ENGINEERING & CONSTRUCTION MANAGEMENT PROJECT

STOP WORK AUTHORITY FORM


A.     Observer Data (SWA is initiated/reported by)/Data Observer (SWA digagas/dilapor oleh):

Name/Nama: Badge./Badge no: Signature:


Dept./Dept: Job Title/Jabatan:

Company/Perusahaan:
Date:

B.      Observee Data (SWA is implemented to)/Data Observee (SWA diterapkan kepada):

Name/Nama: Badge/Badge no: Signature:


Dept./Dept: Job Title/Jabatan:

Company/Perusahaan:
Date:

C.     Detail SWA Observation/Observasi Detail SWA:


Location/Lokasi: OU:
Date/Tanggal
Human Lifting
Motor &
Nature Of Job: Earthwork Serious Injuries & Confined
Civil Fatality (SIF): Performance Rigging
Vehicle
Mechanical/ Space Work at
Electrical & Electrical Safety
Process
Piping Excavation Height
Instrument
Other Hotwork Safety
Non SIF
*Probable Severity Level: (tick the box) Hum Physi Syst
3b Category:
an cal em
Description/Deskripsi:

Reason for doing SWA/Alasan melakukan SWA:

Response & Resolution/ Respon & Resolusi:

Feedbacks/ Umpan balik:


No/
Was work activity resumed? / Yes/
Tida
Apakah aktivitas kerja dilanjutkan kembali? Hrs/jam: …….. hrs Ya
k
No/
Was real problem? / Yes/
Tida
Apakah isu SWA disepakati kedua pihak? Ya
No/
k
Was perceived problem? / Yes/
Tida
Apakah isu SWA hanya dirasakan satu pihak? Ya No/
Was issue resolved? / Yes/ k
Tida
Apakah isu yang dibahas terselesaikan? Ya
No/
k
Were outside resources involved to mitigate? / Yes/
Tida
Apakah melibatkan pihak lain untuk mitigasi? Ya
C822444-COR-HS-FRM-0001 rev02 k
Distribution SWA files:
White - Contractor Pink - CPI Yellow - RW Issuer Green - HES File
C822444-COR-HS-FRM-0001 rev02