CONSTRUCTION (IFC)

26 JAN 2022
A9 ‐ RC BEAMS DESIGN.xlsx
Calculation Report, OPERATION SHELTER, Plant Plant No. 015

Design  As Top  As Top As Bottom  As Bottom At Shear Torsion Long  Al Torsion Torsion Tran  At Torsion
Story Label V Combo Warnings Errors
Section Combo cm² Combo cm² cm²/cm Combo cm² Combo cm²/cm
ROOF B14 B ‐ 40X60 DCon14 0.05781 DCon1 5 DCon14 0 DCon14 0 DCon14 0 No Message No Message
ROOF B14 B ‐ 40X60 DCon14 0.05572 DCon1 5 DCon14 0 DCon14 0 DCon14 0 No Message No Message
ROOF B14 B ‐ 40X60 DCon14 0.05572 DCon1 5 DCon14 0 DCon14 0 DCon14 0 No Message No Message
ROOF B14 B ‐ 40X60 DCon14 0.05572 DCon1 5 DCon14 0 DCon14 0 DCon14 0 No Message No Message
ROOF B14 B ‐ 40X60 DCon14 0.03693 DCon1 5 DCon14 0 DCon14 0 DCon14 0 No Message No Message
ROOF B14 B ‐ 40X60 DCon14 0.03693 DCon2 4 DCon14 0 DCon14 0 DCon14 0 No Message No Message
ROOF B14 B ‐ 40X60 DCon14 0.03693 DCon10 3 DCon14 0 DCon14 0 DCon14 0 No Message No Message
ROOF B14 B ‐ 40X60 DCon14 0.01394 DCon10 3 DCon14 0 DCon14 0 DCon14 0 No Message No Message
ROOF B14 B ‐ 40X60 DCon14 0.01394 DCon10 1 DCon14 0 DCon14 0 DCon14 0 No Message No Message
ROOF B14 B ‐ 40X60 DCon9 2 DCon14 0.01394 DCon9 0.04 DCon14 0 DCon14 0 No Message No Message
ROOF B14 B ‐ 40X60 DCon9 2 DCon14 0 DCon13 0.01 DCon14 12 DCon1 0.02 No Message No Message
ROOF B14 B ‐ 40X60 DCon9 4 DCon14 0 DCon13 0.01 DCon14 12 DCon1 0.02 No Message No Message
ROOF B14 B ‐ 40X60 DCon9 6 DCon14 0 DCon13 0.01 DCon14 12 DCon1 0.02 No Message No Message
ROOF B15 B ‐ 40X60 DCon10 4 DCon14 0.09936 DCon14 0 DCon14 0 DCon14 0 No Message No Message
ROOF B15 B ‐ 40X60 DCon10 3 DCon14 0.09936 DCon14 0 DCon14 0 DCon14 0 No Message No Message
ROOF B15 B ‐ 40X60 DCon10 2 DCon14 0.09936 DCon14 0 DCon14 0 DCon14 0 No Message No Message
ROOF B15 B ‐ 40X60 DCon10 2 DCon14 0.1214 DCon14 0 DCon14 0 DCon14 0 No Message No Message
ROOF B15 B ‐ 40X60 DCon10 1 DCon13 1 DCon14 0 DCon14 0 DCon14 0 No Message No Message
ROOF B15 B ‐ 40X60 DCon14 0.1214 DCon9 1 DCon14 0 DCon14 0 DCon14 0 No Message No Message
ROOF B15 B ‐ 40X60 DCon14 0.126 DCon9 1 DCon14 0 DCon14 0 DCon14 0 No Message No Message
ROOF B15 B ‐ 40X60 DCon14 0.126 DCon10 1 DCon14 0 DCon14 0 DCon14 0 No Message No Message
ROOF B15 B ‐ 40X60 DCon14 0.126 DCon10 2 DCon14 0 DCon14 0 DCon14 0 No Message No Message
ROOF B15 B ‐ 40X60 DCon14 0.1222 DCon10 2 DCon14 0 DCon14 0 DCon14 0 No Message No Message
ROOF B15 B ‐ 40X60 DCon14 0.1222 DCon10 1 DCon14 0 DCon14 0 DCon14 0 No Message No Message
ROOF B15 B ‐ 40X60 DCon13 1 DCon14 1 DCon14 0 DCon14 0 DCon14 0 No Message No Message
ROOF B15 B ‐ 40X60 DCon13 1 DCon14 1 DCon4 0.01 DCon10 12 DCon10 0.01 No Message No Message
ROOF B15 B ‐ 40X60 DCon9 2 DCon14 0.4375 DCon4 0.01 DCon10 12 DCon10 0.01 No Message No Message
ROOF B15 B ‐ 40X60 DCon9 3 DCon14 0.08953 DCon4 0.01 DCon10 12 DCon10 0.01 No Message No Message
ROOF B16 B ‐ 40X60 DCon10 3 DCon14 0.04366 DCon14 0 DCon14 0 DCon14 0 No Message No Message
ROOF B16 B ‐ 40X60 DCon10 2 DCon13 0.3134 DCon14 0 DCon14 0 DCon14 0 No Message No Message
ROOF B16 B ‐ 40X60 DCon12 1 DCon13 1 DCon14 0 DCon14 0 DCon14 0 No Message No Message
ROOF B16 B ‐ 40X60 DCon10 1 DCon13 1 DCon14 0 DCon14 0 DCon14 0 No Message No Message
ROOF B16 B ‐ 40X60 DCon14 0.07774 DCon9 1 DCon14 0 DCon14 0 DCon14 0 No Message No Message
ROOF B16 B ‐ 40X60 DCon14 0.07774 DCon9 2 DCon14 0 DCon14 0 DCon14 0 No Message No Message
ROOF B16 B ‐ 40X60 DCon14 0.09707 DCon9 2 DCon14 0 DCon14 0 DCon14 0 No Message No Message
ROOF B16 B ‐ 40X60 DCon14 0.09707 DCon1 2 DCon14 0 DCon14 0 DCon14 0 No Message No Message
ROOF B16 B ‐ 40X60 DCon14 0.09707 DCon10 2 DCon14 0 DCon14 0 DCon14 0 No Message No Message
ROOF B16 B ‐ 40X60 DCon14 0.09393 DCon10 2 DCon14 0 DCon14 0 DCon14 0 No Message No Message
ROOF B16 B ‐ 40X60 DCon14 0.09393 DCon10 1 DCon14 0 DCon14 0 DCon14 0 No Message No Message
ROOF B16 B ‐ 40X60 DCon9 1 DCon14 1 DCon14 0 DCon14 0 DCon14 0 No Message No Message
Page 79 of 281

ROOF B16 B ‐ 40X60 DCon9 1 DCon14 1 DCon14 0 DCon14 0 DCon14 0 No Message No Message
ROOF B16 B ‐ 40X60 DCon9 2 DCon14 0.3257 DCon14 0 DCon14 0 DCon14 0 No Message No Message
ROOF B16 B ‐ 40X60 DCon9 3 DCon14 0.06255 DCon14 0 DCon14 0 DCon14 0 No Message No Message

ISSUED FOR CONSTRUCTION (IFC)

26 JAN 2022
A9 ‐ RC BEAMS DESIGN.xlsx
Calculation Report, OPERATION SHELTER, Plant Plant No. 015

Design  As Top  As Top As Bottom  As Bottom At Shear Torsion Long  Al Torsion Torsion Tran  At Torsion
Story Label V Combo Warnings Errors
Section Combo cm² Combo cm² cm²/cm Combo cm² Combo cm²/cm
ROOF B17 B ‐ 40X60 DCon10 3 DCon8 0.03287 DCon14 0 DCon14 0 DCon14 0 No Message No Message
ROOF B17 B ‐ 40X60 DCon10 2 DCon13 0.3504 DCon14 0 DCon14 0 DCon14 0 No Message No Message
ROOF B17 B ‐ 40X60 DCon10 1 DCon13 1 DCon14 0 DCon14 0 DCon14 0 No Message No Message
ROOF B17 B ‐ 40X60 DCon10 1 DCon13 1 DCon14 0 DCon14 0 DCon14 0 No Message No Message
ROOF B17 B ‐ 40X60 DCon14 0.07611 DCon9 1 DCon14 0 DCon14 0 DCon14 0 No Message No Message
ROOF B17 B ‐ 40X60 DCon14 0.05917 DCon9 1 DCon14 0 DCon14 0 DCon14 0 No Message No Message
ROOF B17 B ‐ 40X60 DCon14 0.07538 DCon9 1 DCon14 0 DCon14 0 DCon14 0 No Message No Message
ROOF B17 B ‐ 40X60 DCon14 0.07538 DCon1 1 DCon14 0 DCon14 0 DCon14 0 No Message No Message
ROOF B17 B ‐ 40X60 DCon14 0.07538 DCon10 1 DCon14 0 DCon14 0 DCon14 0 No Message No Message
ROOF B17 B ‐ 40X60 DCon14 0.06983 DCon10 2 DCon14 0 DCon14 0 DCon14 0 No Message No Message
ROOF B17 B ‐ 40X60 DCon14 0.06983 DCon10 1 DCon14 0 DCon14 0 DCon14 0 No Message No Message
ROOF B17 B ‐ 40X60 DCon9 1 DCon14 1 DCon14 0 DCon14 0 DCon14 0 No Message No Message
ROOF B17 B ‐ 40X60 DCon9 1 DCon14 1 DCon14 0 DCon14 0 DCon14 0 No Message No Message
ROOF B17 B ‐ 40X60 DCon9 2 DCon14 0.3845 DCon14 0 DCon14 0 DCon14 0 No Message No Message
ROOF B17 B ‐ 40X60 DCon9 3 DCon14 0.0758 DCon14 0 DCon14 0 DCon14 0 No Message No Message
ROOF B18 B ‐ 40X60 DCon10 3 DCon13 0.3188 DCon14 0 DCon14 0 DCon14 0 No Message No Message
ROOF B18 B ‐ 40X60 DCon10 2 DCon13 1 DCon14 0 DCon14 0 DCon14 0 No Message No Message
ROOF B18 B ‐ 40X60 DCon14 0.4756 DCon9 1 DCon14 0 DCon14 0 DCon14 0 No Message No Message
ROOF B18 B ‐ 40X60 DCon14 1 DCon9 1 DCon14 0 DCon14 0 DCon14 0 No Message No Message
ROOF B18 B ‐ 40X60 DCon14 0.02803 DCon9 1 DCon14 0 DCon14 0 DCon14 0 No Message No Message
ROOF B18 B ‐ 40X60 DCon14 0.02803 DCon10 2 DCon14 0 DCon14 0 DCon14 0 No Message No Message
ROOF B18 B ‐ 40X60 DCon14 0.04247 DCon10 2 DCon14 0 DCon14 0 DCon14 0 No Message No Message
ROOF B18 B ‐ 40X60 DCon14 0.04247 DCon10 2 DCon14 0 DCon14 0 DCon14 0 No Message No Message
ROOF B18 B ‐ 40X60 DCon13 0.3451 DCon10 2 DCon14 0 DCon14 0 DCon14 0 No Message No Message
ROOF B18 B ‐ 40X60 DCon13 0.2763 DCon10 2 DCon14 0 DCon14 0 DCon14 0 No Message No Message
ROOF B18 B ‐ 40X60 DCon13 1 DCon10 1 DCon14 0 DCon14 0 DCon14 0 No Message No Message
ROOF B18 B ‐ 40X60 DCon9 2 DCon14 1 DCon14 0 DCon14 0 DCon14 0 No Message No Message
ROOF B19 B ‐ 40X60 DCon10 4 DCon14 0 DCon14 0 DCon14 0 DCon14 0 No Message No Message
ROOF B19 B ‐ 40X60 DCon10 2 DCon13 1 DCon14 0 DCon14 0 DCon14 0 No Message No Message
ROOF B19 B ‐ 40X60 DCon14 1 DCon13 1 DCon14 0 DCon14 0 DCon14 0 No Message No Message
ROOF B19 B ‐ 40X60 DCon14 1 DCon9 1 DCon14 0 DCon14 0 DCon14 0 No Message No Message
ROOF B19 B ‐ 40X60 DCon14 0 DCon9 2 DCon14 0 DCon14 0 DCon14 0 No Message No Message
ROOF B19 B ‐ 40X60 DCon14 0 DCon9 3 DCon14 0 DCon14 0 DCon14 0 No Message No Message
ROOF B19 B ‐ 40X60 DCon14 0 DCon9 3 DCon14 0 DCon14 0 DCon14 0 No Message No Message
ROOF B19 B ‐ 40X60 DCon14 0 DCon9 3 DCon14 0 DCon14 0 DCon14 0 No Message No Message
ROOF B19 B ‐ 40X60 DCon14 0 DCon1 3 DCon14 0 DCon14 0 DCon14 0 No Message No Message
ROOF B19 B ‐ 40X60 DCon8 0 DCon1 3 DCon14 0 DCon14 0 DCon14 0 No Message No Message
ROOF B19 B ‐ 40X60 DCon8 0 DCon1 3 DCon14 0 DCon14 0 DCon14 0 No Message No Message
ROOF B19 B ‐ 40X60 DCon8 0 DCon10 2 DCon14 0 DCon14 0 DCon14 0 No Message No Message
ROOF B19 B ‐ 40X60 DCon8 0.02767 DCon10 2 DCon14 0 DCon14 0 DCon14 0 No Message No Message
Page 80 of 281

ROOF B19 B ‐ 40X60 DCon13 0.3099 DCon10 1 DCon14 0 DCon14 0 DCon14 0 No Message No Message
ROOF B19 B ‐ 40X60 DCon9 2 DCon14 0.1266 DCon14 0 DCon14 0 DCon14 0 No Message No Message
ROOF B19 B ‐ 40X60 DCon9 2 DCon14 0.1099 DCon14 0 DCon14 0 DCon14 0 No Message No Message

ISSUED FOR CONSTRUCTION (IFC)

26 JAN 2022
A9 ‐ RC BEAMS DESIGN.xlsx
Calculation Report, OPERATION SHELTER, Plant Plant No. 015

Design  As Top  As Top As Bottom  As Bottom At Shear Torsion Long  Al Torsion Torsion Tran  At Torsion
Story Label V Combo Warnings Errors
Section Combo cm² Combo cm² cm²/cm Combo cm² Combo cm²/cm
ROOF B19 B ‐ 40X60 DCon9 4 DCon8 0.04808 DCon14 0 DCon14 0 DCon14 0 No Message No Message
ROOF B19 B ‐ 40X60 DCon9 5 DCon8 0.04808 DCon9 0.04 DCon14 0 DCon14 0 No Message No Message
ROOF B23 B ‐ 40X60 DCon10 5 DCon8 0.06412 DCon14 0.04 DCon14 0 DCon14 0 No Message No Message
ROOF B23 B ‐ 40X60 DCon10 2 DCon13 0.401 DCon12 0.04 DCon14 0 DCon14 0 No Message No Message
ROOF B23 B ‐ 40X60 DCon14 0.4594 DCon9 2 DCon12 0.04 DCon14 0 DCon14 0 No Message No Message
ROOF B23 B ‐ 40X60 DCon14 1 DCon9 2 DCon14 0 DCon14 0 DCon14 0 No Message No Message
ROOF B23 B ‐ 40X60 DCon8 0.04274 DCon9 3 DCon14 0 DCon14 0 DCon14 0 No Message No Message
ROOF B23 B ‐ 40X60 DCon8 0.04274 DCon9 5 DCon14 0 DCon14 0 DCon14 0 No Message No Message
ROOF B23 B ‐ 40X60 DCon8 0.03556 DCon9 5 DCon14 0 DCon14 0 DCon14 0 No Message No Message
ROOF B23 B ‐ 40X60 DCon8 0.03556 DCon2 5 DCon14 0 DCon14 0 DCon14 0 No Message No Message
ROOF B23 B ‐ 40X60 DCon8 0.03556 DCon2 5 DCon14 0 DCon14 0 DCon14 0 No Message No Message
ROOF B23 B ‐ 40X60 DCon8 0.03339 DCon2 5 DCon14 0 DCon14 0 DCon14 0 No Message No Message
ROOF B23 B ‐ 40X60 DCon8 0.03339 DCon2 4 DCon14 0 DCon14 0 DCon14 0 No Message No Message
ROOF B23 B ‐ 40X60 DCon8 0.03339 DCon2 3 DCon14 0 DCon14 0 DCon14 0 No Message No Message
ROOF B23 B ‐ 40X60 DCon8 0.03556 DCon2 3 DCon9 0.04 DCon14 0 DCon14 0 No Message No Message
ROOF B23 B ‐ 40X60 DCon13 0.2085 DCon10 1 DCon9 0.04 DCon14 0 DCon14 0 No Message No Message
ROOF B23 B ‐ 40X60 DCon9 3 DCon8 0.03556 DCon11 0.04 DCon14 0 DCon14 0 No Message No Message
ROOF B23 B ‐ 40X60 DCon9 3 DCon8 0.04786 DCon13 0.04 DCon14 0 DCon14 0 No Message No Message
ROOF B23 B ‐ 40X60 DCon9 5 DCon8 0.04786 DCon13 0.04 DCon14 0 DCon14 0 No Message No Message
ROOF B23 B ‐ 40X60 DCon11 7 DCon8 0.04786 DCon13 0.04 DCon14 0 DCon14 0 No Message No Message
ROOF B24 B ‐ 40X60 DCon10 6 DCon8 0.07425 DCon14 0.04 DCon14 0 DCon14 0 No Message No Message
ROOF B24 B ‐ 40X60 DCon10 3 DCon13 0.1095 DCon14 0.04 DCon14 0 DCon14 0 No Message No Message
ROOF B24 B ‐ 40X60 DCon8 0.2168 DCon9 2 DCon14 0.04 DCon14 0 DCon14 0 No Message No Message
ROOF B24 B ‐ 40X60 DCon14 0.2747 DCon9 2 DCon10 0.04 DCon14 0 DCon14 0 No Message No Message
ROOF B24 B ‐ 40X60 DCon8 0.0474 DCon9 4 DCon14 0 DCon14 0 DCon14 0 No Message No Message
ROOF B24 B ‐ 40X60 DCon8 0.0474 DCon9 6 DCon14 0 DCon14 0 DCon14 0 No Message No Message
ROOF B24 B ‐ 40X60 DCon8 0.03601 DCon9 6 DCon14 0 DCon14 0 DCon14 0 No Message No Message
ROOF B24 B ‐ 40X60 DCon8 0.03601 DCon2 6 DCon14 0 DCon14 0 DCon14 0 No Message No Message
ROOF B24 B ‐ 40X60 DCon8 0.03601 DCon2 7 DCon14 0 DCon14 0 DCon14 0 No Message No Message
ROOF B24 B ‐ 40X60 DCon8 0.03034 DCon2 7 DCon14 0 DCon14 0 DCon14 0 No Message No Message
ROOF B24 B ‐ 40X60 DCon8 0.03034 DCon2 5 DCon14 0 DCon14 0 DCon14 0 No Message No Message
ROOF B24 B ‐ 40X60 DCon8 0.03034 DCon2 4 DCon14 0 DCon14 0 DCon14 0 No Message No Message
ROOF B24 B ‐ 40X60 DCon8 0.0301 DCon2 4 DCon12 0.04 DCon14 0 DCon14 0 No Message No Message
ROOF B24 B ‐ 40X60 DCon8 0.0301 DCon10 1 DCon12 0.04 DCon14 0 DCon14 0 No Message No Message
ROOF B24 B ‐ 40X60 DCon9 3 DCon8 0.0301 DCon12 0.04 DCon14 0 DCon14 0 No Message No Message
ROOF B24 B ‐ 40X60 DCon9 3 DCon8 0.03849 DCon14 0.04 DCon14 0 DCon14 0 No Message No Message
ROOF B24 B ‐ 40X60 DCon9 6 DCon8 0.03849 DCon14 0.04 DCon14 0 DCon14 0 No Message No Message
ROOF B24 B ‐ 40X60 DCon11 7 DCon8 0.03849 DCon14 0.04 DCon14 0 DCon14 0 No Message No Message
ROOF B25 B ‐ 40X60 DCon10 3 DCon13 0.4552 DCon12 0.04 DCon14 0 DCon14 0 No Message No Message
ROOF B25 B ‐ 40X60 DCon14 1 DCon13 1 DCon10 0.04 DCon14 0 DCon14 0 No Message No Message
Page 81 of 281

ROOF B25 B ‐ 40X60 DCon8 0.1551 DCon9 2 DCon10 0.04 DCon14 0 DCon14 0 No Message No Message
ROOF B25 B ‐ 40X60 DCon8 0.1078 DCon9 2 DCon14 0 DCon14 0 DCon14 0 No Message No Message
ROOF B25 B ‐ 40X60 DCon8 0.1078 DCon9 3 DCon14 0 DCon14 0 DCon14 0 No Message No Message

ISSUED FOR CONSTRUCTION (IFC)

26 JAN 2022
A9 ‐ RC BEAMS DESIGN.xlsx
Calculation Report, OPERATION SHELTER, Plant Plant No. 015

Design  As Top  As Top As Bottom  As Bottom At Shear Torsion Long  Al Torsion Torsion Tran  At Torsion
Story Label V Combo Warnings Errors
Section Combo cm² Combo cm² cm²/cm Combo cm² Combo cm²/cm
ROOF B25 B ‐ 40X60 DCon8 0.1078 DCon9 3 DCon14 0 DCon14 0 DCon14 0 No Message No Message
ROOF B25 B ‐ 40X60 DCon8 0.0818 DCon9 3 DCon14 0 DCon14 0 DCon14 0 No Message No Message
ROOF B25 B ‐ 40X60 DCon8 0.0818 DCon1 3 DCon14 0 DCon14 0 DCon14 0 No Message No Message
ROOF B25 B ‐ 40X60 DCon8 0.0818 DCon2 3 DCon14 0 DCon14 0 DCon14 0 No Message No Message
ROOF B25 B ‐ 40X60 DCon8 0.06792 DCon2 3 DCon14 0 DCon14 0 DCon14 0 No Message No Message
ROOF B25 B ‐ 40X60 DCon8 0.06792 DCon10 2 DCon14 0 DCon14 0 DCon14 0 No Message No Message
ROOF B25 B ‐ 40X60 DCon9 1 DCon14 1 DCon14 0 DCon14 0 DCon14 0 No Message No Message
ROOF B25 B ‐ 40X60 DCon9 1 DCon14 1 DCon11 0.04 DCon14 0 DCon14 0 No Message No Message
ROOF B25 B ‐ 40X60 DCon9 3 DCon8 0.06094 DCon11 0.04 DCon14 0 DCon14 0 No Message No Message
ROOF B25 B ‐ 40X60 DCon9 4 DCon8 0.06094 DCon11 0.04 DCon14 0 DCon14 0 No Message No Message
ROOF B26 B ‐ 40X60 DCon10 4 DCon8 0.04225 DCon10 0.04 DCon14 0 DCon14 0 No Message No Message
ROOF B26 B ‐ 40X60 DCon10 2 DCon8 0.04225 DCon10 0.04 DCon14 0 DCon14 0 No Message No Message
ROOF B26 B ‐ 40X60 DCon10 1 DCon13 0.4894 DCon14 0 DCon14 0 DCon14 0 No Message No Message
ROOF B26 B ‐ 40X60 DCon10 1 DCon13 0.487 DCon14 0 DCon14 0 DCon14 0 No Message No Message
ROOF B26 B ‐ 40X60 DCon8 0.04105 DCon9 1 DCon14 0 DCon14 0 DCon14 0 No Message No Message
ROOF B26 B ‐ 40X60 DCon8 0.04105 DCon2 2 DCon14 0 DCon14 0 DCon14 0 No Message No Message
ROOF B26 B ‐ 40X60 DCon8 0.04016 DCon2 2 DCon14 0 DCon14 0 DCon14 0 No Message No Message
ROOF B26 B ‐ 40X60 DCon8 0.04016 DCon2 2 DCon14 0 DCon14 0 DCon14 0 No Message No Message
ROOF B26 B ‐ 40X60 DCon8 0.04016 DCon2 2 DCon14 0 DCon14 0 DCon14 0 No Message No Message
ROOF B26 B ‐ 40X60 DCon8 0.04104 DCon10 2 DCon14 0 DCon14 0 DCon14 0 No Message No Message
ROOF B26 B ‐ 40X60 DCon8 0.04104 DCon10 2 DCon14 0 DCon14 0 DCon14 0 No Message No Message
ROOF B26 B ‐ 40X60 DCon13 1 DCon10 1 DCon14 0 DCon14 0 DCon14 0 No Message No Message
ROOF B26 B ‐ 40X60 DCon13 1 DCon14 1 DCon14 0 DCon14 0 DCon14 0 No Message No Message
ROOF B26 B ‐ 40X60 DCon9 2 DCon14 0.1085 DCon14 0 DCon14 0 DCon14 0 No Message No Message
ROOF B26 B ‐ 40X60 DCon9 3 DCon8 0.04396 DCon14 0 DCon14 0 DCon14 0 No Message No Message
ROOF B27 B ‐ 40X60 DCon10 3 DCon13 0.05757 DCon14 0 DCon14 0 DCon14 0 No Message No Message
ROOF B27 B ‐ 40X60 DCon10 2 DCon13 0.4608 DCon14 0 DCon14 0 DCon14 0 No Message No Message
ROOF B27 B ‐ 40X60 DCon14 0.3327 DCon9 1 DCon14 0 DCon14 0 DCon14 0 No Message No Message
ROOF B27 B ‐ 40X60 DCon14 0.3266 DCon9 1 DCon14 0 DCon14 0 DCon14 0 No Message No Message
ROOF B27 B ‐ 40X60 DCon8 0.03673 DCon9 2 DCon14 0 DCon14 0 DCon14 0 No Message No Message
ROOF B27 B ‐ 40X60 DCon8 0.03673 DCon2 2 DCon14 0 DCon14 0 DCon14 0 No Message No Message
ROOF B27 B ‐ 40X60 DCon4 0.04657 DCon2 2 DCon14 0 DCon14 0 DCon14 0 No Message No Message
ROOF B27 B ‐ 40X60 DCon4 0.04657 DCon2 2 DCon14 0 DCon14 0 DCon14 0 No Message No Message
ROOF B27 B ‐ 40X60 DCon4 0.04657 DCon2 1 DCon14 0 DCon14 0 DCon14 0 No Message No Message
ROOF B27 B ‐ 40X60 DCon4 0.07377 DCon2 1 DCon14 0 DCon14 0 DCon14 0 No Message No Message
ROOF B27 B ‐ 40X60 DCon9 2 DCon4 0.07377 DCon14 0 DCon14 0 DCon14 0 No Message No Message
ROOF B27 B ‐ 40X60 DCon9 4 DCon4 0.07377 DCon14 0 DCon14 0 DCon14 0 No Message No Message
ROOF B27 B ‐ 40X60 DCon9 4 DCon4 0.1343 DCon12 0.04 DCon14 0 DCon14 0 No Message No Message
ROOF B27 B ‐ 40X60 DCon9 6 DCon4 0.1343 DCon12 0.04 DCon14 0 DCon14 0 No Message No Message
ROOF B27 B ‐ 40X60 DCon11 7 DCon4 0.1343 DCon12 0.04 DCon14 0 DCon14 0 No Message No Message
Page 82 of 281

ROOF B28 B ‐ 40X60 DCon10 7 DCon8 0.03477 DCon14 0.04 DCon14 0 DCon14 0 No Message No Message
ROOF B28 B ‐ 40X60 DCon10 5 DCon8 0.03477 DCon14 0.04 DCon14 0 DCon14 0 No Message No Message
ROOF B28 B ‐ 40X60 DCon10 2 DCon8 0.03477 DCon14 0.04 DCon14 0 DCon14 0 No Message No Message

ISSUED FOR CONSTRUCTION (IFC)

26 JAN 2022
A9 ‐ RC BEAMS DESIGN.xlsx
Calculation Report, OPERATION SHELTER, Plant Plant No. 015

Design  As Top  As Top As Bottom  As Bottom At Shear Torsion Long  Al Torsion Torsion Tran  At Torsion
Story Label V Combo Warnings Errors
Section Combo cm² Combo cm² cm²/cm Combo cm² Combo cm²/cm
ROOF B28 B ‐ 40X60 DCon10 2 DCon8 0.01101 DCon10 0.04 DCon14 0 DCon14 0 No Message No Message
ROOF B28 B ‐ 40X60 DCon8 0.01101 DCon9 2 DCon14 0 DCon14 0 DCon14 0 No Message No Message
ROOF B28 B ‐ 40X60 DCon8 0.01101 DCon2 4 DCon14 0 DCon14 0 DCon14 0 No Message No Message
ROOF B28 B ‐ 40X60 DCon8 0 DCon2 4 DCon14 0 DCon14 0 DCon14 0 No Message No Message
ROOF B28 B ‐ 40X60 DCon8 0 DCon2 4 DCon14 0 DCon14 0 DCon14 0 No Message No Message
ROOF B28 B ‐ 40X60 DCon8 0 DCon2 5 DCon14 0 DCon14 0 DCon14 0 No Message No Message
ROOF B28 B ‐ 40X60 DCon8 0 DCon2 5 DCon14 0 DCon14 0 DCon14 0 No Message No Message
ROOF B28 B ‐ 40X60 DCon8 0 DCon10 5 DCon14 0 DCon14 0 DCon14 0 No Message No Message
ROOF B28 B ‐ 40X60 DCon8 0 DCon10 4 DCon14 0 DCon14 0 DCon14 0 No Message No Message
ROOF B28 B ‐ 40X60 DCon8 0 DCon10 4 DCon14 0 DCon14 0 DCon14 0 No Message No Message
ROOF B28 B ‐ 40X60 DCon8 0 DCon10 3 DCon14 0 DCon14 0 DCon14 0 No Message No Message
ROOF B28 B ‐ 40X60 DCon13 1 DCon10 2 DCon14 0 DCon14 0 DCon14 0 No Message No Message
ROOF B28 B ‐ 40X60 DCon13 1 DCon10 1 DCon12 0.04 DCon14 0 DCon14 0 No Message No Message
ROOF B28 B ‐ 40X60 DCon9 3 DCon14 0.4495 DCon12 0.04 DCon14 0 DCon14 0 No Message No Message
ROOF B28 B ‐ 40X60 DCon9 5 DCon8 0 DCon13 0.04 DCon14 0 DCon14 0 No Message No Message
ROOF B29 B ‐ 40X60 DCon12 7 DCon4 0.2515 DCon14 0.04 DCon14 0 DCon14 0 No Message No Message
ROOF B29 B ‐ 40X60 DCon10 7 DCon4 0.2515 DCon14 0.04 DCon14 0 DCon14 0 No Message No Message
ROOF B29 B ‐ 40X60 DCon10 4 DCon4 0.2515 DCon14 0.04 DCon14 0 DCon14 0 No Message No Message
ROOF B29 B ‐ 40X60 DCon10 4 DCon4 0.1629 DCon10 0.04 DCon14 0 DCon14 0 No Message No Message
ROOF B29 B ‐ 40X60 DCon10 2 DCon4 0.1629 DCon10 0.04 DCon14 0 DCon14 0 No Message No Message
ROOF B29 B ‐ 40X60 DCon4 0.1629 DCon10 1 DCon14 0 DCon14 0 DCon14 0 No Message No Message
ROOF B29 B ‐ 40X60 DCon8 0.1428 DCon10 1 DCon14 0 DCon14 0 DCon14 0 No Message No Message
ROOF B29 B ‐ 40X60 DCon8 0.1428 DCon10 2 DCon14 0 DCon14 0 DCon14 0 No Message No Message
ROOF B29 B ‐ 40X60 DCon13 0.2071 DCon10 3 DCon14 0 DCon14 0 DCon14 0 No Message No Message
ROOF B29 B ‐ 40X60 DCon8 0.1786 DCon10 3 DCon14 0 DCon14 0 DCon14 0 No Message No Message
ROOF B29 B ‐ 40X60 DCon13 1 DCon10 2 DCon14 0 DCon14 0 DCon14 0 No Message No Message
ROOF B29 B ‐ 40X60 DCon13 2 DCon10 2 DCon14 0 DCon14 0 DCon14 0 No Message No Message
ROOF B30 B ‐ 40X60 DCon10 5 DCon8 0.02072 DCon14 0.04 DCon14 0 DCon14 0 No Message No Message
ROOF B30 B ‐ 40X60 DCon10 3 DCon13 0.163 DCon14 0.04 DCon14 0 DCon14 0 No Message No Message
ROOF B30 B ‐ 40X60 DCon14 0.3489 DCon9 2 DCon14 0.04 DCon14 0 DCon14 0 No Message No Message
ROOF B30 B ‐ 40X60 DCon14 0.4362 DCon9 2 DCon14 0 DCon14 0 DCon14 0 No Message No Message
ROOF B30 B ‐ 40X60 DCon8 0.01574 DCon9 3 DCon14 0 DCon14 0 DCon14 0 No Message No Message
ROOF B30 B ‐ 40X60 DCon8 0.01574 DCon9 5 DCon14 0 DCon14 0 DCon14 0 No Message No Message
ROOF B30 B ‐ 40X60 DCon8 0.01546 DCon9 5 DCon14 0 DCon14 0 DCon14 0 No Message No Message
ROOF B30 B ‐ 40X60 DCon8 0.01546 DCon2 5 DCon14 0 DCon14 0 DCon14 0 No Message No Message
ROOF B30 B ‐ 40X60 DCon8 0.01546 DCon2 6 DCon14 0 DCon14 0 DCon14 0 No Message No Message
ROOF B30 B ‐ 40X60 DCon8 0.01739 DCon2 6 DCon14 0 DCon14 0 DCon14 0 No Message No Message
ROOF B30 B ‐ 40X60 DCon8 0.01739 DCon2 5 DCon14 0 DCon14 0 DCon14 0 No Message No Message
ROOF B30 B ‐ 40X60 DCon8 0.01739 DCon2 4 DCon14 0 DCon14 0 DCon14 0 No Message No Message
ROOF B30 B ‐ 40X60 DCon8 0.02133 DCon2 4 DCon11 0.04 DCon14 0 DCon14 0 No Message No Message
Page 83 of 281

ROOF B30 B ‐ 40X60 DCon8 0.02133 DCon10 1 DCon11 0.04 DCon14 0 DCon14 0 No Message No Message
ROOF B30 B ‐ 40X60 DCon9 2 DCon8 0.02133 DCon11 0.04 DCon14 0 DCon14 0 No Message No Message
ROOF B30 B ‐ 40X60 DCon9 3 DCon8 0.0316 DCon14 0.04 DCon14 0 DCon14 0 No Message No Message

ISSUED FOR CONSTRUCTION (IFC)

26 JAN 2022
A9 ‐ RC BEAMS DESIGN.xlsx
Calculation Report, OPERATION SHELTER, Plant Plant No. 015

Design  As Top  As Top As Bottom  As Bottom At Shear Torsion Long  Al Torsion Torsion Tran  At Torsion
Story Label V Combo Warnings Errors
Section Combo cm² Combo cm² cm²/cm Combo cm² Combo cm²/cm
ROOF B30 B ‐ 40X60 DCon9 5 DCon8 0.0316 DCon14 0.04 DCon14 0 DCon14 0 No Message No Message
ROOF B30 B ‐ 40X60 DCon11 7 DCon8 0.0316 DCon14 0.04 DCon14 0 DCon14 0 No Message No Message
ROOF B31 B ‐ 40X60 DCon10 6 DCon8 0.03057 DCon12 0.04 DCon14 0 DCon14 0 No Message No Message
ROOF B31 B ‐ 40X60 DCon10 4 DCon8 0.03057 DCon12 0.04 DCon14 0 DCon14 0 No Message No Message
ROOF B31 B ‐ 40X60 DCon10 2 DCon8 0.03057 DCon12 0.04 DCon14 0 DCon14 0 No Message No Message
ROOF B31 B ‐ 40X60 DCon10 2 DCon8 0.02147 DCon14 0 DCon14 0 DCon14 0 No Message No Message
ROOF B31 B ‐ 40X60 DCon14 0.3982 DCon9 1 DCon14 0 DCon14 0 DCon14 0 No Message No Message
ROOF B31 B ‐ 40X60 DCon8 0.02147 DCon2 2 DCon14 0 DCon14 0 DCon14 0 No Message No Message
ROOF B31 B ‐ 40X60 DCon8 0.01781 DCon2 2 DCon14 0 DCon14 0 DCon14 0 No Message No Message
ROOF B31 B ‐ 40X60 DCon8 0.01781 DCon2 2 DCon14 0 DCon14 0 DCon14 0 No Message No Message
ROOF B31 B ‐ 40X60 DCon8 0.01781 DCon2 2 DCon14 0 DCon14 0 DCon14 0 No Message No Message
ROOF B31 B ‐ 40X60 DCon14 0.02405 DCon2 2 DCon14 0 DCon14 0 DCon14 0 No Message No Message
ROOF B31 B ‐ 40X60 DCon14 0.02405 DCon10 2 DCon14 0 DCon14 0 DCon14 0 No Message No Message
ROOF B31 B ‐ 40X60 DCon13 1 DCon10 1 DCon14 0 DCon14 0 DCon14 0 No Message No Message
ROOF B31 B ‐ 40X60 DCon13 1 DCon14 1 DCon14 0 DCon14 0 DCon14 0 No Message No Message
ROOF B31 B ‐ 40X60 DCon9 2 DCon14 0.1719 DCon14 0 DCon14 0 DCon14 0 No Message No Message
ROOF B31 B ‐ 40X60 DCon9 3 DCon14 0.05347 DCon14 0 DCon14 0 DCon14 0 No Message No Message
ROOF B32 B ‐ 40X60 DCon10 4 DCon14 0 DCon14 0 DCon14 0 DCon14 0 No Message No Message
ROOF B32 B ‐ 40X60 DCon10 2 DCon13 0.02839 DCon14 0 DCon14 0 DCon14 0 No Message No Message
ROOF B32 B ‐ 40X60 DCon10 1 DCon13 1 DCon14 0 DCon14 0 DCon14 0 No Message No Message
ROOF B32 B ‐ 40X60 DCon14 1 DCon13 1 DCon14 0 DCon14 0 DCon14 0 No Message No Message
ROOF B32 B ‐ 40X60 DCon14 0 DCon9 1 DCon14 0 DCon14 0 DCon14 0 No Message No Message
ROOF B32 B ‐ 40X60 DCon14 0 DCon9 2 DCon14 0 DCon14 0 DCon14 0 No Message No Message
ROOF B32 B ‐ 40X60 DCon14 0 DCon2 2 DCon14 0 DCon14 0 DCon14 0 No Message No Message
ROOF B32 B ‐ 40X60 DCon14 0 DCon2 2 DCon14 0 DCon14 0 DCon14 0 No Message No Message
ROOF B32 B ‐ 40X60 DCon14 0 DCon2 2 DCon14 0 DCon14 0 DCon14 0 No Message No Message
ROOF B32 B ‐ 40X60 DCon14 0.009181 DCon10 2 DCon14 0 DCon14 0 DCon14 0 No Message No Message
ROOF B32 B ‐ 40X60 DCon14 0.009181 DCon10 1 DCon14 0 DCon14 0 DCon14 0 No Message No Message
ROOF B32 B ‐ 40X60 DCon9 1 DCon14 1 DCon14 0 DCon14 0 DCon14 0 No Message No Message
ROOF B32 B ‐ 40X60 DCon9 1 DCon14 1 DCon14 0 DCon14 0 DCon14 0 No Message No Message
ROOF B32 B ‐ 40X60 DCon9 2 DCon14 0.03958 DCon14 0 DCon14 0 DCon14 0 No Message No Message
ROOF B32 B ‐ 40X60 DCon9 4 DCon14 0.03958 DCon9 0.04 DCon14 0 DCon14 0 No Message No Message
ROOF B33 B ‐ 40X60 DCon10 4 DCon13 0.01676 DCon10 0.04 DCon14 0 DCon14 0 No Message No Message
ROOF B33 B ‐ 40X60 DCon10 2 DCon13 0.2859 DCon14 0 DCon14 0 DCon14 0 No Message No Message
ROOF B33 B ‐ 40X60 DCon14 0.3218 DCon9 1 DCon14 0 DCon14 0 DCon14 0 No Message No Message
ROOF B33 B ‐ 40X60 DCon14 0.3071 DCon9 1 DCon14 0 DCon14 0 DCon14 0 No Message No Message
ROOF B33 B ‐ 40X60 DCon14 0 DCon9 2 DCon14 0 DCon14 0 DCon14 0 No Message No Message
ROOF B33 B ‐ 40X60 DCon14 0 DCon1 2 DCon14 0 DCon14 0 DCon14 0 No Message No Message
ROOF B33 B ‐ 40X60 DCon14 0 DCon1 2 DCon14 0 DCon14 0 DCon14 0 No Message No Message
ROOF B33 B ‐ 40X60 DCon14 0 DCon10 2 DCon14 0 DCon14 0 DCon14 0 No Message No Message
Page 84 of 281

ROOF B33 B ‐ 40X60 DCon14 0 DCon10 2 DCon14 0 DCon14 0 DCon14 0 No Message No Message
ROOF B33 B ‐ 40X60 DCon14 0 DCon10 2 DCon14 0 DCon14 0 DCon14 0 No Message No Message
ROOF B33 B ‐ 40X60 DCon13 1 DCon10 1 DCon14 0 DCon14 0 DCon14 0 No Message No Message

ISSUED FOR CONSTRUCTION (IFC)

26 JAN 2022
A9 ‐ RC BEAMS DESIGN.xlsx
Calculation Report, OPERATION SHELTER, Plant Plant No. 015

Design  As Top  As Top As Bottom  As Bottom At Shear Torsion Long  Al Torsion Torsion Tran  At Torsion
Story Label V Combo Warnings Errors
Section Combo cm² Combo cm² cm²/cm Combo cm² Combo cm²/cm
ROOF B33 B ‐ 40X60 DCon9 2 DCon14 1 DCon14 0 DCon14 0 DCon14 0 No Message No Message
ROOF B34 B ‐ 40X60 DCon10 7 DCon8 0.03651 DCon14 0.04 DCon14 0 DCon14 0 No Message No Message
ROOF B34 B ‐ 40X60 DCon10 5 DCon8 0.03651 DCon14 0.04 DCon14 0 DCon14 0 No Message No Message
ROOF B34 B ‐ 40X60 DCon10 2 DCon8 0.03651 DCon12 0.04 DCon14 0 DCon14 0 No Message No Message
ROOF B34 B ‐ 40X60 DCon10 2 DCon8 0.0138 DCon14 0 DCon14 0 DCon14 0 No Message No Message
ROOF B34 B ‐ 40X60 DCon8 0.0138 DCon9 1 DCon14 0 DCon14 0 DCon14 0 No Message No Message
ROOF B34 B ‐ 40X60 DCon8 0.0138 DCon2 3 DCon14 0 DCon14 0 DCon14 0 No Message No Message
ROOF B34 B ‐ 40X60 DCon8 0.006216 DCon2 4 DCon14 0 DCon14 0 DCon14 0 No Message No Message
ROOF B34 B ‐ 40X60 DCon8 0.006216 DCon2 4 DCon14 0 DCon14 0 DCon14 0 No Message No Message
ROOF B34 B ‐ 40X60 DCon8 0.006216 DCon2 5 DCon14 0 DCon14 0 DCon14 0 No Message No Message
ROOF B34 B ‐ 40X60 DCon8 0 DCon2 5 DCon14 0 DCon14 0 DCon14 0 No Message No Message
ROOF B34 B ‐ 40X60 DCon8 0 DCon10 5 DCon14 0 DCon14 0 DCon14 0 No Message No Message
ROOF B34 B ‐ 40X60 DCon8 0 DCon10 4 DCon14 0 DCon14 0 DCon14 0 No Message No Message
ROOF B34 B ‐ 40X60 DCon8 0 DCon10 4 DCon14 0 DCon14 0 DCon14 0 No Message No Message
ROOF B34 B ‐ 40X60 DCon8 0 DCon10 3 DCon14 0 DCon14 0 DCon14 0 No Message No Message
ROOF B34 B ‐ 40X60 DCon13 1 DCon10 1 DCon14 0 DCon14 0 DCon14 0 No Message No Message
ROOF B34 B ‐ 40X60 DCon13 1 DCon10 1 DCon12 0.04 DCon14 0 DCon14 0 No Message No Message
ROOF B34 B ‐ 40X60 DCon9 3 DCon14 0.3458 DCon12 0.04 DCon14 0 DCon14 0 No Message No Message
ROOF B34 B ‐ 40X60 DCon9 5 DCon14 0 DCon12 0.04 DCon14 0 DCon14 0 No Message No Message
ROOF B35 B ‐ 40X60 DCon10 7 DCon8 0.03956 DCon14 0.04 DCon14 0 DCon14 0 No Message No Message
ROOF B35 B ‐ 40X60 DCon10 5 DCon8 0.03956 DCon14 0.04 DCon14 0 DCon14 0 No Message No Message
ROOF B35 B ‐ 40X60 DCon10 2 DCon8 0.03956 DCon12 0.04 DCon14 0 DCon14 0 No Message No Message
ROOF B35 B ‐ 40X60 DCon10 2 DCon13 0.01832 DCon14 0 DCon14 0 DCon14 0 No Message No Message
ROOF B35 B ‐ 40X60 DCon8 0.01368 DCon9 1 DCon14 0 DCon14 0 DCon14 0 No Message No Message
ROOF B35 B ‐ 40X60 DCon8 0.01368 DCon2 3 DCon14 0 DCon14 0 DCon14 0 No Message No Message
ROOF B35 B ‐ 40X60 DCon8 0.006545 DCon2 3 DCon14 0 DCon14 0 DCon14 0 No Message No Message
ROOF B35 B ‐ 40X60 DCon8 0.006545 DCon2 4 DCon14 0 DCon14 0 DCon14 0 No Message No Message
ROOF B35 B ‐ 40X60 DCon8 0.006545 DCon2 5 DCon14 0 DCon14 0 DCon14 0 No Message No Message
ROOF B35 B ‐ 40X60 DCon8 0 DCon2 5 DCon14 0 DCon14 0 DCon14 0 No Message No Message
ROOF B35 B ‐ 40X60 DCon8 0 DCon10 4 DCon14 0 DCon14 0 DCon14 0 No Message No Message
ROOF B35 B ‐ 40X60 DCon8 0 DCon10 4 DCon14 0 DCon14 0 DCon14 0 No Message No Message
ROOF B35 B ‐ 40X60 DCon8 0.006267 DCon10 4 DCon14 0 DCon14 0 DCon14 0 No Message No Message
ROOF B35 B ‐ 40X60 DCon8 0.006267 DCon10 3 DCon14 0 DCon14 0 DCon14 0 No Message No Message
ROOF B35 B ‐ 40X60 DCon13 1 DCon10 1 DCon14 0 DCon14 0 DCon14 0 No Message No Message
ROOF B35 B ‐ 40X60 DCon13 1 DCon14 1 DCon12 0.04 DCon14 0 DCon14 0 No Message No Message
ROOF B35 B ‐ 40X60 DCon9 3 DCon14 0.3818 DCon12 0.04 DCon14 0 DCon14 0 No Message No Message
ROOF B35 B ‐ 40X60 DCon9 5 DCon8 0.007788 DCon12 0.04 DCon14 0 DCon14 0 No Message No Message
ROOF B21 B ‐ 40X60 DCon1 10 DCon14 0 DCon14 0.04 DCon14 0 DCon14 0 No Message No Message
ROOF B21 B ‐ 40X60 DCon12 7 DCon14 0 DCon14 0.04 DCon14 0 DCon14 0 No Message No Message
ROOF B21 B ‐ 40X60 DCon10 6 DCon14 0 DCon14 0.04 DCon14 0 DCon14 0 No Message No Message
Page 85 of 281

ROOF B21 B ‐ 40X60 DCon10 5 DCon14 0 DCon14 0.04 DCon14 0 DCon14 0 No Message No Message
ROOF B21 B ‐ 40X60 DCon10 1 DCon14 0 DCon14 0.04 DCon14 0 DCon14 0 No Message No Message
ROOF B21 B ‐ 40X60 DCon14 0 DCon2 3 DCon14 0.04 DCon14 0 DCon14 0 No Message No Message

ISSUED FOR CONSTRUCTION (IFC)

26 JAN 2022
A9 ‐ RC BEAMS DESIGN.xlsx
Calculation Report, OPERATION SHELTER, Plant Plant No. 015

Design  As Top  As Top As Bottom  As Bottom At Shear Torsion Long  Al Torsion Torsion Tran  At Torsion
Story Label V Combo Warnings Errors
Section Combo cm² Combo cm² cm²/cm Combo cm² Combo cm²/cm
ROOF B21 B ‐ 40X60 DCon14 0 DCon2 4 DCon2 0.04 DCon14 0 DCon14 0 No Message No Message
ROOF B21 B ‐ 40X60 DCon14 0 DCon2 6 DCon1 0.04 DCon14 0 DCon14 0 No Message No Message
ROOF B21 B ‐ 40X60 DCon14 0 DCon9 7 DCon14 0 DCon14 0 DCon14 0 No Message No Message
ROOF B21 B ‐ 40X60 DCon14 0 DCon9 7 DCon14 0 DCon14 0 DCon14 0 No Message No Message
ROOF B21 B ‐ 40X60 DCon14 0 DCon12 7 DCon14 0 DCon14 0 DCon14 0 No Message No Message
ROOF B21 B ‐ 40X60 DCon14 0 DCon12 7 DCon14 0 DCon14 0 DCon14 0 No Message No Message
ROOF B21 B ‐ 40X60 DCon14 0 DCon12 7 DCon14 0 DCon14 0 DCon14 0 No Message No Message
ROOF B21 B ‐ 40X60 DCon14 0 DCon10 7 DCon14 0 DCon14 0 DCon14 0 No Message No Message
ROOF B21 B ‐ 40X60 DCon14 0 DCon2 7 DCon14 0 DCon14 0 DCon14 0 No Message No Message
ROOF B21 B ‐ 40X60 DCon14 0 DCon2 7 DCon14 0 DCon14 0 DCon14 0 No Message No Message
ROOF B21 B ‐ 40X60 DCon14 0 DCon2 5 DCon14 0 DCon14 0 DCon14 0 No Message No Message
ROOF B21 B ‐ 40X60 DCon14 0 DCon2 3 DCon14 0 DCon14 0 DCon14 0 No Message No Message
ROOF B21 B ‐ 40X60 DCon14 0 DCon2 3 DCon2 0.04 DCon14 0 DCon14 0 No Message No Message
ROOF B21 B ‐ 40X60 DCon9 0.09949 DCon2 0.09941 DCon10 0.04 DCon14 0 DCon14 0 No Message No Message
ROOF B21 B ‐ 40X60 DCon1 3 DCon14 0 DCon10 0.04 DCon14 0 DCon14 0 No Message No Message
ROOF B36 B ‐ 40X60 DCon1 3 DCon14 0 DCon14 0 DCon14 0 DCon14 0 No Message No Message
ROOF B36 B ‐ 40X60 DCon9 1 DCon14 0 DCon14 0 DCon14 0 DCon14 0 No Message No Message
ROOF B36 B ‐ 40X60 DCon9 0.1267 DCon2 0.05538 DCon14 0 DCon14 0 DCon14 0 No Message No Message
ROOF B36 B ‐ 40X60 DCon4 0.05306 DCon2 0.09572 DCon14 0 DCon14 0 DCon14 0 No Message No Message
ROOF B36 B ‐ 40X60 DCon14 0 DCon2 1 DCon14 0 DCon14 0 DCon14 0 No Message No Message
ROOF B36 B ‐ 40X60 DCon14 0 DCon2 2 DCon14 0 DCon14 0 DCon14 0 No Message No Message
ROOF B36 B ‐ 40X60 DCon14 0 DCon2 2 DCon14 0 DCon14 0 DCon14 0 No Message No Message
ROOF B36 B ‐ 40X60 DCon14 0 DCon2 1 DCon14 0 DCon14 0 DCon14 0 No Message No Message
ROOF B36 B ‐ 40X60 DCon14 0 DCon2 1 DCon14 0 DCon14 0 DCon14 0 No Message No Message
ROOF B36 B ‐ 40X60 DCon14 0 DCon2 1 DCon14 0 DCon14 0 DCon14 0 No Message No Message
ROOF B36 B ‐ 40X60 DCon9 2 DCon14 0 DCon14 0 DCon14 0 DCon14 0 No Message No Message
ROOF B36 B ‐ 40X60 DCon9 3 DCon14 0 DCon14 0 DCon14 0 DCon14 0 No Message No Message
ROOF B36 B ‐ 40X60 DCon9 3 DCon14 0 DCon12 0.04 DCon14 0 DCon14 0 No Message No Message
ROOF B36 B ‐ 40X60 DCon9 6 DCon14 0 DCon12 0.04 DCon14 0 DCon14 0 No Message No Message
ROOF B36 B ‐ 40X60 DCon9 7 DCon14 0 DCon12 0.04 DCon14 0 DCon14 0 No Message No Message
ROOF B37 B ‐ 40X60 DCon10 8 DCon14 0 DCon14 0.04 DCon14 0 DCon14 0 No Message No Message
ROOF B37 B ‐ 40X60 DCon4 7 DCon14 0 DCon14 0.04 DCon14 0 DCon14 0 No Message No Message
ROOF B37 B ‐ 40X60 DCon4 3 DCon14 0 DCon14 0.04 DCon14 0 DCon14 0 No Message No Message
ROOF B37 B ‐ 40X60 DCon10 3 DCon14 0 DCon14 0.04 DCon14 0 DCon14 0 No Message No Message
ROOF B37 B ‐ 40X60 DCon14 0 DCon2 2 DCon14 0.04 DCon14 0 DCon14 0 No Message No Message
ROOF B37 B ‐ 40X60 DCon14 0 DCon2 6 DCon14 0.04 DCon14 0 DCon14 0 No Message No Message
ROOF B37 B ‐ 40X60 DCon14 0 DCon2 6 DCon14 0 DCon14 0 DCon14 0 No Message No Message
ROOF B37 B ‐ 40X60 DCon14 0 DCon9 7 DCon14 0 DCon14 0 DCon14 0 No Message No Message
ROOF B37 B ‐ 40X60 DCon14 0 DCon2 8 DCon14 0 DCon14 0 DCon14 0 No Message No Message
ROOF B37 B ‐ 40X60 DCon14 0 DCon2 8 DCon14 0 DCon14 0 DCon14 0 No Message No Message
Page 86 of 281

ROOF B37 B ‐ 40X60 DCon14 0 DCon2 8 DCon14 0 DCon14 0 DCon14 0 No Message No Message
ROOF B37 B ‐ 40X60 DCon14 0 DCon2 9 DCon14 0 DCon14 0 DCon14 0 No Message No Message
ROOF B37 B ‐ 40X60 DCon14 0 DCon2 9 DCon14 0 DCon14 0 DCon14 0 No Message No Message

ISSUED FOR CONSTRUCTION (IFC)

26 JAN 2022
A9 ‐ RC BEAMS DESIGN.xlsx
Calculation Report, OPERATION SHELTER, Plant Plant No. 015

Design  As Top  As Top As Bottom  As Bottom At Shear Torsion Long  Al Torsion Torsion Tran  At Torsion
Story Label V Combo Warnings Errors
Section Combo cm² Combo cm² cm²/cm Combo cm² Combo cm²/cm
ROOF B37 B ‐ 40X60 DCon14 0 DCon2 8 DCon14 0 DCon14 0 DCon14 0 No Message No Message
ROOF B37 B ‐ 40X60 DCon14 0 DCon2 8 DCon14 0 DCon14 0 DCon14 0 No Message No Message
ROOF B37 B ‐ 40X60 DCon14 0 DCon2 8 DCon14 0 DCon14 0 DCon14 0 No Message No Message
ROOF B37 B ‐ 40X60 DCon14 0 DCon12 7 DCon14 0 DCon14 0 DCon14 0 No Message No Message
ROOF B37 B ‐ 40X60 DCon14 0 DCon2 7 DCon14 0 DCon14 0 DCon14 0 No Message No Message
ROOF B37 B ‐ 40X60 DCon14 0 DCon10 7 DCon14 0.04 DCon14 0 DCon14 0 No Message No Message
ROOF B37 B ‐ 40X60 DCon14 0 DCon2 2 DCon14 0.04 DCon14 0 DCon14 0 No Message No Message
ROOF B37 B ‐ 40X60 DCon9 5 DCon14 0 DCon14 0.04 DCon14 0 DCon14 0 No Message No Message
ROOF B37 B ‐ 40X60 DCon9 5 DCon14 0 DCon1 0.05 DCon11 12 DCon9 0.01 No Message No Message
ROOF B37 B ‐ 40X60 DCon1 8 DCon14 0 DCon1 0.06 DCon11 12 DCon9 0.01 No Message No Message
ROOF B37 B ‐ 40X60 DCon1 13 DCon14 0 DCon1 0.06 DCon11 12 DCon9 0.01 No Message No Message
ROOF B38 B ‐ 40X60 DCon10 5 DCon8 0.06578 DCon14 0.04 DCon14 0 DCon14 0 No Message No Message
ROOF B38 B ‐ 40X60 DCon10 2 DCon13 0.3277 DCon12 0.04 DCon14 0 DCon14 0 No Message No Message
ROOF B38 B ‐ 40X60 DCon14 0.4133 DCon9 2 DCon12 0.04 DCon14 0 DCon14 0 No Message No Message
ROOF B38 B ‐ 40X60 DCon14 1 DCon9 2 DCon14 0 DCon14 0 DCon14 0 No Message No Message
ROOF B38 B ‐ 40X60 DCon8 0.04268 DCon9 3 DCon14 0 DCon14 0 DCon14 0 No Message No Message
ROOF B38 B ‐ 40X60 DCon8 0.04268 DCon9 5 DCon14 0 DCon14 0 DCon14 0 No Message No Message
ROOF B38 B ‐ 40X60 DCon8 0.03417 DCon9 5 DCon14 0 DCon14 0 DCon14 0 No Message No Message
ROOF B38 B ‐ 40X60 DCon8 0.03417 DCon2 5 DCon14 0 DCon14 0 DCon14 0 No Message No Message
ROOF B38 B ‐ 40X60 DCon8 0.03417 DCon2 5 DCon14 0 DCon14 0 DCon14 0 No Message No Message
ROOF B38 B ‐ 40X60 DCon8 0.03188 DCon2 5 DCon14 0 DCon14 0 DCon14 0 No Message No Message
ROOF B38 B ‐ 40X60 DCon8 0.03188 DCon2 4 DCon14 0 DCon14 0 DCon14 0 No Message No Message
ROOF B38 B ‐ 40X60 DCon8 0.03188 DCon2 3 DCon14 0 DCon14 0 DCon14 0 No Message No Message
ROOF B38 B ‐ 40X60 DCon8 0.03523 DCon2 3 DCon9 0.04 DCon14 0 DCon14 0 No Message No Message
ROOF B38 B ‐ 40X60 DCon13 0.1323 DCon10 1 DCon9 0.04 DCon14 0 DCon14 0 No Message No Message
ROOF B38 B ‐ 40X60 DCon9 3 DCon8 0.03523 DCon11 0.04 DCon14 0 DCon14 0 No Message No Message
ROOF B38 B ‐ 40X60 DCon9 3 DCon8 0.05094 DCon13 0.04 DCon14 0 DCon14 0 No Message No Message
ROOF B38 B ‐ 40X60 DCon9 5 DCon8 0.05094 DCon13 0.04 DCon14 0 DCon14 0 No Message No Message
ROOF B38 B ‐ 40X60 DCon9 7 DCon8 0.05094 DCon13 0.04 DCon14 0 DCon14 0 No Message No Message
ROOF B39 B ‐ 40X60 DCon10 5 DCon8 0.0788 DCon12 0.04 DCon14 0 DCon14 0 No Message No Message
ROOF B39 B ‐ 40X60 DCon10 3 DCon13 0.3507 DCon12 0.04 DCon14 0 DCon14 0 No Message No Message
ROOF B39 B ‐ 40X60 DCon14 1 DCon9 2 DCon12 0.04 DCon14 0 DCon14 0 No Message No Message
ROOF B39 B ‐ 40X60 DCon14 1 DCon9 2 DCon14 0 DCon14 0 DCon14 0 No Message No Message
ROOF B39 B ‐ 40X60 DCon8 0.05027 DCon9 3 DCon14 0 DCon14 0 DCon14 0 No Message No Message
ROOF B39 B ‐ 40X60 DCon8 0.05027 DCon9 5 DCon14 0 DCon14 0 DCon14 0 No Message No Message
ROOF B39 B ‐ 40X60 DCon8 0.03613 DCon9 5 DCon14 0 DCon14 0 DCon14 0 No Message No Message
ROOF B39 B ‐ 40X60 DCon8 0.03613 DCon2 5 DCon14 0 DCon14 0 DCon14 0 No Message No Message
ROOF B39 B ‐ 40X60 DCon8 0.03613 DCon2 5 DCon14 0 DCon14 0 DCon14 0 No Message No Message
ROOF B39 B ‐ 40X60 DCon8 0.03222 DCon2 5 DCon14 0 DCon14 0 DCon14 0 No Message No Message
ROOF B39 B ‐ 40X60 DCon8 0.03222 DCon2 4 DCon14 0 DCon14 0 DCon14 0 No Message No Message
Page 87 of 281

ROOF B39 B ‐ 40X60 DCon8 0.03222 DCon2 3 DCon14 0 DCon14 0 DCon14 0 No Message No Message
ROOF B39 B ‐ 40X60 DCon8 0.03506 DCon2 3 DCon14 0 DCon14 0 DCon14 0 No Message No Message
ROOF B39 B ‐ 40X60 DCon13 0.112 DCon10 1 DCon9 0.04 DCon14 0 DCon14 0 No Message No Message

ISSUED FOR CONSTRUCTION (IFC)

26 JAN 2022
A9 ‐ RC BEAMS DESIGN.xlsx
Calculation Report, OPERATION SHELTER, Plant Plant No. 015

Design  As Top  As Top As Bottom  As Bottom At Shear Torsion Long  Al Torsion Torsion Tran  At Torsion
Story Label V Combo Warnings Errors
Section Combo cm² Combo cm² cm²/cm Combo cm² Combo cm²/cm
ROOF B39 B ‐ 40X60 DCon9 3 DCon8 0.03506 DCon11 0.04 DCon14 0 DCon14 0 No Message No Message
ROOF B39 B ‐ 40X60 DCon9 3 DCon8 0.05413 DCon13 0.04 DCon14 0 DCon14 0 No Message No Message
ROOF B39 B ‐ 40X60 DCon9 5 DCon8 0.05413 DCon13 0.04 DCon14 0 DCon14 0 No Message No Message
ROOF B39 B ‐ 40X60 DCon9 7 DCon8 0.05413 DCon13 0.04 DCon14 0 DCon14 0 No Message No Message
ROOF B40 B ‐ 40X60 DCon10 7 DCon8 0.06048 DCon14 0.04 DCon14 0 DCon14 0 No Message No Message
ROOF B40 B ‐ 40X60 DCon10 5 DCon8 0.06048 DCon12 0.04 DCon14 0 DCon14 0 No Message No Message
ROOF B40 B ‐ 40X60 DCon10 2 DCon8 0.06048 DCon12 0.04 DCon14 0 DCon14 0 No Message No Message
ROOF B40 B ‐ 40X60 DCon10 2 DCon8 0.02597 DCon14 0 DCon14 0 DCon14 0 No Message No Message
ROOF B40 B ‐ 40X60 DCon8 0.02597 DCon9 1 DCon14 0 DCon14 0 DCon14 0 No Message No Message
ROOF B40 B ‐ 40X60 DCon8 0.02597 DCon2 3 DCon14 0 DCon14 0 DCon14 0 No Message No Message
ROOF B40 B ‐ 40X60 DCon8 0.01569 DCon2 3 DCon14 0 DCon14 0 DCon14 0 No Message No Message
ROOF B40 B ‐ 40X60 DCon8 0.01569 DCon2 4 DCon14 0 DCon14 0 DCon14 0 No Message No Message
ROOF B40 B ‐ 40X60 DCon8 0.01569 DCon2 5 DCon14 0 DCon14 0 DCon14 0 No Message No Message
ROOF B40 B ‐ 40X60 DCon8 0.01072 DCon2 5 DCon14 0 DCon14 0 DCon14 0 No Message No Message
ROOF B40 B ‐ 40X60 DCon8 0.01072 DCon10 4 DCon14 0 DCon14 0 DCon14 0 No Message No Message
ROOF B40 B ‐ 40X60 DCon8 0.01072 DCon10 4 DCon14 0 DCon14 0 DCon14 0 No Message No Message
ROOF B40 B ‐ 40X60 DCon8 0.01015 DCon10 4 DCon14 0 DCon14 0 DCon14 0 No Message No Message
ROOF B40 B ‐ 40X60 DCon8 0.01015 DCon10 3 DCon14 0 DCon14 0 DCon14 0 No Message No Message
ROOF B40 B ‐ 40X60 DCon13 1 DCon10 2 DCon14 0 DCon14 0 DCon14 0 No Message No Message
ROOF B40 B ‐ 40X60 DCon13 1 DCon10 1 DCon12 0.04 DCon14 0 DCon14 0 No Message No Message
ROOF B40 B ‐ 40X60 DCon9 2 DCon14 0.48 DCon12 0.04 DCon14 0 DCon14 0 No Message No Message
ROOF B40 B ‐ 40X60 DCon9 4 DCon8 0.01289 DCon12 0.04 DCon14 0 DCon14 0 No Message No Message
ROOF B41 B ‐ 40X60 DCon12 7 DCon8 0.05949 DCon14 0.04 DCon14 0 DCon14 0 No Message No Message
ROOF B41 B ‐ 40X60 DCon10 5 DCon8 0.05949 DCon14 0.04 DCon14 0 DCon14 0 No Message No Message
ROOF B41 B ‐ 40X60 DCon10 2 DCon8 0.05949 DCon14 0.04 DCon14 0 DCon14 0 No Message No Message
ROOF B41 B ‐ 40X60 DCon10 2 DCon8 0.03155 DCon12 0.04 DCon14 0 DCon14 0 No Message No Message
ROOF B41 B ‐ 40X60 DCon8 0.03155 DCon9 2 DCon12 0.04 DCon14 0 DCon14 0 No Message No Message
ROOF B41 B ‐ 40X60 DCon8 0.03155 DCon2 4 DCon10 0.04 DCon14 0 DCon14 0 No Message No Message
ROOF B41 B ‐ 40X60 DCon8 0.02331 DCon2 4 DCon14 0 DCon14 0 DCon14 0 No Message No Message
ROOF B41 B ‐ 40X60 DCon8 0.02331 DCon2 5 DCon14 0 DCon14 0 DCon14 0 No Message No Message
ROOF B41 B ‐ 40X60 DCon8 0.02331 DCon2 6 DCon14 0 DCon14 0 DCon14 0 No Message No Message
ROOF B41 B ‐ 40X60 DCon8 0.02162 DCon2 6 DCon14 0 DCon14 0 DCon14 0 No Message No Message
ROOF B41 B ‐ 40X60 DCon8 0.02162 DCon10 5 DCon14 0 DCon14 0 DCon14 0 No Message No Message
ROOF B41 B ‐ 40X60 DCon8 0.02162 DCon10 5 DCon14 0 DCon14 0 DCon14 0 No Message No Message
ROOF B41 B ‐ 40X60 DCon8 0.02491 DCon10 5 DCon14 0 DCon14 0 DCon14 0 No Message No Message
ROOF B41 B ‐ 40X60 DCon8 0.02491 DCon10 3 DCon14 0 DCon14 0 DCon14 0 No Message No Message
ROOF B41 B ‐ 40X60 DCon13 1 DCon10 2 DCon14 0 DCon14 0 DCon14 0 No Message No Message
ROOF B41 B ‐ 40X60 DCon13 1 DCon10 2 DCon13 0.04 DCon14 0 DCon14 0 No Message No Message
ROOF B41 B ‐ 40X60 DCon9 3 DCon14 0.3511 DCon13 0.04 DCon14 0 DCon14 0 No Message No Message
ROOF B41 B ‐ 40X60 DCon9 5 DCon8 0.03524 DCon13 0.04 DCon14 0 DCon14 0 No Message No Message
Page 88 of 281

ROOF B42 B ‐ 40X60 DCon10 7 DCon8 0.04828 DCon14 0.04 DCon14 0 DCon14 0 No Message No Message
ROOF B42 B ‐ 40X60 DCon10 5 DCon8 0.04828 DCon14 0.04 DCon14 0 DCon14 0 No Message No Message
ROOF B42 B ‐ 40X60 DCon10 2 DCon13 0.05719 DCon12 0.04 DCon14 0 DCon14 0 No Message No Message

ISSUED FOR CONSTRUCTION (IFC)

26 JAN 2022
A9 ‐ RC BEAMS DESIGN.xlsx
Calculation Report, OPERATION SHELTER, Plant Plant No. 015

Design  As Top  As Top As Bottom  As Bottom At Shear Torsion Long  Al Torsion Torsion Tran  At Torsion
Story Label V Combo Warnings Errors
Section Combo cm² Combo cm² cm²/cm Combo cm² Combo cm²/cm
ROOF B42 B ‐ 40X60 DCon10 2 DCon13 0.03866 DCon14 0 DCon14 0 DCon14 0 No Message No Message
ROOF B42 B ‐ 40X60 DCon8 0.02258 DCon9 2 DCon14 0 DCon14 0 DCon14 0 No Message No Message
ROOF B42 B ‐ 40X60 DCon8 0.02258 DCon2 4 DCon14 0 DCon14 0 DCon14 0 No Message No Message
ROOF B42 B ‐ 40X60 DCon8 0.0141 DCon2 4 DCon14 0 DCon14 0 DCon14 0 No Message No Message
ROOF B42 B ‐ 40X60 DCon8 0.0141 DCon2 4 DCon14 0 DCon14 0 DCon14 0 No Message No Message
ROOF B42 B ‐ 40X60 DCon8 0.0141 DCon2 5 DCon14 0 DCon14 0 DCon14 0 No Message No Message
ROOF B42 B ‐ 40X60 DCon8 0.01039 DCon2 5 DCon14 0 DCon14 0 DCon14 0 No Message No Message
ROOF B42 B ‐ 40X60 DCon8 0.01039 DCon10 5 DCon14 0 DCon14 0 DCon14 0 No Message No Message
ROOF B42 B ‐ 40X60 DCon8 0.01039 DCon10 4 DCon14 0 DCon14 0 DCon14 0 No Message No Message
ROOF B42 B ‐ 40X60 DCon8 0.009304 DCon10 4 DCon14 0 DCon14 0 DCon14 0 No Message No Message
ROOF B42 B ‐ 40X60 DCon8 0.009304 DCon10 3 DCon14 0 DCon14 0 DCon14 0 No Message No Message
ROOF B42 B ‐ 40X60 DCon13 1 DCon10 2 DCon14 0 DCon14 0 DCon14 0 No Message No Message
ROOF B42 B ‐ 40X60 DCon13 1 DCon10 2 DCon12 0.04 DCon14 0 DCon14 0 No Message No Message
ROOF B42 B ‐ 40X60 DCon9 3 DCon14 1 DCon12 0.04 DCon14 0 DCon14 0 No Message No Message
ROOF B42 B ‐ 40X60 DCon9 5 DCon8 0.01264 DCon12 0.04 DCon14 0 DCon14 0 No Message No Message
ROOF B43 B ‐ 40X60 DCon10 5 DCon8 0.09286 DCon14 0.04 DCon14 0 DCon14 0 No Message No Message
ROOF B43 B ‐ 40X60 DCon10 3 DCon13 0.3647 DCon14 0.04 DCon14 0 DCon14 0 No Message No Message
ROOF B43 B ‐ 40X60 DCon14 0.4887 DCon9 2 DCon12 0.04 DCon14 0 DCon14 0 No Message No Message
ROOF B43 B ‐ 40X60 DCon14 1 DCon9 2 DCon14 0 DCon14 0 DCon14 0 No Message No Message
ROOF B43 B ‐ 40X60 DCon8 0.05806 DCon9 3 DCon14 0 DCon14 0 DCon14 0 No Message No Message
ROOF B43 B ‐ 40X60 DCon8 0.05806 DCon9 5 DCon14 0 DCon14 0 DCon14 0 No Message No Message
ROOF B43 B ‐ 40X60 DCon8 0.0424 DCon9 5 DCon14 0 DCon14 0 DCon14 0 No Message No Message
ROOF B43 B ‐ 40X60 DCon8 0.0424 DCon2 5 DCon14 0 DCon14 0 DCon14 0 No Message No Message
ROOF B43 B ‐ 40X60 DCon8 0.0424 DCon2 5 DCon14 0 DCon14 0 DCon14 0 No Message No Message
ROOF B43 B ‐ 40X60 DCon8 0.03746 DCon2 5 DCon14 0 DCon14 0 DCon14 0 No Message No Message
ROOF B43 B ‐ 40X60 DCon8 0.03746 DCon2 4 DCon14 0 DCon14 0 DCon14 0 No Message No Message
ROOF B43 B ‐ 40X60 DCon8 0.03746 DCon2 3 DCon14 0 DCon14 0 DCon14 0 No Message No Message
ROOF B43 B ‐ 40X60 DCon8 0.04102 DCon2 3 DCon9 0.04 DCon14 0 DCon14 0 No Message No Message
ROOF B43 B ‐ 40X60 DCon13 0.1253 DCon10 1 DCon11 0.04 DCon14 0 DCon14 0 No Message No Message
ROOF B43 B ‐ 40X60 DCon9 3 DCon8 0.04102 DCon11 0.04 DCon14 0 DCon14 0 No Message No Message
ROOF B43 B ‐ 40X60 DCon9 3 DCon8 0.06059 DCon13 0.04 DCon14 0 DCon14 0 No Message No Message
ROOF B43 B ‐ 40X60 DCon9 5 DCon8 0.06059 DCon13 0.04 DCon14 0 DCon14 0 No Message No Message
ROOF B43 B ‐ 40X60 DCon11 7 DCon8 0.06059 DCon13 0.04 DCon14 0 DCon14 0 No Message No Message
ROOF B44 B ‐ 40X60 DCon10 5 DCon8 0.04733 DCon14 0 DCon14 0 DCon14 0 No Message No Message
ROOF B44 B ‐ 40X60 DCon10 3 DCon8 0.04733 DCon14 0 DCon14 0 DCon14 0 No Message No Message
ROOF B44 B ‐ 40X60 DCon10 2 DCon13 0.3887 DCon14 0 DCon14 0 DCon14 0 No Message No Message
ROOF B44 B ‐ 40X60 DCon10 2 DCon13 0.3935 DCon14 0 DCon14 0 DCon14 0 No Message No Message
ROOF B44 B ‐ 40X60 DCon14 0.02806 DCon9 1 DCon14 0 DCon14 0 DCon14 0 No Message No Message
ROOF B44 B ‐ 40X60 DCon8 0.01975 DCon9 2 DCon14 0 DCon14 0 DCon14 0 No Message No Message
ROOF B44 B ‐ 40X60 DCon14 0 DCon9 2 DCon14 0 DCon14 0 DCon14 0 No Message No Message
Page 89 of 281

ROOF B44 B ‐ 40X60 DCon14 0 DCon1 3 DCon14 0 DCon14 0 DCon14 0 No Message No Message
ROOF B44 B ‐ 40X60 DCon14 0 DCon1 3 DCon14 0 DCon14 0 DCon14 0 No Message No Message
ROOF B44 B ‐ 40X60 DCon14 0 DCon10 3 DCon14 0 DCon14 0 DCon14 0 No Message No Message

ISSUED FOR CONSTRUCTION (IFC)

26 JAN 2022
A9 ‐ RC BEAMS DESIGN.xlsx
Calculation Report, OPERATION SHELTER, Plant Plant No. 015

Design  As Top  As Top As Bottom  As Bottom At Shear Torsion Long  Al Torsion Torsion Tran  At Torsion
Story Label V Combo Warnings Errors
Section Combo cm² Combo cm² cm²/cm Combo cm² Combo cm²/cm
ROOF B44 B ‐ 40X60 DCon14 0 DCon10 3 DCon14 0 DCon14 0 DCon14 0 No Message No Message
ROOF B44 B ‐ 40X60 DCon14 0 DCon10 3 DCon14 0 DCon14 0 DCon14 0 No Message No Message
ROOF B44 B ‐ 40X60 DCon14 0 DCon10 3 DCon14 0 DCon14 0 DCon14 0 No Message No Message
ROOF B44 B ‐ 40X60 DCon13 0.119 DCon10 2 DCon14 0 DCon14 0 DCon14 0 No Message No Message
ROOF B44 B ‐ 40X60 DCon13 1 DCon14 1 DCon14 0 DCon14 0 DCon14 0 No Message No Message
ROOF B44 B ‐ 40X60 DCon13 1 DCon14 1 DCon14 0 DCon14 0 DCon14 0 No Message No Message
ROOF B44 B ‐ 40X60 DCon9 2 DCon14 1 DCon14 0 DCon14 0 DCon14 0 No Message No Message
ROOF B44 B ‐ 40X60 DCon9 4 DCon14 0.02825 DCon14 0 DCon14 0 DCon14 0 No Message No Message
GROUND B1 GB ‐ 35X60 DCon10 6 DCon14 0 DCon14 0.03 DCon14 0 DCon14 0 No Message No Message
GROUND B1 GB ‐ 35X60 DCon10 3 DCon14 0 DCon14 0.03 DCon14 0 DCon14 0 No Message No Message
GROUND B1 GB ‐ 35X60 DCon14 0.2248 DCon9 1 DCon12 0.03 DCon14 0 DCon14 0 No Message No Message
GROUND B1 GB ‐ 35X60 DCon14 0 DCon9 3 DCon14 0 DCon14 0 DCon14 0 No Message No Message
GROUND B1 GB ‐ 35X60 DCon14 0 DCon1 4 DCon14 0 DCon14 0 DCon14 0 No Message No Message
GROUND B1 GB ‐ 35X60 DCon14 0 DCon1 4 DCon14 0 DCon14 0 DCon14 0 No Message No Message
GROUND B1 GB ‐ 35X60 DCon14 0 DCon1 4 DCon14 0 DCon14 0 DCon14 0 No Message No Message
GROUND B1 GB ‐ 35X60 DCon14 0 DCon1 3 DCon14 0 DCon14 0 DCon14 0 No Message No Message
GROUND B1 GB ‐ 35X60 DCon14 0 DCon10 2 DCon14 0 DCon14 0 DCon14 0 No Message No Message
GROUND B1 GB ‐ 35X60 DCon13 1 DCon14 1 DCon12 0.03 DCon14 0 DCon14 0 No Message No Message
GROUND B1 GB ‐ 35X60 DCon9 3 DCon14 0 DCon14 0.03 DCon14 0 DCon14 0 No Message No Message
GROUND B1 GB ‐ 35X60 DCon11 7 DCon14 0 DCon14 0.03 DCon14 0 DCon14 0 No Message No Message
GROUND B2 GB ‐ 35X60 DCon10 6 DCon14 0 DCon14 0.03 DCon14 0 DCon14 0 No Message No Message
GROUND B2 GB ‐ 35X60 DCon10 3 DCon14 0 DCon14 0.03 DCon14 0 DCon14 0 No Message No Message
GROUND B2 GB ‐ 35X60 DCon14 0.2294 DCon9 1 DCon12 0.03 DCon14 0 DCon14 0 No Message No Message
GROUND B2 GB ‐ 35X60 DCon14 0 DCon9 2 DCon14 0 DCon14 0 DCon14 0 No Message No Message
GROUND B2 GB ‐ 35X60 DCon14 0 DCon1 4 DCon14 0 DCon14 0 DCon14 0 No Message No Message
GROUND B2 GB ‐ 35X60 DCon14 0 DCon1 4 DCon14 0 DCon14 0 DCon14 0 No Message No Message
GROUND B2 GB ‐ 35X60 DCon14 0 DCon1 4 DCon14 0 DCon14 0 DCon14 0 No Message No Message
GROUND B2 GB ‐ 35X60 DCon14 0 DCon10 3 DCon14 0 DCon14 0 DCon14 0 No Message No Message
GROUND B2 GB ‐ 35X60 DCon14 0 DCon10 1 DCon11 0.03 DCon14 0 DCon14 0 No Message No Message
GROUND B2 GB ‐ 35X60 DCon9 2 DCon14 0 DCon13 0.03 DCon14 0 DCon14 0 No Message No Message
GROUND B2 GB ‐ 35X60 DCon9 6 DCon14 0 DCon14 0.03 DCon14 0 DCon14 0 No Message No Message
GROUND B3 GB ‐ 35X60 DCon10 3 DCon14 0 DCon14 0.03 DCon14 0 DCon14 0 No Message No Message
GROUND B3 GB ‐ 35X60 DCon10 1 DCon13 1 DCon12 0.03 DCon14 0 DCon14 0 No Message No Message
GROUND B3 GB ‐ 35X60 DCon14 0 DCon9 2 DCon14 0 DCon14 0 DCon14 0 No Message No Message
GROUND B3 GB ‐ 35X60 DCon14 0 DCon9 2 DCon14 0 DCon14 0 DCon14 0 No Message No Message
GROUND B3 GB ‐ 35X60 DCon14 0 DCon1 3 DCon14 0 DCon14 0 DCon14 0 No Message No Message
GROUND B3 GB ‐ 35X60 DCon14 0 DCon10 2 DCon14 0 DCon14 0 DCon14 0 No Message No Message
GROUND B3 GB ‐ 35X60 DCon14 0 DCon10 1 DCon14 0 DCon14 0 DCon14 0 No Message No Message
GROUND B3 GB ‐ 35X60 DCon9 1 DCon14 0.2523 DCon11 0.03 DCon14 0 DCon14 0 No Message No Message
GROUND B3 GB ‐ 35X60 DCon9 4 DCon14 0 DCon13 0.03 DCon14 0 DCon14 0 No Message No Message
Page 90 of 281

GROUND B4 GB ‐ 35X60 DCon10 4 DCon14 0 DCon14 0.03 DCon14 0 DCon14 0 No Message No Message
GROUND B4 GB ‐ 35X60 DCon10 1 DCon13 0.4255 DCon12 0.03 DCon14 0 DCon14 0 No Message No Message
GROUND B4 GB ‐ 35X60 DCon14 0 DCon9 2 DCon14 0 DCon14 0 DCon14 0 No Message No Message

ISSUED FOR CONSTRUCTION (IFC)

26 JAN 2022
A9 ‐ RC BEAMS DESIGN.xlsx
Calculation Report, OPERATION SHELTER, Plant Plant No. 015

Design  As Top  As Top As Bottom  As Bottom At Shear Torsion Long  Al Torsion Torsion Tran  At Torsion
Story Label V Combo Warnings Errors
Section Combo cm² Combo cm² cm²/cm Combo cm² Combo cm²/cm
GROUND B4 GB ‐ 35X60 DCon14 0 DCon1 2 DCon14 0 DCon14 0 DCon14 0 No Message No Message
GROUND B4 GB ‐ 35X60 DCon14 0 DCon1 2 DCon14 0 DCon14 0 DCon14 0 No Message No Message
GROUND B4 GB ‐ 35X60 DCon14 0 DCon10 2 DCon14 0 DCon14 0 DCon14 0 No Message No Message
GROUND B4 GB ‐ 35X60 DCon14 0 DCon10 1 DCon14 0 DCon14 0 DCon14 0 No Message No Message
GROUND B4 GB ‐ 35X60 DCon9 1 DCon14 0.3109 DCon11 0.03 DCon14 0 DCon14 0 No Message No Message
GROUND B4 GB ‐ 35X60 DCon9 4 DCon14 0 DCon13 0.03 DCon14 0 DCon14 0 No Message No Message
GROUND B5 GB ‐ 35X60 DCon10 4 DCon14 0 DCon14 0.03 DCon14 0 DCon14 0 No Message No Message
GROUND B5 GB ‐ 35X60 DCon10 1 DCon13 0.3473 DCon12 0.03 DCon14 0 DCon14 0 No Message No Message
GROUND B5 GB ‐ 35X60 DCon14 0 DCon11 2 DCon14 0 DCon14 0 DCon14 0 No Message No Message
GROUND B5 GB ‐ 35X60 DCon14 0 DCon1 3 DCon14 0 DCon14 0 DCon14 0 No Message No Message
GROUND B5 GB ‐ 35X60 DCon14 0 DCon1 3 DCon14 0 DCon14 0 DCon14 0 No Message No Message
GROUND B5 GB ‐ 35X60 DCon14 0 DCon1 2 DCon14 0 DCon14 0 DCon14 0 No Message No Message
GROUND B5 GB ‐ 35X60 DCon14 0 DCon10 1 DCon14 0 DCon14 0 DCon14 0 No Message No Message
GROUND B5 GB ‐ 35X60 DCon11 2 DCon14 0 DCon12 0.03 DCon14 0 DCon14 0 No Message No Message
GROUND B5 GB ‐ 35X60 DCon11 5 DCon14 0 DCon14 0.03 DCon14 0 DCon14 0 No Message No Message
GROUND B6 GB ‐ 35X60 DCon12 7 DCon14 0 DCon14 0.03 DCon14 0 DCon14 0 No Message No Message
GROUND B6 GB ‐ 35X60 DCon10 4 DCon14 0 DCon14 0.03 DCon14 0 DCon14 0 No Message No Message
GROUND B6 GB ‐ 35X60 DCon10 1 DCon14 0 DCon14 0.03 DCon14 0 DCon14 0 No Message No Message
GROUND B6 GB ‐ 35X60 DCon14 0 DCon9 2 DCon12 0.03 DCon14 0 DCon14 0 No Message No Message
GROUND B6 GB ‐ 35X60 DCon14 0 DCon1 4 DCon14 0 DCon14 0 DCon14 0 No Message No Message
GROUND B6 GB ‐ 35X60 DCon14 0 DCon1 6 DCon14 0 DCon14 0 DCon14 0 No Message No Message
GROUND B6 GB ‐ 35X60 DCon14 0 DCon1 6 DCon14 0 DCon14 0 DCon14 0 No Message No Message
GROUND B6 GB ‐ 35X60 DCon14 0 DCon1 6 DCon14 0 DCon14 0 DCon14 0 No Message No Message
GROUND B6 GB ‐ 35X60 DCon14 0 DCon1 4 DCon14 0 DCon14 0 DCon14 0 No Message No Message
GROUND B6 GB ‐ 35X60 DCon14 0 DCon10 2 DCon12 0.03 DCon14 0 DCon14 0 No Message No Message
GROUND B6 GB ‐ 35X60 DCon9 1 DCon14 0 DCon14 0.03 DCon14 0 DCon14 0 No Message No Message
GROUND B6 GB ‐ 35X60 DCon9 4 DCon14 0 DCon14 0.03 DCon14 0 DCon14 0 No Message No Message
GROUND B6 GB ‐ 35X60 DCon1 7 DCon14 0 DCon14 0.03 DCon14 0 DCon14 0 No Message No Message
GROUND B7 GB ‐ 35X60 DCon12 5 DCon14 0 DCon14 0.03 DCon14 0 DCon14 0 No Message No Message
GROUND B7 GB ‐ 35X60 DCon12 2 DCon14 0 DCon12 0.03 DCon14 0 DCon14 0 No Message No Message
GROUND B7 GB ‐ 35X60 DCon14 0 DCon9 1 DCon14 0 DCon14 0 DCon14 0 No Message No Message
GROUND B7 GB ‐ 35X60 DCon14 0 DCon1 2 DCon14 0 DCon14 0 DCon14 0 No Message No Message
GROUND B7 GB ‐ 35X60 DCon14 0 DCon1 3 DCon14 0 DCon14 0 DCon14 0 No Message No Message
GROUND B7 GB ‐ 35X60 DCon14 0 DCon1 2 DCon14 0 DCon14 0 DCon14 0 No Message No Message
GROUND B7 GB ‐ 35X60 DCon14 0 DCon12 2 DCon14 0 DCon14 0 DCon14 0 No Message No Message
GROUND B7 GB ‐ 35X60 DCon11 1 DCon14 0.3586 DCon11 0.03 DCon14 0 DCon14 0 No Message No Message
GROUND B7 GB ‐ 35X60 DCon9 4 DCon14 0 DCon13 0.03 DCon14 0 DCon14 0 No Message No Message
GROUND B8 GB ‐ 35X60 DCon10 4 DCon14 0 DCon14 0.03 DCon14 0 DCon14 0 No Message No Message
GROUND B8 GB ‐ 35X60 DCon10 1 DCon13 0.2886 DCon12 0.03 DCon14 0 DCon14 0 No Message No Message
GROUND B8 GB ‐ 35X60 DCon14 0 DCon9 2 DCon14 0 DCon14 0 DCon14 0 No Message No Message
Page 91 of 281

GROUND B8 GB ‐ 35X60 DCon14 0 DCon1 2 DCon14 0 DCon14 0 DCon14 0 No Message No Message


GROUND B8 GB ‐ 35X60 DCon14 0 DCon1 3 DCon14 0 DCon14 0 DCon14 0 No Message No Message
GROUND B8 GB ‐ 35X60 DCon14 0 DCon1 2 DCon14 0 DCon14 0 DCon14 0 No Message No Message

ISSUED FOR CONSTRUCTION (IFC)

