SESCO ROAD, TG. KIDURONG, BINTULU, SARAWAK FOR SERBA DINAMIK GROUP BERHAD
- Schedule of Crane Updated: 28 March 2018
20T 2
Factory 1 91.84 30.00 12.50 Overhead
30T 1
5T 1
Manual Blasting
59.00 20.00 12.50 Overhead
Workshop
10T 1
Auto Blasting
59.00 30.00 12.50 Overhead 10T 2
Workshop
Final Inspection
Area &
91.84 34.00 - Gantry 15T 2
Quarantine
Area
Page 1 of 2
PROPOSED DEVELOPMENT OF INTEGRATED OIL AND GAS SERVICE HUB ON PLOT 20, KINDA II INDUSTRIAL ESTATE, KIDURONG
SESCO ROAD, TG. KIDURONG, BINTULU, SARAWAK FOR SERBA DINAMIK GROUP BERHAD
- Schedule of Crane Updated: 28 March 2018
Notes:
* Building height shown refer to min. clear height after roof structural member.
* Lifting height to be as high as possible based on the allowable clear height given.