Design and Construction of Pipeline Bridge for TMC & STEM Pipe Line DOCUMENT NO. DATE
Job :
near Lodha Dham. 188-E-DN-6001 13.08.2021
DESIGNED CHECKED SHEET
Title : Annexure
MTH MTH
Annexure-1
I Lifting Hook
The length of the precast girder is 19 m . The self weight of the girder is 48 MT. The girder will lifted at two ends
from locations as specified in the drawing.
Annexure-2
2.0 Loads
Railing load
Concrete below railing = 0.3 x 0.20 x 25.00
= 1.5 kN/m
Railing 11 kg/m for ISA 757510
3.8 kg/m
= 3.8 x 3 + 11
= 1.724 kN/m (( 3.8* 3+ 11)/100)+ 1.5
Applied load is 5 kN/m.