PROJECT: MEMBINA JALAN PERHUBUNGAN DESA DARI Weather


11 12 12
KOA SIMOI LAMA KE POS LENJANG, LIPIS, PAHANG 1 11 1
10 10
2 2
9 3 9 3
8 4 8 4
7 5 7 5
Date: 21/03/2022 Day: Monday 6 6
AM PM
Work Start: 0800 Work End: 1900
Fine Drizzle Rain

1. MANPOWER RECORD

TRADE NO TRADE NO TRADE NO


PROJECT MANAGER 2 MACHINE COORDINATOR 1 STEEL WORKER -
PROJECT COORDINATOR 1 GENERAL WORKER - FLAGMAN -
SITE MANAGER 1 PILING OPERATOR - EXCAVATOR OPERATOR 2
SITE ENGINEER 1 PILING WORKER - BACKPUSHER OPERATOR 2
PLANNER ENGINEER 1 CARPENTER - COMPACTOR OPERATOR 1
SAFETY & HEALTH OFFICER 1 BARBENDER - LORRY DRIVER -
M & E COORDINATOR - CONCRETE WORKER - BACKHOE OPERATOR -
SUPERVISOR - WELDER - WEIGHT BRIDGE OPERATOR -
QA/QC ENGINEER 1 BAR CUTTER BULLDOZER OPERATOR 1
LAND SURVEYOR 1
CHAINMAN 2
SITE SAFETY SUPERVISOR 1
QUANTITY SURVEYOR 1
ENVIRONMENTAL OFFICER 3
LAB TECHNICIAN - TOTAL 23 PAXS

2. PLANT, MACHINERIES, TOOLS & EQUIPMENTS

ITEM NO WORKING TIME ITEM NO WORKING TIME


ROLLER COMPACTOR 1 0800 1900
BACKPUSHER 1 0800 1900
BULLDOZER 1 0800 1900
EXCAVATOR 1 0800 1900
DUMP TRUCK - - -
BACKHOE - - -
MOBILE CRANE - - -
GENERATOR SET - - -
BAR BENDING MACHINE - - -
BAR CUTTING MACHINE - - -
WATER JET - - -
WELDING SET - - -
WATER PUMP - - -
PILING MACHINE - - - TOTAL 4/6 NOS
Borang : JPD-SPB-11
No. Pindaan : 0
Muka Surat : 2 / 2

3. MATERIAL DELIVERY

ITEM NO ITEM NO ITEM NO


Tiada penghantaran barang - - - - -

4. WORK ACTIVITIES

1. Kerja-kerja pembersihan tapak pembinaan jalan raya dari CH8000-CH9000

5. REMARKS

1. Cuaca baik.
2. Dua buah jentera mengalami kerosakan dan ‘idling’ iaitu sebuah ‘Excavator’ dan sebuah ‘bulldozer’

CONTRACTOR CLIENT / CONSULTANT

Saddam
Name : Saddam Tamimi Name :