26 JAN 2022
A9 ‐ RC BEAMS DESIGN.xlsx
Calculation Report, OPERATION SHELTER, Plant Plant No. 015

Design  As Top  As Top As Bottom  As Bottom At Shear Torsion Long  Al Torsion Torsion Tran  At Torsion
Story Label V Combo Warnings Errors
Section Combo cm² Combo cm² cm²/cm Combo cm² Combo cm²/cm
GROUND B8 GB ‐ 35X60 DCon14 0 DCon10 2 DCon14 0 DCon14 0 DCon14 0 No Message No Message
GROUND B8 GB ‐ 35X60 DCon9 1 DCon14 0.3555 DCon11 0.03 DCon14 0 DCon14 0 No Message No Message
GROUND B8 GB ‐ 35X60 DCon9 4 DCon14 0 DCon13 0.03 DCon14 0 DCon14 0 No Message No Message
GROUND B9 GB ‐ 35X60 DCon10 4 DCon14 0 DCon14 0.03 DCon14 0 DCon14 0 No Message No Message
GROUND B9 GB ‐ 35X60 DCon10 1 DCon13 0.347 DCon12 0.03 DCon14 0 DCon14 0 No Message No Message
GROUND B9 GB ‐ 35X60 DCon14 0 DCon9 1 DCon14 0 DCon14 0 DCon14 0 No Message No Message
GROUND B9 GB ‐ 35X60 DCon14 0 DCon9 2 DCon14 0 DCon14 0 DCon14 0 No Message No Message
GROUND B9 GB ‐ 35X60 DCon14 0 DCon1 2 DCon14 0 DCon14 0 DCon14 0 No Message No Message
GROUND B9 GB ‐ 35X60 DCon14 0 DCon10 2 DCon14 0 DCon14 0 DCon14 0 No Message No Message
GROUND B9 GB ‐ 35X60 DCon14 0 DCon10 1 DCon14 0 DCon14 0 DCon14 0 No Message No Message
GROUND B9 GB ‐ 35X60 DCon9 1 DCon14 0.4143 DCon11 0.03 DCon14 0 DCon14 0 No Message No Message
GROUND B9 GB ‐ 35X60 DCon9 3 DCon14 0 DCon13 0.03 DCon14 0 DCon14 0 No Message No Message
GROUND B10 GB ‐ 35X60 DCon10 3 DCon14 0 DCon12 0.03 DCon14 0 DCon14 0 No Message No Message
GROUND B10 GB ‐ 35X60 DCon10 1 DCon13 1 DCon14 0 DCon14 0 DCon14 0 No Message No Message
GROUND B10 GB ‐ 35X60 DCon14 0 DCon9 1 DCon14 0 DCon14 0 DCon14 0 No Message No Message
GROUND B10 GB ‐ 35X60 DCon14 0 DCon1 2 DCon14 0 DCon14 0 DCon14 0 No Message No Message
GROUND B10 GB ‐ 35X60 DCon14 0 DCon1 2 DCon14 0 DCon14 0 DCon14 0 No Message No Message
GROUND B10 GB ‐ 35X60 DCon14 0 DCon10 2 DCon14 0 DCon14 0 DCon14 0 No Message No Message
GROUND B10 GB ‐ 35X60 DCon13 1 DCon14 1 DCon14 0 DCon14 0 DCon14 0 No Message No Message
GROUND B10 GB ‐ 35X60 DCon9 3 DCon14 0 DCon12 0.03 DCon14 0 DCon14 0 No Message No Message
GROUND B11 GB ‐ 35X60 DCon10 3 DCon14 0 DCon14 0.03 DCon14 0 DCon14 0 No Message No Message
GROUND B11 GB ‐ 35X60 DCon10 1 DCon13 1 DCon12 0.03 DCon14 0 DCon14 0 No Message No Message
GROUND B11 GB ‐ 35X60 DCon14 0 DCon9 2 DCon14 0 DCon14 0 DCon14 0 No Message No Message
GROUND B11 GB ‐ 35X60 DCon14 0 DCon9 2 DCon14 0 DCon14 0 DCon14 0 No Message No Message
GROUND B11 GB ‐ 35X60 DCon14 0 DCon1 3 DCon14 0 DCon14 0 DCon14 0 No Message No Message
GROUND B11 GB ‐ 35X60 DCon14 0 DCon10 2 DCon14 0 DCon14 0 DCon14 0 No Message No Message
GROUND B11 GB ‐ 35X60 DCon14 0 DCon10 1 DCon14 0 DCon14 0 DCon14 0 No Message No Message
GROUND B11 GB ‐ 35X60 DCon9 1 DCon14 0.2527 DCon11 0.03 DCon14 0 DCon14 0 No Message No Message
GROUND B11 GB ‐ 35X60 DCon9 4 DCon14 0 DCon13 0.03 DCon14 0 DCon14 0 No Message No Message
GROUND B12 GB ‐ 35X60 DCon10 4 DCon14 0 DCon14 0.03 DCon14 0 DCon14 0 No Message No Message
GROUND B12 GB ‐ 35X60 DCon10 1 DCon13 1 DCon12 0.03 DCon14 0 DCon14 0 No Message No Message
GROUND B12 GB ‐ 35X60 DCon14 0 DCon9 2 DCon14 0 DCon14 0 DCon14 0 No Message No Message
GROUND B12 GB ‐ 35X60 DCon14 0 DCon1 2 DCon14 0 DCon14 0 DCon14 0 No Message No Message
GROUND B12 GB ‐ 35X60 DCon14 0 DCon1 2 DCon14 0 DCon14 0 DCon14 0 No Message No Message
GROUND B12 GB ‐ 35X60 DCon14 0 DCon10 2 DCon14 0 DCon14 0 DCon14 0 No Message No Message
GROUND B12 GB ‐ 35X60 DCon13 0.4574 DCon10 1 DCon14 0 DCon14 0 DCon14 0 No Message No Message
GROUND B12 GB ‐ 35X60 DCon9 3 DCon14 0 DCon12 0.03 DCon14 0 DCon14 0 No Message No Message
GROUND B12 GB ‐ 35X60 DCon9 6 DCon14 0 DCon14 0.03 DCon14 0 DCon14 0 No Message No Message
GROUND B12 GB ‐ 35X60 DCon10 6 DCon14 0 DCon14 0.03 DCon14 0 DCon14 0 No Message No Message
GROUND B12 GB ‐ 35X60 DCon10 5 DCon14 0 DCon14 0.03 DCon14 0 DCon14 0 No Message No Message
Page 92 of 281

GROUND B13 GB ‐ 35X60 DCon10 5 DCon14 0 DCon14 0.03 DCon14 0 DCon14 0 No Message No Message
GROUND B13 GB ‐ 35X60 DCon10 3 DCon14 0 DCon12 0.03 DCon14 0 DCon14 0 No Message No Message
GROUND B13 GB ‐ 35X60 DCon14 0.4277 DCon11 1 DCon14 0 DCon14 0 DCon14 0 No Message No Message

ISSUED FOR CONSTRUCTION (IFC)

26 JAN 2022
A9 ‐ RC BEAMS DESIGN.xlsx
Calculation Report, OPERATION SHELTER, Plant Plant No. 015

Design  As Top  As Top As Bottom  As Bottom At Shear Torsion Long  Al Torsion Torsion Tran  At Torsion
Story Label V Combo Warnings Errors
Section Combo cm² Combo cm² cm²/cm Combo cm² Combo cm²/cm
GROUND B13 GB ‐ 35X60 DCon14 0 DCon11 2 DCon14 0 DCon14 0 DCon14 0 No Message No Message
GROUND B13 GB ‐ 35X60 DCon14 0 DCon1 3 DCon14 0 DCon14 0 DCon14 0 No Message No Message
GROUND B13 GB ‐ 35X60 DCon14 0 DCon1 3 DCon14 0 DCon14 0 DCon14 0 No Message No Message
GROUND B13 GB ‐ 35X60 DCon14 0 DCon10 2 DCon14 0 DCon14 0 DCon14 0 No Message No Message
GROUND B13 GB ‐ 35X60 DCon13 0.07245 DCon10 1 DCon14 0 DCon14 0 DCon14 0 No Message No Message
GROUND B13 GB ‐ 35X60 DCon11 2 DCon14 0 DCon12 0.03 DCon14 0 DCon14 0 No Message No Message
GROUND B13 GB ‐ 35X60 DCon11 5 DCon14 0 DCon14 0.03 DCon14 0 DCon14 0 No Message No Message
GROUND B14 GB ‐ 35X60 DCon1 7 DCon14 0 DCon14 0.03 DCon14 0 DCon14 0 No Message No Message
GROUND B14 GB ‐ 35X60 DCon10 4 DCon14 0 DCon14 0.03 DCon14 0 DCon14 0 No Message No Message
GROUND B14 GB ‐ 35X60 DCon10 1 DCon14 0 DCon14 0.03 DCon14 0 DCon14 0 No Message No Message
GROUND B14 GB ‐ 35X60 DCon14 0 DCon9 2 DCon12 0.03 DCon14 0 DCon14 0 No Message No Message
GROUND B14 GB ‐ 35X60 DCon14 0 DCon1 4 DCon14 0 DCon14 0 DCon14 0 No Message No Message
GROUND B14 GB ‐ 35X60 DCon14 0 DCon1 6 DCon14 0 DCon14 0 DCon14 0 No Message No Message
GROUND B14 GB ‐ 35X60 DCon14 0 DCon1 6 DCon14 0 DCon14 0 DCon14 0 No Message No Message
GROUND B14 GB ‐ 35X60 DCon14 0 DCon1 6 DCon14 0 DCon14 0 DCon14 0 No Message No Message
GROUND B14 GB ‐ 35X60 DCon14 0 DCon1 4 DCon14 0 DCon14 0 DCon14 0 No Message No Message
GROUND B14 GB ‐ 35X60 DCon14 0 DCon10 2 DCon12 0.03 DCon14 0 DCon14 0 No Message No Message
GROUND B14 GB ‐ 35X60 DCon9 1 DCon14 0 DCon14 0.03 DCon14 0 DCon14 0 No Message No Message
GROUND B14 GB ‐ 35X60 DCon9 4 DCon14 0 DCon14 0.03 DCon14 0 DCon14 0 No Message No Message
GROUND B14 GB ‐ 35X60 DCon1 7 DCon14 0 DCon14 0.03 DCon14 0 DCon14 0 No Message No Message
GROUND B15 GB ‐ 35X60 DCon12 5 DCon14 0 DCon14 0.03 DCon14 0 DCon14 0 No Message No Message
GROUND B15 GB ‐ 35X60 DCon12 2 DCon13 0.0174 DCon12 0.03 DCon14 0 DCon14 0 No Message No Message
GROUND B15 GB ‐ 35X60 DCon14 0 DCon9 1 DCon14 0 DCon14 0 DCon14 0 No Message No Message
GROUND B15 GB ‐ 35X60 DCon14 0 DCon1 2 DCon14 0 DCon14 0 DCon14 0 No Message No Message
GROUND B15 GB ‐ 35X60 DCon14 0 DCon1 3 DCon14 0 DCon14 0 DCon14 0 No Message No Message
GROUND B15 GB ‐ 35X60 DCon14 0 DCon1 2 DCon14 0 DCon14 0 DCon14 0 No Message No Message
GROUND B15 GB ‐ 35X60 DCon14 0 DCon12 2 DCon14 0 DCon14 0 DCon14 0 No Message No Message
GROUND B15 GB ‐ 35X60 DCon9 1 DCon14 0.3408 DCon11 0.03 DCon14 0 DCon14 0 No Message No Message
GROUND B15 GB ‐ 35X60 DCon9 4 DCon14 0 DCon13 0.03 DCon14 0 DCon14 0 No Message No Message
GROUND B16 GB ‐ 35X60 DCon12 4 DCon14 0 DCon14 0.03 DCon14 0 DCon14 0 No Message No Message
GROUND B16 GB ‐ 35X60 DCon10 1 DCon13 0.2892 DCon12 0.03 DCon14 0 DCon14 0 No Message No Message
GROUND B16 GB ‐ 35X60 DCon14 0 DCon9 2 DCon14 0 DCon14 0 DCon14 0 No Message No Message
GROUND B16 GB ‐ 35X60 DCon14 0 DCon1 2 DCon14 0 DCon14 0 DCon14 0 No Message No Message
GROUND B16 GB ‐ 35X60 DCon14 0 DCon1 3 DCon14 0 DCon14 0 DCon14 0 No Message No Message
GROUND B16 GB ‐ 35X60 DCon14 0 DCon1 2 DCon14 0 DCon14 0 DCon14 0 No Message No Message
GROUND B16 GB ‐ 35X60 DCon14 0 DCon10 2 DCon14 0 DCon14 0 DCon14 0 No Message No Message
GROUND B16 GB ‐ 35X60 DCon9 1 DCon14 0.3397 DCon11 0.03 DCon14 0 DCon14 0 No Message No Message
GROUND B16 GB ‐ 35X60 DCon9 4 DCon14 0 DCon13 0.03 DCon14 0 DCon14 0 No Message No Message
GROUND B17 GB ‐ 35X60 DCon10 4 DCon14 0 DCon14 0.03 DCon14 0 DCon14 0 No Message No Message
GROUND B17 GB ‐ 35X60 DCon10 1 DCon13 0.3458 DCon12 0.03 DCon14 0 DCon14 0 No Message No Message
Page 93 of 281

GROUND B17 GB ‐ 35X60 DCon14 0 DCon9 1 DCon14 0 DCon14 0 DCon14 0 No Message No Message
GROUND B17 GB ‐ 35X60 DCon14 0 DCon9 2 DCon14 0 DCon14 0 DCon14 0 No Message No Message
GROUND B17 GB ‐ 35X60 DCon14 0 DCon1 2 DCon14 0 DCon14 0 DCon14 0 No Message No Message

ISSUED FOR CONSTRUCTION (IFC)

26 JAN 2022
A9 ‐ RC BEAMS DESIGN.xlsx
Calculation Report, OPERATION SHELTER, Plant Plant No. 015

Design  As Top  As Top As Bottom  As Bottom At Shear Torsion Long  Al Torsion Torsion Tran  At Torsion
Story Label V Combo Warnings Errors
Section Combo cm² Combo cm² cm²/cm Combo cm² Combo cm²/cm
GROUND B17 GB ‐ 35X60 DCon14 0 DCon10 2 DCon14 0 DCon14 0 DCon14 0 No Message No Message
GROUND B17 GB ‐ 35X60 DCon14 0 DCon10 1 DCon14 0 DCon14 0 DCon14 0 No Message No Message
GROUND B17 GB ‐ 35X60 DCon9 1 DCon14 0.4191 DCon11 0.03 DCon14 0 DCon14 0 No Message No Message
GROUND B17 GB ‐ 35X60 DCon9 3 DCon14 0 DCon13 0.03 DCon14 0 DCon14 0 No Message No Message
GROUND B18 GB ‐ 35X60 DCon10 3 DCon14 0 DCon12 0.03 DCon14 0 DCon14 0 No Message No Message
GROUND B18 GB ‐ 35X60 DCon10 1 DCon13 1 DCon14 0 DCon14 0 DCon14 0 No Message No Message
GROUND B18 GB ‐ 35X60 DCon14 0 DCon9 1 DCon14 0 DCon14 0 DCon14 0 No Message No Message
GROUND B18 GB ‐ 35X60 DCon14 0 DCon1 2 DCon14 0 DCon14 0 DCon14 0 No Message No Message
GROUND B18 GB ‐ 35X60 DCon14 0 DCon1 2 DCon14 0 DCon14 0 DCon14 0 No Message No Message
GROUND B18 GB ‐ 35X60 DCon14 0 DCon10 2 DCon14 0 DCon14 0 DCon14 0 No Message No Message
GROUND B18 GB ‐ 35X60 DCon13 1 DCon14 1 DCon14 0 DCon14 0 DCon14 0 No Message No Message
GROUND B18 GB ‐ 35X60 DCon9 3 DCon14 0 DCon12 0.03 DCon14 0 DCon14 0 No Message No Message
GROUND B19 GB ‐ 35X60 DCon10 6 DCon14 0 DCon14 0.03 DCon14 0 DCon14 0 No Message No Message
GROUND B19 GB ‐ 35X60 DCon10 3 DCon14 0 DCon14 0.03 DCon14 0 DCon14 0 No Message No Message
GROUND B19 GB ‐ 35X60 DCon14 0.1287 DCon9 1 DCon12 0.03 DCon14 0 DCon14 0 No Message No Message
GROUND B19 GB ‐ 35X60 DCon14 0 DCon9 3 DCon14 0 DCon14 0 DCon14 0 No Message No Message
GROUND B19 GB ‐ 35X60 DCon14 0 DCon1 4 DCon14 0 DCon14 0 DCon14 0 No Message No Message
GROUND B19 GB ‐ 35X60 DCon14 0 DCon1 4 DCon14 0 DCon14 0 DCon14 0 No Message No Message
GROUND B19 GB ‐ 35X60 DCon14 0 DCon1 4 DCon14 0 DCon14 0 DCon14 0 No Message No Message
GROUND B19 GB ‐ 35X60 DCon14 0 DCon1 3 DCon14 0 DCon14 0 DCon14 0 No Message No Message
GROUND B19 GB ‐ 35X60 DCon14 0 DCon10 2 DCon14 0 DCon14 0 DCon14 0 No Message No Message
GROUND B19 GB ‐ 35X60 DCon13 0.4794 DCon14 0.4091 DCon12 0.03 DCon14 0 DCon14 0 No Message No Message
GROUND B19 GB ‐ 35X60 DCon9 3 DCon14 0 DCon14 0.03 DCon14 0 DCon14 0 No Message No Message
GROUND B19 GB ‐ 35X60 DCon11 7 DCon14 0 DCon14 0.03 DCon14 0 DCon14 0 No Message No Message
GROUND B20 GB ‐ 35X60 DCon10 6 DCon14 0 DCon14 0.03 DCon14 0 DCon14 0 No Message No Message
GROUND B20 GB ‐ 35X60 DCon10 3 DCon14 0 DCon14 0.03 DCon14 0 DCon14 0 No Message No Message
GROUND B20 GB ‐ 35X60 DCon14 1 DCon13 0.4523 DCon12 0.03 DCon14 0 DCon14 0 No Message No Message
GROUND B20 GB ‐ 35X60 DCon14 0 DCon9 2 DCon14 0 DCon14 0 DCon14 0 No Message No Message
GROUND B20 GB ‐ 35X60 DCon14 0 DCon9 3 DCon14 0 DCon14 0 DCon14 0 No Message No Message
GROUND B22 GB ‐ 35X60 DCon14 0 DCon1 3 DCon14 0 DCon14 0 DCon14 0 No Message No Message
GROUND B22 GB ‐ 35X60 DCon14 0 DCon1 4 DCon14 0 DCon14 0 DCon14 0 No Message No Message
GROUND B22 GB ‐ 35X60 DCon14 0 DCon1 4 DCon14 0 DCon14 0 DCon14 0 No Message No Message
GROUND B22 GB ‐ 35X60 DCon14 0 DCon1 3 DCon14 0 DCon14 0 DCon14 0 No Message No Message
GROUND B22 GB ‐ 35X60 DCon14 0 DCon10 2 DCon14 0 DCon14 0 DCon14 0 No Message No Message
GROUND B22 GB ‐ 35X60 DCon13 0.1509 DCon10 1 DCon11 0.03 DCon14 0 DCon14 0 No Message No Message
GROUND B22 GB ‐ 35X60 DCon9 2 DCon14 0 DCon13 0.03 DCon14 0 DCon14 0 No Message No Message
GROUND B22 GB ‐ 35X60 DCon9 6 DCon14 0 DCon14 0.03 DCon14 0 DCon14 0 No Message No Message
GROUND B23 GB ‐ 35X60 DCon10 5 DCon2 0.1812 DCon14 0.03 DCon14 0 DCon14 0 No Message No Message
GROUND B23 GB ‐ 35X60 DCon10 3 DCon2 0.1812 DCon12 0.03 DCon14 0 DCon14 0 No Message No Message
GROUND B23 GB ‐ 35X60 DCon10 1 DCon9 1 DCon14 0 DCon14 0 DCon14 0 No Message No Message
Page 94 of 281

GROUND B23 GB ‐ 35X60 DCon2 0.153 DCon9 2 DCon14 0 DCon14 0 DCon14 0 No Message No Message
GROUND B23 GB ‐ 35X60 DCon2 0.153 DCon9 3 DCon14 0 DCon14 0 DCon14 0 No Message No Message
GROUND B23 GB ‐ 35X60 DCon2 0.153 DCon1 4 DCon14 0 DCon14 0 DCon14 0 No Message No Message

ISSUED FOR CONSTRUCTION (IFC)

26 JAN 2022
A9 ‐ RC BEAMS DESIGN.xlsx

Design  As Top  As Top As Bottom  As Bottom At Shear Torsion Long  Al Torsion Torsion Tran  At Torsion
Story Label V Combo Warnings Errors
Section Combo cm² Combo cm² cm²/cm Combo cm² Combo cm²/cm
GROUND B23 GB ‐ 35X60 DCon2 0.153 DCon1 4 DCon14 0 DCon14 0 DCon14 0 No Message No Message
GROUND B23 GB ‐ 35X60 DCon2 0.153 DCon1 3 DCon14 0 DCon14 0 DCon14 0 No Message No Message
GROUND B23 GB ‐ 35X60 DCon2 0.153 DCon10 2 DCon14 0 DCon14 0 DCon14 0 No Message No Message
GROUND B23 GB ‐ 35X60 DCon9 1 DCon10 1 DCon14 0 DCon14 0 DCon14 0 No Message No Message
GROUND B23 GB ‐ 35X60 DCon9 3 DCon2 0.1812 DCon11 0.03 DCon14 0 DCon14 0 No Message No Message
GROUND B23 GB ‐ 35X60 DCon9 5 DCon2 0.1812 DCon13 0.03 DCon14 0 DCon14 0 No Message No Message
GROUND B24 GB ‐ 35X60 DCon10 6 DCon2 0.4379 DCon14 0.03 DCon14 0 DCon14 0 No Message No Message
GROUND B24 GB ‐ 35X60 DCon10 3 DCon2 0.4379 DCon12 0.03 DCon14 0 DCon14 0 No Message No Message
GROUND B24 GB ‐ 35X60 DCon10 1 DCon9 1 DCon14 0 DCon14 0 DCon14 0 No Message No Message
GROUND B24 GB ‐ 35X60 DCon2 0.3698 DCon9 3 DCon14 0 DCon14 0 DCon14 0 No Message No Message
GROUND B24 GB ‐ 35X60 DCon2 0.3698 DCon1 3 DCon14 0 DCon14 0 DCon14 0 No Message No Message
GROUND B24 GB ‐ 35X60 DCon2 0.3698 DCon1 4 DCon14 0 DCon14 0 DCon14 0 No Message No Message
GROUND B24 GB ‐ 35X60 DCon2 0.3698 DCon1 4 DCon14 0 DCon14 0 DCon14 0 No Message No Message
GROUND B24 GB ‐ 35X60 DCon2 0.3698 DCon1 3 DCon14 0 DCon14 0 DCon14 0 No Message No Message
GROUND B24 GB ‐ 35X60 DCon2 0.3698 DCon10 3 DCon14 0 DCon14 0 DCon14 0 No Message No Message
GROUND B24 GB ‐ 35X60 DCon9 1 DCon10 2 DCon14 0 DCon14 0 DCon14 0 No Message No Message
GROUND B24 GB ‐ 35X60 DCon9 3 DCon2 0.4379 DCon11 0.03 DCon14 0 DCon14 0 No Message No Message
GROUND B24 GB ‐ 35X60 DCon9 5 DCon2 0.4379 DCon13 0.03 DCon14 0 DCon14 0 No Message No Message
GROUND B25 GB ‐ 35X60 DCon10 3 DCon10 0.05058 DCon14 0 DCon14 0 DCon14 0 No Message No Message
GROUND B25 GB ‐ 35X60 DCon10 1 DCon13 1 DCon14 0 DCon14 0 DCon14 0 No Message No Message
GROUND B25 GB ‐ 35X60 DCon14 0.1046 DCon9 1 DCon14 0 DCon14 0 DCon14 0 No Message No Message
GROUND B25 GB ‐ 35X60 DCon10 0.04271 DCon9 2 DCon14 0 DCon14 0 DCon14 0 No Message No Message
GROUND B25 GB ‐ 35X60 DCon10 0.04271 DCon1 2 DCon14 0 DCon14 0 DCon14 0 No Message No Message
GROUND B25 GB ‐ 35X60 DCon10 0.04271 DCon10 2 DCon14 0 DCon14 0 DCon14 0 No Message No Message
GROUND B25 GB ‐ 35X60 DCon10 0.04271 DCon10 1 DCon14 0 DCon14 0 DCon14 0 No Message No Message
GROUND B25 GB ‐ 35X60 DCon9 1 DCon14 1 DCon14 0 DCon14 0 DCon14 0 No Message No Message
GROUND B25 GB ‐ 35X60 DCon9 3 DCon10 0.05058 DCon11 0.03 DCon14 0 DCon14 0 No Message No Message
GROUND B26 GB ‐ 35X60 DCon12 3 DCon14 0 DCon14 0 DCon14 0 DCon14 0 No Message No Message
GROUND B26 GB ‐ 35X60 DCon12 1 DCon13 0.406 DCon14 0 DCon14 0 DCon14 0 No Message No Message
GROUND B26 GB ‐ 35X60 DCon14 0 DCon11 1 DCon14 0 DCon14 0 DCon14 0 No Message No Message
GROUND B26 GB ‐ 35X60 DCon14 0 DCon11 1 DCon14 0 DCon14 0 DCon14 0 No Message No Message
GROUND B26 GB ‐ 35X60 DCon14 0 DCon1 2 DCon14 0 DCon14 0 DCon14 0 No Message No Message
GROUND B26 GB ‐ 35X60 DCon14 0 DCon12 1 DCon14 0 DCon14 0 DCon14 0 No Message No Message
GROUND B26 GB ‐ 35X60 DCon14 0 DCon12 1 DCon14 0 DCon14 0 DCon14 0 No Message No Message
GROUND B26 GB ‐ 35X60 DCon11 1 DCon14 0.3686 DCon14 0 DCon14 0 DCon14 0 No Message No Message
GROUND B26 GB ‐ 35X60 DCon11 3 DCon14 0 DCon11 0.03 DCon14 0 DCon14 0 No Message No Message
GROUND B27 GB ‐ 35X60 DCon12 3 DCon14 0 DCon12 0.03 DCon14 0 DCon14 0 No Message No Message
GROUND B27 GB ‐ 35X60 DCon12 1 DCon14 0 DCon14 0 DCon14 0 DCon14 0 No Message No Message
GROUND B27 GB ‐ 35X60 DCon14 0 DCon11 1 DCon14 0 DCon14 0 DCon14 0 No Message No Message
GROUND B27 GB ‐ 35X60 DCon14 0 DCon11 1 DCon14 0 DCon14 0 DCon14 0 No Message No Message
GROUND B27 GB ‐ 35X60 DCon14 0 DCon1 2 DCon14 0 DCon14 0 DCon14 0 No Message No Message
GROUND B27 GB ‐ 35X60 DCon14 0 DCon12 2 DCon14 0 DCon14 0 DCon14 0 No Message No Message
GROUND B27 GB ‐ 35X60 DCon14 0 DCon12 1 DCon14 0 DCon14 0 DCon14 0 No Message No Message

ISSUED FOR CONSTRUCTION (IFC)

26 JAN 2022
Calculation Report, OPERATION SHELTER, Plant Plant No. 015 Page 95 of 281
A9 ‐ RC BEAMS DESIGN.xlsx
Calculation Report, OPERATION SHELTER, Plant Plant No. 015

Design  As Top  As Top As Bottom  As Bottom At Shear Torsion Long  Al Torsion Torsion Tran  At Torsion
Story Label V Combo Warnings Errors
Section Combo cm² Combo cm² cm²/cm Combo cm² Combo cm²/cm
GROUND B27 GB ‐ 35X60 DCon13 0.4617 DCon14 0.3184 DCon14 0 DCon14 0 DCon14 0 No Message No Message
GROUND B27 GB ‐ 35X60 DCon11 2 DCon14 0 DCon11 0.03 DCon14 0 DCon14 0 No Message No Message
GROUND B28 GB ‐ 35X60 DCon10 5 DCon10 0.2299 DCon14 0.03 DCon14 0 DCon14 0 No Message No Message
GROUND B28 GB ‐ 35X60 DCon10 3 DCon10 0.2299 DCon12 0.03 DCon14 0 DCon14 0 No Message No Message
GROUND B28 GB ‐ 35X60 DCon14 1 DCon9 1 DCon14 0 DCon14 0 DCon14 0 No Message No Message
GROUND B28 GB ‐ 35X60 DCon10 0.1942 DCon9 2 DCon14 0 DCon14 0 DCon14 0 No Message No Message
GROUND B28 GB ‐ 35X60 DCon10 0.1942 DCon1 3 DCon14 0 DCon14 0 DCon14 0 No Message No Message
GROUND B28 GB ‐ 35X60 DCon10 0.1942 DCon1 3 DCon14 0 DCon14 0 DCon14 0 No Message No Message
GROUND B28 GB ‐ 35X60 DCon10 0.1942 DCon1 3 DCon14 0 DCon14 0 DCon14 0 No Message No Message
GROUND B28 GB ‐ 35X60 DCon10 0.1942 DCon10 3 DCon14 0 DCon14 0 DCon14 0 No Message No Message
GROUND B28 GB ‐ 35X60 DCon9 1 DCon10 2 DCon14 0 DCon14 0 DCon14 0 No Message No Message
GROUND B28 GB ‐ 35X60 DCon9 3 DCon14 0.3617 DCon11 0.03 DCon14 0 DCon14 0 No Message No Message
GROUND B28 GB ‐ 35X60 DCon9 5 DCon10 0.2299 DCon12 0.03 DCon14 0 DCon14 0 No Message No Message
GROUND B29 GB ‐ 35X60 DCon12 2 DCon13 1 DCon14 0 DCon14 0 DCon14 0 No Message No Message
GROUND B29 GB ‐ 35X60 DCon14 1 DCon9 2 DCon14 0 DCon14 0 DCon14 0 No Message No Message
GROUND B29 GB ‐ 35X60 DCon9 0.04641 DCon9 2 DCon14 0 DCon14 0 DCon14 0 No Message No Message
GROUND B29 GB ‐ 35X60 DCon9 0.04641 DCon1 1 DCon14 0 DCon14 0 DCon14 0 No Message No Message
GROUND B29 GB ‐ 35X60 DCon9 0.04641 DCon10 2 DCon14 0 DCon14 0 DCon14 0 No Message No Message
GROUND B29 GB ‐ 35X60 DCon9 1 DCon10 1 DCon14 0 DCon14 0 DCon14 0 No Message No Message
GROUND B29 GB ‐ 35X60 DCon9 3 DCon14 1 DCon14 0 DCon14 0 DCon14 0 No Message No Message
GROUND B30 GB ‐ 35X60 DCon10 5 DCon2 0.2993 DCon14 0.03 DCon14 0 DCon14 0 No Message No Message
GROUND B30 GB ‐ 35X60 DCon10 3 DCon2 0.2993 DCon12 0.03 DCon14 0 DCon14 0 No Message No Message
GROUND B30 GB ‐ 35X60 DCon10 1 DCon9 1 DCon14 0 DCon14 0 DCon14 0 No Message No Message
GROUND B30 GB ‐ 35X60 DCon2 0.2527 DCon9 2 DCon14 0 DCon14 0 DCon14 0 No Message No Message
GROUND B30 GB ‐ 35X60 DCon2 0.2527 DCon1 3 DCon14 0 DCon14 0 DCon14 0 No Message No Message
GROUND B30 GB ‐ 35X60 DCon2 0.2527 DCon1 4 DCon14 0 DCon14 0 DCon14 0 No Message No Message
GROUND B30 GB ‐ 35X60 DCon2 0.2527 DCon1 4 DCon14 0 DCon14 0 DCon14 0 No Message No Message
GROUND B30 GB ‐ 35X60 DCon2 0.2527 DCon1 3 DCon14 0 DCon14 0 DCon14 0 No Message No Message
GROUND B30 GB ‐ 35X60 DCon2 0.2527 DCon10 2 DCon14 0 DCon14 0 DCon14 0 No Message No Message
GROUND B30 GB ‐ 35X60 DCon9 1 DCon10 1 DCon14 0 DCon14 0 DCon14 0 No Message No Message
GROUND B30 GB ‐ 35X60 DCon9 3 DCon2 0.2993 DCon11 0.03 DCon14 0 DCon14 0 No Message No Message
GROUND B30 GB ‐ 35X60 DCon9 5 DCon2 0.2993 DCon13 0.03 DCon14 0 DCon14 0 No Message No Message
GROUND B31 GB ‐ 35X60 DCon12 3 DCon14 0 DCon12 0.03 DCon14 0 DCon14 0 No Message No Message
GROUND B31 GB ‐ 35X60 DCon12 1 DCon13 1 DCon14 0 DCon14 0 DCon14 0 No Message No Message
GROUND B31 GB ‐ 35X60 DCon14 0 DCon9 1 DCon14 0 DCon14 0 DCon14 0 No Message No Message
GROUND B31 GB ‐ 35X60 DCon14 0 DCon9 2 DCon14 0 DCon14 0 DCon14 0 No Message No Message
GROUND B31 GB ‐ 35X60 DCon14 0 DCon1 2 DCon14 0 DCon14 0 DCon14 0 No Message No Message
GROUND B31 GB ‐ 35X60 DCon14 0 DCon10 2 DCon14 0 DCon14 0 DCon14 0 No Message No Message
GROUND B31 GB ‐ 35X60 DCon14 0 DCon10 1 DCon14 0 DCon14 0 DCon14 0 No Message No Message
GROUND B31 GB ‐ 35X60 DCon9 1 DCon14 0.3518 DCon14 0 DCon14 0 DCon14 0 No Message No Message
Page 96 of 281

GROUND B31 GB ‐ 35X60 DCon9 3 DCon14 0 DCon11 0.03 DCon14 0 DCon14 0 No Message No Message
GROUND B32 GB ‐ 35X60 DCon10 3 DCon14 0 DCon14 0 DCon14 0 DCon14 0 No Message No Message
GROUND B32 GB ‐ 35X60 DCon10 1 DCon13 1 DCon14 0 DCon14 0 DCon14 0 No Message No Message

ISSUED FOR CONSTRUCTION (IFC)

26 JAN 2022
A9 ‐ RC BEAMS DESIGN.xlsx
Calculation Report, OPERATION SHELTER, Plant Plant No. 015

Design  As Top  As Top As Bottom  As Bottom At Shear Torsion Long  Al Torsion Torsion Tran  At Torsion
Story Label V Combo Warnings Errors
Section Combo cm² Combo cm² cm²/cm Combo cm² Combo cm²/cm
GROUND B32 GB ‐ 35X60 DCon14 0.0616 DCon9 1 DCon14 0 DCon14 0 DCon14 0 No Message No Message
GROUND B32 GB ‐ 35X60 DCon14 0 DCon9 2 DCon14 0 DCon14 0 DCon14 0 No Message No Message
GROUND B32 GB ‐ 35X60 DCon14 0 DCon1 2 DCon14 0 DCon14 0 DCon14 0 No Message No Message
GROUND B32 GB ‐ 35X60 DCon14 0 DCon10 2 DCon14 0 DCon14 0 DCon14 0 No Message No Message
GROUND B32 GB ‐ 35X60 DCon13 0.05685 DCon10 1 DCon14 0 DCon14 0 DCon14 0 No Message No Message
GROUND B32 GB ‐ 35X60 DCon9 1 DCon14 1 DCon14 0 DCon14 0 DCon14 0 No Message No Message
GROUND B32 GB ‐ 35X60 DCon9 3 DCon14 0 DCon14 0 DCon14 0 DCon14 0 No Message No Message
GROUND B33 GB ‐ 35X60 DCon10 3 DCon13 0.2533 DCon14 0 DCon14 0 DCon14 0 No Message No Message
GROUND B33 GB ‐ 35X60 DCon10 1 DCon9 1 DCon14 0 DCon14 0 DCon14 0 No Message No Message
GROUND B33 GB ‐ 35X60 DCon9 0.06588 DCon9 1 DCon14 0 DCon14 0 DCon14 0 No Message No Message
GROUND B33 GB ‐ 35X60 DCon9 0.06588 DCon9 1 DCon14 0 DCon14 0 DCon14 0 No Message No Message
GROUND B33 GB ‐ 35X60 DCon9 0.06588 DCon1 1 DCon14 0 DCon14 0 DCon14 0 No Message No Message
GROUND B33 GB ‐ 35X60 DCon9 0.06588 DCon10 1 DCon14 0 DCon14 0 DCon14 0 No Message No Message
GROUND B33 GB ‐ 35X60 DCon9 1 DCon14 1 DCon14 0 DCon14 0 DCon14 0 No Message No Message
GROUND B33 GB ‐ 35X60 DCon9 3 DCon14 0.3379 DCon14 0 DCon14 0 DCon14 0 No Message No Message
GROUND B34 GB ‐ 35X60 DCon10 5 DCon2 0.2141 DCon12 0.03 DCon14 0 DCon14 0 No Message No Message
GROUND B34 GB ‐ 35X60 DCon10 3 DCon2 0.2141 DCon12 0.03 DCon14 0 DCon14 0 No Message No Message
GROUND B34 GB ‐ 35X60 DCon10 1 DCon9 1 DCon14 0 DCon14 0 DCon14 0 No Message No Message
GROUND B34 GB ‐ 35X60 DCon2 0.1808 DCon9 2 DCon14 0 DCon14 0 DCon14 0 No Message No Message
GROUND B34 GB ‐ 35X60 DCon2 0.1808 DCon1 3 DCon14 0 DCon14 0 DCon14 0 No Message No Message
GROUND B34 GB ‐ 35X60 DCon2 0.1808 DCon1 3 DCon14 0 DCon14 0 DCon14 0 No Message No Message
GROUND B34 GB ‐ 35X60 DCon2 0.1808 DCon1 3 DCon14 0 DCon14 0 DCon14 0 No Message No Message
GROUND B34 GB ‐ 35X60 DCon2 0.1808 DCon10 2 DCon14 0 DCon14 0 DCon14 0 No Message No Message
GROUND B34 GB ‐ 35X60 DCon9 1 DCon10 1 DCon14 0 DCon14 0 DCon14 0 No Message No Message
GROUND B34 GB ‐ 35X60 DCon9 3 DCon2 0.2141 DCon11 0.03 DCon14 0 DCon14 0 No Message No Message
GROUND B34 GB ‐ 35X60 DCon9 5 DCon2 0.2141 DCon12 0.03 DCon14 0 DCon14 0 No Message No Message
GROUND B35 GB ‐ 35X60 DCon10 5 DCon2 0.1532 DCon12 0.03 DCon14 0 DCon14 0 No Message No Message
GROUND B35 GB ‐ 35X60 DCon10 3 DCon2 0.1532 DCon12 0.03 DCon14 0 DCon14 0 No Message No Message
GROUND B35 GB ‐ 35X60 DCon14 1 DCon9 1 DCon14 0 DCon14 0 DCon14 0 No Message No Message
GROUND B35 GB ‐ 35X60 DCon2 0.1294 DCon9 2 DCon14 0 DCon14 0 DCon14 0 No Message No Message
GROUND B35 GB ‐ 35X60 DCon2 0.1294 DCon1 3 DCon14 0 DCon14 0 DCon14 0 No Message No Message
GROUND B35 GB ‐ 35X60 DCon2 0.1294 DCon1 3 DCon14 0 DCon14 0 DCon14 0 No Message No Message
GROUND B35 GB ‐ 35X60 DCon2 0.1294 DCon1 3 DCon14 0 DCon14 0 DCon14 0 No Message No Message
GROUND B35 GB ‐ 35X60 DCon2 0.1294 DCon10 2 DCon14 0 DCon14 0 DCon14 0 No Message No Message
GROUND B35 GB ‐ 35X60 DCon13 1 DCon10 1 DCon14 0 DCon14 0 DCon14 0 No Message No Message
GROUND B35 GB ‐ 35X60 DCon9 2 DCon14 0.1889 DCon11 0.03 DCon14 0 DCon14 0 No Message No Message
GROUND B35 GB ‐ 35X60 DCon9 5 DCon2 0.1532 DCon12 0.03 DCon14 0 DCon14 0 No Message No Message
GROUND B21 GB ‐ 35X60 DCon10 3 DCon10 2 DCon14 0.03 DCon14 0 DCon14 0 No Message No Message
GROUND B21 GB ‐ 35X60 DCon10 2 DCon10 1 DCon14 0.03 DCon14 0 DCon14 0 No Message No Message
GROUND B21 GB ‐ 35X60 DCon10 2 DCon10 1 DCon14 0.03 DCon14 0 DCon14 0 No Message No Message
Page 97 of 281

GROUND B21 GB ‐ 35X60 DCon10 1 DCon10 1 DCon14 0.03 DCon14 0 DCon14 0 No Message No Message
GROUND B21 GB ‐ 35X60 DCon10 1 DCon10 1 DCon14 0.03 DCon14 0 DCon14 0 No Message No Message
GROUND B21 GB ‐ 35X60 DCon10 1 DCon9 1 DCon14 0.03 DCon14 0 DCon14 0 No Message No Message

ISSUED FOR CONSTRUCTION (IFC)

26 JAN 2022
A9 ‐ RC BEAMS DESIGN.xlsx
Calculation Report, OPERATION SHELTER, Plant Plant No. 015

Design  As Top  As Top As Bottom  As Bottom At Shear Torsion Long  Al Torsion Torsion Tran  At Torsion
Story Label V Combo Warnings Errors
Section Combo cm² Combo cm² cm²/cm Combo cm² Combo cm²/cm
GROUND B21 GB ‐ 35X60 DCon10 1 DCon1 2 DCon14 0.03 DCon14 0 DCon14 0 No Message No Message
GROUND B21 GB ‐ 35X60 DCon10 1 DCon1 2 DCon14 0.03 DCon14 0 DCon14 0 No Message No Message
GROUND B21 GB ‐ 35X60 DCon10 1 DCon1 2 DCon14 0.03 DCon14 0 DCon14 0 No Message No Message
GROUND B21 GB ‐ 35X60 DCon10 1 DCon1 2 DCon14 0.03 DCon14 0 DCon14 0 No Message No Message
GROUND B21 GB ‐ 35X60 DCon10 1 DCon1 1 DCon14 0.03 DCon14 0 DCon14 0 No Message No Message
GROUND B21 GB ‐ 35X60 DCon10 1 DCon10 1 DCon14 0.03 DCon14 0 DCon14 0 No Message No Message
GROUND B21 GB ‐ 35X60 DCon10 1 DCon10 1 DCon14 0.03 DCon14 0 DCon14 0 No Message No Message
GROUND B21 GB ‐ 35X60 DCon9 2 DCon9 1 DCon14 0.03 DCon14 0 DCon14 0 No Message No Message
GROUND B36 GB ‐ 35X60 DCon10 1 DCon10 1 DCon14 0.03 DCon14 0 DCon14 0 No Message No Message
GROUND B36 GB ‐ 35X60 DCon9 1 DCon9 1 DCon14 0.03 DCon14 0 DCon14 0 No Message No Message
GROUND B36 GB ‐ 35X60 DCon9 1 DCon9 1 DCon14 0.03 DCon14 0 DCon14 0 No Message No Message
GROUND B36 GB ‐ 35X60 DCon9 1 DCon9 1 DCon14 0.03 DCon14 0 DCon14 0 No Message No Message
GROUND B36 GB ‐ 35X60 DCon9 1 DCon9 1 DCon14 0.03 DCon14 0 DCon14 0 No Message No Message
GROUND B36 GB ‐ 35X60 DCon9 1 DCon9 1 DCon14 0.03 DCon14 0 DCon14 0 No Message No Message
GROUND B36 GB ‐ 35X60 DCon9 1 DCon9 1 DCon14 0.03 DCon14 0 DCon14 0 No Message No Message
GROUND B36 GB ‐ 35X60 DCon9 2 DCon9 1 DCon14 0.03 DCon14 0 DCon14 0 No Message No Message
GROUND B36 GB ‐ 35X60 DCon9 2 DCon9 1 DCon14 0.03 DCon14 0 DCon14 0 No Message No Message
GROUND B36 GB ‐ 35X60 DCon9 3 DCon9 2 DCon14 0.03 DCon14 0 DCon14 0 No Message No Message
GROUND B37 GB ‐ 35X60 DCon10 5 DCon10 4 DCon14 0.03 DCon14 0 DCon14 0 No Message No Message
GROUND B37 GB ‐ 35X60 DCon10 4 DCon1 3 DCon14 0.03 DCon14 0 DCon14 0 No Message No Message
GROUND B37 GB ‐ 35X60 DCon10 3 DCon1 3 DCon13 0.03 DCon14 0 DCon14 0 No Message No Message
GROUND B37 GB ‐ 35X60 DCon9 3 DCon1 3 DCon14 0.03 DCon14 0 DCon14 0 No Message No Message
GROUND B37 GB ‐ 35X60 DCon9 3 DCon1 3 DCon14 0.03 DCon14 0 DCon14 0 No Message No Message
GROUND B37 GB ‐ 35X60 DCon9 3 DCon1 3 DCon14 0.03 DCon14 0 DCon14 0 No Message No Message
GROUND B37 GB ‐ 35X60 DCon9 3 DCon1 3 DCon14 0.03 DCon14 0 DCon14 0 No Message No Message
GROUND B37 GB ‐ 35X60 DCon9 3 DCon1 3 DCon14 0.03 DCon14 0 DCon14 0 No Message No Message
GROUND B37 GB ‐ 35X60 DCon9 3 DCon1 4 DCon14 0.03 DCon14 0 DCon14 0 No Message No Message
GROUND B37 GB ‐ 35X60 DCon9 3 DCon1 4 DCon14 0.03 DCon14 0 DCon14 0 No Message No Message
GROUND B37 GB ‐ 35X60 DCon9 3 DCon10 4 DCon14 0.03 DCon14 0 DCon14 0 No Message No Message
GROUND B37 GB ‐ 35X60 DCon9 3 DCon10 4 DCon14 0.03 DCon14 0 DCon14 0 No Message No Message
GROUND B37 GB ‐ 35X60 DCon9 3 DCon1 4 DCon14 0.04 DCon13 10 DCon9 0.02 No Message No Message
GROUND B37 GB ‐ 35X60 DCon9 3 DCon1 3 DCon14 0.04 DCon13 10 DCon9 0.02 No Message No Message
GROUND B37 GB ‐ 35X60 DCon9 3 DCon1 3 DCon14 0.04 DCon13 10 DCon9 0.02 No Message No Message
GROUND B37 GB ‐ 35X60 DCon9 4 DCon1 3 DCon14 0.04 DCon13 10 DCon9 0.02 No Message No Message
GROUND B37 GB ‐ 35X60 DCon9 5 DCon9 4 DCon14 0.04 DCon13 10 DCon9 0.02 No Message No Message
GROUND B38 GB ‐ 35X60 DCon10 5 DCon2 0.2169 DCon14 0.03 DCon14 0 DCon14 0 No Message No Message
GROUND B38 GB ‐ 35X60 DCon10 3 DCon2 0.2169 DCon12 0.03 DCon14 0 DCon14 0 No Message No Message
GROUND B38 GB ‐ 35X60 DCon10 1 DCon9 1 DCon14 0 DCon14 0 DCon14 0 No Message No Message
GROUND B38 GB ‐ 35X60 DCon2 0.1831 DCon9 2 DCon14 0 DCon14 0 DCon14 0 No Message No Message
GROUND B38 GB ‐ 35X60 DCon2 0.1831 DCon9 3 DCon14 0 DCon14 0 DCon14 0 No Message No Message
Page 98 of 281

GROUND B38 GB ‐ 35X60 DCon2 0.1831 DCon1 4 DCon14 0 DCon14 0 DCon14 0 No Message No Message
GROUND B38 GB ‐ 35X60 DCon2 0.1831 DCon1 4 DCon14 0 DCon14 0 DCon14 0 No Message No Message
GROUND B38 GB ‐ 35X60 DCon2 0.1831 DCon1 3 DCon14 0 DCon14 0 DCon14 0 No Message No Message

ISSUED FOR CONSTRUCTION (IFC)

26 JAN 2022
A9 ‐ RC BEAMS DESIGN.xlsx
Calculation Report, OPERATION SHELTER, Plant Plant No. 015

Design  As Top  As Top As Bottom  As Bottom At Shear Torsion Long  Al Torsion Torsion Tran  At Torsion
Story Label V Combo Warnings Errors
Section Combo cm² Combo cm² cm²/cm Combo cm² Combo cm²/cm
GROUND B38 GB ‐ 35X60 DCon2 0.1831 DCon10 2 DCon14 0 DCon14 0 DCon14 0 No Message No Message
GROUND B38 GB ‐ 35X60 DCon9 1 DCon10 1 DCon14 0 DCon14 0 DCon14 0 No Message No Message
GROUND B38 GB ‐ 35X60 DCon9 3 DCon2 0.2169 DCon11 0.03 DCon14 0 DCon14 0 No Message No Message
GROUND B38 GB ‐ 35X60 DCon9 5 DCon2 0.2169 DCon13 0.03 DCon14 0 DCon14 0 No Message No Message
GROUND B39 GB ‐ 35X60 DCon10 5 DCon2 0.1757 DCon14 0.03 DCon14 0 DCon14 0 No Message No Message
GROUND B39 GB ‐ 35X60 DCon10 3 DCon2 0.1757 DCon12 0.03 DCon14 0 DCon14 0 No Message No Message
GROUND B39 GB ‐ 35X60 DCon10 1 DCon9 1 DCon14 0 DCon14 0 DCon14 0 No Message No Message
GROUND B39 GB ‐ 35X60 DCon2 0.1483 DCon9 2 DCon14 0 DCon14 0 DCon14 0 No Message No Message
GROUND B39 GB ‐ 35X60 DCon2 0.1483 DCon9 3 DCon14 0 DCon14 0 DCon14 0 No Message No Message
GROUND B39 GB ‐ 35X60 DCon2 0.1483 DCon1 4 DCon14 0 DCon14 0 DCon14 0 No Message No Message
GROUND B39 GB ‐ 35X60 DCon2 0.1483 DCon1 3 DCon14 0 DCon14 0 DCon14 0 No Message No Message
GROUND B39 GB ‐ 35X60 DCon2 0.1483 DCon1 3 DCon14 0 DCon14 0 DCon14 0 No Message No Message
GROUND B39 GB ‐ 35X60 DCon2 0.1483 DCon10 2 DCon14 0 DCon14 0 DCon14 0 No Message No Message
GROUND B39 GB ‐ 35X60 DCon9 1 DCon10 1 DCon14 0 DCon14 0 DCon14 0 No Message No Message
GROUND B39 GB ‐ 35X60 DCon9 3 DCon2 0.1757 DCon12 0.03 DCon14 0 DCon14 0 No Message No Message
GROUND B39 GB ‐ 35X60 DCon9 5 DCon2 0.1757 DCon13 0.03 DCon14 0 DCon14 0 No Message No Message
GROUND B40 GB ‐ 35X60 DCon10 3 DCon10 2 DCon14 0.03 DCon14 0 DCon14 0 No Message No Message
GROUND B40 GB ‐ 35X60 DCon10 2 DCon9 1 DCon14 0.03 DCon14 0 DCon14 0 No Message No Message
GROUND B40 GB ‐ 35X60 DCon10 2 DCon9 1 DCon14 0.03 DCon14 0 DCon14 0 No Message No Message
GROUND B40 GB ‐ 35X60 DCon9 1 DCon9 1 DCon14 0.03 DCon14 0 DCon14 0 No Message No Message
GROUND B40 GB ‐ 35X60 DCon9 1 DCon9 1 DCon14 0.03 DCon14 0 DCon14 0 No Message No Message
GROUND B40 GB ‐ 35X60 DCon9 1 DCon9 1 DCon14 0.03 DCon14 0 DCon14 0 No Message No Message
GROUND B40 GB ‐ 35X60 DCon9 1 DCon10 1 DCon14 0.03 DCon14 0 DCon14 0 No Message No Message
GROUND B40 GB ‐ 35X60 DCon9 1 DCon10 1 DCon14 0.03 DCon14 0 DCon14 0 No Message No Message
GROUND B40 GB ‐ 35X60 DCon9 2 DCon10 2 DCon14 0.03 DCon14 0 DCon14 0 No Message No Message
GROUND B40 GB ‐ 35X60 DCon9 2 DCon10 1 DCon14 0.03 DCon14 0 DCon14 0 No Message No Message
GROUND B40 GB ‐ 35X60 DCon9 3 DCon9 2 DCon14 0.03 DCon14 0 DCon14 0 No Message No Message
GROUND B41 GB ‐ 35X60 DCon10 3 DCon10 2 DCon14 0.03 DCon14 0 DCon14 0 No Message No Message
GROUND B41 GB ‐ 35X60 DCon10 2 DCon9 2 DCon14 0.03 DCon14 0 DCon14 0 No Message No Message
GROUND B41 GB ‐ 35X60 DCon10 2 DCon9 2 DCon14 0.03 DCon14 0 DCon14 0 No Message No Message
GROUND B41 GB ‐ 35X60 DCon9 1 DCon9 2 DCon14 0.03 DCon14 0 DCon14 0 No Message No Message
GROUND B41 GB ‐ 35X60 DCon9 1 DCon9 2 DCon14 0.03 DCon14 0 DCon14 0 No Message No Message
GROUND B41 GB ‐ 35X60 DCon9 1 DCon9 2 DCon14 0.03 DCon14 0 DCon14 0 No Message No Message
GROUND B41 GB ‐ 35X60 DCon9 1 DCon9 2 DCon14 0.03 DCon14 0 DCon14 0 No Message No Message
GROUND B41 GB ‐ 35X60 DCon9 1 DCon10 2 DCon14 0.03 DCon14 0 DCon14 0 No Message No Message
GROUND B41 GB ‐ 35X60 DCon9 2 DCon10 2 DCon14 0.03 DCon14 0 DCon14 0 No Message No Message
GROUND B41 GB ‐ 35X60 DCon9 2 DCon9 2 DCon14 0.03 DCon14 0 DCon14 0 No Message No Message
GROUND B41 GB ‐ 35X60 DCon9 3 DCon9 2 DCon14 0.03 DCon14 0 DCon14 0 No Message No Message
GROUND B42 GB ‐ 35X60 DCon10 3 DCon10 2 DCon14 0.03 DCon14 0 DCon14 0 No Message No Message
GROUND B42 GB ‐ 35X60 DCon10 2 DCon9 1 DCon14 0.03 DCon14 0 DCon14 0 No Message No Message
Page 99 of 281

GROUND B42 GB ‐ 35X60 DCon10 2 DCon9 2 DCon14 0.03 DCon14 0 DCon14 0 No Message No Message
GROUND B42 GB ‐ 35X60 DCon10 1 DCon9 2 DCon14 0.03 DCon14 0 DCon14 0 No Message No Message
GROUND B42 GB ‐ 35X60 DCon10 1 DCon10 1 DCon14 0.03 DCon14 0 DCon14 0 No Message No Message

ISSUED FOR CONSTRUCTION (IFC)

26 JAN 2022
A9 ‐ RC BEAMS DESIGN.xlsx
Calculation Report, OPERATION SHELTER, Plant Plant No. 015

Design  As Top  As Top As Bottom  As Bottom At Shear Torsion Long  Al Torsion Torsion Tran  At Torsion
Story Label V Combo Warnings Errors
Section Combo cm² Combo cm² cm²/cm Combo cm² Combo cm²/cm
GROUND B42 GB ‐ 35X60 DCon10 1 DCon10 1 DCon14 0.03 DCon14 0 DCon14 0 No Message No Message
GROUND B42 GB ‐ 35X60 DCon10 1 DCon10 1 DCon14 0.03 DCon14 0 DCon14 0 No Message No Message
GROUND B42 GB ‐ 35X60 DCon10 1 DCon10 2 DCon14 0.03 DCon14 0 DCon14 0 No Message No Message
GROUND B42 GB ‐ 35X60 DCon9 2 DCon10 2 DCon14 0.03 DCon14 0 DCon14 0 No Message No Message
GROUND B42 GB ‐ 35X60 DCon9 2 DCon10 2 DCon14 0.03 DCon14 0 DCon14 0 No Message No Message
GROUND B42 GB ‐ 35X60 DCon9 3 DCon9 2 DCon14 0.03 DCon14 0 DCon14 0 No Message No Message
GROUND B43 GB ‐ 35X50 DCon12 5 DCon10 3 DCon14 0.03 DCon14 0 DCon14 0 No Message No Message
GROUND B43 GB ‐ 35X50 DCon10 3 DCon10 2 DCon14 0.03 DCon14 0 DCon14 0 No Message No Message
GROUND B43 GB ‐ 35X50 DCon10 2 DCon10 2 DCon14 0.03 DCon14 0 DCon14 0 No Message No Message
GROUND B43 GB ‐ 35X50 DCon10 2 DCon9 3 DCon14 0.03 DCon14 0 DCon14 0 No Message No Message
GROUND B43 GB ‐ 35X50 DCon10 2 DCon1 4 DCon14 0.03 DCon14 0 DCon14 0 No Message No Message
GROUND B43 GB ‐ 35X50 DCon10 2 DCon1 4 DCon14 0 DCon14 0 DCon14 0 No Message No Message
GROUND B43 GB ‐ 35X50 DCon10 2 DCon1 4 DCon14 0 DCon14 0 DCon14 0 No Message No Message
GROUND B43 GB ‐ 35X50 DCon10 2 DCon1 4 DCon14 0.03 DCon14 0 DCon14 0 No Message No Message
GROUND B43 GB ‐ 35X50 DCon10 2 DCon10 2 DCon14 0.03 DCon14 0 DCon14 0 No Message No Message
GROUND B43 GB ‐ 35X50 DCon10 2 DCon10 2 DCon14 0.03 DCon14 0 DCon14 0 No Message No Message
GROUND B43 GB ‐ 35X50 DCon9 3 DCon10 2 DCon14 0.03 DCon14 0 DCon14 0 No Message No Message
GROUND B43 GB ‐ 35X50 DCon11 5 DCon9 3 DCon14 0.03 DCon14 0 DCon14 0 No Message No Message
Page 100 of 281

ISSUED FOR CONSTRUCTION (IFC)

26 JAN 2022
CALCULATION SHEET

SNC-LAVALIN FAYEZ ENGINEERING, Al Khobar, Saudi Arabia


PROJECT : Updrade Buildings for Risk Mitigation - RT Refinery
B.I Number : 10-02062-0002-001 Designed
Desi ned :: AIA
Project Code No. : 510008 Checked
Ch ed : : NFP / AKM
Calc. No. : PE-P20081 Revision
Re on :: IFC
Subject : Structural Calculation - Operation Shelter - Plant No. 015 Rev. No.
Re No. :: 00

3.2.3.2 Column Design

ISSUED FOR CONSTRUCTION (IFC)

26 JAN 2022
Calculation Report, OPERATION SHELTER, Plant Plant No. 015 Page 101 of 281
A9 :  Concrete Column PMM Envelope
P M Major M Minor PMM Ratio or 
Story Label Section Location PMM Combo
kN kN‐m kN‐m Rebar %
ROOF C1 C ‐ 55X55 ‐ 12T20 Top 128 27 ‐72 DCon9 0.168
ROOF C1 C ‐ 55X55 ‐ 12T20 Bottom 163 ‐25 89 DCon9 0.196
ROOF C2 C ‐ 55X55 ‐ 12T20 Top 223 44 ‐48 DCon9 0.146
ROOF C2 C ‐ 55X55 ‐ 12T20 Bottom 258 ‐28 62 DCon9 0.143
ROOF C3 C ‐ 55X55 ‐ 12T20 Top 130 27 74 DCon10 0.173
ROOF C3 C ‐ 55X55 ‐ 12T20 Bottom 165 ‐24 ‐89 DCon10 0.195
ROOF C4 C ‐ 55X55 ‐ 12T20 Top 217 ‐7 ‐97 DCon9 0.186
ROOF C4 C ‐ 55X55 ‐ 12T20 Bottom 252 8 91 DCon9 0.166
ROOF C5 C ‐ 55X55 ‐ 12T20 Top 393 ‐12 ‐50 DCon9 0.109
ROOF C5 C ‐ 55X55 ‐ 12T20 Bottom 428 14 57 DCon9 0.123
ROOF C6 C ‐ 55X55 ‐ 12T20 Top 223 ‐7 102 DCon10 0.198
ROOF C6 C ‐ 55X55 ‐ 12T20 Bottom 258 8 ‐89 DCon10 0.164
ROOF C7 C ‐ 55X55 ‐ 12T20 Top 206 ‐7 ‐95 DCon9 0.185
ROOF C7 C ‐ 55X55 ‐ 12T20 Bottom 240 8 75 DCon9 0.138
ROOF C8 C ‐ 55X55 ‐ 12T20 Top 357 ‐11 ‐49 DCon9 0.105
ROOF C8 C ‐ 55X55 ‐ 12T20 Bottom 392 12 71 DCon9 0.146
ROOF C9 C ‐ 55X55 ‐ 12T20 Top 213 ‐7 99 DCon10 0.194
ROOF C9 C ‐ 55X55 ‐ 12T20 Bottom 247 8 ‐90 DCon10 0.164
ROOF C10 C ‐ 55X55 ‐ 12T20 Top 267 67 96 DCon10 0.264
ROOF C10 C ‐ 55X55 ‐ 12T20 Bottom 302 ‐72 ‐58 DCon10 0.206
ROOF C11 C ‐ 55X55 ‐ 12T20 Top 541 121 ‐17 DCon10 0.241
ROOF C11 C ‐ 55X55 ‐ 12T20 Bottom 583 ‐38 74 DCon9 0.18
ROOF C12 C ‐ 55X55 ‐ 12T20 Top 254 63 ‐82 DCon10 0.232
ROOF C12 C ‐ 55X55 ‐ 12T20 Bottom 289 ‐70 40 DCon10 0.175
ROOF C13 C ‐ 55X55 ‐ 12T20 Top 157 ‐64 ‐14 DCon9 0.13
ROOF C13 C ‐ 55X55 ‐ 12T20 Bottom 217 38 57 DCon9 0.15
ROOF C14 C ‐ 55X55 ‐ 12T20 Top 450 ‐26 ‐159 DCon9 0.306
ROOF C14 C ‐ 55X55 ‐ 12T20 Bottom 485 16 116 DCon9 0.228
ROOF C15 C ‐ 55X55 ‐ 12T20 Top 347 ‐44 207 DCon10 0.468
ROOF C15 C ‐ 55X55 ‐ 12T20 Bottom 371 77 ‐84 DCon9 0.255
ROOF C16 C ‐ 55X55 ‐ 12T20 Top 215 7 106 DCon10 0.214
ROOF C16 C ‐ 55X55 ‐ 12T20 Bottom 250 ‐8 ‐90 DCon10 0.164
ROOF C17 C ‐ 55X55 ‐ 12T20 Top 426 ‐36 ‐58 DCon9 0.15
ROOF C17 C ‐ 55X55 ‐ 12T20 Bottom 461 15 75 DCon9 0.156
ROOF C19 C ‐ 55X55 ‐ 12T20 Top 204 6 ‐89 DCon9 0.17
ROOF C19 C ‐ 55X55 ‐ 12T20 Bottom 238 ‐8 72 DCon9 0.132
ROOF C20 C ‐ 55X55 ‐ 12T20 Top 214 ‐7 98 DCon10 0.191
ROOF C20 C ‐ 55X55 ‐ 12T20 Bottom 249 8 ‐88 DCon10 0.161
ROOF C21 C ‐ 55X55 ‐ 12T20 Top 366 12 ‐46 DCon9 0.102
ROOF C21 C ‐ 55X55 ‐ 12T20 Bottom 401 13 56 DCon9 0.12
ROOF C23 C ‐ 55X55 ‐ 12T20 Top 211 ‐7 ‐94 DCon9 0.181
ROOF C23 C ‐ 55X55 ‐ 12T20 Bottom 246 8 88 DCon9 0.161
ROOF C24 C ‐ 55X55 ‐ 12T20 Top 209 ‐7 97 DCon10 0.19
ROOF C24 C ‐ 55X55 ‐ 12T20 Bottom 244 8 ‐89 DCon10 0.162
ROOF C25 C ‐ 55X55 ‐ 12T20 Top 367 ‐12 ‐48 DCon9 0.104
ROOF C25 C ‐ 55X55 ‐ 12T20 Bottom 402 13 58 DCon9 0.123
ROOF C27 C ‐ 55X55 ‐ 12T20 Top 204 ‐6 ‐93 DCon9 0.18
ROOF C27 C ‐ 55X55 ‐ 12T20 Bottom 239 8 89 DCon9 0.162
ROOF C28 C ‐ 55X55 ‐ 12T20 Top 120 ‐21 70 DCon10 0.157

ISSUED FOR CONSTRUCTION (IFC)

26 JAN 2022
Calculation Report, OPERATION SHELTER, Plant Plant No. 015 Page 102 of 281
A9 :  Concrete Column PMM Envelope
P M Major M Minor PMM Ratio or 
Story Label Section Location PMM Combo
kN kN‐m kN‐m Rebar %
ROOF C28 C ‐ 55X55 ‐ 12T20 Bottom 155 21 ‐85 DCon10 0.187
ROOF C29 C ‐ 55X55 ‐ 12T20 Top 204 ‐32 ‐46 DCon9 0.123
ROOF C29 C ‐ 55X55 ‐ 12T20 Bottom 239 23 58 DCon9 0.131
ROOF C31 C ‐ 55X55 ‐ 12T20 Top 118 ‐20 ‐68 DCon9 0.153
ROOF C31 C ‐ 55X55 ‐ 12T20 Bottom 153 21 86 DCon9 0.189
GROUND C1 C ‐ 55X55 ‐ 12T20 Top 327 12 ‐54 DCon12 0.114
GROUND C1 C ‐ 55X55 ‐ 12T20 Bottom 377 ‐12 69 DCon9 0.141
GROUND C2 C ‐ 55X55 ‐ 12T20 Top 635 7 ‐20 DCon1 0.117
GROUND C2 C ‐ 55X55 ‐ 12T20 Bottom 562 ‐18 57 DCon9 0.139
GROUND C3 C ‐ 55X55 ‐ 12T20 Top 335 12 58 DCon11 0.121
GROUND C3 C ‐ 55X55 ‐ 12T20 Bottom 378 ‐12 ‐67 DCon12 0.137
GROUND C4 C ‐ 55X55 ‐ 12T20 Top 465 ‐15 ‐39 DCon12 0.105
GROUND C4 C ‐ 55X55 ‐ 12T20 Bottom 525 17 64 DCon9 0.144
GROUND C5 C ‐ 55X55 ‐ 12T20 Top 803 25 1 DCon1 0.148
GROUND C5 C ‐ 55X55 ‐ 12T20 Bottom 718 ‐23 56 DCon9 0.156
GROUND C6 C ‐ 55X55 ‐ 12T20 Top 488 ‐15 45 DCon9 0.114
GROUND C6 C ‐ 55X55 ‐ 12T20 Bottom 528 17 ‐60 DCon10 0.138
GROUND C7 C ‐ 55X55 ‐ 12T20 Top 445 14 40 DCon9 0.104
GROUND C7 C ‐ 55X55 ‐ 12T20 Bottom 453 14 49 DCon9 0.115
GROUND C8 C ‐ 55X55 ‐ 12T20 Top 626 20 ‐43 DCon10 0.13
GROUND C8 C ‐ 55X55 ‐ 12T20 Bottom 631 ‐20 68 DCon9 0.16
GROUND C9 C ‐ 55X55 ‐ 12T20 Top 487 16 41 DCon9 0.111
GROUND C9 C ‐ 55X55 ‐ 12T20 Bottom 531 18 ‐58 DCon10 0.137
GROUND C10 C ‐ 55X55 ‐ 12T20 Top 714 23 9 DCon1 0.132
GROUND C10 C ‐ 55X55 ‐ 12T20 Bottom 653 ‐21 ‐56 DCon10 0.148
GROUND C11 C ‐ 55X55 ‐ 12T20 Top 856 ‐27 ‐19 DCon1 0.158
GROUND C11 C ‐ 55X55 ‐ 12T20 Bottom 777 25 65 DCon9 0.174
GROUND C12 C ‐ 55X55 ‐ 12T20 Top 564 18 41 DCon9 0.12
GROUND C12 C ‐ 55X55 ‐ 12T20 Bottom 544 ‐48 ‐17 DCon10 0.125
GROUND C13 C ‐ 55X55 ‐ 12T20 Top 555 ‐19 ‐18 DCon1 0.104
GROUND C13 C ‐ 55X55 ‐ 12T20 Bottom 482 51 15 DCon9 0.122
GROUND C14 C ‐ 55X55 ‐ 12T20 Top 657 5 21 DCon1 0.121
GROUND C14 C ‐ 55X55 ‐ 12T20 Bottom 627 21 ‐65 DCon10 0.157
GROUND C15 C ‐ 55X55 ‐ 12T20 Top 647 ‐21 ‐53 DCon10 0.144
GROUND C15 C ‐ 55X55 ‐ 12T20 Bottom 655 21 ‐52 DCon10 0.143
GROUND C16 C ‐ 55X55 ‐ 12T20 Top 580 18 11 DCon1 0.107
GROUND C16 C ‐ 55X55 ‐ 12T20 Bottom 532 ‐17 ‐55 DCon10 0.133
GROUND C17 C ‐ 55X55 ‐ 12T20 Top 716 23 ‐18 DCon1 0.132
GROUND C17 C ‐ 55X55 ‐ 12T20 Bottom 647 ‐21 62 DCon9 0.155
GROUND C19 C ‐ 55X55 ‐ 12T20 Top 445 ‐14 37 DCon9 0.099
GROUND C19 C ‐ 55X55 ‐ 12T20 Bottom 452 ‐14 44 DCon9 0.109
GROUND C20 C ‐ 55X55 ‐ 12T20 Top 482 15 40 DCon9 0.107
GROUND C20 C ‐ 55X55 ‐ 12T20 Bottom 525 ‐17 ‐56 DCon10 0.132
GROUND C21 C ‐ 55X55 ‐ 12T20 Top 782 ‐2 ‐25 DCon1 0.144
GROUND C21 C ‐ 55X55 ‐ 12T20 Bottom 702 22 52 DCon9 0.15
GROUND C23 C ‐ 55X55 ‐ 12T20 Top 563 ‐18 ‐10 DCon1 0.104
GROUND C23 C ‐ 55X55 ‐ 12T20 Bottom 519 ‐16 58 DCon9 0.135
GROUND C24 C ‐ 55X55 ‐ 12T20 Top 463 ‐15 41 DCon9 0.107
GROUND C24 C ‐ 55X55 ‐ 12T20 Bottom 508 ‐16 ‐57 DCon10 0.132

ISSUED FOR CONSTRUCTION (IFC)

26 JAN 2022
Calculation Report, OPERATION SHELTER, Plant Plant No. 015 Page 103 of 281
A9 :  Concrete Column PMM Envelope
P M Major M Minor PMM Ratio or 
Story Label Section Location PMM Combo
kN kN‐m kN‐m Rebar %
GROUND C25 C ‐ 55X55 ‐ 12T20 Top 771 ‐24 0 DCon1 0.142
GROUND C25 C ‐ 55X55 ‐ 12T20 Bottom 692 22 53 DCon9 0.149
GROUND C27 C ‐ 55X55 ‐ 12T20 Top 444 ‐14 ‐39 DCon12 0.102
GROUND C27 C ‐ 55X55 ‐ 12T20 Bottom 501 ‐16 60 DCon9 0.135
GROUND C28 C ‐ 55X55 ‐ 12T20 Top 317 ‐10 56 DCon11 0.116
GROUND C28 C ‐ 55X55 ‐ 12T20 Bottom 358 11 ‐63 DCon12 0.13
GROUND C29 C ‐ 55X55 ‐ 12T20 Top 607 ‐5 ‐19 DCon1 0.112
GROUND C29 C ‐ 55X55 ‐ 12T20 Bottom 537 17 54 DCon9 0.132
GROUND C31 C ‐ 55X55 ‐ 12T20 Top 310 ‐10 ‐52 DCon12 0.107
GROUND C31 C ‐ 55X55 ‐ 12T20 Bottom 357 11 66 DCon9 0.135

ISSUED FOR CONSTRUCTION (IFC)

26 JAN 2022
Calculation Report, OPERATION SHELTER, Plant Plant No. 015 Page 104 of 281
CALCULATION SHEET

SNC-LAVALIN FAYEZ ENGINEERING, Al Khobar, Saudi Arabia


PROJECT : Updrade Buildings for Risk Mitigation - RT Refinery
B.I Number : 10-02062-0002-001 Designed
Desi ned :: AIA
Project Code No. : 510008 Checked
Ch ed : : NFP / AKM
Calc. No. : PE-P20081 Revision
Re on :: IFC
Subject : Structural Calculation - Operation Shelter - Plant No. 015 Rev. No.
Re No. :: 00

3.2.3.3 Base Reactions

ISSUED FOR CONSTRUCTION (IFC)

26 JAN 2022
Calculation Report, OPERATION SHELTER, Plant Plant No. 015 Page 105 of 281
ETABS 18.0.2
Calculation Report, OPERATION SHELTER, Plant Plant No. 015 3/15/2020

1 2 3 4 5 6 7 8 9

A 1 4 7 12 13 19 23 27 31

B 14

C 2 5 8 11 17 21 25 29

D 3 X 6 9 10 15 16 20 24 28
Page 106 of 281

ISSUED FOR CONSTRUCTION (IFC)

26 JAN 2022

A9-R1.EDB Plan View - Base - Z = -1.5 (m) Frame Span Loads (WALL)
A9:  Joint Reactions
FX FY FZ MX MY MZ
Story Joint Label Load Case/Combo
kN kN kN kN‐m kN‐m kN‐m
Base 1 ENV ‐ Service 29 ‐7 310 50 30 1
Base 1 ENV ‐ Service 0 ‐51 161 ‐27 ‐22 ‐1
Base 2 ENV ‐ Service 26 18 480 40 33 1
Base 2 ENV ‐ Service ‐3 ‐23 261 ‐36 ‐21 ‐1
Base 3 ENV ‐ Service 29 53 316 28 30 1
Base 3 ENV ‐ Service 0 9 165 ‐49 ‐22 ‐1
Base 4 ENV ‐ Service 13 5 431 47 24 1
Base 4 ENV ‐ Service ‐21 ‐36 232 ‐30 ‐32 ‐1
Base 5 ENV ‐ Service 22 17 607 40 31 0
Base 5 ENV ‐ Service ‐13 ‐20 345 ‐36 ‐25 0
Base 6 ENV ‐ Service 14 32 434 30 25 1
Base 6 ENV ‐ Service ‐21 ‐1 239 ‐43 ‐32 ‐1
Base 7 ENV ‐ Service 16 22 371 34 26 1
Base 7 ENV ‐ Service ‐16 ‐9 198 ‐33 ‐29 ‐1
Base 8 ENV ‐ Service 29 0 531 50 35 1
Base 8 ENV ‐ Service ‐8 ‐49 304 ‐27 ‐22 ‐1
Base 9 ENV ‐ Service 17 35 436 28 26 1
Base 9 ENV ‐ Service ‐16 ‐1 238 ‐42 ‐29 ‐1
Base 10 ENV ‐ Service 39 31 537 27 35 1
Base 10 ENV ‐ Service 1 ‐3 298 ‐41 ‐21 ‐1
Base 11 ENV ‐ Service ‐1 1 655 47 22 1
Base 11 ENV ‐ Service ‐37 ‐48 361 ‐26 ‐31 ‐1
Base 12 ENV ‐ Service 40 25 469 32 35 1
Base 12 ENV ‐ Service 2 ‐7 256 ‐32 ‐21 ‐1
Base 13 ENV ‐ Service ‐3 11 430 31 19 0
Base 13 ENV ‐ Service ‐42 ‐20 215 ‐30 ‐38 ‐1
Base 14 ENV ‐ Service 3 47 512 24 16 1
Base 14 ENV ‐ Service ‐12 ‐1 268 ‐47 ‐30 0
Base 15 ENV ‐ Service ‐2 4 541 24 20 1
Base 15 ENV ‐ Service ‐43 ‐24 305 ‐37 ‐39 ‐1
Base 16 ENV ‐ Service 17 32 438 25 28 0
Base 16 ENV ‐ Service ‐15 ‐1 241 ‐40 ‐26 ‐1
Base 17 ENV ‐ Service 34 2 546 45 33 0
Base 17 ENV ‐ Service ‐2 ‐46 303 ‐26 ‐22 ‐1
Base 19 ENV ‐ Service 16 20 371 31 28 1
Base 19 ENV ‐ Service ‐15 ‐8 199 ‐31 ‐26 ‐1
Base 20 ENV ‐ Service 16 34 431 28 28 1
Base 20 ENV ‐ Service ‐16 ‐2 236 ‐40 ‐27 ‐1
Base 21 ENV ‐ Service 14 17 590 37 25 1
Base 21 ENV ‐ Service ‐20 ‐21 338 ‐33 ‐30 ‐1
Base 23 ENV ‐ Service 17 3 426 42 28 1
Base 23 ENV ‐ Service ‐16 ‐32 232 ‐27 ‐26 ‐1
Base 24 ENV ‐ Service 16 35 417 28 28 1
Base 24 ENV ‐ Service ‐18 ‐1 227 ‐41 ‐27 ‐1
Base 25 ENV ‐ Service 15 17 581 37 26 1
Base 25 ENV ‐ Service ‐21 ‐21 329 ‐34 ‐30 ‐1
Base 27 ENV ‐ Service 16 2 410 44 28 1
Base 27 ENV ‐ Service ‐17 ‐35 222 ‐27 ‐27 ‐1

ISSUED FOR CONSTRUCTION (IFC)

26 JAN 2022
Calculation Report, OPERATION SHELTER, Plant Plant No. 015 Page 107 of 281
A9:  Joint Reactions
FX FY FZ MX MY MZ
Story Joint Label Load Case/Combo
kN kN kN kN‐m kN‐m kN‐m
Base 28 ENV ‐ Service 3 53 303 25 22 1
Base 28 ENV ‐ Service ‐26 10 152 ‐46 ‐30 ‐1
Base 29 ENV ‐ Service 6 16 462 38 22 1
Base 29 ENV ‐ Service ‐21 ‐22 245 ‐34 ‐30 ‐1
Base 31 ENV ‐ Service 3 ‐8 298 48 22 1
Base 31 ENV ‐ Service ‐26 ‐51 149 ‐24 ‐29 ‐1

ISSUED FOR CONSTRUCTION (IFC)

26 JAN 2022
Calculation Report, OPERATION SHELTER, Plant Plant No. 015 Page 108 of 281
CALCULATION SHEET

SNC-LAVALIN FAYEZ ENGINEERING, Al Khobar, Saudi Arabia


PROJECT : Updrade Buildings for Risk Mitigation - RT Refinery
B.I Number : 10-02062-0002-001 Designed
Desi ned :: AIA
Project Code No. : 510008 Checked
Ch ed : : NFP / AKM
Calc. No. : PE-P20081 Revision
Re on :: IFC
Subject : Structural Calculation - Operation Shelter Rev. No.
Re No. :: 00

3.2.3.3 Drift

ISSUED FOR CONSTRUCTION (IFC)

26 JAN 2022
Calculation Report, OPERATION SHELTER, Plant Plant No. 015 Page 109 of 281
ETABS 18.0.2 License #*1XDU9L5PCC84BR8

Story Response - Maximum Story Drifts


Summary Description
This is story response output for a specified range of stories and a selected load case or load combination.

Input Data

Name A9 - Story Drift

Display Type Max story drifts Story Range All Stories

Load Case SEISMIC Top Story ROOF

Output Type Max Bottom Story Base

Plot

Maximum Story Drifts

ROOF

GROUND

Base

0 80 160 240 320 400 480 560 640 720 800 E-6

Drift, Unitless

A9-R1.EDB Page 1 of 2 3/16/2020


ISSUED FOR CONSTRUCTION (IFC)

26 JAN 2022
Calculation Report, OPERATION SHELTER, Plant Plant No. 015 Page 110 of 281
ETABS 18.0.2 License #*1XDU9L5PCC84BR8

Tabulated Plot Coordinates

Story Response Values

Story Elevation Location X-Dir Y-Dir


m
ROOF 4.6 Top 0.000432 0.000618
GROUND 0 Top 0.000147 0.000215
Base -1.5 Top 0 0

Maximum Story Drift Ratio = D x Cd / I


= 0.000618 x 2.5 / 1.5
= 0.001 < 0.01

A9-R1.EDB Page 2 of 2 3/16/2020


ISSUED FOR CONSTRUCTION (IFC)

26 JAN 2022
Calculation Report, OPERATION SHELTER, Plant Plant No. 015 Page 111 of 281
CALCULATION SHEET

SNC-LAVALIN FAYEZ ENGINEERING, Al Khobar, Saudi Arabia


PROJECT : Updrade Buildings for Risk Mitigation - RT Refinery
B.I Number : 10-02062-0002-001 Desi ned : : AIA
Designed
Project Code No. : 510008 Checked
Ch ed : : NFP / AKM
Calc. No. : PE-P20081 Re on : :
Revision IFC
Subject : Structural Calculation - Operation Shelter - Plant No. 015 Re No. : :
Rev. No. 00

3.3 SAFE

ISSUED FOR CONSTRUCTION (IFC)

26 JAN 2022
Calculation Report, OPERATION SHELTER, Plant Plant No. 015 Page 112 of 281
CALCULATION SHEET

SNC-LAVALIN FAYEZ ENGINEERING, Al Khobar, Saudi Arabia


PROJECT : Updrade Buildings for Risk Mitigation - RT Refinery
B.I Number : 10-02062-0002-001 Designed
Desi ned :: AIA
Project Code No. : 510008 Checked
Ch ed : : NFP / AKM
Calc. No. : PE-P20081 Revision
Re on :: IFC
Subject : Structural Calculation - Operation Shelter - Plant No. 015 Rev. No.
Re No. :: 00

3.3.1 Slabs

ISSUED FOR CONSTRUCTION (IFC)

26 JAN 2022
Calculation Report, OPERATION SHELTER, Plant Plant No. 015 Page 113 of 281
CALCULATION SHEET

SNC-LAVALIN FAYEZ ENGINEERING, Al Khobar, Saudi Arabia


PROJECT : Updrade Buildings for Risk Mitigation - RT Refinery
B.I Number : 10-02062-0002-001 Desi ned : : AIA
Designed
Project Code No. : 510008 Checked
Ch ed : : NFP / AKM
Calc. No. : PE-P20081 Re on : :
Revision IFC
Subject : Structural Calculation - Operation Shelter - Plant No. 015 Re No. : :
Rev. No. 00

3.3.1.1 SAFE Input Report

ISSUED FOR CONSTRUCTION (IFC)

26 JAN 2022
Calculation Report, OPERATION SHELTER, Plant Plant No. 015 Page 114 of 281
1. Model properties
This section provides model properties, including items such as material properties, section properties, and support
properties.

1.1. Material properties

Table 1: Material Properties 03 - Concrete


Table 1: Material Properties 03 - Concrete
Material E U A UnitWt Fc LtWtConc UserModRu
p
N/mm2 1/C kN/m3 N/mm2
C35 27805.00000 0.200000 9.9000E-06 2.4000E+01 35.00000 No No
CSAC30 26667.31234 0.200000 9.9000E-06 2.3563E+01 30.00000 No No
MAT3 24870.00000 0.200000 9.9000E-06 0.0000E+00 28.00000 No No
MAT4 24870.00000 0.200000 9.9000E-06 2.4000E+01 27.50000 No No

Table 2: Material Properties 04 - Rebar


Table 2: Material Properties 04 - Rebar
Material E UnitWt Fy Fu
N/mm2 kN/m3 N/mm2 N/mm2
CSA-G30.18Gr4 200000 7.6973E+01 400.00000 500.00000
00
MAT2 200000 7.6973E+01 413.68550 517.10688

2.2. Section properties

Table 3: Slab Properties 02


Table 4: Slab Properties 02 - Solid Slabs
Slab Type MatProp Thickness Ortho
mm
Col_Stiff Stiff MAT4 320.000 No
S20 Slab C35 200.000 No

ISSUED FOR CONSTRUCTION (IFC)

26 JAN 2022
Calculation Report, OPERATION SHELTER, Plant Plant No. 015 Page 115 of 281
3. Load patterns

Table 4: Load Patterns


Table 18: Load Patterns
LoadPat Type SelfWtMult

DEAD DEAD 1.000000


LIVE LIVE 0.000000
SDL SUPER DEAD 0.000000
WALL SUPER DEAD 0.000000
SEISMIC(1/6) QUAKE 0.000000
SEISMIC(2/6) QUAKE 0.000000
SEISMIC(3/6) QUAKE 0.000000
SEISMIC(4/6) QUAKE 0.000000
SEISMIC(5/6) QUAKE 0.000000
SEISMIC(6/6) QUAKE 0.000000
WIND(1/12) WIND 0.000000
WIND(2/12) WIND 0.000000
WIND(3/12) WIND 0.000000
WIND(4/12) WIND 0.000000
WIND(5/12) WIND 0.000000
WIND(6/12) WIND 0.000000
WIND(7/12) WIND 0.000000
WIND(8/12) WIND 0.000000
WIND(9/12) WIND 0.000000
WIND(10/12) WIND 0.000000
WIND(11/12) WIND 0.000000
WIND(12/12) WIND 0.000000

ISSUED FOR CONSTRUCTION (IFC)

26 JAN 2022
Calculation Report, OPERATION SHELTER, Plant Plant No. 015 Page 116 of 281
4. Load cases

Table 5: Load Cases 02 - Static


Table 22: Load Cases 02 - Static
LoadCase InitialCond AType RelForceTol CreepCoeff ShrinkStrn

DEAD Zero Linear


LIVE Zero Linear
SDL Zero Linear
SEISMIC(1/6) Zero Linear
SEISMIC(2/6) Zero Linear
SEISMIC(3/6) Zero Linear
SEISMIC(4/6) Zero Linear
SEISMIC(5/6) Zero Linear
SEISMIC(6/6) Zero Linear
WALL Zero Linear
WIND(1/12) Zero Linear
WIND(2/12) Zero Linear
WIND(3/12) Zero Linear
WIND(4/12) Zero Linear
WIND(5/12) Zero Linear
WIND(6/12) Zero Linear
WIND(7/12) Zero Linear
WIND(8/12) Zero Linear
WIND(9/12) Zero Linear
WIND(10/12) Zero Linear
WIND(11/12) Zero Linear
WIND(12/12) Zero Linear
D1 Zero Cracked 0.000010
D2 Zero Cracked 0.000010
D3 Zero Long Term 0.000010 2.000000 0.000500
Cracked

ISSUED FOR CONSTRUCTION (IFC)

26 JAN 2022
Calculation Report, OPERATION SHELTER, Plant Plant No. 015 Page 117 of 281
Table 6: Load Cases 06 - Loads Applied
Table 23: Load Cases 06 - Loads Applied
LoadCase LoadPat SF

DEAD DEAD 1.000000


LIVE LIVE 1.000000
SDL SDL 1.000000
SEISMIC(1/6) SEISMIC(1/6) 1.000000
SEISMIC(2/6) SEISMIC(2/6) 1.000000
SEISMIC(3/6) SEISMIC(3/6) 1.000000
SEISMIC(4/6) SEISMIC(4/6) 1.000000
SEISMIC(5/6) SEISMIC(5/6) 1.000000
SEISMIC(6/6) SEISMIC(6/6) 1.000000
WALL WALL 1.000000
WIND(1/12) WIND(1/12) 1.000000
WIND(2/12) WIND(2/12) 1.000000
WIND(3/12) WIND(3/12) 1.000000
WIND(4/12) WIND(4/12) 1.000000
WIND(5/12) WIND(5/12) 1.000000
WIND(6/12) WIND(6/12) 1.000000
WIND(7/12) WIND(7/12) 1.000000
WIND(8/12) WIND(8/12) 1.000000
WIND(9/12) WIND(9/12) 1.000000
WIND(10/12) WIND(10/12) 1.000000
WIND(11/12) WIND(11/12) 1.000000
WIND(12/12) WIND(12/12) 1.000000
D1 DEAD 1.000000
D1 SDL 1.000000
D1 WALL 1.000000
D1 LIVE 1.000000
D2 DEAD 1.000000
D2 SDL 1.000000
D2 WALL 1.000000
D2 LIVE 0.250000
D3 DEAD 1.000000
D3 SDL 1.000000
D3 WALL 1.000000
D3 LIVE 0.250000

ISSUED FOR CONSTRUCTION (IFC)

26 JAN 2022
Calculation Report, OPERATION SHELTER, Plant Plant No. 015 Page 118 of 281
4.1. Load combinations

Load combinations shall be as defined / shown on the ETABS input report UNO

Table 7: Load Combination for Long Term Deflection

TABLE:    Load Combinations 
Combo  Load  SF  Type  DSStrength DSServInit DSServNorm  DSServLong AutoDesign Notes
LTD  D1  1  Linear Add No  No  No  No  No
LTD  D2 ‐1   
LTD  D3  1   

ISSUED FOR CONSTRUCTION (IFC)

26 JAN 2022
Calculation Report, OPERATION SHELTER, Plant Plant No. 015 Page 119 of 281
5. Design summary
This section provides design information for beams, strips, and punching checks.

