Professional Documents
Culture Documents
Movable Tower Light-Monthly Inspection Checklist: Acceptable Not Acceptable N/A
Movable Tower Light-Monthly Inspection Checklist: Acceptable Not Acceptable N/A
Location: Date: _
Equipment Code:
Comments:
Note:
All non-compliance/deficiencies should be rectify within two (2) days after the inspections
date.
Inspected By: