Abhay Consultants Pvt ltd

Design and Construction of Pipeline Bridge for TMC & STEM Pipe Line DOCUMENT NO. DATE
Job :
near Lodha Dham. 188-E-DN-6001 13.08.2021
DESIGNED CHECKED SHEET
Title : Annexure
MTH MTH

Annexure-1

I Lifting Hook

The length of the precast girder is 19 m . The self weight of the girder is 48 MT. The girder will lifted at two ends
from locations as specified in the drawing.

Reactions at each end: 48 MT


2
= 24 MT
Factored load = 1.35 x 24
= 32.4 MT
Lifting arrangement = 3 Nos of Strands of 12.7 mm
Area of Strand = 140 mm2
Yield strength = 1860 Mpa
Axial capacity of Strand
= 1860 x 140 x 3 x 0.87
= 679.6 kN
= 67.96 MT > 32.4 MT

Shear Capacity of the strand


= 0.57 x 1860 x 3 x 140 x 0.87
= 38.74 MT > 32.4 MT
Abhay Consultants Pvt ltd
Design and Construction of Pipeline Bridge for TMC & STEM Pipe Line DOCUMENT NO. DATE
Job :
near Lodha Dham. 188-E-DN-6001 13.08.2021
DESIGNED CHECKED SHEET
Title : Design of RCC Girder for RCC Type Superstructure of 19 m span
MTH MTH

Annexure-2

2.0 Loads

Dia of Pipe = 2500 mm


Thickness of Pipe = 20 mm
Weight of pipe (empty) = 1.22 t/m = 3.14*0.25*((( 2500/1000)^2)-((( 2500- 20*2)/1000)^2))*7850/1000
Weight of Water in pipe = 4.75 t/m = 3.14*0.25*(((( 2500- 20*2)/1000)^2))*1000/1000
Total = 5.98 t/m
Weight of Railing = t/m

Weight of the pedestal = 2.3 x 2.3 x 0.3 x 25


= 39.68 kN
= 3.968 MT
= 0.99 MT Same is applied as point load ( 3.97/4 )
Applied load is 15 kN.

Railing load
Concrete below railing = 0.3 x 0.20 x 25.00
= 1.5 kN/m
Railing 11 kg/m for ISA 757510
3.8 kg/m
= 3.8 x 3 + 11
= 1.724 kN/m (( 3.8* 3+ 11)/100)+ 1.5
Applied load is 5 kN/m.