5.1. Preferences
Table 8: Design Preferences 01 - Resistance Factors
Table 29: Design Preferences 01 -
Resistance Factors
PhiTen PhiComp PhiShear

0.900000 0.650000 0.750000

Table 9: Design Preferences 02 - Rebar Cover - Slabs


Table 30: Design Preferences 02 - Rebar Cover - Slabs
CoverTop CoverBot BarSize InnerLayer PTCGSTop PTCGSBotE PTCGSBotI SlabType
xt nt
mm mm mm mm mm
25.000 25.000 18 B 25.000 40.000 25.000 Two Way

ISSUED FOR CONSTRUCTION (IFC)

26 JAN 2022
Calculation Report, OPERATION SHELTER, Plant Plant No. 015 Page 120 of 281
CALCULATION SHEET

SNC-LAVALIN FAYEZ ENGINEERING, Al Khobar, Saudi Arabia


PROJECT : Updrade Buildings for Risk Mitigation - RT Refinery
B.I Number : 10-02062-0002-001 Desi ned : : AIA
Designed
Project Code No. : 510008 Checked
Ch ed : : NFP / AKM
Calc. No. : PE-P20081 Re on : :
Revision IFC
Subject : Structural Calculation - Operation Shelter - Plant No. 015 Re No. : :
Rev. No. 00

3.3.1.2 SAFE Input Sketches

ISSUED FOR CONSTRUCTION (IFC)

26 JAN 2022
Calculation Report, OPERATION SHELTER, Plant Plant No. 015 Page 121 of 281
A9-ROOF
Calculation Report, OPERATION SHELTER, Plant Plant No. 015 3/16/2020 7:49 AM

Z
Y X
Page 122 of 281

ISSUED FOR CONSTRUCTION (IFC)

26 JAN 2022

SAFE 2016 16.0.2 3-D View kN - m


A9-ROOF
Calculation Report, OPERATION SHELTER, Plant Plant No. 015 3/16/2020 7:51 AM

1 2 3 4 5 6 7 8 9

X D
Page 123 of 281

ISSUED FOR CONSTRUCTION (IFC)

26 JAN 2022

SAFE 2016 16.0.2 Plan View kN - m


CALCULATION SHEET

SNC-LAVALIN FAYEZ ENGINEERING, Al Khobar, Saudi Arabia


PROJECT : Updrade Buildings for Risk Mitigation - RT Refinery
B.I Number : 10-02062-0002-001 Designed
Desi ned :: AIA
Project Code No. : 510008 Checked
Ch ed : : NFP / AKM
Calc. No. : PE-P20081 Revision
Re on :: IFC
Subject : Structural Calculation - Operation Shelter - Plant No. 015 Rev. No.
Re No. :: 00

3.3.1.3 Flexure Design

ISSUED FOR CONSTRUCTION (IFC)

26 JAN 2022
Calculation Report, OPERATION SHELTER, Plant Plant No. 015 Page 124 of 281
Slab Bottom Reinforcement @ X-Direction (cm²/m)

Slab Bottom Reinforcement @ Y-Direction (cm²/m)

ISSUED FOR CONSTRUCTION (IFC)

26 JAN 2022
Calculation Report, OPERATION SHELTER, Plant Plant No. 015 Page 125 of 281
Slab Top Reinforcement @ X-Direction (cm²/m)

Slab Top Reinforcement @ Y-Direction (cm²/m)

ISSUED FOR CONSTRUCTION (IFC)

26 JAN 2022
Calculation Report, OPERATION SHELTER, Plant Plant No. 015 Page 126 of 281
Slab Bottom Reinforcement – Φ 10 / 150 @ X-Direction (cm²/m)

Slab Bottom Reinforcement – Φ 10 / 150 @ Y-Direction (cm²/m)

ISSUED FOR CONSTRUCTION (IFC)

26 JAN 2022
Calculation Report, OPERATION SHELTER, Plant Plant No. 015 Page 127 of 281
Slab Top Reinforcement – Φ 10 / 150 @ X-Direction (cm²/m)

Slab Top Reinforcement – Φ 10 / 150 @ Y-Direction (cm²/m)

ISSUED FOR CONSTRUCTION (IFC)

26 JAN 2022
Calculation Report, OPERATION SHELTER, Plant Plant No. 015 Page 128 of 281
CALCULATION SHEET

SNC-LAVALIN FAYEZ ENGINEERING, Al Khobar, Saudi Arabia


PROJECT : Updrade Buildings for Risk Mitigation - RT Refinery
B.I Number : 10-02062-0002-001 Designed
Desi ned :: AIA
Project Code No. : 510008 Checked
Ch ed : : NFP / AKM
Calc. No. : PE-P20081 Revision
Re on :: IFC
Subject : Structural Calculation - Operation Shelter - Plant No. 015 Rev. No.
Re No. :: 00

3.3.1.4 Deflection (Long Term)

ISSUED FOR CONSTRUCTION (IFC)

26 JAN 2022
Calculation Report, OPERATION SHELTER, Plant Plant No. 015 Page 129 of 281
LTD values based on reinforcement mesh - Φ 10 / 150 (mm)

Allowable Long-Term Deflection (LTD) = L / 240 = 6500 / 240 = 27.00 mm

Maximum Long-Term Deflection (LTD) = 11.00 mm < 27.00 mm

ISSUED FOR CONSTRUCTION (IFC)

26 JAN 2022
Calculation Report, OPERATION SHELTER, Plant Plant No. 015 Page 130 of 281
CALCULATION SHEET

SNC-LAVALIN FAYEZ ENGINEERING, Al Khobar, Saudi Arabia


PROJECT : Updrade Buildings for Risk Mitigation - RT Refinery
B.I Number : 10-02062-0002-001 Desi ned : : AIA
Designed
Project Code No. : 510008 Checked
Ch ed : : NFP / AKM
Calc. No. : PE-P20081 Re on : :
Revision IFC
Subject : Structural Calculation - Operation Shelter Re No. : :
Rev. No. 00

3.3.2 Foundations

ISSUED FOR CONSTRUCTION (IFC)

26 JAN 2022
Calculation Report, OPERATION SHELTER, Plant Plant No. 015 Page 131 of 281
CALCULATION SHEET

SNC-LAVALIN FAYEZ ENGINEERING, Al Khobar, Saudi Arabia


PROJECT : Updrade Buildings for Risk Mitigation - RT Refinery
B.I Number : 10-02062-0002-001 Desi ned : : AIA
Designed
Project Code No. : 510008 Checked
Ch ed : : NFP / AKM
Calc. No. : PE-P20081 Re on : :
Revision IFC
Subject : Structural Calculation - Operation Shelter - Plant No. 015 Re No. : :
Rev. No. 00

3.3.2.1 SAFE Input Report

ISSUED FOR CONSTRUCTION (IFC)

26 JAN 2022
Calculation Report, OPERATION SHELTER, Plant Plant No. 015 Page 132 of 281
1. Model properties
1.1. Material properties

Table 1: Material Properties 03 - Concrete


Table 1: Material Properties 03 - Concrete
Material E U A UnitWt Fc LtWtConc UserModRu
p
N/mm2 1/C kN/m3 N/mm2
C35 27805.00000 0.200000 9.9000E-06 2.4000E+01 35.00000 No No
CSAC30 26667.31234 0.200000 9.9000E-06 2.3563E+01 30.00000 No No

Table 2: Material Properties 04 - Rebar


Table 2: Material Properties 04 - Rebar
Material E UnitWt Fy Fu
N/mm2 kN/m3 N/mm2 N/mm2
CSA-G30.18Gr4 200000 7.6973E+01 400.00000 500.00000
00

1.2. Section properties


Table 3: Slab Properties 02 - Solid Slabs
Table 4: Slab Properties 02 - Solid Slabs
Slab Type MatProp Thickness Ortho
mm
. Stiff C35 800.000 No
F60 Footing C35 600.000 No

1.3. Support properties

Table 4: Soil Properties


Table 10: Soil Properties
Soil Subgrade NonlinOpt
kN/m3
Ks - 200 2.4000E+04 Compression
Only

ISSUED FOR CONSTRUCTION (IFC)

26 JAN 2022
Calculation Report, OPERATION SHELTER, Plant Plant No. 015 Page 133 of 281
2. Model loading
2.1. Load patterns

Table 5: Load Patterns


Table 5: Load Patterns
LoadPat Type SelfWtMult

DEAD DEAD 1.000000


LIVE LIVE 0.000000
SDL SUPER DEAD 0.000000
WALL SUPER DEAD 0.000000
SEISMIC(1/6) QUAKE 0.000000
SEISMIC(2/6) QUAKE 0.000000
SEISMIC(3/6) QUAKE 0.000000
SEISMIC(4/6) QUAKE 0.000000
SEISMIC(5/6) QUAKE 0.000000
SEISMIC(6/6) QUAKE 0.000000
WIND(1/12) WIND 0.000000
WIND(2/12) WIND 0.000000
WIND(3/12) WIND 0.000000
WIND(4/12) WIND 0.000000
WIND(5/12) WIND 0.000000
WIND(6/12) WIND 0.000000
WIND(7/12) WIND 0.000000
WIND(8/12) WIND 0.000000
WIND(9/12) WIND 0.000000
WIND(10/12) WIND 0.000000
WIND(11/12) WIND 0.000000
WIND(12/12) WIND 0.000000
DEAD_ABOVE DEAD 0.000000
LIVE_ABOVE LIVE 0.000000
SDL_ABOVE SUPER DEAD 0.000000
SEISMIC(1/6)_ABOVE QUAKE 0.000000
SEISMIC(2/6)_ABOVE QUAKE 0.000000
SEISMIC(3/6)_ABOVE QUAKE 0.000000
SEISMIC(4/6)_ABOVE QUAKE 0.000000
SEISMIC(5/6)_ABOVE QUAKE 0.000000
SEISMIC(6/6)_ABOVE QUAKE 0.000000
WALL_ABOVE SUPER DEAD 0.000000
WIND(1/12)_ABOVE WIND 0.000000
WIND(2/12)_ABOVE WIND 0.000000
WIND(3/12)_ABOVE WIND 0.000000
WIND(4/12)_ABOVE WIND 0.000000
WIND(5/12)_ABOVE WIND 0.000000
WIND(6/12)_ABOVE WIND 0.000000
WIND(7/12)_ABOVE WIND 0.000000
WIND(8/12)_ABOVE WIND 0.000000
WIND(9/12)_ABOVE WIND 0.000000
WIND(10/12)_ABOVE WIND 0.000000
WIND(11/12)_ABOVE WIND 0.000000
WIND(12/12)_ABOVE WIND 0.000000

ISSUED FOR CONSTRUCTION (IFC)

26 JAN 2022
Calculation Report, OPERATION SHELTER, Plant Plant No. 015 Page 134 of 281
2.2. Load combinations

Load combinations shall be as defined / shown on the ETABS input report UNO

Table 7: Load Combinations


Table 6: Load Combinations
Combo Load SF Type DSStrength DSServInit DSServNorm DSServLong

SOIL PRESSURE DStlS1 1.000000 Envelope


SOIL PRESSURE DStlS2 1.000000
SOIL PRESSURE DStlS3 1.000000
SOIL PRESSURE DStlS4 1.000000
SOIL PRESSURE DStlS5(1/12) 1.000000
SOIL PRESSURE DStlS5(2/12) 1.000000
SOIL PRESSURE DStlS5(3/12) 1.000000
SOIL PRESSURE DStlS5(4/12) 1.000000
SOIL PRESSURE DStlS5(5/12) 1.000000
SOIL PRESSURE DStlS5(6/12) 1.000000
SOIL PRESSURE DStlS5(7/12) 1.000000
SOIL PRESSURE DStlS5(8/12) 1.000000
SOIL PRESSURE DStlS5(9/12) 1.000000
SOIL PRESSURE DStlS5(10/12) 1.000000
SOIL PRESSURE DStlS5(11/12) 1.000000
SOIL PRESSURE DStlS5(12/12) 1.000000
SOIL PRESSURE DStlS6(1/12) 1.000000
SOIL PRESSURE DStlS6(2/12) 1.000000
SOIL PRESSURE DStlS6(3/12) 1.000000
SOIL PRESSURE DStlS6(4/12) 1.000000
SOIL PRESSURE DStlS6(5/12) 1.000000
SOIL PRESSURE DStlS6(6/12) 1.000000
SOIL PRESSURE DStlS6(7/12) 1.000000
SOIL PRESSURE DStlS6(8/12) 1.000000
SOIL PRESSURE DStlS6(9/12) 1.000000
SOIL PRESSURE DStlS6(10/12) 1.000000
SOIL PRESSURE DStlS6(11/12) 1.000000
SOIL PRESSURE DStlS6(12/12) 1.000000
SOIL PRESSURE DStlS7 1.000000
SOIL PRESSURE DStlS8 1.000000

ISSUED FOR CONSTRUCTION (IFC)

26 JAN 2022
Calculation Report, OPERATION SHELTER, Plant Plant No. 015 Page 135 of 281
4. Design summary
4.1. Preferences
Table 7: Design Preferences 01 - Resistance Factors
Table 7: Design Preferences 01 -
Resistance Factors
PhiTen PhiComp PhiShear

0.900000 0.650000 0.750000

Table 8: Design Preferences 02 - Rebar Cover - Slabs


Table 8: Design Preferences 02 - Rebar Cover - Slabs
CoverTop CoverBot BarSize InnerLayer PTCGSTop PTCGSBotE PTCGSBotI SlabType
xt nt
mm mm mm mm mm
75.000 75.000 16 B 25.000 40.000 25.000 Two Way

ISSUED FOR CONSTRUCTION (IFC)

26 JAN 2022
Calculation Report, OPERATION SHELTER, Plant Plant No. 015 Page 136 of 281
CALCULATION SHEET

SNC-LAVALIN FAYEZ ENGINEERING, Al Khobar, Saudi Arabia


PROJECT : Updrade Buildings for Risk Mitigation - RT Refinery
B.I Number : 10-02062-0002-001 Desi ned : : AIA
Designed
Project Code No. : 510008 Checked
Ch ed : : NFP / AKM
Calc. No. : PE-P20081 Re on : :
Revision IFC
Subject : Structural Calculation - Operation Shelter - Plant No. 015 Re No. : :
Rev. No. 00

3.3.2.2 SAFE Input Sketches

ISSUED FOR CONSTRUCTION (IFC)

26 JAN 2022
Calculation Report, OPERATION SHELTER, Plant Plant No. 015 Page 137 of 281
A9-FOUNDATION-R1
Calculation Report, OPERATION SHELTER, Plant Plant No. 015 3/16/2020 9:03 AM

1 2 3 4 5 6 7 8 9

F60 F60 F60 F60 F60 F60 F60 F60 F60


A

F60 B

F60 F60 F60 F60 F60 F60 F60 F60


C

F60 F60 F60 F60 F60 F60 F60 F60 F60 D


X
Page 138 of 281

ISSUED FOR CONSTRUCTION (IFC)

26 JAN 2022

SAFE 2016 16.0.2 Plan View kN - m


A9-FOUNDATION-R1
Calculation Report, OPERATION SHELTER, Plant Plant No. 015 3/16/2020 9:04 AM

1 2 3 4 5 6 7 8 9

Ks - 200 Ks - 200 Ks - 200 Ks - 200 Ks - 200 Ks - 200 Ks - 200 Ks - 200 Ks - 200


A

Ks - 200 B

Ks - 200 Ks - 200 Ks - 200 Ks - 200 Ks - 200 Ks - 200 Ks - 200 Ks - 200


C

Ks - 200 Ks - 200 Ks - 200 Ks - 200 Ks - 200 Ks - 200 Ks - 200 Ks - 200 Ks - 200 D


X
Page 139 of 281

ISSUED FOR CONSTRUCTION (IFC)

26 JAN 2022

SAFE 2016 16.0.2 Plan View kN - m


CALCULATION SHEET

SNC-LAVALIN FAYEZ ENGINEERING, Al Khobar, Saudi Arabia


PROJECT : Updrade Buildings for Risk Mitigation - RT Refinery
B.I Number : 10-02062-0002-001 Designed
Desi ned :: AIA
Project Code No. : 510008 Checked
Ch ed : : NFP / AKM
Calc. No. : PE-P20081 Revision
Re on :: IFC
Subject : Structural Calculation - Operation Shelter - Plant No. 015 Rev. No.
Re No. :: 00

3.3.2.3 Flexure Design

ISSUED FOR CONSTRUCTION (IFC)

26 JAN 2022
Calculation Report, OPERATION SHELTER, Plant Plant No. 015 Page 140 of 281
Foundations Bottom Reinforcement @ X-Direction (cm²/m)

Foundations Bottom Reinforcement @ Y-Direction (cm²/m)

ISSUED FOR CONSTRUCTION (IFC)

26 JAN 2022
Calculation Report, OPERATION SHELTER, Plant Plant No. 015 Page 141 of 281
Foundations Top Reinforcement @ X-Direction (cm²/m)

Foundations Top Reinforcement @ X-Direction (cm²/m)

ISSUED FOR CONSTRUCTION (IFC)

26 JAN 2022
Calculation Report, OPERATION SHELTER, Plant Plant No. 015 Page 142 of 281
CALCULATION SHEET

SNC-LAVALIN FAYEZ ENGINEERING, Al Khobar, Saudi Arabia


PROJECT : Updrade Buildings for Risk Mitigation - RT Refinery
B.I Number : 10-02062-0002-001 Desi ned : : AIA
Designed
Project Code No. : 510008 Checked
Ch ed : : NFP / AKM
Calc. No. : PE-P20081 Re on : :
Revision IFC
Subject : Structural Calculation - Operation Shelter - Plant No. 015 Re No. : :
Rev. No. 00

3.3.2.4 Punching Check

ISSUED FOR CONSTRUCTION (IFC)

26 JAN 2022
Calculation Report, OPERATION SHELTER, Plant Plant No. 015 Page 143 of 281
A9-FOUNDATION-R1
Calculation Report, OPERATION SHELTER, Plant Plant No. 015 3/16/2020 9:09 AM

1 2 3 4 5 6 7 8 9

0.1121 0.1553 0.1251 0.1566 0.1449 0.1229 0.1436 0.1393 0.1063


A

0.1806
B

0.1603 0.184 0.1879 0.2254 0.1901 0.2012 0.1977 0.1525


C

0.1127 0.1368 0.1473 0.1831 0.1926 0.1472 0.1441 0.1401 0.1068


X D
Page 144 of 281

ISSUED FOR CONSTRUCTION (IFC)

26 JAN 2022

SAFE 2016 16.0.2 Punching Shear Capacity Ratios/Shear Reinforcement kN - m


CALCULATION SHEET

SNC-LAVALIN FAYEZ ENGINEERING, Al Khobar, Saudi Arabia


PROJECT : Updrade Buildings for Risk Mitigation - RT Refinery
B.I Number : 10-02062-0002-001 Desi ned : : AIA
Designed
Project Code No. : 510008 Checked
Ch ed : : NFP / AKM
Calc. No. : PE-P20081 Re on : :
Revision IFC
Subject : Structural Calculation - Operation Shelter - Plant No. 015 Re No. : :
Rev. No. 00

3.3.2.5 Base Pressure

ISSUED FOR CONSTRUCTION (IFC)

26 JAN 2022
Calculation Report, OPERATION SHELTER, Plant Plant No. 015 Page 145 of 281
Soil Pressure (Kn/m²)

ISSUED FOR CONSTRUCTION (IFC)

26 JAN 2022
Calculation Report, OPERATION SHELTER, Plant Plant No. 015 Page 146 of 281
CALCULATION SHEET

SNC-LAVALIN FAYEZ ENGINEERING, Al Khobar, Saudi Arabia


PROJECT : Updrade Buildings for Risk Mitigation - RT Refinery
B.I Number : 10-02062-0002-001 Designed : AIA / NFP
Project Code No. : 510008 Checcked : NFP / AKM
Calc. No. : PE-P20081 Reviision : IFC Sub
Subject : Structural Calculation - Operator Shelter, Plant No. 015 (Bldg-A9) Rev.. No. : 00

4.0 SDOF BLAST ANALYSIS AND DESIGN

ISSUED FOR CONSTRUCTION (IFC)

26 JAN 2022
Calculation Report, OPERATION SHELTER, Plant Plant No. 015 Page 147 of 281
CALCULATION SHEET

SNC-LAVALIN FAYEZ ENGINEERING, Al Khobar, Saudi Arabia


PROJECT : Updrade Buildings for Risk Mitigation - RT Refinery
B.I Number : 10-02062-0002-001 Designed : AIA / NFP
Project Code No. : 510008 Checcked : NFP / AKM
Calc. No. : PE-P20081 Reviision : IFC Sub
Subject : Structural Calculation - Operator Shelter, Plant No. 015 (Bldg-A9) Rev.. No. : 00

4.1 REINFORCED CONCRETE WALL DESIGN


(FRONT WALLS)

ISSUED FOR CONSTRUCTION (IFC)

26 JAN 2022
Calculation Report, OPERATION SHELTER, Plant Plant No. 015 Page 148 of 281
CALCULATION SHEET

SNC-LAVALIN FAYEZ ENGINEERING, Al Khobar, Saudi Arabia


PROJECT : Updrade Buildings for Risk Mitigation - RT Refinery
B.I Number : 10-02062-0002-001 Designed : AIA / NFP
Project Code No. : 510008 Checcked : NFP / AKM
Calc. No. : PE-P20081 Reviision : IFC Sub
Subject : Structural Calculation - Operator Shelter, Plant No. 015 (Bldg-A9) Rev.. No. : 00

4.1.1 REINFORCED CONCRETE EAST-WALL DESIGN

ISSUED FOR CONSTRUCTION (IFC)

26 JAN 2022
Calculation Report, OPERATION SHELTER, Plant Plant No. 015 Page 149 of 281
CALCULATION SHEET

SNC-LAVALIN FAYEZ ENGINEERING, Al Khobar, Saudi Arabia


PROJECT : Upgrade Buildings for Risk Mitigation - RT Refinery
EWO / B.I. No. : 10-02062-0002-001 Designed : NFP
Project Code No. : 510008 Checked : AMK
Calc. No. : PE-P20081 Revision : IFC SUB
Subject : Building A9, 300mm RC Wall Design (Exterior Front-Wall) Rev. No. : 00

DEAD LOAD AND BLAST LOAD ON RC WALL PANEL COMPONENT

Dimensions:
Design Strip, b 1.000 m
Wall Height, H 4.050 m (Refer to attached Design drawings…..)
Wall Thickness, T 0.300 m (Refer to attached Design drawings…..)

Figure - RC Wall Panel Tributary Area

L L

b Wall Location
Considering Front RC wall
facing blast source located
on the east side of the
building (along Grid-A).
H

Refer to attached Design


Drawings RA-102122 and
RA-462174.

Compute Static Dead Load on RC Wall Panel

Load Transfer from Beams 0.000 kN/m (No loads transfer from beams…..)
RC Wall Self-weight 29.160 kN/m
Other superimposed DL 0.000 kN/m
Total 29.160 kN/m

Static Load, P = 29.160 kN per 1.00 meter width of wall

Define the Dynamic Blast Load on RC Wall Panel (Refer to Blast Load Calculation pages…..)
Blast Pressure on Front Wall
Blast Pressure (P) vs. Time (t)
Blast Wall Pressure, Pr = 183.070 kPa 200.00
Rise time, tr = 0.000 secs
150.00
Time duration, to = 0.039 secs
Blast Pressure, P

100.00

50.00

0.000 0.00
0.00
0.000 #####
0.000

0.005

0.010

0.015

0.020

0.025

0.030

0.035

0.040

0.045

0.039 0.00
Time, t

ISSUED FOR CONSTRUCTION (IFC)

26 JAN 2022
Calculation Report, OPERATION SHELTER, Plant Plant No. 015 Page 150 of 281
CALCULATION SHEET

SNC-LAVALIN FAYEZ ENGINEERING, Al Khobar, Saudi Arabia


PROJECT : Upgrade Buildings for Risk Mitigation - RT Refinery
EWO / B.I. No. : 10-02062-0002-001 Designed : NFP
Project Code No. : 510008 Checked : AMK
Calc. No. : PE-P20081 Revision : IFC SUB
Subject : Building A9, 300mm RC Wall Design (Exterior Front-Wall) Rev. No. : 00

Blast Load Tabulation:

Time Increment, ∆t = 0.0030 secs < 10% of period of vibration, tn o.k.

Pressure Eqv. UDL Dyn. Force


Time
Pa = Pa x b F = UDL x H
0.0000 183.070 183.070 741.434
0.0030 168.988 168.988 684.400
0.0060 154.905 154.905 627.367
0.0090 140.823 140.823 570.333
0.0120 126.741 126.741 513.300
0.0150 112.658 112.658 456.267
0.0180 98.576 98.576 399.233
0.0210 84.494 84.494 342.200
0.0240 70.412 70.412 285.167
0.0270 56.329 56.329 228.133
0.0300 42.247 42.247 171.100
0.0330 28.165 28.165 114.067
0.0360 14.082 14.082 57.033
0.0390 0.000 0.000 0.000
0.0420 0.000 0.000 0.000
0.0450 0.000 0.000 0.000
0.0480 0.000 0.000 0.000
0.0510 0.000 0.000 0.000
0.0540 0.000 0.000 0.000
0.0570 0.000 0.000 0.000
0.0600 0.000 0.000 0.000
0.0630 0.000 0.000 0.000
0.0660 0.000 0.000 0.000
0.0690 0.000 0.000 0.000
0.0720 0.000 0.000 0.000
0.0750 0.000 0.000 0.000
0.0780 0.000 0.000 0.000
0.0810 0.000 0.000 0.000
0.0840 0.000 0.000 0.000
0.0870 0.000 0.000 0.000
0.0900 0.000 0.000 0.000
0.0930 0.000 0.000 0.000
0.0960 0.000 0.000 0.000
0.0990 0.000 0.000 0.000
0.1020 0.000 0.000 0.000
0.1050 0.000 0.000 0.000
0.1080 0.000 0.000 0.000
0.1110 0.000 0.000 0.000
0.1140 0.000 0.000 0.000
0.1170 0.000 0.000 0.000
0.1200 0.000 0.000 0.000

ISSUED FOR CONSTRUCTION (IFC)

26 JAN 2022
Calculation Report, OPERATION SHELTER, Plant Plant No. 015 Page 151 of 281
CALCULATION SHEET

SNC-LAVALIN FAYEZ ENGINEERING, Al Khobar, Saudi Arabia


PROJECT : Upgrade Buildings for Risk Mitigation - RT Refinery
EWO / B.I. No. : 10-02062-0002-001 Designed : NFP
Project Code No. : 510008 Checked : AMK
Calc. No. : PE-P20081 Revision : IFC SUB
Subject : Building A9, 300mm RC Wall Design (Exterior Front-Wall) Rev. No. : 00

0.1230 0.000 0.000 0.000


0.1260 0.000 0.000 0.000
0.1290 0.000 0.000 0.000
0.1320 0.000 0.000 0.000
0.1350 0.000 0.000 0.000
0.1380 0.000 0.000 0.000
0.1410 0.000 0.000 0.000
0.1440 0.000 0.000 0.000
0.1470 0.000 0.000 0.000
0.1500 0.000 0.000 0.000
0.1530 0.000 0.000 0.000
0.1560 0.000 0.000 0.000
0.1590 0.000 0.000 0.000
0.1620 0.000 0.000 0.000
0.1650 0.000 0.000 0.000
0.1680 0.000 0.000 0.000
0.1710 0.000 0.000 0.000
0.1740 0.000 0.000 0.000
0.1770 0.000 0.000 0.000
0.1800 0.000 0.000 0.000
0.1830 0.000 0.000 0.000
0.1860 0.000 0.000 0.000
0.1890 0.000 0.000 0.000
0.1920 0.000 0.000 0.000
0.1950 0.000 0.000 0.000
0.1980 0.000 0.000 0.000
0.2010 0.000 0.000 0.000
0.2040 0.000 0.000 0.000
0.2070 0.000 0.000 0.000
0.2100 0.000 0.000 0.000
0.2130 0.000 0.000 0.000
0.2160 0.000 0.000 0.000
0.2190 0.000 0.000 0.000
0.2220 0.000 0.000 0.000
0.2250 0.000 0.000 0.000
0.2280 0.000 0.000 0.000
0.2310 0.000 0.000 0.000
0.2340 0.000 0.000 0.000
0.2370 0.000 0.000 0.000
0.2400 0.000 0.000 0.000
0.2430 0.000 0.000 0.000

ISSUED FOR CONSTRUCTION (IFC)

26 JAN 2022
Calculation Report, OPERATION SHELTER, Plant Plant No. 015 Page 152 of 281
CALCULATION SHEET

SNC-LAVALIN FAYEZ ENGINEERING, Al Khobar, Saudi Arabia


PROJECT : Upgrade Buildings for Risk Mitigation - RT Refinery
EWO / B.I. No. : 10-02062-0002-001 Designed : NFP
Project Code No. : 510008 Checked : AMK
Calc. No. : PE-P20081 Revision : IFC SUB
Subject : Building A9, 300mm RC Wall Design (Exterior Front-Wall) Rev. No. : 00

REINFORCED CONCRETE WALL PANEL DYNAMIC PROPERTIES - SDOF Equivalent System


(ref: ASCE-41088)

RC Wall Panel Dimensions and Boundary Conditions


Wall Thickness, T 300 mm
Wall Height, H 4.05 m
Wall Des. Width, b 1000 mm (Considering 1-m design strip)
Concrete Cover 20 mm
Boundary Condition : Pinned - Pinned

RC Wall Panel Mass


Mass, M = Total Dead Load, P / Gravitational accelation, g
Mass, M = 2.972 kN-s²/m per unit width or 0.003 kN-s²/mm per unit width

RC Wall Panel Rebar Schedule

Ø12 @ 350 Ø16 @ 200 Notes:


Inside Face
300

Outside Face
Ø12 @ 350 Ø16 @ 200
Wall Panel Sectional Plan View

Bar
Rebars Vertical Bars Horizontal Bars Remarks
Location
@ Midspan Ø16 @ 200 Ø12 @ 350 Inside Face See attached Design Drawings RA-102122 and RA-462174.
@ Support Ø16 @ 200 Ø12 @ 350 Outside Face

Material Increase Factors


Material / Strength Factor Concrete Steel Stress Type Remarks
Strength Increase Factor (SIF) 1.00 1.10 Flexure New construction.
Dynamic Increase Factor (DIF) 1.19 1.17 Flexure

Material Strength
Concrete Unit Weight 24 kN/m³
Concrete Ult. Comp. Strength, Fc' 35.00 Mpa
Steel Yield Strength, Fy 420.00 Mpa
F'dc = Fc' x SIF x DIF 41.65 Mpa
Fds = Fy x SIF x DIF 540.54 Mpa
Conc. Modulus of Elasticity, Ec 30332.30 Mpa
Steel Modulus of Elasticity, Es 200000.00 Mpa

ISSUED FOR CONSTRUCTION (IFC)

26 JAN 2022
Calculation Report, OPERATION SHELTER, Plant Plant No. 015 Page 153 of 281
CALCULATION SHEET

SNC-LAVALIN FAYEZ ENGINEERING, Al Khobar, Saudi Arabia


PROJECT : Upgrade Buildings for Risk Mitigation - RT Refinery
EWO / B.I. No. : 10-02062-0002-001 Designed : NFP
Project Code No. : 510008 Checked : AMK
Calc. No. : PE-P20081 Revision : IFC SUB
Subject : Building A9, 300mm RC Wall Design (Exterior Front-Wall) Rev. No. : 00

Compute RC Wall Panel Effective Depths


Short Span Section Long Span Section
Positive (inbound) Negative (rebound) Positive (inbound) Negative (rebound)
Bending Resistance Bending Resistance Bending Resistance Bending Resistance
@ Mid-height 272.000 272.000 258.000 258.000
@ Support 272.000 272.000 258.000 258.000

Compute RC Wall Panel Strength


Determine β1 value as per ACI 318-08, 10.2.7.3;
0.85 (
for Fdc' ≤ 28Mpa )

  0.65 
β1 =   
max  0.85 − 0.05 Fdc − 28  
'
( for F'
dc > 28Mpa )
   
   7 
β1 = 0.7525

Strength Reduction Factor (ACI 318-08)


F = 1.000

Min Limits of Steel Reinforcements:


Required minimum rebars, Asmin (ACI 318-08, 14.3.2)

 For Vertical rebars ; 


 0.0012(b × d ) 
  = 360.000 mm² vertical bars per linear meter of Wall Panel.
As (min ) = 
 For Horizontal rebars ; = 450.000 mm² horizontal bars per linear meter of Wall Panel.
 0.0015(b × d )
 

Bending Capacities:
The following calculations are per 1.0m strip width of RC Wall Panel:
Wall Panel Section
Section Unit
Inbound Rebound
Total area of Reinf # of Bars x Area of 1-bar @ Mid-height 1005.310 1005.310 mm²
or
Steel, Ast Min. ACI Reinforcement @ Support 1005.310 1005.310 mm²
Depth of Stress- As × Fds @ Mid-height 15.349 15.349 mm
a=
Block, a 0.85F ' dc b @ Support 15.349 15.349 mm
Bending Moment   a  @ Mid-height 143.637 143.637 kN-m
M p = φAs Fds d −  
Capacity, Mpc & Mps   2  @ Support 143.637 143.637 kN-m

ISSUED FOR CONSTRUCTION (IFC)

26 JAN 2022
Calculation Report, OPERATION SHELTER, Plant Plant No. 015 Page 154 of 281
CALCULATION SHEET

SNC-LAVALIN FAYEZ ENGINEERING, Al Khobar, Saudi Arabia


PROJECT : Upgrade Buildings for Risk Mitigation - RT Refinery
EWO / B.I. No. : 10-02062-0002-001 Designed : NFP
Project Code No. : 510008 Checked : AMK
Calc. No. : PE-P20081 Revision : IFC SUB
Subject : Building A9, 300mm RC Wall Design (Exterior Front-Wall) Rev. No. : 00

Compute RC Wall Panel Resistance & Transformation Factors

Flexural (Bending) Resistance as per ASCE 41088, Table 6.1


Total Bending Resistance (kN) Transformation Factors
Loading Diagram Strain Range
Inbound, Rb+ Rebound, Rb- Load Fac., KL Mass Fac. KM
8(M8psM+ pcM pc )
Elastic Rb =Rb = 283.73 283.73 0.64 0.50
LL
8M
12 M pc
Rbb ==
ps
Plastic R 283.73 283.73 0.50 0.33
LL

Compute for Nominal Shear Strength:

Fc' (b )(d )
1
Vn =
6
Vn = 292.567 kN

Compute for Nominal Shear Resistance of wall section (Critical section at distance 'd' from the support)
RV = Vn H / (0.5 H - d)
RV = 675.925 kN

Flexural resistance is less than Shear resistance, thus Flexural resistance governs…..

Compute RC Wall Panel Stiffness, Ke ( PCA notes to ACI 318-08 and ASCE-41088 )
Moment of Inertia for Wall Panel Cracked Section (midheight-inbound), Icr

Es
n= = 6.594
Ec

b
B= = 0.151
nAs

Transformed Section Wall Panel


b(kd )
3
I cr = + nAs (d − kd ) 367504753.535 mm4 per unit width
2
=
3
where :

kd =
( 2dB + 1 − 1 )
B = 53.786 mm

Moment of Inertia for Rectangular Wall Panel Gross Section (per unit width), Ig

bh 3
Ig = =
4
2250000000.000 mm per unit width
12

ISSUED FOR CONSTRUCTION (IFC)

26 JAN 2022
Calculation Report, OPERATION SHELTER, Plant Plant No. 015 Page 155 of 281
CALCULATION SHEET

SNC-LAVALIN FAYEZ ENGINEERING, Al Khobar, Saudi Arabia


PROJECT : Upgrade Buildings for Risk Mitigation - RT Refinery
EWO / B.I. No. : 10-02062-0002-001 Designed : NFP
Project Code No. : 510008 Checked : AMK
Calc. No. : PE-P20081 Revision : IFC SUB
Subject : Building A9, 300mm RC Wall Design (Exterior Front-Wall) Rev. No. : 00

Average Moment of Inertia (per unit width), Ia


I g + I cr
Ia = =
4
2250000000.000 mm per unit width
2
Compute for Stiffness, K (as per ASCE 41088, Table 6.1)
Loading Diagram Strain Range Stiffness, Ke Unit

384EE((II))
384
Elastic K ==
K 78901.276 N/mm
5LL3 3

Plastic 0 0.000 N/mm

Equivalent Mass, Me

Use average elastic and plastic transformation values for KLM:


elastic KLM = 0.50 / 0.64 = 0.781
plastic KLM = 0.33 / 0.50 = 0.660
average KLM = 0.721

Me = (KLM) (M)
Me = 0.003 kN-s²/mm per unit width

Period of vibration, tn
Me
t n = 2π
Ke
tn = 0.039 secs.

Summary
Equivalent Mass, M 0.003 kN-s²/mm per unit width
Stiffness, Ke 78.901 kN/mm
inbound resistance, Ru+ 283.727 kN per unit width
rebound resistance, Ru- 283.727 kN per unit width
static load, Fs 0.000 kN per unit width

ISSUED FOR CONSTRUCTION (IFC)

26 JAN 2022
Calculation Report, OPERATION SHELTER, Plant Plant No. 015 Page 156 of 281
CALCULATION SHEET

SNC-LAVALIN FAYEZ ENGINEERING, Al Khobar, Saudi Arabia


PROJECT : Upgrade Buildings for Risk Mitigation - RT Refinery
EWO / B.I. No. : 10-02062-0002-001 Designed : NFP
Project Code No. : 510008 Checked : AMK
Calc. No. : PE-P20081 Revision : IFC SUB
Subject : Building A9, 300mm RC Wall Design (Exterior Front-Wall) Rev. No. : 00

NON-LINEAR (ELASTO-PLASTIC) SDOF ANALYSIS - ASCE 41088

Coefficents @ Vp
Loading Diagram Strain Range
Rstnce, CR Force, CF

Elastic 0.39 0.11

Plastic 0.38 0.12

RESPONSE GRAPH (Based on calculated values from the table on next page…..)

Dyn. Load, F
Dyn. Load/Deformation vs. Time
Deformation, y / 5
800.00
700.00
600.00
500.00
400.00
300.00
200.00
100.00
0.00
-100.00
0.0000

0.1000

0.2000

0.3000

0.4000

0.5000

0.6000

Support Reaction, V
Support Reaction/Resistance vs. Time
Resistance, R
400.000
300.000
200.000
100.000
0.000
-100.000
-200.000
-300.000
-400.000
0.0000

0.1000

0.2000

0.3000

0.4000

0.5000

0.6000

ISSUED FOR CONSTRUCTION (IFC)

26 JAN 2022
Calculation Report, OPERATION SHELTER, Plant Plant No. 015 Page 157 of 281
DESIGN INPUT

26 JAN 2022
Subject
time increment, ∆t 0.003 secs

Calc. No.
PROJECT

ISSUED FOR CONSTRUCTION (IFC)


mass, M 0.003 kN-s²/mm
stiffness, K 78.901 kN/mm

Project Code No.


damping, C 0.000 kN-s/mm

EWO / B.I. Number


positive resistance, Ru+ 283.727 kN
rebound resistance, Ru- -283.727 kN
static load, Fs 0.000 kN

LEGEND : : 510008

: PE-P20081
KEY = 0 is elastic Z= 1 is increasing plastic deformation
KEY = +1 is positive plastic Z= 2 is end of rebound plastic deformation
KEY = -1 is rebound plastic Z= 3 is end of positive plastic deformation
: 10-02062-0002-001

Z= 4 is continued elastic
Z= 5 is start of rebound plastic deformation
Z= 6 is start of positive plastic deformation

Numerical Integration (Newmark-Beta Method)


Dyn. Def. @ Yield pt. Dyn. Ductile
Time, Def. Vel. Acc. Rstnce incr incr incr
Load, KEY eff K Z Reaction Ratio

Calculation Report, OPERATION SHELTER, Plant Plant No. 015


t y v a R ye+ ye- F y v
F V µ
secs kN mm mm/s mm/s² kN mm mm kN/mm kN mm mm/s kN
0.0000 741.43 0.000 0.000 249432.875 0.000 3.596 -3.596 0 2060.55 2167.267 1.052 677.640 81.558 -
: Upgrade Buildings for Risk Mitigation - RT Refinery

0.0030 684.40 1.052 677.640 202327.091 82.988 3.596 -3.596 0 2060.55 5775.743 2.803 466.596 4 107.649 -
0.0060 627.37 3.855 1144.236 115607.076 283.727 3.596 -3.596 1 1981.65 7776.317 3.924 318.041 6 183.100 1.07
: Building A9, 300mm RC Wall Design (Exterior Front-Wall)
CALCULATION

0.0090 570.33 7.779 1462.277 96419.932 283.727 3.596 -3.596 1 1981.65 9495.953 4.792 260.479 1 176.256 2.16
0.0120 513.30 12.571 1722.756 77232.788 283.727 3.596 -3.596 1 1981.65 10873.389 5.487 202.918 1 169.412 3.50
0.0150 456.27 18.058 1925.673 58045.643 283.727 3.596 -3.596 1 1981.65 11908.625 6.009 145.356 1 162.568 5.02
0.0180 399.23 24.067 2071.030 38858.499 283.727 3.596 -3.596 1 1981.65 12601.661 6.359 87.795 1 155.724 6.69
0.0210 342.20 30.427 2158.824 19671.355 283.727 3.596 -3.596 1 1981.65 12952.497 6.536 30.233 1 148.880 8.46
SHEET

0.0240 285.17 36.963 2189.058 484.211 283.727 3.596 -3.596 1 1981.65 12961.133 6.541 -27.328 1 142.036 10.28
0.0270 228.13 43.503 2161.730 -18702.934 283.727 3.596 -3.596 1 1981.65 12627.568 6.372 -84.890 1 135.192 12.10
0.0300 171.10 49.876 2076.840 -37890.078 283.727 3.596 -3.596 1 1981.65 11951.804 6.031 -142.451 1 128.348 13.87
0.0330 114.07 55.907 1934.389 -57077.222 283.727 3.596 -3.596 1 1981.65 10933.840 5.518 -200.012 1 121.504 15.55
0.0360 57.03 61.424 1734.377 -76264.366 283.727 3.596 -3.596 1 1981.65 9573.675 4.831 -257.574 1 114.660 17.08
SNC-LAVALIN FAYEZ ENGINEERING, Al Khobar, Saudi Arabia

0.0390 0.00 66.256 1476.803 -95451.510 283.727 3.596 -3.596 1 1981.65 7928.344 4.001 -286.355 1 107.816 18.42
0.0420 0.00 70.256 1190.449 -95451.510 283.727 3.596 -3.596 1 1981.65 6225.980 3.142 -286.355 1 107.816 19.54
Revision

0.0450 0.00 73.398 904.094 -95451.510 283.727 3.596 -3.596 1 1981.65 4523.615 2.283 -286.355 1 107.816 20.41
Rev. No.
Checked
Designed

0.0480 0.00 75.681 617.739 -95451.510 283.727 3.596 -3.596 1 1981.65 2821.250 1.424 -286.355 1 107.816 21.05
0.0510 0.00 77.105 331.385 -95451.510 283.727 3.596 -3.596 1 1981.65 1118.886 0.565 -286.355 1 107.816 21.44
0.0540 0.00 77.669 45.030 -95451.510 283.727 3.596 -3.596 1 1981.65 -583.479 -0.294 -286.355 1 107.816 21.60
:
:
:
:

0.0570 0.00 77.375 -241.324 -87635.893 260.496 77.669 70.477 0 2060.55 -2216.148 -1.076 -220.085 3 101.593 -
0.0600 0.00 76.299 -461.409 -59087.573 175.636 77.669 70.477 0 2060.55 -3269.967 -1.587 -114.077 4 68.498 -
0.0630 0.00 74.712 -575.487 -16964.006 50.425 77.669 70.477 0 2060.55 -3572.517 -1.734 18.140 4 19.666 -
00
NFP

AMK

IFC SUB

0.0660 0.00 72.979 -557.347 29057.006 -86.371 77.669 70.477 0 2060.55 -3054.290 -1.482 146.189 4 -33.685 -
0.0690 0.00 71.496 -411.158 68402.231 -203.324 77.669 70.477 0 2060.55 -1834.345 -0.890 240.652 4 -79.296 -
0.0720 0.00 70.606 -170.507 92032.187 -273.564 77.669 70.477 0 2060.55 -192.964 -0.094 279.825 4 -106.690 -

Page 158 of 281


0.0750 0.00 70.512 109.318 94517.941 -280.952 77.669 70.477 0 2060.55 1492.750 0.724 254.710 4 -109.571 -
0.0780 0.00 71.237 364.028 75288.395 -223.793 77.669 70.477 0 2060.55 2835.509 1.376 171.075 4 -87.279 -
0.0810 0.00 72.613 535.103 38761.499 -115.218 77.669 70.477 0 2060.55 3526.815 1.712 48.136 4 -44.935 -

26 JAN 2022
Subject
0.0840 0.00 74.325 583.239 -6670.771 19.829 77.669 70.477 0 2060.55 3407.842 1.654 -85.862 4 7.733 -

Calc. No.
PROJECT

ISSUED FOR CONSTRUCTION (IFC)


0.0870 0.00 75.978 497.377 -50570.445 150.319 77.669 70.477 0 2060.55 2505.925 1.216 -200.133 4 58.625 -
0.0900 0.00 77.195 297.244 -82851.666 246.275 77.669 70.477 0 2060.55 1028.277 0.499 -268.424 4 96.047 -

Project Code No.


0.0930 0.00 77.694 28.820 -95451.510 283.727 77.669 70.477 1 1981.65 -679.851 -0.343 -286.355 6 107.816 1.01

EWO / B.I. Number


0.0960 0.00 77.351 -257.535 -86344.997 256.659 77.694 70.502 0 2060.55 -2301.009 -1.117 -214.573 3 100.097 -
0.0990 0.00 76.234 -472.108 -56703.500 168.550 77.694 70.502 0 2060.55 -3312.308 -1.607 -106.107 4 65.734 -
0.1020 0.00 74.626 -578.215 -14034.493 41.717 77.694 70.502 0 2060.55 -3562.611 -1.729 26.737 4 16.270 -
0.1050 0.00 72.897 -551.478 31858.910 -94.700 77.694 70.502 0 2060.55 -2994.412 -1.453 153.438 4 -36.933 -
0.1080 0.00 71.444 -398.041 70432.795 -209.360 77.694 70.502 0 2060.55 -1738.253 -0.844 244.887 4 -81.650 - : 510008
0.1110 0.00 70.601 -153.154 92824.892 -275.920 77.694 70.502 0 2060.55 -82.734 -0.040 280.073 4 -107.609 -
: PE-P20081
0.1140 0.00 70.560 126.919 93890.665 -279.088 77.694 70.502 0 2060.55 1591.793 0.773 250.914 4 -108.844 -
0.1170 0.00 71.333 377.833 73385.254 -218.136 77.694 70.502 0 2060.55 2900.609 1.408 164.107 4 -85.073 -
: 10-02062-0002-001

0.1200 0.00 72.741 541.941 36019.735 -107.068 77.694 70.502 0 2060.55 3543.016 1.719 39.598 4 -41.756 -
0.1230 0.00 74.460 581.538 -9621.243 28.599 77.694 70.502 0 2060.55 3371.423 1.636 -94.010 4 11.154 -
0.1260 0.00 76.096 487.529 -53051.761 157.695 77.694 70.502 0 2060.55 2425.252 1.177 -206.018 4 61.501 -
0.1290 0.00 77.273 281.511 -84293.747 250.561 77.694 70.502 0 2060.55 921.884 0.447 -270.695 4 97.719 -
0.1320 0.00 77.721 10.816 -95451.510 283.727 77.694 70.502 1 1981.65 -786.882 -0.397 -286.355 6 107.816 1.01
0.1350 0.00 77.324 -275.539 -84911.334 252.397 77.721 70.529 0 2060.55 -2395.255 -1.162 -208.451 3 98.435 -
0.1380 0.00 76.161 -483.989 -54055.761 160.680 77.721 70.529 0 2060.55 -3359.332 -1.630 -97.255 4 62.665 -

Calculation Report, OPERATION SHELTER, Plant Plant No. 015


0.1410 0.00 74.531 -581.244 -10780.991 32.046 77.721 70.529 0 2060.55 -3551.610 -1.724 36.285 4 12.498 -
0.1440 0.00 72.807 -544.960 34970.690 -103.950 77.721 70.529 0 2060.55 -2927.912 -1.421 161.488 4 -40.540 -
0.1470 0.00 71.386 -383.472 72687.928 -216.063 77.721 70.529 0 2060.55 -1631.533 -0.792 249.590 4 -84.265 -
: Upgrade Buildings for Risk Mitigation - RT Refinery

0.1500 0.00 70.594 -133.882 93705.266 -278.537 77.721 70.529 0 2060.55 39.687 0.019 280.349 4 -108.629 -
0.1530 0.00 70.614 146.467 93194.016 -277.017 77.721 70.529 0 2060.55 1701.790 0.826 246.698 4 -108.037 -
: Building A9, 300mm RC Wall Design (Exterior Front-Wall)
CALCULATION

0.1560 0.00 71.440 393.165 71271.635 -211.853 77.721 70.529 0 2060.55 2972.910 1.443 156.370 4 -82.623 -
0.1590 0.00 72.882 549.535 32974.746 -98.017 77.721 70.529 0 2060.55 3561.010 1.728 30.115 4 -38.227 -
0.1620 0.00 74.611 579.650 -12898.022 38.339 77.721 70.529 0 2060.55 3330.975 1.617 -103.058 4 14.952 -
0.1650 0.00 76.227 476.592 -55807.497 165.887 77.721 70.529 0 2060.55 2335.656 1.134 -212.554 4 64.696 -
0.1680 0.00 77.361 264.037 -85895.316 255.322 77.721 70.529 0 2060.55 803.725 0.390 -273.216 4 99.576 -
SHEET

0.1710 0.00 77.751 -9.179 -95451.510 283.727 77.721 70.529 1 1981.65 -905.750 -0.457 -286.355 6 107.816 1.01
0.1740 0.00 77.294 -295.533 -83319.115 247.664 77.751 70.559 0 2060.55 -2499.925 -1.213 -201.651 3 96.589 -
0.1770 0.00 76.080 -497.185 -51115.196 151.939 77.751 70.559 0 2060.55 -3411.557 -1.656 -87.424 4 59.256 -
0.1800 0.00 74.425 -584.609 -7167.668 21.306 77.751 70.559 0 2060.55 -3539.392 -1.718 46.888 4 8.309 -
0.1830 0.00 72.707 -537.721 38426.616 -114.222 77.751 70.559 0 2060.55 -2854.058 -1.385 170.429 4 -44.547 -
SNC-LAVALIN FAYEZ ENGINEERING, Al Khobar, Saudi Arabia

0.1860 0.00 71.322 -367.292 75192.466 -223.508 77.751 70.559 0 2060.55 -1513.011 -0.734 254.813 4 -87.168 -
0.1890 0.00 70.588 -112.479 94683.005 -281.443 77.751 70.559 0 2060.55 175.648 0.085 280.655 4 -109.763 -
Revision

0.1920 0.00 70.673 168.176 92420.321 -274.717 77.751 70.559 0 2060.55 1823.951 0.885 242.017 4 -107.140 -
Rev. No.
Checked
Designed

0.1950 0.00 71.558 410.193 68924.262 -204.876 77.751 70.559 0 2060.55 3053.206 1.482 147.776 4 -79.902 -
0.1980 0.00 73.040 557.969 29592.998 -87.965 77.751 70.559 0 2060.55 3580.993 1.738 19.584 4 -34.306 -
0.2010 0.00 74.778 577.553 -16537.196 49.156 77.751 70.559 0 2060.55 3286.054 1.595 -113.108 4 19.171 -
:
:
:
:

0.2040 0.00 76.372 464.445 -58868.003 174.984 77.751 70.559 0 2060.55 2236.152 1.085 -219.813 4 68.244 -
0.2070 0.00 77.458 244.632 -87674.010 260.609 77.751 70.559 0 2060.55 672.498 0.326 -276.017 4 101.638 -
0.2100 0.00 77.784 -31.385 -95451.510 283.727 77.751 70.559 1 1981.65 -1037.764 -0.524 -286.355 6 107.816 1.01
00
NFP

AMK

IFC SUB

0.2130 0.00 77.260 -317.739 -81550.805 242.408 77.784 70.592 0 2060.55 -2616.170 -1.270 -194.100 3 94.539 -
0.2160 0.00 75.991 -511.840 -47849.421 142.231 77.784 70.592 0 2060.55 -3469.558 -1.684 -76.506 4 55.470 -
0.2190 0.00 74.307 -588.346 -3154.732 9.377 77.784 70.592 0 2060.55 -3525.822 -1.711 58.665 4 3.657 -

Page 159 of 281


0.2220 0.00 72.596 -529.681 42264.750 -125.631 77.784 70.592 0 2060.55 -2772.036 -1.345 180.358 4 -48.996 -
0.2250 0.00 71.251 -349.323 77973.994 -231.776 77.784 70.592 0 2060.55 -1381.380 -0.670 260.614 4 -90.393 -
0.2280 0.00 70.580 -88.709 95451.510 -283.727 77.784 70.592 -1 1981.65 323.814 0.163 286.355 5 -107.816 1.00

26 JAN 2022
Subject
0.2310 0.00 70.744 197.646 91114.064 -270.834 77.772 70.580 0 2060.55 1987.500 0.965 234.938 2 -105.625 -

Calc. No.
PROJECT

ISSUED FOR CONSTRUCTION (IFC)


0.2340 0.00 71.708 432.584 65511.179 -194.730 77.772 70.580 0 2060.55 3155.883 1.532 135.553 4 -75.945 -
0.2370 0.00 73.240 568.136 24857.238 -73.888 77.772 70.580 0 2060.55 3599.208 1.747 5.024 4 -28.816 -

Project Code No.


0.2400 0.00 74.986 573.161 -21507.601 63.931 77.772 70.580 0 2060.55 3215.623 1.561 -126.658 4 24.933 -

EWO / B.I. Number


0.2430 0.00 76.547 446.503 -62931.115 187.061 77.772 70.580 0 2060.55 2093.255 1.016 -229.241 4 72.954 -
0.2460 0.00 77.563 217.262 -89896.336 267.215 77.772 70.580 0 2060.55 489.966 0.238 -279.157 4 104.214 -
0.2490 0.00 77.801 -61.895 -95451.510 283.727 77.772 70.580 1 1981.65 -1219.145 -0.615 -286.355 6 107.816 1.01
0.2520 0.00 77.185 -348.249 -79121.236 235.186 77.801 70.609 0 2060.55 -2775.885 -1.347 -183.725 3 91.723 -
0.2550 0.00 75.838 -531.975 -43362.408 128.894 77.801 70.609 0 2060.55 -3549.248 -1.722 -61.505 4 50.269 - : 510008
0.2580 0.00 74.116 -593.480 2358.842 -7.012 77.801 70.609 0 2060.55 -3507.178 -1.702 74.845 4 -2.735 -
: PE-P20081
0.2610 0.00 72.414 -518.635 47538.154 -141.306 77.801 70.609 0 2060.55 -2659.342 -1.291 194.001 4 -55.109 -
0.2640 0.00 71.123 -324.634 81795.674 -243.136 77.801 70.609 0 2060.55 -1200.527 -0.583 268.585 4 -94.823 -
: 10-02062-0002-001

0.2670 0.00 70.540 -56.049 95451.510 -283.727 77.801 70.609 -1 1981.65 517.972 0.261 286.355 5 -107.816 1.02
0.2700 0.00 70.802 230.305 88513.348 -263.104 77.732 70.540 0 2060.55 2158.466 1.048 223.832 2 -102.611 -
0.2730 0.00 71.849 454.137 60708.087 -180.453 77.732 70.540 0 2060.55 3241.186 1.573 119.495 4 -70.377 -
0.2760 0.00 73.422 573.632 18955.270 -56.344 77.732 70.540 0 2060.55 3579.251 1.737 -12.296 4 -21.974 -
0.2790 0.00 75.159 561.337 -27152.481 80.710 77.732 70.540 0 2060.55 3094.990 1.502 -141.262 4 31.477 -
0.2820 0.00 76.661 420.075 -67022.006 199.221 77.732 70.540 0 2060.55 1899.662 0.922 -237.773 4 77.696 -
0.2850 0.00 77.583 182.302 -91493.366 271.962 77.732 70.540 0 2060.55 267.890 0.130 -279.657 4 106.065 -

Calculation Report, OPERATION SHELTER, Plant Plant No. 015


0.2880 0.00 77.713 -97.355 -94944.316 282.220 77.732 70.540 0 2060.55 -1425.429 -0.692 -257.289 4 110.066 -
0.2910 0.00 77.022 -354.644 -76582.008 227.638 77.732 70.540 0 2060.55 -2791.258 -1.355 -175.811 4 88.779 -
0.2940 0.00 75.667 -530.455 -40625.145 120.757 77.732 70.540 0 2060.55 -3515.802 -1.706 -53.940 4 47.095 -
: Upgrade Buildings for Risk Mitigation - RT Refinery

0.2970 0.00 73.961 -584.395 4665.261 -13.867 77.732 70.540 0 2060.55 -3432.598 -1.666 80.324 4 -5.408 -
0.3000 0.00 72.295 -504.071 48883.833 -145.306 77.732 70.540 0 2060.55 -2560.761 -1.243 196.133 4 -56.669 -
: Building A9, 300mm RC Wall Design (Exterior Front-Wall)
CALCULATION

0.3030 0.00 71.052 -307.938 81871.446 -243.361 77.732 70.540 0 2060.55 -1100.595 -0.534 266.881 4 -94.911 -
0.3060 0.00 70.518 -41.057 95451.510 -283.727 77.732 70.540 -1 1981.65 607.100 0.306 286.355 5 -107.816 1.01
0.3090 0.00 70.824 245.297 87319.494 -259.555 77.710 70.518 0 2060.55 2236.948 1.086 218.734 2 -101.227 -
0.3120 0.00 71.910 464.032 58503.234 -173.900 77.710 70.518 0 2060.55 3280.345 1.592 112.124 4 -67.821 -
0.3150 0.00 73.502 576.155 16245.980 -48.291 77.710 70.518 0 2060.55 3570.089 1.733 -20.247 4 -18.833 -
SHEET

0.3180 0.00 75.234 555.909 -29743.755 88.413 77.710 70.518 0 2060.55 3039.614 1.475 -147.966 4 34.481 -
0.3210 0.00 76.710 407.943 -68899.924 204.803 77.710 70.518 0 2060.55 1810.793 0.879 -241.690 4 79.873 -
0.3240 0.00 77.588 166.254 -92226.480 274.141 77.710 70.518 0 2060.55 165.946 0.081 -279.886 4 106.915 -
0.3270 0.00 77.669 -113.632 -94364.195 280.495 77.710 70.518 0 2060.55 -1517.026 -0.736 -253.779 4 109.393 -
0.3300 0.00 76.933 -367.412 -74821.934 222.406 77.710 70.518 0 2060.55 -2851.465 -1.384 -169.367 4 86.739 -
SNC-LAVALIN FAYEZ ENGINEERING, Al Khobar, Saudi Arabia

0.3330 0.00 75.549 -536.779 -38089.490 113.220 77.710 70.518 0 2060.55 -3530.786 -1.714 -46.043 4 44.156 -
0.3360 0.00 73.835 -582.822 7393.934 -21.978 77.710 70.518 0 2060.55 -3398.916 -1.650 87.859 4 -8.572 -
Revision

0.3390 0.00 72.186 -494.963 51178.618 -152.127 77.710 70.518 0 2060.55 -2486.152 -1.207 201.576 4 -59.330 -
Rev. No.
Checked
Designed

0.3420 0.00 70.979 -293.388 83205.121 -247.325 77.710 70.518 0 2060.55 -1002.200 -0.486 268.981 4 -96.457 -
0.3450 0.00 70.493 -24.407 95451.510 -283.727 77.710 70.518 -1 1981.65 706.085 0.356 286.355 5 -107.816 1.01
0.3480 0.00 70.849 261.948 85993.605 -255.614 77.685 70.493 0 2060.55 2324.109 1.128 213.072 2 -99.689 -
:
:
:
:

0.3510 0.00 71.977 475.020 56054.537 -166.621 77.685 70.493 0 2060.55 3323.834 1.613 103.937 4 -64.982 -
0.3540 0.00 73.590 578.957 13237.057 -39.347 77.685 70.493 0 2060.55 3559.915 1.728 -29.077 4 -15.345 -
0.3570 0.00 75.318 549.880 -32621.610 96.967 77.685 70.493 0 2060.55 2978.113 1.445 -155.411 4 37.817 -
00
NFP

AMK
IFC SUB

0.3600 0.00 76.763 394.470 -70985.530 211.003 77.685 70.493 0 2060.55 1712.096 0.831 -246.039 4 82.291 -
0.3630 0.00 77.594 148.430 -93040.673 276.561 77.685 70.493 0 2060.55 52.728 0.026 -280.141 4 107.859 -
0.3660 0.00 77.620 -131.710 -93719.916 278.580 77.685 70.493 0 2060.55 -1618.754 -0.786 -249.881 4 108.646 -

Page 160 of 281


0.3690 0.00 76.834 -381.591 -72867.204 216.596 77.685 70.493 0 2060.55 -2918.330 -1.416 -162.211 4 84.472 -
0.3720 0.00 75.418 -543.802 -35273.406 104.849 77.685 70.493 0 2060.55 -3547.426 -1.722 -37.274 4 40.891 -
0.3750 0.00 73.696 -581.076 10424.385 -30.986 77.685 70.493 0 2060.55 -3361.509 -1.631 96.227 4 -12.085 -

26 JAN 2022
Subject
0.3780 0.00 72.065 -484.848 53727.194 -159.703 77.685 70.493 0 2060.55 -2403.292 -1.166 207.620 4 -62.284 -

Calc. No.
PROJECT

ISSUED FOR CONSTRUCTION (IFC)


0.3810 0.00 70.899 -277.228 84686.293 -251.728 77.685 70.493 0 2060.55 -892.923 -0.433 271.313 4 -98.174 -
0.3840 0.00 70.465 -5.915 95451.510 -283.727 77.685 70.493 -1 1981.65 816.017 0.412 286.355 5 -107.816 1.01

Project Code No.


0.3870 0.00 70.877 280.439 84521.080 -251.237 77.657 70.465 0 2060.55 2420.910 1.175 206.784 2 -97.982 -

EWO / B.I. Number


0.3900 0.00 72.052 487.223 53335.026 -158.537 77.657 70.465 0 2060.55 3372.133 1.637 94.846 4 -61.829 -
0.3930 0.00 73.688 582.069 9895.362 -29.414 77.657 70.465 0 2060.55 3548.615 1.722 -38.884 4 -11.471 -
0.3960 0.00 75.411 543.186 -35817.740 106.467 77.657 70.465 0 2060.55 2909.811 1.412 -163.679 4 41.522 -
0.3990 0.00 76.823 379.506 -73301.792 217.888 77.657 70.465 0 2060.55 1602.483 0.778 -250.870 4 84.976 -
0.4020 0.00 77.600 128.636 -93944.911 279.249 77.657 70.465 0 2060.55 -73.011 -0.035 -280.424 4 108.907 - : 510008
0.4050 0.00 77.565 -151.788 -93004.383 276.453 77.657 70.465 0 2060.55 -1731.732 -0.840 -245.551 4 107.817 -
: PE-P20081
0.4080 0.00 76.725 -397.339 -70696.292 210.143 77.657 70.465 0 2060.55 -2992.590 -1.452 -154.263 4 81.956 -
0.4110 0.00 75.272 -551.602 -32145.877 95.553 77.657 70.465 0 2060.55 -3565.908 -1.731 -27.534 4 37.266 -
: 10-02062-0002-001

0.4140 0.00 73.542 -579.136 13789.986 -40.990 77.657 70.465 0 2060.55 -3319.965 -1.611 105.521 4 -15.986 -
0.4170 0.00 71.930 -473.614 56557.629 -168.116 77.657 70.465 0 2060.55 -2311.268 -1.122 214.333 4 -65.565 -
0.4200 0.00 70.809 -259.281 86331.275 -256.618 77.657 70.465 0 2060.55 -771.561 -0.374 273.903 4 -100.081 -
0.4230 0.00 70.434 14.622 95451.510 -283.727 77.657 70.465 -1 1981.65 938.107 0.473 286.355 5 -107.816 1.01
0.4260 0.00 70.908 300.976 82885.701 -246.376 77.626 70.434 0 2060.55 2528.416 1.227 199.801 2 -96.087 -
0.4290 0.00 72.135 500.777 50314.752 -149.559 77.626 70.434 0 2060.55 3425.773 1.663 84.748 4 -58.328 -
0.4320 0.00 73.797 585.525 6184.095 -18.382 77.626 70.434 0 2060.55 3536.066 1.716 -49.775 4 -7.169 -

Calculation Report, OPERATION SHELTER, Plant Plant No. 015


0.4350 0.00 75.513 535.750 -39367.346 117.019 77.626 70.434 0 2060.55 2833.954 1.375 -172.862 4 45.637 -
0.4380 0.00 76.889 362.888 -75874.221 225.534 77.626 70.434 0 2060.55 1480.748 0.719 -256.235 4 87.958 -
0.4410 0.00 77.607 106.653 -94949.153 282.234 77.626 70.434 0 2060.55 -212.657 -0.103 -280.738 4 110.071 -
: Upgrade Buildings for Risk Mitigation - RT Refinery

0.4440 0.00 77.504 -174.086 -92209.715 274.091 77.626 70.434 0 2060.55 -1857.205 -0.901 -240.743 4 106.896 -
0.4470 0.00 76.603 -414.828 -68285.289 202.976 77.626 70.434 0 2060.55 -3075.063 -1.492 -145.437 4 79.161 -
: Building A9, 300mm RC Wall Design (Exterior Front-Wall)
CALCULATION

0.4500 0.00 75.110 -560.265 -28672.460 85.228 77.626 70.434 0 2060.55 -3586.433 -1.741 -16.717 4 33.239 -
0.4530 0.00 73.370 -576.982 17527.806 -52.101 77.626 70.434 0 2060.55 -3273.827 -1.589 115.843 4 -20.319 -
0.4560 0.00 71.781 -461.138 59701.096 -177.460 77.626 70.434 0 2060.55 -2209.066 -1.072 221.789 4 -69.209 -
0.4590 0.00 70.709 -239.349 88158.184 -262.048 77.626 70.434 0 2060.55 -636.777 -0.309 276.779 4 -102.199 -
0.4620 0.00 70.400 37.430 95451.510 -283.727 77.626 70.434 -1 1981.65 1073.699 0.542 286.355 5 -107.816 1.01
SHEET

0.4650 0.00 70.942 323.784 81069.458 -240.977 77.592 70.400 0 2060.55 2647.813 1.285 192.045 2 -93.981 -
0.4680 0.00 72.227 515.829 46960.452 -139.589 77.592 70.400 0 2060.55 3485.346 1.691 73.534 4 -54.440 -
0.4710 0.00 73.918 589.363 2062.380 -6.130 77.592 70.400 0 2060.55 3522.128 1.709 -61.871 4 -2.391 -
0.4740 0.00 75.628 527.492 -43309.519 128.737 77.592 70.400 0 2060.55 2749.709 1.334 -183.061 4 50.207 -
0.4770 0.00 76.962 344.431 -78731.147 234.027 77.592 70.400 0 2060.55 1345.550 0.653 -262.193 4 91.270 -
SNC-LAVALIN FAYEZ ENGINEERING, Al Khobar, Saudi Arabia

0.4800 0.00 77.615 82.238 -95451.510 283.727 77.592 70.400 1 1981.65 -362.281 -0.183 -286.355 6 107.816 1.01
0.4830 0.00 77.432 -204.116 -90598.809 269.303 77.615 70.423 0 2060.55 -2021.372 -0.981 -232.738 3 105.028 -
Revision

0.4860 0.00 76.451 -436.854 -64559.588 191.902 77.615 70.423 0 2060.55 -3172.783 -1.540 -132.371 4 74.842 -
Rev. No.
Checked
Designed

0.4890 0.00 74.912 -569.225 -23687.937 70.412 77.615 70.423 0 2060.55 -3595.254 -1.745 -1.593 4 27.461 -
0.4920 0.00 73.167 -570.818 22625.968 -67.255 77.615 70.423 0 2060.55 -3191.723 -1.549 129.551 4 -26.230 -
0.4950 0.00 71.618 -441.267 63741.604 -189.470 77.615 70.423 0 2060.55 -2054.900 -0.997 230.932 4 -73.893 -
:
:
:
:

30

RESULTS SUMMARY
00
NFP

AMK
IFC SUB

Def, y Reaction Ductility


Inbound 77.801 183.100 21.599
Rebound - -109.763 1.019

Page 161 of 281


Component/Member response exceeds the elastic range…..
CALCULATION SHEET

SNC-LAVALIN FAYEZ ENGINEERING, Al Khobar, Saudi Arabia


PROJECT : Upgrade Buildings for Risk Mitigation - RT Refinery
EWO / B.I. No. : 10-02062-0002-001 Designed : NFP
Project Code No. : 510008 Checked : AMK
Calc. No. : PE-P20081 Revision : IFC SUB
Subject : Building A9, 300mm RC Wall Design (Exterior Front-Wall) Rev. No. : 00

DEFORMATION LIMITS (RESPONSE CRITERIA) - As per BDR and SAES-M-009

Member / Component : RC Wall Panel


Material : Concrete
Wall Height, H : 4050.000 mm
Response Criteria : High (Refer to BDR datasheet and SAES-M-009, Table-9)
Support Rotation, θ : 5 º (SAES-M-009, Table-9) Wall Panels (no shear reinforcement)
Ductility Ratio, µ : n/a (SAES-M-009, Table-9)

CHECK DEFORMATION AND DUCTILITY RATIO


Support Rotation, θ1:

xm = Deformation, y = 77.801 mm
 xm 
θ1 = Arc tan   = 2.200 º < 5.0 º RC Wall Panel Design is acceptable!
 0.5 L 

Ductility Ratio, µ:

Max Ductilty Ratio = n/a

Therefore, RC wall panel design is acceptable….

ISSUED FOR CONSTRUCTION (IFC)

26 JAN 2022
Calculation Report, OPERATION SHELTER, Plant Plant No. 015 Page 162 of 281
CALCULATION SHEET

SNC-LAVALIN FAYEZ ENGINEERING, Al Khobar, Saudi Arabia


PROJECT : Updrade Buildings for Risk Mitigation - RT Refinery
B.I Number : 10-02062-0002-001 Designed : AIA / NFP
Project Code No. : 510008 Checcked : NFP / AKM
Calc. No. : PE-P20081 Reviision : IFC Sub
Subject : Structural Calculation - Operator Shelter, Plant No. 015 (Bldg-A9) Rev.. No. : 00

4.1.2 REINFORCED CONCRETE SOUTH-WALL DESIGN

ISSUED FOR CONSTRUCTION (IFC)

26 JAN 2022
Calculation Report, OPERATION SHELTER, Plant Plant No. 015 Page 163 of 281
CALCULATION SHEET

SNC-LAVALIN FAYEZ ENGINEERING, Al Khobar, Saudi Arabia


PROJECT : Upgrade Buildings for Risk Mitigation - RT Refinery
EWO / B.I. No. : 10-02062-0002-001 Designed : NFP
Project Code No. : 510008 Checked : AMK
Calc. No. : PE-P20081 Revision : IFC SUB
Subject : Building A9, 300mm RC Wall Design (Exterior Front-Wall) Rev. No. : 00

DEAD LOAD AND BLAST LOAD ON RC WALL PANEL COMPONENT

Dimensions:
Design Strip, b 1.000 m
Wall Height, H 4.050 m (Refer to attached Design drawings…..)
Wall Thickness, T 0.300 m (Refer to attached Design drawings…..)

Figure - RC Wall Panel Tributary Area

L L

b Wall Location
Considering Front RC wall
facing blast source located
on the south side of the
building (along Grid-9).
H

Refer to attached Design


Drawings RA-102122 and
RA-462174.

Compute Static Dead Load on RC Wall Panel

Load Transfer from Beams 0.000 kN/m (No loads transfer from beams…..)
RC Wall Self-weight 29.160 kN/m
Other superimposed DL 0.000 kN/m
Total 29.160 kN/m

Static Load, P = 29.160 kN per 1.00 meter width of wall

Define the Dynamic Blast Load on RC Wall Panel (Refer to Blast Load Calculation pages…..)
Blast Pressure on Front Wall
Blast Pressure (P) vs. Time (t)
Blast Wall Pressure, Pr = 186.070 kPa 200.00
Rise time, tr = 0.000 secs
150.00
Time duration, to = 0.039 secs
Blast Pressure, P

100.00

50.00

0.000 0.00
0.00
0.000 #####
0.000

0.005

0.010

0.015

0.020

0.025

0.030

0.035

0.040

0.045

0.039 0.00
Time, t

ISSUED FOR CONSTRUCTION (IFC)

26 JAN 2022
Calculation Report, OPERATION SHELTER, Plant Plant No. 015 Page 164 of 281
CALCULATION SHEET

SNC-LAVALIN FAYEZ ENGINEERING, Al Khobar, Saudi Arabia


PROJECT : Upgrade Buildings for Risk Mitigation - RT Refinery
EWO / B.I. No. : 10-02062-0002-001 Designed : NFP
Project Code No. : 510008 Checked : AMK
Calc. No. : PE-P20081 Revision : IFC SUB
Subject : Building A9, 300mm RC Wall Design (Exterior Front-Wall) Rev. No. : 00

Blast Load Tabulation:

Time Increment, ∆t = 0.0030 secs < 10% of period of vibration, tn o.k.

Pressure Eqv. UDL Dyn. Force


Time
Pa = Pa x b F = UDL x H
0.0000 186.070 186.070 753.584
0.0030 171.757 171.757 695.616
0.0060 157.444 157.444 637.648
0.0090 143.131 143.131 579.680
0.0120 128.818 128.818 521.712
0.0150 114.505 114.505 463.744
0.0180 100.192 100.192 405.776
0.0210 85.878 85.878 347.808
0.0240 71.565 71.565 289.840
0.0270 57.252 57.252 231.872
0.0300 42.939 42.939 173.904
0.0330 28.626 28.626 115.936
0.0360 14.313 14.313 57.968
0.0390 0.000 0.000 0.000
0.0420 0.000 0.000 0.000
0.0450 0.000 0.000 0.000
0.0480 0.000 0.000 0.000
0.0510 0.000 0.000 0.000
0.0540 0.000 0.000 0.000
0.0570 0.000 0.000 0.000
0.0600 0.000 0.000 0.000
0.0630 0.000 0.000 0.000
0.0660 0.000 0.000 0.000
0.0690 0.000 0.000 0.000
0.0720 0.000 0.000 0.000
0.0750 0.000 0.000 0.000
0.0780 0.000 0.000 0.000
0.0810 0.000 0.000 0.000
0.0840 0.000 0.000 0.000
0.0870 0.000 0.000 0.000
0.0900 0.000 0.000 0.000
0.0930 0.000 0.000 0.000
0.0960 0.000 0.000 0.000
0.0990 0.000 0.000 0.000
0.1020 0.000 0.000 0.000
0.1050 0.000 0.000 0.000
0.1080 0.000 0.000 0.000
0.1110 0.000 0.000 0.000
0.1140 0.000 0.000 0.000
0.1170 0.000 0.000 0.000
0.1200 0.000 0.000 0.000

ISSUED FOR CONSTRUCTION (IFC)

26 JAN 2022
Calculation Report, OPERATION SHELTER, Plant Plant No. 015 Page 165 of 281
CALCULATION SHEET

SNC-LAVALIN FAYEZ ENGINEERING, Al Khobar, Saudi Arabia


PROJECT : Upgrade Buildings for Risk Mitigation - RT Refinery
EWO / B.I. No. : 10-02062-0002-001 Designed : NFP
Project Code No. : 510008 Checked : AMK
Calc. No. : PE-P20081 Revision : IFC SUB
Subject : Building A9, 300mm RC Wall Design (Exterior Front-Wall) Rev. No. : 00

0.1230 0.000 0.000 0.000


0.1260 0.000 0.000 0.000
0.1290 0.000 0.000 0.000
0.1320 0.000 0.000 0.000
0.1350 0.000 0.000 0.000
0.1380 0.000 0.000 0.000
0.1410 0.000 0.000 0.000
0.1440 0.000 0.000 0.000
0.1470 0.000 0.000 0.000
0.1500 0.000 0.000 0.000
0.1530 0.000 0.000 0.000
0.1560 0.000 0.000 0.000
0.1590 0.000 0.000 0.000
0.1620 0.000 0.000 0.000
0.1650 0.000 0.000 0.000
0.1680 0.000 0.000 0.000
0.1710 0.000 0.000 0.000
0.1740 0.000 0.000 0.000
0.1770 0.000 0.000 0.000
0.1800 0.000 0.000 0.000
0.1830 0.000 0.000 0.000
0.1860 0.000 0.000 0.000
0.1890 0.000 0.000 0.000
0.1920 0.000 0.000 0.000
0.1950 0.000 0.000 0.000
0.1980 0.000 0.000 0.000
0.2010 0.000 0.000 0.000
0.2040 0.000 0.000 0.000
0.2070 0.000 0.000 0.000
0.2100 0.000 0.000 0.000
0.2130 0.000 0.000 0.000
0.2160 0.000 0.000 0.000
0.2190 0.000 0.000 0.000
0.2220 0.000 0.000 0.000
0.2250 0.000 0.000 0.000
0.2280 0.000 0.000 0.000
0.2310 0.000 0.000 0.000
0.2340 0.000 0.000 0.000
0.2370 0.000 0.000 0.000
0.2400 0.000 0.000 0.000
0.2430 0.000 0.000 0.000

ISSUED FOR CONSTRUCTION (IFC)

26 JAN 2022
Calculation Report, OPERATION SHELTER, Plant Plant No. 015 Page 166 of 281
CALCULATION SHEET

SNC-LAVALIN FAYEZ ENGINEERING, Al Khobar, Saudi Arabia


PROJECT : Upgrade Buildings for Risk Mitigation - RT Refinery
EWO / B.I. No. : 10-02062-0002-001 Designed : NFP
Project Code No. : 510008 Checked : AMK
Calc. No. : PE-P20081 Revision : IFC SUB
Subject : Building A9, 300mm RC Wall Design (Exterior Front-Wall) Rev. No. : 00

REINFORCED CONCRETE WALL PANEL DYNAMIC PROPERTIES - SDOF Equivalent System


(ref: ASCE-41088)

RC Wall Panel Dimensions and Boundary Conditions


Wall Thickness, T 300 mm
Wall Height, H 4.05 m
Wall Des. Width, b 1000 mm (Considering 1-m design strip)
Concrete Cover 20 mm
Boundary Condition : Pinned - Pinned

RC Wall Panel Mass


Mass, M = Total Dead Load, P / Gravitational accelation, g
Mass, M = 2.972 kN-s²/m per unit width or 0.003 kN-s²/mm per unit width

RC Wall Panel Rebar Schedule

Ø12 @ 350 Ø16 @ 200 Notes:


Inside Face
300

Outside Face
Ø12 @ 350 Ø16 @ 200
Wall Panel Sectional Plan View

Bar
Rebars Vertical Bars Horizontal Bars Remarks
Location
@ Midspan Ø16 @ 200 Ø12 @ 350 Inside Face See attached Design Drawings RA-102122 and RA-462174.
@ Support Ø16 @ 200 Ø12 @ 350 Outside Face

Material Increase Factors


Material / Strength Factor Concrete Steel Stress Type Remarks
Strength Increase Factor (SIF) 1.00 1.10 Flexure New construction.
Dynamic Increase Factor (DIF) 1.19 1.17 Flexure

Material Strength
Concrete Unit Weight 24 kN/m³
Concrete Ult. Comp. Strength, Fc' 35.00 Mpa
Steel Yield Strength, Fy 420.00 Mpa
F'dc = Fc' x SIF x DIF 41.65 Mpa
Fds = Fy x SIF x DIF 540.54 Mpa
Conc. Modulus of Elasticity, Ec 30332.30 Mpa
Steel Modulus of Elasticity, Es 200000.00 Mpa

ISSUED FOR CONSTRUCTION (IFC)

26 JAN 2022
Calculation Report, OPERATION SHELTER, Plant Plant No. 015 Page 167 of 281
CALCULATION SHEET

SNC-LAVALIN FAYEZ ENGINEERING, Al Khobar, Saudi Arabia


PROJECT : Upgrade Buildings for Risk Mitigation - RT Refinery
EWO / B.I. No. : 10-02062-0002-001 Designed : NFP
Project Code No. : 510008 Checked : AMK
Calc. No. : PE-P20081 Revision : IFC SUB
Subject : Building A9, 300mm RC Wall Design (Exterior Front-Wall) Rev. No. : 00

Compute RC Wall Panel Effective Depths


Short Span Section Long Span Section
Positive (inbound) Negative (rebound) Positive (inbound) Negative (rebound)
Bending Resistance Bending Resistance Bending Resistance Bending Resistance
@ Mid-height 272.000 272.000 258.000 258.000
@ Support 272.000 272.000 258.000 258.000

Compute RC Wall Panel Strength


Determine β1 value as per ACI 318-08, 10.2.7.3;
0.85 (
for Fdc' ≤ 28Mpa )

  0.65 
β1 =   
max  0.85 − 0.05 Fdc − 28  
'
( for F'
dc > 28Mpa )
   
   7 
β1 = 0.7525

Strength Reduction Factor (ACI 318-08)


F = 1.000

Min Limits of Steel Reinforcements:


Required minimum rebars, Asmin (ACI 318-08, 14.3.2)

 For Vertical rebars ; 


 0.0012(b × d ) 
  = 360.000 mm² vertical bars per linear meter of Wall Panel.
As (min ) = 
 For Horizontal rebars ; = 450.000 mm² horizontal bars per linear meter of Wall Panel.
 0.0015(b × d )
 

Bending Capacities:
The following calculations are per 1.0m strip width of RC Wall Panel:
Wall Panel Section
Section Unit
Inbound Rebound
Total area of Reinf # of Bars x Area of 1-bar @ Mid-height 1005.310 1005.310 mm²
or
Steel, Ast Min. ACI Reinforcement @ Support 1005.310 1005.310 mm²
Depth of Stress- As × Fds @ Mid-height 15.349 15.349 mm
a=
Block, a 0.85F ' dc b @ Support 15.349 15.349 mm
Bending Moment   a  @ Mid-height 143.637 143.637 kN-m
M p = φAs Fds d −  
Capacity, Mpc & Mps   2  @ Support 143.637 143.637 kN-m

ISSUED FOR CONSTRUCTION (IFC)

26 JAN 2022
Calculation Report, OPERATION SHELTER, Plant Plant No. 015 Page 168 of 281
CALCULATION SHEET

SNC-LAVALIN FAYEZ ENGINEERING, Al Khobar, Saudi Arabia


PROJECT : Upgrade Buildings for Risk Mitigation - RT Refinery
EWO / B.I. No. : 10-02062-0002-001 Designed : NFP
Project Code No. : 510008 Checked : AMK
Calc. No. : PE-P20081 Revision : IFC SUB
Subject : Building A9, 300mm RC Wall Design (Exterior Front-Wall) Rev. No. : 00

Compute RC Wall Panel Resistance & Transformation Factors

Flexural (Bending) Resistance as per ASCE 41088, Table 6.1


Total Bending Resistance (kN) Transformation Factors
Loading Diagram Strain Range
Inbound, Rb+ Rebound, Rb- Load Fac., KL Mass Fac. KM
8(M8psM+ pcM pc )
Elastic Rb =Rb = 283.73 283.73 0.64 0.50
LL
8M
12 M pc
Rbb ==
ps
Plastic R 283.73 283.73 0.50 0.33
LL

Compute for Nominal Shear Strength:

Fc' (b )(d )
1
Vn =
6
Vn = 292.567 kN

Compute for Nominal Shear Resistance of wall section (Critical section at distance 'd' from the support)
RV = Vn H / (0.5 H - d)
RV = 675.925 kN

Flexural resistance is less than Shear resistance, thus Flexural resistance governs…..

Compute RC Wall Panel Stiffness, Ke ( PCA notes to ACI 318-08 and ASCE-41088 )
Moment of Inertia for Wall Panel Cracked Section (midheight-inbound), Icr

Es
n= = 6.594
Ec

b
B= = 0.151
nAs

Transformed Section Wall Panel


b(kd )
3
I cr = + nAs (d − kd ) 367504753.535 mm4 per unit width
2
=
3
where :

kd =
( 2dB + 1 − 1 )
B = 53.786 mm

Moment of Inertia for Rectangular Wall Panel Gross Section (per unit width), Ig

bh 3
Ig = =
4
2250000000.000 mm per unit width
12

ISSUED FOR CONSTRUCTION (IFC)

26 JAN 2022
Calculation Report, OPERATION SHELTER, Plant Plant No. 015 Page 169 of 281
CALCULATION SHEET

SNC-LAVALIN FAYEZ ENGINEERING, Al Khobar, Saudi Arabia


PROJECT : Upgrade Buildings for Risk Mitigation - RT Refinery
EWO / B.I. No. : 10-02062-0002-001 Designed : NFP
Project Code No. : 510008 Checked : AMK
Calc. No. : PE-P20081 Revision : IFC SUB
Subject : Building A9, 300mm RC Wall Design (Exterior Front-Wall) Rev. No. : 00

Average Moment of Inertia (per unit width), Ia


I g + I cr
Ia = =
4
2250000000.000 mm per unit width
2
Compute for Stiffness, K (as per ASCE 41088, Table 6.1)
Loading Diagram Strain Range Stiffness, Ke Unit

384EE((II))
384
Elastic K ==
K 78901.276 N/mm
5LL3 3

Plastic 0 0.000 N/mm

Equivalent Mass, Me

Use average elastic and plastic transformation values for KLM:


elastic KLM = 0.50 / 0.64 = 0.781
plastic KLM = 0.33 / 0.50 = 0.660
average KLM = 0.721

Me = (KLM) (M)
Me = 0.003 kN-s²/mm per unit width

Period of vibration, tn
Me
t n = 2π
Ke
tn = 0.039 secs.

Summary
Equivalent Mass, M 0.003 kN-s²/mm per unit width
Stiffness, Ke 78.901 kN/mm
inbound resistance, Ru+ 283.727 kN per unit width
rebound resistance, Ru- 283.727 kN per unit width
static load, Fs 0.000 kN per unit width

ISSUED FOR CONSTRUCTION (IFC)

26 JAN 2022
Calculation Report, OPERATION SHELTER, Plant Plant No. 015 Page 170 of 281
CALCULATION SHEET

SNC-LAVALIN FAYEZ ENGINEERING, Al Khobar, Saudi Arabia


PROJECT : Upgrade Buildings for Risk Mitigation - RT Refinery
EWO / B.I. No. : 10-02062-0002-001 Designed : NFP
Project Code No. : 510008 Checked : AMK
Calc. No. : PE-P20081 Revision : IFC SUB
Subject : Building A9, 300mm RC Wall Design (Exterior Front-Wall) Rev. No. : 00

NON-LINEAR (ELASTO-PLASTIC) SDOF ANALYSIS - ASCE 41088

Coefficents @ Vp
Loading Diagram Strain Range
Rstnce, CR Force, CF

Elastic 0.39 0.11

Plastic 0.38 0.12

RESPONSE GRAPH (Based on calculated values from the table on next page…..)

Dyn. Load, F
Dyn. Load/Deformation vs. Time
Deformation, y / 5
800.00
700.00
600.00
500.00
400.00
300.00
200.00
100.00
0.00
-100.00
0.0000

0.1000

0.2000

0.3000

0.4000

0.5000

0.6000

Support Reaction, V
Support Reaction/Resistance vs. Time
Resistance, R
400.000
300.000
200.000
100.000
0.000
-100.000
-200.000
-300.000
-400.000
0.0000

0.1000

0.2000

0.3000

0.4000

0.5000

0.6000

ISSUED FOR CONSTRUCTION (IFC)

26 JAN 2022
Calculation Report, OPERATION SHELTER, Plant Plant No. 015 Page 171 of 281
DESIGN INPUT

26 JAN 2022
Subject
time increment, ∆t 0.003 secs

Calc. No.
PROJECT

ISSUED FOR CONSTRUCTION (IFC)


mass, M 0.003 kN-s²/mm
stiffness, K 78.901 kN/mm

Project Code No.


damping, C 0.000 kN-s/mm

EWO / B.I. Number


positive resistance, Ru+ 283.727 kN
rebound resistance, Ru- -283.727 kN
static load, Fs 0.000 kN

LEGEND : : 510008

: PE-P20081
KEY = 0 is elastic Z= 1 is increasing plastic deformation
KEY = +1 is positive plastic Z= 2 is end of rebound plastic deformation
KEY = -1 is rebound plastic Z= 3 is end of positive plastic deformation
: 10-02062-0002-001

Z= 4 is continued elastic
Z= 5 is start of rebound plastic deformation
Z= 6 is start of positive plastic deformation

Numerical Integration (Newmark-Beta Method)


Dyn. Def. @ Yield pt. Dyn. Ductile
Time, Def. Vel. Acc. Rstnce incr incr incr
Load, KEY eff K Z Reaction Ratio

Calculation Report, OPERATION SHELTER, Plant Plant No. 015


t y v a R ye+ ye- F y v
F V µ
secs kN mm mm/s mm/s² kN mm mm kN/mm kN mm mm/s kN
0.0000 741.43 0.000 0.000 249432.875 0.000 3.596 -3.596 0 2060.55 2167.267 1.052 677.640 81.558 -
: Upgrade Buildings for Risk Mitigation - RT Refinery

0.0030 684.40 1.052 677.640 202327.091 82.988 3.596 -3.596 0 2060.55 5775.743 2.803 466.596 4 107.649 -
0.0060 627.37 3.855 1144.236 115607.076 283.727 3.596 -3.596 1 1981.65 7776.317 3.924 318.041 6 183.100 1.07
: Building A9, 300mm RC Wall Design (Exterior Front-Wall)
CALCULATION

0.0090 570.33 7.779 1462.277 96419.932 283.727 3.596 -3.596 1 1981.65 9495.953 4.792 260.479 1 176.256 2.16
0.0120 513.30 12.571 1722.756 77232.788 283.727 3.596 -3.596 1 1981.65 10873.389 5.487 202.918 1 169.412 3.50
0.0150 456.27 18.058 1925.673 58045.643 283.727 3.596 -3.596 1 1981.65 11908.625 6.009 145.356 1 162.568 5.02
0.0180 399.23 24.067 2071.030 38858.499 283.727 3.596 -3.596 1 1981.65 12601.661 6.359 87.795 1 155.724 6.69
0.0210 342.20 30.427 2158.824 19671.355 283.727 3.596 -3.596 1 1981.65 12952.497 6.536 30.233 1 148.880 8.46
SHEET

0.0240 285.17 36.963 2189.058 484.211 283.727 3.596 -3.596 1 1981.65 12961.133 6.541 -27.328 1 142.036 10.28
0.0270 228.13 43.503 2161.730 -18702.934 283.727 3.596 -3.596 1 1981.65 12627.568 6.372 -84.890 1 135.192 12.10
0.0300 171.10 49.876 2076.840 -37890.078 283.727 3.596 -3.596 1 1981.65 11951.804 6.031 -142.451 1 128.348 13.87
0.0330 114.07 55.907 1934.389 -57077.222 283.727 3.596 -3.596 1 1981.65 10933.840 5.518 -200.012 1 121.504 15.55
0.0360 57.03 61.424 1734.377 -76264.366 283.727 3.596 -3.596 1 1981.65 9573.675 4.831 -257.574 1 114.660 17.08
SNC-LAVALIN FAYEZ ENGINEERING, Al Khobar, Saudi Arabia

0.0390 0.00 66.256 1476.803 -95451.510 283.727 3.596 -3.596 1 1981.65 7928.344 4.001 -286.355 1 107.816 18.42
0.0420 0.00 70.256 1190.449 -95451.510 283.727 3.596 -3.596 1 1981.65 6225.980 3.142 -286.355 1 107.816 19.54
Revision

0.0450 0.00 73.398 904.094 -95451.510 283.727 3.596 -3.596 1 1981.65 4523.615 2.283 -286.355 1 107.816 20.41
Rev. No.
Checked
Designed

0.0480 0.00 75.681 617.739 -95451.510 283.727 3.596 -3.596 1 1981.65 2821.250 1.424 -286.355 1 107.816 21.05
0.0510 0.00 77.105 331.385 -95451.510 283.727 3.596 -3.596 1 1981.65 1118.886 0.565 -286.355 1 107.816 21.44
0.0540 0.00 77.669 45.030 -95451.510 283.727 3.596 -3.596 1 1981.65 -583.479 -0.294 -286.355 1 107.816 21.60
:
:
:
:

0.0570 0.00 77.375 -241.324 -87635.893 260.496 77.669 70.477 0 2060.55 -2216.148 -1.076 -220.085 3 101.593 -
0.0600 0.00 76.299 -461.409 -59087.573 175.636 77.669 70.477 0 2060.55 -3269.967 -1.587 -114.077 4 68.498 -
0.0630 0.00 74.712 -575.487 -16964.006 50.425 77.669 70.477 0 2060.55 -3572.517 -1.734 18.140 4 19.666 -
00
NFP

AMK

IFC SUB

0.0660 0.00 72.979 -557.347 29057.006 -86.371 77.669 70.477 0 2060.55 -3054.290 -1.482 146.189 4 -33.685 -
0.0690 0.00 71.496 -411.158 68402.231 -203.324 77.669 70.477 0 2060.55 -1834.345 -0.890 240.652 4 -79.296 -
0.0720 0.00 70.606 -170.507 92032.187 -273.564 77.669 70.477 0 2060.55 -192.964 -0.094 279.825 4 -106.690 -

Page 172 of 281


0.0750 0.00 70.512 109.318 94517.941 -280.952 77.669 70.477 0 2060.55 1492.750 0.724 254.710 4 -109.571 -
0.0780 0.00 71.237 364.028 75288.395 -223.793 77.669 70.477 0 2060.55 2835.509 1.376 171.075 4 -87.279 -
0.0810 0.00 72.613 535.103 38761.499 -115.218 77.669 70.477 0 2060.55 3526.815 1.712 48.136 4 -44.935 -

26 JAN 2022
Subject
0.0840 0.00 74.325 583.239 -6670.771 19.829 77.669 70.477 0 2060.55 3407.842 1.654 -85.862 4 7.733 -

Calc. No.
PROJECT

ISSUED FOR CONSTRUCTION (IFC)


0.0870 0.00 75.978 497.377 -50570.445 150.319 77.669 70.477 0 2060.55 2505.925 1.216 -200.133 4 58.625 -
0.0900 0.00 77.195 297.244 -82851.666 246.275 77.669 70.477 0 2060.55 1028.277 0.499 -268.424 4 96.047 -

Project Code No.


0.0930 0.00 77.694 28.820 -95451.510 283.727 77.669 70.477 1 1981.65 -679.851 -0.343 -286.355 6 107.816 1.01

EWO / B.I. Number


0.0960 0.00 77.351 -257.535 -86344.997 256.659 77.694 70.502 0 2060.55 -2301.009 -1.117 -214.573 3 100.097 -
0.0990 0.00 76.234 -472.108 -56703.500 168.550 77.694 70.502 0 2060.55 -3312.308 -1.607 -106.107 4 65.734 -
0.1020 0.00 74.626 -578.215 -14034.493 41.717 77.694 70.502 0 2060.55 -3562.611 -1.729 26.737 4 16.270 -
0.1050 0.00 72.897 -551.478 31858.910 -94.700 77.694 70.502 0 2060.55 -2994.412 -1.453 153.438 4 -36.933 -
0.1080 0.00 71.444 -398.041 70432.795 -209.360 77.694 70.502 0 2060.55 -1738.253 -0.844 244.887 4 -81.650 - : 510008
0.1110 0.00 70.601 -153.154 92824.892 -275.920 77.694 70.502 0 2060.55 -82.734 -0.040 280.073 4 -107.609 -
: PE-P20081
0.1140 0.00 70.560 126.919 93890.665 -279.088 77.694 70.502 0 2060.55 1591.793 0.773 250.914 4 -108.844 -
0.1170 0.00 71.333 377.833 73385.254 -218.136 77.694 70.502 0 2060.55 2900.609 1.408 164.107 4 -85.073 -
: 10-02062-0002-001

0.1200 0.00 72.741 541.941 36019.735 -107.068 77.694 70.502 0 2060.55 3543.016 1.719 39.598 4 -41.756 -
0.1230 0.00 74.460 581.538 -9621.243 28.599 77.694 70.502 0 2060.55 3371.423 1.636 -94.010 4 11.154 -
0.1260 0.00 76.096 487.529 -53051.761 157.695 77.694 70.502 0 2060.55 2425.252 1.177 -206.018 4 61.501 -
0.1290 0.00 77.273 281.511 -84293.747 250.561 77.694 70.502 0 2060.55 921.884 0.447 -270.695 4 97.719 -
0.1320 0.00 77.721 10.816 -95451.510 283.727 77.694 70.502 1 1981.65 -786.882 -0.397 -286.355 6 107.816 1.01
0.1350 0.00 77.324 -275.539 -84911.334 252.397 77.721 70.529 0 2060.55 -2395.255 -1.162 -208.451 3 98.435 -
0.1380 0.00 76.161 -483.989 -54055.761 160.680 77.721 70.529 0 2060.55 -3359.332 -1.630 -97.255 4 62.665 -

Calculation Report, OPERATION SHELTER, Plant Plant No. 015


0.1410 0.00 74.531 -581.244 -10780.991 32.046 77.721 70.529 0 2060.55 -3551.610 -1.724 36.285 4 12.498 -
0.1440 0.00 72.807 -544.960 34970.690 -103.950 77.721 70.529 0 2060.55 -2927.912 -1.421 161.488 4 -40.540 -
0.1470 0.00 71.386 -383.472 72687.928 -216.063 77.721 70.529 0 2060.55 -1631.533 -0.792 249.590 4 -84.265 -
: Upgrade Buildings for Risk Mitigation - RT Refinery

0.1500 0.00 70.594 -133.882 93705.266 -278.537 77.721 70.529 0 2060.55 39.687 0.019 280.349 4 -108.629 -
0.1530 0.00 70.614 146.467 93194.016 -277.017 77.721 70.529 0 2060.55 1701.790 0.826 246.698 4 -108.037 -
: Building A9, 300mm RC Wall Design (Exterior Front-Wall)
CALCULATION

0.1560 0.00 71.440 393.165 71271.635 -211.853 77.721 70.529 0 2060.55 2972.910 1.443 156.370 4 -82.623 -
0.1590 0.00 72.882 549.535 32974.746 -98.017 77.721 70.529 0 2060.55 3561.010 1.728 30.115 4 -38.227 -
0.1620 0.00 74.611 579.650 -12898.022 38.339 77.721 70.529 0 2060.55 3330.975 1.617 -103.058 4 14.952 -
0.1650 0.00 76.227 476.592 -55807.497 165.887 77.721 70.529 0 2060.55 2335.656 1.134 -212.554 4 64.696 -
0.1680 0.00 77.361 264.037 -85895.316 255.322 77.721 70.529 0 2060.55 803.725 0.390 -273.216 4 99.576 -
SHEET

0.1710 0.00 77.751 -9.179 -95451.510 283.727 77.721 70.529 1 1981.65 -905.750 -0.457 -286.355 6 107.816 1.01
0.1740 0.00 77.294 -295.533 -83319.115 247.664 77.751 70.559 0 2060.55 -2499.925 -1.213 -201.651 3 96.589 -
0.1770 0.00 76.080 -497.185 -51115.196 151.939 77.751 70.559 0 2060.55 -3411.557 -1.656 -87.424 4 59.256 -
0.1800 0.00 74.425 -584.609 -7167.668 21.306 77.751 70.559 0 2060.55 -3539.392 -1.718 46.888 4 8.309 -
0.1830 0.00 72.707 -537.721 38426.616 -114.222 77.751 70.559 0 2060.55 -2854.058 -1.385 170.429 4 -44.547 -
SNC-LAVALIN FAYEZ ENGINEERING, Al Khobar, Saudi Arabia

0.1860 0.00 71.322 -367.292 75192.466 -223.508 77.751 70.559 0 2060.55 -1513.011 -0.734 254.813 4 -87.168 -
0.1890 0.00 70.588 -112.479 94683.005 -281.443 77.751 70.559 0 2060.55 175.648 0.085 280.655 4 -109.763 -
Revision

0.1920 0.00 70.673 168.176 92420.321 -274.717 77.751 70.559 0 2060.55 1823.951 0.885 242.017 4 -107.140 -
Rev. No.
Checked
Designed

0.1950 0.00 71.558 410.193 68924.262 -204.876 77.751 70.559 0 2060.55 3053.206 1.482 147.776 4 -79.902 -
0.1980 0.00 73.040 557.969 29592.998 -87.965 77.751 70.559 0 2060.55 3580.993 1.738 19.584 4 -34.306 -
0.2010 0.00 74.778 577.553 -16537.196 49.156 77.751 70.559 0 2060.55 3286.054 1.595 -113.108 4 19.171 -
:
:
:
:

0.2040 0.00 76.372 464.445 -58868.003 174.984 77.751 70.559 0 2060.55 2236.152 1.085 -219.813 4 68.244 -
0.2070 0.00 77.458 244.632 -87674.010 260.609 77.751 70.559 0 2060.55 672.498 0.326 -276.017 4 101.638 -
0.2100 0.00 77.784 -31.385 -95451.510 283.727 77.751 70.559 1 1981.65 -1037.764 -0.524 -286.355 6 107.816 1.01
00
NFP

AMK

IFC SUB

0.2130 0.00 77.260 -317.739 -81550.805 242.408 77.784 70.592 0 2060.55 -2616.170 -1.270 -194.100 3 94.539 -
0.2160 0.00 75.991 -511.840 -47849.421 142.231 77.784 70.592 0 2060.55 -3469.558 -1.684 -76.506 4 55.470 -
0.2190 0.00 74.307 -588.346 -3154.732 9.377 77.784 70.592 0 2060.55 -3525.822 -1.711 58.665 4 3.657 -

Page 173 of 281


0.2220 0.00 72.596 -529.681 42264.750 -125.631 77.784 70.592 0 2060.55 -2772.036 -1.345 180.358 4 -48.996 -
0.2250 0.00 71.251 -349.323 77973.994 -231.776 77.784 70.592 0 2060.55 -1381.380 -0.670 260.614 4 -90.393 -
0.2280 0.00 70.580 -88.709 95451.510 -283.727 77.784 70.592 -1 1981.65 323.814 0.163 286.355 5 -107.816 1.00

26 JAN 2022
Subject
0.2310 0.00 70.744 197.646 91114.064 -270.834 77.772 70.580 0 2060.55 1987.500 0.965 234.938 2 -105.625 -

Calc. No.
PROJECT

ISSUED FOR CONSTRUCTION (IFC)


0.2340 0.00 71.708 432.584 65511.179 -194.730 77.772 70.580 0 2060.55 3155.883 1.532 135.553 4 -75.945 -
0.2370 0.00 73.240 568.136 24857.238 -73.888 77.772 70.580 0 2060.55 3599.208 1.747 5.024 4 -28.816 -

Project Code No.


0.2400 0.00 74.986 573.161 -21507.601 63.931 77.772 70.580 0 2060.55 3215.623 1.561 -126.658 4 24.933 -

EWO / B.I. Number


0.2430 0.00 76.547 446.503 -62931.115 187.061 77.772 70.580 0 2060.55 2093.255 1.016 -229.241 4 72.954 -
0.2460 0.00 77.563 217.262 -89896.336 267.215 77.772 70.580 0 2060.55 489.966 0.238 -279.157 4 104.214 -
0.2490 0.00 77.801 -61.895 -95451.510 283.727 77.772 70.580 1 1981.65 -1219.145 -0.615 -286.355 6 107.816 1.01
0.2520 0.00 77.185 -348.249 -79121.236 235.186 77.801 70.609 0 2060.55 -2775.885 -1.347 -183.725 3 91.723 -
0.2550 0.00 75.838 -531.975 -43362.408 128.894 77.801 70.609 0 2060.55 -3549.248 -1.722 -61.505 4 50.269 - : 510008
0.2580 0.00 74.116 -593.480 2358.842 -7.012 77.801 70.609 0 2060.55 -3507.178 -1.702 74.845 4 -2.735 -
: PE-P20081
0.2610 0.00 72.414 -518.635 47538.154 -141.306 77.801 70.609 0 2060.55 -2659.342 -1.291 194.001 4 -55.109 -
0.2640 0.00 71.123 -324.634 81795.674 -243.136 77.801 70.609 0 2060.55 -1200.527 -0.583 268.585 4 -94.823 -
: 10-02062-0002-001

0.2670 0.00 70.540 -56.049 95451.510 -283.727 77.801 70.609 -1 1981.65 517.972 0.261 286.355 5 -107.816 1.02
0.2700 0.00 70.802 230.305 88513.348 -263.104 77.732 70.540 0 2060.55 2158.466 1.048 223.832 2 -102.611 -
0.2730 0.00 71.849 454.137 60708.087 -180.453 77.732 70.540 0 2060.55 3241.186 1.573 119.495 4 -70.377 -
0.2760 0.00 73.422 573.632 18955.270 -56.344 77.732 70.540 0 2060.55 3579.251 1.737 -12.296 4 -21.974 -
0.2790 0.00 75.159 561.337 -27152.481 80.710 77.732 70.540 0 2060.55 3094.990 1.502 -141.262 4 31.477 -
0.2820 0.00 76.661 420.075 -67022.006 199.221 77.732 70.540 0 2060.55 1899.662 0.922 -237.773 4 77.696 -
0.2850 0.00 77.583 182.302 -91493.366 271.962 77.732 70.540 0 2060.55 267.890 0.130 -279.657 4 106.065 -

Calculation Report, OPERATION SHELTER, Plant Plant No. 015


0.2880 0.00 77.713 -97.355 -94944.316 282.220 77.732 70.540 0 2060.55 -1425.429 -0.692 -257.289 4 110.066 -
0.2910 0.00 77.022 -354.644 -76582.008 227.638 77.732 70.540 0 2060.55 -2791.258 -1.355 -175.811 4 88.779 -
0.2940 0.00 75.667 -530.455 -40625.145 120.757 77.732 70.540 0 2060.55 -3515.802 -1.706 -53.940 4 47.095 -
: Upgrade Buildings for Risk Mitigation - RT Refinery

0.2970 0.00 73.961 -584.395 4665.261 -13.867 77.732 70.540 0 2060.55 -3432.598 -1.666 80.324 4 -5.408 -
0.3000 0.00 72.295 -504.071 48883.833 -145.306 77.732 70.540 0 2060.55 -2560.761 -1.243 196.133 4 -56.669 -
: Building A9, 300mm RC Wall Design (Exterior Front-Wall)
CALCULATION

0.3030 0.00 71.052 -307.938 81871.446 -243.361 77.732 70.540 0 2060.55 -1100.595 -0.534 266.881 4 -94.911 -
0.3060 0.00 70.518 -41.057 95451.510 -283.727 77.732 70.540 -1 1981.65 607.100 0.306 286.355 5 -107.816 1.01
0.3090 0.00 70.824 245.297 87319.494 -259.555 77.710 70.518 0 2060.55 2236.948 1.086 218.734 2 -101.227 -
0.3120 0.00 71.910 464.032 58503.234 -173.900 77.710 70.518 0 2060.55 3280.345 1.592 112.124 4 -67.821 -
0.3150 0.00 73.502 576.155 16245.980 -48.291 77.710 70.518 0 2060.55 3570.089 1.733 -20.247 4 -18.833 -
SHEET

0.3180 0.00 75.234 555.909 -29743.755 88.413 77.710 70.518 0 2060.55 3039.614 1.475 -147.966 4 34.481 -
0.3210 0.00 76.710 407.943 -68899.924 204.803 77.710 70.518 0 2060.55 1810.793 0.879 -241.690 4 79.873 -
0.3240 0.00 77.588 166.254 -92226.480 274.141 77.710 70.518 0 2060.55 165.946 0.081 -279.886 4 106.915 -
0.3270 0.00 77.669 -113.632 -94364.195 280.495 77.710 70.518 0 2060.55 -1517.026 -0.736 -253.779 4 109.393 -
0.3300 0.00 76.933 -367.412 -74821.934 222.406 77.710 70.518 0 2060.55 -2851.465 -1.384 -169.367 4 86.739 -
SNC-LAVALIN FAYEZ ENGINEERING, Al Khobar, Saudi Arabia

0.3330 0.00 75.549 -536.779 -38089.490 113.220 77.710 70.518 0 2060.55 -3530.786 -1.714 -46.043 4 44.156 -
0.3360 0.00 73.835 -582.822 7393.934 -21.978 77.710 70.518 0 2060.55 -3398.916 -1.650 87.859 4 -8.572 -
Revision

0.3390 0.00 72.186 -494.963 51178.618 -152.127 77.710 70.518 0 2060.55 -2486.152 -1.207 201.576 4 -59.330 -
Rev. No.
Checked
Designed

0.3420 0.00 70.979 -293.388 83205.121 -247.325 77.710 70.518 0 2060.55 -1002.200 -0.486 268.981 4 -96.457 -
0.3450 0.00 70.493 -24.407 95451.510 -283.727 77.710 70.518 -1 1981.65 706.085 0.356 286.355 5 -107.816 1.01
0.3480 0.00 70.849 261.948 85993.605 -255.614 77.685 70.493 0 2060.55 2324.109 1.128 213.072 2 -99.689 -
:
:
:
:

0.3510 0.00 71.977 475.020 56054.537 -166.621 77.685 70.493 0 2060.55 3323.834 1.613 103.937 4 -64.982 -
0.3540 0.00 73.590 578.957 13237.057 -39.347 77.685 70.493 0 2060.55 3559.915 1.728 -29.077 4 -15.345 -
0.3570 0.00 75.318 549.880 -32621.610 96.967 77.685 70.493 0 2060.55 2978.113 1.445 -155.411 4 37.817 -
00
NFP

AMK
IFC SUB

0.3600 0.00 76.763 394.470 -70985.530 211.003 77.685 70.493 0 2060.55 1712.096 0.831 -246.039 4 82.291 -
0.3630 0.00 77.594 148.430 -93040.673 276.561 77.685 70.493 0 2060.55 52.728 0.026 -280.141 4 107.859 -
0.3660 0.00 77.620 -131.710 -93719.916 278.580 77.685 70.493 0 2060.55 -1618.754 -0.786 -249.881 4 108.646 -

Page 174 of 281


0.3690 0.00 76.834 -381.591 -72867.204 216.596 77.685 70.493 0 2060.55 -2918.330 -1.416 -162.211 4 84.472 -
0.3720 0.00 75.418 -543.802 -35273.406 104.849 77.685 70.493 0 2060.55 -3547.426 -1.722 -37.274 4 40.891 -
0.3750 0.00 73.696 -581.076 10424.385 -30.986 77.685 70.493 0 2060.55 -3361.509 -1.631 96.227 4 -12.085 -

26 JAN 2022
Subject
0.3780 0.00 72.065 -484.848 53727.194 -159.703 77.685 70.493 0 2060.55 -2403.292 -1.166 207.620 4 -62.284 -

Calc. No.
PROJECT

ISSUED FOR CONSTRUCTION (IFC)


0.3810 0.00 70.899 -277.228 84686.293 -251.728 77.685 70.493 0 2060.55 -892.923 -0.433 271.313 4 -98.174 -
0.3840 0.00 70.465 -5.915 95451.510 -283.727 77.685 70.493 -1 1981.65 816.017 0.412 286.355 5 -107.816 1.01

Project Code No.


0.3870 0.00 70.877 280.439 84521.080 -251.237 77.657 70.465 0 2060.55 2420.910 1.175 206.784 2 -97.982 -

EWO / B.I. Number


0.3900 0.00 72.052 487.223 53335.026 -158.537 77.657 70.465 0 2060.55 3372.133 1.637 94.846 4 -61.829 -
0.3930 0.00 73.688 582.069 9895.362 -29.414 77.657 70.465 0 2060.55 3548.615 1.722 -38.884 4 -11.471 -
0.3960 0.00 75.411 543.186 -35817.740 106.467 77.657 70.465 0 2060.55 2909.811 1.412 -163.679 4 41.522 -
0.3990 0.00 76.823 379.506 -73301.792 217.888 77.657 70.465 0 2060.55 1602.483 0.778 -250.870 4 84.976 -
0.4020 0.00 77.600 128.636 -93944.911 279.249 77.657 70.465 0 2060.55 -73.011 -0.035 -280.424 4 108.907 - : 510008
0.4050 0.00 77.565 -151.788 -93004.383 276.453 77.657 70.465 0 2060.55 -1731.732 -0.840 -245.551 4 107.817 -
: PE-P20081
0.4080 0.00 76.725 -397.339 -70696.292 210.143 77.657 70.465 0 2060.55 -2992.590 -1.452 -154.263 4 81.956 -
0.4110 0.00 75.272 -551.602 -32145.877 95.553 77.657 70.465 0 2060.55 -3565.908 -1.731 -27.534 4 37.266 -
: 10-02062-0002-001

0.4140 0.00 73.542 -579.136 13789.986 -40.990 77.657 70.465 0 2060.55 -3319.965 -1.611 105.521 4 -15.986 -
0.4170 0.00 71.930 -473.614 56557.629 -168.116 77.657 70.465 0 2060.55 -2311.268 -1.122 214.333 4 -65.565 -
0.4200 0.00 70.809 -259.281 86331.275 -256.618 77.657 70.465 0 2060.55 -771.561 -0.374 273.903 4 -100.081 -
0.4230 0.00 70.434 14.622 95451.510 -283.727 77.657 70.465 -1 1981.65 938.107 0.473 286.355 5 -107.816 1.01
0.4260 0.00 70.908 300.976 82885.701 -246.376 77.626 70.434 0 2060.55 2528.416 1.227 199.801 2 -96.087 -
0.4290 0.00 72.135 500.777 50314.752 -149.559 77.626 70.434 0 2060.55 3425.773 1.663 84.748 4 -58.328 -
0.4320 0.00 73.797 585.525 6184.095 -18.382 77.626 70.434 0 2060.55 3536.066 1.716 -49.775 4 -7.169 -

Calculation Report, OPERATION SHELTER, Plant Plant No. 015


0.4350 0.00 75.513 535.750 -39367.346 117.019 77.626 70.434 0 2060.55 2833.954 1.375 -172.862 4 45.637 -
0.4380 0.00 76.889 362.888 -75874.221 225.534 77.626 70.434 0 2060.55 1480.748 0.719 -256.235 4 87.958 -
0.4410 0.00 77.607 106.653 -94949.153 282.234 77.626 70.434 0 2060.55 -212.657 -0.103 -280.738 4 110.071 -
: Upgrade Buildings for Risk Mitigation - RT Refinery

0.4440 0.00 77.504 -174.086 -92209.715 274.091 77.626 70.434 0 2060.55 -1857.205 -0.901 -240.743 4 106.896 -
0.4470 0.00 76.603 -414.828 -68285.289 202.976 77.626 70.434 0 2060.55 -3075.063 -1.492 -145.437 4 79.161 -
: Building A9, 300mm RC Wall Design (Exterior Front-Wall)
CALCULATION

0.4500 0.00 75.110 -560.265 -28672.460 85.228 77.626 70.434 0 2060.55 -3586.433 -1.741 -16.717 4 33.239 -
0.4530 0.00 73.370 -576.982 17527.806 -52.101 77.626 70.434 0 2060.55 -3273.827 -1.589 115.843 4 -20.319 -
0.4560 0.00 71.781 -461.138 59701.096 -177.460 77.626 70.434 0 2060.55 -2209.066 -1.072 221.789 4 -69.209 -
0.4590 0.00 70.709 -239.349 88158.184 -262.048 77.626 70.434 0 2060.55 -636.777 -0.309 276.779 4 -102.199 -
0.4620 0.00 70.400 37.430 95451.510 -283.727 77.626 70.434 -1 1981.65 1073.699 0.542 286.355 5 -107.816 1.01
SHEET

0.4650 0.00 70.942 323.784 81069.458 -240.977 77.592 70.400 0 2060.55 2647.813 1.285 192.045 2 -93.981 -
0.4680 0.00 72.227 515.829 46960.452 -139.589 77.592 70.400 0 2060.55 3485.346 1.691 73.534 4 -54.440 -
0.4710 0.00 73.918 589.363 2062.380 -6.130 77.592 70.400 0 2060.55 3522.128 1.709 -61.871 4 -2.391 -
0.4740 0.00 75.628 527.492 -43309.519 128.737 77.592 70.400 0 2060.55 2749.709 1.334 -183.061 4 50.207 -
0.4770 0.00 76.962 344.431 -78731.147 234.027 77.592 70.400 0 2060.55 1345.550 0.653 -262.193 4 91.270 -
SNC-LAVALIN FAYEZ ENGINEERING, Al Khobar, Saudi Arabia

0.4800 0.00 77.615 82.238 -95451.510 283.727 77.592 70.400 1 1981.65 -362.281 -0.183 -286.355 6 107.816 1.01
0.4830 0.00 77.432 -204.116 -90598.809 269.303 77.615 70.423 0 2060.55 -2021.372 -0.981 -232.738 3 105.028 -
Revision

0.4860 0.00 76.451 -436.854 -64559.588 191.902 77.615 70.423 0 2060.55 -3172.783 -1.540 -132.371 4 74.842 -
Rev. No.
Checked
Designed

0.4890 0.00 74.912 -569.225 -23687.937 70.412 77.615 70.423 0 2060.55 -3595.254 -1.745 -1.593 4 27.461 -
0.4920 0.00 73.167 -570.818 22625.968 -67.255 77.615 70.423 0 2060.55 -3191.723 -1.549 129.551 4 -26.230 -
0.4950 0.00 71.618 -441.267 63741.604 -189.470 77.615 70.423 0 2060.55 -2054.900 -0.997 230.932 4 -73.893 -
:
:
:
:

30

RESULTS SUMMARY
00
NFP

AMK
IFC SUB

Def, y Reaction Ductility


Inbound 77.801 183.100 21.599
Rebound - -109.763 1.019

Page 175 of 281


Component/Member response exceeds the elastic range…..
CALCULATION SHEET

SNC-LAVALIN FAYEZ ENGINEERING, Al Khobar, Saudi Arabia


PROJECT : Upgrade Buildings for Risk Mitigation - RT Refinery
EWO / B.I. No. : 10-02062-0002-001 Designed : NFP
Project Code No. : 510008 Checked : AMK
Calc. No. : PE-P20081 Revision : IFC SUB
Subject : Building A9, 300mm RC Wall Design (Exterior Front-Wall) Rev. No. : 00

DEFORMATION LIMITS (RESPONSE CRITERIA) - As per BDR and SAES-M-009

Member / Component : RC Wall Panel


Material : Concrete
Wall Height, H : 4050.000 mm
Response Criteria : High (Refer to BDR datasheet and SAES-M-009, Table-9)
Support Rotation, θ : 5 º (SAES-M-009, Table-9) Wall Panels (no shear reinforcement)
Ductility Ratio, µ : n/a (SAES-M-009, Table-9)

CHECK DEFORMATION AND DUCTILITY RATIO


Support Rotation, θ1:

xm = Deformation, y = 77.801 mm
 xm 
θ1 = Arc tan   = 2.200 º < 5.0 º RC Wall Panel Design is acceptable!
 0.5 L 

Ductility Ratio, µ:

Max Ductilty Ratio = n/a

Therefore, RC wall panel design is acceptable….

ISSUED FOR CONSTRUCTION (IFC)

26 JAN 2022
Calculation Report, OPERATION SHELTER, Plant Plant No. 015 Page 176 of 281
CALCULATION SHEET

SNC-LAVALIN FAYEZ ENGINEERING, Al Khobar, Saudi Arabia


PROJECT : Updrade Buildings for Risk Mitigation - RT Refinery
B.I Number : 10-02062-0002-001 Designed : AIA / NFP
Project Code No. : 510008 Checcked : NFP / AKM
Calc. No. : PE-P20081 Reviision : IFC Sub
Subject : Structural Calculation - Operator Shelter, Plant No. 015 (Bldg-A9) Rev.. No. : 00

4.2 CMU WALL DESIGN


(SIDE AND REAR WALLS)

ISSUED FOR CONSTRUCTION (IFC)

26 JAN 2022
Calculation Report, OPERATION SHELTER, Plant Plant No. 015 Page 177 of 281
CALCULATION SHEET

SNC-LAVALIN FAYEZ ENGINEERING, Al Khobar, Saudi Arabia


PROJECT : Upgrade Buildings for Risk Mitigation - RT Refinery
EWO / B.I. No. : 10-02062-0002-001 Designed : NFP

Project Code No.: 510008 Checked : AMK

Calc. No. : PE-P20081 Revision : IFC SUB

Subject : Building A9, 300mm CMU Wall Design (Exterior Side-Walls) Rev. No. : 00

REINFORCED CMU WALL DESIGN :

CMU MATERIAL AND CROSS-SECTIONAL PROPERTIES :

Concrete masonry unit (CMU) : 12˝ CMU, Solid Grouted Wall Fully Grouted

Compressive strength, f'm 1500 psi or 10.34 Mpa


Reinforcement, fy 60000 psi or 414 MPa
CMU Modulus of Elasticity, Em Em=900f'm 1350000 psi or 9308 MPa (ACI 530-05)
CMU Modulus of Rupture, f r Type M or S Mortar Cement 163 psi or 1.124 MPa (ACI 530-05)
For Hollow CMU Fully Grouted
Steel Modulus of Elasticity, Es 200000 MPa
300 mm thk. grouted CMU unit weight 133 PSF or 6.37 KPa (SABP-Q-008)
Nominal wall thickness, tn 12 inches or 300 mm
Actual wall thickness, ta 11.625 inches or 295 mm (SABP-Q-008)
Eff. Depth, d : Vertical Rebar placed at the Center of cell. 5.75 inches or 146 mm (SABP-Q-008)
2 2
Cross-Sectional Area (Face Shell), Am 139.5 in /ft or 2.95E+05 mm /m (NCMA TEK)
4 4
Moment of Inertia, Im 1571 in /ft or 2.14E+09 mm /m (NCMA TEK)

FIGURE - CMU WALL SECTION

Design Strip, b
s
ta

ISSUED FOR CONSTRUCTION (IFC)

26 JAN 2022
Calculation Report, OPERATION SHELTER, Plant Plant No. 015 Page 178 of 281
CALCULATION SHEET

SNC-LAVALIN FAYEZ ENGINEERING, Al Khobar, Saudi Arabia


PROJECT : Upgrade Buildings for Risk Mitigation - RT Refinery
EWO / B.I. No. : 10-02062-0002-001 Designed : NFP
Project Code No. : 510008 Checked : AMK
Calc. No. : PE-P20081 Revision : IFC SUB
Subject : Building A9, 300mm CMU Wall Design (Exterior Side-Walls) Rev. No. : 00

CHECK CMU WALL COMPONENT AGAINST DEAD LOAD AND BLAST LOAD

Dimensions:
Design Strip, b 1.000 m
Wall Height, H 4.050 m

Figure - CMU Wall Tributary Area

L L

b
Wall Location
CMU wall located on west
side portion of the building
along Grid-D.

This wall design is also


H

applicable to wall on the


north side of the building.

Refer to attached Design


Drawing RA-460674.

Compute Static Dead Load on CMU Wall

Load Transfer from Beams 0.000 kN/m


CMU Wall Self-weight 25.791 kN/m
Total 25.791 kN

Static Load, P = 25.791 kN per linear meter length

Define the Dynamic Blast Load on CMU Wall (Refer to Blast Load Calculation pages under section 2.5…..)
Blast Pressure on Side Wall
Eff. Side-on Pressure, Pa = 66.490 kPa
Blast Pressure (P) vs. Time (t)
Rise time, tr = 0.002 secs 70.00
Time duration, to = 0.044 secs 60.00
50.00
Blast Pressure, P

40.00
30.00
0.000 0.00 20.00
0.002 66.49 10.00
0.044 0.00 0.00
0.000

0.005

0.010

0.015

0.020

0.025

0.030

0.035

0.040

0.045

0.050

Time, t

ISSUED FOR CONSTRUCTION (IFC)

26 JAN 2022
Calculation Report, OPERATION SHELTER, Plant Plant No. 015 Page 179 of 281
CALCULATION SHEET

SNC-LAVALIN FAYEZ ENGINEERING, Al Khobar, Saudi Arabia


PROJECT : Upgrade Buildings for Risk Mitigation - RT Refinery
EWO / B.I. No. : 10-02062-0002-001 Designed : NFP
Project Code No. : 510008 Checked : AMK
Calc. No. : PE-P20081 Revision : IFC SUB
Subject : Building A9, 300mm CMU Wall Design (Exterior Side-Walls) Rev. No. : 00

Blast Load Tabulation:

Time Increment, ∆t = 0.0020 secs < 10% of period of vibration, tn o.k.

Pressure Equivalent Dyn. Force


Time
Pa UDL = Pa x b F = UDL x H
0.0000 0.000 0.000 0.000
0.0020 66.490 66.490 269.285
0.0040 63.324 63.324 256.461
0.0060 60.158 60.158 243.638
0.0080 56.991 56.991 230.815
0.0100 53.825 53.825 217.992
0.0120 50.659 50.659 205.169
0.0140 47.493 47.493 192.346
0.0160 44.327 44.327 179.523
0.0180 41.160 41.160 166.700
0.0200 37.994 37.994 153.877
0.0220 34.828 34.828 141.054
0.0240 31.662 31.662 128.231
0.0260 28.496 28.496 115.408
0.0280 25.330 25.330 102.585
0.0300 22.163 22.163 89.761
0.0320 18.997 18.997 76.938
0.0340 15.831 15.831 64.115
0.0360 12.665 12.665 51.292
0.0380 9.499 9.499 38.469
0.0400 6.332 6.332 25.646
0.0420 3.166 3.166 12.823
0.0440 0.000 0.000 0.000
0.0460 0.000 0.000 0.000
0.0480 0.000 0.000 0.000
0.0500 0.000 0.000 0.000
0.0520 0.000 0.000 0.000
0.0540 0.000 0.000 0.000
0.0560 0.000 0.000 0.000
0.0580 0.000 0.000 0.000
0.0600 0.000 0.000 0.000
0.0620 0.000 0.000 0.000
0.0640 0.000 0.000 0.000
0.0660 0.000 0.000 0.000
0.0680 0.000 0.000 0.000
0.0700 0.000 0.000 0.000
0.0720 0.000 0.000 0.000
0.0740 0.000 0.000 0.000
0.0760 0.000 0.000 0.000

ISSUED FOR CONSTRUCTION (IFC)

26 JAN 2022
Calculation Report, OPERATION SHELTER, Plant Plant No. 015 Page 180 of 281
CALCULATION SHEET

SNC-LAVALIN FAYEZ ENGINEERING, Al Khobar, Saudi Arabia


PROJECT : Upgrade Buildings for Risk Mitigation - RT Refinery
EWO / B.I. No. : 10-02062-0002-001 Designed : NFP
Project Code No. : 510008 Checked : AMK
Calc. No. : PE-P20081 Revision : IFC SUB
Subject : Building A9, 300mm CMU Wall Design (Exterior Side-Walls) Rev. No. : 00

CMU Wall DYNAMIC PROPERTIES - SDOF Equivalent System

CMU Wall Dimensions and Boundary Conditions


CMU Wall Height, H 4050 mm = 4.05 m
Boundary Condition Pinned - Pinned

CMU Wall Mass


Mass, M = CMU Wall Self-weight / Gravitational accelation, g
Mass, M = 2.629 kN-s²/m or 0.003 kN-s²/mm

Material Increase Factors


Material / Strength Factor CMU Steel Stress Type Remarks
Strength Increase Factor (SIF) 1.00 1.10 Flexure New building.
Dynamic Increase Factor (DIF) 1.19 1.17 Flexure

Material Strength
Compressive strength, f'm 10.34 Mpa
Steel Yield Strength, Fy 413.70 Mpa
f'dm = f'm x SIF x DIF 12.31 Mpa
p
Fds = Fy x SIF x DIF 532.43 Mpa
CMU Modulus of Elasticity, Em 9308.25 Mpa
Steel Modulus of Elasticity, Es 200000.00 Mpa

CMU Wall and Rebar Schedule


Bar Diameter = Ø16 mm
Bar Spacing = 600 mm on-center
CMU Wall thickness, tn = 12 inches (Nominal) ≈ 300 mm
Actual Wall Thickness, ta = 11.625 inches = 295 mm (SABP-Q-008)
Effective depth, d = 146.050 mm (SABP-Q-008)
CMU Cross-Sectional Area, A=bxd = 146050.000 mm² per 1.00 meter length of wall
Design strip (width), b = 1000 mm
Steel Area provided, As = 335.103 mm²

1000
600
300

ISSUED FOR CONSTRUCTION (IFC)

26 JAN 2022
Calculation Report, OPERATION SHELTER, Plant Plant No. 015 Page 181 of 281
CALCULATION SHEET

SNC-LAVALIN FAYEZ ENGINEERING, Al Khobar, Saudi Arabia


PROJECT : Upgrade Buildings for Risk Mitigation - RT Refinery
EWO / B.I. No. : 10-02062-0002-001 Designed : NFP
Project Code No. : 510008 Checked : AMK
Calc. No. : PE-P20081 Revision : IFC SUB
Subject : Building A9, 300mm CMU Wall Design (Exterior Side-Walls) Rev. No. : 00

CMU Wall Design Strength and Resistance, R (Ref: ACI 530-05, Chapter 3)

Compute for Nominal Flexural Capacity, Mn+ and Mn-

 a
M n   As Fds  P  d   = 26.083 kN-m per 1.00 meter length of wall
 2

where:
Pu  As Fds 
a = 19.431 mm
0.80 f ' dm b

Axial Load, ½P = 12.895 kN (due to self-weight, calculated @ mid-height)

Compute CMU Wall Bending Resistance & Transformation Factors (ASCE 41088, Table 6.1 )
Bending Resistance (kN) Transformation Factors
Loading Diagram Strain Range
Inbound, Rb+ Rebound, Rb- Load Fac., KL Mass Fac. KM
8M pc
Elastic Rb  51.52 51.52 0.64 0.50
L
8M pc
Plastic Rb  51.52 51.52 0.50 0.33
L
Where:
Ultimate Moment Capacity at mid-height, Mpc = 26.083 kN-m (Considering pure flexure)

Compute for Nominal Shear Strength/Resistance:

Compute for Shear capacity of CMU wall


   M  
0.0834.00  1.75 Vd  An  0.25 P 
'
 f dm 
Vm  Min    v  
 ' 

4 An f dm 

Vm = 98.910 kN per 1.00 meter length of wall

where:
CMU cross-sectional area, An = 146050.000 mm² per 1.00 meter length of wall
Unfactored Axial Load, P = 12.895 kN/m (calculated @ mid-height)
 M 
ratio   = 1.000 (assumed conservative value)
 Vd v 

Compute for Total Nominal Shear Capacity of the reinforced masonry wall section
Vn  Vm
Vn = 98.910 kN per meter length of wall

ISSUED FOR CONSTRUCTION (IFC)

26 JAN 2022
Calculation Report, OPERATION SHELTER, Plant Plant No. 015 Page 182 of 281
CALCULATION SHEET

SNC-LAVALIN FAYEZ ENGINEERING, Al Khobar, Saudi Arabia


PROJECT : Upgrade Buildings for Risk Mitigation - RT Refinery
EWO / B.I. No. : 10-02062-0002-001 Designed : NFP
Project Code No. : 510008 Checked : AMK
Calc. No. : PE-P20081 Revision : IFC SUB
Subject : Building A9, 300mm CMU Wall Design (Exterior Side-Walls) Rev. No. : 00

Compute for Nominal Shear Resistance of CMU wall section (Critical section at distance 'd' from the support)
RV = Vn H / (0.5 H - d)
RV = 213.196 kN per 1.00 meter length of wall

Shear resistance is 120% higher than Flexural resistance, thus Flexural resistance governs…..

Compute CMU Wall Stiffness, Ke


From NCMA TEK MANUAL Masonry Design and Construction

Gross Moment of Inertia, Ig


Ig = 2144790588 mm4 per linear meter length of wall

Compute for Cracked Moment of Inertia, Icr


b

d kd N.A.
ta nsAsm

 kd 
bkd    ns Asm d m  kd 
 2 
Let:
Es
n= = 21.486
Em
b
B= = 0.139
ns Asm

Solving for kd:


2 Bd  1  1
kd  = 39.222 mm
B

Solving for Icr:


bkd 
3
 n s Asm d  kd 
2
I cr 
3
Icr = 102282107.425 mm4 per linear meter length of wall

Compute for average Moment of Inertia, Iavg


Iavg = 1123536347.885 mm4 per linear meter length of wall

ISSUED FOR CONSTRUCTION (IFC)

26 JAN 2022
Calculation Report, OPERATION SHELTER, Plant Plant No. 015 Page 183 of 281
CALCULATION SHEET

SNC-LAVALIN FAYEZ ENGINEERING, Al Khobar, Saudi Arabia


PROJECT : Upgrade Buildings for Risk Mitigation - RT Refinery
EWO / B.I. No. : 10-02062-0002-001 Designed : NFP
Project Code No. : 510008 Checked : AMK
Calc. No. : PE-P20081 Revision : IFC SUB
Subject : Building A9, 300mm CMU Wall Design (Exterior Side-Walls) Rev. No. : 00

Compute for Stiffness, K (as per ASCE 41088, Table 6.1)


Loading Diagram Strain Range Stiffness, Ke Unit

384 E I avg 
Elastic K 12090.696 N/mm
5L3

Plastic 0 0.000 N/mm

Where:
L = Column Height, H

Equivalent Mass, Me

Use average elastic and plastic transformation values for KLM:


elastic KLM = 0.50 / 0.64 = 0.781
plastic KLM = 0.33 / 0.50 = 0.660
average KLM = 0.721

Me = (A
(Avg. KLM) (M)
Me = 0.002 kN-s²/mm

Period of vibration, tn
Me
t n  2
Ke
tn = 0.079 secs.

Summary
Equivalent Mass, M 0.002 kN-s²/mm
Stiffness, Ke 12.091 kN/mm
positive resistance, Ru+ 51.522 kN
rebound resistance, Ru- -51.522 kN
static load, Fs 0.000 kN

ISSUED FOR CONSTRUCTION (IFC)

26 JAN 2022
Calculation Report, OPERATION SHELTER, Plant Plant No. 015 Page 184 of 281
CALCULATION SHEET

SNC-LAVALIN FAYEZ ENGINEERING, Al Khobar, Saudi Arabia


PROJECT : Upgrade Buildings for Risk Mitigation - RT Refinery
EWO / B.I. No. : 10-02062-0002-001 Designed : NFP
Project Code No. : 510008 Checked : AMK
Calc. No. : PE-P20081 Revision : IFC SUB
Subject : Building A9, 300mm CMU Wall Design (Exterior Side-Walls) Rev. No. : 00

NON-LINEAR (ELASTO-PLASTIC) SDOF ANALYSIS - Ref: ASCE-41088

TRANSFORMATION FACTORS (for Support Reaction, V)


Coefficents @ Vp
Loading Diagram Strain Range
Rstnce, CR Force, CF

Elastic 0.39 0.11

Plastic 0.38 0.12

RESPONSE GRAPH (Based on calculated values from the table on next page…..)

Dyn. Load/Deformation vs. Time Dyn. Load, F
Deformation, y / 10
400.00  
350.00  
300.00  
250 00
250.00  
200.00  
150.00  
100.00  
50.00  
0.00  
‐50.00  
0.0000 

0.0500 

0.1000 

0.1500 

0.2000 

0.2500 

0.3000 

0.3500 

Support Reaction/Resistance vs. Time Support Reaction, V
Resistance, R
60.000  

40.000  

20.000  

0.000  

‐20.000  

‐40.000  

‐60.000  
0.0000 

0.0500 

0.1000 

0.1500 

0.2000 

0.2500 

0.3000 

0.3500 

ISSUED FOR CONSTRUCTION (IFC)

26 JAN 2022
Calculation Report, OPERATION SHELTER, Plant Plant No. 015 Page 185 of 281
DESIGN INPUT

26 JAN 2022
Subject
time increment, ∆t 0.002 secs

Calc. No.
PROJECT

ISSUED FOR CONSTRUCTION (IFC)


mass, M 0.002 kN-s²/mm
stiffness, K 12.091 kN/mm

Project Code No.


damping, C 0.000 kN-s/mm

EWO / B.I. Number


positive resistance, Ru+ 51.522 kN
rebound resistance, Ru- -51.522 kN
static load, Fs 0.000 kN

LEGEND : : 510008
KEY = 0 is elastic Z= 1 is increasing plastic deformation : PE-P20081
KEY = +1 is positive plastic Z= 2 is end of rebound plastic deformation
KEY = -1 is rebound plastic Z= 3 is end of positive plastic deformation
: 10-02062-0002-001

Z= 4 is continued elastic
Z= 5 is start of rebound plastic deformation
Z= 6 is start of positive plastic deformation

Numerical Integration (Newmark-Beta Method)


Dyn. Def. @ Yield pt. Dyn. Ductile
Time, Def. Vel. Acc. Rstnce incr incr incr
Load, KEY eff K Z Reaction Ratio

Calculation Report, OPERATION SHELTER, Plant Plant No. 015


t y v a R ye+ ye- F y v
F V μ
secs kN mm mm/s mm/s² kN mm mm kN/mm kN mm mm/s kN
0.0000 0.00 0.000 0.000 0.000 0.000 4.261 -4.261 0 2853.90 136.305 0.048 71.641 0.000 -
: Upgrade Buildings for Risk Mitigation - RT Refinery
SNC-LAVALIN FAYEZ ENGINE

0 0020
0.0020 136 30
136.30 0 048
0.048 71 641
71.641 71641 207
71641.207 0 577
0.577 4 261
4.261 -4 261
-4.261 0 2853 90
2853.90 807 872
807.872 0 283
0.283 138 050
138.050 4 15 219
15.219 -
0.0040 129.81 0.331 209.691 66408.650 4.000 4.261 -4.261 0 2853.90 1562.754 0.548 125.897 4 15.840 -
CALCULATION

: Building A9, 300mm CMU Wall Design (Exterior Side--Walls)

0.0060 123.32 0.878 335.588 59488.029 10.621 4.261 -4.261 0 2853.90 2238.968 0.785 110.543 4 17.708 -
0.0080 116.83 1.663 446.131 51055.264 20.106 4.261 -4.261 0 2853.90 2819.325 0.988 92.380 4 20.693 -
0.0100 110.34 2.651 538.511 41324.708 32.050 4.261 -4.261 0 2853.90 3289.073 1.152 71.868 4 24.637 -
0.0120 103.85 3.803 610.379 30543.706 45.985 4.261 -4.261 0 2853.90 3636.270 1.274 49.530 4 29.358 -
0.0140 97.36 5.077 659.909 24195.144 51.522 4.261 -4.261 1 2841.81 3881.697 1.366 44.964 6 31.261 1.19
SHEET

0.0160 90.87 6.443 704.874 20769.144 51.522 4.261 -4.261 1 2841.81 4117.785 1.449 38.112 1 30.483 1.51
0.0180 84.38 7.892 742.986 17343.143 51.522 4.261 -4.261 1 2841.81 4314.928 1.518 31.260 1 29.704 1.85
0.0200 77.89 9.411 774.246 13917.143 51.522 4.261 -4.261 1 2841.81 4473.128 1.574 24.408 1 28.925 2.21
0.0220 71.40 10.985 798.655 10491.142 51.522 4.261 -4.261 1 2841.81 4592.383 1.616 17.556 1 28.146 2.58
0.0240 64.91 12.601 816.211 7065.142 51.522 4.261 -4.261 1 2841.81 4672.694 1.644 10.704 1 27.367 2.96
EERING, Al Khobar, Saudi Arabia

0.0260 58.42 14.245 826.915 3639.141 51.522 4.261 -4.261 1 2841.81 4714.061 1.659 3.852 1 26.588 3.34
0.0280 51.93 15.904 830.767 213.141 51.522 4.261 -4.261 1 2841.81 4716.484 1.660 -3.000 1 25.809 3.73
Revision

0.0300 45.43 17.564 827.768 -3212.860 51.522 4.261 -4.261 1 2841.81 4679.963 1.647 -9.852 1 25.030 4.12
Rev. No.
Checked
Designed

0.0320 38.94 19.210 817.916 -6638.860 51.522 4.261 -4.261 1 2841.81 4604.497 1.620 -16.704 1 24.252 4.51
0.0340 32.45 20.831 801.212 -10064.861 51.522 4.261 -4.261 1 2841.81 4490.087 1.580 -23.556 1 23.473 4.89
0.0360 25.96 22.411 777.657 -13490.861 51.522 4.261 -4.261 1 2841.81 4336.734 1.526 -30.408 1 22.694 5.26
:
:
:
:

0.0380 19.47 23.937 747.249 -16916.861 51.522 4.261 -4.261 1 2841.81 4144.436 1.458 -37.260 1 21.915 5.62
0.0400 12.98 25.395 709.989 -20342.862 51.522 4.261 -4.261 1 2841.81 3913.194 1.377 -44.112 1 21.136 5.96
0.0420 6.49 26.772 665.877 -23768.862 51.522 4.261 -4.261 1 2841.81 3643.008 1.282 -50.964 1 20.357 6.28
00
NFP

AMK

0.0440 0.00 28.054 614.914 -27194.863 51.522 4.261 -4.261 1 2841.81 3340.368 1.175 -54.390 1 19.578 6.58
IFC SUB

0.0460 0.00 29.229 560.524 -27194.863 51.522 4.261 -4.261 1 2841.81 3031.238 1.067 -54.390 1 19.578 6.86
0.0480 0.00 30.296 506.134 -27194.863 51.522 4.261 -4.261 1 2841.81 2722.107 0.958 -54.390 1 19.578 7.11

Page 186 of 281


0.0500 0.00 31.254 451.744 -27194.863 51.522 4.261 -4.261 1 2841.81 2412.977 0.849 -54.390 1 19.578 7.33
0.0520 0.00 32.103 397.355 -27194.863 51.522 4.261 -4.261 1 2841.81 2103.847 0.740 -54.390 1 19.578 7.53
0.0540 0.00 32.843 342.965 -27194.863 51.522 4.261 -4.261 1 2841.81 1794.716 0.632 -54.390 1 19.578 7.71

26 JAN 2022
Subject
0.0560 0.00 33.475 288.575 -27194.863 51.522 4.261 -4.261 1 2841.81 1485.586 0.523 -54.390 1 19.578 7.86

Calc. No.
PROJECT

ISSUED FOR CONSTRUCTION (IFC)


0.0580 0.00 33.998 234.186 -27194.863 51.522 4.261 -4.261 1 2841.81 1176.456 0.414 -54.390 1 19.578 7.98
0.0600 0.00 34.412 179.796 -27194.863 51.522 4.261 -4.261 1 2841.81 867.325 0.305 -54.390 1 19.578 8.08

Project Code No.


0.0620 0.00 34.717 125.406 -27194.863 51.522 4.261 -4.261 1 2841.81 558.195 0.196 -54.390 1 19.578 8.15

EWO / B.I. Number


0.0640 0.00 34.913 71.016 -27194.863 51.522 4.261 -4.261 1 2841.81 249.065 0.088 -54.390 1 19.578 8.19
0.0660 0.00 35.001 16.627 -27194.863 51.522 4.261 -4.261 1 2841.81 -60.066 -0.021 -54.390 1 19.578 8.21
0.0680 0.00 34.980 -37.763 -27059.973 51.266 35.001 26.478 0 2853.90 -368.429 -0.129 -53.296 3 19.994 -
0.0700 0.00 34.851 -91.059 -26236.094 49.705 35.001 26.478 0 2853.90 -666.661 -0.234 -50.981 4 19.385 -
0.0720 0.00 34.617 -142.041 -24745.312 46.881 35.001 26.478 0 2853.90 -947.947 -0.332 -47.371 4 18.284 - : 510008
0.0740 0.00 34.285 -189.411 -22625.520 42.865 35.001 26.478 0 2853.90 -1205.136 -0.422 -42.556 4 16.717 -
: PE-P20081
0.0760 0.00 33.863 -231.967 -19930.603 37.759 35.001 26.478 0 2853.90 -1431.692 -0.502 -36.660 4 14.726 -
0.0780 0.00 33.361 -268.627 -16729.063 31.694 35.001 26.478 0 2853.90 -1621.855 -0.568 -29.831 4 12.361 -
: 10-02062-0002-001

0.0800 0.00 32.793 -298.458 -13102.282 24.823 35.001 26.478 0 2853.90 -1770.792 -0.620 -22.245 4 9.681 -
0.0820 0.00 32.172 -320.703 -9142.450 17.321 35.001 26.478 0 2853.90 -1874.716 -0.657 -14.093 4 6.755 -
0.0840 0.00 31.515 -334.796 -4950.222 9.378 35.001 26.478 0 2853.90 -1930.987 -0.677 -5.582 4 3.658 -
0.0860 0.00 30.839 -340.378 -632.164 1.198 35.001 26.478 0 2853.90 -1938.172 -0.679 3.070 4 0.467 -
0.0880 0.00 30.160 -337.308 3701.964 -7.014 35.001 26.478 0 2853.90 -1896.091 -0.664 11.644 4 -2.735 -
0.0900 0.00 29.495 -325.665 7941.990 -15.046 35.001 26.478 0 2853.90 -1805.813 -0.633 19.922 4 -5.868 -
0.0920 0.00 28.863 -305.742 11980.136 -22.697 35.001 26.478 0 2853.90 -1669.632 -0.585 27.694 4 -8.852 -

Calculation Report, OPERATION SHELTER, Plant Plant No. 015


0.0940 0.00 28.277 -278.049 15713.756 -29.770 35.001 26.478 0 2853.90 -1491.010 -0.522 34.762 4 -11.610 -
0.0960 0.00 27.755 -243.287 19047.942 -36.087 35.001 26.478 0 2853.90 -1274.488 -0.447 40.946 4 -14.074 -
0.0980 0.00 27.308 -202.341 21897.942 -41.486 35.001 26.478 0 2853.90 -1025.569 -0.359 46.089 4 -16.180 -
: Upgrade Buildings for Risk Mitigation - RT Refinery
SNC-LAVALIN FAYEZ ENGINE

0 1000
0.1000 0 00
0.00 26 949
26.949 -156 252
-156.252 24191 312
24191.312 -45 831
-45.831 35 001
35.001 26 478
26.478 0 2853 90
2853.90 -750 580
-750.580 -0 263
-0.263 50 061
50.061 4 -17 874
-17.874 -
0.1020 0.00 26.686 -106.191 25869.754 -49.011 35.001 26.478 0 2853.90 -456.513 -0.160 52.760 4 -19.114 -
CALCULATION

: Building A9, 300mm CMU Wall Design (Exterior Side--Walls)

0.1040 0.00 26.526 -53.430 26890.605 -50.945 35.001 26.478 0 2853.90 -150.841 -0.053 54.119 4 -19.869 -
0.1060 0.00 26.473 0.688 27194.863 -51.522 35.001 26.478 -1 2841.81 158.477 0.056 54.390 5 -19.578 1.00
0.1080 0.00 26.529 55.078 26838.970 -50.847 34.996 26.473 0 2853.90 465.585 0.163 52.637 2 -19.831 -
0.1100 0.00 26.692 107.715 25797.833 -48.875 34.996 26.473 0 2853.90 758.835 0.266 49.899 4 -19.061 -
0.1120 0.00 26.958 157.614 24100.933 -45.660 34.996 26.473 0 2853.90 1032.795 0.362 45.892 4 -17.807 -
SHEET

0.1140 0.00 27.320 203.506 21791.403 -41.285 34.996 26.473 0 2853.90 1280.503 0.449 40.719 4 -16.101 -
0.1160 0.00 27.769 244.225 18927.950 -35.860 34.996 26.473 0 2853.90 1495.662 0.524 34.511 4 -13.985 -
0.1180 0.00 28.293 278.737 15583.362 -29.523 34.996 26.473 0 2853.90 1672.801 0.586 27.426 4 -11.514 -
0.1200 0.00 28.879 306.163 11842.655 -22.436 34.996 26.473 0 2853.90 1807.420 0.633 19.644 4 -8.750 -
0.1220 0.00 29.512 325.806 7800.916 -14.779 34.996 26.473 0 2853.90 1896.094 0.664 11.362 4 -5.764 -
EERING, Al Khobar, Saudi Arabia

0.1240 0.00 30.177 337.168 3560.883 -6.746 34.996 26.473 0 2853.90 1936.572 0.679 2.791 4 -2.631 -
0.1260 0.00 30.855 339.959 -769.665 1.458 34.996 26.473 0 2853.90 1927.823 0.676 -5.850 4 0.569 -
Revision

0.1280 0.00 31.531 334.109 -5080.649 9.625 34.996 26.473 0 2853.90 1870.070 0.655 -14.343 4 3.754 -
Rev. No.
Checked
Designed

0.1300 0.00 32.186 319.766 -9262.487 17.548 34.996 26.473 0 2853.90 1764.781 0.618 -22.471 4 6.844 -
0.1320 0.00 32.804 297.294 -13208.878 25.025 34.996 26.473 0 2853.90 1614.633 0.566 -30.028 4 9.760 -
0.1340 0.00 33.370 267.266 -16819.508 31.865 34.996 26.473 0 2853.90 1423.442 0.499 -36.822 4 12.427 -
:
:
:
:

0.1360 0.00 33.869 230.444 -20002.598 37.896 34.996 26.473 0 2853.90 1196.067 0.419 -42.680 4 14.779 -
0.1380 0.00 34.288 187.764 -22677.235 42.963 34.996 26.473 0 2853.90 938.290 0.329 -47.453 4 16.756 -
0.1400 0.00 34.617 140.311 -24775.433 46.938 34.996 26.473 0 2853.90 656.662 0.230 -51.019 4 18.306 -
00
NFP

AMK

0.1420 0.00 34.847 89.292 -26243.855 49.720 34.996 26.473 0 2853.90 358.342 0.126 -53.289 4 19.391 -
IFC SUB

0.1440 0.00 34.972 36.003 -27045.177 51.238 34.996 26.473 0 2853.90 50.913 0.018 -54.204 4 19.983 -
0.1460 0.00 34.990 -18.201 -27159.028 51.454 34.996 26.473 0 2853.90 -257.810 -0.090 -53.742 4 20.067 -

Page 187 of 281


0.1480 0.00 34.900 -71.943 -26582.515 50.362 34.996 26.473 0 2853.90 -559.980 -0.196 -51.913 4 19.641 -
0.1500 0.00 34.704 -123.856 -25330.293 47.989 34.996 26.473 0 2853.90 -847.915 -0.297 -48.764 4 18.716 -
0.1520 0.00 34.407 -172.620 -23434.192 44.397 34.996 26.473 0 2853.90 -1114.297 -0.390 -44.377 4 17.315 -

26 JAN 2022
Subject
0.1540 0.00 34.016 -216.997 -20942.409 39.676 34.996 26.473 0 2853.90 -1352.354 -0.474 -38.861 4 15.474 -

Calc. No.
PROJECT

ISSUED FOR CONSTRUCTION (IFC)


0.1560 0.00 33.542 -255.857 -17918.285 33.947 34.996 26.473 0 2853.90 -1556.035 -0.545 -32.357 4 13.239 -
0.1580 0.00 32.997 -288.214 -14438.689 27.355 34.996 26.473 0 2853.90 -1720.163 -0.603 -25.031 4 10.668 -

Project Code No.


0.1600 0.00 32.394 -313.245 -10592.072 20.067 34.996 26.473 0 2853.90 -1840.566 -0.645 -17.068 4 7.826 -

EWO / B.I. Number


0.1620 0.00 31.749 -330.313 -6476.212 12.269 34.996 26.473 0 2853.90 -1914.182 -0.671 -8.672 4 4.785 -
0.1640 0.00 31.079 -338.985 -2195.731 4.160 34.996 26.473 0 2853.90 -1939.142 -0.679 -0.055 4 1.622 -
0.1660 0.00 30.399 -339.040 2140.564 -4.055 34.996 26.473 0 2853.90 -1914.810 -0.671 8.563 4 -1.582 -
0.1680 0.00 29.728 -330.477 6422.448 -12.168 34.996 26.473 0 2853.90 -1841.804 -0.645 16.964 4 -4.745 -
0.1700 0.00 29.083 -313.514 10541.077 -19.970 34.996 26.473 0 2853.90 -1721.981 -0.603 24.933 4 -7.788 - : 510008
0.1720 0.00 28.479 -288.581 14391.759 -27.266 34.996 26.473 0 2853.90 -1558.387 -0.546 32.268 4 -10.634 -
: PE-P20081
0.1740 0.00 27.933 -256.313 17876.613 -33.868 34.996 26.473 0 2853.90 -1355.179 -0.475 38.784 4 -13.208 -
0.1760 0.00 27.459 -217.529 20907.055 -39.609 34.996 26.473 0 2853.90 -1117.524 -0.392 44.313 4 -15.448 -
: 10-02062-0002-001

0.1780 0.00 27.067 -173.216 23406.053 -44.344 34.996 26.473 0 2853.90 -851.462 -0.298 48.716 4 -17.294 -
0.1800 0.00 26.769 -124.500 25310.086 -47.951 34.996 26.473 0 2853.90 -563.756 -0.198 51.881 4 -18.701 -
0.1820 0.00 26.571 -72.619 26570.753 -50.339 34.996 26.473 0 2853.90 -261.720 -0.092 53.727 4 -19.632 -
0.1840 0.00 26.479 -18.892 27156.010 -51.448 34.996 26.473 0 2853.90 46.969 0.016 54.207 4 -20.065 -
0.1860 0.00 26.496 35.315 27050.980 -51.249 34.996 26.473 0 2853.90 354.463 0.124 53.309 4 -19.987 -
0.1880 0.00 26.620 88.624 26258.331 -49.747 34.996 26.473 0 2853.90 652.948 0.229 51.057 4 -19.401 -
0.1900 0.00 26.849 139.681 24798.214 -46.981 34.996 26.473 0 2853.90 934.835 0.328 47.506 4 -18.323 -

Calculation Report, OPERATION SHELTER, Plant Plant No. 015


0.1920 0.00 27.176 187.187 22707.743 -43.021 34.996 26.473 0 2853.90 1192.959 0.418 42.748 4 -16.778 -
0.1940 0.00 27.594 229.934 20040.056 -37.967 34.996 26.473 0 2853.90 1420.759 0.498 36.903 4 -14.807 -
0.1960 0.00 28.092 266.837 16862.965 -31.948 34.996 26.473 0 2853.90 1612.444 0.565 30.120 4 -12.460 -
: Upgrade Buildings for Risk Mitigation - RT Refinery
SNC-LAVALIN FAYEZ ENGINE

0 1980
0.1980 0 00
0.00 28 657
28.657 296 958
296.958 13257 228
13257.228 -25 116
-25.116 34 996
34.996 26 473
26.473 0 2853 90
2853.90 1763 142
1763.142 0 618
0.618 22 572
22.572 4 -9 795
-9.795 -
0.2000 0.00 29.275 319.529 9314.502 -17.647 34.996 26.473 0 2853.90 1869.022 0.655 14.450 4 -6.882 -
CALCULATION

: Building A9, 300mm CMU Wall Design (Exterior Side--Walls)

0.2020 0.00 29.930 333.979 5135.007 -9.728 34.996 26.473 0 2853.90 1927.393 0.675 5.960 4 -3.794 -
0.2040 0.00 30.605 339.939 824.984 -1.563 34.996 26.473 0 2853.90 1936.771 0.679 -2.681 4 -0.610 -
0.2060 0.00 31.284 337.258 -3506.009 6.642 34.996 26.473 0 2853.90 1896.917 0.665 -11.254 4 2.590 -
0.2080 0.00 31.949 326.004 -7747.883 14.679 34.996 26.473 0 2853.90 1808.845 0.634 -19.541 4 5.725 -
0.2100 0.00 32.582 306.463 -11792.810 22.342 34.996 26.473 0 2853.90 1674.794 0.587 -27.331 4 8.713 -
SHEET

0.2120 0.00 33.169 279.132 -15537.972 29.437 34.996 26.473 0 2853.90 1498.170 0.525 -34.426 4 11.481 -
0.2140 0.00 33.694 244.706 -18888.169 35.784 34.996 26.473 0 2853.90 1283.464 0.450 -40.646 4 13.956 -
0.2160 0.00 34.144 204.060 -21758.242 41.222 34.996 26.473 0 2853.90 1036.133 0.363 -45.833 4 16.077 -
0.2180 0.00 34.507 158.226 -24075.235 45.611 34.996 26.473 0 2853.90 762.464 0.267 -49.855 4 17.788 -
0.2200 0.00 34.774 108.371 -25780.252 48.842 34.996 26.473 0 2853.90 469.414 0.164 -52.610 4 19.048 -
EERING, Al Khobar, Saudi Arabia

0.2220 0.00 34.939 55.761 -26829.952 50.830 34.996 26.473 0 2853.90 164.432 0.058 -54.028 4 19.824 -
0.2240 0.00 34.996 1.733 -27194.863 51.522 34.996 26.473 1 2841.81 -144.715 -0.051 -54.390 6 19.578 1.00
Revision

0.2260 0.00 34.945 -52.657 -26869.876 50.906 34.996 26.474 0 2853.90 -451.998 -0.158 -52.729 3 19.853 -
Rev. No.
Checked
Designed

0.2280 0.00 34.787 -105.386 -25859.122 48.991 34.996 26.474 0 2853.90 -745.944 -0.261 -50.050 4 19.107 -
0.2300 0.00 34.526 -155.436 -24191.047 45.831 34.996 26.474 0 2853.90 -1020.930 -0.358 -46.099 4 17.874 -
0.2320 0.00 34.168 -201.535 -21908.051 41.506 34.996 26.474 0 2853.90 -1269.964 -0.445 -40.976 4 16.187 -
:
:
:
:

0.2340 0.00 33.723 -242.511 -19068.168 36.125 34.996 26.474 0 2853.90 -1486.716 -0.521 -34.812 4 14.089 -
0.2360 0.00 33.202 -277.323 -15743.584 29.827 34.996 26.474 0 2853.90 -1665.677 -0.584 -27.762 4 11.632 -
0.2380 0.00 32.618 -305.085 -12018.809 22.770 34.996 26.474 0 2853.90 -1802.297 -0.632 -20.007 4 8.880 -
00
NFP

AMK

0.2400 0.00 31.987 -325.093 -7988.525 15.135 34.996 26.474 0 2853.90 -1893.105 -0.663 -11.744 4 5.902 -
IFC SUB

0.2420 0.00 31.323 -336.836 -3755.177 7.114 34.996 26.474 0 2853.90 -1935.791 -0.678 -3.182 4 2.775 -
0.2440 0.00 30.645 -340.018 573.625 -1.087 34.996 26.474 0 2853.90 -1929.270 -0.676 5.461 4 -0.424 -

Page 188 of 281


0.2460 0.00 29.969 -334.556 4887.845 -9.260 34.996 26.474 0 2853.90 -1873.709 -0.657 13.966 4 -3.611 -
0.2480 0.00 29.313 -320.591 9077.820 -17.198 34.996 26.474 0 2853.90 -1770.519 -0.620 22.115 4 -6.707 -
0.2500 0.00 28.692 -298.476 13037.043 -24.699 34.996 26.474 0 2853.90 -1622.324 -0.568 29.702 4 -9.633 -

26 JAN 2022
Subject
0.2520 0.00 28.124 -268.774 16664.873 -31.572 34.996 26.474 0 2853.90 -1432.891 -0.502 36.534 4 -12.313 -

Calc. No.
PROJECT

ISSUED FOR CONSTRUCTION (IFC)


0.2540 0.00 27.622 -232.240 19869.093 -37.643 34.996 26.474 0 2853.90 -1207.034 -0.423 42.437 4 -14.681 -
0.2560 0.00 27.199 -189.803 22568.254 -42.756 34.996 26.474 0 2853.90 -950.496 -0.333 47.262 4 -16.675 -

Project Code No.


0.2580 0.00 26.866 -142.541 24693.746 -46.783 34.996 26.474 0 2853.90 -669.796 -0.235 50.885 4 -18.245 -

EWO / B.I. Number


0.2600 0.00 26.631 -91.655 26191.539 -49.621 34.996 26.474 0 2853.90 -372.071 -0.130 53.215 4 -19.352 -
0.2620 0.00 26.501 -38.440 27023.561 -51.197 34.996 26.474 0 2853.90 -64.888 -0.023 54.192 4 -19.967 -
0.2640 0.00 26.478 15.752 27168.662 -51.472 34.996 26.474 0 2853.90 243.945 0.085 53.792 4 -20.074 -
0.2660 0.00 26.563 69.544 26623.154 -50.439 34.996 26.474 0 2853.90 546.576 0.192 52.024 4 -19.671 -
0.2680 0.00 26.755 121.568 25400.904 -48.123 34.996 26.474 0 2853.90 835.314 0.293 48.934 4 -18.768 - : 510008
0.2700 0.00 27.048 170.502 23532.979 -44.584 34.996 26.474 0 2853.90 1102.819 0.386 44.600 4 -17.388 -
: PE-P20081
0.2720 0.00 27.434 215.102 21066.863 -39.912 34.996 26.474 0 2853.90 1342.291 0.470 39.132 4 -15.566 -
0.2740 0.00 27.904 254.234 18065.241 -34.225 34.996 26.474 0 2853.90 1547.643 0.542 32.670 4 -13.348 -
: 10-02062-0002-001

0.2760 0.00 28.447 286.903 14604.412 -27.669 34.996 26.474 0 2853.90 1713.655 0.600 25.377 4 -10.791 -
0.2780 0.00 29.047 312.280 10772.350 -20.409 34.996 26.474 0 2853.90 1836.107 0.643 17.439 4 -7.959 -
0.2800 0.00 29.690 329.719 6666.461 -12.630 34.996 26.474 0 2853.90 1911.886 0.670 9.058 4 -4.926 -
0.2820 0.00 30.360 338.777 2391.116 -4.530 34.996 26.474 0 2853.90 1939.066 0.679 0.446 4 -1.767 -
0.2840 0.00 31.040 339.223 -1945.010 3.685 34.996 26.474 0 2853.90 1916.957 0.672 -8.177 4 1.437 -
0.2860 0.00 31.711 331.046 -6231.695 11.806 34.996 26.474 0 2853.90 1846.120 0.647 -16.592 4 4.604 -
0.2880 0.00 32.358 314.454 -10359.975 19.627 34.996 26.474 0 2853.90 1728.355 0.606 -24.585 4 7.655 -

Calculation Report, OPERATION SHELTER, Plant Plant No. 015


0.2900 0.00 32.964 289.869 -14224.911 26.950 34.996 26.474 0 2853.90 1566.657 0.549 -31.953 4 10.510 -
0.2920 0.00 33.513 257.916 -17728.259 33.587 34.996 26.474 0 2853.90 1365.136 0.478 -38.509 4 13.099 -
0.2940 0.00 33.991 219.407 -20780.967 39.370 34.996 26.474 0 2853.90 1128.914 0.396 -44.086 4 15.354 -
: Upgrade Buildings for Risk Mitigation - RT Refinery
SNC-LAVALIN FAYEZ ENGINE

0 2960
0.2960 0 00
0.00 34 387
34.387 175 321
175.321 -23305 437
-23305.437 44 153
44.153 34 996
34.996 26 474
26.474 0 2853 90
2853.90 863 996
863.996 0 303
0.303 -48 543
-48.543 4 17 220
17.220 -
0.2980 0.00 34.690 126.778 -25237.499 47.813 34.996 26.474 0 2853.90 577.115 0.202 -51.766 4 18.647 -
CALCULATION

: Building A9, 300mm CMU Wall Design (Exterior Side--Walls)

0.3000 0.00 34.892 75.012 -26528.040 50.258 34.996 26.474 0 2853.90 275.565 0.097 -53.672 4 19.601 -
0.3020 0.00 34.988 21.340 -27144.256 51.426 34.996 26.474 0 2853.90 -32.990 -0.012 -54.215 4 20.056 -
0.3040 0.00 34.977 -32.875 -27070.484 51.286 34.996 26.474 0 2853.90 -340.707 -0.119 -53.379 4 20.002 -
0.3060 0.00 34.857 -86.254 -26308.598 49.843 34.996 26.474 0 2853.90 -639.763 -0.224 -51.187 4 19.439 -
0.3080 0.00 34.633 -137.441 -24877.966 47.132 34.996 26.474 0 2853.90 -922.556 -0.323 -47.693 4 18.382 -
SHEET

0.3100 0.00 34.310 -185.133 -22814.952 43.224 34.996 26.474 0 2853.90 -1181.899 -0.414 -42.987 4 16.857 -
0.3120 0.00 33.896 -228.120 -20171.998 38.217 34.996 26.474 0 2853.90 -1411.199 -0.494 -37.188 4 14.904 -
0.3140 0.00 33.401 -265.309 -17016.285 32.238 34.996 26.474 0 2853.90 -1604.627 -0.562 -30.444 4 12.573 -
0.3160 0.00 32.839 -295.753 -13428.030 25.440 34.996 26.474 0 2853.90 -1757.266 -0.616 -22.926 4 9.922 -
0.3180 0.00 32.223 -318.679 -9498.443 17.995 34.996 26.474 0 2853.90 -1865.237 -0.654 -14.826 4 7.018 -
EERING, Al Khobar, Saudi Arabia

0.3200 0.00 31.570 -333.505 -5327.413 10.093 34.996 26.474 0 2853.90 -1925.795 -0.675 -6.348 4 3.936 -
0.3220 0.00 30.895 -339.854 -1020.963 1.934 34.996 26.474 0 2853.90 -1937.401 -0.679 2.290 4 0.754 -
Revision

0.3240 0.00 30.216 -337.563 3311.440 -6.274 34.996 26.474 0 2853.90 -1899.759 -0.666 10.871 4 -2.447 -
Rev. No.
Checked
Designed

0.3260 0.00 29.550 -326.692 7559.667 -14.322 34.996 26.474 0 2853.90 -1813.826 -0.636 19.175 4 -5.586 -
0.3280 0.00 28.915 -307.517 11615.733 -22.006 34.996 26.474 0 2853.90 -1681.788 -0.589 26.992 4 -8.583 -
0.3300 0.00 28.326 -280.524 15376.535 -29.131 34.996 26.474 0 2853.90 -1506.999 -0.528 34.123 4 -11.361 -
:
:
:
:

29
RESULTS SUMMARY
Def, y Reaction Ductility
00
NFP

AMK

Inbound 35.001 31.261 8.214


IFC SUB

Rebound - -20.074 -

Page 189 of 281


Component/Member response exceeds the elastic range…..
CALCULATION SHEET

SNC-LAVALIN FAYEZ ENGINEERING, Al Khobar, Saudi Arabia


PROJECT : Upgrade Buildings for Risk Mitigation - RT Refinery
EWO / B.I. No. : 10-02062-0002-001 Designed : NFP
Project Code No. : 510008 Checked : AMK
Calc. No. : PE-P20081 Revision : IFC SUB
Subject : Building A9, 300mm CMU Wall Design (Exterior Side-Walls) Rev. No. : 00

DEFORMATION LIMITS (RESPONSE CRITERIA) - As per BDR and SAES-M-009

Member / Component : CMU Wall


Material : CMU
Height, H : 4050 mm
Response Criteria : High
Support Rotation, θ : 5 º (SAES-M-009, Table-10)
Ductility Ratio, μ : n/a (SAES-M-009, Table-10)

CHECK DEFORMATION AND DUCTILITY RATIO


Support Rotation, θ1:

xm = Deformation, y = 35.001 mm
 xm 
1  Arc tan   = 0.990 º < 5.0 º Design is acceptable!
 0.5 L 

Ductility Ratio, μ:

Max Ductilty Ratio = n/a

Interaction check:
2 2
 C   C 
        1.0
 A  ip  A  op

0.039 < 1.0 o.k.


Where:
∆Cip = 0.00 (No dynamic in-plane loads for CMU wall)
∆Aip = 0.00 (No allowable in-plane deformation specified for CMU wall in SAES-M-009, Table-10)
∆Cop = 0.990 calculated support rotation (out-of-plane)
∆Aop = 5.000 allowable support rotation (out-of-plane)

Wall design is acceptable…..

ISSUED FOR CONSTRUCTION (IFC)

26 JAN 2022
Calculation Report, OPERATION SHELTER, Plant Plant No. 015 Page 190 of 281
CALCULATION SHEET

SNC-LAVALIN FAYEZ ENGINEERING, Al Khobar, Saudi Arabia


PROJECT : Updrade Buildings for Risk Mitigation - RT Refinery
B.I Number : 10-02062-0002-001 Designed : AIA / NFP
Project Code No. : 510008 Checcked : NFP / AKM
Calc. No. : PE-P20081 Reviision : IFC Sub
Subject : Structural Calculation - Operator Shelter, Plant No. 015 (Bldg-A9) Rev.. No. : 00

4.3 ROOF SLAB DESIGN

ISSUED FOR CONSTRUCTION (IFC)

26 JAN 2022
Calculation Report, OPERATION SHELTER, Plant Plant No. 015 Page 191 of 281
CALCULATION SHEET

SNC-LAVALIN FAYEZ ENGINEERING, Al Khobar, Saudi Arabia


PROJECT : Updrade Buildings for Risk Mitigation - RT Refinery
B.I Number : 10-02062-0002-001 Designed : AIA / NFP
Project Code No. : 510008 Checcked : NFP / AKM
Calc. No. : PE-P20081 Reviision : IFC Sub
Subject : Structural Calculation - Operator Shelter, Plant No. 015 (Bldg-A9) Rev.. No. : 00

4.3.1 ROOF SLAB, 'S1' DESIGN

ISSUED FOR CONSTRUCTION (IFC)

26 JAN 2022
Calculation Report, OPERATION SHELTER, Plant Plant No. 015 Page 192 of 281
CALCULATION SHEET

SNC-LAVALIN FAYEZ ENGINEERING, Al Khobar, Saudi Arabia


PROJECT : Updrade Buildings for Risk Mitigation - RT Refinery
EWO / B.I. No. : 10-02062-0002-001 Designed : NFP
Project Code No. : 510008 Checked : AMK
Calc. No. : PE-P20081 Revision : IFC SUB
Subject : Bldg-A9, Operators Shelter, Design RC Roof Slab, 'S1' Rev. No. : 00

DEAD LOAD AND BLAST LOAD ON ROOF SLAB COMPONENT

Dimensions:
short clear span, ℓa 4.500 m
long clear span, ℓb 5.600 m
Slab Thickness 0.200 m

Figure - Slab Panel (Two-way) - Fixed support on all edges

Slab Mark & Location


Considering Roof Slab Panel between
Grid C & D and Grid 3 & 4.
(Short Span)
ℓa = 4.500

DL = 9.450 kPa Refer to attached drawings RA-462171


and RA-462173.

ℓb = 5.600
(Long Span)

Compute Static Dead Load on RC Beam

Superimposed DL 4.650 kN/m² (Refer to Design Criteria page, section 2.1)


Slab-Weight 4.800 kN/m² (For 200mm thick RC slab)
Total 9.450 kN/m²

Total DL = 238.140 kN

Define the Dynamic Blast Load on RC Slab

Blast Pressure on Roof (Refer to Calculation on next pages…..): Blast Pressure (P) vs. Time (t)


Eff. Side-on Pressure, Pa = 51.210 kPa 60.00
Rise time, tr = 0.013 secs 50.00
Time duration, to = 0.054 secs
Blast Pressure, P

40.00

30.00

20.00
0.000 0.00
0.013 51.21 10.00

0.054 0.00 0.00


0.000

0.010

0.020

0.030

0.040

0.050

0.060

Time, t

ISSUED FOR CONSTRUCTION (IFC)

26 JAN 2022
Calculation Report, OPERATION SHELTER, Plant Plant No. 015 Page 193 of 281
CALCULATION SHEET

SNC-LAVALIN FAYEZ ENGINEERING, Al Khobar, Saudi Arabia


PROJECT : Updrade Buildings for Risk Mitigation - RT Refinery
EWO / B.I. No. : 10-02062-0002-001 Designed : NFP
Project Code No. : 510008 Checked : AMK
Calc. No. : PE-P20081 Revision : IFC SUB
Subject : Bldg-A9, Operators Shelter, Design RC Roof Slab, 'S1' Rev. No. : 00

Blast Load Tabulation:

Time Increment, ∆t = 0.0030 secs < 10% of period of vibration, tn

Pressure Dyn. Force, F =


Time
Pa Pa x (ℓa x ℓb)
0.0000 0.000 0.000
0.0030 11.975 301.782

(Short Span)
0.0060 23.951 603.563
35.926 905.345 Pa

ℓa
0.0090
0.0120 47.902 1207.126
0.0150 48.537 1223.136
0.0180 44.844 1130.072
0.0210 41.151 1037.008
0.0240 37.458 943.943
ℓb
0.0270 33.765 850.879
(Long Span)
0.0300 30.072 757.815
0.0330 26.379 664.750
0.0360 22.686 571.686 Effective Blast Load Calculation for Roof Slab
0.0390 18.993 478.622 (Considering blast load direction from the West side)
0.0420 15.300 385.557 Pso = 72.40 (from BDR)
0.0450 11.607 292.493 td = 0.042 (from BDR)
0.0480 7.914 199.429 L1 = 5.60 (From Grid-D (Front wall) to Grid-C)
0.0510 4.221 106.364 Lw = 18.16 (See sec 2.5, Blast Load Calc pages…..)
0.0540 0.528 13.300 cd = -0.40 (See sec 2.5, Blast Load Calc pages…..)
0.0570 0.000 0.000 Lw/L1 = 3.24
0.0600 0.000 0.000 Ce = 0.80 (from figure 3.9 of ASCE-41088)
0.0630 0.000 0.000 qo = 16.78 (See sec 2.5, Blast Load Calc pages…..)
0.0660 0.000 0.000 U = 436.52 (See sec 2.5, Blast Load Calc pages…..)
0.0690 0.000 0.000
0.0720 0.000 0.000 Par , Equivalent peak overpressure,
0.0750 0.000 0.000 Par = Ce Pso + Cd qo
0.0780 0.000 0.000 Par = 51.21 kPa
0.0810 0.000 0.000
0.0840 0.000 0.000 tr , rise time,
0.0870 0.000 0.000 tr = L1 / U
0.0900 0.000 0.000 tr = 0.013 secs
0.0930 0.000 0.000
0.0960 0.000 0.000 to , total positive phase duration
0.0990 0.000 0.000 to = tr + td
0.1020 0.000 0.000 to = 0.054 secs
0.1050 0.000 0.000
0.1080 0.000 0.000
ISSUED FOR CONSTRUCTION (IFC)

26 JAN 2022
Calculation Report, OPERATION SHELTER, Plant Plant No. 015 Page 194 of 281
CALCULATION SHEET

SNC-LAVALIN FAYEZ ENGINEERING, Al Khobar, Saudi Arabia


PROJECT : Updrade Buildings for Risk Mitigation - RT Refinery
EWO / B.I. No. : 10-02062-0002-001 Designed : NFP
Project Code No. : 510008 Checked : AMK
Calc. No. : PE-P20081 Revision : IFC SUB
Subject : Bldg-A9, Operators Shelter, Design RC Roof Slab, 'S1' Rev. No. : 00

0.1110 0.000 0.000


0.1140 0.000 0.000
0.1170 0.000 0.000
0.1200 0.000 0.000
0.1230 0.000 0.000
0.1260 0.000 0.000
0.1290 0.000 0.000
0.1320 0.000 0.000
0.1350 0.000 0.000
0.1380 0.000 0.000
0.1410 0.000 0.000
0.1440 0.000 0.000
0.1470 0.000 0.000
0.1500 0.000 0.000
0.1530 0.000 0.000
0.1560 0.000 0.000
0.1590 0.000 0.000
0.1620 0.000 0.000
0.1650 0.000 0.000
0.1680 0.000 0.000
0.1710 0.000 0.000
0.1740 0.000 0.000
0.1770 0.000 0.000
0.1800 0.000 0.000
0.1830 0.000 0.000
0.1860 0.000 0.000
0.1890 0.000 0.000
0.1920 0.000 0.000
0.1950 0.000 0.000
0.1980 0.000 0.000
0.2010 0.000 0.000
0.2040 0.000 0.000
0.2070 0.000 0.000
0.2100 0.000 0.000
0.2130 0.000 0.000
0.2160 0.000 0.000
0.2190 0.000 0.000
0.2220 0.000 0.000
0.2250 0.000 0.000
0.2280 0.000 0.000
0.2310 0.000 0.000
0.2340 0.000 0.000
0.2370 0.000 0.000
0.2400 0.000 0.000
0.2430 0.000 0.000
0.2460 0.000 0.000

ISSUED FOR CONSTRUCTION (IFC)

26 JAN 2022
Calculation Report, OPERATION SHELTER, Plant Plant No. 015 Page 195 of 281
CALCULATION SHEET

SNC-LAVALIN FAYEZ ENGINEERING, Al Khobar, Saudi Arabia


PROJECT : Updrade Buildings for Risk Mitigation - RT Refinery
EWO / B.I. No. : 10-02062-0002-001 Designed : NFP
Project Code No. : 510008 Checked : AMK
Calc. No. : PE-P20081 Revision : IFC SUB
Subject : Bldg-A9, Operators Shelter, Design RC Roof Slab, 'S1' Rev. No. : 00

REINFORCED CONCRETE ROOF SLAB DYNAMIC PROPERTIES - SDOF Equivalent System


(ref: Introduction to Structural Dynamics by John M. Biggs)

Slab Panel Dimensions and Boundary Conditions


Slab Thickness, T 200 mm
Short Span, La 4.50 m
Long Span Lb 5.60 m
Slab Des. Width, b 1000 mm (Considering 1-m design strip along short span, La)
Concrete Cover 25 mm
Boundary Condition Fixed support on all edges

Slab Mass
Mass, M = Static Pressure DL x La / Gravitational accelation, g
Mass, M = 109.239 kN-s²/m or 0.109 kN-s²/mm

Slab Rebar Schedule


Ø10 @ 150 Ø10 @ 150
200

Ø10 @ 150 Ø10 @ 150

Slab Section along Short Span

For Short For Long Bar


Rebars Remarks
Span Sections Span Sections Location
@ Midspan Ø10 @ 150 Ø10 @ 150 Bottom Refer to attached drawings
@ Support Ø10 @ 150 Ø10 @ 150 Top RA-462171 and RA-462173.

Material Increase Factors


Material / Strength Factor Concrete Steel Stress Type Remarks
Strength Increase Factor (SIF) 1.00 1.10 Flexure
New Building.
Dynamic Increase Factor (DIF) 1.19 1.17 Flexure

Material Strength
Concrete Unit Weight 24 kN/m³
Concrete Ult. Comp. Strength, Fc' 35.00 Mpa
Steel Yield Strength, Fy 422.00 Mpa
F'dc = Fc' x SIF x DIF 41.65 Mpa
Fds = Fy x SIF x DIF 543.114 Mpa
Conc. Modulus of Elasticity, Ec 30332.30 Mpa
Steel Modulus if Elasticity, Es 200000.00 Mpa

ISSUED FOR CONSTRUCTION (IFC)

26 JAN 2022
Calculation Report, OPERATION SHELTER, Plant Plant No. 015 Page 196 of 281
CALCULATION SHEET

SNC-LAVALIN FAYEZ ENGINEERING, Al Khobar, Saudi Arabia


PROJECT : Updrade Buildings for Risk Mitigation - RT Refinery
EWO / B.I. No. : 10-02062-0002-001 Designed : NFP
Project Code No. : 510008 Checked : AMK
Calc. No. : PE-P20081 Revision : IFC SUB
Subject : Bldg-A9, Operators Shelter, Design RC Roof Slab, 'S1' Rev. No. : 00

Compute Slab Effective Depths


Short Span Section Long Span Section
Positive (inbound) Negative (rebound) Positive (inbound) Negative (rebound)
Bending Resistance Bending Resistance Bending Resistance Bending Resistance
@ Midspan 170.000 170.000 160.000 160.000
@ Support 170.000 170.000 160.000 160.000

Compute Slab Strength


Determine β1 value as per ACI 318-08, 10.2.7.3;
0.85 
for Fdc'  28Mpa 

  0.65 
1    
max  0.85  0.05 Fdc  28  
'
 for F '
dc  28Mpa 
   
   7 

β1 = 0.7525

Strength Reduction Factor (ACI 318-08)


318 08)
F = 1.000

Min Limits of Steel Reinforcements:


Required minimum rebars, Asmin (ACI 318-08, 13.3.1)

 For Grade 420 rebars; 


 0.0018b  d  
  = 306.000 mm² (for inbound bending)
As min   
 For Grade 280 or Grade 530 rebars ;  = 306.000 mm² (for rebound bending)
 0.0020b  d 
 

Bending Capacities:
The following calculations are per unit width of slab:
Short Span Section Long Span Section
Section Unit
Inbound Rebound Inbound Rebound
Total area of Reinf # of Bars x Area of 1-bar @ Midspan 523.599 523.599 523.599 523.599 mm²
or
Steel, Ast Min. ACI Reinforcement @ Support 523.599 523.599 523.599 523.599 mm²
Depth of Stress- As  Fds @ Midspan 8.033 8.033 8.033 8.033 mm
a
Block, a 0.85F ' dc b @ Support 8.033 8.033 8.033 8.033 mm
Bending Moment   a  @ Midspan 47.201 47.201 44.358 44.358 kN-m
M p  As Fds d   
Capacities, Mp   2  @ Support 47.201 47.201 44.358 44.358 kN-m

ISSUED FOR CONSTRUCTION (IFC)

26 JAN 2022
Calculation Report, OPERATION SHELTER, Plant Plant No. 015 Page 197 of 281
CALCULATION SHEET

SNC-LAVALIN FAYEZ ENGINEERING, Al Khobar, Saudi Arabia


PROJECT : Updrade Buildings for Risk Mitigation - RT Refinery
EWO / B.I. No. : 10-02062-0002-001 Designed : NFP
Project Code No. : 510008 Checked : AMK
Calc. No. : PE-P20081 Revision : IFC SUB
Subject : Bldg-A9, Operators Shelter, Design RC Roof Slab, 'S1' Rev. No. : 00

Slab Bending Capacities (ref: Introduction to Structural Dynamics by John M. Biggs)


MPCa = total positive ultimate Moment capacity along midspan section parallel to short edge.
MPCa = Mp(midspan-inbound, Shortspan section) x La MPCa = Mp(midspan-rebound, Shortspan section) x La
MPCa = 212.406 kN-m MPCa = 212.406 kN-m

MPSa = total negative ultimate Moment capacity along short edge.


MPSa = Mp(support-inbound, Shortspan section) x La MPSa = Mp(support-rebound, Shortspan section) x La
MPSa = 212.406 kN-m MPSa = 212.406 kN-m

MPCb = neg. ultimate Moment capacity per unit width at center of long edge.
MPCb = Mp(support-inbound, Longspan section) MoPCb = Mp(support-rebound, Longspan section)
o
MPCb = 44.358 kN-m per linear meter M PCb = 44.358 kN-m per linear meter

MPCb = total positive ultimate Moment capacity along midspan section parallel to long edge.
MPCb = Mp(midspan-inbound, Longspan section) x Lb MPCb = Mp(midspan-rebound, Longspan section) x Lb
MPCb = 248.403 kN-m M PCb = 248.403 kN-m

MPSb = total negative ultimate Moment capacity along long edge.


MPSb = Mp(support-inbound, Longspan section) x Lb MPSb = Mp(support-rebound, Longspan section) x Lb
MPSb = 248.403 kN-m MPSb = 248.403 kN-m

Compute Slab Bending Resistance & Transformation Factors


(Ref: Introduction to Structural Dynamics by John M. Biggs, Table 5.5, pp 214)

Total Bending Resistance Transformation Factors


Loading Diagram Strain Range
Inbound, Rb+ Rebound, Rb- Load Fac., KL Mass Fac. KM
Elastic Rb = 26.44 MPCb 1172.63 1172.63 0.36 0.25

Plastic Rb = See below 2272.73 2272.73 0.37 0.20

Where:
a = short clear span, ℓa
b = long clear span, ℓb

Total Bending resistance in plastic range for La / Lb slab ratio = 0.804


1
Rb  12M PCa  M PSa   10.33
12.8M PCb  M PSb 
a
Rb+ = 2272.728 kN
Rb- = 2272.728 kN

ISSUED FOR CONSTRUCTION (IFC)

26 JAN 2022
Calculation Report, OPERATION SHELTER, Plant Plant No. 015 Page 198 of 281
CALCULATION SHEET

SNC-LAVALIN FAYEZ ENGINEERING, Al Khobar, Saudi Arabia


PROJECT : Updrade Buildings for Risk Mitigation - RT Refinery
EWO / B.I. No. : 10-02062-0002-001 Designed : NFP
Project Code No. : 510008 Checked : AMK
Calc. No. : PE-P20081 Revision : IFC SUB
Subject : Bldg-A9, Operators Shelter, Design RC Roof Slab, 'S1' Rev. No. : 00

Compute Slab Shear Resistance


Shear Capacity of Concrete section for width, Lb

Vc  0.17 Fc' Lb x d 


Vc = 1044.464 kN

Compute for Nominal Shear Resistance of slab section (Critical section at distance 'd' from the support)
RV = Vc La / (0.5 La - d)
RV = 2259.657 kN

Shear resistance is not higher than Flexural resistance by 120%, thus Shear resistance controls.

Compute Slab Stiffness, Ke ( PCA notes to ACI 318-08 and ASCE-41088 )


Moment of Inertia for Slab Cracked Section (midspan-inbound, short-span), Icr

Es
n = 6.594
Ec
b
B = 0.290
nAs

bkd 
3
 nAs d  kd 
2 4
Transformed Section RC Slab I cr  = 76634.473 mm per unit width
3
where :
kd 30.982
kd 
 
2dB  1  1
B

Moment of Inertia for Rectangular Slab Gross Section (per unit width), Ig
bh 3
Ig  =
4
666666.667 mm per unit width
12

Average Moment of Inertia (per unit width), Ia


I g  I cr
Ia  =
4
371650.570 mm per unit width
2
Compute for Stiffness, K (Ref: Introduction to Structural Dynamics by John M. Biggs, Table 5.5, pp 214)
Loading Diagram Strain Range Stiffness, Ke Unit

Elastic K = 706.32 EIa/La2 393203.630 N/mm

Plastic 0 0.000 N/mm

ISSUED FOR CONSTRUCTION (IFC)

26 JAN 2022
Calculation Report, OPERATION SHELTER, Plant Plant No. 015 Page 199 of 281
CALCULATION SHEET

SNC-LAVALIN FAYEZ ENGINEERING, Al Khobar, Saudi Arabia


PROJECT : Updrade Buildings for Risk Mitigation - RT Refinery
EWO / B.I. No. : 10-02062-0002-001 Designed : NFP
Project Code No. : 510008 Checked : AMK
Calc. No. : PE-P20081 Revision : IFC SUB
Subject : Bldg-A9, Operators Shelter, Design RC Roof Slab, 'S1' Rev. No. : 00

Equivalent Mass, Me

Use average elastic and plastic transformation values for KLM:


elastic KLM = 0.25 / 0.36 = 0.694
plastic KLM = 0.20 / 0.37 = 0.540
average KLM = 0.617

Me = (KLM) (M)
Me = 0.067 kN-s²/mm per unit width of Lb

Period of vibration, tn
Me
t n  2
Ke
tn = 0.082 secs.

Summary
Equivalent Mass, M 0.067 kN-s²/mm
Stiffness, Ke 393.204 kN/mm
positive resistance, Ru+ 2272.728 kN
rebound resistance, Ru- 2272.728 kN
static load, Fs 238.140 kN

ISSUED FOR CONSTRUCTION (IFC)

26 JAN 2022
Calculation Report, OPERATION SHELTER, Plant Plant No. 015 Page 200 of 281
CALCULATION SHEET

SNC-LAVALIN FAYEZ ENGINEERING, Al Khobar, Saudi Arabia


PROJECT : Updrade Buildings for Risk Mitigation - RT Refinery
EWO / B.I. No. : 10-02062-0002-001 Designed : NFP
Project Code No. : 510008 Checked : AMK
Calc. No. : PE-P20081 Revision : IFC SUB
Subject : Bldg-A9, Operators Shelter, Design RC Roof Slab, 'S1' Rev. No. : 00

NON-LINEAR (ELASTO-PLASTIC) SDOF ANALYSIS - Ref: Introduction to Structural Dynamics by John M. Biggs

SUPPORT REACTION COEFFICIENTS (for Support Reaction, V)

Wall Support Reaction Coefficients


Loading Diagram Strain Range Supports (Short Span), Va Supports (Long Span), Vb
Rstnce, CR Force, CF Rstnce, CR Force, CF

Elastic 0.12 0.08 0.19 0.11

Plastic 0.13 0.07 0.20 0.10

Where:
a = short clear span, ℓa
b = long clear span, ℓb

RESPONSE GRAPH (Based on calculated values from the table on next page…..)

Dyn. Load/Deformation vs. Time Dyn. Load, F
Deformation, y / 75
Deformation y / 75
1400.00 
1200.00 
1000.00 
800.00 
600.00 
400.00 
200.00 
0.00 
‐200.00 
‐400.00 
0.0000 

0.1000 

0.2000 

0.3000 

0.4000 

0.5000 

0.6000 

Support Reaction, Va
Support Reaction/Resistance vs. Time Support Reaction, Vb
Resistance, R
2500.00 
2000.00 
1500.00 
1000.00 
500.00 
0.00 
‐500.00 
‐1000.00 
‐1500.00 
‐2000.00 
0.0000 

0.1000 

0.2000 

0.3000 

0.4000 

0.5000 

0.6000 

ISSUED FOR CONSTRUCTION (IFC)

26 JAN 2022
Calculation Report, OPERATION SHELTER, Plant Plant No. 015 Page 201 of 281
DESIGN INPUT

26 JAN 2022
Subject
time increment, ∆t 0.003 secs

Calc. No.
PROJECT

ISSUED FOR CONSTRUCTION (IFC)


mass, M 0.067 kN-s²/mm
stiffness, K 393.204 kN/mm

Project Code No.


damping, C 0.000 kN-s/mm

EWO / B.I. Number


positive resistance, Ru+ 2272.728 kN
rebound resistance, Ru- -2272.728 kN
static load, Fs 238.140 kN

LEGEND : : 510008
KEY = 0 is elastic Z= 1 is increasing plastic deformation : PE-P20081
KEY = +1 is positive plastic Z= 2 is end of rebound plastic deformation
KEY = -1 is rebound plastic Z= 3 is end of positive plastic deformation
: 10-02062-0002-001

Z= 4 is continued elastic
Z= 5 is start of rebound plastic deformation
Z= 6 is start of positive plastic deformation

Numerical Integration (Newmark-Beta Method)


Dyn. Def. @ Yield pt. Dyn. Reaction, V Ductile
Time, Def. Vel. Acc. Rstnce incr incr incr
Load, KEY eff K Z Ratio

Calculation Report, OPERATION SHELTER, Plant Plant No. 015


t y v a R ye+ ye- F y v Va Vb
F μ
secs kN mm mm/s mm/s² kN mm mm kN/mm kN mm mm/s kN/m kN/m
0.0000 0.00 0.61 0.00 0.00 238.14 5.78 -5.78 0 45308.04 301.78 0.01 6.66 28.75 45.08 -
: Updrade Buildings for Risk Mitigation - RT Refinery
SNC-LAVALIN FAYEZ ENGINE

0 0030
0.0030 301 78
301.78 0 61
0.61 6 66
6.66 4440 44
4440.44 240 76
240.76 5 78
5.78 -5 78
-5.78 0 45308 04
45308.04 2096 76
2096.76 0 05
0.05 19 64
19.64 4 53 31
53.31 78 66
78.66 -
: Bldg-A9, Operators Shelter, Design RC Roof Slab, 'S1'

0.0060 603.56 0.66 26.30 8649.67 258.96 5.78 -5.78 0 45308.04 5593.24 0.12 31.59 4 79.76 115.19 -
CALCULATION

0.0090 905.34 0.78 57.88 12408.50 307.50 5.78 -5.78 0 45308.04 10609.17 0.23 41.89 4 109.87 157.47 -
0.0120 1207.13 1.02 99.78 15521.21 399.57 5.78 -5.78 0 45308.04 16597.59 0.37 43.71 4 145.23 207.99 -
0.0150 1223.14 1.38 143.49 13620.85 543.61 5.78 -5.78 0 45308.04 21994.52 0.49 34.54 4 163.91 237.01 -
0.0180 1130.07 1.87 178.03 9406.32 734.49 5.78 -5.78 0 45308.04 25796.87 0.57 21.16 4 179.47 262.93 -
0.0210 1037.01 2.44 199.19 4701.99 958.36 5.78 -5.78 0 45308.04 27697.57 0.61 6.68 4 199.02 295.11 -
SHEET

0.0240 943.94 3.05 205.88 -247.18 1198.74 5.78 -5.78 0 45308.04 27597.65 0.61 -8.15 4 220.56 330.40 -
0.0270 850.88 3.66 197.73 -5183.47 1438.24 5.78 -5.78 0 45308.04 25502.32 0.56 -22.55 4 241.99 365.53 -
0.0300 757.81 4.22 175.18 -9849.86 1659.56 5.78 -5.78 0 45308.04 21520.68 0.47 -35.78 4 261.23 397.22 -
0.0330 664.75 4.70 139.40 -14003.36 1846.33 5.78 -5.78 0 45308.04 15860.05 0.35 -47.15 4 276.30 422.37 -
0.0360 571.69 5.05 92.25 -17427.69 1983.97 5.78 -5.78 0 45308.04 8815.20 0.19 -56.06 4 285.43 438.22 -
EERING, Al Khobar, Saudi Arabia

0.0390 478.62 5.24 36.20 -19944.55 2060.47 5.78 -5.78 0 45308.04 752.94 0.02 -62.05 4 287.19 442.50 -
0.0420 385.56 5.26 -25.86 -21422.88 2067.01 5.78 -5.78 0 45308.04 -7906.91 -0.17 -64.81 4 280.50 433.53 -
Revision

0.0450 292.49 5.08 -90.67 -21785.71 1998.39 5.78 -5.78 0 45308.04 -16713.42 -0.37 -64.20 4 264.74 410.34 -
Rev. No.
Checked
Designed

0.0480 199.43 4.71 -154.87 -21014.14 1853.34 5.78 -5.78 0 45308.04 -25208.04 -0.56 -60.24 4 239.75 372.68 -
0.0510 106.36 4.16 -215.11 -19148.35 1634.57 5.78 -5.78 0 45308.04 -32948.45 -0.73 -53.15 4 205.86 321.06 -
0.0540 13.30 3.43 -268.26 -16285.50 1348.63 5.78 -5.78 0 45308.04 -39451.83 -0.87 -41.53 4 163.87 256.73 -
:
:
:
:

0.0570 0.00 2.56 -309.79 -11400.98 1006.25 5.78 -5.78 0 45308.04 -44047.19 -0.97 -25.69 4 121.47 190.47 -
0.0600 0.00 1.59 -335.48 -5727.11 623.99 5.78 -5.78 0 45308.04 -46362.28 -1.02 -8.22 4 75.32 118.11 -
0.0630 0.00 0.56 -343.71 244.97 221.64 5.78 -5.78 0 45308.04 -46263.25 -1.02 9.67 4 26.75 41.95 -
00
NFP

AMK

IFC SUB

0.0660 0.00 -0.46 -334.03 6204.30 -179.86 5.78 -5.78 0 45308.04 -43755.27 -0.97 27.07 4 -21.71 -34.04 -
0.0690 0.00 -1.42 -306.97 11840.57 -559.59 5.78 -5.78 0 45308.04 -38968.91 -0.86 43.05 4 -67.55 -105.92 -
0.0720 0.00 -2.28 -263.92 16860.29 -897.78 5.78 -5.78 0 45308.04 -32153.42 -0.71 56.79 4 -108.37 -169.94 -

Page 202 of 281


0.0750 0.00 -2.99 -207.12 21002.08 -1176.82 5.78 -5.78 0 45308.04 -23663.67 -0.52 67.58 4 -142.06 -222.75 -
0.0780 0.00 -3.52 -139.54 24050.28 -1382.18 5.78 -5.78 0 45308.04 -13941.74 -0.31 74.84 4 -166.85 -261.63 -
0.0810 0.00 -3.82 -64.70 25846.16 -1503.17 5.78 -5.78 0 45308.04 -3493.86 -0.08 78.21 4 -181.45 -284.53 -

26 JAN 2022
Subject
0.0840 0.00 -3.90 13.51 26296.22 -1533.50 5.78 -5.78 0 45308.04 7135.95 0.16 77.51 4 -185.11 -290.27 -

Calc. No.
PROJECT

ISSUED FOR CONSTRUCTION (IFC)


0.0870 0.00 -3.74 91.02 25377.01 -1471.57 5.78 -5.78 0 45308.04 17394.19 0.38 72.77 4 -177.64 -278.55 -
0.0900 0.00 -3.36 163.79 23136.41 -1320.61 5.78 -5.78 0 45308.04 26746.70 0.59 64.24 4 -159.42 -249.97 -

Project Code No.


0.0930 0.00 -2.77 228.04 19691.07 -1088.49 5.78 -5.78 0 45308.04 34706.50 0.77 52.37 4 -131.40 -206.04 -

EWO / B.I. Number


0.0960 0.00 -2.00 280.40 15220.41 -787.29 5.78 -5.78 0 45308.04 40859.09 0.90 37.77 4 -95.04 -149.02 -
0.0990 0.00 -1.10 318.17 9957.21 -432.70 5.78 -5.78 0 45308.04 44884.13 0.99 21.20 4 -52.23 -81.90 -
0.1020 0.00 -0.11 339.37 4175.53 -43.17 5.78 -5.78 0 45308.04 46572.02 1.03 3.53 4 -5.21 -8.17 -
0.1050 0.00 0.92 342.90 -1823.57 361.00 5.78 -5.78 0 45308.04 45834.87 1.01 -14.33 4 43.58 68.33 -
0.1080 0.00 1.93 328.57 -7727.72 758.77 5.78 -5.78 0 45308.04 42711.07 0.94 -31.44 4 91.59 143.63 - : 510008
0.1110 0.00 2.87 297.13 -13229.48 1129.44 5.78 -5.78 0 45308.04 37363.27 0.82 -46.91 4 136.34 213.79 - : PE-P20081
0.1140 0.00 3.70 250.23 -18042.37 1453.70 5.78 -5.78 0 45308.04 30069.94 0.66 -59.94 4 175.48 275.16 -
0.1170 0.00 4.36 190.29 -21915.78 1714.66 5.78 -5.78 0 45308.04 21210.84 0.47 -69.85 4 206.98 324.56 -
: 10-02062-0002-001

0.1200 0.00 4.83 120.44 -24648.02 1898.73 5.78 -5.78 0 45308.04 11247.28 0.25 -76.12 4 229.20 359.40 -
0.1230 0.00 5.08 44.33 -26096.83 1996.34 5.78 -5.78 0 45308.04 698.07 0.02 -78.43 4 240.99 377.88 -
0.1260 0.00 5.09 -34.10 -26186.75 2002.40 5.78 -5.78 0 45308.04 -9887.49 -0.22 -76.65 4 241.72 379.03 -
0.1290 0.00 4.87 -110.75 -24913.11 1916.59 5.78 -5.78 0 45308.04 -19958.20 -0.44 -70.88 4 231.36 362.78 -
0.1320 0.00 4.43 -181.63 -22342.22 1743.39 5.78 -5.78 0 45308.04 -28989.68 -0.64 -61.43 4 210.45 330.00 -
0.1350 0.00 3.79 -243.06 -18607.96 1491.80 5.78 -5.78 0 45308.04 -36511.64 -0.81 -48.77 4 180.08 282.38 -
0.1380 0.00 2.99 -291.83 -13904.77 1174.94 5.78 -5.78 0 45308.04 -42132.41 -0.93 -33.57 4 141.83 222.40 -

Calculation Report, OPERATION SHELTER, Plant Plant No. 015


0.1410 0.00 2.06 -325.40 -8477.55 809.29 5.78 -5.78 0 45308.04 -45559.32 -1.01 -16.63 4 97.69 153.19 -
0.1440 0.00 1.05 -342.03 -2608.90 413.91 5.78 -5.78 0 45308.04 -46613.93 -1.03 1.18 4 49.96 78.35 -
0.1470 0.00 0.02 -340.85 3395.60 9.37 5.78 -5.78 0 45308.04 -45241.31 -1.00 18.93 4 1.13 1.77 -
: Updrade Buildings for Risk Mitigation - RT Refinery

0 1500
0.1500 0 00
0.00 -0 97
-0.97 -321 92
-321.92 9223 29
9223.29 -383 25
-383.25 5 78
5.78 -5 78
-5.78 0 45308 04
45308.04 -41512 95
-41512.95 -0 92
-0.92 35 69
35.69 4 -46 26
-46.26 -72 54
-72.54 -
SNC-LAVALIN FAYEZ ENGINEE

: Bldg-A9, Operators Shelter, Design RC Roof Slab, 'S1'

0.1530 0.00 -1.89 -286.23 14570.72 -743.52 5.78 -5.78 0 45308.04 -35622.98 -0.79 50.60 4 -89.75 -140.74 -
CALCULATION

0.1560 0.00 -2.68 -235.64 19159.43 -1052.67 5.78 -5.78 0 45308.04 -27878.09 -0.62 62.86 4 -127.07 -199.26 -
0.1590 0.00 -3.29 -172.77 22750.51 -1294.61 5.78 -5.78 0 45308.04 -18681.57 -0.41 71.86 4 -156.28 -245.05 -
0.1620 0.00 -3.70 -100.91 25156.94 -1456.74 5.78 -5.78 0 45308.04 -8512.29 -0.19 77.12 4 -175.85 -275.74 -
0.1650 0.00 -3.89 -23.79 26253.44 -1530.61 5.78 -5.78 0 45308.04 2100.23 0.05 78.35 4 -184.77 -289.72 -
0.1680 0.00 -3.85 54.56 25982.90 -1512.39 5.78 -5.78 0 45308.04 12603.39 0.28 75.51 4 -182.57 -286.27 -
SHEET

0.1710 0.00 -3.57 130.07 24359.42 -1403.01 5.78 -5.78 0 45308.04 22450.28 0.50 68.74 4 -169.36 -265.57 -
0.1740 0.00 -3.07 198.82 21467.52 -1208.18 5.78 -5.78 0 45308.04 31128.18 0.69 58.39 4 -145.84 -228.69 -
0.1770 0.00 -2.39 257.20 17457.79 -938.03 5.78 -5.78 0 45308.04 38185.20 0.84 45.00 4 -113.23 -177.56 -
0.1800 0.00 -1.54 302.20 12539.03 -606.64 5.78 -5.78 0 45308.04 43253.89 0.95 29.26 4 -73.23 -114.83 -
0.1830 0.00 -0.59 331.46 6967.34 -231.27 5.78 -5.78 0 45308.04 46070.33 1.02 12.00 4 -27.92 -43.78 -
ERING, Al Khobar, Saudi Arabia

0.1860 0.00 0.43 343.46 1032.87 168.55 5.78 -5.78 0 45308.04 46487.85 1.03 -5.88 4 20.35 31.90 -
0.1890 0.00 1.45 337.57 -4955.39 572.00 5.78 -5.78 0 45308.04 44484.71 0.98 -23.46 4 69.05 108.27 -
Revision

0.1920 0.00 2.44 314.11 -10685.62 958.05 5.78 -5.78 0 45308.04 40165.22 0.89 -39.82 4 115.65 181.35 -
Rev. No.
Checked
Designed

0.1950 0.00 3.32 274.30 -15859.44 1306.63 5.78 -5.78 0 45308.04 33754.31 0.74 -54.10 4 157.73 247.33 -
0.1980 0.00 4.07 220.19 -20207.45 1599.56 5.78 -5.78 0 45308.04 25585.78 0.56 -65.57 4 193.09 302.77 -
0.2010 0.00 4.63 154.63 -23503.24 1821.61 5.78 -5.78 0 45308.04 16084.98 0.36 -73.62 4 219.89 344.80 -
:
:
:
:

0.2040 0.00 4.99 81.01 -25575.20 1961.20 5.78 -5.78 0 45308.04 5746.62 0.13 -77.84 4 236.74 371.23 -
0.2070 0.00 5.11 3.18 -26315.45 2011.07 5.78 -5.78 0 45308.04 -4890.96 -0.11 -78.00 4 242.76 380.67 -
0.2100 0.00 5.01 -74.83 -25685.42 1968.62 5.78 -5.78 0 45308.04 -15273.87 -0.34 -74.11 4 237.64 372.63 -
00
NFP

AMK

IFC SUB

0.2130 0.00 4.67 -148.93 -23717.94 1836.07 5.78 -5.78 0 45308.04 -24861.46 -0.55 -66.35 4 221.64 347.54 -
0.2160 0.00 4.12 -215.28 -20515.45 1620.31 5.78 -5.78 0 45308.04 -33154.50 -0.73 -55.14 4 195.59 306.70 -
0.2190 0.00 3.39 -270.42 -16244.71 1332.58 5.78 -5.78 0 45308.04 -39721.15 -0.88 -41.06 4 160.86 252.24 -

Page 203 of 281


0.2220 0.00 2.51 -311.48 -11128.09 987.86 5.78 -5.78 0 45308.04 -44219.50 -0.98 -24.84 4 119.25 186.99 -
0.2250 0.00 1.54 -336.32 -5432.03 604.11 5.78 -5.78 0 45308.04 -46415.31 -1.02 -7.33 4 72.92 114.35 -
0.2280 0.00 0.51 -343.65 546.89 201.29 5.78 -5.78 0 45308.04 -46194.24 -1.02 10.57 4 24.30 38.10 -

26 JAN 2022
Subject
0.2310 0.00 -0.51 -333.08 6497.33 -199.60 5.78 -5.78 0 45308.04 -43567.80 -0.96 27.91 4 -24.09 -37.78 -

Calc. No.
PROJECT

ISSUED FOR CONSTRUCTION (IFC)


0.2340 0.00 -1.47 -305.17 12109.45 -577.70 5.78 -5.78 0 45308.04 -38672.75 -0.85 43.80 4 -69.74 -109.35 -
0.2370 0.00 -2.32 -261.37 17091.02 -913.32 5.78 -5.78 0 45308.04 -31763.99 -0.70 57.41 4 -110.25 -172.88 -

Project Code No.


0.2400 0.00 -3.02 -203.96 21182.64 -1188.98 5.78 -5.78 0 45308.04 -23201.26 -0.51 68.03 4 -143.53 -225.06 -

EWO / B.I. Number


0.2430 0.00 -3.54 -135.93 24171.28 -1390.33 5.78 -5.78 0 45308.04 -13430.42 -0.30 75.11 4 -167.83 -263.17 -
0.2460 0.00 -3.83 -60.82 25901.30 -1506.89 5.78 -5.78 0 45308.04 -2960.24 -0.07 78.28 4 -181.90 -285.23 -
0.2490 0.00 -3.90 17.45 26282.62 -1532.58 5.78 -5.78 0 45308.04 7664.07 0.17 77.37 4 -185.00 -290.10 -
0.2520 0.00 -3.73 94.82 25295.38 -1466.07 5.78 -5.78 0 45308.04 17889.31 0.39 72.43 4 -176.98 -277.51 -
0.2550 0.00 -3.33 167.25 22991.00 -1310.82 5.78 -5.78 0 45308.04 27183.04 0.60 63.72 4 -158.23 -248.12 - : 510008
0.2580 0.00 -2.73 230.97 19489.46 -1074.91 5.78 -5.78 0 45308.04 35061.33 0.77 51.69 4 -129.76 -203.46 - : PE-P20081
0.2610 0.00 -1.96 282.67 14973.08 -770.63 5.78 -5.78 0 45308.04 41113.96 0.91 36.98 4 -93.03 -145.87 -
0.2640 0.00 -1.05 319.64 9677.05 -413.82 5.78 -5.78 0 45308.04 45025.75 0.99 20.33 4 -49.95 -78.33 -
: 10-02062-0002-001

0.2670 0.00 -0.06 339.97 3877.13 -23.07 5.78 -5.78 0 45308.04 46593.01 1.03 2.63 4 -2.79 -4.37 -
0.2700 0.00 0.97 342.60 -2124.67 381.28 5.78 -5.78 0 45308.04 45734.15 1.01 -15.21 4 46.03 72.17 -
0.2730 0.00 1.98 327.39 -8015.85 778.19 5.78 -5.78 0 45308.04 42493.88 0.94 -32.26 4 93.94 147.30 -
0.2760 0.00 2.92 295.13 -13489.63 1146.97 5.78 -5.78 0 45308.04 37040.92 0.82 -47.63 4 138.46 217.10 -
0.2790 0.00 3.73 247.51 -18261.00 1468.42 5.78 -5.78 0 45308.04 29659.21 0.65 -60.51 4 177.26 277.95 -
0.2820 0.00 4.39 186.99 -22081.50 1725.82 5.78 -5.78 0 45308.04 20733.13 0.46 -70.25 4 208.33 326.67 -
0.2850 0.00 4.85 116.74 -24752.21 1905.75 5.78 -5.78 0 45308.04 10727.45 0.24 -76.33 4 230.05 360.73 -

Calculation Report, OPERATION SHELTER, Plant Plant No. 015


0.2880 0.00 5.08 40.41 -26134.05 1998.85 5.78 -5.78 0 45308.04 163.20 0.00 -78.43 4 241.29 378.35 -
0.2910 0.00 5.09 -38.02 -26155.07 2000.27 5.78 -5.78 0 45308.04 -10409.56 -0.23 -76.45 4 241.46 378.62 -
0.2940 0.00 4.86 -114.48 -24814.18 1909.93 5.78 -5.78 0 45308.04 -20440.28 -0.45 -70.49 4 230.56 361.52 -
: Updrade Buildings for Risk Mitigation - RT Refinery

0 2970
0.2970 0 00
0.00 4 41
4.41 -184 97
-184.97 -22181 19
-22181.19 1732 54
1732.54 5 78
5.78 -5 78
-5.78 0 45308 04
45308.04 -29406 66
-29406.66 -0 65
-0.65 -60 86
-60.86 4 209 14
209.14 327 94
327.94 -
SNC-LAVALIN FAYEZ ENGINEE

: Bldg-A9, Operators Shelter, Design RC Roof Slab, 'S1'

0.3000 0.00 3.76 -245.83 -18393.22 1477.33 5.78 -5.78 0 45308.04 -36841.82 -0.81 -48.06 4 178.34 279.64 -
CALCULATION

0.3030 0.00 2.94 -293.89 -13647.50 1157.60 5.78 -5.78 0 45308.04 -42358.60 -0.93 -32.76 4 139.74 219.12 -
0.3060 0.00 2.01 -326.65 -8191.14 790.00 5.78 -5.78 0 45308.04 -45669.73 -1.01 -15.75 4 95.36 149.53 -
0.3090 0.00 1.00 -342.40 -2308.27 393.65 5.78 -5.78 0 45308.04 -46602.81 -1.03 2.08 4 47.52 74.51 -
0.3120 0.00 -0.03 -340.32 3694.80 -10.79 5.78 -5.78 0 45308.04 -45109.25 -1.00 19.80 4 -1.30 -2.04 -
0.3150 0.00 -1.02 -320.52 9505.48 -402.27 5.78 -5.78 0 45308.04 -41266.82 -0.91 36.49 4 -48.56 -76.14 -
SHEET

0.3180 0.00 -1.93 -284.03 14821.20 -760.40 5.78 -5.78 0 45308.04 -35275.59 -0.78 51.28 4 -91.79 -143.93 -
0.3210 0.00 -2.71 -232.75 19365.17 -1066.54 5.78 -5.78 0 45308.04 -27447.54 -0.61 63.40 4 -128.75 -201.88 -
0.3240 0.00 -3.32 -169.35 22900.78 -1304.74 5.78 -5.78 0 45308.04 -18190.28 -0.40 72.22 4 -157.50 -246.97 -
0.3270 0.00 -3.72 -97.13 25243.93 -1462.60 5.78 -5.78 0 45308.04 -7985.83 -0.18 77.27 4 -176.56 -276.85 -
0.3300 0.00 -3.90 -19.86 26272.62 -1531.91 5.78 -5.78 0 45308.04 2634.44 0.06 78.31 4 -184.92 -289.97 -
ERING, Al Khobar, Saudi Arabia

0.3330 0.00 -3.84 58.45 25933.26 -1509.04 5.78 -5.78 0 45308.04 13117.53 0.29 75.27 4 -182.16 -285.64 -
0.3360 0.00 -3.55 133.72 24243.55 -1395.20 5.78 -5.78 0 45308.04 22917.59 0.51 68.30 4 -168.42 -264.09 -
Revision

0.3390 0.00 -3.04 202.02 21291.46 -1196.31 5.78 -5.78 0 45308.04 31524.31 0.70 57.78 4 -144.41 -226.45 -
Rev. No.
Checked
Designed

0.3420 0.00 -2.35 259.80 17230.70 -922.73 5.78 -5.78 0 45308.04 38489.54 0.85 44.26 4 -111.39 -174.66 -
0.3450 0.00 -1.50 304.06 12272.73 -588.70 5.78 -5.78 0 45308.04 43450.59 0.96 28.42 4 -71.06 -111.43 -
0.3480 0.00 -0.54 332.48 6675.71 -211.62 5.78 -5.78 0 45308.04 46149.13 1.02 11.11 4 -25.55 -40.06 -
:
:
:
:

0.3510 0.00 0.48 343.59 731.08 188.89 5.78 -5.78 0 45308.04 46444.66 1.03 -6.78 4 22.80 35.75 -
0.3540 0.00 1.51 336.81 -5251.61 591.95 5.78 -5.78 0 45308.04 44321.78 0.98 -24.32 4 71.46 112.05 -
0.3570 0.00 2.48 312.49 -10960.85 976.60 5.78 -5.78 0 45308.04 39891.04 0.88 -40.59 4 117.89 184.86 -
00
NFP

AMK

IFC SUB

0.3600 0.00 3.36 271.90 -16099.36 1322.79 5.78 -5.78 0 45308.04 33383.14 0.74 -54.75 4 159.68 250.39 -
0.3630 0.00 4.10 217.15 -20399.55 1612.50 5.78 -5.78 0 45308.04 25136.96 0.55 -66.06 4 194.65 305.22 -
0.3660 0.00 4.66 151.10 -23637.53 1830.65 5.78 -5.78 0 45308.04 15581.88 0.34 -73.92 4 220.99 346.52 -

Page 204 of 281


0.3690 0.00 5.00 77.17 -25644.69 1965.88 5.78 -5.78 0 45308.04 5215.43 0.12 -77.94 4 237.31 372.11 -
0.3720 0.00 5.11 -0.77 -26316.50 2011.14 5.78 -5.78 0 45308.04 -5422.58 -0.12 -77.90 4 242.77 380.68 -
0.3750 0.00 5.00 -78.67 -25618.00 1964.08 5.78 -5.78 0 45308.04 -15778.23 -0.35 -73.81 4 237.09 371.77 -

26 JAN 2022
Subject
0.3780 0.00 4.65 -152.48 -23585.55 1827.15 5.78 -5.78 0 45308.04 -25312.31 -0.56 -65.87 4 220.56 345.85 -

Calc. No.
PROJECT

ISSUED FOR CONSTRUCTION (IFC)


0.3810 0.00 4.09 -218.34 -20324.99 1607.48 5.78 -5.78 0 45308.04 -33528.35 -0.74 -54.50 4 194.05 304.27 -
0.3840 0.00 3.35 -272.84 -16006.09 1316.51 5.78 -5.78 0 45308.04 -39998.54 -0.88 -40.29 4 158.92 249.20 -

Project Code No.


0.3870 0.00 2.47 -313.13 -10853.74 969.38 5.78 -5.78 0 45308.04 -44385.99 -0.98 -23.98 4 117.02 183.49 -

EWO / B.I. Number


0.3900 0.00 1.49 -337.11 -5136.23 584.18 5.78 -5.78 0 45308.04 -46462.22 -1.03 -6.43 4 70.52 110.58 -
0.3930 0.00 0.46 -343.54 848.73 180.96 5.78 -5.78 0 45308.04 -46119.14 -1.02 11.46 4 21.84 34.25 -
0.3960 0.00 -0.56 -332.09 6789.50 -219.28 5.78 -5.78 0 45308.04 -43374.59 -0.96 28.75 4 -26.47 -41.51 -
0.3990 0.00 -1.52 -303.34 12376.73 -595.71 5.78 -5.78 0 45308.04 -38371.51 -0.85 44.54 4 -71.91 -112.76 -
0.4020 0.00 -2.36 -258.79 17319.49 -928.71 5.78 -5.78 0 45308.04 -31370.39 -0.69 58.02 4 -112.11 -175.79 - : 510008
0.4050 0.00 -3.05 -200.77 21360.42 -1200.96 5.78 -5.78 0 45308.04 -22735.79 -0.50 68.47 4 -144.97 -227.32 - : PE-P20081
0.4080 0.00 -3.56 -132.30 24289.10 -1398.27 5.78 -5.78 0 45308.04 -12917.32 -0.29 75.36 4 -168.79 -264.67 -
0.4110 0.00 -3.84 -56.94 25953.02 -1510.37 5.78 -5.78 0 45308.04 -2426.24 -0.05 78.33 4 -182.32 -285.89 -
: 10-02062-0002-001

0.4140 0.00 -3.89 21.39 26265.55 -1531.43 5.78 -5.78 0 45308.04 8191.18 0.18 77.21 4 -184.87 -289.88 -
0.4170 0.00 -3.71 98.61 25210.42 -1460.34 5.78 -5.78 0 45308.04 18382.07 0.41 72.08 4 -176.28 -276.42 -
0.4200 0.00 -3.31 170.69 22842.56 -1300.81 5.78 -5.78 0 45308.04 27615.80 0.61 63.19 4 -157.03 -246.23 -
0.4230 0.00 -2.70 233.88 19285.27 -1061.15 5.78 -5.78 0 45308.04 35411.56 0.78 51.01 4 -128.10 -200.86 -
0.4260 0.00 -1.92 284.89 14723.79 -753.83 5.78 -5.78 0 45308.04 41363.41 0.91 36.18 4 -91.00 -142.69 -
0.4290 0.00 -1.00 321.07 9395.63 -394.86 5.78 -5.78 0 45308.04 45161.43 1.00 19.46 4 -47.67 -74.74 -
0.4320 0.00 -0.01 340.53 3578.23 -2.93 5.78 -5.78 0 45308.04 46607.87 1.03 1.73 4 -0.35 -0.56 -

Calculation Report, OPERATION SHELTER, Plant Plant No. 015


0.4350 0.00 1.02 342.26 -2425.49 401.55 5.78 -5.78 0 45308.04 45627.41 1.01 -16.09 4 48.47 76.01 -
0.4380 0.00 2.03 326.17 -8302.92 797.53 5.78 -5.78 0 45308.04 42271.09 0.93 -33.08 4 96.27 150.96 -
0.4410 0.00 2.96 293.09 -13748.00 1164.37 5.78 -5.78 0 45308.04 36713.69 0.81 -48.34 4 140.56 220.40 -
: Updrade Buildings for Risk Mitigation - RT Refinery

0 4440
0.4440 0 00
0.00 3 77
3.77 244 75
244.75 -18477 22
-18477.22 1482 99
1482.99 5 78
5.78 -5 78
-5.78 0 45308 04
45308.04 29244 58
29244.58 0 65
0.65 -61 08
-61.08 4 179 02
179.02 280 71
280.71 -
SNC-LAVALIN FAYEZ ENGINEE

: Bldg-A9, Operators Shelter, Design RC Roof Slab, 'S1'

0.4470 0.00 4.42 183.67 -22244.31 1736.79 5.78 -5.78 0 45308.04 20252.68 0.45 -70.65 4 209.66 328.75 -
CALCULATION

0.4500 0.00 4.86 113.02 -24853.13 1912.55 5.78 -5.78 0 45308.04 10206.21 0.23 -76.53 4 230.87 362.02 -
0.4530 0.00 5.09 36.49 -26167.83 2001.13 5.78 -5.78 0 45308.04 -371.70 -0.01 -78.43 4 241.56 378.78 -
0.4560 0.00 5.08 -41.94 -26119.95 1997.90 5.78 -5.78 0 45308.04 -10930.26 -0.24 -76.25 4 241.18 378.17 -
0.4590 0.00 4.84 -118.19 -24711.98 1903.04 5.78 -5.78 0 45308.04 -20919.67 -0.46 -70.09 4 229.72 360.22 -
0.4620 0.00 4.38 -188.28 -22017.25 1721.49 5.78 -5.78 0 45308.04 -29819.78 -0.66 -60.29 4 207.81 325.85 -
SHEET

0.4650 0.00 3.72 -248.57 -18176.06 1462.70 5.78 -5.78 0 45308.04 -37167.15 -0.82 -47.35 4 176.57 276.87 -
0.4680 0.00 2.90 -295.92 -13388.43 1140.15 5.78 -5.78 0 45308.04 -42579.20 -0.94 -31.94 4 137.63 215.81 -
0.4710 0.00 1.96 -327.86 -7903.66 770.63 5.78 -5.78 0 45308.04 -45774.13 -1.01 -14.87 4 93.03 145.87 -
0.4740 0.00 0.95 -342.72 -2007.33 373.38 5.78 -5.78 0 45308.04 -46585.56 -1.03 2.98 4 45.07 70.68 -
0.4770 0.00 -0.08 -339.74 3993.51 -30.91 5.78 -5.78 0 45308.04 -44971.25 -0.99 20.67 4 -3.73 -5.85 -
ERING, Al Khobar, Saudi Arabia

0.4800 0.00 -1.07 -319.07 9786.41 -421.19 5.78 -5.78 0 45308.04 -41015.25 -0.91 37.28 4 -50.84 -79.73 -
0.4830 0.00 -1.98 -281.79 15069.73 -777.14 5.78 -5.78 0 45308.04 -34923.56 -0.77 51.96 4 -93.81 -147.10 -
Revision

0.4860 0.00 -2.75 -229.83 19568.35 -1080.22 5.78 -5.78 0 45308.04 -27013.38 -0.60 63.92 4 -130.40 -204.47 -
Rev. No.
Checked
Designed

0.4890 0.00 -3.34 -165.91 23048.04 -1314.66 5.78 -5.78 0 45308.04 -17696.59 -0.39 72.56 4 -158.70 -248.85 -
0.4920 0.00 -3.73 -93.34 25327.60 -1468.24 5.78 -5.78 0 45308.04 -7458.33 -0.16 77.42 4 -177.24 -277.92 -
0.4950 0.00 -3.90 -15.92 26288.33 -1532.96 5.78 -5.78 0 45308.04 3168.30 0.07 78.25 4 -185.05 -290.17 -
:
:
:
:

RESULTS SUMMARY
00
NFP

AMK
IFC SUB

Def, y Reaction Ductility


Inbound 5.257 287.189 0.000
Rebound -3.900 -185.115 0.000

Page 205 of 281


Component/Member response remains in the elastic range…..
CALCULATION SHEET

SNC-LAVALIN FAYEZ ENGINEERING, Al Khobar, Saudi Arabia


PROJECT : Updrade Buildings for Risk Mitigation - RT Refinery
EWO / B.I. No. : 10-02062-0002-001 Designed : NFP
Project Code No. : 510008 Checked : AMK
Calc. No. : PE-P20081 Revision : IFC SUB
Subject : Bldg-A9, Operators Shelter, Design RC Roof Slab, 'S1' Rev. No. : 00

DEFORMATION LIMITS (RESPONSE CRITERIA) - As per BDR and SAES-M-009

Member / Component : Slab


Material : Concrete
Short Span, La : 4500.000 mm
Response Criteria : High (Refer to BDR datasheet and SAES-M-009, Table-9)
Support Rotation, θ : n/a (SAES-M-009, Table-9) RC Component (Shear control without Shear
Ductility Ratio, μ : 1.30 (SAES-M-009, Table-9) reinforcement)

CHECK DEFORMATION AND DUCTILITY RATIO


Support Rotation, θ1:

xm = Deformation, y = 5.257 mm
 xm 
1  Arc tan   = n/a
 0.5 L 

Ductility Ratio, μ:

Max Ductilty Ratio = 0.909 < 1.30 Response remains in the elastic range!

RC roof slab design is acceptable…..

ISSUED FOR CONSTRUCTION (IFC)

26 JAN 2022
Calculation Report, OPERATION SHELTER, Plant Plant No. 015 Page 206 of 281
CALCULATION SHEET

SNC-LAVALIN FAYEZ ENGINEERING, Al Khobar, Saudi Arabia


PROJECT : Updrade Buildings for Risk Mitigation - RT Refinery
B.I Number : 10-02062-0002-001 Designed : AIA / NFP
Project Code No. : 510008 Checcked : NFP / AKM
Calc. No. : PE-P20081 Reviision : IFC Sub
Subject : Structural Calculation - Operator Shelter, Plant No. 015 (Bldg-A9) Rev.. No. : 00

4.3.2 ROOF SLAB, 'S2' DESIGN

ISSUED FOR CONSTRUCTION (IFC)

26 JAN 2022
Calculation Report, OPERATION SHELTER, Plant Plant No. 015 Page 207 of 281
CALCULATION SHEET

SNC-LAVALIN FAYEZ ENGINEERING, Al Khobar, Saudi Arabia


PROJECT : Updrade Buildings for Risk Mitigation - RT Refinery
EWO / B.I. No. : 10-02062-0002-001 Designed : NFP
Project Code No. : 510008 Checked : AMK
Calc. No. : PE-P20081 Revision : IFC SUB
Subject : Bldg-A9, Operators Shelter, Design RC Roof Slab, 'S2' Rev. No. : 00

DEAD LOAD AND BLAST LOAD ON ROOF SLAB COMPONENT

Dimensions:
short clear span, ℓa 5.600 m
long clear span, ℓb 6.550 m
Slab Thickness 0.200 m

Figure - Slab Panel (Two-way) - Fixed support on all edges

Slab Mark & Location


Considering Roof Slab Panel between
Grid C & D and Grid 4 & 5.
(Short Span)
ℓa = 5.600

DL = 9.450 kPa Refer to attached drawings RA-462171


and RA-462173.

ℓb = 6.550
(Long Span)

Compute Static Dead Load on RC Beam

Superimposed DL 4.650 kN/m² (Refer to Design Criteria page, section 2.1)


Slab-Weight 4.800 kN/m² (For 200mm thick RC slab)
Total 9.450 kN/m²

Total DL = 346.626 kN

Define the Dynamic Blast Load on RC Slab

Blast Pressure on Roof (Refer to Calculation on next pages…..): Blast Pressure (P) vs. Time (t)


Eff. Side-on Pressure, Pa = 51.210 kPa 60.00
Rise time, tr = 0.013 secs 50.00
Time duration, to = 0.054 secs
Blast Pressure, P

40.00

30.00

20.00
0.000 0.00
0.013 51.21 10.00

0.054 0.00 0.00


0.000

0.010

0.020

0.030

0.040

0.050

0.060

Time, t

ISSUED FOR CONSTRUCTION (IFC)

26 JAN 2022
Calculation Report, OPERATION SHELTER, Plant Plant No. 015 Page 208 of 281
CALCULATION SHEET

SNC-LAVALIN FAYEZ ENGINEERING, Al Khobar, Saudi Arabia


PROJECT : Updrade Buildings for Risk Mitigation - RT Refinery
EWO / B.I. No. : 10-02062-0002-001 Designed : NFP
Project Code No. : 510008 Checked : AMK
Calc. No. : PE-P20081 Revision : IFC SUB
Subject : Bldg-A9, Operators Shelter, Design RC Roof Slab, 'S2' Rev. No. : 00

Blast Load Tabulation:

Time Increment, ∆t = 0.0030 secs < 10% of period of vibration, tn

Pressure Dyn. Force, F =


Time
Pa Pa x (ℓa x ℓb)
0.0000 0.000 0.000
0.0030 11.975 439.260

(Short Span)
0.0060 23.951 878.520
35.926 1317.779 Pa

ℓa
0.0090
0.0120 47.902 1757.039
0.0150 48.537 1780.343
0.0180 44.844 1644.882
0.0210 41.151 1509.422
0.0240 37.458 1373.962
ℓb
0.0270 33.765 1238.502
(Long Span)
0.0300 30.072 1103.041
0.0330 26.379 967.581
0.0360 22.686 832.121 Effective Blast Load Calculation for Roof Slab
0.0390 18.993 696.660 (Considering blast load direction from the West side)
0.0420 15.300 561.200 Pso = 72.40 (from BDR)
0.0450 11.607 425.740 td = 0.042 (from BDR)
0.0480 7.914 290.280 L1 = 5.60 (From Grid-D (Front wall) to Grid-C)
0.0510 4.221 154.819 Lw = 18.16 (See sec 2.5, Blast Load Calc pages…..)
0.0540 0.528 19.359 cd = -0.40 (See sec 2.5, Blast Load Calc pages…..)
0.0570 0.000 0.000 Lw/L1 = 3.24
0.0600 0.000 0.000 Ce = 0.80 (from figure 3.9 of ASCE-41088)
0.0630 0.000 0.000 qo = 16.78 (See sec 2.5, Blast Load Calc pages…..)
0.0660 0.000 0.000 U = 436.52 (See sec 2.5, Blast Load Calc pages…..)
0.0690 0.000 0.000
0.0720 0.000 0.000 Par , Equivalent peak overpressure,
0.0750 0.000 0.000 Par = Ce Pso + Cd qo
0.0780 0.000 0.000 Par = 51.21 kPa
0.0810 0.000 0.000
0.0840 0.000 0.000 tr , rise time,
0.0870 0.000 0.000 tr = L1 / U
0.0900 0.000 0.000 tr = 0.013 secs
0.0930 0.000 0.000
0.0960 0.000 0.000 to , total positive phase duration
0.0990 0.000 0.000 to = tr + td
0.1020 0.000 0.000 to = 0.054 secs
0.1050 0.000 0.000
0.1080 0.000 0.000
ISSUED FOR CONSTRUCTION (IFC)

26 JAN 2022
Calculation Report, OPERATION SHELTER, Plant Plant No. 015 Page 209 of 281
CALCULATION SHEET

SNC-LAVALIN FAYEZ ENGINEERING, Al Khobar, Saudi Arabia


PROJECT : Updrade Buildings for Risk Mitigation - RT Refinery
EWO / B.I. No. : 10-02062-0002-001 Designed : NFP
Project Code No. : 510008 Checked : AMK
Calc. No. : PE-P20081 Revision : IFC SUB
Subject : Bldg-A9, Operators Shelter, Design RC Roof Slab, 'S2' Rev. No. : 00

0.1110 0.000 0.000


0.1140 0.000 0.000
0.1170 0.000 0.000
0.1200 0.000 0.000
0.1230 0.000 0.000
0.1260 0.000 0.000
0.1290 0.000 0.000
0.1320 0.000 0.000
0.1350 0.000 0.000
0.1380 0.000 0.000
0.1410 0.000 0.000
0.1440 0.000 0.000
0.1470 0.000 0.000
0.1500 0.000 0.000
0.1530 0.000 0.000
0.1560 0.000 0.000
0.1590 0.000 0.000
0.1620 0.000 0.000
0.1650 0.000 0.000
0.1680 0.000 0.000
0.1710 0.000 0.000
0.1740 0.000 0.000
0.1770 0.000 0.000
0.1800 0.000 0.000
0.1830 0.000 0.000
0.1860 0.000 0.000
0.1890 0.000 0.000
0.1920 0.000 0.000
0.1950 0.000 0.000
0.1980 0.000 0.000
0.2010 0.000 0.000
0.2040 0.000 0.000
0.2070 0.000 0.000
0.2100 0.000 0.000
0.2130 0.000 0.000
0.2160 0.000 0.000
0.2190 0.000 0.000
0.2220 0.000 0.000
0.2250 0.000 0.000
0.2280 0.000 0.000
0.2310 0.000 0.000
0.2340 0.000 0.000
0.2370 0.000 0.000
0.2400 0.000 0.000
0.2430 0.000 0.000
0.2460 0.000 0.000

ISSUED FOR CONSTRUCTION (IFC)

26 JAN 2022
Calculation Report, OPERATION SHELTER, Plant Plant No. 015 Page 210 of 281
CALCULATION SHEET

SNC-LAVALIN FAYEZ ENGINEERING, Al Khobar, Saudi Arabia


PROJECT : Updrade Buildings for Risk Mitigation - RT Refinery
EWO / B.I. No. : 10-02062-0002-001 Designed : NFP
Project Code No. : 510008 Checked : AMK
Calc. No. : PE-P20081 Revision : IFC SUB
Subject : Bldg-A9, Operators Shelter, Design RC Roof Slab, 'S2' Rev. No. : 00

REINFORCED CONCRETE ROOF SLAB DYNAMIC PROPERTIES - SDOF Equivalent System


(ref: Introduction to Structural Dynamics by John M. Biggs)

Slab Panel Dimensions and Boundary Conditions


Slab Thickness, T 200 mm
Short Span, La 5.60 m
Long Span Lb 6.55 m
Slab Des. Width, b 1000 mm (Considering 1-m design strip along short span, La)
Concrete Cover 25 mm
Boundary Condition Fixed support on all edges

Slab Mass
Mass, M = Static Pressure DL x La / Gravitational accelation, g
Mass, M = 197.870 kN-s²/m or 0.198 kN-s²/mm

Slab Rebar Schedule


Ø12 @ 150 Ø12 @ 150
200

Ø12 @ 150 Ø12 @ 150

Slab Section along Short Span

For Short For Long Bar


Rebars Remarks
Span Sections Span Sections Location
@ Midspan Ø12 @ 150 Ø12 @ 150 Bottom Refer to attached drawings
@ Support Ø12 @ 150 Ø12 @ 150 Top RA-462171 and RA-462173.

Material Increase Factors


Material / Strength Factor Concrete Steel Stress Type Remarks
Strength Increase Factor (SIF) 1.00 1.10 Flexure BRAND NEW MATERIAL
Dynamic Increase Factor (DIF) 1.19 1.17 Flexure

Material Strength
Concrete Unit Weight 24 kN/m³
Concrete Ult. Comp. Strength, Fc' 35.00 Mpa
Steel Yield Strength, Fy 422.00 Mpa
F'dc = Fc' x SIF x DIF 41.65 Mpa
Fds = Fy x SIF x DIF 543.114 Mpa
Conc. Modulus of Elasticity, Ec 30332.30 Mpa
Steel Modulus if Elasticity, Es 200000.00 Mpa

ISSUED FOR CONSTRUCTION (IFC)

26 JAN 2022
Calculation Report, OPERATION SHELTER, Plant Plant No. 015 Page 211 of 281
CALCULATION SHEET

SNC-LAVALIN FAYEZ ENGINEERING, Al Khobar, Saudi Arabia


PROJECT : Updrade Buildings for Risk Mitigation - RT Refinery
EWO / B.I. No. : 10-02062-0002-001 Designed : NFP
Project Code No. : 510008 Checked : AMK
Calc. No. : PE-P20081 Revision : IFC SUB
Subject : Bldg-A9, Operators Shelter, Design RC Roof Slab, 'S2' Rev. No. : 00

Compute Slab Effective Depths


Short Span Section Long Span Section
Positive (inbound) Negative (rebound) Positive (inbound) Negative (rebound)
Bending Resistance Bending Resistance Bending Resistance Bending Resistance
@ Midspan 169.000 169.000 157.000 157.000
@ Support 169.000 169.000 157.000 157.000

Compute Slab Strength


Determine β1 value as per ACI 318-08, 10.2.7.3;
0.85 
for Fdc'  28Mpa 

  0.65 
1    
max  0.85  0.05 Fdc  28  
'
 for F '
dc  28Mpa 
   
   7 

β1 = 0.7525

Strength Reduction Factor (ACI 318-08)


318 08)
F = 1.000

Min Limits of Steel Reinforcements:


Required minimum rebars, Asmin (ACI 318-08, 13.3.1)

 For Grade 420 rebars; 


 0.0018b  d  
  = 304.200 mm² (for inbound bending)
As min   
 For Grade 280 or Grade 530 rebars ;  = 304.200 mm² (for rebound bending)
 0.0020b  d 
 

Bending Capacities:
The following calculations are per unit width of slab:
Short Span Section Long Span Section
Section Unit
Inbound Rebound Inbound Rebound
Total area of Reinf # of Bars x Area of 1-bar @ Midspan 753.982 753.982 753.982 753.982 mm²
or
Steel, Ast Min. ACI Reinforcement @ Support 753.982 753.982 753.982 753.982 mm²
Depth of Stress- As  Fds @ Midspan 11.567 11.567 11.567 11.567 mm
a
Block, a 0.85F ' dc b @ Support 11.567 11.567 11.567 11.567 mm
Bending Moment   a  @ Midspan 66.837 66.837 61.923 61.923 kN-m
M p  As Fds d   
Capacities, Mp   2  @ Support 66.837 66.837 61.923 61.923 kN-m

ISSUED FOR CONSTRUCTION (IFC)

26 JAN 2022
Calculation Report, OPERATION SHELTER, Plant Plant No. 015 Page 212 of 281
CALCULATION SHEET

SNC-LAVALIN FAYEZ ENGINEERING, Al Khobar, Saudi Arabia


PROJECT : Updrade Buildings for Risk Mitigation - RT Refinery
EWO / B.I. No. : 10-02062-0002-001 Designed : NFP
Project Code No. : 510008 Checked : AMK
Calc. No. : PE-P20081 Revision : IFC SUB
Subject : Bldg-A9, Operators Shelter, Design RC Roof Slab, 'S2' Rev. No. : 00

Slab Bending Capacities (ref: Introduction to Structural Dynamics by John M. Biggs)


MPCa = total positive ultimate Moment capacity along midspan section parallel to short edge.
MPCa = Mp(midspan-inbound, Shortspan section) x La MPCa = Mp(midspan-rebound, Shortspan section) x La
MPCa = 374.287 kN-m MPCa = 374.287 kN-m

MPSa = total negative ultimate Moment capacity along short edge.


MPSa = Mp(support-inbound, Shortspan section) x La MPSa = Mp(support-rebound, Shortspan section) x La
MPSa = 374.287 kN-m MPSa = 374.287 kN-m

MPCb = neg. ultimate Moment capacity per unit width at center of long edge.
MPCb = Mp(support-inbound, Longspan section) MoPCb = Mp(support-rebound, Longspan section)
o
MPCb = 61.923 kN-m per linear meter M PCb = 61.923 kN-m per linear meter

MPCb = total positive ultimate Moment capacity along midspan section parallel to long edge.
MPCb = Mp(midspan-inbound, Longspan section) x Lb MPCb = Mp(midspan-rebound, Longspan section) x Lb
MPCb = 405.595 kN-m M PCb = 405.595 kN-m

MPSb = total negative ultimate Moment capacity along long edge.


MPSb = Mp(support-inbound, Longspan section) x Lb MPSb = Mp(support-rebound, Longspan section) x Lb
MPSb = 405.595 kN-m MPSb = 405.595 kN-m

Compute Slab Bending Resistance & Transformation Factors


(Ref: Introduction to Structural Dynamics by John M. Biggs, Table 5.5, pp 214)

Total Bending Resistance Transformation Factors


Loading Diagram Strain Range
Inbound, Rb+ Rebound, Rb- Load Fac., KL Mass Fac. KM
Elastic Rb = 26.95 MPCb 1668.80 1668.80 0.35 0.24

Plastic Rb = See below 3151.83 3151.83 0.36 0.19

Where:
a = short clear span, ℓa
b = long clear span, ℓb

Total Bending resistance in plastic range for La / Lb slab ratio = 0.855


1
Rb  12M PCa  M PSa   10.68
12.8M PCb  M PSb 
a
Rb+ = 3151.827 kN
Rb- = 3151.827 kN

ISSUED FOR CONSTRUCTION (IFC)

26 JAN 2022
Calculation Report, OPERATION SHELTER, Plant Plant No. 015 Page 213 of 281
CALCULATION SHEET

SNC-LAVALIN FAYEZ ENGINEERING, Al Khobar, Saudi Arabia


PROJECT : Updrade Buildings for Risk Mitigation - RT Refinery
EWO / B.I. No. : 10-02062-0002-001 Designed : NFP
Project Code No. : 510008 Checked : AMK
Calc. No. : PE-P20081 Revision : IFC SUB
Subject : Bldg-A9, Operators Shelter, Design RC Roof Slab, 'S2' Rev. No. : 00

Compute Slab Shear Resistance


Shear Capacity of Concrete section for width, Lb

Vc  0.17 Fc' Lb x d 


Vc = 1214.463 kN

Compute for Nominal Shear Resistance of slab section (Critical section at distance 'd' from the support)
RV = Vc La / (0.5 La - d)
RV = 2584.947 kN

Shear resistance is not higher than Flexural resistance by 120%, thus Shear resistance controls.

Compute Slab Stiffness, Ke ( PCA notes to ACI 318-08 and ASCE-41088 )


Moment of Inertia for Slab Cracked Section (midspan-inbound, short-span), Icr

Es
n = 6.594
Ec
b
B = 0.201
nAs

bkd 
3
 nAs d  kd 
2 4
Transformed Section RC Slab I cr  = 103488.274 mm per unit width
3
where :
kd 36.321
kd 
 
2dB  1  1
B

Moment of Inertia for Rectangular Slab Gross Section (per unit width), Ig
bh 3
Ig  =
4
666666.667 mm per unit width
12

Average Moment of Inertia (per unit width), Ia


I g  I cr
Ia  =
4
385077.470 mm per unit width
2
Compute for Stiffness, K (Ref: Introduction to Structural Dynamics by John M. Biggs, Table 5.5, pp 214)
Loading Diagram Strain Range Stiffness, Ke Unit

Elastic K = 725.34 EIa/La2 270157.219 N/mm

Plastic 0 0.000 N/mm

ISSUED FOR CONSTRUCTION (IFC)

26 JAN 2022
Calculation Report, OPERATION SHELTER, Plant Plant No. 015 Page 214 of 281
CALCULATION SHEET

SNC-LAVALIN FAYEZ ENGINEERING, Al Khobar, Saudi Arabia


PROJECT : Updrade Buildings for Risk Mitigation - RT Refinery
EWO / B.I. No. : 10-02062-0002-001 Designed : NFP
Project Code No. : 510008 Checked : AMK
Calc. No. : PE-P20081 Revision : IFC SUB
Subject : Bldg-A9, Operators Shelter, Design RC Roof Slab, 'S2' Rev. No. : 00

Equivalent Mass, Me

Use average elastic and plastic transformation values for KLM:


elastic KLM = 0.24 / 0.35 = 0.685
plastic KLM = 0.19 / 0.36 = 0.526
average KLM = 0.606

Me = (KLM) (M)
Me = 0.120 kN-s²/mm per unit width of Lb

Period of vibration, tn
Me
t n  2
Ke
tn = 0.132 secs.

Summary
Equivalent Mass, M 0.120 kN-s²/mm
Stiffness, Ke 270.157 kN/mm
positive resistance, Ru+ 3151.827 kN
rebound resistance, Ru- 3151.827 kN
static load, Fs 346.626 kN

ISSUED FOR CONSTRUCTION (IFC)

26 JAN 2022
Calculation Report, OPERATION SHELTER, Plant Plant No. 015 Page 215 of 281
CALCULATION SHEET

SNC-LAVALIN FAYEZ ENGINEERING, Al Khobar, Saudi Arabia


PROJECT : Updrade Buildings for Risk Mitigation - RT Refinery
EWO / B.I. No. : 10-02062-0002-001 Designed : NFP
Project Code No. : 510008 Checked : AMK
Calc. No. : PE-P20081 Revision : IFC SUB
Subject : Bldg-A9, Operators Shelter, Design RC Roof Slab, 'S2' Rev. No. : 00

NON-LINEAR (ELASTO-PLASTIC) SDOF ANALYSIS - Ref: Introduction to Structural Dynamics by John M. Biggs

SUPPORT REACTION COEFFICIENTS (for Support Reaction, V)

Wall Support Reaction Coefficients


Loading Diagram Strain Range Supports (Short Span), Va Supports (Long Span), Vb
Rstnce, CR Force, CF Rstnce, CR Force, CF

Elastic 0.13 0.09 0.18 0.10

Plastic 0.14 0.08 0.19 0.09

Where:
a = short clear span, ℓa
b = long clear span, ℓb

RESPONSE GRAPH (Based on calculated values from the table on next page…..)

Dyn. Load/Deformation vs. Time Dyn. Load, F
Deformation, y / 75
Deformation y / 75
2000.00 

1500.00 

1000.00 

500.00 

0.00 

‐500.00 

‐1000.00 
0.0000 

0.1000 

0.2000 

0.3000 

0.4000 

0.5000 

0.6000 

Support Reaction, Va
Support Reaction/Resistance vs. Time Support Reaction, Vb
Resistance, R
3000.00 
2500.00 
2000.00 
1500.00 
1000.00 
500.00 
0.00 
‐500.00 
‐1000.00 
‐1500.00 
‐2000.00 
0.0000 

0.1000 

0.2000 

0.3000 

0.4000 

0.5000 

0.6000 

ISSUED FOR CONSTRUCTION (IFC)

26 JAN 2022
Calculation Report, OPERATION SHELTER, Plant Plant No. 015 Page 216 of 281
DESIGN INPUT

26 JAN 2022
Subject
time increment, ∆t 0.003 secs

Calc. No.
PROJECT

ISSUED FOR CONSTRUCTION (IFC)


mass, M 0.120 kN-s²/mm
stiffness, K 270.157 kN/mm

Project Code No.


damping, C 0.000 kN-s/mm

EWO / B.I. Number


positive resistance, Ru+ 3151.827 kN
rebound resistance, Ru- -3151.827 kN
static load, Fs 346.626 kN

LEGEND : : 510008
KEY = 0 is elastic Z= 1 is increasing plastic deformation : PE-P20081
KEY = +1 is positive plastic Z= 2 is end of rebound plastic deformation
KEY = -1 is rebound plastic Z= 3 is end of positive plastic deformation
: 10-02062-0002-001

Z= 4 is continued elastic
Z= 5 is start of rebound plastic deformation
Z= 6 is start of positive plastic deformation

Numerical Integration (Newmark-Beta Method)


Dyn. Def. @ Yield pt. Dyn. Reaction, V Ductile
Time, Def. Vel. Acc. Rstnce incr incr incr
Load, KEY eff K Z Ratio

Calculation Report, OPERATION SHELTER, Plant Plant No. 015


t y v a R ye+ ye- F y v Va Vb
F μ
secs kN mm mm/s mm/s² kN mm mm kN/mm kN mm mm/s kN/m kN/m
0.0000 0.00 1.28 0.00 0.00 346.63 11.67 -11.67 0 80163.05 439.26 0.01 5.48 45.41 62.05 -
: Updrade Buildings for Risk Mitigation - RT Refinery
SNC-LAVALIN FAYEZ ENGINE

0 0030
0.0030 439 26
439.26 1 29
1.29 5 48
5.48 3653 05
3653.05 348 11
348.11 11 67
11.67 -11 67
-11.67 0 80163 05
80163.05 3065 94
3065.94 0 04
0.04 16 33
16.33 4 83 15
83.15 108 22
108.22 -
: Bldg-A9, Operators Shelter, Design RC Roof Slab, 'S2
2'

0.0060 878.52 1.33 21.81 7232.24 358.44 11.67 -11.67 0 80163.05 8266.18 0.10 26.85 4 122.06 155.97 -
CALCULATION

0.0090 1317.78 1.43 48.65 10665.19 386.30 11.67 -11.67 0 80163.05 15934.83 0.20 36.82 4 163.27 206.86 -
0.0120 1757.04 1.63 85.48 13882.48 440.00 11.67 -11.67 0 80163.05 25500.87 0.32 40.86 4 207.86 262.38 -
0.0150 1780.34 1.95 126.34 13359.80 525.94 11.67 -11.67 0 80163.05 34948.29 0.44 36.91 4 221.11 280.20 -
0.0180 1644.88 2.38 163.25 11246.64 643.72 11.67 -11.67 0 80163.05 43035.03 0.54 30.23 4 224.95 287.13 -
0.0210 1509.42 2.92 193.48 8906.07 788.75 11.67 -11.67 0 80163.05 49438.82 0.62 22.94 4 232.37 298.93 -
SHEET

0.0240 1373.96 3.54 216.41 6385.42 955.36 11.67 -11.67 0 80163.05 54030.16 0.67 15.18 4 242.61 314.60 -
0.0270 1238.50 4.21 231.60 3735.64 1137.45 11.67 -11.67 0 80163.05 56716.22 0.71 7.12 4 254.88 333.04 -
0.0300 1103.04 4.92 238.72 1010.33 1328.59 11.67 -11.67 0 80163.05 57442.69 0.72 -1.09 4 268.34 353.10 -
0.0330 967.58 5.63 237.63 -1735.41 1522.18 11.67 -11.67 0 80163.05 56194.87 0.70 -9.27 4 282.12 373.60 -
0.0360 832.12 6.34 228.36 -4446.06 1711.56 11.67 -11.67 0 80163.05 52997.99 0.66 -17.27 4 295.34 393.34 -
EERING, Al Khobar, Saudi Arabia

0.0390 696.66 7.00 211.09 -7066.81 1890.17 11.67 -11.67 0 80163.05 47916.70 0.60 -24.92 4 307.16 411.16 -
0.0420 561.20 7.59 186.17 -9544.66 2051.65 11.67 -11.67 0 80163.05 41053.75 0.51 -32.06 4 316.73 425.91 -
Revision

0.0450 425.74 8.11 154.11 -11829.51 2190.01 11.67 -11.67 0 80163.05 32547.90 0.41 -38.56 4 323.27 436.52 -
Rev. No.
Checked
Designed

0.0480 290.28 8.51 115.55 -13875.17 2299.70 11.67 -11.67 0 80163.05 22571.16 0.28 -44.27 4 326.06 442.00 -
0.0510 154.82 8.79 71.28 -15640.26 2375.76 11.67 -11.67 0 80163.05 11325.25 0.14 -49.09 4 324.44 441.46 -
0.0540 19.36 8.94 22.18 -17089.09 2413.93 11.67 -11.67 0 80163.05 -846.32 -0.01 -51.47 4 317.86 434.14 -
:
:
:
:

0.0570 0.00 8.92 -29.29 -17226.83 2411.08 11.67 -11.67 0 80163.05 -13213.68 -0.16 -51.12 4 315.83 431.60 -
0.0600 0.00 8.76 -80.41 -16855.24 2366.55 11.67 -11.67 0 80163.05 -25333.20 -0.32 -49.50 4 310.00 423.63 -
0.0630 0.00 8.44 -129.91 -16142.83 2281.17 11.67 -11.67 0 80163.05 -36940.48 -0.46 -46.87 4 298.82 408.35 -
00
NFP

AMK

IFC SUB

0.0660 0.00 7.98 -176.78 -15103.99 2156.68 11.67 -11.67 0 80163.05 -47800.79 -0.60 -43.30 4 282.51 386.06 -
0.0690 0.00 7.39 -220.08 -13759.75 1995.59 11.67 -11.67 0 80163.05 -57694.55 -0.72 -38.85 4 261.41 357.23 -
0.0720 0.00 6.67 -258.92 -12137.28 1801.15 11.67 -11.67 0 80163.05 -66421.69 -0.83 -33.61 4 235.94 322.42 -

Page 217 of 281


0.0750 0.00 5.84 -292.53 -10269.38 1577.30 11.67 -11.67 0 80163.05 -73805.74 -0.92 -27.69 4 206.61 282.35 -
0.0780 0.00 4.92 -320.23 -8193.83 1328.57 11.67 -11.67 0 80163.05 -79697.40 -0.99 -21.22 4 174.03 237.82 -
0.0810 0.00 3.92 -341.45 -5952.60 1059.98 11.67 -11.67 0 80163.05 -83977.53 -1.05 -14.32 4 138.85 189.74 -

26 JAN 2022
Subject
0.0840 0.00 2.88 -355.76 -3591.00 776.97 11.67 -11.67 0 80163.05 -86559.59 -1.08 -7.12 4 101.78 139.08 -

Calc. No.
PROJECT

ISSUED FOR CONSTRUCTION (IFC)


0.0870 0.00 1.80 -362.88 -1156.79 485.25 11.67 -11.67 0 80163.05 -87391.36 -1.09 0.22 4 63.56 86.86 -
0.0900 0.00 0.71 -362.67 1300.81 190.74 11.67 -11.67 0 80163.05 -86456.03 -1.08 7.55 4 24.99 34.14 -

Project Code No.


0.0930 0.00 -0.37 -355.12 3732.11 -100.63 11.67 -11.67 0 80163.05 -83772.51 -1.05 14.73 4 -13.18 -18.01 -

EWO / B.I. Number


0.0960 0.00 -1.42 -340.39 6087.94 -382.95 11.67 -11.67 0 80163.05 -79395.05 -0.99 21.61 4 -50.16 -68.55 -
0.0990 0.00 -2.41 -318.78 8320.68 -650.52 11.67 -11.67 0 80163.05 -73412.19 -0.92 28.06 4 -85.21 -116.45 -
0.1020 0.00 -3.32 -290.72 10385.16 -897.92 11.67 -11.67 0 80163.05 -65944.89 -0.82 33.94 4 -117.62 -160.74 -
0.1050 0.00 -4.15 -256.78 12239.65 -1120.17 11.67 -11.67 0 80163.05 -57144.14 -0.71 39.13 4 -146.73 -200.52 -
0.1080 0.00 -4.86 -217.65 13846.64 -1312.75 11.67 -11.67 0 80163.05 -47187.91 -0.59 43.53 4 -171.96 -234.99 - : 510008
0.1110 0.00 -5.45 -174.12 15173.65 -1471.77 11.67 -11.67 0 80163.05 -36277.50 -0.45 47.05 4 -192.79 -263.46 - : PE-P20081
0.1140 0.00 -5.90 -127.07 16193.84 -1594.03 11.67 -11.67 0 80163.05 -24633.55 -0.31 49.62 4 -208.81 -285.34 -
0.1170 0.00 -6.21 -77.45 16886.58 -1677.05 11.67 -11.67 0 80163.05 -12491.49 -0.16 51.19 4 -219.68 -300.20 -
: 10-02062-0002-001

0.1200 0.00 -6.36 -26.26 17237.86 -1719.15 11.67 -11.67 0 80163.05 -96.85 0.00 51.72 4 -225.20 -307.74 -
0.1230 0.00 -6.36 25.46 17240.58 -1719.47 11.67 -11.67 0 80163.05 12299.75 0.15 51.20 4 -225.24 -307.80 -
0.1260 0.00 -6.21 76.66 16894.69 -1678.02 11.67 -11.67 0 80163.05 24447.64 0.30 49.65 4 -219.81 -300.38 -
0.1290 0.00 -5.91 126.31 16207.18 -1595.63 11.67 -11.67 0 80163.05 36101.19 0.45 47.10 4 -209.02 -285.63 -
0.1320 0.00 -5.46 173.41 15191.95 -1473.97 11.67 -11.67 0 80163.05 47024.75 0.59 43.59 4 -193.08 -263.85 -
0.1350 0.00 -4.87 217.00 13869.53 -1315.49 11.67 -11.67 0 80163.05 56997.45 0.71 39.20 4 -172.32 -235.48 -
0.1380 0.00 -4.16 256.21 12266.66 -1123.40 11.67 -11.67 0 80163.05 65817.62 0.82 34.02 4 -147.16 -201.10 -

Calculation Report, OPERATION SHELTER, Plant Plant No. 015


0.1410 0.00 -3.34 290.23 10415.75 -901.59 11.67 -11.67 0 80163.05 73306.92 0.91 28.15 4 -118.10 -161.39 -
0.1440 0.00 -2.42 318.39 8354.23 -654.54 11.67 -11.67 0 80163.05 79313.91 0.99 21.72 4 -85.74 -117.17 -
0.1470 0.00 -1.43 340.10 6123.78 -387.24 11.67 -11.67 0 80163.05 83717.13 1.04 14.84 4 -50.73 -69.32 -
: Updrade Buildings for Risk Mitigation - RT Refinery

0 1500
0.1500 0 00
0.00 -0 39
-0.39 354 94
354.94 3769 51
3769.51 -105 11
-105.11 11 67
11.67 -11 67
-11.67 0 80163 05
80163.05 86427 54
86427.54 1 08
1.08 7 66
7.66 4 -13 77
-13.77 -18 82
-18.82 -
SNC-LAVALIN FAYEZ ENGINEE

: Bldg-A9, Operators Shelter, Design RC Roof Slab, 'S2


2'

0.1530 0.00 0.69 362.61 1339.01 186.16 11.67 -11.67 0 80163.05 87390.34 1.09 0.33 4 24.39 33.32 -
CALCULATION

0.1560 0.00 1.78 362.94 -1118.56 480.67 11.67 -11.67 0 80163.05 86586.05 1.08 -7.01 4 62.96 86.04 -
0.1590 0.00 2.86 355.93 -3553.52 772.48 11.67 -11.67 0 80163.05 84030.94 1.05 -14.21 4 101.19 138.28 -
0.1620 0.00 3.91 341.72 -5916.62 1055.67 11.67 -11.67 0 80163.05 79776.68 1.00 -21.12 4 138.28 188.97 -
0.1650 0.00 4.90 320.61 -8160.08 1324.52 11.67 -11.67 0 80163.05 73909.29 0.92 -27.60 4 173.50 237.10 -
0.1680 0.00 5.82 293.01 -10238.54 1573.61 11.67 -11.67 0 80163.05 66547.41 0.83 -33.52 4 206.13 281.69 -
SHEET

0.1710 0.00 6.65 259.49 -12109.97 1797.88 11.67 -11.67 0 80163.05 57839.90 0.72 -38.77 4 235.51 321.83 -
0.1740 0.00 7.38 220.72 -13736.54 1992.80 11.67 -11.67 0 80163.05 47962.83 0.60 -43.23 4 261.04 356.73 -
0.1770 0.00 7.97 177.49 -15085.34 2154.44 11.67 -11.67 0 80163.05 37115.93 0.46 -46.82 4 282.22 385.66 -
0.1800 0.00 8.44 130.66 -16129.10 2279.53 11.67 -11.67 0 80163.05 25518.53 0.32 -49.46 4 298.60 408.05 -
0.1830 0.00 8.76 81.20 -16846.73 2365.53 11.67 -11.67 0 80163.05 13405.12 0.17 -51.11 4 309.87 423.45 -
ERING, Al Khobar, Saudi Arabia

0.1860 0.00 8.92 30.09 -17223.71 2410.70 11.67 -11.67 0 80163.05 1020.66 0.01 -51.71 4 315.78 431.53 -
0.1890 0.00 8.94 -21.62 -17252.41 2414.14 11.67 -11.67 0 80163.05 -11384.45 -0.14 -51.28 4 316.23 432.15 -
Revision

0.1920 0.00 8.79 -72.90 -16932.26 2375.78 11.67 -11.67 0 80163.05 -23559.35 -0.29 -49.80 4 311.21 425.28 -
Rev. No.
Checked
Designed

0.1950 0.00 8.50 -122.70 -16269.73 2296.38 11.67 -11.67 0 80163.05 -35257.87 -0.44 -47.32 4 300.81 411.07 -
0.1980 0.00 8.06 -170.02 -15278.21 2177.56 11.67 -11.67 0 80163.05 -46243.46 -0.58 -43.88 4 285.24 389.80 -
0.2010 0.00 7.48 -213.91 -13977.76 2021.71 11.67 -11.67 0 80163.05 -56293.97 -0.70 -39.56 4 264.83 361.90 -
:
:
:
:

0.2040 0.00 6.78 -253.46 -12394.68 1832.00 11.67 -11.67 0 80163.05 -65206.19 -0.81 -34.43 4 239.98 327.94 -
0.2070 0.00 5.97 -287.90 -10560.96 1612.24 11.67 -11.67 0 80163.05 -72799.90 -0.91 -28.61 4 211.19 288.60 -
0.2100 0.00 5.06 -316.51 -8513.70 1366.90 11.67 -11.67 0 80163.05 -78921.56 -0.98 -22.21 4 179.05 244.69 -
00
NFP

AMK

IFC SUB

0.2130 0.00 4.08 -338.72 -6294.28 1100.93 11.67 -11.67 0 80163.05 -83447.37 -1.04 -15.36 4 144.21 197.07 -
0.2160 0.00 3.03 -354.08 -3947.59 819.70 11.67 -11.67 0 80163.05 -86285.84 -1.08 -8.20 4 107.37 146.73 -
0.2190 0.00 1.96 -362.29 -1521.08 528.91 11.67 -11.67 0 80163.05 -87379.55 -1.09 -0.88 4 69.28 94.68 -

Page 218 of 281


0.2220 0.00 0.87 -363.17 936.19 234.43 11.67 -11.67 0 80163.05 -86706.40 -1.08 6.47 4 30.71 41.97 -
0.2250 0.00 -0.21 -356.70 3374.53 -57.78 11.67 -11.67 0 80163.05 -84279.99 -1.05 13.68 4 -7.57 -10.34 -
0.2280 0.00 -1.27 -343.02 5744.63 -341.81 11.67 -11.67 0 80163.05 -80149.39 -1.00 20.61 4 -44.77 -61.19 -

26 JAN 2022
Subject
0.2310 0.00 -2.27 -322.41 7998.57 -611.92 11.67 -11.67 0 80163.05 -74398.13 -0.93 27.13 4 -80.16 -109.54 -

Calc. No.
PROJECT

ISSUED FOR CONSTRUCTION (IFC)


0.2340 0.00 -3.19 -295.27 10090.78 -862.65 11.67 -11.67 0 80163.05 -67142.49 -0.84 33.10 4 -113.00 -154.42 -
0.2370 0.00 -4.03 -262.17 11978.95 -1088.92 11.67 -11.67 0 80163.05 -58529.20 -0.73 38.41 4 -142.64 -194.93 -

Project Code No.


0.2400 0.00 -4.76 -223.76 13624.90 -1286.17 11.67 -11.67 0 80163.05 -48732.40 -0.61 42.93 4 -168.48 -230.23 -

EWO / B.I. Number


0.2430 0.00 -5.37 -180.83 14995.34 -1450.41 11.67 -11.67 0 80163.05 -37950.22 -0.47 46.59 4 -189.99 -259.63 -
0.2460 0.00 -5.84 -134.24 16062.57 -1578.30 11.67 -11.67 0 80163.05 -26400.65 -0.33 49.30 4 -206.75 -282.53 -
0.2490 0.00 -6.17 -84.94 16805.00 -1667.27 11.67 -11.67 0 80163.05 -14317.25 -0.18 51.02 4 -218.40 -298.45 -
0.2520 0.00 -6.35 -33.92 17207.63 -1715.52 11.67 -11.67 0 80163.05 -1944.35 -0.02 51.70 4 -224.72 -307.09 -
0.2550 0.00 -6.37 17.78 17262.31 -1722.08 11.67 -11.67 0 80163.05 10467.87 0.13 51.35 4 -225.58 -308.26 - : 510008
0.2580 0.00 -6.24 69.13 16967.93 -1686.80 11.67 -11.67 0 80163.05 22668.42 0.28 49.95 4 -220.96 -301.95 - : PE-P20081
0.2610 0.00 -5.96 119.07 16330.45 -1610.40 11.67 -11.67 0 80163.05 34410.61 0.43 47.54 4 -210.95 -288.27 -
0.2640 0.00 -5.53 166.61 15362.77 -1494.44 11.67 -11.67 0 80163.05 45456.99 0.57 44.17 4 -195.76 -267.52 -
: 10-02062-0002-001

0.2670 0.00 -4.96 210.78 14084.43 -1341.24 11.67 -11.67 0 80163.05 55584.21 0.69 39.91 4 -175.69 -240.09 -
0.2700 0.00 -4.27 250.69 12521.31 -1153.92 11.67 -11.67 0 80163.05 64587.48 0.81 34.84 4 -151.15 -206.56 -
0.2730 0.00 -3.47 285.53 10704.99 -936.25 11.67 -11.67 0 80163.05 72284.75 0.90 29.07 4 -122.64 -167.60 -
0.2760 0.00 -2.56 314.60 8672.21 -692.65 11.67 -11.67 0 80163.05 78520.39 0.98 22.70 4 -90.73 -123.99 -
0.2790 0.00 -1.58 337.30 6464.08 -428.03 11.67 -11.67 0 80163.05 83168.29 1.04 15.88 4 -56.07 -76.62 -
0.2820 0.00 -0.55 353.19 4125.24 -147.74 11.67 -11.67 0 80163.05 86134.49 1.07 8.74 4 -19.35 -26.45 -
0.2850 0.00 0.53 361.93 1702.98 142.54 11.67 -11.67 0 80163.05 87358.99 1.09 1.42 4 18.67 25.52 -

Calculation Report, OPERATION SHELTER, Plant Plant No. 015


0.2880 0.00 1.62 363.35 -753.71 436.95 11.67 -11.67 0 80163.05 86817.05 1.08 -5.92 4 57.24 78.22 -
0.2910 0.00 2.70 357.43 -3195.16 729.53 11.67 -11.67 0 80163.05 84519.62 1.05 -13.15 4 95.56 130.59 -
0.2940 0.00 3.75 344.28 -5572.00 1014.37 11.67 -11.67 0 80163.05 80513.15 1.00 -20.11 4 132.87 181.58 -
: Updrade Buildings for Risk Mitigation - RT Refinery

0 2970
0.2970 0 00
0.00 4 76
4.76 324 17
324.17 -7836 17
-7836.17 1285 71
1285.71 11 67
11.67 -11 67
-11.67 0 80163 05
80163.05 74878 66
74878.66 0 93
0.93 -26 67
-26.67 4 168 42
168.42 230 15
230.15 -
SNC-LAVALIN FAYEZ ENGINEE

: Bldg-A9, Operators Shelter, Design RC Roof Slab, 'S2


2'

0.3000 0.00 5.69 297.50 -9941.90 1538.06 11.67 -11.67 0 80163.05 67730.07 0.84 -32.68 4 201.47 275.32 -
CALCULATION

0.3030 0.00 6.54 264.82 -11846.59 1766.31 11.67 -11.67 0 80163.05 59211.95 0.74 -38.04 4 231.37 316.18 -
0.3060 0.00 7.28 226.78 -13511.73 1965.86 11.67 -11.67 0 80163.05 49496.53 0.62 -42.62 4 257.51 351.90 -
0.3090 0.00 7.89 184.16 -14903.66 2132.67 11.67 -11.67 0 80163.05 38780.26 0.48 -46.35 4 279.36 381.76 -
0.3120 0.00 8.38 137.81 -15994.23 2263.36 11.67 -11.67 0 80163.05 27279.83 0.34 -49.13 4 296.48 405.16 -
0.3150 0.00 8.72 88.68 -16761.39 2355.30 11.67 -11.67 0 80163.05 15227.78 0.19 -50.93 4 308.53 421.62 -
SHEET

0.3180 0.00 8.91 37.75 -17189.62 2406.62 11.67 -11.67 0 80163.05 2867.82 0.04 -51.69 4 315.25 430.80 -
0.3210 0.00 8.94 -13.94 -17270.27 2416.28 11.67 -11.67 0 80163.05 -9550.13 -0.12 -51.41 4 316.51 432.53 -
0.3240 0.00 8.82 -65.35 -17001.71 2384.10 11.67 -11.67 0 80163.05 -21774.97 -0.27 -50.09 4 312.30 426.77 -
0.3270 0.00 8.55 -115.43 -16389.35 2310.72 11.67 -11.67 0 80163.05 -33559.50 -0.42 -47.75 4 302.69 413.64 -
0.3300 0.00 8.13 -163.19 -15445.60 2197.62 11.67 -11.67 0 80163.05 -44665.45 -0.56 -44.45 4 287.87 393.39 -
ERING, Al Khobar, Saudi Arabia

0.3330 0.00 7.58 -207.64 -14189.53 2047.09 11.67 -11.67 0 80163.05 -54868.23 -0.68 -40.25 4 268.15 366.44 -
0.3360 0.00 6.89 -247.89 -12646.54 1862.18 11.67 -11.67 0 80163.05 -63961.55 -0.80 -35.24 4 243.93 333.34 -
Revision

0.3390 0.00 6.10 -283.14 -10847.82 1646.62 11.67 -11.67 0 80163.05 -71761.52 -0.90 -29.52 4 215.69 294.76 -
Rev. No.
Checked
Designed

0.3420 0.00 5.20 -312.65 -8829.76 1404.78 11.67 -11.67 0 80163.05 -78110.44 -0.97 -23.19 4 184.02 251.47 -
0.3450 0.00 4.23 -335.85 -6633.16 1141.54 11.67 -11.67 0 80163.05 -82879.92 -1.03 -16.40 4 149.53 204.34 -
0.3480 0.00 3.19 -352.25 -4302.42 862.23 11.67 -11.67 0 80163.05 -85973.51 -1.07 -9.28 4 112.94 154.34 -
:
:
:
:

0.3510 0.00 2.12 -361.53 -1884.70 572.49 11.67 -11.67 0 80163.05 -87328.68 -1.09 -1.97 4 74.99 102.48 -
0.3540 0.00 1.03 -363.50 571.14 278.18 11.67 -11.67 0 80163.05 -86918.01 -1.08 5.38 4 36.44 49.80 -
0.3570 0.00 -0.05 -358.12 3015.43 -14.74 11.67 -11.67 0 80163.05 -84749.80 -1.06 12.62 4 -1.93 -2.64 -
00
NFP

AMK

IFC SUB

0.3600 0.00 -1.11 -345.50 5398.75 -300.36 11.67 -11.67 0 80163.05 -80867.91 -1.01 19.61 4 -39.34 -53.77 -
0.3630 0.00 -2.12 -325.89 7672.90 -572.89 11.67 -11.67 0 80163.05 -75350.82 -0.94 26.20 4 -75.04 -102.55 -
0.3660 0.00 -3.06 -299.69 9791.90 -826.83 11.67 -11.67 0 80163.05 -68310.09 -0.85 32.26 4 -108.31 -148.01 -

Page 219 of 281


0.3690 0.00 -3.91 -267.44 11712.90 -1057.04 11.67 -11.67 0 80163.05 -59888.09 -0.75 37.66 4 -138.46 -189.22 -
0.3720 0.00 -4.66 -229.77 13397.06 -1258.87 11.67 -11.67 0 80163.05 -50255.12 -0.63 42.31 4 -164.90 -225.35 -
0.3750 0.00 -5.29 -187.46 14810.32 -1428.23 11.67 -11.67 0 80163.05 -39605.96 -0.49 46.10 4 -187.09 -255.66 -

26 JAN 2022
Subject
0.3780 0.00 -5.78 -141.36 15924.12 -1561.71 11.67 -11.67 0 80163.05 -28155.95 -0.35 48.96 4 -204.57 -279.56 -

Calc. No.
PROJECT

ISSUED FOR CONSTRUCTION (IFC)


0.3810 0.00 -6.13 -92.40 16715.91 -1656.60 11.67 -11.67 0 80163.05 -16136.61 -0.20 50.83 4 -217.00 -296.54 -
0.3840 0.00 -6.33 -41.57 17169.70 -1710.98 11.67 -11.67 0 80163.05 -3790.97 -0.05 51.67 4 -224.13 -306.28 -

Project Code No.


0.3870 0.00 -6.38 10.10 17276.31 -1723.76 11.67 -11.67 0 80163.05 8631.31 0.11 51.46 4 -225.80 -308.57 -

EWO / B.I. Number


0.3900 0.00 -6.27 61.56 17033.58 -1694.67 11.67 -11.67 0 80163.05 20879.07 0.26 50.22 4 -221.99 -303.36 -
0.3930 0.00 -6.01 111.78 16446.43 -1624.30 11.67 -11.67 0 80163.05 32704.65 0.41 47.96 4 -212.77 -290.76 -
0.3960 0.00 -5.60 159.74 15526.71 -1514.08 11.67 -11.67 0 80163.05 43868.91 0.55 44.73 4 -198.33 -271.03 -
0.3990 0.00 -5.06 204.47 14293.04 -1366.24 11.67 -11.67 0 80163.05 54146.12 0.68 40.60 4 -178.97 -244.57 -
0.4020 0.00 -4.38 245.07 12770.35 -1183.76 11.67 -11.67 0 80163.05 63328.47 0.79 35.64 4 -155.06 -211.90 - : 510008
0.4050 0.00 -3.59 280.71 10989.44 -970.34 11.67 -11.67 0 80163.05 71230.27 0.89 29.96 4 -127.11 -173.70 - : PE-P20081
0.4080 0.00 -2.70 310.67 8986.32 -730.29 11.67 -11.67 0 80163.05 77691.76 0.97 23.68 4 -95.66 -130.73 -
0.4110 0.00 -1.73 334.35 6801.49 -468.46 11.67 -11.67 0 80163.05 82582.28 1.03 16.92 4 -61.36 -83.86 -
: 10-02062-0002-001

0.4140 0.00 -0.70 351.27 4479.13 -190.15 11.67 -11.67 0 80163.05 85802.93 1.07 9.82 4 -24.91 -34.04 -
0.4170 0.00 0.37 361.09 2066.20 99.01 11.67 -11.67 0 80163.05 87288.60 1.09 2.52 4 12.97 17.72 -
0.4200 0.00 1.46 363.61 -388.51 393.19 11.67 -11.67 0 80163.05 87009.25 1.09 -4.84 4 51.50 70.38 -
0.4230 0.00 2.54 358.77 -2835.37 686.41 11.67 -11.67 0 80163.05 84970.51 1.06 -12.09 4 89.92 122.87 -
0.4260 0.00 3.60 346.68 -5224.89 972.77 11.67 -11.67 0 80163.05 81213.63 1.01 -19.10 4 127.43 174.13 -
0.4290 0.00 4.61 327.58 -7508.77 1246.47 11.67 -11.67 0 80163.05 75814.56 0.95 -25.72 4 163.28 223.13 -
0.4320 0.00 5.56 301.86 -9640.81 1501.97 11.67 -11.67 0 80163.05 68882.47 0.86 -31.83 4 196.75 268.86 -

Calculation Report, OPERATION SHELTER, Plant Plant No. 015


0.4350 0.00 6.42 270.03 -11577.90 1734.11 11.67 -11.67 0 80163.05 60557.54 0.76 -37.29 4 227.16 310.42 -
0.4380 0.00 7.17 232.74 -13280.89 1938.20 11.67 -11.67 0 80163.05 51008.10 0.64 -41.99 4 253.89 346.95 -
0.4410 0.00 7.81 190.75 -14715.33 2110.10 11.67 -11.67 0 80163.05 40427.24 0.50 -45.85 4 276.41 377.72 -
: Updrade Buildings for Risk Mitigation - RT Refinery

0 4440
0.4440 0 00
0.00 8 31
8.31 144 89
144.89 -15852 22
-15852.22 2246 35
2246.35 11 67
11.67 -11 67
-11.67 0 80163 05
80163.05 29028 93
29028.93 0 36
0.36 -48 78
-48.78 4 294 25
294.25 402 11
402.11 -
SNC-LAVALIN FAYEZ ENGINEE

: Bldg-A9, Operators Shelter, Design RC Roof Slab, 'S2


2'

0.4470 0.00 8.68 96.11 -16668.56 2344.18 11.67 -11.67 0 80163.05 17043.63 0.21 -50.72 4 307.07 419.63 -
CALCULATION

0.4500 0.00 8.89 45.39 -17147.86 2401.61 11.67 -11.67 0 80163.05 4713.70 0.06 -51.64 4 314.59 429.91 -
0.4530 0.00 8.95 -6.25 -17280.42 2417.50 11.67 -11.67 0 80163.05 -7711.54 -0.10 -51.52 4 316.67 432.75 -
0.4560 0.00 8.85 -57.77 -17063.55 2391.51 11.67 -11.67 0 80163.05 -19980.85 -0.25 -50.35 4 313.27 428.10 -
0.4590 0.00 8.60 -108.12 -16501.66 2324.17 11.67 -11.67 0 80163.05 -31846.14 -0.40 -48.16 4 304.45 416.04 -
0.4620 0.00 8.21 -156.28 -15606.09 2216.85 11.67 -11.67 0 80163.05 -43067.47 -0.54 -45.00 4 290.39 396.83 -
SHEET

0.4650 0.00 7.67 -201.28 -14394.95 2071.71 11.67 -11.67 0 80163.05 -53417.96 -0.67 -40.93 4 271.38 370.85 -
0.4680 0.00 7.00 -242.21 -12892.74 1891.68 11.67 -11.67 0 80163.05 -62688.31 -0.78 -36.03 4 247.80 338.63 -
0.4710 0.00 6.22 -278.25 -11129.84 1680.42 11.67 -11.67 0 80163.05 -70691.07 -0.88 -30.41 4 220.12 300.81 -
0.4740 0.00 5.34 -308.65 -9141.88 1442.18 11.67 -11.67 0 80163.05 -77264.41 -0.96 -24.17 4 188.91 258.16 -
0.4770 0.00 4.37 -332.82 -6969.06 1181.79 11.67 -11.67 0 80163.05 -82275.41 -1.03 -17.44 4 154.81 211.55 -
ERING, Al Khobar, Saudi Arabia

0.4800 0.00 3.35 -350.26 -4655.33 904.52 11.67 -11.67 0 80163.05 -85622.77 -1.07 -10.35 4 118.48 161.92 -
0.4830 0.00 2.28 -360.61 -2247.47 615.96 11.67 -11.67 0 80163.05 -87238.78 -1.09 -3.06 4 80.69 110.26 -
Revision

0.4860 0.00 1.19 -363.67 205.84 321.96 11.67 -11.67 0 80163.05 -87090.77 -1.09 4.29 4 42.17 57.63 -
Rev. No.
Checked
Designed

0.4890 0.00 0.11 -359.38 2654.99 28.45 11.67 -11.67 0 80163.05 -85181.73 -1.06 11.56 4 3.73 5.09 -
0.4920 0.00 -0.96 -347.82 5050.45 -258.62 11.67 -11.67 0 80163.05 -81550.27 -1.02 18.59 4 -33.88 -46.29 -
0.4950 0.00 -1.97 -329.23 7343.79 -533.45 11.67 -11.67 0 80163.05 -76269.82 -0.95 25.25 4 -69.88 -95.49 -
:
:
:
:

RESULTS SUMMARY
00
NFP

AMK
IFC SUB

Def, y Reaction Ductility


Inbound 8.948 326.060 0.000
Rebound -6.381 -225.799 0.000

Page 220 of 281


Component/Member response remains in the elastic range…..
CALCULATION SHEET

SNC-LAVALIN FAYEZ ENGINEERING, Al Khobar, Saudi Arabia


PROJECT : Updrade Buildings for Risk Mitigation - RT Refinery
EWO / B.I. No. : 10-02062-0002-001 Designed : NFP
Project Code No. : 510008 Checked : AMK
Calc. No. : PE-P20081 Revision : IFC SUB
Subject : Bldg-A9, Operators Shelter, Design RC Roof Slab, 'S2' Rev. No. : 00

DEFORMATION LIMITS (RESPONSE CRITERIA) - As per BDR and SAES-M-009

Member / Component : Slab


Material : Concrete
Short Span, La : 5600.000 mm
Response Criteria : High (Refer to BDR datasheet and SAES-M-009, Table-9)
Support Rotation, θ : n/a (SAES-M-009, Table-9) RC Component (Shear control without Shear
Ductility Ratio, μ : 1.30 (SAES-M-009, Table-9) reinforcement)

CHECK DEFORMATION AND DUCTILITY RATIO


Support Rotation, θ1:

xm = Deformation, y = 8.948 mm
 xm 
1  Arc tan   = n/a
 0.5 L 

Ductility Ratio, μ:

Max Ductilty Ratio = 0.767 < 1.30 Response remains in the elastic range!

RC roof slab design is acceptable…..

ISSUED FOR CONSTRUCTION (IFC)

26 JAN 2022
Calculation Report, OPERATION SHELTER, Plant Plant No. 015 Page 221 of 281
CALCULATION SHEET

SNC-LAVALIN FAYEZ ENGINEERING, Al Khobar, Saudi Arabia


PROJECT : Updrade Buildings for Risk Mitigation - RT Refinery
B.I Number : 10-02062-0002-001 Designed : AIA / NFP
Project Code No. : 510008 Checcked : NFP / AKM
Calc. No. : PE-P20081 Reviision : IFC Sub
Subject : Structural Calculation - Operator Shelter, Plant No. 015 (Bldg-A9) Rev.. No. : 00

4.4 ROOF BEAM DESIGN

ISSUED FOR CONSTRUCTION (IFC)

26 JAN 2022
Calculation Report, OPERATION SHELTER, Plant Plant No. 015 Page 222 of 281
CALCULATION SHEET

SNC-LAVALIN FAYEZ ENGINEERING, Al Khobar, Saudi Arabia


PROJECT : Updrade Buildings for Risk Mitigation - RT Refinery
B.I Number : 10-02062-0002-001 Designed : AIA / NFP
Project Code No. : 510008 Checcked : NFP / AKM
Calc. No. : PE-P20081 Reviision : IFC Sub
Subject : Structural Calculation - Operator Shelter, Plant No. 015 (Bldg-A9) Rev.. No. : 00

4.4.1 ROOF BEAM, 'RB1' DESIGN

ISSUED FOR CONSTRUCTION (IFC)

26 JAN 2022
Calculation Report, OPERATION SHELTER, Plant Plant No. 015 Page 223 of 281
CALCULATION SHEET

SNC-LAVALIN FAYEZ ENGINEERING, Al Khobar, Saudi Arabia


PROJECT : Updrade Buildings for Risk Mitigation - RT Refinery
EWO / B.I. No. : 10-02062-0002-001 Designed : NFP
Project Code No. : 510008 Checked : AMK
Calc. No. : PE-P20081 Revision : IFC SUB
Subject : Building A9, Design of RC Beam, RB1 Rev. No. : 00

DEAD LOAD AND BLAST LOAD ON RC BEAM COMPONENT

Dimensions:
Beam Spacing 5.525 m (Tributary width, average of S1, S2) see attached drawing (Roof Framing Plan)
Beam Span, L 5.400 m see attached drawing (Roof Framing Plan)

Figure - ETABS Model (Roof Beams are highlighted)


Plan - ETABS Structure Model
Beam Shear Diagram (Static Dead Loads):

Considering the Beam located along Grid-4 spanning


between Grid-A & Grid-C.

See attached drawing RA-462171


RA 462171.

Compute Static Dead Load on RC Beam


Support Reaction @ Left Support 90.096 kN
Support Reaction @ Right Support 99.265 kN
S (Support Reactions) 189.361 kN

Support Re actions 
UDL 
L

Total Static DLUDL = 35.067 kN/m

Define the Dynamic Blast Load on RC Beam (Refer to Blast Load Calculation on next page…..)
Blast Pressure on Roof (Refer to Blast Load Calc on next page…..):
Blast Pressure (P) vs. Time (t)
Blast Roof Pressure, Par = 51.210 kPa 60.000

Rise time, tr = 0.012 secs 50.000


Blast Pressure, P

40.000
Time duration, to = 0.054 secs
30.000
20.000
0.000 0.000
10.000
0.012 #####
0.000
0.054 0.000
0.000

0.010

0.020

0.030

0.040

0.050

0.060

Time, t

ISSUED FOR CONSTRUCTION (IFC)

26 JAN 2022
Calculation Report, OPERATION SHELTER, Plant Plant No. 015 Page 224 of 281
CALCULATION SHEET

SNC-LAVALIN FAYEZ ENGINEERING, Al Khobar, Saudi Arabia


PROJECT : Updrade Buildings for Risk Mitigation - RT Refinery
EWO / B.I. No. : 10-02062-0002-001 Designed : NFP
Project Code No. : 510008 Checked : AMK
Calc. No. : PE-P20081 Revision : IFC SUB
Subject : Building A9, Design of RC Beam, RB1 Rev. No. : 00

Blast Load Tabulation:

Time Increment, ∆t = 0.003 secs < 10% of period of vibration, tn o.k.

Pressure Eqv. UDL = Dyn. Force Effective Blast Load Calculation for Beam
Time
Pa Pa x (tri. width) F = UDL x L
0.000 0.000 0.000 0.000 Pso = 72.40 (from BDR)
0.003 12.419 68.615 370.521 td = 0.042 (from BDR)
0.006 24.838 137.230 741.041 L1 = 5.40 (Frrom Grid-A (front wall) to Grid-C)
0.009 37.257 205.845 1111.562 Lw = 18.16 (See sec 2.3, Blast Load Calc pages…..)
0.012 49.676 274.460 1482.083 cd = -0.40 (See sec 2.3, Blast Load Calc pages…..)
0.015 47.973 265.052 1431.279 Lw/L1 = 3.36
0.018 44.280 244.648 1321.097 Ce = 0.80 (from figure 3.9 of ASCE-41088)
0.021 40.587 224.244 1210.916 qo = 16.78 (See sec 2.3, Blast Load Calc pages…..)
0.024 36.894 203.840 1100.734 U = 436.52 (See sec 2.3, Blast Load Calc pages…..)
0.027 33.201 183.436 990.553
0.030 29.508 163.032 880.371 Par , Equivalent peak overpressure,
0.033 25.815 142.628 770.190 Par = Ce Pso + Cd qo
0.036 22.122 122.224 660.008 Par = 51.21 kPa
0.039 18.429 101.820 549.827
0.042 14.736 81.416 439.645 tr , rise time,
0.045 11.043 61.012 329.464 tr = L1 / U
0.048 7.350 40.608 219.282 tr = 0.012 secs
0.051 3.657 20.204 109.101
0.054 0.000 0.000 0.000 to , total positive phase duration
0.057 0.000 0.000 0.000 to = tr + td
0.060 0.000 0.000 0.000 to = 0.054 secs
0.063 0.000 0.000 0.000
0.066 0.000 0.000 0.000
0.069 0.000 0.000 0.000
0.072 0.000 0.000 0.000
0.075 0.000 0.000 0.000
0.078 0.000 0.000 0.000
0.081 0.000 0.000 0.000
0.084 0.000 0.000 0.000
0.087 0.000 0.000 0.000
0.090 0.000 0.000 0.000
0.093 0.000 0.000 0.000
0.096 0.000 0.000 0.000
0.099 0.000 0.000 0.000
0.102 0.000 0.000 0.000
0.105 0.000 0.000 0.000
0.108 0.000 0.000 0.000
ISSUED FOR CONSTRUCTION (IFC)

26 JAN 2022
Calculation Report, OPERATION SHELTER, Plant Plant No. 015 Page 225 of 281
CALCULATION SHEET

SNC-LAVALIN FAYEZ ENGINEERING, Al Khobar, Saudi Arabia


PROJECT : Updrade Buildings for Risk Mitigation - RT Refinery
EWO / B.I. No. : 10-02062-0002-001 Designed : NFP
Project Code No. : 510008 Checked : AMK
Calc. No. : PE-P20081 Revision : IFC SUB
Subject : Building A9, Design of RC Beam, RB1 Rev. No. : 00

0.111 0.000 0.000 0.000


0.114 0.000 0.000 0.000
0.117 0.000 0.000 0.000
0.120 0.000 0.000 0.000
0.123 0.000 0.000 0.000
0.126 0.000 0.000 0.000
0.129 0.000 0.000 0.000
0.132 0.000 0.000 0.000
0.135 0.000 0.000 0.000
0.138 0.000 0.000 0.000
0.141 0.000 0.000 0.000
0.144 0.000 0.000 0.000
0.147 0.000 0.000 0.000
0.150 0.000 0.000 0.000
0.153 0.000 0.000 0.000
0.156 0.000 0.000 0.000
0.159 0.000 0.000 0.000
0.162 0.000 0.000 0.000
0.165 0.000 0.000 0.000
0 168
0.168 0 000
0.000 0 000
0.000 0 000
0.000
0.171 0.000 0.000 0.000
0.174 0.000 0.000 0.000
0.177 0.000 0.000 0.000
0.180 0.000 0.000 0.000
0.183 0.000 0.000 0.000
0.186 0.000 0.000 0.000
0.189 0.000 0.000 0.000
0.192 0.000 0.000 0.000
0.195 0.000 0.000 0.000
0.198 0.000 0.000 0.000
0.201 0.000 0.000 0.000
0.204 0.000 0.000 0.000
0.207 0.000 0.000 0.000
0.210 0.000 0.000 0.000
0.213 0.000 0.000 0.000
0.216 0.000 0.000 0.000
0.219 0.000 0.000 0.000
0.222 0.000 0.000 0.000
0.225 0.000 0.000 0.000
0.228 0.000 0.000 0.000
0.231 0.000 0.000 0.000
0.234 0.000 0.000 0.000
0.237 0.000 0.000 0.000
0.240 0.000 0.000 0.000
0.243 0.000 0.000 0.000

ISSUED FOR CONSTRUCTION (IFC)

26 JAN 2022
Calculation Report, OPERATION SHELTER, Plant Plant No. 015 Page 226 of 281
CALCULATION SHEET

SNC-LAVALIN FAYEZ ENGINEERING, Al Khobar, Saudi Arabia


PROJECT : Updrade Buildings for Risk Mitigation - RT Refinery
EWO / B.I. No. : 10-02062-0002-001 Designed : NFP
Project Code No. : 510008 Checked : AMK
Calc. No. : PE-P20081 Revision : IFC SUB
Subject : Building A9, Design of RC Beam, RB1 Rev. No. : 00

REINFORCED CONCRETE BEAM DYNAMIC PROPERTIES - SDOF Equivalent System

Beam Dimensions and Boundary Conditions


Beam Depth, H 600 mm
Beam Width, b 400 mm
Concrete Cover 50 mm
Beam Length, L 5.40 m
Boundary Condition Fixed - Fixed

Beam Mass
Mass, M = Static DLUDL / Gravitational accelation, g
Mass, M = 19.303 kN-s²/m or 0.019 kN-s²/mm

Beam Rebar Schedule

Remarks
Rebars @ Midspan @ Support
Considering Roof Beam along
Top 1st Layer 4 of Ø16 4 of Ø16 Grid 4, spanning between Grid-A &
bars 2nd Layer 0 of Ø0 0 of Ø0 Grid-C.
Bot. 2nd Layer 0 of Ø0 0 of Ø0
bars 1st Layer 4 of Ø16 4 of Ø16 Refer to attached drawings RA-
Stirrups (4 - Legs) Ø10 @ 150 mm 462171 and RA-462173.

Material Increase Factors


Material / Strength Factor Concrete Steel Stress Type Remarks
Strength Increase Factor (SIF) 1.00 1.10 Flexure BRAND NEW MATERIAL
Dynamic Increase Factor (DIF) 1.19 1.17 Flexure

Material Strength
Concrete Unit Weight 24 kN/m³
Concrete Ult. Comp. Strength, Fc' 35.00 Mpa
Steel Yield Strength, Fy 422.00 Mpa
F'dc = Fc' x SIF x DIF 41.65 Mpa
Fds = Fy x SIF x DIF 543.114 Mpa
Conc. Modulus of Elasticity, Ec 30332.30 Mpa
Steel Modulus if Elasticity, Es 200000.00 Mpa

Compute Beam Effective Depths


@ Midspan @ Support
Positive (inbound) Negative (rebound) Positive (inbound) Negative (rebound)
Bending Resistance Bending Resistance Bending Resistance Bending Resistance
Effective depth, d 532.000 532.000 532.000 532.000
Effective depth, d' 68.000 68.000 68.000 68.000

ISSUED FOR CONSTRUCTION (IFC)

26 JAN 2022
Calculation Report, OPERATION SHELTER, Plant Plant No. 015 Page 227 of 281
CALCULATION SHEET

SNC-LAVALIN FAYEZ ENGINEERING, Al Khobar, Saudi Arabia


PROJECT : Updrade Buildings for Risk Mitigation - RT Refinery
EWO / B.I. No. : 10-02062-0002-001 Designed : NFP
Project Code No. : 510008 Checked : AMK
Calc. No. : PE-P20081 Revision : IFC SUB
Subject : Building A9, Design of RC Beam, RB1 Rev. No. : 00

Compute Beam Yield Strength


Determine β1 value as per ACI 318-08, 10.2.7.3;
0.85 
for Fdc'  28Mpa 

  0.65 
1    
 max   F '
 28    for F '
 28Mpa 
 0.85  0.05  
dc dc
 7
   
β1 = 0.7525

Maximum Values - Neutral Axis, Cmax and Depth of Stress-Block, amax;


εc(max) = 0.003 (Max concrete strain, ACI 318-08, 10.2.3)
εt(min) = 0.005 (Min steel strain, ACI 318-08, 10.3.4)

Min Limits of Steel Reinforcements:


Required minimum rebars, Asmin (ACI 318-08, 10.5.1)

 0.25 F ' 
 c
b  d 
 Fy  = 632.162 mm² (for inbound bending)
As min   max  
1 . 4  = 632.162 mm² (for rebound bending)
F b  d  
 y 

From ACI 318-11, 10.2.2 and Stress-Strain Diagram;


@ Midspan @ Support
Unit
inbound Rebound inbound Rebound
 c max 
Max Location of
cmax  d  199.500 199.500 199.500 199.500 mm
Neutral Axis, cmax  c max    t min) 
Maximum depth of
stress block, amax
amax  1cmax 150.124 150.124 150.124 150.124 mm

Total area of Reinf # of Bars x Area of 1-bar


or 804.248 804.248 804.248 804.248 mm²
Steel, Ast Min. ACI Reinforcement

Depth of Stress- As  Fds


a 30.845 30.845 30.845 30.845 mm
Block, a 0.85F ' dc b
Area of Reinforcing
804.248 804.248 804.248 804.248 mm²
Steel in Ten., As
Area of Reinforcing
As'  Ast  As 0.000 0.000 0.000 0.000 mm²
Steel in Comp., As'
  a 
Bending Moment M p  As Fds d    
  2  225.640 225.640 225.640 225.640 kN-m
Capacity, Mpc & Mps  
As' Fds d  d '

ISSUED FOR CONSTRUCTION (IFC)

26 JAN 2022
Calculation Report, OPERATION SHELTER, Plant Plant No. 015 Page 228 of 281
CALCULATION SHEET

SNC-LAVALIN FAYEZ ENGINEERING, Al Khobar, Saudi Arabia


PROJECT : Updrade Buildings for Risk Mitigation - RT Refinery
EWO / B.I. No. : 10-02062-0002-001 Designed : NFP
Project Code No. : 510008 Checked : AMK
Calc. No. : PE-P20081 Revision : IFC SUB
Subject : Building A9, Design of RC Beam, RB1 Rev. No. : 00

Compute Beam Bending Resistance & Transformation Factors (ASCE 41088, Table 6.2 )

Bending Resistance (kN) Transformation Factors


Loading Diagram Strain Range
Inbound, Rb+ Rebound, Rb- Load Fac., KL Mass Fac. KM
12M ps
Elastic Rb  501.42 501.42 0.53 0.41
L

Plastic Rb 

8 M ps  M pc  668.56 668.56 0.50 0.33
L

Compute Beam Shear Resistance


Shear Capacity of Concrete
Vc  0.17 Fc' b x d 
Vc = 233.468 kN

Shear Capacity of Shear links (Stirrups)


 Av  provided  Where:
Vs    Fys d
 s  Av = 314.159 mm² (Area of 2-legs Ø10 stirrups)
Vs = 605.148 kN

Total Shear Capacity, Vn


Vn  Vc  Vs
Vn = 838.616 kN

Shear Resistance of Beam at distance 'd' from the Support


RV = Vn L / (0.5 L - d)
RV = 2088.803 kN

Shear resistance is 120% higher than Flexural resistance, thus Flexural resistance governs…..

Compute Beam Stiffness, Ke (ASCE 41088, Table 6.2 )


Moment of Inertia for Beam Cracked Section, Icr

Singly Reinforced Beam Doubly Reinforced Beam

Es
n = 6.594
Ec
b
B = 0.075
nAs
ISSUED FOR CONSTRUCTION (IFC)

26 JAN 2022
Calculation Report, OPERATION SHELTER, Plant Plant No. 015 Page 229 of 281
CALCULATION SHEET

SNC-LAVALIN FAYEZ ENGINEERING, Al Khobar, Saudi Arabia


PROJECT : Updrade Buildings for Risk Mitigation - RT Refinery
EWO / B.I. No. : 10-02062-0002-001 Designed : NFP
Project Code No. : 510008 Checked : AMK
Calc. No. : PE-P20081 Revision : IFC SUB
Subject : Building A9, Design of RC Beam, RB1 Rev. No. : 00

Without compressio n steel :  


  
 I  bkd   nA d  kd 2 
3

 cr 3
s
  Icr 1121150571.040
  
 where  

 kd 
2dB  1  1  



kd 106.248
 B  
  4
I cr  With compressio n steel :  = 1121150571.040 mm
 
 I cr  bkd   nAs d  kd 2  n  1As' kd  d ' 2
3

 3
  
 Icr 1121150571.040
 where 
 
  rd '   kd 106.248
  1  r   1  r 
2
 2dB1  
' 
 kd   d 
; r 
n  1As   r 0.000
 B nAs  
 

Moment of Inertia for Rectangular Beam Gross Section, Ig


bh 3
Ig  = 00000000 000 mm
7200000000.000
4
12

Average Moment of Inertia, Ia


I g  I cr
Ia  = 4160575285.520 mm
4
2
Compute for Stiffness, K (as per ASCE 41088, Table 6.2)
Loading Diagram Strain Range Stiffness, Ke Unit
384 EI
Elastic K  82931.448 N/mm
L3
384 EI
E-P K 16586.290 N/mm
5 L3

Equivalent Mass, Me

Use average elastic and plastic transformation values for KLM:


elastic KLM = 0.41 / 0.53 = 0.774
plastic KLM = 0.33 / 0.50 = 0.660
Average KLM = 0.717

Me = (Avg. KLM) (M)


Me = 0.014 kN-s²/mm

ISSUED FOR CONSTRUCTION (IFC)

26 JAN 2022
Calculation Report, OPERATION SHELTER, Plant Plant No. 015 Page 230 of 281
CALCULATION SHEET

SNC-LAVALIN FAYEZ ENGINEERING, Al Khobar, Saudi Arabia


PROJECT : Updrade Buildings for Risk Mitigation - RT Refinery
EWO / B.I. No. : 10-02062-0002-001 Designed : NFP
Project Code No. : 510008 Checked : AMK
Calc. No. : PE-P20081 Revision : IFC SUB
Subject : Building A9, Design of RC Beam, RB1 Rev. No. : 00

Period of vibration, tn
Me
t n  2
Ke
tn = 0.081 secs.

Summary
Equivalent Mass, Me 0.014 kN-s²/mm
Stiffness, Ke 82.931 kN/mm
inbound resistance, Ru+ 668.563 kN
rebound resistance, Ru- -668.563 kN
static load, Fs 189.361 kN

ISSUED FOR CONSTRUCTION (IFC)

26 JAN 2022
Calculation Report, OPERATION SHELTER, Plant Plant No. 015 Page 231 of 281
CALCULATION SHEET

SNC-LAVALIN FAYEZ ENGINEERING, Al Khobar, Saudi Arabia


PROJECT : Updrade Buildings for Risk Mitigation - RT Refinery
EWO / B.I. No. : 10-02062-0002-001 Designed : NFP
Project Code No. : 510008 Checked : AMK
Calc. No. : PE-P20081 Revision : IFC SUB
Subject : Building A9, Design of RC Beam, RB1 Rev. No. : 00

NON-LINEAR (ELASTO-PLASTIC) SDOF ANALYSIS

TRANSFORMATION FACTORS (for Support Reaction, V) - ASCE 41088, Table 6.2


Coefficents
Loading Diagram Strain Range
Rstnce, CR Force, CF

Elastic 0.36 0.14

Plastic 0.38 0.12

RESPONSE GRAPH (Based on calculated values from the table on next page…..)

Dyn. Load/Deformation vs. Time Dyn. Load, F
Deformation, y / 10
1600.00  
1400.00  
1200 00
1200.00  
1000.00  
800.00  
600.00  
400.00  
200.00  
0.00  
‐200.00  
0.000 

0.100 

0.200 

0.300 

0.400 

0.500 

0.600 

Support Reaction/Resistance vs. Time Support Reaction, V
Resistance, R
800.000  

600.000  

400.000  

200.000  

0.000  

‐200.000  

‐400.000  
0.000 

0.100 

0.200 

0.300 

0.400 

0.500 

0.600 

ISSUED FOR CONSTRUCTION (IFC)

26 JAN 2022
Calculation Report, OPERATION SHELTER, Plant Plant No. 015 Page 232 of 281
DESIGN INPUT

26 JAN 2022
Subject
time increment, ∆t 0.003 secs

Calc. No.
PROJECT

ISSUED FOR CONSTRUCTION (IFC)


mass, M 0.014 kN-s²/mm
stiffness, K 82.931 kN/mm

Project Code No.


damping, C 0.000 kN-s/mm

EWO / B.I. Number


inbound resistance, Ru+ 668.563 kN
rebound resistance, Ru- -668.563 kN
static load, Fs 189.361 kN

LEGEND : : 510008

: PE-P20081
KEY = 0 is elastic Z= 1 is increasing plastic deformation
KEY = +1 is positive plastic Z= 2 is end of rebound plastic deformation
KEY = -1 is rebound plastic Z= 3 is end of positive plastic deformation
: 10-02062-0002-001

Z= 4 is continued elastic
Z= 5 is start of rebound plastic deformation
Z= 6 is start of positive plastic deformation

Numerical Integration (Newmark-Beta Method)


Dyn. Def. @ Yield pt. Dyn. Ductile
: Building A9, Design of RC Beam, RB1

Time, Def. Vel. Acc. Rstnce incr incr incr


Load, KEY eff K Z Reaction Ratio

Calculation Report, OPERATION SHELTER, Plant Plant No. 015


t y v a R ye+ ye- F y v
F V μ
secs kN mm mm/s mm/s² kN mm mm kN/mm kN mm mm/s kN
0.000 0.00 2.283 0.000 0.000 189.361 8.062 -8.062 0 9307.03 370.521 0.040 39.811 68.170 -
: Updrade Buildings for Risk Mitigation - RT Refinery
SNC-LAVALIN FAYEZ ENGINE

0 003
0.003 370 52
370.52 2 323
2.323 39 811
39.811 26540 561
26540.561 192 663
192.663 8 062
8.062 -8 062
-8.062 0 9307 03
9307.03 2573 835
2573.835 0 277
0.277 117 304
117.304 4 121 231
121.231 -
0.006 741.04 2.600 157.115 51662.164 215.597 8.062 -8.062 0 9307.03 6862.667 0.737 188.526 4 181.361 -
CALCULATION

0.009 1111.56 3.337 345.641 74021.714 276.748 8.062 -8.062 0 9307.03 13007.719 1.398 249.668 4 255.248 -
0.012 1482.08 4.735 595.309 92423.786 392.655 8.062 -8.062 0 9307.03 20259.130 2.177 252.193 4 348.847 -
0.015 1431.28 6.911 847.502 75704.860 573.176 8.062 -8.062 0 9307.03 26484.534 2.846 189.585 4 406.722 -
0.018 1321.10 9.757 1037.087 60847.507 668.563 8.062 -8.062 1 9224.10 31114.084 3.373 170.598 6 412.586 1.21
0.021 1210.92 13.130 1207.685 52884.198 668.563 8.062 -8.062 1 9224.10 35504.366 3.849 146.708 1 399.364 1.63
SHEET

0.024 1100.73 16.979 1354.392 44920.889 668.563 8.062 -8.062 1 9224.10 39233.558 4.253 122.818 1 386.142 2.11
0.027 990.55 21.233 1477.210 36957.581 668.563 8.062 -8.062 1 9224.10 42301.661 4.586 98.928 1 372.920 2.63
0.030 880.37 25.819 1576.138 28994.272 668.563 8.062 -8.062 1 9224.10 44708.675 4.847 75.038 1 359.699 3.20
0.033 770.19 30.666 1651.176 21030.963 668.563 8.062 -8.062 1 9224.10 46454.600 5.036 51.148 1 346.477 3.80
0.036 660.01 35.702 1702.324 13067.654 668.563 8.062 -8.062 1 9224.10 47539.436 5.154 27.258 1 333.255 4.43
EERING, Al Khobar, Saudi Arabia

0.039 549.83 40.856 1729.582 5104.345 668.563 8.062 -8.062 1 9224.10 47963.183 5.200 3.368 1 320.033 5.07
0.042 439.65 46.055 1732.950 -2858.963 668.563 8.062 -8.062 1 9224.10 47725.841 5.174 -20.522 1 306.811 5.71
Revision

0.045 329.46 51.229 1712.428 -10822.272 668.563 8.062 -8.062 1 9224.10 46827.409 5.077 -44.412 1 293.590 6.35
Rev. No.
Checked
Designed

0.048 219.28 56.306 1668.016 -18785.581 668.563 8.062 -8.062 1 9224.10 45267.889 4.908 -68.302 1 280.368 6.98
0.051 109.10 61.214 1599.714 -26748.890 668.563 8.062 -8.062 1 9224.10 43048.360 4.667 -92.074 1 267.146 7.59
0.054 0.00 65.881 1507.640 -34634.071 668.563 8.062 -8.062 1 9224.10 40282.248 4.367 -103.902 1 254.054 8.17
:
:
:
:

0.057 0.00 70.248 1403.738 -34634.071 668.563 8.062 -8.062 1 9224.10 37407.036 4.055 -103.902 1 254.054 8.71
0.060 0.00 74.303 1299.835 -34634.071 668.563 8.062 -8.062 1 9224.10 34531.823 3.744 -103.902 1 254.054 9.22
0.063 0.00 78.047 1195.933 -34634.071 668.563 8.062 -8.062 1 9224.10 31656.610 3.432 -103.902 1 254.054 9.68
00
NFP

AMK

0.066 0.00 81.479 1092.031 -34634.071 668.563 8.062 -8.062 1 9224.10 28781.397 3.120 -103.902 1 254.054 10.11
IFC SUB

0.069 0.00 84.599 988.129 -34634.071 668.563 8.062 -8.062 1 9224.10 25906.185 2.809 -103.902 1 254.054 10.49
0.072 0.00 87.407 884.227 -34634.071 668.563 8.062 -8.062 1 9224.10 23030.972 2.497 -103.902 1 254.054 10.84

Page 233 of 281


0.075 0.00 89.904 780.324 -34634.071 668.563 8.062 -8.062 1 9224.10 20155.759 2.185 -103.902 1 254.054 11.15
0.078 0.00 92.089 676.422 -34634.071 668.563 8.062 -8.062 1 9224.10 17280.547 1.873 -103.902 1 254.054 11.42
0.081 0.00 93.963 572.520 -34634.071 668.563 8.062 -8.062 1 9224.10 14405.334 1.562 -103.902 1 254.054 11.66

26 JAN 2022
Subject
0.084 0.00 95.524 468.618 -34634.071 668.563 8.062 -8.062 1 9224.10 11530.121 1.250 -103.902 1 254.054 11.85

Calc. No.
PROJECT

ISSUED FOR CONSTRUCTION (IFC)


0.087 0.00 96.774 364.715 -34634.071 668.563 8.062 -8.062 1 9224.10 8654.908 0.938 -103.902 1 254.054 12.00
0.090 0.00 97.713 260.813 -34634.071 668.563 8.062 -8.062 1 9224.10 5779.696 0.627 -103.902 1 254.054 12.12

Project Code No.


0.093 0.00 98.339 156.911 -34634.071 668.563 8.062 -8.062 1 9224.10 2904.483 0.315 -103.902 1 254.054 12.20

EWO / B.I. Number


0.096 0.00 98.654 53.009 -34634.071 668.563 8.062 -8.062 1 9224.10 29.270 0.003 -103.902 1 254.054 12.24
0.099 0.00 98.657 -50.893 -34634.071 668.563 8.062 -8.062 1 9224.10 -2845.943 -0.309 -103.902 1 254.054 12.24
0.102 0.00 98.349 -154.796 -32784.776 642.976 98.657 82.534 0 9307.03 -5644.394 -0.606 -92.902 3 231.471 -
0.105 0.00 97.742 -247.697 -29149.727 592.681 98.657 82.534 0 9307.03 -8064.313 -0.866 -79.659 4 213.365 -
0.108 0.00 96.876 -327.356 -23956.224 520.823 98.657 82.534 0 9307.03 -10053.085 -1.080 -62.157 4 187.496 - : 510008
0.111 0.00 95.796 -389.513 -17481.932 431.244 98.657 82.534 0 9307.03 -11504.380 -1.236 -41.332 4 155.248 -
: PE-P20081
0.114 0.00 94.560 -430.846 -10072.990 328.732 98.657 82.534 0 9307.03 -12340.608 -1.326 -18.298 4 118.344 -
0.117 0.00 93.234 -449.144 -2125.509 218.770 98.657 82.534 0 9307.03 -12517.062 -1.345 5.715 4 78.757 -
: 10-02062-0002-001

0.120 0.00 91.889 -443.428 5935.610 107.235 98.657 82.534 0 9307.03 -12024.306 -1.292 29.423 4 38.605 -
0.123 0.00 90.597 -414.006 13679.390 0.091 98.657 82.534 0 9307.03 -10888.685 -1.170 51.557 4 0.033 -
0.126 0.00 89.427 -362.449 20691.818 -96.934 98.657 82.534 0 9307.03 -9170.915 -0.985 70.935 4 -34.896 -
0.129 0.00 88.442 -291.514 26597.983 -178.653 98.657 82.534 0 9307.03 -6962.833 -0.748 86.520 4 -64.315 -
0.132 0.00 87.693 -204.994 31082.121 -240.696 98.657 82.534 0 9307.03 -4382.492 -0.471 97.480 4 -86.650 -
0.135 0.00 87.223 -107.514 33904.492 -279.746 98.657 82.534 0 9307.03 -1567.847 -0.168 103.228 4 -100.709 -
: Building A9, Design of RC Beam, RB1

0.138 0.00 87.054 -4.286 34914.202 -293.717 98.657 82.534 0 9307.03 1330.621 0.143 103.457 4 -105.738 -

Calculation Report, OPERATION SHELTER, Plant Plant No. 015


0.141 0.00 87.197 99.171 34057.268 -281.860 98.657 82.534 0 9307.03 4157.950 0.447 98.155 4 -101.470 -
0.144 0.00 87.644 197.326 31379.505 -244.810 98.657 82.534 0 9307.03 6762.978 0.727 87.605 4 -88.132 -
0.147 0.00 88.370 284.931 27024.076 -184.548 98.657 82.534 0 9307.03 9006.433 0.968 72.372 4 -66.437 -
: Updrade Buildings for Risk Mitigation - RT Refinery
SNC-LAVALIN FAYEZ ENGINE

0 150
0.150 0 00
0.00 89 338
89.338 357 303
357.303 21223 838
21223.838 -104 295
-104.295 98 657
98.657 82 534
82.534 0 9307 03
9307.03 10768 370
10768.370 1 157
1.157 53 269
53.269 4 -37 546
-37.546 -
0.153 0.00 90.495 410.572 14288.895 -8.342 98.657 82.534 0 9307.03 11954.589 1.284 31.318 4 -3.003 -
CALCULATION

0.156 0.00 91.780 441.891 6590.014 98.181 98.657 82.534 0 9307.03 12501.672 1.343 7.693 4 35.345 -
0.159 0.00 93.123 449.584 -1461.195 209.578 98.657 82.534 0 9307.03 12380.368 1.330 -16.343 4 75.448 -
0.162 0.00 94.453 433.241 -9434.282 319.895 98.657 82.534 0 9307.03 11597.163 1.246 -39.506 4 115.162 -
0.165 0.00 95.699 393.735 -16902.977 423.233 98.657 82.534 0 9307.03 10193.931 1.095 -60.556 4 152.364 -
0.168 0.00 96.794 333.178 -23467.976 514.067 98.657 82.534 0 9307.03 8245.693 0.886 -78.369 4 185.064 -
SHEET

0.171 0.00 97.680 254.809 -28778.288 587.542 98.657 82.534 0 9307.03 5856.609 0.629 -91.992 4 211.515 -
0.174 0.00 98.310 162.817 -32550.006 639.728 98.657 82.534 0 9307.03 3154.409 0.339 -100.697 4 230.302 -
0.177 0.00 98.649 62.119 -34581.478 667.836 98.657 82.534 0 9307.03 283.562 0.030 -104.018 4 240.421 -
0.180 0.00 98.679 -41.899 -34634.071 668.563 98.657 82.534 1 9224.10 -2597.048 -0.282 -103.902 6 254.054 1.00
0.183 0.00 98.398 -145.801 -32946.508 645.214 98.679 82.556 0 9307.03 -5402.212 -0.580 -93.621 3 232.277 -
EERING, Al Khobar, Saudi Arabia

0.186 0.00 97.817 -239.422 -29467.426 597.077 98.679 82.556 0 9307.03 -7848.506 -0.843 -80.820 4 214.948 -
0.189 0.00 96.974 -320.243 -24412.906 527.142 98.679 82.556 0 9307.03 -9875.190 -1.061 -63.699 4 189.771 -
Revision

0.192 0.00 95.913 -383.942 -18053.180 439.148 98.679 82.556 0 9307.03 -11373.908 -1.222 -43.172 4 158.093 -
Rev. No.
Checked
Designed

0.195 0.00 94.691 -427.114 -10728.263 337.799 98.679 82.556 0 9307.03 -12264.535 -1.318 -20.337 4 121.608 -
0.198 0.00 93.373 -447.451 -2829.773 228.514 98.679 82.556 0 9307.03 -12499.454 -1.343 3.585 4 82.265 -
0.201 0.00 92.030 -443.866 5220.007 117.136 98.679 82.556 0 9307.03 -12066.106 -1.296 27.316 4 42.169 -
:
:
:
:

0.204 0.00 90.733 -416.550 12990.706 9.620 98.679 82.556 0 9307.03 -10987.658 -1.181 49.586 4 3.463 -
0.207 0.00 89.553 -366.963 20066.873 -88.287 98.679 82.556 0 9307.03 -9321.768 -1.002 69.206 4 -31.783 -
0.210 0.00 88.551 -297.758 26070.190 -171.350 98.679 82.556 0 9307.03 -7157.503 -0.769 85.125 4 -61.686 -
00
NFP

AMK

0.213 0.00 87.782 -212.633 30679.697 -235.128 98.679 82.556 0 9307.03 -4610.570 -0.495 96.493 4 -84.646 -
IFC SUB

0.216 0.00 87.287 -116.140 33648.952 -276.211 98.679 82.556 0 9307.03 -1817.138 -0.195 102.702 4 -99.436 -
0.219 0.00 87.092 -13.438 34819.208 -292.403 98.679 82.556 0 9307.03 1073.444 0.115 103.421 4 -105.265 -

Page 234 of 281


0.222 0.00 87.207 89.983 34127.899 -282.838 98.679 82.556 0 9307.03 3906.636 0.420 98.610 4 -101.822 -
0.225 0.00 87.627 188.593 31611.985 -248.027 98.679 82.556 0 9307.03 6530.964 0.702 88.527 4 -89.290 -
0.228 0.00 88.328 277.120 27405.975 -189.832 98.679 82.556 0 9307.03 8806.123 0.946 73.711 4 -68.340 -

26 JAN 2022
Subject
0.231 0.00 89.275 350.831 21734.739 -111.364 98.679 82.556 0 9307.03 10610.473 1.140 54.954 4 -40.091 -

Calc. No.
PROJECT

ISSUED FOR CONSTRUCTION (IFC)


0.234 0.00 90.415 405.785 14901.483 -16.818 98.679 82.556 0 9307.03 11847.548 1.273 33.260 4 -6.054 -
0.237 0.00 91.688 439.045 7271.538 88.751 98.679 82.556 0 9307.03 12451.208 1.338 9.787 4 31.950 -

Project Code No.


0.240 0.00 93.025 448.831 -747.172 199.699 98.679 82.556 0 9307.03 12389.181 1.331 -14.210 4 71.892 -

EWO / B.I. Number


0.243 0.00 94.357 434.622 -8725.934 310.094 98.679 82.556 0 9307.03 11664.781 1.253 -37.446 4 111.634 -
0.246 0.00 95.610 397.176 -16238.176 414.035 98.679 82.556 0 9307.03 10316.738 1.108 -58.681 4 149.053 -
0.249 0.00 96.718 338.495 -22882.263 505.963 98.679 82.556 0 9307.03 8417.124 0.904 -76.778 4 182.147 -
0.252 0.00 97.623 261.717 -28302.979 580.965 98.679 82.556 0 9307.03 6067.499 0.652 -90.770 4 209.148 -
0.255 0.00 98.275 170.947 -32210.512 635.031 98.679 82.556 0 9307.03 3393.482 0.365 -99.910 4 228.611 - : 510008
0.258 0.00 98.639 71.037 -34395.950 665.269 98.679 82.556 0 9307.03 538.037 0.058 -103.708 4 239.497 -
: PE-P20081
0.261 0.00 98.697 -32.670 -34634.071 668.563 98.679 82.556 1 9224.10 -2341.674 -0.254 -103.902 6 254.054 1.00
0.264 0.00 98.443 -136.573 -33112.450 647.510 98.697 82.574 0 9307.03 -5153.727 -0.554 -94.359 3 233.104 -
: 10-02062-0002-001

0.267 0.00 97.890 -230.931 -29793.396 601.587 98.697 82.574 0 9307.03 -7627.082 -0.819 -82.012 4 216.571 -
0.270 0.00 97.070 -312.944 -24881.475 533.625 98.697 82.574 0 9307.03 -9692.664 -1.041 -65.281 4 192.105 -
0.273 0.00 96.029 -378.225 -18639.298 447.257 98.697 82.574 0 9307.03 -11240.041 -1.208 -45.060 4 161.013 -
0.276 0.00 94.821 -423.285 -11400.593 347.101 98.697 82.574 0 9307.03 -12186.482 -1.309 -22.429 4 124.957 -
0.279 0.00 93.512 -445.714 -3552.371 238.512 98.697 82.574 0 9307.03 -12481.389 -1.341 1.400 4 85.864 -
0.282 0.00 92.171 -444.314 4485.775 127.295 98.697 82.574 0 9307.03 -12108.994 -1.301 25.155 4 45.826 -
: Building A9, Design of RC Beam, RB1

0.285 0.00 90.869 -419.159 12284.095 19.397 98.697 82.574 0 9307.03 -11089.207 -1.191 47.565 4 6.983 -

Calculation Report, OPERATION SHELTER, Plant Plant No. 015


0.288 0.00 89.678 -371.595 19425.660 -79.415 98.697 82.574 0 9307.03 -9476.549 -1.018 67.431 4 -28.589 -
0.291 0.00 88.660 -304.163 25528.657 -163.857 98.697 82.574 0 9307.03 -7357.239 -0.791 83.693 4 -58.989 -
0.294 0.00 87.869 -220.470 30266.797 -229.415 98.697 82.574 0 9307.03 -4844.584 -0.521 95.480 4 -82.589 -
: Updrade Buildings for Risk Mitigation - RT Refinery
SNC-LAVALIN FAYEZ ENGINE

0 297
0.297 0 00
0.00 87 349
87.349 -124 990
-124.990 33386 760
33386.760 -272 583
-272.583 98 697
98.697 82 574
82.574 0 9307 03
9307.03 -2072 919
-2072.919 -0 223
-0.223 102 163
102.163 4 -98 130
-98.130 -
0.300 0.00 87.126 -22.827 34721.742 -291.054 98.697 82.574 0 9307.03 809.572 0.087 103.383 4 -104.779 -
CALCULATION

0.303 0.00 87.213 80.556 34200.369 -283.840 98.697 82.574 0 9307.03 3648.780 0.392 99.076 4 -102.182 -
0.306 0.00 87.605 179.633 31850.516 -251.327 98.697 82.574 0 9307.03 6292.910 0.676 89.472 4 -90.478 -
0.309 0.00 88.281 269.105 27797.816 -195.254 98.697 82.574 0 9307.03 8600.599 0.924 75.085 4 -70.291 -
0.312 0.00 89.205 344.190 22258.940 -118.617 98.697 82.574 0 9307.03 10448.466 1.123 56.683 4 -42.702 -
0.315 0.00 90.328 400.874 15530.018 -25.515 98.697 82.574 0 9307.03 11737.720 1.261 35.251 4 -9.185 -
SHEET

0.318 0.00 91.589 436.125 7970.803 79.076 98.697 82.574 0 9307.03 12399.431 1.332 11.934 4 28.467 -
0.321 0.00 92.921 448.059 -14.562 189.563 98.697 82.574 0 9307.03 12398.222 1.332 -12.021 4 68.243 -
0.324 0.00 94.253 436.039 -7999.147 300.038 98.697 82.574 0 9307.03 11734.158 1.261 -35.333 4 108.014 -
0.327 0.00 95.514 400.706 -15556.068 404.597 98.697 82.574 0 9307.03 10442.742 1.122 -56.756 4 145.655 -
0.330 0.00 96.636 343.950 -22281.304 497.649 98.697 82.574 0 9307.03 8593.017 0.923 -75.145 4 179.153 -
EERING, Al Khobar, Saudi Arabia

0.333 0.00 97.560 268.805 -27815.298 574.218 98.697 82.574 0 9307.03 6283.878 0.675 -89.516 4 206.718 -
0.336 0.00 98.235 179.289 -31862.181 630.211 98.697 82.574 0 9307.03 3638.779 0.391 -99.102 4 226.876 -
Revision

0.339 0.00 98.626 80.187 -34205.593 662.635 98.697 82.574 0 9307.03 799.137 0.086 -103.389 4 238.549 -
Rev. No.
Checked
Designed

0.342 0.00 98.712 -23.202 -34634.071 668.563 98.697 82.574 1 9224.10 -2079.653 -0.225 -103.902 6 254.054 1.00
0.345 0.00 98.486 -127.104 -33282.712 649.866 98.712 82.588 0 9307.03 -4898.772 -0.526 -95.116 3 233.952 -
0.348 0.00 97.960 -222.220 -30127.851 606.214 98.712 82.588 0 9307.03 -7399.893 -0.795 -83.235 4 218.237 -
:
:
:
:

0.351 0.00 97.165 -305.455 -25362.242 540.277 98.712 82.588 0 9307.03 -9505.387 -1.021 -66.904 4 194.500 -
0.354 0.00 96.143 -372.359 -19240.673 455.578 98.712 82.588 0 9307.03 -11102.688 -1.193 -46.997 4 164.008 -
0.357 0.00 94.950 -419.356 -12090.425 356.646 98.712 82.588 0 9307.03 -12106.397 -1.301 -24.576 4 128.393 -
00
NFP

AMK

0.360 0.00 93.650 -443.932 -4293.778 248.770 98.712 82.588 0 9307.03 -12462.853 -1.339 -0.842 4 89.557 -
IFC SUB

0.363 0.00 92.311 -444.774 3732.431 137.719 98.712 82.588 0 9307.03 -12152.999 -1.306 22.937 4 49.579 -
0.366 0.00 91.005 -421.837 11559.089 29.428 98.712 82.588 0 9307.03 -11193.399 -1.203 45.490 4 10.594 -

Page 235 of 281


0.369 0.00 89.802 -376.347 18767.756 -70.312 98.712 82.588 0 9307.03 -9635.358 -1.035 65.611 4 -25.312 -
0.372 0.00 88.767 -310.736 24973.028 -156.169 98.712 82.588 0 9307.03 -7562.175 -0.813 82.224 4 -56.221 -
0.375 0.00 87.954 -228.511 29843.149 -223.553 98.712 82.588 0 9307.03 -5084.690 -0.546 94.441 4 -80.479 -

26 JAN 2022
Subject
0.378 0.00 87.408 -134.070 33117.742 -268.861 98.712 82.588 0 9307.03 -2335.358 -0.251 101.609 4 -96.790 -

Calc. No.
PROJECT

ISSUED FOR CONSTRUCTION (IFC)


0.381 0.00 87.157 -32.461 34621.738 -289.670 98.712 82.588 0 9307.03 538.831 0.058 103.345 4 -104.281 -
0.384 0.00 87.215 70.884 34274.725 -284.869 98.712 82.588 0 9307.03 3384.212 0.364 99.555 4 -102.553 -

Project Code No.


0.387 0.00 87.579 170.439 32095.257 -254.714 98.712 82.588 0 9307.03 6048.660 0.650 90.443 4 -91.697 -

EWO / B.I. Number


0.390 0.00 88.228 260.882 28199.857 -200.816 98.712 82.588 0 9307.03 8389.724 0.901 76.495 4 -72.294 -
0.393 0.00 89.130 337.377 22796.786 -126.059 98.712 82.588 0 9307.03 10282.242 1.105 58.458 4 -45.381 -
0.396 0.00 90.235 395.834 16174.914 -34.437 98.712 82.588 0 9307.03 11625.033 1.249 37.295 4 -12.397 -
0.399 0.00 91.484 433.129 8688.270 69.149 98.712 82.588 0 9307.03 12346.306 1.327 14.138 4 24.894 -
0.402 0.00 92.810 447.267 737.119 179.162 98.712 82.588 0 9307.03 12407.500 1.333 -9.774 4 64.498 - : 510008
0.405 0.00 94.143 437.492 -7253.441 289.721 98.712 82.588 0 9307.03 11805.342 1.268 -33.164 4 104.299 -
: PE-P20081
0.408 0.00 95.412 404.328 -14856.205 394.914 98.712 82.588 0 9307.03 10572.026 1.136 -54.781 4 142.169 -
0.411 0.00 96.548 349.547 -21664.701 489.117 98.712 82.588 0 9307.03 8773.490 0.943 -73.469 4 176.082 -
: 10-02062-0002-001

0.414 0.00 97.490 276.077 -27314.921 567.294 98.712 82.588 0 9307.03 6505.890 0.699 -88.230 4 204.226 -
0.417 0.00 98.189 187.848 -31504.782 625.266 98.712 82.588 0 9307.03 3890.461 0.418 -98.273 4 225.096 -
0.420 0.00 98.608 89.575 -34010.280 659.932 98.712 82.588 0 9307.03 1067.034 0.115 -103.062 4 237.576 -
0.423 0.00 98.722 -13.487 -34634.071 668.563 98.712 82.588 1 9224.10 -1810.810 -0.196 -103.902 6 254.054 1.00
0.426 0.00 98.526 -117.389 -33457.406 652.283 98.722 82.599 0 9307.03 -4637.181 -0.498 -95.893 3 234.822 -
0.429 0.00 98.028 -213.281 -30471.012 610.963 98.722 82.599 0 9307.03 -7166.790 -0.770 -84.490 4 219.947 -
: Building A9, Design of RC Beam, RB1

0.432 0.00 97.258 -297.771 -25855.524 547.102 98.722 82.599 0 9307.03 -9313.235 -1.001 -68.570 4 196.957 -

Calculation Report, OPERATION SHELTER, Plant Plant No. 015


0.435 0.00 96.257 -366.341 -19857.703 464.115 98.722 82.599 0 9307.03 -10961.760 -1.178 -48.984 4 167.081 -
0.438 0.00 95.079 -415.325 -12798.214 366.439 98.722 82.599 0 9307.03 -12024.227 -1.292 -26.779 4 131.918 -
0.441 0.00 93.787 -442.104 -5054.485 259.296 98.722 82.599 0 9307.03 -12443.835 -1.337 -3.143 4 93.346 -
: Updrade Buildings for Risk Mitigation - RT Refinery
SNC-LAVALIN FAYEZ ENGINE

0 444
0.444 0 00
0.00 92 450
92.450 -445 246
-445.246 2959 475
2959.475 148 413
148.413 98 722
98.722 82 599
82.599 0 9307 03
9307.03 -12198 149
-12198.149 -1 311
-1.311 20 662
20.662 4 53 429
53.429 -
0.447 0.00 91.139 -424.584 10815.211 39.720 98.722 82.599 0 9307.03 -11300.304 -1.214 43.362 4 14.299 -
CALCULATION

0.450 0.00 89.925 -381.223 18092.726 -60.973 98.722 82.599 0 9307.03 -9798.302 -1.053 63.743 4 -21.950 -
0.453 0.00 88.873 -317.479 24402.935 -148.282 98.722 82.599 0 9307.03 -7772.446 -0.835 80.717 4 -53.381 -
0.456 0.00 88.037 -236.762 29408.472 -217.539 98.722 82.599 0 9307.03 -5331.046 -0.573 93.375 4 -78.314 -
0.459 0.00 87.465 -143.387 32841.722 -265.042 98.722 82.599 0 9307.03 -2604.629 -0.280 101.041 4 -95.415 -
0.462 0.00 87.185 -42.345 34519.130 -288.251 98.722 82.599 0 9307.03 261.042 0.028 103.305 4 -103.770 -
SHEET

0.465 0.00 87.213 60.960 34351.017 -285.925 98.722 82.599 0 9307.03 3112.756 0.334 100.046 4 -102.933 -
0.468 0.00 87.547 161.006 32346.369 -258.188 98.722 82.599 0 9307.03 5798.051 0.623 91.438 4 -92.948 -
0.471 0.00 88.170 252.444 28612.363 -206.524 98.722 82.599 0 9307.03 8173.360 0.878 77.941 4 -74.349 -
0.474 0.00 89.048 330.386 23348.633 -133.694 98.722 82.599 0 9307.03 10111.691 1.086 60.278 4 -48.130 -
0.477 0.00 90.135 390.663 16836.598 -43.593 98.722 82.599 0 9307.03 11509.413 1.237 39.392 4 -15.693 -
EERING, Al Khobar, Saudi Arabia

0.480 0.00 91.372 430.055 9424.415 58.964 98.722 82.599 0 9307.03 12291.799 1.321 16.399 4 21.227 -
0.483 0.00 92.692 446.454 1508.367 168.491 98.722 82.599 0 9307.03 12417.019 1.334 -7.470 4 60.657 -
Revision

0.486 0.00 94.026 438.984 -6488.323 279.134 98.722 82.599 0 9307.03 11878.378 1.276 -30.940 4 100.488 -
Rev. No.
Checked
Designed

0.489 0.00 95.303 408.044 -14138.124 384.978 98.722 82.599 0 9307.03 10704.675 1.150 -52.755 4 138.592 -
0.492 0.00 96.453 355.289 -21032.047 480.364 98.722 82.599 0 9307.03 8958.660 0.963 -71.750 4 172.931 -
0.495 0.00 97.415 283.539 -26801.518 560.191 98.722 82.599 0 9307.03 6733.682 0.724 -86.909 4 201.669 -
:
:
:
:

32

RESULTS SUMMARY
00
NFP

AMK

IFC SUB

Def, y Reaction Ductility


Inbound 98.722 412.586 12.238
Rebound - -105.738 -

Page 236 of 281


Component/Member response exceeds the elastic range…..
CALCULATION SHEET

SNC-LAVALIN FAYEZ ENGINEERING, Al Khobar, Saudi Arabia


PROJECT : Updrade Buildings for Risk Mitigation - RT Refinery
EWO / B.I. No. : 10-02062-0002-001 Designed : NFP
Project Code No. : 510008 Checked : AMK
Calc. No. : PE-P20081 Revision : IFC SUB
Subject : Building A9, Design of RC Beam, RB1 Rev. No. : 00

DEFORMATION LIMITS (RESPONSE CRITERIA) - As per BDR and SAES-M-009

Member / Component : Beam


Material : Concrete
Beam Span, L 5400.000 mm
Response Criteria : High (Refer to BDR datasheet and SAES-M-009, Table-9)
Support Rotation : 5º (Refer to SAES-M-009, Table-9)
Ductility Ratio : n/a (Refer to SAES-M-009, Table-9)

CHECK DEFORMATION AND DUCTILITY RATIO


Support Rotation, θ1:

xm = Deformation, y = 98.722 mm

 xm 
1  Arc tan   = 2.094 º < 5.0 º Beam Design is acceptable!
 0.5 L 

Ductility Ratio, μ:

Max Ductilty Ratio = n/a

Therefore, design of RC beam, 'RB1' is safe for Blast Load.

ISSUED FOR CONSTRUCTION (IFC)

26 JAN 2022
Calculation Report, OPERATION SHELTER, Plant Plant No. 015 Page 237 of 281
CALCULATION SHEET

SNC-LAVALIN FAYEZ ENGINEERING, Al Khobar, Saudi Arabia


PROJECT : Updrade Buildings for Risk Mitigation - RT Refinery
B.I Number : 10-02062-0002-001 Designed : AIA / NFP
Project Code No. : 510008 Checcked : NFP / AKM
Calc. No. : PE-P20081 Reviision : IFC Sub
Subject : Structural Calculation - Operator Shelter, Plant No. 015 (Bldg-A9) Rev.. No. : 00

4.4.2 ROOF BEAM, 'RB3' DESIGN

ISSUED FOR CONSTRUCTION (IFC)

26 JAN 2022
Calculation Report, OPERATION SHELTER, Plant Plant No. 015 Page 238 of 281
CALCULATION SHEET

SNC-LAVALIN FAYEZ ENGINEERING, Al Khobar, Saudi Arabia


PROJECT : Updrade Buildings for Risk Mitigation - RT Refinery
EWO / B.I. No. : 10-02062-0002-001 Designed : NFP
Project Code No. : 510008 Checked : AMK
Calc. No. : PE-P20081 Revision : IFC SUB
Subject : Building A9, Design of RC Beam, RB3 Rev. No. : 00

DEAD LOAD AND BLAST LOAD ON RC BEAM COMPONENT

Dimensions:
Beam Spacing 5.500 m (Tributary width, average of S1, S2) see attached drawing (Roof Framing Plan)
Beam Span, L 7.590 m see attached drawing (Roof Framing Plan)

Figure - ETABS Model (Roof Beams are highlighted)


Plan - ETABS Structure Model
Beam Shear Diagram (Static Dead Loads):

Considering Roof Beam 'RB3' located along Grid-


5, spanning between Grid-B and Grid-D.

S attached
See tt h d d
drawing
i RARA-462171.
462171

Compute Static Dead Load on RC Beam


Support Reaction @ Left Support 132.696 kN
Support Reaction @ Right Support 176.258 kN
S (Support Reactions) 308.954 kN

Support Re actions 
UDL 
L

Total Static DLUDL = 40.705 kN/m

Define the Dynamic Blast Load on RC Beam (Refer to Blast Load Calculation on next page…..)
Blast Pressure on Roof (Refer to Blast Load Calc on next page…..):
Blast Pressure (P) vs. Time (t)
Blast Roof Pressure, Par = 44.694 kPa 50.000

Rise time, tr = 0.017 secs 40.000


Blast Pressure, P

Time duration, to = 0.059 secs 30.000

20.000
0.000 0.000 10.000
0.017 #####
0.000
0.059 0.000
0.000

0.010

0.020

0.030

0.040

0.050

0.060

0.070

Time, t

ISSUED FOR CONSTRUCTION (IFC)

26 JAN 2022
Calculation Report, OPERATION SHELTER, Plant Plant No. 015 Page 239 of 281
CALCULATION SHEET

SNC-LAVALIN FAYEZ ENGINEERING, Al Khobar, Saudi Arabia


PROJECT : Updrade Buildings for Risk Mitigation - RT Refinery
EWO / B.I. No. : 10-02062-0002-001 Designed : NFP
Project Code No. : 510008 Checked : AMK
Calc. No. : PE-P20081 Revision : IFC SUB
Subject : Building A9, Design of RC Beam, RB3 Rev. No. : 00

Blast Load Tabulation:

Time Increment, ∆t = 0.003 secs < 10% of period of vibration, tn o.k.

Pressure Eqv. UDL = Dyn. Force Effective Blast Load Calculation for Beam
Time
Pa Pa x (tri. width) F = UDL x L
0.000 0.000 0.000 0.000 Pso = 72.40 (from BDR)
0.003 7.711 42.413 321.912 td = 0.042 (from BDR)
0.006 15.423 84.825 643.824 L1 = 7.59 (From Grid-D (Front wall) to Grid-B)
0.009 23.134 127.238 965.736 Lw = 18.16 (See sec 2.3, Blast Load Calc pages…..)
0.012 30.846 169.651 1287.648 cd = -0.40 (See sec 2.3, Blast Load Calc pages…..)
0.015 38.557 212.063 1609.561 Lw/L1 = 2.39
0.018 44.036 242.198 1838.281 Ce = 0.71 (from figure 3.9 of ASCE-41088)
0.021 40.813 224.471 1703.732 qo = 16.78 (See sec 2.3, Blast Load Calc pages…..)
0.024 37.590 206.743 1569.183 U = 436.52 (See sec 2.3, Blast Load Calc pages…..)
0.027 34.367 189.016 1434.633
0.030 31.143 171.289 1300.084 Par , Equivalent peak overpressure,
0.033 27.920 153.562 1165.535 Par = Ce Pso + Cd qo
0.036 24.697 135.835 1030.985 Par = 44.69 kPa
0.039 21.474 118.108 896.436
0.042 18.251 100.380 761.887 tr , rise time,
0.045 15.028 82.653 627.337 tr = L1 / U
0.048 11.805 64.926 492.788 tr = 0.017 secs
0.051 8.582 47.199 358.239
0.054 5.358 29.472 223.689 to , total positive phase duration
0.057 2.135 11.744 89.140 to = tr + td
0.060 0.000 0.000 0.000 to = 0.059 secs
0.063 0.000 0.000 0.000
0.066 0.000 0.000 0.000
0.069 0.000 0.000 0.000
0.072 0.000 0.000 0.000
0.075 0.000 0.000 0.000
0.078 0.000 0.000 0.000
0.081 0.000 0.000 0.000
0.084 0.000 0.000 0.000
0.087 0.000 0.000 0.000
0.090 0.000 0.000 0.000
0.093 0.000 0.000 0.000
0.096 0.000 0.000 0.000
0.099 0.000 0.000 0.000
0.102 0.000 0.000 0.000
0.105 0.000 0.000 0.000
0.108 0.000 0.000 0.000
ISSUED FOR CONSTRUCTION (IFC)

26 JAN 2022
Calculation Report, OPERATION SHELTER, Plant Plant No. 015 Page 240 of 281
CALCULATION SHEET

SNC-LAVALIN FAYEZ ENGINEERING, Al Khobar, Saudi Arabia


PROJECT : Updrade Buildings for Risk Mitigation - RT Refinery
EWO / B.I. No. : 10-02062-0002-001 Designed : NFP
Project Code No. : 510008 Checked : AMK
Calc. No. : PE-P20081 Revision : IFC SUB
Subject : Building A9, Design of RC Beam, RB3 Rev. No. : 00

0.111 0.000 0.000 0.000


0.114 0.000 0.000 0.000
0.117 0.000 0.000 0.000
0.120 0.000 0.000 0.000
0.123 0.000 0.000 0.000
0.126 0.000 0.000 0.000
0.129 0.000 0.000 0.000
0.132 0.000 0.000 0.000
0.135 0.000 0.000 0.000
0.138 0.000 0.000 0.000
0.141 0.000 0.000 0.000
0.144 0.000 0.000 0.000
0.147 0.000 0.000 0.000
0.150 0.000 0.000 0.000
0.153 0.000 0.000 0.000
0.156 0.000 0.000 0.000
0.159 0.000 0.000 0.000
0.162 0.000 0.000 0.000
0.165 0.000 0.000 0.000
0 168
0.168 0 000
0.000 0 000
0.000 0 000
0.000
0.171 0.000 0.000 0.000
0.174 0.000 0.000 0.000
0.177 0.000 0.000 0.000
0.180 0.000 0.000 0.000
0.183 0.000 0.000 0.000
0.186 0.000 0.000 0.000
0.189 0.000 0.000 0.000
0.192 0.000 0.000 0.000
0.195 0.000 0.000 0.000
0.198 0.000 0.000 0.000
0.201 0.000 0.000 0.000
0.204 0.000 0.000 0.000
0.207 0.000 0.000 0.000
0.210 0.000 0.000 0.000
0.213 0.000 0.000 0.000
0.216 0.000 0.000 0.000
0.219 0.000 0.000 0.000
0.222 0.000 0.000 0.000
0.225 0.000 0.000 0.000
0.228 0.000 0.000 0.000
0.231 0.000 0.000 0.000
0.234 0.000 0.000 0.000
0.237 0.000 0.000 0.000
0.240 0.000 0.000 0.000
0.243 0.000 0.000 0.000

ISSUED FOR CONSTRUCTION (IFC)

26 JAN 2022
Calculation Report, OPERATION SHELTER, Plant Plant No. 015 Page 241 of 281
CALCULATION SHEET

SNC-LAVALIN FAYEZ ENGINEERING, Al Khobar, Saudi Arabia


PROJECT : Updrade Buildings for Risk Mitigation - RT Refinery
EWO / B.I. No. : 10-02062-0002-001 Designed : NFP
Project Code No. : 510008 Checked : AMK
Calc. No. : PE-P20081 Revision : IFC SUB
Subject : Building A9, Design of RC Beam, RB3 Rev. No. : 00

REINFORCED CONCRETE BEAM DYNAMIC PROPERTIES - SDOF Equivalent System

Beam Dimensions and Boundary Conditions


Beam Depth, H 600 mm
Beam Width, b 400 mm
Concrete Cover 50 mm
Beam Length, L 7.59 m
Boundary Condition Fixed - Fixed

Beam Mass
Mass, M = Static DLUDL / Gravitational accelation, g
Mass, M = 31.494 kN-s²/m or 0.031 kN-s²/mm

Beam Rebar Schedule

Remarks
Rebars @ Midspan @ Support
Considering Roof Beam 'RB3'
Top 1st Layer 4 of Ø20 4 of Ø20 located along Grid-5, spanning
bars 2nd Layer 0 of Ø0 2 of Ø20 between Grid-B and Grid-D.
Bot. 2nd Layer 2 of Ø20 0 of Ø0
bars 1st Layer 4 of Ø20 4 of Ø20 See attached drawings RA-462171
Stirrups (4 - Legs) Ø10 @ 150 mm and RA-462173.

Material Increase Factors


Material / Strength Factor Concrete Steel Stress Type Remarks
Strength Increase Factor (SIF) 1.00 1.10 Flexure BRAND NEW MATERIAL
Dynamic Increase Factor (DIF) 1.19 1.17 Flexure

Material Strength
Concrete Unit Weight 24 kN/m³
Concrete Ult. Comp. Strength, Fc' 35.00 Mpa
Steel Yield Strength, Fy 422.00 Mpa
F'dc = Fc' x SIF x DIF 41.65 Mpa
Fds = Fy x SIF x DIF 543.114 Mpa
Conc. Modulus of Elasticity, Ec 30332.30 Mpa
Steel Modulus if Elasticity, Es 200000.00 Mpa

Compute Beam Effective Depths


@ Midspan @ Support
Positive (inbound) Negative (rebound) Positive (inbound) Negative (rebound)
Bending Resistance Bending Resistance Bending Resistance Bending Resistance
Effective depth, d 507.500 530.000 507.500 530.000
Effective depth, d' 70.000 92.500 70.000 92.500

ISSUED FOR CONSTRUCTION (IFC)

26 JAN 2022
Calculation Report, OPERATION SHELTER, Plant Plant No. 015 Page 242 of 281
CALCULATION SHEET

SNC-LAVALIN FAYEZ ENGINEERING, Al Khobar, Saudi Arabia


PROJECT : Updrade Buildings for Risk Mitigation - RT Refinery
EWO / B.I. No. : 10-02062-0002-001 Designed : NFP
Project Code No. : 510008 Checked : AMK
Calc. No. : PE-P20081 Revision : IFC SUB
Subject : Building A9, Design of RC Beam, RB3 Rev. No. : 00

Compute Beam Yield Strength


Determine β1 value as per ACI 318-08, 10.2.7.3;
0.85 
for Fdc'  28Mpa 

  0.65 
1    
 max   F '
 28    for F '
 28Mpa 
 0.85  0.05  
dc dc
 7
   
β1 = 0.7525

Maximum Values - Neutral Axis, Cmax and Depth of Stress-Block, amax;


εc(max) = 0.003 (Max concrete strain, ACI 318-08, 10.2.3)
εt(min) = 0.005 (Min steel strain, ACI 318-08, 10.3.4)

Min Limits of Steel Reinforcements:


Required minimum rebars, Asmin (ACI 318-08, 10.5.1)

 0.25 F ' 
 c
b  d 
 Fy  = 603.049 mm² (for inbound bending)
As min   max  
1 . 4  = 629.785 mm² (for rebound bending)
F b  d  
 y 

From ACI 318-11, 10.2.2 and Stress-Strain Diagram;


@ Midspan @ Support
Unit
inbound Rebound inbound Rebound
 c max 
Max Location of
cmax  d  190.313 198.750 190.313 198.750 mm
Neutral Axis, cmax  c max    t min) 
Maximum depth of
stress block, amax
amax  1cmax 143.210 149.559 143.210 149.559 mm

Total area of Reinf # of Bars x Area of 1-bar


or 1884.956 1256.637 1884.956 1256.637 mm²
Steel, Ast Min. ACI Reinforcement

Depth of Stress- As  Fds


a 72.293 48.196 72.293 48.196 mm
Block, a 0.85F ' dc b
Area of Reinforcing
1884.956 1256.637 1884.956 1256.637 mm²
Steel in Ten., As
Area of Reinforcing
As'  Ast  As 0.000 0.000 0.000 0.000 mm²
Steel in Comp., As'
  a 
Bending Moment M p  As Fds d    
  2  482.546 345.277 482.546 345.277 kN-m
Capacity, Mpc & Mps  
As' Fds d  d '

ISSUED FOR CONSTRUCTION (IFC)

26 JAN 2022
Calculation Report, OPERATION SHELTER, Plant Plant No. 015 Page 243 of 281
CALCULATION SHEET

SNC-LAVALIN FAYEZ ENGINEERING, Al Khobar, Saudi Arabia


PROJECT : Updrade Buildings for Risk Mitigation - RT Refinery
EWO / B.I. No. : 10-02062-0002-001 Designed : NFP
Project Code No. : 510008 Checked : AMK
Calc. No. : PE-P20081 Revision : IFC SUB
Subject : Building A9, Design of RC Beam, RB3 Rev. No. : 00

Compute Beam Bending Resistance & Transformation Factors (ASCE 41088, Table 6.2 )

Bending Resistance (kN) Transformation Factors


Loading Diagram Strain Range
Inbound, Rb+ Rebound, Rb- Load Fac., KL Mass Fac. KM
12M ps
Elastic Rb  762.92 545.89 0.53 0.41
L

Plastic Rb 

8 M ps  M pc  1017.22 727.86 0.50 0.33
L

Compute Beam Shear Resistance


Shear Capacity of Concrete
Vc  0.17 Fc' b x d 
Vc = 222.717 kN

Shear Capacity of Shear links (Stirrups)


 Av  provided  Where:
Vs    Fys d
 s  Av = 314.159 mm² (Area of 2-legs Ø10 stirrups)
Vs = 577.279 kN

Total Shear Capacity, Vn


Vn  Vc  Vs
Vn = 799.995 kN

Shear Resistance of Beam at distance 'd' from the Support


RV = Vn L / (0.5 L - d)
RV = 1846.986 kN

Shear resistance is 120% higher than Flexural resistance, thus Flexural resistance governs…..

Compute Beam Stiffness, Ke (ASCE 41088, Table 6.2 )


Moment of Inertia for Beam Cracked Section, Icr

Singly Reinforced Beam Doubly Reinforced Beam

Es
n = 6.594
Ec
b
B = 0.032
nAs
ISSUED FOR CONSTRUCTION (IFC)

26 JAN 2022
Calculation Report, OPERATION SHELTER, Plant Plant No. 015 Page 244 of 281
CALCULATION SHEET

SNC-LAVALIN FAYEZ ENGINEERING, Al Khobar, Saudi Arabia


PROJECT : Updrade Buildings for Risk Mitigation - RT Refinery
EWO / B.I. No. : 10-02062-0002-001 Designed : NFP
Project Code No. : 510008 Checked : AMK
Calc. No. : PE-P20081 Revision : IFC SUB
Subject : Building A9, Design of RC Beam, RB3 Rev. No. : 00

Without compressio n steel :  


  
 I  bkd   nA d  kd 2 
3

 cr 3
s
  Icr 2038421219.270
  
 where  

 kd 
2dB  1  1  



kd 149.215
 B  
  4
I cr  With compressio n steel :  = 2038421219.270 mm
 
 I cr  bkd   nAs d  kd 2  n  1As' kd  d ' 2
3

 3
  
 Icr 2038421219.270
 where 
 
  rd '   kd 149.215
  1  r   1  r 
2
 2dB1  
' 
 kd   d 
; r 
n  1As   r 0.000
 B nAs  
 

Moment of Inertia for Rectangular Beam Gross Section, Ig


bh 3
Ig  = 00000000 000 mm
7200000000.000
4
12

Average Moment of Inertia, Ia


I g  I cr
Ia  = 4619210609.635 mm
4
2
Compute for Stiffness, K (as per ASCE 41088, Table 6.2)
Loading Diagram Strain Range Stiffness, Ke Unit
384 EI
Elastic K  54300.670 N/mm
L3
384 EI
E-P K 10860.134 N/mm
5 L3

Equivalent Mass, Me

Use average elastic and plastic transformation values for KLM:


elastic KLM = 0.41 / 0.53 = 0.774
plastic KLM = 0.33 / 0.50 = 0.660
Average KLM = 0.717

Me = (Avg. KLM) (M)


Me = 0.023 kN-s²/mm

ISSUED FOR CONSTRUCTION (IFC)

26 JAN 2022
Calculation Report, OPERATION SHELTER, Plant Plant No. 015 Page 245 of 281
CALCULATION SHEET

SNC-LAVALIN FAYEZ ENGINEERING, Al Khobar, Saudi Arabia


PROJECT : Updrade Buildings for Risk Mitigation - RT Refinery
EWO / B.I. No. : 10-02062-0002-001 Designed : NFP
Project Code No. : 510008 Checked : AMK
Calc. No. : PE-P20081 Revision : IFC SUB
Subject : Building A9, Design of RC Beam, RB3 Rev. No. : 00

Period of vibration, tn
Me
t n  2
Ke
tn = 0.128 secs.

Summary
Equivalent Mass, Me 0.023 kN-s²/mm
Stiffness, Ke 54.301 kN/mm
inbound resistance, Ru+ 1017.225 kN
rebound resistance, Ru- -727.856 kN
static load, Fs 308.954 kN

ISSUED FOR CONSTRUCTION (IFC)

26 JAN 2022
Calculation Report, OPERATION SHELTER, Plant Plant No. 015 Page 246 of 281
CALCULATION SHEET

SNC-LAVALIN FAYEZ ENGINEERING, Al Khobar, Saudi Arabia


PROJECT : Updrade Buildings for Risk Mitigation - RT Refinery
EWO / B.I. No. : 10-02062-0002-001 Designed : NFP
Project Code No. : 510008 Checked : AMK
Calc. No. : PE-P20081 Revision : IFC SUB
Subject : Building A9, Design of RC Beam, RB3 Rev. No. : 00

NON-LINEAR (ELASTO-PLASTIC) SDOF ANALYSIS

TRANSFORMATION FACTORS (for Support Reaction, V) - ASCE 41088, Table 6.2


Coefficents
Loading Diagram Strain Range
Rstnce, CR Force, CF

Elastic 0.36 0.14

Plastic 0.38 0.12

RESPONSE GRAPH (Based on calculated values from the table on next page…..)

Dyn. Load/Deformation vs. Time Dyn. Load, F
Deformation, y / 20
2000.00  

1500.00  

1000.00  

500.00  

0.00  

‐500.00  
0.000 

0.100 

0.200 

0.300 

0.400 

0.500 

0.600 

Support Reaction/Resistance vs. Time Support Reaction, V
Resistance, R
1200.000  
1000.000  
800.000  
600.000  
400.000  
200.000  
0.000  
‐200.000  
‐400.000  
‐600.000  
0.000 

0.100 

0.200 

0.300 

0.400 

0.500 

0.600 

ISSUED FOR CONSTRUCTION (IFC)

26 JAN 2022
Calculation Report, OPERATION SHELTER, Plant Plant No. 015 Page 247 of 281
DESIGN INPUT

26 JAN 2022
Subject
time increment, ∆t 0.003 secs

Calc. No.
PROJECT

ISSUED FOR CONSTRUCTION (IFC)


mass, M 0.023 kN-s²/mm
stiffness, K 54.301 kN/mm

Project Code No.


damping, C 0.000 kN-s/mm

EWO / B.I. Number


inbound resistance, Ru+ 1017.225 kN
rebound resistance, Ru- -727.856 kN
static load, Fs 308.954 kN

LEGEND : : 510008

: PE-P20081
KEY = 0 is elastic Z= 1 is increasing plastic deformation
KEY = +1 is positive plastic Z= 2 is end of rebound plastic deformation
KEY = -1 is rebound plastic Z= 3 is end of positive plastic deformation
: 10-02062-0002-001

Z= 4 is continued elastic
Z= 5 is start of rebound plastic deformation
Z= 6 is start of positive plastic deformation

Numerical Integration (Newmark-Beta Method)


Dyn. Def. @ Yield pt. Dyn. Ductile
: Building A9, Design of RC Beam, RB3

Time, Def. Vel. Acc. Rstnce incr incr incr


Load, KEY eff K Z Reaction Ratio

Calculation Report, OPERATION SHELTER, Plant Plant No. 015


t y v a R ye+ ye- F y v
F V μ
secs kN mm mm/s mm/s² kN mm mm kN/mm kN mm mm/s kN
0.000 0.00 5.690 0.000 0.000 308.954 18.733 -13.404 0 15103.97 321.912 0.021 21.313 111.223 -
: Updrade Buildings for Risk Mitigation - RT Refinery
SNC-LAVALIN FAYEZ ENGINE

0 003
0.003 321 91
321.91 5 711
5.711 21 313
21.313 14208 723
14208.723 310 111
310.111 18 733
18.733 -13 404
-13.404 0 15103 97
15103.97 2246 441
2246.441 0 149
0.149 63 480
63.480 4 156 708
156.708 -
0.006 643.82 5.860 84.793 28110.954 318.187 18.733 -13.404 0 15103.97 6053.985 0.401 104.277 4 204.683 -
CALCULATION

0.009 965.74 6.261 189.069 41406.810 339.952 18.733 -13.404 0 15103.97 11662.412 0.772 142.824 4 257.586 -
0.012 1287.65 7.033 331.894 53809.489 381.880 18.733 -13.404 0 15103.97 18950.746 1.255 178.291 4 317.748 -
0.015 1609.56 8.287 510.185 65051.457 450.010 18.733 -13.404 0 15103.97 27668.578 1.832 203.743 4 387.342 -
0.018 1838.28 10.119 713.928 70776.892 549.483 18.733 -13.404 0 15103.97 36891.825 2.443 194.577 4 455.173 -
0.021 1703.73 12.562 908.505 58941.407 682.113 18.733 -13.404 0 15103.97 44875.261 2.971 157.164 4 484.083 -
SHEET

0.024 1569.18 15.533 1065.669 45834.510 843.446 18.733 -13.404 0 15103.97 51083.407 3.382 116.360 4 523.326 -
0.027 1434.63 18.915 1182.029 32176.242 1017.225 18.733 -13.404 1 15049.67 55411.966 3.682 87.588 6 558.701 1.01
0.030 1300.08 22.597 1269.617 26216.005 1017.225 18.733 -13.404 1 15049.67 58962.845 3.918 69.708 1 542.555 1.21
0.033 1165.53 26.515 1339.325 20255.769 1017.225 18.733 -13.404 1 15049.67 61706.428 4.100 51.827 1 526.410 1.42
0.036 1030.99 30.615 1391.152 14295.532 1017.225 18.733 -13.404 1 15049.67 63642.714 4.229 33.946 1 510.264 1.63
EERING, Al Khobar, Saudi Arabia

0.039 896.44 34.844 1425.098 8335.295 1017.225 18.733 -13.404 1 15049.67 64771.705 4.304 16.066 1 494.118 1.86
0.042 761.89 39.148 1441.164 2375.058 1017.225 18.733 -13.404 1 15049.67 65093.399 4.325 -1.815 1 477.972 2.09
Revision

0.045 627.34 43.473 1439.349 -3585.179 1017.225 18.733 -13.404 1 15049.67 64607.798 4.293 -19.696 1 461.826 2.32
Rev. No.
Checked
Designed

0.048 492.79 47.766 1419.653 -9545.415 1017.225 18.733 -13.404 1 15049.67 63314.900 4.207 -37.577 1 445.680 2.55
0.051 358.24 51.973 1382.076 -15505.652 1017.225 18.733 -13.404 1 15049.67 61214.706 4.068 -55.457 1 429.534 2.77
0.054 223.69 56.041 1326.619 -21465.889 1017.225 18.733 -13.404 1 15049.67 58307.216 3.874 -73.338 1 413.388 2.99
:
:
:
:

0.057 89.14 59.915 1253.281 -27426.126 1017.225 18.733 -13.404 1 15049.67 54637.839 3.631 -88.201 1 397.242 3.20
0.060 0.00 63.545 1165.079 -31374.822 1017.225 18.733 -13.404 1 15049.67 50477.354 3.354 -94.124 1 386.545 3.39
0.063 0.00 66.899 1070.955 -31374.822 1017.225 18.733 -13.404 1 15049.67 46227.729 3.072 -94.124 1 386.545 3.57
00
NFP

AMK

0.066 0.00 69.971 976.831 -31374.822 1017.225 18.733 -13.404 1 15049.67 41978.104 2.789 -94.124 1 386.545 3.74
IFC SUB

0.069 0.00 72.760 882.706 -31374.822 1017.225 18.733 -13.404 1 15049.67 37728.479 2.507 -94.124 1 386.545 3.88
0.072 0.00 75.267 788.582 -31374.822 1017.225 18.733 -13.404 1 15049.67 33478.854 2.225 -94.124 1 386.545 4.02

Page 248 of 281


0.075 0.00 77.492 694.457 -31374.822 1017.225 18.733 -13.404 1 15049.67 29229.229 1.942 -94.124 1 386.545 4.14
0.078 0.00 79.434 600.333 -31374.822 1017.225 18.733 -13.404 1 15049.67 24979.604 1.660 -94.124 1 386.545 4.24
0.081 0.00 81.094 506.208 -31374.822 1017.225 18.733 -13.404 1 15049.67 20729.979 1.377 -94.124 1 386.545 4.33

26 JAN 2022
Subject
0.084 0.00 82.471 412.084 -31374.822 1017.225 18.733 -13.404 1 15049.67 16480.354 1.095 -94.124 1 386.545 4.40

Calc. No.
PROJECT

ISSUED FOR CONSTRUCTION (IFC)


0.087 0.00 83.566 317.959 -31374.822 1017.225 18.733 -13.404 1 15049.67 12230.729 0.813 -94.124 1 386.545 4.46
0.090 0.00 84.379 223.835 -31374.822 1017.225 18.733 -13.404 1 15049.67 7981.104 0.530 -94.124 1 386.545 4.50

Project Code No.


0.093 0.00 84.909 129.710 -31374.822 1017.225 18.733 -13.404 1 15049.67 3731.479 0.248 -94.124 1 386.545 4.53

EWO / B.I. Number


0.096 0.00 85.157 35.586 -31374.822 1017.225 18.733 -13.404 1 15049.67 -518.146 -0.034 -94.124 1 386.545 4.55
0.099 0.00 85.123 -58.539 -31292.006 1015.355 85.157 53.020 0 15103.97 -4762.163 -0.315 -92.738 3 365.528 -
0.102 0.00 84.808 -151.277 -30533.602 998.235 85.157 53.020 0 15103.97 -8897.847 -0.589 -89.475 4 359.364 -
0.105 0.00 84.218 -240.752 -29116.566 966.246 85.157 53.020 0 15103.97 -12841.598 -0.850 -84.282 4 347.848 -
0.108 0.00 83.368 -325.034 -27071.463 920.079 85.157 53.020 0 15103.97 -16508.346 -1.093 -77.271 4 331.228 - : 510008
0.111 0.00 82.275 -402.305 -24442.408 860.729 85.157 53.020 0 15103.97 -19818.997 -1.312 -68.593 4 309.862 -
: PE-P20081
0.114 0.00 80.963 -470.898 -21286.112 789.477 85.157 53.020 0 15103.97 -22702.137 -1.503 -58.435 4 284.212 -
0.117 0.00 79.460 -529.333 -17670.658 707.860 85.157 53.020 0 15103.97 -25095.574 -1.662 -47.017 4 254.830 -
: 10-02062-0002-001

0.120 0.00 77.799 -576.350 -13674.034 617.638 85.157 53.020 0 15103.97 -26947.681 -1.784 -34.585 4 222.350 -
0.123 0.00 76.014 -610.935 -9382.452 520.758 85.157 53.020 0 15103.97 -28218.505 -1.868 -21.406 4 187.473 -
0.126 0.00 74.146 -632.341 -4888.482 419.309 85.157 53.020 0 15103.97 -28880.636 -1.912 -7.766 4 150.951 -
0.129 0.00 72.234 -640.108 -289.065 315.479 85.157 53.020 0 15103.97 -28919.789 -1.915 6.041 4 113.573 -
0.132 0.00 70.319 -634.066 4316.588 211.509 85.157 53.020 0 15103.97 -28335.120 -1.876 19.719 4 76.143 -
0.135 0.00 68.443 -614.348 8829.129 109.641 85.157 53.020 0 15103.97 -27139.241 -1.797 32.971 4 39.471 -
: Building A9, Design of RC Beam, RB3

0.138 0.00 66.646 -581.377 13151.219 12.072 85.157 53.020 0 15103.97 -25357.948 -1.679 45.511 4 4.346 -

Calculation Report, OPERATION SHELTER, Plant Plant No. 015


0.141 0.00 64.968 -535.866 17189.627 -79.093 85.157 53.020 0 15103.97 -23029.665 -1.525 57.070 4 -28.474 -
0.144 0.00 63.443 -478.796 20857.242 -161.888 85.157 53.020 0 15103.97 -20204.614 -1.338 67.398 4 -58.280 -
0.147 0.00 62.105 -411.397 24074.950 -234.526 85.157 53.020 0 15103.97 -16943.735 -1.122 76.272 4 -84.429 -
: Updrade Buildings for Risk Mitigation - RT Refinery
SNC-LAVALIN FAYEZ ENGINE

0 150
0.150 0 00
0.00 60 983
60.983 -335 125
-335.125 26773 343
26773.343 -295 441
-295.441 85 157
85.157 53 020
53.020 0 15103 97
15103.97 -13317 366
-13317.366 -0 882
-0.882 83 501
83.501 4 -106 359
-106.359 -
0.153 0.00 60.102 -251.624 28894.215 -343.318 85.157 53.020 0 15103.97 -9403.732 -0.623 88.929 4 -123.595 -
CALCULATION

0.156 0.00 59.479 -162.694 30391.817 -377.126 85.157 53.020 0 15103.97 -5287.252 -0.350 92.438 4 -135.765 -
0.159 0.00 59.129 -70.256 31233.844 -396.134 85.157 53.020 0 15103.97 -1056.722 -0.070 93.954 4 -142.608 -
0.162 0.00 59.059 23.698 31402.133 -399.933 85.157 53.020 0 15103.97 3196.603 0.212 93.443 4 -143.976 -
0.165 0.00 59.271 117.141 30893.055 -388.441 85.157 53.020 0 15103.97 7380.974 0.489 90.916 4 -139.839 -
0.168 0.00 59.759 208.057 29717.589 -361.906 85.157 53.020 0 15103.97 11406.132 0.755 86.428 4 -130.286 -
SHEET

0.171 0.00 60.514 294.485 27901.093 -320.899 85.157 53.020 0 15103.97 15185.251 1.005 80.076 4 -115.524 -
0.174 0.00 61.520 374.561 25482.749 -266.306 85.157 53.020 0 15103.97 18636.813 1.234 71.996 4 -95.870 -
0.177 0.00 62.754 446.557 22514.723 -199.305 85.157 53.020 0 15103.97 21686.364 1.436 62.364 4 -71.750 -
0.180 0.00 64.190 508.920 19061.037 -121.339 85.157 53.020 0 15103.97 24268.124 1.607 51.386 4 -43.682 -
0.183 0.00 65.796 560.306 15196.190 -34.092 85.157 53.020 0 15103.97 26326.402 1.743 39.300 4 -12.273 -
EERING, Al Khobar, Saudi Arabia

0.186 0.00 67.539 599.606 11003.550 60.554 85.157 53.020 0 15103.97 27816.800 1.842 26.366 4 21.800 -
0.189 0.00 69.381 625.971 6573.555 160.559 85.157 53.020 0 15103.97 28707.168 1.901 12.863 4 57.801 -
Revision

0.192 0.00 71.282 638.834 2001.763 263.765 85.157 53.020 0 15103.97 28978.301 1.919 -0.917 4 94.955 -
Rev. No.
Checked
Designed

0.195 0.00 73.200 637.917 -2613.208 367.946 85.157 53.020 0 15103.97 28624.350 1.895 -14.678 4 132.460 -
0.198 0.00 75.095 623.240 -7171.811 470.854 85.157 53.020 0 15103.97 27652.949 1.831 -28.121 4 169.507 -
0.201 0.00 76.926 595.118 -11575.712 570.270 85.157 53.020 0 15103.97 26085.054 1.727 -40.958 4 205.297 -
:
:
:
:

0.204 0.00 78.653 554.160 -15729.916 664.049 85.157 53.020 0 15103.97 23954.484 1.586 -52.912 4 239.058 -
0.207 0.00 80.239 501.248 -19544.814 750.168 85.157 53.020 0 15103.97 21307.198 1.411 -63.724 4 270.061 -
0.210 0.00 81.650 437.524 -22938.115 826.770 85.157 53.020 0 15103.97 18200.300 1.205 -73.162 4 297.637 -
00
NFP

AMK

0.213 0.00 82.855 364.361 -25836.624 892.203 85.157 53.020 0 15103.97 14700.807 0.973 -81.022 4 321.193 -
IFC SUB

0.216 0.00 83.828 283.340 -28177.818 945.054 85.157 53.020 0 15103.97 10884.206 0.721 -87.134 4 340.219 -
0.219 0.00 84.549 196.206 -29911.194 984.184 85.157 53.020 0 15103.97 6832.825 0.452 -91.366 4 354.306 -

Page 249 of 281


0.222 0.00 85.001 104.840 -30999.363 1008.749 85.157 53.020 0 15103.97 2634.055 0.174 -93.627 4 363.150 -
0.225 0.00 85.176 11.213 -31374.822 1017.225 85.157 53.020 1 15049.67 -1618.552 -0.108 -94.124 6 386.545 1.00
0.228 0.00 85.068 -82.911 -31116.127 1011.385 85.176 53.038 0 15103.97 -5850.658 -0.387 -91.951 3 364.099 -

26 JAN 2022
Subject
0.231 0.00 84.681 -174.862 -30184.374 990.351 85.176 53.038 0 15103.97 -9939.040 -0.658 -88.179 4 356.526 -

Calc. No.
PROJECT

ISSUED FOR CONSTRUCTION (IFC)


0.234 0.00 84.023 -263.041 -28601.521 954.619 85.176 53.038 0 15103.97 -13813.030 -0.915 -82.505 4 343.663 -
0.237 0.00 83.108 -345.546 -26401.712 904.959 85.176 53.038 0 15103.97 -17389.062 -1.151 -75.051 4 325.785 -

Project Code No.


0.240 0.00 81.957 -420.597 -23632.398 842.443 85.176 53.038 0 15103.97 -20589.999 -1.363 -65.979 4 303.280 -

EWO / B.I. Number


0.243 0.00 80.594 -486.576 -20353.315 768.420 85.176 53.038 0 15103.97 -23346.795 -1.546 -55.483 4 276.631 -
0.246 0.00 79.048 -542.058 -16635.195 684.485 85.176 53.038 0 15103.97 -25599.982 -1.695 -43.790 4 246.415 -
0.249 0.00 77.353 -585.848 -12558.242 592.450 85.176 53.038 0 15103.97 -27300.958 -1.808 -31.153 4 213.282 -
0.252 0.00 75.545 -617.001 -8210.397 494.299 85.176 53.038 0 15103.97 -28413.031 -1.881 -17.844 4 177.948 -
0.255 0.00 73.664 -634.845 -3685.449 392.151 85.176 53.038 0 15103.97 -28912.214 -1.914 -4.150 4 141.174 - : 510008
0.258 0.00 71.750 -638.995 918.998 288.208 85.176 53.038 0 15103.97 -28787.738 -1.906 9.634 4 103.755 -
: PE-P20081
0.261 0.00 69.844 -629.361 5503.621 184.712 85.176 53.038 0 15103.97 -28042.290 -1.857 23.210 4 66.496 -
0.264 0.00 67.987 -606.151 9969.527 83.897 85.176 53.038 0 15103.97 -26691.947 -1.767 36.285 4 30.203 -
: 10-02062-0002-001

0.267 0.00 66.220 -569.866 14220.383 -12.064 85.176 53.038 0 15103.97 -24765.839 -1.640 48.577 4 -4.343 -
0.270 0.00 64.581 -521.289 18164.494 -101.100 85.176 53.038 0 15103.97 -22305.513 -1.477 59.822 4 -36.396 -
0.273 0.00 63.104 -461.467 21716.783 -181.292 85.176 53.038 0 15103.97 -19364.040 -1.282 69.776 4 -65.265 -
0.276 0.00 61.822 -391.691 24800.625 -250.908 85.176 53.038 0 15103.97 -16004.871 -1.060 78.225 4 -90.327 -
0.279 0.00 60.762 -313.466 27349.498 -308.447 85.176 53.038 0 15103.97 -12300.463 -0.814 84.987 4 -111.041 -
0.282 0.00 59.948 -228.479 29308.422 -352.669 85.176 53.038 0 15103.97 -8330.726 -0.552 89.915 4 -126.961 -
: Building A9, Design of RC Beam, RB3

0.285 0.00 59.396 -138.564 30635.141 -382.619 85.176 53.038 0 15103.97 -4181.288 -0.277 92.904 4 -137.743 -

Calculation Report, OPERATION SHELTER, Plant Plant No. 015


0.288 0.00 59.119 -45.659 31301.037 -397.651 85.176 53.038 0 15103.97 58.343 0.004 93.889 4 -143.154 -
0.291 0.00 59.123 48.230 31291.745 -397.442 85.176 53.038 0 15103.97 4296.715 0.284 92.849 4 -143.079 -
0.294 0.00 59.408 141.079 30607.467 -381.994 85.176 53.038 0 15103.97 8442.404 0.559 89.806 4 -137.518 -
: Updrade Buildings for Risk Mitigation - RT Refinery
SNC-LAVALIN FAYEZ ENGINE

0 297
0.297 0 00
0.00 59 967
59.967 230 884
230.884 29262 963
29262.963 -351 643
-351.643 85 176
85.176 53 038
53.038 0 15103 97
15103.97 12405 985
12405.985 0 821
0.821 84 825
84.825 4 -126 591
-126.591 -
0.300 0.00 60.788 315.710 27287.234 -307.042 85.176 53.038 0 15103.97 16101.958 1.066 78.015 4 -110.535 -
CALCULATION

0.303 0.00 61.854 393.725 24722.899 -249.153 85.176 53.038 0 15103.97 19450.600 1.288 69.522 4 -89.695 -
0.306 0.00 63.142 463.247 21625.272 -179.226 85.176 53.038 0 15103.97 22379.678 1.482 59.530 4 -64.521 -
0.309 0.00 64.624 522.777 18061.171 -98.768 85.176 53.038 0 15103.97 24826.009 1.644 48.253 4 -35.556 -
0.312 0.00 66.267 571.030 14107.478 -9.515 85.176 53.038 0 15103.97 26736.825 1.770 35.935 4 -3.426 -
0.315 0.00 68.037 606.965 9849.475 86.607 85.176 53.038 0 15103.97 28070.907 1.859 22.843 4 31.179 -
SHEET

0.318 0.00 69.896 629.808 5379.012 187.525 85.176 53.038 0 15103.97 28799.477 1.907 9.257 4 67.509 -
0.321 0.00 71.803 639.065 792.519 291.063 85.176 53.038 0 15103.97 28906.822 1.914 -4.528 4 104.783 -
0.324 0.00 73.716 634.537 -3811.069 394.987 85.176 53.038 0 15103.97 28390.624 1.880 -18.215 4 142.195 -
0.327 0.00 75.596 616.322 -8332.449 497.055 85.176 53.038 0 15103.97 27262.019 1.805 -31.510 4 178.940 -
0.330 0.00 77.401 584.812 -12674.092 595.065 85.176 53.038 0 15103.97 25545.351 1.691 -44.125 4 214.223 -
EERING, Al Khobar, Saudi Arabia

0.333 0.00 79.092 540.688 -16742.345 686.904 85.176 53.038 0 15103.97 23277.651 1.541 -55.788 4 247.285 -
0.336 0.00 80.634 484.900 -20449.453 770.590 85.176 53.038 0 15103.97 20507.834 1.358 -66.247 4 277.412 -
Revision

0.339 0.00 81.991 418.653 -23715.451 844.318 85.176 53.038 0 15103.97 17295.648 1.145 -75.278 4 303.955 -
Rev. No.
Checked
Designed

0.342 0.00 83.136 343.375 -26469.889 906.498 85.176 53.038 0 15103.97 13710.381 0.908 -82.685 4 326.339 -
0.345 0.00 84.044 260.690 -28653.351 955.789 85.176 53.038 0 15103.97 9829.371 0.651 -88.308 4 344.084 -
0.348 0.00 84.695 172.382 -30218.738 991.127 85.176 53.038 0 15103.97 5736.334 0.380 -92.027 4 356.806 -
:
:
:
:

0.351 0.00 85.075 80.355 -31132.284 1011.750 85.176 53.038 0 15103.97 1519.560 0.101 -93.760 4 364.230 -
0.354 0.00 85.175 -13.405 -31374.283 1017.213 85.176 53.038 0 15103.97 -2729.992 -0.181 -93.471 4 366.197 -
0.357 0.00 84.995 -106.876 -30939.516 1007.398 85.176 53.038 0 15103.97 -6920.656 -0.458 -91.165 4 362.663 -
00
NFP

AMK

0.360 0.00 84.536 -198.041 -29837.359 982.517 85.176 53.038 0 15103.97 -10962.037 -0.726 -86.893 4 353.706 -
IFC SUB

0.363 0.00 83.811 -284.934 -28091.588 943.107 85.176 53.038 0 15103.97 -14766.957 -0.978 -80.747 4 339.519 -
0.366 0.00 82.833 -365.681 -25739.859 890.018 85.176 53.038 0 15103.97 -18253.344 -1.209 -72.859 4 320.407 -

Page 250 of 281


0.369 0.00 81.624 -438.541 -22832.903 824.395 85.176 53.038 0 15103.97 -21345.992 -1.413 -63.399 4 296.782 -
0.372 0.00 80.211 -501.940 -19433.423 747.654 85.176 53.038 0 15103.97 -23978.190 -1.588 -52.572 4 269.155 -
0.375 0.00 78.624 -554.512 -15614.750 661.449 85.176 53.038 0 15103.97 -26093.161 -1.728 -40.611 4 238.122 -

26 JAN 2022
Subject
0.378 0.00 76.896 -595.123 -11459.255 567.641 85.176 53.038 0 15103.97 -27645.283 -1.830 -27.774 4 204.351 -

Calc. No.
PROJECT

ISSUED FOR CONSTRUCTION (IFC)


0.381 0.00 75.066 -622.897 -7056.575 468.253 85.176 53.038 0 15103.97 -28601.075 -1.894 -14.337 4 168.571 -
0.384 0.00 73.172 -637.234 -2501.679 365.428 85.176 53.038 0 15103.97 -28939.919 -1.916 -0.592 4 131.554 -

Project Code No.


0.387 0.00 71.256 -637.826 2107.180 261.385 85.176 53.038 0 15103.97 -28654.508 -1.897 13.167 4 94.099 -

EWO / B.I. Number


0.390 0.00 69.359 -624.660 6670.585 158.369 85.176 53.038 0 15103.97 -27750.998 -1.837 26.641 4 57.013 -
0.393 0.00 67.522 -598.019 11090.101 58.600 85.176 53.038 0 15103.97 -26248.877 -1.738 39.541 4 21.096 -
0.396 0.00 65.784 -558.478 15270.395 -35.768 85.176 53.038 0 15103.97 -24180.548 -1.601 51.588 4 -12.876 -
0.399 0.00 64.183 -506.890 19121.295 -122.700 85.176 53.038 0 15103.97 -21590.626 -1.429 62.522 4 -44.172 -
0.402 0.00 62.753 -444.369 22559.734 -200.321 85.176 53.038 0 15103.97 -18534.978 -1.227 72.107 4 -72.115 - : 510008
0.405 0.00 61.526 -372.262 25511.542 -266.956 85.176 53.038 0 15103.97 -15079.516 -0.998 80.137 4 -96.104 -
: PE-P20081
0.408 0.00 60.528 -292.125 27913.048 -321.169 85.176 53.038 0 15103.97 -11298.778 -0.748 86.438 4 -115.621 -
0.411 0.00 59.780 -205.687 29712.447 -361.790 85.176 53.038 0 15103.97 -7274.317 -0.482 90.875 4 -130.244 -
: 10-02062-0002-001

0.414 0.00 59.298 -114.812 30870.926 -387.942 85.176 53.038 0 15103.97 -3092.943 -0.205 93.352 4 -139.659 -
0.417 0.00 59.093 -21.460 31363.496 -399.061 85.176 53.038 0 15103.97 1155.148 0.076 93.815 4 -143.662 -
0.420 0.00 59.170 72.355 31179.532 -394.908 85.176 53.038 0 15103.97 5378.322 0.356 92.254 4 -142.167 -
0.423 0.00 59.526 164.608 30323.001 -375.573 85.176 53.038 0 15103.97 9485.481 0.628 88.703 4 -135.206 -
0.426 0.00 60.154 253.311 28812.381 -341.471 85.176 53.038 0 15103.97 13388.031 0.886 83.239 4 -122.930 -
0.429 0.00 61.040 336.550 26680.255 -293.339 85.176 53.038 0 15103.97 17001.791 1.126 75.979 4 -105.602 -
: Building A9, Design of RC Beam, RB3

0.432 0.00 62.166 412.530 23972.616 -232.216 85.176 53.038 0 15103.97 20248.810 1.341 67.081 4 -83.598 -

Calculation Report, OPERATION SHELTER, Plant Plant No. 015


0.435 0.00 63.507 479.610 20747.869 -159.419 85.176 53.038 0 15103.97 23059.046 1.527 56.735 4 -57.391 -
0.438 0.00 65.033 536.346 17075.575 -76.519 85.176 53.038 0 15103.97 25371.882 1.680 45.166 4 -27.547 -
0.441 0.00 66.713 581.511 13034.948 14.696 85.176 53.038 0 15103.97 27137.426 1.797 32.622 4 5.291 -
: Updrade Buildings for Risk Mitigation - RT Refinery
SNC-LAVALIN FAYEZ ENGINE

0 444
0.444 0 00
0.00 68 510
68.510 614 134
614.134 8713 147
8713.147 112 259
112.259 85 176
85.176 53 038
53.038 0 15103 97
15103.97 28317 596
28317.596 1 875
1.875 19 375
19.375 4 40 413
40.413 -
0.447 0.00 70.385 633.508 4203.397 214.064 85.176 53.038 0 15103.97 28886.933 1.913 5.710 4 77.063 -
CALCULATION

0.450 0.00 72.297 639.218 -397.023 317.916 85.176 53.038 0 15103.97 28833.157 1.909 -8.079 4 114.450 -
0.453 0.00 74.206 631.139 -4988.880 421.575 85.176 53.038 0 15103.97 28157.429 1.864 -21.693 4 151.767 -
0.456 0.00 76.070 609.446 -9473.122 522.805 85.176 53.038 0 15103.97 26874.323 1.779 -34.839 4 188.210 -
0.459 0.00 77.850 574.607 -13753.022 619.421 85.176 53.038 0 15103.97 25011.518 1.656 -47.234 4 222.992 -
0.462 0.00 79.506 527.373 -17736.259 709.341 85.176 53.038 0 15103.97 22609.195 1.497 -58.610 4 255.363 -
SHEET

0.465 0.00 81.003 468.763 -21336.911 790.624 85.176 53.038 0 15103.97 19719.174 1.306 -68.721 4 284.625 -
0.468 0.00 82.308 400.042 -24477.310 861.517 85.176 53.038 0 15103.97 16403.796 1.086 -77.351 4 310.146 -
0.471 0.00 83.394 322.691 -27089.715 920.491 85.176 53.038 0 15103.97 12734.576 0.843 -84.311 4 331.377 -
0.474 0.00 84.237 238.380 -29117.774 966.273 85.176 53.038 0 15103.97 8790.661 0.582 -89.453 4 347.858 -
0.477 0.00 84.819 148.927 -30517.740 997.877 85.176 53.038 0 15103.97 4657.125 0.308 -92.666 4 359.236 -
EERING, Al Khobar, Saudi Arabia

0.480 0.00 85.128 56.261 -31259.416 1014.620 85.176 53.038 0 15103.97 423.132 0.028 -93.879 4 365.263 -
0.483 0.00 85.156 -37.618 -31326.802 1016.141 85.176 53.038 0 15103.97 -3819.989 -0.253 -93.068 4 365.811 -
Revision

0.486 0.00 84.903 -130.686 -30718.446 1002.407 85.176 53.038 0 15103.97 -7980.710 -0.528 -90.249 4 360.867 -
Rev. No.
Checked
Designed

0.489 0.00 84.374 -220.935 -29447.469 973.716 85.176 53.038 0 15103.97 -11969.281 -0.792 -85.483 4 350.538 -
0.492 0.00 83.582 -306.418 -27541.288 930.685 85.176 53.038 0 15103.97 -15699.666 -1.039 -78.873 4 335.046 -
0.495 0.00 82.542 -385.292 -25041.020 874.242 85.176 53.038 0 15103.97 -19091.396 -1.264 -70.562 4 314.727 -
:
:
:
:

25

RESULTS SUMMARY
00
NFP

AMK

IFC SUB

Def, y Reaction Ductility


Inbound 85.176 558.701 4.546
Rebound - -143.976 -

Page 251 of 281


Component/Member response exceeds the elastic range…..
CALCULATION SHEET

SNC-LAVALIN FAYEZ ENGINEERING, Al Khobar, Saudi Arabia


PROJECT : Updrade Buildings for Risk Mitigation - RT Refinery
EWO / B.I. No. : 10-02062-0002-001 Designed : NFP
Project Code No. : 510008 Checked : AMK
Calc. No. : PE-P20081 Revision : IFC SUB
Subject : Building A9, Design of RC Beam, RB3 Rev. No. : 00

DEFORMATION LIMITS (RESPONSE CRITERIA) - As per BDR and SAES-M-009

Member / Component : Beam


Material : Concrete
Beam Span, L 7590.000 mm
Response Criteria : High (Refer to BDR datasheet and SAES-M-009, Table-9)
Support Rotation : 5º (Refer to SAES-M-009, Table-9)
Ductility Ratio : n/a (Refer to SAES-M-009, Table-9)

CHECK DEFORMATION AND DUCTILITY RATIO


Support Rotation, θ1:

xm = Deformation, y = 85.176 mm

 xm 
1  Arc tan   = 1.286 º < 5.0 º Beam Design is acceptable!
 0.5 L 

Ductility Ratio, μ:

Max Ductilty Ratio = n/a

Therefore, design of RC beam, 'RB3' is safe for Blast Load.

ISSUED FOR CONSTRUCTION (IFC)

26 JAN 2022
Calculation Report, OPERATION SHELTER, Plant Plant No. 015 Page 252 of 281
CALCULATION SHEET

SNC-LAVALIN FAYEZ ENGINEERING, Al Khobar, Saudi Arabia


PROJECT : Updrade Buildings for Risk Mitigation - RT Refinery
B.I Number : 10-02062-0002-001 Designed : AIA / NFP
Project Code No. : 510008 Checcked : NFP / AKM
Calc. No. : PE-P20081 Reviision : IFC Sub
Subject : Structural Calculation - Operator Shelter, Plant No. 015 (Bldg-A9) Rev.. No. : 00

4.5 COLUMN DESIGN

ISSUED FOR CONSTRUCTION (IFC)

26 JAN 2022
Calculation Report, OPERATION SHELTER, Plant Plant No. 015 Page 253 of 281
CALCULATION SHEET

SNC-LAVALIN FAYEZ ENGINEERING, Al Khobar, Saudi Arabia


PROJECT : Updrade Buildings for Risk Mitigation - RT Refinery
EWO / B.I. No. : 10-02062-0002-001 Designed : NFP
Project Code No. : 510008 Checked : AMK
Calc. No. : PE-P20081 Revision : IFC SUB
Subject : Building A9, Design of RC Column, C1 Rev. No. : 00

DEAD LOAD AND BLAST LOAD ON RC COLUMN COMPONENT


Dimensions:
Dimension, L1 6.550 m (See figure below)
Dimension, L2 4.450 m (See figure below)
Dimension, S 7.590 m (From Grid-D (front wall) to Grid-B. See figure below and attached drawings.)
Tributary Width, W 5.500 m (Average of L1, L2)
Column Height, H 5.050 m (from top of Footing to bottom of Roof Beam, See attached drawings)
Founding Depth, d 1.500 m (Footing Depth from Finished Grade Level)
Height, h 1.350 m (Roof Beam Depth and Parapet height expose to Blast)

Figure - Frame Column Tributary Area For Frame‐Column Analyses, Masses are lumped on the Roof or Floors.


BLAST

4 5 6

ROOF PLAN

Structural Component/Member Sizes:


Member / Component B D Self-Weight Moment of Inertia, Ig
Col1 (@ Grid-A/5) 550 550 36.663 7625520833.33 BD 3
Ig 
Col2 (@ Grid-B/5) 550 550 36.663 7625520833.33 12
Col3 (@ Grid-D/5) 550 550 36.663 7625520833.33

C
Compute Static Dead Load on Columns (From ETABS results)
Member / Component DL from ETABS Results Member Label
Col1 (@ Grid-A/5) 157.998 kN C13 B B C
Col2 (@ Grid-B/5) 390.184 kN C14 SECTION C - C
Col3 (@ Grid-D/5) 297.039 kN C15
Col1 Col2 Col3

SECTION A - A
Axial Load, Pu = 157.998 kN (For Column, 'Col1')
SECTION B - B

ISSUED FOR CONSTRUCTION (IFC)

26 JAN 2022
Calculation Report, OPERATION SHELTER, Plant Plant No. 015 Page 254 of 281
CALCULATION SHEET

SNC-LAVALIN FAYEZ ENGINEERING, Al Khobar, Saudi Arabia


PROJECT : Updrade Buildings for Risk Mitigation - RT Refinery
EWO / B.I. No. : 10-02062-0002-001 Designed : NFP
Project Code No. : 510008 Checked : AMK
Calc. No. : PE-P20081 Revision : IFC SUB
Subject : Building A9, Design of RC Column, C1 Rev. No. : 00

Define the Dynamic Blast Load on RC Column, 'Col1'

Horizontal Dynamic Loads to Column (Based on RC wall support Reactions fom the east side)

Horizontal Dynamic Load (F) vs. Time (t) Dynamic Load, F

1000.000   
800.000   
600.000   
400.000   
200.000   
0.000   
‐200.000   
‐400.000   
0.0000

0.1000

0.2000

0.3000

0.4000

0.5000

0.6000
Note: This graph is based on the Blast tabulation on next page.....

Compute for Distribution Factor for Horizontal Dynamic Loads to Column


Distribution of Total lateral Load to Columns:
C l
Column Stiff
Stiffness Di F
Dist Factor (DF)
Mark k k / (Sk)
Col1 0.711 E 0.333 312
EI EI
KK 3 3
Col2 0.711 E 0.333 HH
Col3 0.711 E 0.333

Vertical Dynamic Loads on Column (based on Tributary Area, A):


Blast Pressure on Roof (Refer to section 2.5 for Blast Load Calculations…..)
Blast Roof Pressure, Par = 36.290 kPa
Rise time, tr = 0.039 secs
Arrival Time, ta = 0.013 secs
Time duration, to = 0.081 secs

Vertical Dynamic Load (F) vs. Time (t) Dynamic Load, F

800.000   
700.000   
600.000   
500.000   
400.000   
300.000   
200.000   
100.000   
0.000   
‐100.000   
0.0000

0.1000

0.2000

0.3000

0.4000

0.5000

0.6000

Note: This graph is based on the Blast tabulation Table on next page.....

ISSUED FOR CONSTRUCTION (IFC)

26 JAN 2022
Calculation Report, OPERATION SHELTER, Plant Plant No. 015 Page 255 of 281
CALCULATION SHEET

SNC-LAVALIN FAYEZ ENGINEERING, Al Khobar, Saudi Arabia


PROJECT : Updrade Buildings for Risk Mitigation - RT Refinery
EWO / B.I. No. : 10-02062-0002-001 Designed : NFP
Project Code No. : 510008 Checked : AMK
Calc. No. : PE-P20081 Revision : IFC SUB
Subject : Building A9, Design of RC Column, C1 Rev. No. : 00

Blast Load Tabulation:


WxS 1.00
Time Increment, ∆t = 0.0030 secs < 10% of period of vibration, tn o.k. Wx½ 0.50
Tributary Area, A = W x ½S (for the Column, Col1) Wx¼ 0.25

Front Blast Load Data (for Beam / Parapet surface):


Blast Pressure, Pr = 183.070 kPa Remarks:
Time duration, to = 0.039 secs Fh t   FhRC  Fhb W   Fhcol H  d  DF

550 550 Blast Loads on Column : Col1 0.3333 0.50 (@ Grid-A/5)


Horizontal Dynamic Load Vertical Dynamic Load
Time FhRC(t) Fhb(t) = Fhcol(t) = Column Dyn.
Pressure Dyn. Load
(RC wall Support Pr x h Pr x B Load, Fh(t)
Reaction) (See Remarks)
Par Fv(t) = Par x A
(Beam / Parapet) (Column Surface)
0.0000 81.558 247.145 100.689 721.769 0.000 0.000
0.0030 107.649 228.133 92.943 725.584 0.000 0.000
0.0060 183.100 209.122 85.198 819.893 0.000 0.000
0.0090 176.256 190.111 77.453 763.326 0.000 0.000
0 0120
0.0120 169 412
169.412 171 100
171.100 69 707
69.707 706 760
706.760 0 000
0.000 0 000
0.000
0.0150 162.568 152.089 61.962 650.194 2.792 58.266
0.0180 155.724 133.078 54.217 593.627 6.979 145.666
0.0210 148.880 114.067 46.472 537.061 11.166 233.066
0.0240 142.036 95.056 38.726 480.495 15.353 320.465
0.0270 135.192 76.044 30.981 423.929 19.541 407.865
0.0300 128.348 57.033 23.236 367.362 23.728 495.264
0.0330 121.504 38.022 15.491 310.796 27.915 582.664
0.0360 114.660 19.011 7.745 254.230 32.103 670.063
0.0390 107.816 0.000 0.000 197.663 36.290 757.463
0.0420 107.816 0.000 0.000 197.663 33.698 703.359
0.0450 107.816 0.000 0.000 197.663 31.106 649.254
0.0480 107.816 0.000 0.000 197.663 28.514 595.150
0.0510 107.816 0.000 0.000 197.663 25.921 541.045
0.0540 107.816 0.000 0.000 197.663 23.329 486.941
0.0570 101.593 0.000 0.000 186.254 20.737 432.836
0.0600 68.498 0.000 0.000 125.580 18.145 378.732
0.0630 19.666 0.000 0.000 36.054 15.553 324.627
0.0660 -33.685 0.000 0.000 -61.755 12.961 270.523
0.0690 -79.296 0.000 0.000 -145.377 10.369 216.418
0.0720 -106.690 0.000 0.000 -195.598 7.776 162.314
0.0750 -109.571 0.000 0.000 -200.881 5.184 108.209
0.0780 -87.279 0.000 0.000 -160.012 2.592 54.105
0.0810 -44.935 0.000 0.000 -82.381 0.000 0.000
0.0840 7.733 0.000 0.000 14.178 0.000 0.000
0.0870 58.625 0.000 0.000 107.478 0.000 0.000
0.0900 96.047 0.000 0.000 176.086 0.000 0.000
0.0930 107.816 0.000 0.000 197.663 0.000 0.000
0.0960 100.097 0.000 0.000 183.511 0.000 0.000
ISSUED FOR CONSTRUCTION (IFC)

26 JAN 2022
Calculation Report, OPERATION SHELTER, Plant Plant No. 015 Page 256 of 281
CALCULATION SHEET

SNC-LAVALIN FAYEZ ENGINEERING, Al Khobar, Saudi Arabia


PROJECT : Updrade Buildings for Risk Mitigation - RT Refinery
EWO / B.I. No. : 10-02062-0002-001 Designed : NFP
Project Code No. : 510008 Checked : AMK
Calc. No. : PE-P20081 Revision : IFC SUB
Subject : Building A9, Design of RC Column, C1 Rev. No. : 00

0.0990 65.734 0.000 0.000 120.513 0.000 0.000


0.1020 16.270 0.000 0.000 29.828 0.000 0.000
0.1050 -36.933 0.000 0.000 -67.710 0.000 0.000
0.1080 -81.650 0.000 0.000 -149.692 0.000 0.000
0.1110 -107.609 0.000 0.000 -197.283 0.000 0.000
0.1140 -108.844 0.000 0.000 -199.548 0.000 0.000
0.1170 -85.073 0.000 0.000 -155.967 0.000 0.000
0.1200 -41.756 0.000 0.000 -76.554 0.000 0.000
0.1230 11.154 0.000 0.000 20.448 0.000 0.000
0.1260 61.501 0.000 0.000 112.752 0.000 0.000
0.1290 97.719 0.000 0.000 179.151 0.000 0.000
0.1320 107.816 0.000 0.000 197.663 0.000 0.000
0.1350 98.435 0.000 0.000 180.464 0.000 0.000
0.1380 62.665 0.000 0.000 114.886 0.000 0.000
0.1410 12.498 0.000 0.000 22.913 0.000 0.000
0.1440 -40.540 0.000 0.000 -74.324 0.000 0.000
0.1470 -84.265 0.000 0.000 -154.485 0.000 0.000
0.1500 -108.629 0.000 0.000 -199.154 0.000 0.000
0.1530 -108.037 0.000 0.000 -198.067 0.000 0.000
0 1 60
0.1560 82 623
-82.623 0 000
0.000 0 000
0.000 -151.475
151 475 0 000
0.000 0 000
0.000
0.1590 -38.227 0.000 0.000 -70.082 0.000 0.000
0.1620 14.952 0.000 0.000 27.412 0.000 0.000
0.1650 64.696 0.000 0.000 118.609 0.000 0.000
0.1680 99.576 0.000 0.000 182.555 0.000 0.000
0.1710 107.816 0.000 0.000 197.663 0.000 0.000
0.1740 96.589 0.000 0.000 177.080 0.000 0.000
0.1770 59.256 0.000 0.000 108.636 0.000 0.000
0.1800 8.309 0.000 0.000 15.234 0.000 0.000
0.1830 -44.547 0.000 0.000 -81.669 0.000 0.000
0.1860 -87.168 0.000 0.000 -159.808 0.000 0.000
0.1890 -109.763 0.000 0.000 -201.232 0.000 0.000
0.1920 -107.140 0.000 0.000 -196.423 0.000 0.000
0.1950 -79.902 0.000 0.000 -146.486 0.000 0.000
0.1980 -34.306 0.000 0.000 -62.895 0.000 0.000
0.2010 19.171 0.000 0.000 35.147 0.000 0.000
0.2040 68.244 0.000 0.000 125.113 0.000 0.000
0.2070 101.638 0.000 0.000 186.335 0.000 0.000
0.2100 107.816 0.000 0.000 197.663 0.000 0.000
0.2130 94.539 0.000 0.000 173.322 0.000 0.000
0.2160 55.470 0.000 0.000 101.695 0.000 0.000
0.2190 3.657 0.000 0.000 6.705 0.000 0.000
0.2220 -48.996 0.000 0.000 -89.826 0.000 0.000
0.2250 -90.393 0.000 0.000 -165.720 0.000 0.000
0.2280 -107.816 0.000 0.000 -197.663 0.000 0.000
0.2310 -105.625 0.000 0.000 -193.647 0.000 0.000
0.2340 -75.945 0.000 0.000 -139.232 0.000 0.000
0.2370 -28.816 0.000 0.000 -52.830 0.000 0.000
0.2400 24.933 0.000 0.000 45.711 0.000 0.000
ISSUED FOR CONSTRUCTION (IFC)

26 JAN 2022
Calculation Report, OPERATION SHELTER, Plant Plant No. 015 Page 257 of 281
CALCULATION SHEET

SNC-LAVALIN FAYEZ ENGINEERING, Al Khobar, Saudi Arabia


PROJECT : Updrade Buildings for Risk Mitigation - RT Refinery
EWO / B.I. No. : 10-02062-0002-001 Designed : NFP
Project Code No. : 510008 Checked : AMK
Calc. No. : PE-P20081 Revision : IFC SUB
Subject : Building A9, Design of RC Column, C1 Rev. No. : 00

0.2430 72.954 0.000 0.000 133.749 0.000 0.000


0.2460 104.214 0.000 0.000 191.059 0.000 0.000
0.2490 107.816 0.000 0.000 197.663 0.000 0.000
0.2520 91.723 0.000 0.000 168.158 0.000 0.000
0.2550 50.269 0.000 0.000 92.159 0.000 0.000
0.2580 -2.735 0.000 0.000 -5.013 0.000 0.000
0.2610 -55.109 0.000 0.000 -101.034 0.000 0.000
0.2640 -94.823 0.000 0.000 -173.842 0.000 0.000
0.2670 -107.816 0.000 0.000 -197.663 0.000 0.000
0.2700 -102.611 0.000 0.000 -188.119 0.000 0.000
0.2730 -70.377 0.000 0.000 -129.024 0.000 0.000
0.2760 -21.974 0.000 0.000 -40.286 0.000 0.000
0.2790 31.477 0.000 0.000 57.708 0.000 0.000
0.2820 77.696 0.000 0.000 142.443 0.000 0.000
0.2850 106.065 0.000 0.000 194.453 0.000 0.000
0.2880 110.066 0.000 0.000 201.787 0.000 0.000
0.2910 88.779 0.000 0.000 162.761 0.000 0.000
0.2940 47.095 0.000 0.000 86.341 0.000 0.000
0.2970 -5.408 0.000 0.000 -9.915 0.000 0.000
0 3000
0.3000 -56.669
56 669 0 000
0.000 0 000
0.000 103 894
-103.894 0 000
0.000 0 000
0.000
0.3030 -94.911 0.000 0.000 -174.003 0.000 0.000
0.3060 -107.816 0.000 0.000 -197.663 0.000 0.000
0.3090 -101.227 0.000 0.000 -185.582 0.000 0.000
0.3120 -67.821 0.000 0.000 -124.338 0.000 0.000
0.3150 -18.833 0.000 0.000 -34.528 0.000 0.000
0.3180 34.481 0.000 0.000 63.215 0.000 0.000
0.3210 79.873 0.000 0.000 146.434 0.000 0.000
0.3240 106.915 0.000 0.000 196.011 0.000 0.000
0.3270 109.393 0.000 0.000 200.554 0.000 0.000
0.3300 86.739 0.000 0.000 159.021 0.000 0.000
0.3330 44.156 0.000 0.000 80.952 0.000 0.000
0.3360 -8.572 0.000 0.000 -15.714 0.000 0.000
0.3390 -59.330 0.000 0.000 -108.771 0.000 0.000
0.3420 -96.457 0.000 0.000 -176.838 0.000 0.000
0.3450 -107.816 0.000 0.000 -197.663 0.000 0.000
0.3480 -99.689 0.000 0.000 -182.764 0.000 0.000
0.3510 -64.982 0.000 0.000 -119.134 0.000 0.000
0.3540 -15.345 0.000 0.000 -28.133 0.000 0.000
0.3570 37.817 0.000 0.000 69.331 0.000 0.000
0.3600 82.291 0.000 0.000 150.867 0.000 0.000
0.3630 107.859 0.000 0.000 197.741 0.000 0.000
0.3660 108.646 0.000 0.000 199.185 0.000 0.000
0.3690 84.472 0.000 0.000 154.866 0.000 0.000
0.3720 40.891 0.000 0.000 74.967 0.000 0.000
0.3750 -12.085 0.000 0.000 -22.155 0.000 0.000
0.3780 -62.284 0.000 0.000 -114.188 0.000 0.000
0.3810 -98.174 0.000 0.000 -179.986 0.000 0.000
0.3840 -107.816 0.000 0.000 -197.663 0.000 0.000
ISSUED FOR CONSTRUCTION (IFC)

26 JAN 2022
Calculation Report, OPERATION SHELTER, Plant Plant No. 015 Page 258 of 281
CALCULATION SHEET

SNC-LAVALIN FAYEZ ENGINEERING, Al Khobar, Saudi Arabia


PROJECT : Updrade Buildings for Risk Mitigation - RT Refinery
EWO / B.I. No. : 10-02062-0002-001 Designed : NFP
Project Code No. : 510008 Checked : AMK
Calc. No. : PE-P20081 Revision : IFC SUB
Subject : Building A9, Design of RC Column, C1 Rev. No. : 00

0.3870 -97.982 0.000 0.000 -179.634 0.000 0.000


0.3900 -61.829 0.000 0.000 -113.354 0.000 0.000
0.3930 -11.471 0.000 0.000 -21.031 0.000 0.000
0.3960 41.522 0.000 0.000 76.124 0.000 0.000
0.3990 84.976 0.000 0.000 155.790 0.000 0.000
0.4020 108.907 0.000 0.000 199.663 0.000 0.000
0.4050 107.817 0.000 0.000 197.664 0.000 0.000
0.4080 81.956 0.000 0.000 150.252 0.000 0.000
0.4110 37.266 0.000 0.000 68.320 0.000 0.000
0.4140 -15.986 0.000 0.000 -29.308 0.000 0.000
0.4170 -65.565 0.000 0.000 -120.203 0.000 0.000
0.4200 -100.081 0.000 0.000 -183.482 0.000 0.000
0.4230 -107.816 0.000 0.000 -197.663 0.000 0.000
0.4260 -96.087 0.000 0.000 -176.159 0.000 0.000
0.4290 -58.328 0.000 0.000 -106.935 0.000 0.000
0.4320 -7.169 0.000 0.000 -13.143 0.000 0.000
0.4350 45.637 0.000 0.000 83.668 0.000 0.000
0.4380 87.958 0.000 0.000 161.257 0.000 0.000
0.4410 110.071 0.000 0.000 201.797 0.000 0.000
0 4440
0.4440 106 896
106.896 0 000
0.000 0 000
0.000 195 975
195.975 0 000
0.000 0 000
0.000
0.4470 79.161 0.000 0.000 145.128 0.000 0.000
0.4500 33.239 0.000 0.000 60.938 0.000 0.000
0.4530 -20.319 0.000 0.000 -37.252 0.000 0.000
0.4560 -69.209 0.000 0.000 -126.884 0.000 0.000
0.4590 -102.199 0.000 0.000 -187.364 0.000 0.000
0.4620 -107.816 0.000 0.000 -197.663 0.000 0.000
0.4650 -93.981 0.000 0.000 -172.299 0.000 0.000
0.4680 -54.440 0.000 0.000 -99.806 0.000 0.000
0.4710 -2.391 0.000 0.000 -4.383 0.000 0.000
0.4740 50.207 0.000 0.000 92.047 0.000 0.000
0.4770 91.270 0.000 0.000 167.329 0.000 0.000
0.4800 107.816 0.000 0.000 197.663 0.000 0.000
0.4830 105.028 0.000 0.000 192.552 0.000 0.000
0.4860 74.842 0.000 0.000 137.210 0.000 0.000
0.4890 27.461 0.000 0.000 50.344 0.000 0.000
0.4920 -26.230 0.000 0.000 -48.087 0.000 0.000
0.4950 -73.893 0.000 0.000 -135.471 0.000 0.000

ISSUED FOR CONSTRUCTION (IFC)

26 JAN 2022
Calculation Report, OPERATION SHELTER, Plant Plant No. 015 Page 259 of 281
CALCULATION SHEET

SNC-LAVALIN FAYEZ ENGINEERING, Al Khobar, Saudi Arabia


PROJECT : Updrade Buildings for Risk Mitigation - RT Refinery
EWO / B.I. No. : 10-02062-0002-001 Designed : NFP
Project Code No. : 510008 Checked : AMK
Calc. No. : PE-P20081 Revision : IFC SUB
Subject : Building A9, Design of RC Column, C1 Rev. No. : 00

REINFORCED CONCRETE COLUMN (Col1) DYNAMIC PROPERTIES - SDOF Equivalent System

Column Dimensions and Boundary Conditions


Column Mark C1 (@ Grid-A/5)
Col. Depth, D 550 mm
Col. Width, B 550 mm
Concrete Cover 50 mm
Height, H 5.050 m (from top of Footing to bottom of Roof Beam, See attached drawings)
Boundary Condition Fixed - Fixed

Colum Rebar Schedule (Refer to next page for Column, 'C1' Design Capacity calculations…..)
Main Bar Diameter 20 mm
Total no. of main bars 12 bars
Total Area of Reinf. 3769.911 mm²
Steel Ratio 1.246%
Sec. (Ties) Bar Diameter 10 mm @ 200 mm on-center

Column Mass
Mass, M = Static Axial Load, Pu / Gravitational accelation, g
Mass, M = 16.106 kN-s²/m or 0.016 kN-s²/mm

Material Increase Factors


Material / Strength Factor Concrete Steel Stress Type Remarks
Strength Increase Factor (SIF) 1.00 1.10 Flexure New Structure.
Dynamic Increase Factor (DIF) 1.19 1.17 Flexure

Material Strength
Concrete Unit Weight 24 kN/m³
Concrete Ult. Comp. Strength, Fc' 35.00 Mpa
Steel Yield Strength, Fy 420.00 Mpa
F'dc = Fc' x SIF x DIF 41.65 Mpa
Fds = Fy x SIF x DIF 540.54 Mpa
Conc. Modulus of Elasticity, Ec 30332.30 Mpa
Steel Modulus of Elasticity, Es 200000.00 Mpa

Column Design Strength


From Column, 'C1' Interaction Diagram (refer to next page…..):

Axial Load Capacity, Pn(max) 10090.87 (Pure Axial, Compression)


Axial Load Capacity, Ptens 2037.80 (Pure Axial, Tension)
+ -
Flexural Capacity, Mn and Mn 473.15 (Pure Flexure)
Axial Load Capacity, Pnb 3535.52 (Axial @ balance condition)
Flexural Capacity, Mnb 944.69 (Flexure @ balance condition)

ISSUED FOR CONSTRUCTION (IFC)

26 JAN 2022
Calculation Report, OPERATION SHELTER, Plant Plant No. 015 Page 260 of 281
CALCULATION SHEET

SNC-LAVALIN FAYEZ ENGINEERING, Al Khobar, Saudi Arabia


PROJECT : Updrade Buildings for Risk Mitigation - RT Refinery
EWO / B.I. No. : 10-02062-0002-001 Designed : NFP
Project Code No. : 510008 Checked : AMK
Calc. No. : PE-P20081 Revision : IFC SUB
Subject : Building A9, Design of RC Column, C1 Rev. No. : 00

STAAD Output

ISSUED FOR CONSTRUCTION (IFC)

26 JAN 2022
Calculation Report, OPERATION SHELTER, Plant Plant No. 015 Page 261 of 281
CALCULATION SHEET

SNC-LAVALIN FAYEZ ENGINEERING, Al Khobar, Saudi Arabia


PROJECT : Updrade Buildings for Risk Mitigation - RT Refinery
EWO / B.I. No. : 10-02062-0002-001 Designed : NFP
Project Code No. : 510008 Checked : AMK
Calc. No. : PE-P20081 Revision : IFC SUB
Subject : Building A9, Design of RC Column, C1 Rev. No. : 00

Compute Column Lateral Stiffness, Ke


Calculate Ig (for square or rectangular section )

BD 3 4
Ig  = 7625520833.333 mm
12

Calculate Icr (as per ACI 318-08, Section 10.10.4.1 )


Since Column is laterally loaded with Blast Pressure, the response is more like a beam than a column.
This a conservative approach as it will yield a lower stiffness for the column component.

I cr  0.35 I g
Icr = 2668932292 mm4

Calculate Iavg (as per ACI 318-08, Section 10.10.4.1 )


I g  I cr
I avg 
2
Iavg = 5147226562.500 mm4

Compute for Effective Stiffness Ke :


12
3EI
EI
Ke 
H 3
Ke = 14547.413 N/mm

Compute Member / Component Lateral Flexural Resistance

Compute for ∆ based on Nominal Moment Capacity


M H 
2

6
3EI avg
∆= 12.881 mm
6 EI
M  3EI  
M  H 22  
H 
Compute for Resistance Ru+ and Ru- :
3EI
12 EIavg 12 EI
R
Ru   Ruu 
avg
  F  3EI  
H
H
33 F  H 33  
H 
Ru+ = Ru- = 187.386 kN

ISSUED FOR CONSTRUCTION (IFC)

26 JAN 2022
Calculation Report, OPERATION SHELTER, Plant Plant No. 015 Page 262 of 281
CALCULATION SHEET

SNC-LAVALIN FAYEZ ENGINEERING, Al Khobar, Saudi Arabia


PROJECT : Updrade Buildings for Risk Mitigation - RT Refinery
EWO / B.I. No. : 10-02062-0002-001 Designed : NFP
Project Code No. : 510008 Checked : AMK
Calc. No. : PE-P20081 Revision : IFC SUB
Subject : Building A9, Design of RC Column, C1 Rev. No. : 00

Compute Member / Component Lateral Flexural Resistance


Shear Capacity of Concrete
Vc  0.17 Fc' b x d 
Where:
d= D - Concreter Cover - Tie Dia - ½ Main Bar Dia
d= 480 mm

Vc = 289.641 kN

Shear Capacity of Shear links (Ties)


 Av  provided 
Vs    Fys d
 s 
Where:
Av = 157.080 mm² (Area of 2-legs Ø10 stirrups)

Vs = 203.779 kN

Total Shear Resistance, Rv


Rv  Vc  Vs
Rv = 493.420 kN

Shear resistance is 120% higher than Flexural resistance, thus Flexural resistance governs…..

Compute Column Axial Stiffness, Kev


AE
Ke 
H
Ke = 1816934.878 N/mm

Determine Member / Component Axial Resistance

Ru+ = 10090.870 kN
Ru- = -2037.800 kN

Equivalent Mass, Me

Me = M
Me = 0.016 kN-s²/mm (Both for Lateral and Vertical response)

ISSUED FOR CONSTRUCTION (IFC)

26 JAN 2022
Calculation Report, OPERATION SHELTER, Plant Plant No. 015 Page 263 of 281
CALCULATION SHEET

SNC-LAVALIN FAYEZ ENGINEERING, Al Khobar, Saudi Arabia


PROJECT : Updrade Buildings for Risk Mitigation - RT Refinery
EWO / B.I. No. : 10-02062-0002-001 Designed : NFP
Project Code No. : 510008 Checked : AMK
Calc. No. : PE-P20081 Revision : IFC SUB
Subject : Building A9, Design of RC Column, C1 Rev. No. : 00

Period of vibration, tn
Me
t n  2
Ke
tn = 0.20906 secs. (For Lateral Response)
tn = 0.01871 secs. (For Vertical Response)

Summary
Response Direction
SDOF Properties Units
Lateral Vertical
Equivalent Mass, Me 0.016 0.016 kN-s²/mm
Stiffness, Ke 14.547 1816.935 kN/mm
positive resistance, Ru+ 187.386 10090.870 kN
rebound resistance, Ru- -187.386 -2037.800 kN
static load, Fs 0.000 157.998 kN

ISSUED FOR CONSTRUCTION (IFC)

26 JAN 2022
Calculation Report, OPERATION SHELTER, Plant Plant No. 015 Page 264 of 281
CALCULATION SHEET

SNC-LAVALIN FAYEZ ENGINEERING, Al Khobar, Saudi Arabia


PROJECT : Updrade Buildings for Risk Mitigation - RT Refinery
EWO / B.I. No. : 10-02062-0002-001 Designed : NFP
Project Code No. : 510008 Checked : AMK
Calc. No. : PE-P20081 Revision : IFC SUB
Subject : Building A9, Design of RC Column, C1 Rev. No. : 00

NON-LINEAR (ELASTO-PLASTIC) SDOF ANALYSIS FOR HORIZONTAL DYNAMIC LOAD

LATERAL RESPONSE GRAPH (Based on calculated values from the table on next page…..)

Dyn. Load/Deformation vs. Time Dyn. Load, F
Deformation, y / 1

1000.00  

800.00  

600.00  

400.00  

200.00  

0.00  

‐200.00  

‐400.00  
0.0000 
000 

0.1000 
000 

0.2000 
000 

0.3000 
000 

0.4000 
000 

0.5000 
000 

0.6000 
000 
Support Reaction/Dyn. Load vs. Time Dyn. Load, F
Support Reaction, V

1000.00  

800.00  

600.00  

400.00  

200.00  

0.00  

‐200.00  

‐400.00  
0.0000 

0.1000 

0.2000 

0.3000 

0.4000 

0.5000 

0.6000 

ISSUED FOR CONSTRUCTION (IFC)

26 JAN 2022
Calculation Report, OPERATION SHELTER, Plant Plant No. 015 Page 265 of 281
DESIGN INPUT

26 JAN 2022
Subject
time increment, ∆t 0.003 secs

Calc. No.
PROJECT

ISSUED FOR CONSTRUCTION (IFC)


mass, M 0.016 kN-s²/mm
stiffness, K 14.547 kN/mm

Project Code No.


damping, C 0.000 kN-s/mm

EWO / B.I. Number


positive resistance, Ru+ 187.386 kN
rebound resistance, Ru- -187.386 kN
static load, Fs 0.000 kN

LEGEND : : 510008

: PE-P20081
KEY = 0 is elastic Z= 1 is increasing plastic deformation
KEY = +1 is positive plastic Z= 2 is end of rebound plastic deformation
KEY = -1 is rebound plastic Z= 3 is end of positive plastic deformation
: 10-02062-0002-001

Z= 4 is continued elastic
Z= 5 is start of rebound plastic deformation
Z= 6 is start of positive plastic deformation

Numerical Integration (Newmark-Beta Method)


Dyn. Def. @ Yield pt. Dyn. Ductile
: Building A9, Design of RC Column, C1

Time, Def. Vel. Acc. Rstnce incr incr incr


Load, KEY eff K Z Reaction Ratio

Calculation Report, OPERATION SHELTER, Plant Plant No. 015


t y v a R ye+ ye- F y v
F V μ
secs kN mm mm/s mm/s² kN mm mm kN/mm kN mm mm/s kN
0.0000 721.77 0.000 0.000 44814.098 0.000 12.881 -12.881 0 10751.77 2169.122 0.202 134.524 0.000 -
: Updrade Buildings for Risk Mitigation - RT Refinery
SNC-LAVALIN FAYEZ ENGINE

0 0030
0.0030 725 58
725.58 0 202
0.202 134 524
134.524 44868 769
44868.769 2 935
2.935 12 881
12.881 -12 881
-12.881 0 10751 77
10751.77 6595 510
6595.510 0 613
0.613 142 559
142.559 4 2 935
2.935 -
0.0060 819.89 0.815 277.083 50170.233 11.859 12.881 -12.881 0 10751.77 11292.838 1.050 143.819 4 11.859 -
CALCULATION

0.0090 763.33 1.866 420.902 45709.381 27.138 12.881 -12.881 0 10751.77 15709.966 1.461 129.880 4 27.138 -
0.0120 706.76 3.327 550.782 40877.454 48.394 12.881 -12.881 0 10751.77 19660.161 1.829 114.887 4 48.394 -
0.0150 650.19 5.155 665.669 35713.678 74.995 12.881 -12.881 0 10751.77 23111.354 2.150 98.960 4 74.995 -
0.0180 593.63 7.305 764.630 30259.973 106.265 12.881 -12.881 0 10751.77 26035.528 2.422 82.231 4 106.265 -
0.0210 537.06 9.726 846.861 24560.613 141.492 12.881 -12.881 0 10751.77 28408.944 2.642 64.834 4 141.492 -
SHEET

0.0240 480.49 12.369 911.694 18661.866 179.930 12.881 -12.881 0 10751.77 30212.334 2.810 46.910 4 179.930 -
0.0270 423.93 15.178 958.604 14686.748 187.386 12.881 -12.881 1 10737.23 31531.324 2.937 38.792 6 187.386 1.18
0.0300 367.36 18.115 997.396 11174.589 187.386 12.881 -12.881 1 10737.23 32611.180 3.037 28.256 1 187.386 1.41
0.0330 310.80 21.152 1025.652 7662.429 187.386 12.881 -12.881 1 10737.23 33351.640 3.106 17.719 1 187.386 1.64
0.0360 254.23 24.259 1043.371 4150.270 187.386 12.881 -12.881 1 10737.23 33752.701 3.144 7.183 1 187.386 1.88
EERING, Al Khobar, Saudi Arabia

0.0390 197.66 27.402 1050.554 638.110 187.386 12.881 -12.881 1 10737.23 33870.931 3.155 1.914 1 187.386 2.13
0.0420 197.66 30.557 1052.468 638.110 187.386 12.881 -12.881 1 10737.23 33932.595 3.160 1.914 1 187.386 2.37
Revision

0.0450 197.66 33.717 1054.382 638.110 187.386 12.881 -12.881 1 10737.23 33994.259 3.166 1.914 1 187.386 2.62
Rev. No.
Checked
Designed

0.0480 197.66 36.883 1056.297 638.110 187.386 12.881 -12.881 1 10737.23 34055.923 3.172 1.914 1 187.386 2.86
0.0510 197.66 40.055 1058.211 638.110 187.386 12.881 -12.881 1 10737.23 34117.586 3.178 1.914 1 187.386 3.11
0.0540 197.66 43.232 1060.125 638.110 187.386 12.881 -12.881 1 10737.23 34167.841 3.182 0.852 1 187.386 3.36
:
:
:
:

0.0570 186.25 46.414 1060.977 -70.268 187.386 12.881 -12.881 1 10737.23 34111.786 3.177 -5.862 1 187.386 3.60
0.0600 125.58 49.591 1055.115 -3837.494 187.386 12.881 -12.881 1 10737.23 33712.097 3.140 -19.850 1 187.386 3.85
0.0630 36.05 52.731 1035.265 -9396.105 187.386 12.881 -12.881 1 10737.23 32795.821 3.054 -37.298 1 187.386 4.09
00
NFP

AMK

IFC SUB

0.0660 -61.76 55.785 997.967 -15469.022 187.386 12.881 -12.881 1 10737.23 31315.160 2.917 -54.195 1 187.386 4.33
0.0690 -145.38 58.702 943.772 -20661.004 187.386 12.881 -12.881 1 10737.23 29351.982 2.734 -66.660 1 187.386 4.56
0.0720 -195.60 61.436 877.112 -23779.205 187.386 12.881 -12.881 1 10737.23 27099.016 2.524 -71.830 1 187.386 4.77

Page 266 of 281


0.0750 -200.88 63.959 805.282 -24107.224 187.386 12.881 -12.881 1 10737.23 24815.565 2.311 -68.515 1 187.386 4.97
0.0780 -160.01 66.271 736.767 -21569.700 187.386 12.881 -12.881 1 10737.23 22767.939 2.120 -57.479 1 187.386 5.14
0.0810 -82.38 68.391 679.288 -16749.623 187.386 12.881 -12.881 1 10737.23 21168.265 1.971 -41.256 1 187.386 5.31

26 JAN 2022
Subject
0.0840 14.18 70.363 638.032 -10754.397 187.386 12.881 -12.881 1 10737.23 20125.756 1.874 -23.574 1 187.386 5.46

Calc. No.
PROJECT

ISSUED FOR CONSTRUCTION (IFC)


0.0870 107.48 72.237 614.458 -4961.411 187.386 12.881 -12.881 1 10737.23 19621.617 1.827 -8.495 1 187.386 5.61
0.0900 176.09 74.064 605.964 -701.593 187.386 12.881 -12.881 1 10737.23 19506.788 1.817 -0.095 1 187.386 5.75

Project Code No.


0.0930 197.66 75.881 605.868 638.110 187.386 12.881 -12.881 1 10737.23 19532.722 1.819 0.596 1 187.386 5.89

EWO / B.I. Number


0.0960 183.51 77.700 606.465 -240.614 187.386 12.881 -12.881 1 10737.23 19460.625 1.812 -6.589 1 187.386 6.03
0.0990 120.51 79.513 599.876 -4152.096 187.386 12.881 -12.881 1 10737.23 19031.699 1.772 -20.902 1 187.386 6.17
0.1020 29.83 81.285 578.973 -9782.683 187.386 12.881 -12.881 1 10737.23 18079.496 1.684 -38.432 1 187.386 6.31
0.1050 -67.71 82.969 540.541 -15838.760 187.386 12.881 -12.881 1 10737.23 16564.473 1.543 -55.152 1 187.386 6.44
0.1080 -149.69 84.512 485.390 -20928.956 187.386 12.881 -12.881 1 10737.23 14576.394 1.358 -67.219 1 187.386 6.56 : 510008
0.1110 -197.28 85.869 418.171 -23883.810 187.386 12.881 -12.881 1 10737.23 12313.707 1.147 -71.862 1 187.386 6.67
: PE-P20081
0.1140 -199.55 87.016 346.308 -24024.449 187.386 12.881 -12.881 1 10737.23 10037.949 0.935 -68.015 1 187.386 6.76
0.1170 -155.97 87.951 278.294 -21318.562 187.386 12.881 -12.881 1 10737.23 8013.662 0.746 -56.560 1 187.386 6.83
: 10-02062-0002-001

0.1200 -76.55 88.697 221.734 -16387.821 187.386 12.881 -12.881 1 10737.23 6447.612 0.600 -40.129 1 187.386 6.89
0.1230 20.45 89.298 181.605 -10365.054 187.386 12.881 -12.881 1 10737.23 5441.286 0.507 -22.499 1 187.386 6.93
0.1260 112.75 89.805 159.106 -4633.978 187.386 12.881 -12.881 1 10737.23 4967.577 0.463 -7.718 1 187.386 6.97
0.1290 179.15 90.267 151.388 -511.296 187.386 12.881 -12.881 1 10737.23 4870.281 0.454 0.190 1 187.386 7.01
0.1320 197.66 90.721 151.579 638.110 187.386 12.881 -12.881 1 10737.23 4896.233 0.456 0.312 1 187.386 7.04
0.1350 180.46 91.177 151.891 -429.800 187.386 12.881 -12.881 1 10737.23 4806.321 0.448 -7.397 1 187.386 7.08
: Building A9, Design of RC Column, C1

0.1380 114.89 91.624 144.494 -4501.490 187.386 12.881 -12.881 1 10737.23 4344.924 0.405 -22.070 1 187.386 7.11

Calculation Report, OPERATION SHELTER, Plant Plant No. 015


0.1410 22.91 92.029 122.424 -10212.014 187.386 12.881 -12.881 1 10737.23 3352.822 0.312 -39.692 1 187.386 7.14
0.1440 -74.32 92.341 82.732 -16249.390 187.386 12.881 -12.881 1 10737.23 1799.637 0.168 -56.214 1 187.386 7.17
0.1470 -154.49 92.509 26.518 -21226.543 187.386 12.881 -12.881 1 10737.23 -216.098 -0.020 -67.840 1 187.386 7.18
: Updrade Buildings for Risk Mitigation - RT Refinery
SNC-LAVALIN FAYEZ ENGINE

0 1500
0.1500 -199 15
-199.15 92 489
92.489 -41 322
-41.322 -23981 805
-23981.805 187 093
187.093 92 509
92.509 66 747
66.747 0 10751 77
10751.77 -2488 704
-2488.704 -0 231
-0.231 -71 531
-71.531 3 187 093
187.093 -
0.1530 -198.07 92.257 -112.853 -23705.269 183.726 92.509 66.747 0 10751.77 -4733.959 -0.440 -66.180 4 183.726 -
CALCULATION

0.1560 -151.48 91.817 -179.033 -20414.707 177.321 92.509 66.747 0 10751.77 -6671.934 -0.621 -52.823 4 177.321 -
0.1590 -70.08 91.197 -231.855 -14800.565 168.294 92.509 66.747 0 10751.77 -8086.086 -0.752 -34.303 4 168.294 -
0.1620 27.41 90.444 -266.158 -8067.913 157.353 92.509 66.747 0 10751.77 -8872.027 -0.825 -14.592 4 157.353 -
0.1650 118.61 89.619 -280.750 -1660.270 145.349 92.509 66.747 0 10751.77 -9059.717 -0.843 2.116 4 145.349 -
0.1680 182.56 88.777 -278.634 3071.200 133.091 92.509 66.747 0 10751.77 -8811.770 -0.820 11.731 4 133.091 -
SHEET

0.1710 197.66 87.957 -266.903 4749.526 121.168 92.509 66.747 0 10751.77 -8388.491 -0.780 13.389 4 121.168 -
0.1740 177.08 87.177 -253.514 4176.210 109.819 92.509 66.747 0 10751.77 -8032.783 -0.747 7.166 4 109.819 -
0.1770 108.64 86.430 -246.348 601.413 98.950 92.509 66.747 0 10751.77 -7999.624 -0.744 -5.887 4 98.950 -
0.1800 15.23 85.686 -252.235 -4525.853 88.126 92.509 66.747 0 10751.77 -8440.480 -0.785 -21.539 4 88.126 -
0.1830 -81.67 84.901 -273.773 -9833.388 76.706 92.509 66.747 0 10751.77 -9371.967 -0.872 -35.597 4 76.706 -
EERING, Al Khobar, Saudi Arabia

0.1860 -159.81 84.029 -309.370 -13897.674 64.026 92.509 66.747 0 10751.77 -10678.254 -0.993 -44.205 4 64.026 -
0.1890 -201.23 83.036 -353.575 -15572.577 49.578 92.509 66.747 0 10751.77 -12136.878 -1.129 -44.740 4 49.578 -
Revision

0.1920 -196.42 81.907 -398.316 -14254.395 33.156 92.509 66.747 0 10751.77 -13469.224 -1.253 -36.415 4 33.156 -
Rev. No.
Checked
Designed

0.1950 -146.49 80.654 -434.731 -10022.337 14.932 92.509 66.747 0 10751.77 -14404.078 -1.340 -20.467 4 14.932 -
0.1980 -62.89 79.315 -455.198 -3622.135 -4.557 92.509 66.747 0 10751.77 -14739.653 -1.371 0.122 4 -4.557 -
0.2010 35.15 77.944 -455.076 3703.442 -24.500 92.509 66.747 0 10751.77 -14389.846 -1.338 21.303 4 -24.500 -
:
:
:
:

0.2040 125.11 76.605 -433.773 10498.267 -43.970 92.509 66.747 0 10751.77 -13404.090 -1.247 38.886 4 -43.970 -
0.2070 186.34 75.359 -394.887 15425.553 -62.106 92.509 66.747 0 10751.77 -11963.335 -1.113 48.839 4 -62.106 -
0.2100 197.66 74.246 -346.048 17133.920 -78.293 92.509 66.747 0 10751.77 -10343.268 -0.962 50.438 4 -78.293 -
00
NFP

AMK

IFC SUB

0.2130 173.32 73.284 -295.610 16491.476 -92.287 92.509 66.747 0 10751.77 -8796.898 -0.818 43.912 4 -92.287 -
0.2160 101.70 72.466 -251.698 12783.266 -104.190 92.509 66.747 0 10751.77 -7584.950 -0.705 30.459 4 -104.190 -
0.2190 6.70 71.760 -221.239 7522.569 -114.452 92.509 66.747 0 10751.77 -6859.547 -0.638 14.442 4 -114.452 -

Page 267 of 281


0.2220 -89.83 71.122 -206.797 2105.289 -123.734 92.509 66.747 0 10751.77 -6635.465 -0.617 0.084 4 -123.734 -
0.2250 -165.72 70.505 -206.714 -2049.456 -132.712 92.509 66.747 0 10751.77 -6789.564 -0.631 -8.268 4 -132.712 -
0.2280 -197.66 69.874 -214.982 -3462.435 -141.898 92.509 66.747 0 10751.77 -7088.196 -0.659 -9.120 4 -141.898 -

26 JAN 2022
Subject
0.2310 -193.65 69.215 -224.102 -2617.568 -151.489 92.509 66.747 0 10751.77 -7290.747 -0.678 -1.866 4 -151.489 -

Calc. No.
PROJECT

ISSUED FOR CONSTRUCTION (IFC)


0.2340 -139.23 68.536 -225.968 1373.463 -161.353 92.509 66.747 0 10751.77 -7126.034 -0.663 13.065 4 -161.353 -
0.2370 -52.83 67.874 -212.902 7336.789 -170.995 92.509 66.747 0 10751.77 -6404.906 -0.596 31.995 4 -170.995 -

Project Code No.


0.2400 45.71 67.278 -180.907 13993.142 -179.661 92.509 66.747 0 10751.77 -5063.180 -0.471 50.817 4 -179.661 -

EWO / B.I. Number


0.2430 133.75 66.807 -130.091 19884.724 -186.511 92.509 66.747 0 10751.77 -3172.347 -0.295 65.391 4 -186.511 -
0.2460 191.06 66.512 -64.699 23497.358 -187.386 92.509 66.747 -1 10737.23 -942.131 -0.088 71.107 5 -187.386 1.02
0.2490 197.66 66.424 6.408 23907.449 -187.386 92.509 66.747 -1 10737.23 1332.056 0.124 68.974 1 -187.386 1.03
0.2520 168.16 66.548 75.382 21963.425 -185.581 92.186 66.424 0 10751.77 3413.413 0.317 58.382 2 -185.581 -
0.2550 92.16 66.866 133.764 16957.947 -180.963 92.186 66.424 0 10751.77 5030.972 0.468 41.190 4 -180.963 - : 510008
0.2580 -5.01 67.334 174.954 10501.944 -174.156 92.186 66.424 0 10751.77 6046.979 0.562 21.801 4 -174.156 -
: PE-P20081
0.2610 -101.03 67.896 196.755 4032.101 -165.974 92.186 66.424 0 10751.77 6459.834 0.601 4.501 4 -165.974 -
0.2640 -173.84 68.497 201.257 -1031.189 -157.234 92.186 66.424 0 10751.77 6409.172 0.596 -6.120 4 -157.234 -
: 10-02062-0002-001

0.2670 -197.66 69.093 195.137 -3048.664 -148.562 92.186 66.424 0 10751.77 6147.930 0.572 -9.032 4 -148.562 -
0.2700 -188.12 69.665 186.105 -2972.551 -140.244 92.186 66.424 0 10751.77 5910.228 0.550 -4.159 4 -140.244 -
0.2730 -129.02 70.215 181.946 200.113 -132.247 92.186 66.424 0 10751.77 5959.209 0.554 8.114 4 -132.247 -
0.2760 -40.29 70.769 190.060 5209.177 -124.184 92.186 66.424 0 10751.77 6471.854 0.602 23.939 4 -124.184 -
0.2790 57.71 71.371 213.999 10749.850 -115.428 92.186 66.424 0 10751.77 7497.408 0.697 39.197 4 -115.428 -
0.2820 142.44 72.068 253.195 15381.174 -105.283 92.186 66.424 0 10751.77 8951.042 0.833 49.859 4 -105.283 -
: Building A9, Design of RC Column, C1

0.2850 194.45 72.901 303.055 17858.444 -93.172 92.186 66.424 0 10751.77 10632.119 0.989 52.919 4 -93.172 -

Calculation Report, OPERATION SHELTER, Plant Plant No. 015


0.2880 201.79 73.889 355.974 17420.644 -78.787 92.186 66.424 0 10751.77 12269.203 1.141 47.081 4 -78.787 -
0.2910 162.76 75.031 403.055 13966.846 -62.186 92.186 66.424 0 10751.77 13581.496 1.263 33.072 4 -62.186 -
0.2940 86.34 76.294 436.127 8081.032 -43.810 92.186 66.424 0 10751.77 14342.570 1.334 13.471 4 -43.810 -
: Updrade Buildings for Risk Mitigation - RT Refinery
SNC-LAVALIN FAYEZ ENGINE

0 2970
0.2970 -9 92
-9.92 77 628
77.628 449 598
449.598 899 632
899.632 -24 405
-24.405 92 186
92.186 66 424
66.424 0 10751 77
10751.77 14431 784
14431.784 1 342
1.342 -7 872
-7.872 4 -24 405
-24.405 -
0.3000 -103.89 78.970 441.725 -6147.825 -4.878 92.186 66.424 0 10751.77 13861.558 1.289 -26.720 4 -4.878 -
CALCULATION

0.3030 -174.00 80.259 415.006 -11665.345 13.877 92.186 66.424 0 10751.77 12780.726 1.189 -38.810 4 13.877 -
0.3060 -197.66 81.448 376.195 -14208.085 31.170 92.186 66.424 0 10751.77 11443.469 1.064 -42.941 4 31.170 -
0.3090 -185.58 82.512 333.254 -14419.301 46.653 92.186 66.424 0 10751.77 10099.221 0.939 -38.827 4 46.653 -
0.3120 -124.34 83.452 294.428 -11465.136 60.317 92.186 66.424 0 10751.77 9019.854 0.839 -27.168 4 60.317 -
0.3150 -34.53 84.290 267.260 -6646.626 72.522 92.186 66.424 0 10751.77 8385.489 0.780 -11.893 4 72.522 -
SHEET

0.3180 63.22 85.070 255.367 -1282.287 83.867 92.186 66.424 0 10751.77 8247.052 0.767 2.864 4 83.867 -
0.3210 146.43 85.837 258.231 3191.926 95.026 92.186 66.424 0 10751.77 8521.861 0.793 13.119 4 95.026 -
0.3240 196.01 86.630 271.350 5554.183 106.556 92.186 66.424 0 10751.77 9013.557 0.838 15.950 4 106.556 -
0.3270 200.55 87.468 287.300 5079.062 118.752 92.186 66.424 0 10751.77 9458.295 0.880 10.177 4 118.752 -
0.3300 159.02 88.348 297.477 1705.697 131.549 92.186 66.424 0 10751.77 9586.590 0.892 -3.362 4 131.549 -
EERING, Al Khobar, Saudi Arabia

0.3330 80.95 89.240 294.116 -3946.857 144.520 92.186 66.424 0 10751.77 9186.587 0.854 -22.001 4 144.520 -
0.3360 -15.71 90.094 272.114 -10720.583 156.950 92.186 66.424 0 10751.77 8154.213 0.758 -41.856 4 156.950 -
Revision

0.3390 -108.77 90.853 230.258 -17183.416 167.982 92.186 66.424 0 10751.77 6518.683 0.606 -58.711 4 167.982 -
Rev. No.
Checked
Designed

0.3420 -176.84 91.459 171.547 -21957.246 176.802 92.186 66.424 0 10751.77 4444.084 0.413 -68.371 4 176.802 -
0.3450 -197.66 91.872 103.176 -23623.647 182.815 92.186 66.424 0 10751.77 2196.937 0.204 -69.760 4 182.815 -
0.3480 -182.76 92.076 33.416 -22883.114 185.788 92.186 66.424 0 10751.77 34.357 0.003 -62.728 4 185.788 -
:
:
:
:

0.3510 -119.13 92.080 -29.312 -18935.251 185.834 92.186 66.424 0 10751.77 -1768.081 -0.164 -48.108 4 185.834 -
0.3540 -28.13 91.915 -77.419 -13136.538 183.442 92.186 66.424 0 10751.77 -3031.067 -0.282 -29.950 4 183.442 -
0.3570 69.33 91.633 -107.370 -6830.410 179.341 92.186 66.424 0 10751.77 -3707.053 -0.345 -12.430 4 179.341 -
00
NFP

AMK

IFC SUB

0.3600 150.87 91.289 -119.800 -1456.498 174.325 92.186 66.424 0 10751.77 -3882.463 -0.361 0.485 4 174.325 -
0.3630 197.74 90.927 -119.315 1780.050 169.072 92.186 66.424 0 10751.77 -3755.879 -0.349 5.948 4 169.072 -
0.3660 199.18 90.578 -113.367 2185.208 163.990 92.186 66.424 0 10751.77 -3590.473 -0.334 2.880 4 163.990 -

Page 268 of 281


0.3690 154.87 90.244 -110.486 -264.879 159.132 92.186 66.424 0 10751.77 -3651.650 -0.340 -7.776 4 159.132 -
0.3720 74.97 89.905 -118.262 -4918.974 154.192 92.186 66.424 0 10751.77 -4144.219 -0.385 -23.280 4 154.192 -
0.3750 -22.16 89.519 -141.542 -10601.090 148.584 92.186 66.424 0 10751.77 -5163.566 -0.480 -39.724 4 148.584 -

26 JAN 2022
Subject
0.3780 -114.19 89.039 -181.266 -15881.531 141.598 92.186 66.424 0 10751.77 -6672.044 -0.621 -52.932 4 141.598 -

Calc. No.
PROJECT

ISSUED FOR CONSTRUCTION (IFC)


0.3810 -179.99 88.418 -234.198 -19406.376 132.570 92.186 66.424 0 10751.77 -8499.259 -0.790 -58.795 4 132.570 -
0.3840 -197.66 87.628 -292.993 -19789.974 121.071 92.186 66.424 0 10751.77 -10375.958 -0.965 -56.383 4 121.071 -

Project Code No.


0.3870 -179.63 86.663 -349.376 -17798.899 107.032 92.186 66.424 0 10751.77 -12047.704 -1.121 -45.706 4 107.032 -

EWO / B.I. Number


0.3900 -113.35 85.542 -395.081 -12671.492 90.731 92.186 66.424 0 10751.77 -13246.171 -1.232 -27.747 4 90.731 -
0.3930 -21.03 84.310 -422.828 -5826.421 72.809 92.186 66.424 0 10751.77 -13804.376 -1.284 -6.691 4 72.809 -
0.3960 76.12 83.026 -429.520 1365.546 54.131 92.186 66.424 0 10751.77 -13689.905 -1.273 13.241 4 54.131 -
0.3990 155.79 81.753 -416.278 7461.994 35.608 92.186 66.424 0 10751.77 -13004.608 -1.210 28.111 4 35.608 -
0.4020 199.66 80.543 -388.168 11278.548 18.013 92.186 66.424 0 10751.77 -11960.577 -1.112 35.157 4 18.013 - : 510008
0.4050 197.66 79.431 -353.011 12159.224 1.830 92.186 66.424 0 10751.77 -10830.983 -1.007 33.427 4 1.830 -
: PE-P20081
0.4080 150.25 78.424 -319.584 10125.349 -12.825 92.186 66.424 0 10751.77 -9887.039 -0.920 23.991 4 -12.825 -
0.4110 68.32 77.504 -295.593 5868.843 -26.202 92.186 66.424 0 10751.77 -9335.600 -0.868 9.690 4 -26.202 -
: 10-02062-0002-001

0.4140 -29.31 76.636 -285.902 591.430 -38.834 92.186 66.424 0 10751.77 -9271.713 -0.862 -5.523 4 -38.834 -
0.4170 -120.20 75.773 -291.425 -4273.272 -51.378 92.186 66.424 0 10751.77 -9657.045 -0.898 -17.496 4 -51.378 -
0.4200 -183.48 74.875 -308.921 -7390.920 -64.445 92.186 66.424 0 10751.77 -10322.170 -0.960 -22.193 4 -64.445 -
0.4230 -197.66 73.915 -331.114 -7404.307 -78.411 92.186 66.424 0 10751.77 -11001.999 -1.023 -18.824 4 -78.411 -
0.4260 -176.16 72.892 -349.938 -5144.836 -93.297 92.186 66.424 0 10751.77 -11451.451 -1.065 -7.544 4 -93.297 -
0.4290 -106.94 71.827 -357.482 115.232 -108.791 92.186 66.424 0 10751.77 -11415.748 -1.062 10.519 4 -108.791 -
: Building A9, Design of RC Column, C1

0.4320 -13.14 70.765 -346.963 6897.716 -124.237 92.186 66.424 0 10751.77 -10746.167 -0.999 31.064 4 -124.237 -

Calculation Report, OPERATION SHELTER, Plant Plant No. 015


0.4350 83.67 69.766 -315.899 13811.435 -138.777 92.186 66.424 0 10751.77 -9430.721 -0.877 49.849 4 -138.777 -
0.4380 161.26 68.889 -266.050 19421.128 -151.537 92.186 66.424 0 10751.77 -7591.008 -0.706 62.996 4 -151.537 -
0.4410 201.80 68.183 -203.055 22575.957 -161.807 92.186 66.424 0 10751.77 -5455.742 -0.507 67.873 4 -161.807 -
: Updrade Buildings for Risk Mitigation - RT Refinery
SNC-LAVALIN FAYEZ ENGINE

0 4440
0.4440 195 98
195.98 67 675
67.675 -135 182
-135.182 22672 789
22672.789 -169 189
-169.189 92 186
92.186 66 424
66.424 0 10751 77
10751.77 -3309 781
-3309.781 -0 308
-0.308 63 700
63.700 4 -169 189
-169.189 -
0.4470 145.13 67.367 -71.482 19793.780 -173.667 92.186 66.424 0 10751.77 -1430.351 -0.133 51.721 4 -173.667 -
CALCULATION

0.4500 60.94 67.234 -19.761 14686.646 -175.603 92.186 66.424 0 10751.77 -25.107 -0.002 34.918 4 -175.603 -
0.4530 -37.25 67.232 15.157 8592.184 -175.637 92.186 66.424 0 10751.77 813.758 0.076 17.326 4 -175.637 -
0.4560 -126.88 67.308 32.483 2958.649 -174.536 92.186 66.424 0 10751.77 1128.819 0.105 3.101 4 -174.536 -
0.4590 -187.36 67.413 35.584 -891.368 -173.008 92.186 66.424 0 10751.77 1092.863 0.102 -3.771 4 -173.008 -
0.4620 -197.66 67.514 31.813 -1622.635 -171.530 92.186 66.424 0 10751.77 971.723 0.090 -2.628 4 -171.530 -
SHEET

0.4650 -172.30 67.605 29.185 -129.385 -170.215 92.186 66.424 0 10751.77 1006.348 0.094 6.237 4 -170.215 -
0.4680 -99.81 67.698 35.422 4287.086 -168.853 92.186 66.424 0 10751.77 1443.561 0.134 21.566 4 -168.853 -
0.4710 -4.38 67.832 56.988 10090.549 -166.900 92.186 66.424 0 10751.77 2419.669 0.225 38.948 4 -166.900 -
0.4740 92.05 68.057 95.936 15874.536 -163.626 92.186 66.424 0 10751.77 3932.558 0.366 54.139 4 -163.626 -
0.4770 167.33 68.423 150.075 20218.394 -158.305 92.186 66.424 0 10751.77 5841.415 0.543 62.744 4 -158.305 -
EERING, Al Khobar, Saudi Arabia

0.4800 197.66 68.967 212.820 21611.112 -150.402 92.186 66.424 0 10751.77 7894.360 0.734 63.362 4 -150.402 -
0.4830 192.55 69.701 276.182 20630.528 -139.720 92.186 66.424 0 10751.77 9837.762 0.915 55.498 4 -139.720 -
Revision

0.4860 137.21 70.616 331.680 16367.948 -126.410 92.186 66.424 0 10751.77 11387.956 1.059 39.579 4 -126.410 -
Rev. No.
Checked
Designed

0.4890 50.34 71.675 371.258 10017.856 -111.002 92.186 66.424 0 10751.77 12344.465 1.148 19.331 4 -111.002 -
0.4920 -48.09 72.823 390.589 2869.252 -94.299 92.186 66.424 0 10751.77 12632.783 1.175 -1.123 4 -94.299 -
0.4950 -135.47 73.998 389.467 -3617.611 -77.207 92.186 66.424 0 10751.77 12506.051 1.163 0.188 4 -77.207 -
:
:
:
:

43

RESULTS SUMMARY
Def, y Reaction Ductility
00
NFP

AMK
IFC SUB

Inbound 92.509 187.386 7.182


Rebound - -187.386 -

Page 269 of 281


Component/Member response exceeds the elastic range…..
CALCULATION SHEET

SNC-LAVALIN FAYEZ ENGINEERING, Al Khobar, Saudi Arabia


PROJECT : Updrade Buildings for Risk Mitigation - RT Refinery
EWO / B.I. No. : 10-02062-0002-001 Designed : NFP
Project Code No. : 510008 Checked : AMK
Calc. No. : PE-P20081 Revision : IFC SUB
Subject : Building A9, Design of RC Column, C1 Rev. No. : 00

NON-LINEAR (ELASTO-PLASTIC) SDOF ANALYSIS FOR VERTICAL DYNAMIC LOAD

VERTICAL RESPONSE GRAPH (Based on calculated values from the table on next page…..)

Dyn. Load/Deformation vs. Time Dyn. Load, F
Deformation, y / 1000
800.00  
700.00  
600.00  
500.00  
400.00  
300.00  
200.00  
100.00  
0.00  
‐100.00  
0.0000 

0.1000 

0.2000 

0.3000 

0.4000 

0.5000 

0.6000 
0.00

0.10

0.20

0.30

0.40

0.50

0.60
Support Reaction/Dyn. Load vs. Time Dyn. Load, F
Support Reaction, V
1200.00  

1000.00  

800.00  

600.00  

400.00  

200.00  

0.00  

‐200.00  
0.0000 

0.1000 

0.2000 

0.3000 

0.4000 

0.5000 

0.6000 

ISSUED FOR CONSTRUCTION (IFC)

26 JAN 2022
Calculation Report, OPERATION SHELTER, Plant Plant No. 015 Page 270 of 281
DESIGN INPUT

26 JAN 2022
Subject
time increment, ∆t 0.003 secs

Calc. No.
PROJECT

ISSUED FOR CONSTRUCTION (IFC)


mass, M 0.016 kN-s²/mm
stiffness, K 1816.935 kN/mm

Project Code No.


damping, C 0.000 kN-s/mm

EWO / B.I. Number


positive resistance, Ru+ 10090.870 kN
rebound resistance, Ru- -2037.800 kN
static load, Fs 157.998 kN (Pre-load)

LEGEND : : 510008
KEY = 0 is elastic Z= 1 is increasing plastic deformation : PE-P20081
KEY = +1 is positive plastic Z= 2 is end of rebound plastic deformation
KEY = -1 is rebound plastic Z= 3 is end of positive plastic deformation
: 10-02062-0002-001

Z= 4 is continued elastic
Z= 5 is start of rebound plastic deformation
Z= 6 is start of positive plastic deformation

Numerical Integration (Newmark-Beta Method)


Dyn. Def. @ Yield pt. Dyn. Ductile
: Building A9, Design of RC Column, C1

Time, Def. Vel. Acc. Rstnce incr incr incr


Load, KEY eff K Z Reaction Ratio

Calculation Report, OPERATION SHELTER, Plant Plant No. 015


t y v a R ye+ ye- F y v
F V μ
secs kN mm mm/s mm/s² kN mm mm kN/mm kN mm mm/s kN
0.0000 0.00 0.087 0.000 0.000 157.998 5.554 -1.122 0 12554.16 0.000 0.000 0.000 157.998 -
: Updrade Buildings for Risk Mitigation - RT Refinery
SNC-LAVALIN FAYEZ ENGINE

0 0030
0.0030 0 00
0.00 0 087
0.087 0 000
0.000 0 000
0.000 157 998
157.998 5 554
5.554 -1 122
-1.122 0 12554 16
12554.16 0 000
0.000 0 000
0.000 0 000
0.000 4 157 998
157.998 -
0.0060 0.00 0.087 0.000 0.000 157.998 5.554 -1.122 0 12554.16 0.000 0.000 0.000 4 157.998 -
CALCULATION

0.0090 0.00 0.087 0.000 0.000 157.998 5.554 -1.122 0 12554.16 0.000 0.000 0.000 4 157.998 -
0.0120 0.00 0.087 0.000 0.000 157.998 5.554 -1.122 0 12554.16 58.266 0.005 4.641 4 157.998 -
0.0150 58.27 0.092 4.641 3094.134 166.431 5.554 -1.122 0 12554.16 386.401 0.031 12.214 4 166.431 -
0.0180 145.67 0.122 16.855 5048.494 222.354 5.554 -1.122 0 12554.16 874.263 0.070 11.501 4 222.354 -
0.0210 233.07 0.192 28.356 2618.912 348.884 5.554 -1.122 0 12554.16 1127.341 0.090 0.801 4 348.884 -
SHEET

0.0240 320.47 0.282 29.157 -2084.844 512.042 5.554 -1.122 0 12554.16 925.873 0.074 -10.595 4 512.042 -
0.0270 407.86 0.356 18.563 -4978.192 646.041 5.554 -1.122 0 12554.16 444.805 0.035 -12.790 4 646.041 -
0.0300 495.26 0.391 5.773 -3548.647 710.417 5.554 -1.122 0 12554.16 101.881 0.008 -3.879 4 710.417 -
0.0330 582.66 0.399 1.893 962.423 725.162 5.554 -1.122 0 12554.16 194.885 0.016 8.400 4 725.162 -
0.0360 670.06 0.415 10.293 4637.757 753.367 5.554 -1.122 0 12554.16 643.055 0.051 13.385 4 753.367 -
EERING, Al Khobar, Saudi Arabia

0.0390 757.46 0.466 23.679 4285.820 846.435 5.554 -1.122 0 12554.16 915.711 0.073 -4.524 4 846.435 -
0.0420 703.36 0.539 19.154 -7302.103 978.963 5.554 -1.122 0 12554.16 210.072 0.017 -29.777 4 978.963 -
Revision

0.0450 649.25 0.556 -10.622 -12549.127 1009.367 5.554 -1.122 0 12554.16 -1002.613 -0.080 -29.172 4 1009.367 -
Rev. No.
Checked
Designed

0.0480 595.15 0.476 -39.794 -6898.915 864.261 5.554 -1.122 0 12554.16 -1669.290 -0.133 -3.235 4 864.261 -
0.0510 541.05 0.343 -43.030 4742.082 622.668 5.554 -1.122 0 12554.16 -1211.039 -0.096 25.511 4 622.668 -
0.0540 486.94 0.246 -17.519 12265.215 447.397 5.554 -1.122 0 12554.16 -25.789 -0.002 32.104 4 447.397 -
:
:
:
:

0.0570 432.84 0.244 14.586 9137.651 443.665 5.554 -1.122 0 12554.16 857.228 0.068 10.819 4 443.665 -
0.0600 378.73 0.312 25.405 -1924.740 567.729 5.554 -1.122 0 12554.16 671.231 0.053 -19.861 4 567.729 -
0.0630 324.63 0.366 5.544 -11315.751 664.875 5.554 -1.122 0 12554.16 -422.268 -0.034 -33.294 4 664.875 -
00
NFP

AMK
IFC SUB

0.0660 270.52 0.332 -27.750 -10880.548 603.761 5.554 -1.122 0 12554.16 -1473.710 -0.117 -17.816 4 603.761 -
0.0690 216.42 0.215 -45.567 -997.045 390.475 5.554 -1.122 0 12554.16 -1570.059 -0.125 13.133 4 390.475 -
0.0720 162.31 0.090 -32.434 9752.258 163.243 5.554 -1.122 0 12554.16 -627.649 -0.050 32.678 4 163.243 -

Page 271 of 281


0.0750 108.21 0.040 0.244 12033.030 72.405 5.554 -1.122 0 12554.16 535.163 0.043 23.847 4 72.405 -
0.0780 54.10 0.082 24.091 3864.727 149.858 5.554 -1.122 0 12554.16 908.631 0.072 -5.692 4 149.858 -
0.0810 0.00 0.155 18.398 -7659.575 281.362 5.554 -1.122 0 12554.16 222.552 0.018 -25.979 4 281.362 -

26 JAN 2022
Subject
0.0840 0.00 0.173 -7.580 -9659.437 313.572 5.554 -1.122 0 12554.16 -710.888 -0.057 -19.396 4 313.572 -

Calc. No.
PROJECT

ISSUED FOR CONSTRUCTION (IFC)


0.0870 0.00 0.116 -26.976 -3271.371 210.686 5.554 -1.122 0 12554.16 -1027.017 -0.082 4.029 4 210.686 -
0.0900 0.00 0.034 -22.947 5957.442 62.049 5.554 -1.122 0 12554.16 -451.319 -0.036 23.956 4 62.049 -

Project Code No.


0.0930 0.00 -0.002 1.008 10013.015 -3.270 5.554 -1.122 0 12554.16 516.289 0.041 23.080 4 -3.270 -

EWO / B.I. Number


0.0960 0.00 0.039 24.088 5373.624 71.452 5.554 -1.122 0 12554.16 1035.569 0.082 2.162 4 71.452 -
0.0990 0.00 0.122 26.251 -3932.040 221.327 5.554 -1.122 0 12554.16 655.596 0.052 -20.633 4 221.327 -
0.1020 0.00 0.174 5.618 -9823.253 316.210 5.554 -1.122 0 12554.16 -293.674 -0.023 -25.511 4 316.210 -
0.1050 0.00 0.151 -19.893 -7184.286 273.707 5.554 -1.122 0 12554.16 -987.928 -0.079 -8.237 4 273.707 -
0.1080 0.00 0.072 -28.130 1693.271 130.727 5.554 -1.122 0 12554.16 -824.299 -0.066 16.191 4 130.727 - : 510008
0.1110 0.00 0.006 -11.939 9100.450 11.428 5.554 -1.122 0 12554.16 55.124 0.004 26.558 4 11.428 - : PE-P20081
0.1140 0.00 0.011 14.619 8605.106 19.406 5.554 -1.122 0 12554.16 886.679 0.071 13.864 4 19.406 -
0.1170 0.00 0.081 28.483 637.379 147.733 5.554 -1.122 0 12554.16 948.272 0.076 -10.870 4 147.733 -
: 10-02062-0002-001

0.1200 0.00 0.157 17.613 -7883.826 284.974 5.554 -1.122 0 12554.16 186.418 0.015 -26.164 4 284.974 -
0.1230 0.00 0.172 -8.551 -9558.984 311.954 5.554 -1.122 0 12554.16 -737.315 -0.059 -18.739 4 311.954 -
0.1260 0.00 0.113 -27.290 -2933.444 205.244 5.554 -1.122 0 12554.16 -1020.788 -0.081 4.959 4 205.244 -
0.1290 0.00 0.032 -22.331 6239.399 57.508 5.554 -1.122 0 12554.16 -417.844 -0.033 24.350 4 57.508 -
0.1320 0.00 -0.002 2.019 9994.159 -2.966 5.554 -1.122 0 12554.16 547.942 0.044 22.597 4 -2.966 -
0.1350 0.00 0.042 24.616 5070.330 76.336 5.554 -1.122 0 12554.16 1037.914 0.083 1.221 4 76.336 -
: Building A9, Design of RC Column, C1

0.1380 0.00 0.125 25.837 -4256.402 226.551 5.554 -1.122 0 12554.16 626.596 0.050 -21.215 4 226.551 -

Calculation Report, OPERATION SHELTER, Plant Plant No. 015


0.1410 0.00 0.175 4.622 -9887.019 317.237 5.554 -1.122 0 12554.16 -328.836 -0.026 -25.229 4 317.237 -
0.1440 0.00 0.148 -20.607 -6932.083 269.645 5.554 -1.122 0 12554.16 -998.719 -0.080 -7.334 4 269.645 -
0.1470 0.00 0.069 -27.941 2042.439 125.103 5.554 -1.122 0 12554.16 -801.347 -0.064 16.929 4 125.103 -
: Updrade Buildings for Risk Mitigation - RT Refinery
SNC-LAVALIN FAYEZ ENGINE

0 1500
0.1500 0 00
0.00 0 005
0.005 -11 012
-11.012 9243 376
9243.376 9 126
9.126 5 554
5.554 -1 122
-1.122 0 12554 16
12554.16 91 887
91.887 0 007
0.007 26 492
26.492 4 9 126
9.126 -
0.1530 0.00 0.012 15.479 8417.679 22.425 5.554 -1.122 0 12554.16 905.329 0.072 13.050 4 22.425 -
CALCULATION

0.1560 0.00 0.084 28.529 282.354 153.451 5.554 -1.122 0 12554.16 932.615 0.074 -11.724 4 153.451 -
0.1590 0.00 0.159 16.805 -8098.157 288.426 5.554 -1.122 0 12554.16 150.049 0.012 -26.317 4 288.426 -
0.1620 0.00 0.171 -9.512 -9446.503 310.142 5.554 -1.122 0 12554.16 -762.814 -0.061 -18.057 4 310.142 -
0.1650 0.00 0.110 -27.569 -2591.826 199.742 5.554 -1.122 0 12554.16 -1013.275 -0.081 5.883 4 199.742 -
0.1680 0.00 0.029 -21.687 6513.505 53.093 5.554 -1.122 0 12554.16 -383.843 -0.031 24.714 4 53.093 -
SHEET

0.1710 0.00 -0.001 3.028 9962.729 -2.460 5.554 -1.122 0 12554.16 578.906 0.046 22.085 4 -2.460 -
0.1740 0.00 0.045 25.113 4760.656 81.324 5.554 -1.122 0 12554.16 1038.952 0.083 0.278 4 81.324 -
0.1770 0.00 0.128 25.391 -4575.409 231.689 5.554 -1.122 0 12554.16 596.808 0.048 -21.771 4 231.689 -
0.1800 0.00 0.175 3.620 -9938.344 318.064 5.554 -1.122 0 12554.16 -363.585 -0.029 -24.914 4 318.064 -
0.1830 0.00 0.146 -21.294 -6671.157 265.443 5.554 -1.122 0 12554.16 -1008.252 -0.080 -6.423 4 265.443 -
EERING, Al Khobar, Saudi Arabia

0.1860 0.00 0.066 -27.717 2389.036 119.521 5.554 -1.122 0 12554.16 -777.388 -0.062 17.646 4 119.521 -
0.1890 0.00 0.004 -10.072 9374.672 7.011 5.554 -1.122 0 12554.16 128.534 0.010 26.391 4 7.011 -
Revision

0.1920 0.00 0.014 16.320 8219.660 25.614 5.554 -1.122 0 12554.16 922.841 0.074 12.220 4 25.614 -
Rev. No.
Checked
Designed

0.1950 0.00 0.088 28.540 -73.026 159.174 5.554 -1.122 0 12554.16 915.784 0.073 -12.563 4 159.174 -
0.1980 0.00 0.161 15.977 -8302.299 291.714 5.554 -1.122 0 12554.16 113.491 0.009 -26.437 4 291.714 -
0.2010 0.00 0.170 -10.460 -9322.136 308.139 5.554 -1.122 0 12554.16 -787.354 -0.063 -17.354 4 308.139 -
:
:
:
:

0.2040 0.00 0.107 -27.814 -2246.946 194.187 5.554 -1.122 0 12554.16 -1004.487 -0.080 6.799 4 194.187 -
0.2070 0.00 0.027 -21.015 6779.416 48.810 5.554 -1.122 0 12554.16 -349.358 -0.028 25.047 4 48.810 -
0.2100 0.00 -0.001 4.032 9918.763 -1.752 5.554 -1.122 0 12554.16 609.142 0.049 21.546 4 -1.752 -
00
NFP

AMK
IFC SUB

0.2130 0.00 0.048 25.578 4444.992 86.408 5.554 -1.122 0 12554.16 1038.684 0.083 -0.666 4 86.408 -
0.2160 0.00 0.130 24.913 -4888.659 236.734 5.554 -1.122 0 12554.16 566.268 0.045 -22.299 4 236.734 -
0.2190 0.00 0.175 2.614 -9977.164 318.689 5.554 -1.122 0 12554.16 -397.876 -0.032 -24.569 4 318.689 -

Page 272 of 281


0.2220 0.00 0.144 -21.955 -6401.838 261.105 5.554 -1.122 0 12554.16 -1016.518 -0.081 -5.504 4 261.105 -
0.2250 0.00 0.063 -27.458 2732.628 113.987 5.554 -1.122 0 12554.16 -752.450 -0.060 18.340 4 113.987 -
0.2280 0.00 0.003 -9.118 9494.172 5.087 5.554 -1.122 0 12554.16 165.020 0.013 26.258 4 5.087 -

26 JAN 2022
Subject
0.2310 0.00 0.016 17.140 8011.299 28.970 5.554 -1.122 0 12554.16 939.192 0.075 11.374 4 28.970 -

Calc. No.
PROJECT

ISSUED FOR CONSTRUCTION (IFC)


0.2340 0.00 0.091 28.514 -428.315 164.897 5.554 -1.122 0 12554.16 897.802 0.072 -13.386 4 164.897 -
0.2370 0.00 0.162 15.128 -8495.995 294.833 5.554 -1.122 0 12554.16 76.791 0.006 -26.523 4 294.833 -

Project Code No.


0.2400 0.00 0.168 -11.395 -9186.040 305.947 5.554 -1.122 0 12554.16 -810.903 -0.065 -16.628 4 305.947 -

EWO / B.I. Number


0.2430 0.00 0.104 -28.023 -1899.240 188.587 5.554 -1.122 0 12554.16 -994.436 -0.079 7.706 4 188.587 -
0.2460 0.00 0.025 -20.317 7036.796 44.665 5.554 -1.122 0 12554.16 -314.435 -0.025 25.349 4 44.665 -
0.2490 0.00 0.000 5.032 9862.317 -0.843 5.554 -1.122 0 12554.16 638.611 0.051 20.979 4 -0.843 -
0.2520 0.00 0.050 26.011 4123.735 91.582 5.554 -1.122 0 12554.16 1037.108 0.083 -1.608 4 91.582 -
0.2550 0.00 0.133 24.403 -5195.758 241.680 5.554 -1.122 0 12554.16 535.016 0.043 -22.799 4 241.680 - : 510008
0.2580 0.00 0.176 1.604 -10003.431 319.112 5.554 -1.122 0 12554.16 -431.666 -0.034 -24.192 4 319.112 - : PE-P20081
0.2610 0.00 0.141 -22.588 -6124.463 256.638 5.554 -1.122 0 12554.16 -1023.504 -0.082 -4.578 4 256.638 -
0.2640 0.00 0.060 -27.165 3072.781 108.509 5.554 -1.122 0 12554.16 -726.566 -0.058 19.012 4 108.509 -
: 10-02062-0002-001

0.2670 0.00 0.002 -8.153 9601.726 3.354 5.554 -1.122 0 12554.16 201.298 0.016 26.092 4 3.354 -
0.2700 0.00 0.018 17.939 7792.858 32.488 5.554 -1.122 0 12554.16 954.361 0.076 10.515 4 32.488 -
0.2730 0.00 0.094 28.453 -783.065 170.610 5.554 -1.122 0 12554.16 878.689 0.070 -14.193 4 170.610 -
0.2760 0.00 0.164 14.260 -8679.000 297.781 5.554 -1.122 0 12554.16 39.994 0.003 -26.576 4 297.781 -
0.2790 0.00 0.167 -12.316 -9038.386 303.569 5.554 -1.122 0 12554.16 -833.431 -0.066 -15.881 4 303.569 -
0.2820 0.00 0.101 -28.197 -1549.144 182.949 5.554 -1.122 0 12554.16 -983.133 -0.078 8.604 4 182.949 -
: Building A9, Design of RC Column, C1

0.2850 0.00 0.022 -19.593 7285.323 40.662 5.554 -1.122 0 12554.16 -279.115 -0.022 25.618 4 40.662 -

Calculation Report, OPERATION SHELTER, Plant Plant No. 015


0.2880 0.00 0.000 6.025 9793.462 0.266 5.554 -1.122 0 12554.16 667.276 0.053 20.386 4 0.266 -
0.2910 0.00 0.053 26.411 3797.290 96.840 5.554 -1.122 0 12554.16 1034.228 0.082 -2.549 4 96.840 -
0.2940 0.00 0.136 23.863 -5496.320 246.521 5.554 -1.122 0 12554.16 503.091 0.040 -23.270 4 246.521 -
: Updrade Buildings for Risk Mitigation - RT Refinery
SNC-LAVALIN FAYEZ ENGINE

0 2970
0.2970 0 00
0.00 0 176
0.176 0 593
0.593 -10017 111
-10017.111 319 332
319.332 5 554
5.554 -1 122
-1.122 0 12554 16
12554.16 -464 913
-464.913 -0 037
-0.037 -23 785
-23.785 4 319 332
319.332 -
0.3000 0.00 0.139 -23.192 -5839.383 252.046 5.554 -1.122 0 12554.16 -1029.202 -0.082 -3.645 4 252.046 -
CALCULATION

0.3030 0.00 0.057 -26.838 3409.068 103.092 5.554 -1.122 0 12554.16 -699.767 -0.056 19.659 4 103.092 -
0.3060 0.00 0.001 -7.178 9697.200 1.817 5.554 -1.122 0 12554.16 237.322 0.019 25.893 4 1.817 -
0.3090 0.00 0.020 18.715 7564.612 36.164 5.554 -1.122 0 12554.16 968.329 0.077 9.642 4 36.164 -
0.3120 0.00 0.097 28.356 -1136.829 176.308 5.554 -1.122 0 12554.16 858.471 0.068 -14.982 4 176.308 -
0.3150 0.00 0.165 13.374 -8851.086 300.552 5.554 -1.122 0 12554.16 3.146 0.000 -26.596 4 300.552 -
SHEET

0.3180 0.00 0.166 -13.221 -8879.359 301.008 5.554 -1.122 0 12554.16 -854.911 -0.068 -15.115 4 301.008 -
0.3210 0.00 0.098 -28.336 -1197.098 177.279 5.554 -1.122 0 12554.16 -970.593 -0.077 9.491 4 177.279 -
0.3240 0.00 0.020 -18.845 7524.683 36.807 5.554 -1.122 0 12554.16 -243.444 -0.019 25.855 4 36.807 -
0.3270 0.00 0.001 7.011 9712.284 1.574 5.554 -1.122 0 12554.16 695.103 0.055 19.768 4 1.574 -
0.3300 0.00 0.056 26.778 3466.067 102.174 5.554 -1.122 0 12554.16 1030.046 0.082 -3.486 4 102.174 -
EERING, Al Khobar, Saudi Arabia

0.3330 0.00 0.138 23.292 -5789.965 251.251 5.554 -1.122 0 12554.16 470.532 0.037 -23.712 4 251.251 -
0.3360 0.00 0.176 -0.420 -10018.188 319.350 5.554 -1.122 0 12554.16 -497.576 -0.040 -23.348 4 319.350 -
Revision

0.3390 0.00 0.136 -23.767 -5546.955 247.337 5.554 -1.122 0 12554.16 -1033.606 -0.082 -2.709 4 247.337 -
Rev. No.
Checked
Designed

0.3420 0.00 0.054 -26.476 3741.065 97.745 5.554 -1.122 0 12554.16 -672.088 -0.054 20.282 4 97.745 -
0.3450 0.00 0.000 -6.194 9780.471 0.476 5.554 -1.122 0 12554.16 273.049 0.022 25.661 4 0.476 -
0.3480 0.00 0.022 19.467 7326.847 39.993 5.554 -1.122 0 12554.16 981.079 0.078 8.757 4 39.993 -
:
:
:
:

0.3510 0.00 0.100 28.223 -1489.163 181.983 5.554 -1.122 0 12554.16 837.173 0.067 -15.752 4 181.983 -
0.3540 0.00 0.167 12.472 -9012.034 303.145 5.554 -1.122 0 12554.16 -33.705 -0.003 -26.582 4 303.145 -
0.3570 0.00 0.164 -14.110 -8709.161 298.267 5.554 -1.122 0 12554.16 -875.315 -0.070 -14.329 4 298.267 -
00
NFP

AMK
IFC SUB

0.3600 0.00 0.094 -28.439 -843.547 171.584 5.554 -1.122 0 12554.16 -956.831 -0.076 10.367 4 171.584 -
0.3630 0.00 0.018 -18.073 7754.575 33.104 5.554 -1.122 0 12554.16 -207.468 -0.017 26.060 4 33.104 -
0.3660 0.00 0.002 7.988 9618.886 3.078 5.554 -1.122 0 12554.16 722.054 0.058 19.124 4 3.078 -

Page 273 of 281


0.3690 0.00 0.059 27.112 3130.482 107.579 5.554 -1.122 0 12554.16 1024.568 0.082 -4.419 4 107.579 -
0.3720 0.00 0.141 22.693 -6076.326 255.863 5.554 -1.122 0 12554.16 437.382 0.035 -24.124 4 255.863 -
0.3750 0.00 0.176 -1.432 -10006.659 319.164 5.554 -1.122 0 12554.16 -529.612 -0.042 -22.881 4 319.164 -

26 JAN 2022
Subject
0.3780 0.00 0.133 -24.313 -5247.548 242.514 5.554 -1.122 0 12554.16 -1036.709 -0.083 -1.769 4 242.514 -

Calc. No.
PROJECT

ISSUED FOR CONSTRUCTION (IFC)


0.3810 0.00 0.051 -26.082 4068.356 92.474 5.554 -1.122 0 12554.16 -643.563 -0.051 20.880 4 92.474 -
0.3840 0.00 0.000 -5.202 9851.437 -0.667 5.554 -1.122 0 12554.16 308.431 0.025 25.397 4 -0.667 -

Project Code No.


0.3870 0.00 0.024 20.195 7079.864 43.971 5.554 -1.122 0 12554.16 992.594 0.079 7.860 4 43.971 -

EWO / B.I. Number


0.3900 0.00 0.103 28.055 -1839.623 187.627 5.554 -1.122 0 12554.16 814.822 0.065 -16.502 4 187.627 -
0.3930 0.00 0.168 11.553 -9161.644 305.554 5.554 -1.122 0 12554.16 -70.514 -0.006 -26.534 4 305.554 -
0.3960 0.00 0.163 -14.981 -8528.003 295.349 5.554 -1.122 0 12554.16 -894.618 -0.071 -13.525 4 295.349 -
0.3990 0.00 0.091 -28.506 -488.934 165.873 5.554 -1.122 0 12554.16 -941.866 -0.075 11.229 4 165.873 -
0.4020 0.00 0.016 -17.278 7974.710 29.559 5.554 -1.122 0 12554.16 -171.230 -0.014 26.232 4 29.559 - : 510008
0.4050 0.00 0.003 8.954 9513.385 4.777 5.554 -1.122 0 12554.16 748.097 0.060 18.457 4 4.777 - : PE-P20081
0.4080 0.00 0.062 27.411 2790.959 113.048 5.554 -1.122 0 12554.16 1017.801 0.081 -5.346 4 113.048 -
0.4110 0.00 0.143 22.065 -6355.041 260.352 5.554 -1.122 0 12554.16 403.682 0.032 -24.506 4 260.352 -
: 10-02062-0002-001

0.4140 0.00 0.175 -2.442 -9982.539 318.775 5.554 -1.122 0 12554.16 -560.982 -0.045 -22.386 4 318.775 -
0.4170 0.00 0.131 -24.828 -4941.538 237.586 5.554 -1.122 0 12554.16 -1038.507 -0.083 -0.827 4 237.586 -
0.4200 0.00 0.048 -25.654 4390.527 87.285 5.554 -1.122 0 12554.16 -614.228 -0.049 21.451 4 87.285 -
0.4230 0.00 -0.001 -4.203 9910.007 -1.611 5.554 -1.122 0 12554.16 343.426 0.027 25.101 4 -1.611 -
0.4260 0.00 0.026 20.897 6823.973 48.092 5.554 -1.122 0 12554.16 1002.860 0.080 6.954 4 48.092 -
0.4290 0.00 0.106 27.852 -2187.769 193.234 5.554 -1.122 0 12554.16 791.445 0.063 -17.231 4 193.234 -
: Building A9, Design of RC Column, C1

0.4320 0.00 0.169 10.621 -9299.726 307.778 5.554 -1.122 0 12554.16 -107.234 -0.009 -26.454 4 307.778 -

Calculation Report, OPERATION SHELTER, Plant Plant No. 015


0.4350 0.00 0.161 -15.833 -8336.116 292.258 5.554 -1.122 0 12554.16 -912.795 -0.073 -12.705 4 292.258 -
0.4380 0.00 0.088 -28.538 -133.705 160.152 5.554 -1.122 0 12554.16 -925.716 -0.074 12.077 4 160.152 -
0.4410 0.00 0.014 -16.461 8184.810 26.175 5.554 -1.122 0 12554.16 -134.776 -0.011 26.371 4 26.175 -
: Updrade Buildings for Risk Mitigation - RT Refinery
SNC-LAVALIN FAYEZ ENGINE

0 4440
0.4440 0 00
0.00 0 004
0.004 9 910
9.910 9395 914
9395.914 6 669
6.669 5 554
5.554 -1 122
-1.122 0 12554 16
12554.16 773 198
773.198 0 062
0.062 17 766
17.766 4 6 669
6.669 -
0.4470 0.00 0.065 27.676 2447.924 118.572 5.554 -1.122 0 12554.16 1009.754 0.080 -6.267 4 118.572 -
CALCULATION

0.4500 0.00 0.146 21.409 -6625.760 264.712 5.554 -1.122 0 12554.16 369.473 0.029 -24.857 4 264.712 -
0.4530 0.00 0.175 -3.449 -9945.859 318.185 5.554 -1.122 0 12554.16 -591.645 -0.047 -21.863 4 318.185 -
0.4560 0.00 0.128 -25.311 -4629.310 232.557 5.554 -1.122 0 12554.16 -1038.999 -0.083 0.117 4 232.557 -
0.4590 0.00 0.045 -25.195 4707.174 82.185 5.554 -1.122 0 12554.16 -584.121 -0.047 21.995 4 82.185 -
0.4620 0.00 -0.001 -3.200 9956.108 -2.353 5.554 -1.122 0 12554.16 377.988 0.030 24.773 4 -2.353 -
SHEET

0.4650 0.00 0.029 21.574 6559.495 52.352 5.554 -1.122 0 12554.16 1011.865 0.081 6.040 4 52.352 -
0.4680 0.00 0.109 27.613 -2533.162 198.797 5.554 -1.122 0 12554.16 767.073 0.061 -17.939 4 198.797 -
0.4710 0.00 0.171 9.674 -9426.106 309.814 5.554 -1.122 0 12554.16 -143.819 -0.011 -26.340 4 309.814 -
0.4740 0.00 0.159 -16.665 -8133.740 288.999 5.554 -1.122 0 12554.16 -929.824 -0.074 -11.868 4 288.999 -
0.4770 0.00 0.085 -28.534 221.691 154.428 5.554 -1.122 0 12554.16 -908.401 -0.072 12.909 4 154.428 -
EERING, Al Khobar, Saudi Arabia

0.4800 0.00 0.013 -15.624 8384.613 22.957 5.554 -1.122 0 12554.16 -98.153 -0.008 26.477 4 22.957 -
0.4830 0.00 0.005 10.853 9266.621 8.752 5.554 -1.122 0 12554.16 797.327 0.064 17.053 4 8.752 -
Revision

0.4860 0.00 0.068 27.905 2101.809 124.147 5.554 -1.122 0 12554.16 1000.436 0.080 -7.180 4 124.147 -
Rev. No.
Checked
Designed

0.4890 0.00 0.148 20.726 -6888.142 268.938 5.554 -1.122 0 12554.16 334.800 0.027 -25.177 4 268.938 -
0.4920 0.00 0.175 -4.451 -9896.664 317.392 5.554 -1.122 0 12554.16 -621.565 -0.050 -21.312 4 317.392 -
0.4950 0.00 0.125 -25.763 -4311.258 227.435 5.554 -1.122 0 12554.16 -1038.184 -0.083 1.060 4 227.435 -
:
:
:
:

RESULTS SUMMARY
Def, y Reaction Ductility
00
NFP

AMK
IFC SUB

Inbound 0.556 1009.367 0.000


Rebound -0.002 -3.270 0.000

Page 274 of 281


Component/Member response remains in the elastic range…..
CALCULATION SHEET

SNC-LAVALIN FAYEZ ENGINEERING, Al Khobar, Saudi Arabia


PROJECT : Updrade Buildings for Risk Mitigation - RT Refinery
EWO / B.I. No. : 10-02062-0002-001 Designed : NFP
Project Code No. : 510008 Checked : AMK
Calc. No. : PE-P20081 Revision : IFC SUB
Subject : Building A9, Design of RC Column, C1 Rev. No. : 00

DEFORMATION LIMITS (RESPONSE CRITERIA) - As per BDR and SAES-M-009

Member / Component : Column


Material : Concrete
Length L or Height H 5050.000 mm
Response Criteria : High (Refer to BDR datasheet and SAES-M-009, Table-9)
Support Rotation : 2º (SAES-M-009, Table-9)
Ductility Ratio : n/a (SAES-M-009, Table-9)

CHECK DEFORMATION AND DUCTILITY RATIO


Support Rotation, θ1:

θ1
Xm

xm = Deformation, y = 92.509 mm

 xm 
1  Arc tan   = 1.049 º < 2.0 º Column Design is acceptable!
 L 

Ductility Ratio, μ:

Max Ductilty Ratio = n/a

Therefore, design for Column, C1 is acceptable…..

ISSUED FOR CONSTRUCTION (IFC)

26 JAN 2022
Calculation Report, OPERATION SHELTER, Plant Plant No. 015 Page 275 of 281
CALCULATION SHEET

SNC-LAVALIN FAYEZ ENGINEERING, Al Khobar, Saudi Arabia


PROJECT : Updrade Buildings for Risk Mitigation - RT Refinery
B.I Number : 10-02062-0002-001 Designed : AIA / NFP
Project Code No. : 510008 Checcked : NFP / AKM
Calc. No. : PE-P20081 Reviision : IFC Sub
Subject : Structural Calculation - Operator Shelter, Plant No. 015 (Bldg-A9) Rev.. No. : 00

4.6 FOOTING DESIGN

ISSUED FOR CONSTRUCTION (IFC)

26 JAN 2022
Calculation Report, OPERATION SHELTER, Plant Plant No. 015 Page 276 of 281
CALCULATION SHEET

SNC-LAVALIN FAYEZ ENGINEERING, Al Khobar, Saudi Arabia


PROJECT : Updrade Buildings for Risk Mitigation - RT Refinery
EWO / B.I. No. : 10-02062-0002-001 Designed : NFP
Project Code No. : 510008 Checked : AMK
Calc. No. : PE-P20081 Revision : IFC SUB
Subject : Plant # J80, PIB, Design check for Footing, F1 Rev. No. : 00

Design check for Foundation, F1


Figure
L P
Surcharge Pressure Surcharge Pressure
12.00 kPa
B

D
H
50.61
T

Ps Pp
OUTSIDE INSIDE 37.49 84.35
18.56 12.53
Footing Dimensions: 44.99 80.97
Length L
Length, = 2.00
2 00 m (Refer to attached drawings)
Width, B = 2.00 m (Refer to attached drawings) For Footing, 'F1' located
Thickness, T = 0.60 m (Refer to attached drawings) (@ Grid-A/5)
Founding Depth, D = 1.50 m (Refer to attached drawings)

Footing Loads:
Source of Dyn. Blast Loads Hor. Reaction Vert. Reaction Time Incident
Max. Hor Reaction (from Hor. Dyn. Load) 187.386 kN 125.103 kN (at t = 0.147 secs)
Max. Vert Reaction (from Vert Dyn. Load) 187.386 kN 1009.367 kN (at t = 0.045 secs)

Soil Properties and Bearing Capacity


Soil Unit Weight, ws = 18 kN/m³
Soil Report, G.F. No. 2018/100.
Ult. Soil Bearing Cap. (SBC) = 500 kPa
Angle of Internal Friction, Φ = 31 degrees 0.541 3.124

Check footing for Bearing capacity


PT Surcharge Footing Self-weight
Actual Bearing Pressure = + +
BxL Pressure (T x conc. unit wt.)
Actual Bearing Pressure = 57.676 kPa < Ult. SBC o.k.
278.742 kPa < Ult. SBC o.k.

Stabilty Check of footing against sliding

SFv x Friction Coeff + Passive Earth Resistance (Pp) + Earth Surcharge Resistance(Ps)
F.S. =
Max Hor. Reaction
99.001 + 93.501 + 63.543
= = 1.366 > 1.0 (o.k.)
187.386

ISSUED FOR CONSTRUCTION (IFC)

26 JAN 2022
Calculation Report, OPERATION SHELTER, Plant Plant No. 015 Page 277 of 281
CALCULATION SHEET

SNC-LAVALIN FAYEZ ENGINEERING, Al Khobar, Saudi Arabia


PROJECT : Updrade Buildings for Risk Mitigation - RT Refinery
B.I Number : 10-02062-0002-001 Designed
Desi ned :: AIA / NFP
Project Code No. : 510008 Checked
Ch ed : : AKM
Calc. No. : PE-P20081 Revision
Re on :: IFC
Subject : Structural Calculation - Operation Shelter - Plant No. 015 Rev. No.
Re No. :: 00

5.0 APPENDICES

ISSUED FOR CONSTRUCTION (IFC)

26 JAN 2022
Calculation Report, OPERATION SHELTER, Plant Plant No. 015 Page 278 of 281
CALCULATION SHEET

SNC-LAVALIN FAYEZ ENGINEERING, Al Khobar, Saudi Arabia


PROJECT : Updrade Buildings for Risk Mitigation - RT Refinery
B.I Number : 10-02062-0002-001 Designed
Desi ned :: AIA / NFP
Project Code No. : 510008 Checked
Ch ed : : AKM
Calc. No. : PE-P20081 Revision
Re on :: IFC
Subject : Structural Calculation - Operation Shelter - Plant No. 015 Rev.
Re No. :: 00

APPENDIX - I
BDR DATASHEETS

ISSUED FOR CONSTRUCTION (IFC)

26 JAN 2022
Calculation Report, OPERATION SHELTER, Plant Plant No. 015 Page 279 of 281
SAUDI ARAMCO
Blast Design Requirements (BDR)
SAES-M-009 PAGE 1 OF 3
SMART DATA SHEET
1 Facility Name / Location : Ras Tanura Refinery
2 Unit : - Job Number: 4168947-TN-02
3 Building Name : New Operator Shelter Building Number : A9(N) Building Type: Operator Shelter
4
5 Blast Resistant Building Construction
6
7 Building Response Range:  Low  Medium  High
8 Building Structural System:
9 (Check construction type from each column below – refer to Tables 1 & 2 of SAES-M-009. Provide details on under Special Requirements if necessary.)
10 Frame Wall Roof
11  Cast-In-Place Concrete  Cast-In-Place Concrete  Cast-In-Place Concrete
12  Hot-Rolled Steel  Precast Concrete  Precast Concrete
13  Pre-Engineered (built-up steel frame)  Reinforced Masonry / CMU  Single Sheet Metal Panel
14  Load Bearing Wall  Single Sheet Metal Panel  Insulated Metal Sandwich Panel
15  Other:  Insulated Metal Sandwich Panel  Composite Concrete Deck
16  Other:  Other:
17
18 Fragment Resistant Required: Yes No
19
20
21 Blast Load Design Requirements
22
23 Peak side-on pressures and durations for the following table shall be taken from the Building Risk Assessment. (See Figure A1 on following page.)
24 Reflected Load Shape (6) Peak Side-On Pressure (2) Duration (6)
PES # Wall (3) and Angle (4) msec
25 PES Description unit: (5) psig
(1) ( N, S, NE,
26 SW, etc. ) A,B α (4) P1 P2 T1 T2 T3 T4

1.00E-05/yr Blast Loading W,S,E A 0 10.50 - 41.6 - - -


27
28
29
30
31 Notes:
32 (1) A PES (Potential Explosion Site) is a congested/confined volume where a VCE could occur. A PES is a potential blast source.
33 (2) Side-on pressure shall be computed at the wall nearest to the blast center.
34 (3) The reflected wall(s) may be different for each PES. Indicate the reflected wall(s) (N, S, NE, SW, etc.) facing the blast center.
35 (4) Indicate angle of blast center (in degrees) measured from a line normal to reflected wall. See Figure A1 on next page.
36 (5) Specify pressure unit (psig, MPa, millibar, bar).
37 (6) If rise time is a small percentage of the positive phase duration then use load shape A as shown in Figure A1. Negative phase pressure is
38 typically not considered, however if the explosion modeling software predicts a significant negative phase pressure it should be tabulated.
39 (7) Peak Side On Overpressure shall be based on an exceedance frequency of 1x10^-4
40
41
42 No. Date Description By Check. App.
43
44
45
46
47
48
49
50
51
52

Page C1

ISSUED FOR CONSTRUCTION (IFC)

26 JAN 2022
SAUDI ARAMCO
Blast Design Requirements (BDR)
SAES-M-009 PAGE 2 OF 3
SMART DATA SHEET
1 Figure A1 - Load Shapes and Building Orientation
2
3
4
5 P1, T1
P1
6
Pressure

Pressure
7
8 T1 T3 T2 T4
9
Duration Duration
10
P2, T2 P2, T3
11
12 Load Shape A
Load Shape B
13
14
15 Direction of Blast
16
a
17 Reflected Wall (N,S,SE, NW, etc.)
18
19
20
21 Building
22 Plan View
23
24
25
26
27
28
29 Blast Door Requirements
30
31 The table below summarizes the design requirements for each blast door located in the exterior walls of blast resistant buildings
32 Blast Door Building Face Door Location Performance Category (I, II, III)
33 ID or No. ( N, S, SE, NW, etc.) (see Table 11, SAES-M-009)

34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
51
52

Page C2

ISSUED FOR CONSTRUCTION (IFC)

26 JAN 2022
SAUDI ARAMCO
Blast Design Requirements (BDR)
SAES-M-009 PAGE 3 OF 3
SMART DATA SHEET
1 Geotechnical Requirements (Refer to SAES-A-113)
2
3 Foundation Type (Select one and provide data in the appropriate section.)
4
5 Mat Foundation
6
7 Item Value Unit
8 Ultimate Net Bearing Capacity kN/m² (psf)
9
10 At Depth m (ft)
11
12 Dynamic Modulus of Subgrade Reaction kN/m³ (pcf)
13
14 Sliding Friction Coefficient
15 Passive Pressure Coefficient
16
17
18 Spread Footing Foundation
19
20 Ultimate Net Bearing Capacity kN/m² (psf)
21
22 At Depth m (ft)
23
24 Sliding Friction Coefficient
25 Passive Pressure Coefficient
26
27
28 Pile-Supported Foundation
29
30 Pile Description
31 Maximum Vertical Pile Capacity kN (kips)
32
33 Maximum Horizontal Pile Capacity kN (kips)
34
35 Vertical Pile Spring Constant kN/m (kips/in)
36
37 Horizontal Pile Spring Constant kN/m (kips/in)
38
39
40 Other Special Requirements
41
42 Blast Valves Blast Attenuators
43
44 Special Requirements:
45
46
47
48
49
50
51
52

Page C3

ISSUED FOR CONSTRUCTION (IFC)

26 JAN 2022
CALCULATION SHEET

SNC-LAVALIN FAYEZ ENGINEERING, Al Khobar, Saudi Arabia


PROJECT : Updrade Buildings for Risk Mitigation - RT Refinery
B.I Number : 10-02062-0002-001 Desi ned : : AIA / NFP
Designed
Project Code No. : 510008 Checked
Ch ed : : AKM
Calc. No. : PE-P20081 Re on : :
Revision IFC
Subject : Structural Calculation - Operation Shelter - Plant No. 015 Re No. : :
Rev. No. 00

APPENDIX - II
DESIGN DRAWINGS

ISSUED FOR CONSTRUCTION (IFC)

26 JAN 2022
Calculation Report, OPERATION SHELTER, Plant Plant No. 015 Page 280 of 281
NOTES: .O
C
N
1. ALL DIMENSIONS ARE IN MILLIMETERS AND M
AR
ELEVATIONS ARE IN METERS UNLESS
NOTED OTHERWISE. A
2. THIS DRAWING SHALL BE READ IN CONJUNCTION ID
DE HT
WITH THE CIVIL, ARCHITECTURAL, MECHANICAL, UA
LL ELECTRICAL, COMMUNICATION AND OTHER S
AC ORN RELEVANT DRAWINGS.
3. FOR ADDITIONAL GENERAL NOTES & ABBREVATIONS FO
REFER TO DWG. NO. RA-401987.001.
4. ALL DIMENSIONS ARE MEASURED FROM THE GRID TN
LINES UNLESS NOTED OTHERWISE. ES
AH 5. ISOLATED FOOTINGS ARE CONCENTRIC TO THE NO
KK
MA 1 2 3 4 5 6 7 8 9 6.
COLUMNS UNLESS NOTED OTHERWISE.
REFER TO CIVIL DRAWINGS FOR ORIENTATION OF
C
BUILDING. NE
7. EL.+0.000 IS ASSUMED NOMINAL ELEVATION OF TT
THE GROUND FLOOR FINISH LEVEL. REFER TO IR
35875 CIVIL DRAWING FOR THE EXACT ELEVATION. W
8. FOUNDATIONS DESIGNED FOR NET ALLOWABLE
4150 4150 4500 6550 4450 4300 4100 3675 BEARING CAPACITY OF 200 KPA IN ACCORDANCE EH
TO THE GEOTECHNICAL REPORT#SK 19000007-REV.4. T
TU
OH
TI
W
GN
I
W
AR
A D
SI
HT
M
OR
F1 F1 F1 F1 F1 F1 F1 F1 F1
0
1 F
4
3 DE
INA
TB
O
B EB
LEGEND AND ABBREVIATIONS
LL
0
9 F1 - ISOLATED FOOTING MARK AH
9
1 | - CENTER LINE S
F2 ,T
C
0 RA
0
10 P
1
IN
RO
F1 F1 ,L
F2 F2 F2 F2 F2 F2
LU
F
0 NI
0
6
5 NO
REFERENCE DRAWINGS IT
DWG. CONTROL FOR JO. 10-02062-0002 RD-401954 CU
GENERAL NOTES - CONCRETE WORKS RA-401987.001 DO
COLUMN LAYOUT RA-102122.001 RP
FDN. AND COLUMN SCHED. & DETAILS RA-462172.001 ER
SECTIONS & DETAILS RA-462174.001
ON
D .O
C
M
AR
A
F1 F1 F1 3
3
F1 F1 F1 F1 F1 DIU
0 F2 AS
3
FO
B
S B
S

YT
| RE
OPERATION SHELTER PO
AIR STACK RP
FOOTING
EL
OS
| 3 FOUNDATION LAYOUT
RA-462174
SCALE- 1 : 50
EH
2635 001
T
ER
KEY PLAN A
INE
0 1.0 2.0 3.0 4.0 5.0
RE
METER H
SCALE: 1:50M
DE
INA
REVISION VALIDATION
TN
CO
THIS REVISION NO. 00 IS COVERED, FOR ALL APPROVAL AND CERTIFICATION
REQUIREMENTS, PER SAEP-334, UNDER DRAWING COMPLETION CERTIFICATE NO:
10-02062-0002-001
NO
DESIGN CERTIFICATION REVIEW FOR KEY DRAWINGS
REQUIRED
OTHER IT
A
(DESIGN AGENCY) (SAUDI ARAMCO)

ENGG./DATE
NFP
CERTIFIED BY/DATE CONST. AGENCY/DATE
MAO RAZ
OPERATIONS/DATE
KAZ
BY/DATE
M
RO
09/10/20 09/10/20 09/10/20 09/10/20
REV.NO. DATE REVISION DESCRIPTION FN
00 09/10/20 ISSUED FOR CONSTRUCTION I
JOB ORDER/EWO NO. THIS REVISION IS NOT TO BE USED FOR EH
10-02062-0002 CONSTRUCTION UNTIL CERTIFIED AND DATED
T
SAUDI ARABIAN OIL COMPANY
DRAWING TYPE
DN
FOUNDATION LAYOUT FDN A
OPERATION SHELTER GN
ISSUED FOR CONSTRUCTION (IFC) I
TWO STAGE CRUDE UNIT W
AR
RAS TANURA SAUDI ARABIA D
26 JAN 2022 PLANT NO. DRAWING NUMBER SHT. NO. REV. NO.
SI
015 Q RA-102121 001 00
INDEX

HT
Saudi Aramco 2615 ENG. (05/05)
RESTRICTED VECTOR CADD-01
NOTES: .O
C
N
1. ALL DIMENSIONS ARE IN MILLIMETERS AND M
AR
ELEVATIONS ARE IN METERS UNLESS
NOTED OTHERWISE. A
2. THIS DRAWING SHALL BE READ IN CONJUNCTION ID
DE HT
WITH THE CIVIL, ARCHITECTURAL, MECHANICAL, UA
LL ELECTRICAL, COMMUNICATION AND OTHER S
AC ORN RELEVANT DRAWINGS.
3. FOR ADDITIONAL GENERAL NOTES & ABBREVIATIONS FO
REFER TO DWG. NO. RA-401987.001.
4. ALL DIMENSIONS ARE MEASURED FROM THE GRID TN
LINES. ES
AH 5. ALL COLUMNS ARE CONCENTRIC TO GRID LINES NO
KK UNLESS NOTED OTHERWISE.
MA C
1 2 3 4 5 6 7 8 9
6. REFER TO CIVIL DRAWINGS FOR ORIENTATION OF
BUILDING. NE
7. ALL COLUMNS AS SHOWN IN THIS DRAWING ARE TT
ABOVE GRADE LEVEL. IR
8. ALL BELOW GRADE COLUMNS DIMENSIONS SHALL BE W
35875 INCREASED BY (25 mm) ALL AROUND.
EH
4150 4150 4500 6550 4450 4300 4100 3675 T
TU
OH
TI
W
GN
250 I
W
AR
D
A SI
HT
C1 C1 C1 C1 C1 C1 C1 C1 C1
M
OR
F
0
14 DE
3
INA
TB
O
EB
B LEGEND AND ABBREVIATIONS
LL
C1 C1 - COLUMN MARK AH
0 P1 - PEDESTAL MARK
9 | - CENTER LINE S
19 250 ,T
RA
C P
0
0
0
11 IN
C1 C1 C1 C1 C1 C1 C1 C1 RO
,L
LU
F
NI
0
0 NO
6
5 REFERENCE DRAWINGS IT
DWG. CONTROL FOR JO. 10-02062-0002 RD-401954 CU
GENERAL NOTES - CONCRETE WORKS RA-401987.001 DO
FOUNDATION LAYOUT RA-102121.001 RP
FDN. AND COLUMN SCHED. & DETAILS RA-462172.001 ER
SECTIONS AND DETAILS RA-462174.001
250 ON
.O
D C
M
AR
C1 C1 C1 C1 C1 C1 C1 C1 C1 A
| DIU
3
3 AS
2635 0
3
FO
B
S B
S

YT
RE
| OPERATION SHELTER PO
RP
P1
EL
OS
EH
COLUMN LAYOUT (ABOVE GRADE) T
SCALE- 1 : 50
ER
KEY PLAN A
INE
0 1.0 2.0 3.0 4.0 5.0
RE
METER H
SCALE: 1:50M
DE
INA
REVISION VALIDATION
TN
CO
THIS REVISION NO. 00 IS COVERED, FOR ALL APPROVAL AND CERTIFICATION
REQUIREMENTS, PER SAEP-334, UNDER DRAWING COMPLETION CERTIFICATE NO:
10-02062-0002-001
NO
DESIGN CERTIFICATION REVIEW FOR KEY DRAWINGS
REQUIRED
OTHER IT
A
(DESIGN AGENCY) (SAUDI ARAMCO)

ENGG./DATE
NFP
CERTIFIED BY/DATE CONST. AGENCY/DATE
MAO RAZ
OPERATIONS/DATE
KAZ
BY/DATE
M
RO
09/10/20 09/10/20 09/10/20 09/10/20
REV.NO. DATE REVISION DESCRIPTION FN
00 09/10/20 ISSUED FOR CONSTRUCTION I
JOB ORDER/EWO NO. THIS REVISION IS NOT TO BE USED FOR EH
10-02062-0002 CONSTRUCTION UNTIL CERTIFIED AND DATED
T
SAUDI ARABIAN OIL COMPANY
DRAWING TYPE
DN
COLUMN LAYOUT (ABOVE GRADE) FDN A
OPERATION SHELTER GN
ISSUED FOR CONSTRUCTION (IFC) I
TWO STAGE CRUDE UNIT W
AR
RAS TANURA SAUDI ARABIA D
26 JAN 2022 PLANT NO. DRAWING NUMBER SHT. NO. REV. NO.
SI
015 Q RA-102122 001 00
INDEX

HT
Saudi Aramco 2615 ENG. (05/05)
RESTRICTED VECTOR CADD-01
NOTES: .O
C
N
1. ALL DIMENSIONS ARE IN MILLIMETERS AND M
AR
ELEVATIONS ARE IN METERS UNLESS
NOTED OTHERWISE. A
2. THIS DRAWING SHALL BE READ IN CONJUNCTION ID
DE HT
WITH THE CIVIL, ARCHITECTURAL, MECHANICAL, UA
LL ELECTRICAL, COMMUNICATION AND OTHER S
AC ORN RELEVANT DRAWINGS.
3. FOR ADDITIONAL GENERAL NOTES & ABBREVIATIONS FO
REFER TO DWG. NO. RA-401987.001.
4. SLAB ON GRADE CONSTRUCTION JOINTS LOCATION TN
SHALL MEET THE REQUIREMENTS OF ACI 224.3 ES
AH AND ACI-302.1R. LSTK CONTRACTOR SHALL SUBMIT NO
KK SHOP DRAWINGS FOR ARAMCO REPRESENTATIVE
MA C
1 2 3 4 5 6 7 8 9
APPROVAL.
5. ALL BEAMS TOP LEVEL SHALL BE CONSIDERED NE
(-0.05 m) U.N.O. TT
6. FOR THE LOCATIONS AND DIMENSIONS OF IR
CMU WALLS, REFER TO ARCHITECTURAL FLOOR W
35875 PLAN DRAWINGS. EH
7. HVAC EQUIPMENT PADS AND AIR STACK FOUNDATION
/PEDESTAL SIZE, THICKNESS, REINFORCEMENT AND T
4150 4150 4500 6550 4450 4300 4100 3675 ANCHOR BOLTS ARE PRELIMINARY SUBJECT TO THE TU
RECEIPT OF THE RELEVANT VENDOR INFORMATION. OH
8. PAVEMENT THICKENING IS NOT SHOWN FOR CLARITY.
TI
W
EP GN
OL I
S
W
AR
GB1 GB1 %
1 GB1 GB1 GB1 GB1 GB1 GB1 D
A
SI
HT
M
OR
F
RAMP AA 1B DE
UP 01 Z CJ
RA-462174
001
G INA
4
3
RA-462174
001
TB
1B 1B O
G 1B 1B 1B 1B 1B 1B G
G G G IJ
G G G EB
B
(TYP)
LEGEND AND ABBREVIATIONS
A LL
GB - GRADE BEAM AH
RA-462174
P1 - PEDESTAL MARK
S
0
9
001
SSL - STRUCTURAL SALB LEVEL
9
1 GB1 GB1 GB1 GB1 GB1 GB1 GB1 GB1 TOC - TOP OF CONCRETE ,T
TYP - TYPICAL RA
WWF P
C
- WELDED WIRE MESH
0
0 MW - MESH WIRE
0
11 SSL EL - ELEVATION IN
EL.-0.05 T&B - TOP AND BOTTOM RO
1% SLOPE B.W. - BOTHWAYS
150 CJ - CONTROL JOINT ,L
IJ - ISOLATION JOINT LU
- CONTROL JOINT F
SSL MW18.7xMW18.7 150x150 150
{10 @ 150
B EL. -0.05 WWF (ONE LAYER) - SLAB THICKNESS
NI
200 RA-462174
RAMP T&B (B.W.) TOC TOC
001 NO
UP EL. +0.10 EL. +0.10 REFERENCE DRAWINGS IT
0 1
0
6 B
G
2
B B1G B1G CJ
1
B
G
1
B
G
1
B
G
1
B
G
1
B
G
DWG. CONTROL FOR JO. 10-02062-0002 RD-401954 CU
5 G GENERAL NOTES - CONCRETE WORKS RA-401987.001 DO
BEAM AND SLAB SCHEDULE & DETAILS RA-462173.001 RP
IJ
200 SECTIONS & DETAILS RA-462174.001 ER
(TYP) MASONRY WALL SCHEDULE & TYP. DETAILS RA-460674.001 & 002
IJ
ON
2 GB1
(TYP)
GB1 GB1 GB1 GB1 GB1
RA-462174
001
.O
D
GB1 GB1 C
M
AR
EP A
DIU
OL
0
2 S
4 %
1 AS
2
FO
B
S B
S

YT
RE
A OPERATION SHELTER PO
RA-462174
0 TOC TOC 001 RP
0 EL.+0.00 EL.+0.00 CONCRETE PEDESTAL
4 P1 (AIR STACK)
2 EL
OS
HVAC UNIT PAD EH
T
1 ER
2400 1300 2400 RA-462174
001 FIRST FLOOR FRAMING PLAN KEY PLAN A
SCALE- 1 : 50 INE
0 1.0 2.0 3.0 4.0 5.0
RE
METER H
SCALE: 1:50M
DE
INA
REVISION VALIDATION
TN
CO
THIS REVISION NO. 00 IS COVERED, FOR ALL APPROVAL AND CERTIFICATION
REQUIREMENTS, PER SAEP-334, UNDER DRAWING COMPLETION CERTIFICATE NO:
10-02062-0002-001
NO
DESIGN CERTIFICATION REVIEW FOR KEY DRAWINGS
REQUIRED
OTHER IT
A
(DESIGN AGENCY) (SAUDI ARAMCO)

ENGG./DATE
NFP
CERTIFIED BY/DATE CONST. AGENCY/DATE
MAO RAZ
OPERATIONS/DATE
KAZ
BY/DATE
M
RO
09/10/20 09/10/20 09/10/20 09/10/20
REV.NO. DATE REVISION DESCRIPTION FN
00 09/10/20 ISSUED FOR CONSTRUCTION I
JOB ORDER/EWO NO. THIS REVISION IS NOT TO BE USED FOR EH
10-02062-0002 CONSTRUCTION UNTIL CERTIFIED AND DATED
T
SAUDI ARABIAN OIL COMPANY
DRAWING TYPE
DN
FIRST FLOOR FRAMING PLAN FDN A
OPERATION SHELTER GN
ISSUED FOR CONSTRUCTION (IFC) I
TWO STAGE CRUDE UNIT W
AR
RAS TANURA SAUDI ARABIA D
26 JAN 2022 PLANT NO. DRAWING NUMBER SHT. NO. REV. NO.
SI
015 Q RA-102123 001 00
INDEX

HT
Saudi Aramco 2615 ENG. (05/05)
RESTRICTED VECTOR CADD-01
NOTES: .O
C
N
1. ALL DIMENSIONS ARE IN MILLIMETERS AND M
AR
ELEVATIONS ARE IN METERS UNLESS
NOTED OTHERWISE. A
2. THIS DRAWING SHALL BE READ IN CONJUNCTION ID
WITH THE CIVIL, ARCHITECTURAL, MECHANICAL, UA
DE HT ELECTRICAL, COMMUNICATION AND OTHER
LL S
AC ORN RELEVANT DRAWINGS.
3. FOR ADDITIONAL GENERAL NOTES & ABBREVIATIONS FO
REFER TO DWG. NO. RA-401987.001.
TN
ES
AH NO
KK
MA C
NE
TT
1 2 3 4 5 6 7 8 9
IR
W
EH
T
35875 TU
4150 4150 4500 6550 4450 4300 4100 3675 OH
TI
W
C AA GN
I
RA-462174
001
RA-462174
001
W
AR
D
SI
RB1 RB1 RB1 RB2 RB1 RB1 RB1 RB1 HT
A M
OR
F
DE
INA
0
14 1B TB
3 R O
EB
1B S1 1B S1 1B S1 1B S2 S1 1B S1 1B S1 1B S1 1B LEGEND AND ABBREVIATIONS
R R R R R R R R LL
AH
B
RB - ROOF BEAM
SSL - STRUCTURAL SLAB LEVEL S
EL - ELEVATION ,T
0 S1 - SLAB MARK RA
9
9 P
1
RB1 RB1 RB1 RB2 RB1 RB1 RB1 RB1 IN
C
0
0
RO
10
1 ,L
LU
F
C SSL
EL. +4.60
NI
RA-462174
001
3
B NO
R IT
REFERENCE DRAWINGS
DWG. CONTROL FOR JO. 10-02062-0002 RD-401954 CU
0
0 1B S1 1B S1 1B S1 1B S2 S1 1B S1 1B S1 1B S1 1B GENERAL NOTES - CONCRETE WORKS RA-401987.001 DO
6
5 R R R R R R R R RP
BEAM AND SLAB SCHEDULE & DETAILS RA-462173.001
SECTIONS & DETAILS RA-462173.001 ER
MASONRY WALL SCHEDULE & TYP. DETAILS RA-460674.001 & 002
ON
.O
C
M
AR
RB1 RB1 RB1 RB2 RB1 RB1 RB1 RB1
D
A
DIU
AS
FO
B
S B
S

YT
C RE
RA-462174
001 OPERATION SHELTER PO
RP
EL
OS
EH
T
ROOF FRAMING PLAN ER
SCALE- 1 : 50 KEY PLAN A
INE
0 1.0 2.0 3.0 4.0 5.0
RE
METER H
SCALE: 1:50M
DE
INA
REVISION VALIDATION
TN
CO
THIS REVISION NO. 00 IS COVERED, FOR ALL APPROVAL AND CERTIFICATION
REQUIREMENTS, PER SAEP-334, UNDER DRAWING COMPLETION CERTIFICATE NO:
10-02062-0002-001
NO
DESIGN CERTIFICATION REVIEW FOR KEY DRAWINGS
REQUIRED
OTHER IT
A
(DESIGN AGENCY) (SAUDI ARAMCO)

ENGG./DATE
NFP
CERTIFIED BY/DATE CONST. AGENCY/DATE
MAO RAZ
OPERATIONS/DATE
KAZ
BY/DATE
M
RO
09/10/20 09/10/20 09/10/20 09/10/20
REV.NO. DATE REVISION DESCRIPTION FN
00 09/10/20 ISSUED FOR CONSTRUCTION I
JOB ORDER/EWO NO. THIS REVISION IS NOT TO BE USED FOR EH
10-02062-0002 CONSTRUCTION UNTIL CERTIFIED AND DATED
T
SAUDI ARABIAN OIL COMPANY
DRAWING TYPE
DN
ROOF FRAMING PLAN FDN A
OPERATION SHELTER GN
ISSUED FOR CONSTRUCTION (IFC) I
TWO STAGE CRUDE UNIT W
AR
RAS TANURA SAUDI ARABIA D
26 JAN 2022 PLANT NO. DRAWING NUMBER SHT. NO. REV. NO.
SI
015 Q RA-462171 001 00
INDEX

HT
Saudi Aramco 2615 ENG. (05/05)
RESTRICTED VECTOR CADD-01
NOTES: .O
C
1. ALL DIMENSIONS ARE IN MILLIMETERS AND M
AR
ELEVATIONS ARE IN METERS UNLESS
A
GRID
NOTED OTHERWISE.
2. THIS DRAWING SHALL BE READ IN CONJUNCTION
ID
WITH THE CIVIL, ARCHITECTURAL, MECHANICAL, UA
GRID
ELECTRICAL, COMMUNICATION AND OTHER S
RELEVANT DRAWINGS. FO
B 3. FOR ADDITIONAL GENERAL NOTES & ABBREVIATIONS
ROOF BEAM (REINF. NOT SHOWN FOR CLARITY) REFER TO DWG. NO. CA-401987.001. TN
EQ EQ 4. ALL CONCRETE SURFACES IN DIRECT CONTACT
T.O.B
WITH EARTH SHALL BE COATED WITH TWO COATS ES
EL. (VARIES) CONNECTING
FLOOR BEAM OF COALTAR OR BITUMEN COATING THAT CONFORMS NO
(SEE SCHEDULE) TO (APCS-3) OR (APCS-10) OF (SAES-H-001). C
. M 5. ALL BELOW GRADE COLUMNS SHALL BE
R A
E E INCREASED BY (25 mm) ALL AROUND.
NE
P B TT
F 6. SIDE BARS SHALL BE PROVIDED FOR FOUNDATION
S
A O
O
R 0 WITH THICKNESS GREATER THAN (600mm). IR
5 AM 7. ALL REINFORCEMENT DETAILS SHOWN ARE W
Q
E FO
EB
INDICATIVE, CONTRACTOR TO DEVELOP THE
GN EH
R3 RELEVANT SHOP DRAWINGS INCLUDING BUT NOT
)N
I
HT
PE
IT
LIMITED TO BAR MARK, LENGTH, HOOK DETAIL, T
(M CE
R1 S S JOINT HOOPS MAY BE SPACED AT "2Sh" D NN SPLICE LENGTH, LOCATION, ETC. TU
P m P FOR THE DEPTH OF THE SHALLOWEST
A
O
O m O
O CJ CO OH
GRID
O H 00 H /4 BEAM WHEN BEAMS WITH WIDTH ƒ
. L
.L 1 .L S
B hS TIMES THE WIDTH OF THE COLUMN FRAME TI
A - O @ O INTO THE FOUR SIDES OF A COLUMN, FOR ALL W
SH. - C C &
10 OTHER CONDITIONS. USE HOOPS SPACED AT "Sh" O.C d Ø10 @ 50 GN
GN
{ 05 (S1) (STIRRUPS) I
IT W
AR
Q OO D
E F/ MAXIMUM SPACING 50
05
N OF TIES IN LAP LENGTH )S SI
M D/4 FOR DIMENSION @ IET HT
UL )C
H Bs BUT NOT GREATER 10 (
OC (
T THAN 4" (100mm) { M
OR
H
FO IG S COLUMN
E
H IE
T VERTICAL BARS F
R2 | R
A .L (SEE SCHEDULE) DE
E O
R4 L
C C
INA
| OF COLUMN/FOOTING N St
TYP. SECTION (COLUMN WITH CONNECTING BEAM)
M
U 50 2 TB
L
O
C SCALE N.T.S
O
-
EB
TYPICAL ISOLATED FOOTING PLAN LEGEND AND ABBREVIATIONS
SCALE NTS LL
SBC - SOIL BEARING CAPACITY AH
MAXIMUM SPACING "
SSL - STRUCTURAL SLAB LEVEL S
OF TIES IN LAP LENGTH EC B
" FGL - FINISHED GRADE LEVEL
S
P D/4 FOR DIMENSION IL
S TOB - TOP OF BEAM ,T
O
O
O Bs BUT NOT GREATER PS S
A EL - ELEVATION RA
GRID
H L
L
.L THAN 4" (100mm) PA
L
C GRADE BEAM
(RFT. NOT SHOWN FOR CLARITY) COLUMN TYPICAL DETAIL ABBREVIATIONS: TYP - TYPICAL P
O hS CJ - CONSTRUCTION JOINT
C HC - COLUMN CLEAR HEIGHT
THK - THICK IN
T.O.B Sh - SMALLER OF (BS/4) OR 100mm MM - MILLIMETER RO
St - SMALLER OF (8 db-VERTICAL), (BS/2) BOF - BOTTOM OF FOOTING
LO - GREATER OF LARGEST COLUMN DIMENSION, | - CENTER LINE ,L
(HC/16), 500mm EQ - EQUAL LU
BS - SMALLEST COLUMN DIMENSION { - DIAMETER F
@ - AT
C1 - COLUMN MARK NI
F1 - ISOLATED FOOTING MARK NO
COLUMN VERTICAL IT
BARS WITH TIES REFERENCE DRAWINGS
DWG. CONTROL FOR JO. 10-02062-0002 RD-401954 CU
75 05 GENERAL NOTES - CONCRETE WORKS RA-401987.001 DO
E CJ
C
IL FOUNDATION LAYOUT RA-102121.001 RP
P COLUMN LAYOUT RA-102122.001 ER
S
P
A FOOTING ON
L 12mm THK. ISOLATION
JOINT WITH FILLER BOARD BOF EL. (SEE .O
AND SEALENT (TYP) FOUNDATION SCHEDULE) C
M
AR
SSL A
COMPACTED
FGL SELECT FILL/ 50mm THK DIU
LEAN CONCRETE
NATURAL GRADE AS
10mm MILS THK. 75mm FO
75mm CONC. POLYETHYLENE FILM CLEAR COVER
COVER VAPOR BARRIER YT
R3 CJ (TYP) RE
5
7 R4 1 TYPICAL COLUMN ELEVATION PO
Y SCALE N.T.S
- RP
DAMP PROOFING
(SEE NOTE-4) EL
C 1{16 (SEE NOTE-6) OS
BOF
EH
50 THK. LEAN T
CONCRETE
R2 COLUMNS SCHEDULE (SCALE 1:10M)
KEY PLAN
ER
R1 COMPACTED SOIL AS PER A
SOIL REPORT RECOMMENDATION
EQ EQ INE
B COLUMN RE
MARK FOUNDATION TO FIRST FIRST TO ROOF
H
SCALE: AS SHOWN DE
INA
A S E C T I O N 600 550 REVISION VALIDATION
TN
SCALE NTS
CO
- THIS REVISION NO. 00 IS COVERED, FOR ALL APPROVAL AND CERTIFICATION
SH. - REQUIREMENTS, PER SAEP-334, UNDER DRAWING COMPLETION CERTIFICATE NO:
10-02062-0002-001
NO
12 Ø 20 12 Ø 20 DESIGN CERTIFICATION REVIEW FOR KEY DRAWINGS
REQUIRED
OTHER IT
A
(DESIGN AGENCY) (SAUDI ARAMCO)

ENGG./DATE
NFP
CERTIFIED BY/DATE CONST. AGENCY/DATE
MAO RAZ
OPERATIONS/DATE
KAZ
BY/DATE
M
RO
C1 09/10/20 09/10/20 09/10/20 09/10/20

FOUNDATION SCHEDULE
00 05 REV.NO. DATE REVISION DESCRIPTION FN
6 3Ø10 @ 100 TIES 5 3Ø10 @ 150 TIES 00 09/10/20 ISSUED FOR CONSTRUCTION I
FOUNDATION Y DIMENSIONS (mm) REINFORCEMENT EH
MARK TYPE (mm) REMARKS JOB ORDER/EWO NO. THIS REVISION IS NOT TO BE USED FOR
A B C R1 (BOTTOM) R2 (BOTTOM) R3 (TOP) R4 (TOP) 10-02062-0002 CONSTRUCTION UNTIL CERTIFIED AND DATED
F1 ISOLATED FOOTING 1500 2000 2000 600 {16 @ 200 {16 @ 200 {12 @ 300 {12 @ 300
T
F2 ISOLATED FOOTING 1500 2500 2500 600 {16 @ 200 {16 @ 200 {12 @ 300 {12 @ 300
SAUDI ARABIAN OIL COMPANY
DRAWING TYPE
DN
FDN. AND COLUMN SCHED. & DETAILS FDN A
OPERATION SHELTER GN
ISSUED FOR CONSTRUCTION (IFC) I
TWO STAGE CRUDE UNIT W
AR
RAS TANURA SAUDI ARABIA D
26 JAN 2022 PLANT NO. DRAWING NUMBER SHT. NO. REV. NO.
SI
015 Q RA-462172 001 00
INDEX

HT
Saudi Aramco 2615 ENG. (05/05)
RESTRICTED VECTOR CADD-01
NOTES: .O
1. ALL DIMENSIONS ARE IN MILLIMETERS AND C
ELEVATIONS ARE IN METERS UNLESS M
AR
GRID GRID GRID GRID GRID NOTED OTHERWISE.
A
2. THIS DRAWING SHALL BE READ IN CONJUNCTION
WITH THE CIVIL, ARCHITECTURAL, MECHANICAL, ID
| OF COLUMN | OF COLUMN | OF COLUMN | OF COLUMN | OF COLUMN ELECTRICAL, COMMUNICATION AND OTHER UA
RELEVANT DRAWINGS. S
L1 (SPAN) L2 (SPAN) 3. FOR ADDITIONAL GENERAL NOTES & ABBREVIATIONS
CONTINUOUS BEAM CONTINUOUS BEAM REFER TO DWG. NO. CA-401987.001. FO
4. IN CASE OF TWO ADJACENT BEAMS WITH DIFFERENT
0.25L1 LAP SPLICE 0.3L1 OR 0.3L2 0.3L1 OR 0.3L2 LAP SPLICE 0.3L2 OR 0.3L3 TOP REINFORCEMENT, USE THE GREATER OF TN
GREATER GREATER GREATER TYPE "A" BARS. ES
ACI STANDARD
HOOK TOP BARS @ TOP BARS TOP BARS @ TOP BARS @ TOP BARS TOP BARS @ RC BEAM | OF SECONDARY BEAM RC BEAM
5. MAXIMUM CLEAR DISTANCE BETWEEN SIDE NO
LEFT SUPPORT 'C' BAR RIGHT SUPPORT LEFT SUPPORT 'C' BAR RIGHT SUPPORT BARS = 300mm.
C
'A' BAR 'A' BAR 'A' BAR 'A' BAR 6. AREA OF BOTTOM BARS "B" SHALL NOT BE LESS
THAN ONE THIRD OF TOTAL AREA OF BOTTOM NE
REINFORCEMENT. TT
IN M 7. ALL REINFORCEMENT DETAILS SHOWN ARE IR
d d AA
MEB
INDICATIVE, CONTRACTOR TO DEVELOP THE
RELEVANT SHOP DRAWINGS INCLUDING BUT NOT
W
LIMITED TO BAR MARK, LENGTH, HOOK DETAIL, EH
150 SPLICE LENGTH, LOCATION, ETC. T
(MIN.) BOTTOM BARS BOTTOM BARS COLUMN d 50 50 d COLUMN TU
COLUMN 0.125L1 A 'B' BAR 0.125L1 0.125L2 'B' BAR 0.125L2 COLUMN (X1) (X1) OH
EXTRA BOTTOM BARS EXTRA BOTTOM TI
SH -
'D' BAR BARS W
'D' BAR GN
L1/4 L1/2 L1/4 L2/4 L2/2 L2/4 I
ZONE-1 ZONE-2 ZONE-1 ZONE-1 ZONE-2 ZONE-1 W
AR
(X1) (X2) (X1) (X1) (X2) (X1) D
50 50 50 50
STIRRUPS STIRRUPS SI
(SEE SCHED.) (SEE SCHED.) HT
M
TYPICAL BEAM LONGITUDINAL SECTION ADDITIONAL STIRRUPS (BEAM TO BEAM FRAMING CONNECTION)
OR
F
SCALE N.T.S SCALE N.T.S DE
INA
TB
O
EB
MAXIMUM NUMBER OF BARS IN SINGLE LAYER OF BEAM LEGEND AND ABBREVIATIONS
LL
EXTRA 'A' BARS AND BAR BEAM WIDTH (MM) AH
EXTRA 'A' BARS AND DIAMETER GB - GRADE BEAM
'C' CONTINUOUS BARS RB - ROOF BEAM S
'C' CONTINUOUS BARS (MM) 200 250 300 350 400 500 600
Ø25 SPACER BAR THK - THICK ,T
EVERY 1000mm O.C Ø25 SPACER BAR MM - MILLIMETER
(TYP) EVERY 1000mm O.C 16 2 3 4 5 6 7 9 MIN - MINIMUM
RA
(TYP) 20 2 2 3 4 5 7 8 | - CENTER LINE P
25 2 2 2 3 4 6 8 { - DIAMETER IN
@ - AT
b - BEAM WIDTH RO
d SIDE BARS d SIDE BARS d - BEAM DEPTH ,L
EXTRA STIRRUPS STIRRUPS EXTRA STIRRUPS STIRRUPS LU
(AS REQ'D) (AS REQ'D) F
50mm THK. BEAMS SCHEDULE NI
LEAN CONCRETE
SIZE EXTRA 'A' BAR MID SPAN STIRRUPS
EXTRA 'D' BARS AND 50 (TYP)
BEAM
WIDTH DEPTH
CONTINUOUS
LEFT RIGHT
CONTINUOUSEXTRA SIDE BARS REMARKS NO
'B' CONTINUOUS BARS EXTRA 'D' BARS AND MARK 'C' BAR 'B' BAR'D' BAR (EACH FACE) DIAMETER SPACING SPACING NO. OF
REFERENCE DRAWINGS IT
b b(mm) d(mm) SUPPORT SUPPORT (mm) X1(mm) X2(mm) LEGS
b 'B' CONTINUOUS BARS GB1 350 600 4 {16 - - 4 {16 - 1 {16 10 150 200 2 DWG. CONTROL FOR JO. 10-02062-0002 RD-401954 CU
GB2 350 500 4 {16 - - 4 {16 - 1 {16 10 150 200 2 GENERAL NOTES - CONCRETE WORKS RA-401987.001 DO
RP
TYPICAL FLOOR/ROOF BEAM DETAIL TYPICAL GRADE BEAM DETAIL
FIRST FLOOR FRAMING PLAN RA-102123.001
RB1 400 600 4 {16 - - 4 {16 - 1 {16 10 150 200 2 ROOF FRAMING PLAN RA-462171.001 ER
SCALE N.T.S RB2 400 600 4 {16 2 {20 2 {20 4 {16 2 {20 1 {16 10 150 200 2
ON
S E C T I O N
RB3 400 600 4 {20 2 {20 2 {20 4 {20 2 {20 1 {20 10 150 150 4
A .O
-
SCALE N.T.S C
SH -
M
AR
A
DIU
AS
FO
CL OF BEAM CL OF BEAM YT
SHORT SPAN RE
PO
"A1" (SHORT BARS) "B1" (LONG BARS) RP
SSL EL
OS
ST
EH
T
"C1" (SHORT BARS) "D1" (LONG BARS) ER
KEY PLAN A
INE
RE
H
SOLID SLAB TYPICAL SECTION DE
SCALE: NTS
SCALE N.T.S INA
REVISION VALIDATION
TN
CO
THIS REVISION NO. 00 IS COVERED, FOR ALL APPROVAL AND CERTIFICATION
REQUIREMENTS, PER SAEP-334, UNDER DRAWING COMPLETION CERTIFICATE NO:
10-02062-0002-001
NO
DESIGN CERTIFICATION REVIEW FOR KEY DRAWINGS
REQUIRED
OTHER IT
A
(DESIGN AGENCY) (SAUDI ARAMCO)

SOLID SLAB REINFORCEMENT SCHEDULE (ROOF / FLOOR) M


ENGG./DATE CERTIFIED BY/DATE CONST. AGENCY/DATE OPERATIONS/DATE BY/DATE
NFP RAZ KAZ
09/10/20
MAO
09/10/20 09/10/20 09/10/20 RO
SLAB SLAB SHORT BARS (MAIN REINF.) LONG BARS (SECONDARY REINF.) REV.NO. DATE REVISION DESCRIPTION FN
MARK THICKNESS TOP BOTTOM TOP BOTTOM REMARKS 00 09/10/20 ISSUED FOR CONSTRUCTION I
h(mm) "A1" BARS "B1" BARS "C1" BARS "D1" BARS JOB ORDER/EWO NO. THIS REVISION IS NOT TO BE USED FOR EH
S1 200 {10 @ 150 {10 @ 150 {10 @ 150 {10 @ 150 10-02062-0002 CONSTRUCTION UNTIL CERTIFIED AND DATED
T
S2 200 {12 @ 150 {12 @ 150 {12 @ 150 {12 @ 150 SAUDI ARABIAN OIL COMPANY
DRAWING TYPE
DN
BEAM AND SLAB SCHEDULE & DETAILS FDN A
OPERATION SHELTER GN
ISSUED FOR CONSTRUCTION (IFC) I
TWO STAGE CRUDE UNIT W
AR
RAS TANURA SAUDI ARABIA D
26 JAN 2022 PLANT NO. DRAWING NUMBER SHT. NO.
SI
015 Q RA-462173 001 00
INDEX REV. NO.

HT
Saudi Aramco 2615 ENG. (05/05)
RESTRICTED VECTOR CADD-01
NOTES: .O
2400 C
150 (SEE NOTE-5)
1. ALL DIMENSIONS ARE IN MILLIMETERS AND M
AR
TOP (SEE
+5.40 ARCH'L ELEVATIONS ARE IN METERS UNLESS
NOTED OTHERWISE. A
{12 @ 150 2. THIS DRAWING SHALL BE READ IN CONJUNCTION ID
| OF BEAM 300
150 WITH THE CIVIL, ARCHITECTURAL, MECHANICAL, UA
| OF BEAM {10 @ 150 (MIN) ELECTRICAL, COMMUNICATION AND OTHER
RELEVANT DRAWINGS.
S
RC COLUMN CMU WALL RC SLAB 3. FOR ADDITIONAL GENERAL NOTES & ABBREVIATIONS FO
RC COLUMN SLAB RFT. REFER TO DWG. NO. CA-401987.001.
SEE ARCH'L CMU WALL SSL +4.60 ANCHOR BOLTS TN
{10 @ 150 (BY VENDOR) 4. ALL CONCRETE SURFACES IN DIRECT CONTACT
ES
1% SLOPE (SEE NOTE-8) ST (SEE NOTE-5) WITH EARTH SHALL BE COATED WITH TWO COATS
SSL -0.05 SSL -0.05 OF COALTAR OR BITUMEN COATING THAT CONFORMS NO
FGL -0.15 TO (APCS-3) OR (APCS-10) OF (SAES-H-001).
0
5 S ST 5. HVAC EQUIPMENT PADS AND AIR STACK FOUNDATION C
1 T RC BEAM /PEDESTAL SIZE, THICKNESS, REINFORCEMENT AND NE
ANCHOR BOLTS ARE PRELIMINARY. DESIGN TO BE TT
RC BEAM RC COLUMN )5 FINALIZED BY CONSTRUCTION CONTRACTOR BASED ON IR
RC BEAM -E FINAL APPROVED VENDOR INFORMATION.
CMU T
W
004 ON
6. ALL REINFORCEMENT DETAILS SHOWN ARE
WALL INDICATIVE, CONTRACTOR TO DEVELOP THE EH
50mm THK. LEAN 2E RELEVANT SHOP DRAWINGS INCLUDING BUT NOT T
CONCRETE ES
( D LIMITED TO BAR MARK, LENGTH, HOOK DETAIL,
SPLICE LENGTH, LOCATION, ETC.
TU
- 7. FOR BEAMS AND SLABS REINFORCEMENT REFER TO OH
RELEVANT DRAWINGS. TI
8. REINFORCEMENT IS APPLICABLE FOR THE (200mm) W
THICK SLAB ONLY. GN
SECTION SECTION SECTION
A B C I
W
AR
RA-102123 SCALE- 1 : 20M RA-102123 SCALE- 1 : 20M RA-462171 SCALE- 1 : 20M
001 001 001 D
SI
HT
M
OR
| F
HVAC UNIT PAD PLAN
1685
(SEE NOTE-5) 1 DE
150
300 2500 RA-102123 SCALE- 1 : 20M
(MIN) (SEE NOTE-5) 001 INA
1250 1250 TB
ANCHOR BOLTS O
(BY VENDOR) 1100 EB
(SEE NOTE-5)
550 550 2400 LEGEND AND ABBREVIATIONS
(SEE NOTE-5) LL
SSL - STRUCTURAL SLAB LEVEL AH
FGL - FINISHED GRADE LEVEL
ANCHOR BOLTS {16 @ 200 TOP - TOP OF PARAPET S
(BY VENDOR) TOC - TOP OF CONCRETE ,T
TOC +0.00
(SEE NOTE-5) THK - THICK RA
05 FGL -0.15 ADD - ADDITIONAL P
1 RFT - REINFORCEMENT
0
5 CMU - CONCRETE MASONRY UNIT IN
2 05 DAMP PROOFING (TYP) ARCH'L
1 7 00 (SEE NOTE-4)
- ARCHITECTURAL RO
6 RC - REINFORCED CONCRETE
)5 )5 0 2-{16 (TYP) EF - EACH FACE ,L
-E - 5
5 SIDE BARS (EF) TS - SLAB THICKNESS LU
T E | OF RC WALL MM
E 0
3O
7 N
0
0
T
O 0
0 | F |
-
-
MILLIMETER
CENTER LINE
F
3E 5 N 11 50mm THK. LEAN TOP (SEE
+5.40 NI
- 2 -
CONCRETE (TYP)
ARCH'L) { - DIAMETER
E
S
E
E 0 COMPACTED SOIL AS PER
{16 @ 200 @ - AT
NO
( (S 5
5 SOIL REPORT RECOMMENDATION REFERENCE DRAWINGS IT
(TYP) RC SLAB
{12 @ 150 DWG. CONTROL FOR JO. 10-02062-0002 RD-401954 CU
0
5 ANCHOR BOLTS {10 @ 150 DO
SECTION
2 SLAB RFT. GENERAL NOTES - CONCRETE WORKS RA-401987.001
1 (BY VENDOR) D FIRST FLOOR FRAMING PLAN RA-102123.001 RP
(SEE NOTE-5) - SCALE- 1 : 20M SSL +4.60 ROOF FRAMING PLAN RA-462171.001 ER
BEAM AND SLAB SCHEDULE & DETAILS RA-462173.001
ST ON
MASONRY WALL SCHEDULE & TYP. DETAILS RA-460674.001 & 002
SLAB-ON-GRADE TYPICAL DETAILS RA-460675.001 .O
| OF BEAM
C
M
AR
)P T)N A
SEE ARCH'L DWG. SEE ARCH'L DWG. YT E
DIU
RC COLUMN ( M
DE
SLOPE CMU WALL 00 B AS
SLOPE SEE ARCH'L 3 M
SEE ARCH'L SSL -0.05 (E
FGL -0.15
ST FO
2 HVAC UNIT PAD PLAN 3 AIR STACK FOOTING PLAN 00 YT
RA-102123
001
SCALE- 1 : 20M RA-102121
001
SCALE- 1 : 20M 3 {12 @ 200 (TYP) RE
6 {12 (TYP) PO
200
300 184
RP
50mm THK. LEAN EL
| CONCRETE
7.5M HIGH ({750 MAX) OS
1100
AIR STACK (BY VENDOR) EH
REFER HVAC DWG. FOR DETAILS
SECTION
25mm NON-SHRINK T
GROUT (SEE NOTE-5) Z
SCALE- 1 : 20M ER
RA-102123
001
{16 @ 200 KEY PLAN A
0 FGL -0.15 INE
1685 15
(SEE NOTE-5) {12 @ 350 0 0.5 1.0 1.5 2.0
RE
12mm ISOLATION 1100 RC COLUMN METER H
ANCHOR BOLTS 3 NOS. CLOSED
(BY VENDOR) JOINT
G TIES @ 50 300mm THK. DE
(SEE NOTE-5) {16 @ 200 {10 @ 150 0
0 RC WALL
SCALE: 1:20M
INA
(SEE NOTE-8) 0 10
-
40 {20
REVISION VALIDATION
TN
5
0 6 TIES (TYP) CEI
CO
THIS REVISION NO. 00 IS COVERED, FOR ALL APPROVAL AND CERTIFICATION
5 SSL -0.05 1 LP REQUIREMENTS, PER SAEP-334, UNDER DRAWING COMPLETION CERTIFICATE NO:
1 VERTICAL BARS
S
T S SEE ARCH'L 10-02062-0002-001
NO
0 00
5 0 11 PA DESIGN CERTIFICATION REVIEW FOR KEY DRAWINGS OTHER IT
7 0 0 L
(DESIGN AGENCY) REQUIRED (SAUDI ARAMCO)

A
6 0 ENGG./DATE CERTIFIED BY/DATE CONST. AGENCY/DATE OPERATIONS/DATE BY/DATE
M
5 NFP MAO RAZ KAZ
RO
SSL -0.05
1% SLOPE 09/10/20 09/10/20 09/10/20 09/10/20

5Ø10 @ 150 REV.NO. DATE REVISION DESCRIPTION FN


TIES ST FGL -0.15 00 09/10/20 ISSUED FOR CONSTRUCTION I
{16 @ 150 JOB ORDER/EWO NO. THIS REVISION IS NOT TO BE USED FOR EH
{16 @ 200 2500 75mm CLEAR
10-02062-0002 CONSTRUCTION UNTIL CERTIFIED AND DATED
T
COVER RC BEAM
(SEE NOTE-5) SAUDI ARABIAN OIL COMPANY
DRAWING TYPE
DN
SECTIONS AND DETAILS FDN A
50mm THK. LEAN OPERATION SHELTER GN
ISSUED FOR CONSTRUCTION (IFC) I
E SECTION F SECTION G SECTION CONCRETE
TWO STAGE CRUDE UNIT W
AR
- SCALE- 1 : 20M - SCALE- 1 : 20M - SCALE- 1 : 20M
AA SECTION
RAS TANURA SAUDI ARABIA D
26 JAN 2022 PLANT NO. DRAWING NUMBER SHT. NO. REV. NO.
SI
015 Q RA-462174 001 00
INDEX

RA-102123 001 SCALE- 1 : 20M HT


RA-462171 SH 001

Saudi Aramco 2615 ENG. (05/05)


RESTRICTED VECTOR CADD-01
ISSUED FOR CONSTRUCTION (IFC)

26 JAN 2022
ISSUED FOR CONSTRUCTION (IFC)

26 JAN 2022
CALCULATION SHEET

SNC-LAVALIN FAYEZ ENGINEERING, Al Khobar, Saudi Arabia


PROJECT : Updrade Buildings for Risk Mitigation - RT Refinery
B.I Number : 10-02062-0002-001 Designed
Desi ned :: AIA / NFP
Project Code No. : 510008 Checked
Ch ed : : AKM
Calc. No. : PE-P20081 Revision
Re on :: IFC
Subject : Structural Calculation - Operation Shelter - Plant No. 015 Rev. No.
Re No. :: 00

APPENDIX - III
STRUCTURAL DESIGN CHECKLIST

ISSUED FOR CONSTRUCTION (IFC)

26 JAN 2022
Calculation Report, OPERATION SHELTER, Plant Plant No. 015 Page 281 of 281
APPENDIX A - STRUCTURAL CALCULATION CHECK LIST

Project: _Upgrade Buildings For Risk Mitigation - Rastanura Orginator: Ahmed El Bardony / Normel F. Panergo

Calc # PE-P20081 for Operation Shelter - Plant No. 015 Checker: Ammar Abu Ghadib

Date: 08/25/2020

No. Item Reference Type Yes No N/A Designers Comment


Has the calculation report been prepared in 
accordance with Saudi Aramco Engineering Standard 
1 SAES‐A‐204 General x
A204 'Preparation of Structural Calculations'?

2 Are the names of the responsible engineer and 
SAES‐A‐204 General x
responsible checker given on the calculation?
3 Is the structural calculation organized with title 
page, table of contents, headings and page  SAES‐A‐204 Cl. 10.1 ‐ 10.3 General x
numbers?
4 Is the calculation methodology made clear with 
SAES‐A‐204 Cl. 10.8 General x
sufficient explanatory notes?
5 Have the calculations been completed using metric 
units? Are all units used in the calculation clearly  SAES‐A‐204  Cl. 5 General x
identified?
Are the symbols used in the calculation clearly 
recognized and consistent with AISC, ACI and other 
6 SAES‐A‐204  Cl. 6 General x
international structural engineering standards?

7 Have all assumptions used in the calculation been 
SAES‐A‐204  Cl. 8 General x
clearly stated?
Is the CSD Geotechnical Form included in the  Refer to Geotechnical report file # 
package, and are the geotechnical parameters used  2018/100
8 SAES‐A‐204 Cl. 9(b) General x
in the calculation correct and appropriate for the 
design?

ISSUED FOR CONSTRUCTION (IFC)

26 JAN 2022
No. Item Reference Type Yes No N/A Designers Comment
Is the relevant site specific geotechnical  Refer to Geotechnical report file # 
investigation report referenced in the calculation?  2018/100
9 SAES‐Q‐005 Cl. 4.1.1 General x
Does the project have an approved CSD 
Geotechnical Form?
Has the appropriate meteorological data been 
included in the calculation? Has the data been 
10 SAES‐A‐112 General x
selected from SAES‐A‐112 'Meteorological & Seismic 
Design Data'?
11 Is the design criteria listed in the calculation with the 
SAES‐A‐204  Cl. 9 General x
source referenced?
Does the calculation include a clear derivation of all 
primary load cases? Are sketches provided with load 
12 location and intensity indicated? SAES‐A‐204 Cl. 10.6 General x

13 Has the designer referenced Saudi Aramco Best 
Practices (SABP's) where appropriate and applicable  General x
to the design?
14 For each calculation, is it made explicitly clear 
whether ASD or LRFD is being used? General x

15 Have all deflection checks (sway, drift, vertical) been 
made and clearly shown in calculation with  SAES‐M‐001 Cl.7.7 General x
reference to criteria?
16 Has the calculation been made based on certified 
General x
vendor drawings and data sheets? SAES‐M‐001 Cl. 5.2.4.6
17 Are certified vendor data sheets or drawings 
provided with the calculation for reference where  General x
appropriate?
18 Are the structures adequately braced? Has the 
bracing system been rationalized and optimized? General x

19 Have moment connections (frames) been properly 
SAES‐A‐204 Cl. 10.9 General x
identified?
Does the calculation include sketches of the main 
framing complete with bracing configuration, 
20 SAES‐A‐204 Cl. 10.8 General x
member fixities, member orientation indicated?

ISSUED FOR CONSTRUCTION (IFC)

26 JAN 2022
No. Item Reference Type Yes No N/A Designers Comment
21 Has the load path/connection between diaphragm 
and vertical resisting elements been demonstrated? General x

22 Where existing structures are included in the design, 
is the calculation in accordance with clause 8 of  SAES‐M‐001 Cl. 8 General x
SAES‐M‐001?
23
Have thermal loads been considered and applied in 
SAES‐M‐001 Cl. 5.7 Loads x
accordance with clause 5.7 of SAES‐M‐001?

24 Does the structure need to support hydro test 
loads? Are load combinations with hydro test in  SAES‐M‐001 Cl. 6.2.5 Loads x
accordance with SAES‐M‐001?
25 Have wind loads been calculated in accordance with 
SAES‐M‐001   Cl. 5.4 Loads x
ASCE 7‐05?
Are there any loads which may be unaccounted for 
such as electrical, suspended equipment, tanks, 
26 HVAC or any other late design items that may have  Loads x
been added by other disciplines?

27 Have earthquake loads been applied in accordance 
with ASCE 7‐05? SAES‐M‐001 Cl. 5.5 Loads x

28 Have hydrostatic loads been included in the design 
or has the presence of such loads been ruled out  Loads x
through geotechnical investigation?
29 Have special load conditions (ie: hydro test) been  SAES‐M‐001 Cl.
Loads x
noted on the design drawings? 5.2.4.5
30 Have the dead loads used in the design been 
Loads x
checked against the IFC drawings?
31 Are the dead loads used for stability calculations 
reasonable, appropriate and not overestimated? Loads x

32 Has the weight of fireproofing been included in the 
Loads x
design calculations?
33 Are the load combinations used in the calculation  In addition to SAES-M-009
complete, probable, realistic and appropriate? SAES‐M‐001 Cl. 6.1 Loads x

ISSUED FOR CONSTRUCTION (IFC)

26 JAN 2022
No. Item Reference Type Yes No N/A Designers Comment
34 Are the load combinations based on ASCE 7‐05? If  In addition to IBC - 2009 and SAES-M-
not, has the designer justified their basis for use? SAES‐M‐001 Cl. 6.2.1 Loads x 009

35 Has the designer considered unbalanced loading on 
Loads x
the structure? Eccentric loads?
For flat roofs has ponding been considered? If not 
minimum roof slope and roof drainage provisions 
36 SAES‐M‐100 and IBC Loads x
must be made in accordance with code.

37 Are the loads used in the calculation for cable trays 
in accordance with the Aramco Standard? SAES‐M‐001 Cl.5.2.6 Loads x

38 Has the structure supporting cranes been checked 
for the appropriate impact factors as listed in SAES‐ SAES‐M‐001 Cl. 5.6 Crane x
M‐001?
For jib cranes; has the supporting steel been 
checked (strength and deflection) as a result of the 
39 worst load condition based on load size and  Crane x
location? Is column checked for minor or biaxial 
bending?
40 Are crane deflection limits as per Cl. 7.6 of SAES‐M‐
SAES‐M‐001  Cl. 7.6 Crane x
001?
Are computer input files included in the report and  In addition to Spreadsheets.
are they complete including support locations, 
41 member end conditions, loadings, boundary  SAES‐A‐204 Cl. 11 Software x
conditions, load cases and load combinations?

Are the members’ orientations (strong vs. weak axis)  In addition to Spreadsheets.


correct in the software model or calculation and in 
42 Software x
agreement with the drawings?

Has a summary of the computer generated output  In addition to Spreadsheets.


been provided which clearly indicates what results 
have been achieved by the analysis? Member 
43 SAES‐A‐204 Cl. 11.5 Software x
strength ratios?
Maximum deflections under service loads?

ISSUED FOR CONSTRUCTION (IFC)

26 JAN 2022
No. Item Reference Type Yes No N/A Designers Comment
Where the designer has used proprietary software  Structural static analysis and design is
(Excel, Mathcad, etc…) for structural analysis, has  performed using CSI ETABS & SAFE
44 the designer demonstrated the accuracy of the  SAES‐A‐204 Cl. 11.4 Software x software's in addition to Spreadsheets.
results? Has proprietary software been verified?

45 Are baseplate holes oversized as per SAES‐M‐
SAES‐M‐001 Cl. 7.16 Steel x
001 and 12‐SAMSS‐007?
46 Have column base plates been sized correctly and 
are they included in the structural calculation? Steel x

Has the structure been designed to accommodate 
the effects of thermal expansion‐contraction? 
47 SAES‐M‐001 Cl. 7.1.11 Steel x
Example: Allowing for longitudinal movement in 
pipe rack design.
48 Have expansion/contraction joints in steel structures 
been clearly indicated and detailed on the structural  Steel x
drawings?
49 Has metal floor/roof decking and/or composite floor 
been designed in accordance with Steel Deck  SAES‐M‐001 Cl.7.2.1 Steel x
Institute (SDI)?
50 For metal decking; are the gauge, profile and 
properties clearly indicated on construction  Steel x
drawings and in calculation?
Where metal decking has been assumed to act as a 
diaphragm, have the connections to the structural 
51 SAES‐M‐001 Cl. 7.2.2 Steel x
frame been clearly detailed in the construction 
drawings?
52 For water retaining concrete structures, have they 
been designed in accordance with the provisions of  SAES‐Q‐001 Cl. 4.11 Concrete x
ACI 350?
Has precast/prestressed concrete been designed 
and detailed in accordance with SAES‐Q‐012 and the 
53 Precast/Prestressed Concrete Institute (PCI)? SAES‐M‐001 Cl.7.3.3 Concrete x

ISSUED FOR CONSTRUCTION (IFC)

26 JAN 2022
No. Item Reference Type Yes No N/A Designers Comment
Are the location of all expansion, isolation and 
54 construction joints in concrete clearly indicated on  Concrete x
the construction drawings and have these been 
55 Have the foundations been checked for stability 
against sliding and overturning with the factor of  SAES‐Q‐005 Cl. 4.2 Fdn x
safety clearly identified?

Foundations for reciprocating machines greater than 
200HP or centrifugal machines greater than 500HP 
56 SAES‐Q‐007 Cl. 5.1.1 and 5.1.2 Fdn x
have been checked using dynamic analysis in 
accordance with SAES‐Q‐007?
Has the thickness of footings been checked using 
factored loads and has the reinforcing been checked 
57 against the minimum required by ACI 318? Fdn x

58 For foundation design have existing underground 
utilities that could interfere with foundation  SAES‐Q‐005 Cl. 4.3.2(f) Fdn x
construction been identified?
59 For column pedestals has the anchor bolt layout  To be finalized by Construction
been checked against the reinforcing bar locations  Fdn x Contractor based on final approved
for clashes? vendor information
60 Has grout been specified in accordance with SAES‐Q‐ To be finalized by Construction
010 or SAES‐Q‐011 and is the minimum thickness  SAES‐Q‐005 Cl. 4.3.2c Fdn x Contractor based on final approved
specified 25mm? vendor information
61 Are anchor bolts in accordance with Saudi Aramco  To be finalized by Construction
Standard Drawing No. AC‐036022 (rev 8 or later)? SAES‐Q‐005 Cl. 4.8.1 Fdn x Contractor based on final approved
vendor information
62 Has the anchor bolt projection been checked against  To be finalized by Construction
final grout thickness, baseplate thickness and nut  Fdn x Contractor based on final approved
requirements? vendor information
63 Have allowable bearing pressures been checked 
(footing sized) against working stress (service  SAES‐Q‐005 Cl 4.1.2 Fdn x
loads)?
Have all anchor bolts been designed as cast‐in‐ place  To be finalized by Construction
or approval granted in accordance with clause 4.8.9  Contractor based on final approved
64 SAES‐Q‐005 Cl. 4.8.9 Fdn x
of SAES‐Q‐005 for use of post installed bolts? vendor information

ISSUED FOR CONSTRUCTION (IFC)

26 JAN 2022
No. Item Reference Type Yes No N/A Designers Comment
65 Have anchor bolts been designed in accordance to  To be finalized by Construction
ACI 318 Appendix D? SAES‐Q‐005 Cl. 4.8.4 Fdn x Contractor based on final approved
vendor information
66 To be finalized by Construction
Have all columns been designed with a minimum of  SAES‐M‐001 Cl. Fdn x Contractor based on final approved
4 anchor bolts as required by SAES‐M‐001? 7.1.9(a) vendor information
Have pedestals (short columns) been designed for  To be finalized by Construction
the worst combination of reaction forces including  Contractor based on final approved
67 Fdn x
shear, bending, tension or compression? vendor information

68 Have anchor bolt locations for vendor supplied  To be finalized by Construction


equipment been checked against the certified  Fdn x Contractor based on final approved
vendor drawings for correctness? vendor information
Are notes on the drawing clear with respect to the  To be finalized by Construction
placement of anchor bolts and the use of templates  Contractor based on final approved
69 to hold anchor bolts in position during construction? SAES‐Q‐005 Cl. 4.8.2 Fdn x vendor information

70 Are rebar spacings adequate to allow flow of 
Fdn x
concrete between bars?
71 Have additional reinforcing bars been provided 
Fdn x
diagonally at sleeve locations and corners?
72 Do dowels extending from footing into pedestal 
have the required development length at each end?  Fdn x
Is lap splice length correct?

ISSUED FOR CONSTRUCTION (IFC)

26 JAN 2022