DIVISION 2 - SITE CONSTRUCTION/SITE WORKS

SECTION NO. TITLE

02010 SOIL INVESTIGATION


02020 CAVITY PROBING
02060 DEMOLITION
02072 MINOR DEMOLITION FOR REMODELLING
02110 CLEARING AND GRUBBING
02167 REINFORCED EARTH
02200 EARTHWORKS
02210 COMPACTION AND TESTING OF EARTHWORK
02220 STRUCTURAL EXCAVATION AND BACKFILL
02221 TRENCHING, BACKFILLING, COMPACTION AND GENERAL GRADING
02230 AGGREGATE OR GRANULAR SUBBASE
02232 AGGREGATE BASE COURSE
02513 PAVEMENTS - ASPHALTIC CONCRETE
02720 STORMWATER DRAINAGE
02726 MANHOLE COVERS AND FRAMES
02730 SANITARY SEWERAGE
02832 CHAIN LINK FENCE AND GATES

SITE CONSTRUCTION - THE CONSTRUCTION OF BUILDINGS AND OTHER STRUCTURES ON A SITE, AS WELL
AS RENOVATIONS TO REAL ESTATE, IS REFERRED TO AS SITE CONSTRUCTION. LAND PREPARATION, NEW
CONSTRUCTION, RECONSTRUCTION, REMODELING, RENOVATION, REPAIR, UPGRADING, AND MAKING
CHANGES AND ADDITIONS TO REAL PROPERTY ARE ALL INCLUDED IN THIS TERM, WHETHER THE WORK IS
DONE BY THE MANUFACTURER OR BY OTHER FIRMS.

02010 – SOIL INVESTIGATION

EXECUTION

3.01 GENERAL

A. CONDUCT SUPPLEMENTARY SOIL INVESTIGATION AND TESTING IN ACCORDANCE


WITH THE APPROPRIATE AMERICAN STANDARDS.

B. DRILL BOREHOLES USING METHODS ACCEPTABLE TO THE ENGINEER SATISFYING THE


REQUIREMENTS FOR SAMPLING, INSITU TESTING AND INSTRUMENTATION, AND WHICH
MINIMISES THE DISTURBANCE TO THE BASE OF THE BOREHOLE WHICH SAMPLES OR
INSITU TESTS ARE TO BE TAKEN.

C. PROVIDE FULL DAILY RECORDS OF ALL BOREHOLES GIVING ALL DETAILS RELATING
TO THE DRILLING OF THE HOLE, THE STRATA ENCOUNTERED, SAMPLES AND TESTS
TAKEN.

D. UNLESS OTHERWISE INSTRUCTED BY THE ENGINEER, BACKFILL ALL BOREHOLES WITH A


SAND CEMENT GROUT CONTAINING 10% BENTONITE, SUFFICIENTLY FLUID TO ENSURE
COMPLETE FILLING OF THE HOLE, OR WITH OTHER MIXTURES AS INSTRUCTED BY THE
ENGINEER. PLACE BACKFILL IN SUCH A MANNER AS TO ENSURE THE DISPLACEMENT OF
ALL WATER IN THE BOREHOLE.

E. PREPARE GEOLOGICAL LOGS OF ALL BOREHOLES BY SUITABLY QUALIFIED ENGINEERING


PERSONNEL, IN ACCORDANCE WITH THE RECOMMENDATIONS OF ASTM OR OTHER
STANDARDS ACCEPTABLE TO THE ENGINEER.

F. ON COMPLETION OF ALL FIELDWORK AND LABORATORY TESTING, SUBMIT TO THE


ENGINEER THREE COPIES OF THE FINAL FACTUAL REPORT.

G. SUBMIT THE REPORT TO THE ENGINEER IN DRAFT FORM FOR COMMENT, IN


ACCORDANCE WITH THE APPROVED PROGRAMME. SUBMIT THE FINAL REPORT,
INCORPORATING THE REQUIRED MODIFICATIONS WITHIN ONE WEEK OF THE APPROVAL
OF THE DRAFT.
THE REPORT SHALL INCLUDE THE FOLLOWING:

1. A DESCRIPTION OF THE INVESTIGATION GIVING DETAILS OF THE WORK,


METHODS ADOPTED FOR THE FIELDWORK AND LABORATORY TESTS.

2. A DIMENSIONED SITE PLAN SHOWING THE LOCATION OF THE BOREHOLES.

3. THE GEOLOGICAL LOGS FOR THE BOREHOLES INCLUDING DESCRIPTIONS AND


CLASSIFICATIONS OF THE MATERIALS ENCOUNTERED.

4. THE RESULTS OF ALL FIELD AND LABORATORY TESTS.

5. ELEVATION OF THE WATER TABLE, IF ENCOUNTERED.

6. RECOMMENDATIONS OF FOUNDATION TYPE AND DESIGN CRITERIA, INCLUDING


BEARING CAPACITY, PROVISIONS TO MITIGATE THE EFFECTS OF EXPENSIVE SOILS
AND THE EFFECTS OF ADJACENT LOADS.

7. EXPECTED TOTAL AND DIFFERENTIAL SETTLEMENT.

PREPARE THE REPORT USING METRIC UNITS.

H. WHEN THE ANALYSIS OF THE TEST RESULTS SHOWS THAT THE SOIL PROPERTIES ARE
INADEQUATE TO MEET THE DESIGN LOADS, MAKE RECOMMENDATIONS FOR THE
IMPROVEMENT OF THE SOIL PROPERTIES OR ALTERNATIVE DESIGN CONFIGURATIONS
FOR CONSIDERATION BY THE ENGINEER. CARRY OUT ANY REDESIGN WORK NEEDED,
SUBJECT TO THE APPROVAL OF THE ENGINEER WITHOUT ANY EXTRA COST.

02060 - DEMOLITION
PART 3 EXECUTION
3.01 DEMOLITION AND SALVAGE
3.02 ELECTRICAL AND TELECOMMUNICATIONS INSTALLATIONS
3.03 WATER AND SEWERAGE INSTALLATION
3.04 DIVERSION AND SEALING OF DRAINS AND SERVICES
3.01 OIL PIPELINE INSTALLATIONS
3.02 DISPOSAL OF DEMOLISHED MATERIALS
3.03 BLASTING
3.04 BURNING OF REFUSE MATERIALS
3.05 RELICS AND ANTIQUES
SECTION 02072

MINOR DEMOLITION FOR REMODELING

PART 3 EXECUTION

3.01 EXAMINATION
3.02 PREPARATION
3.03 DEMOLITION
SECTION 02110

CLEARING AND GRUBBING

PART 3 EXECUTION

3.01 GENERAL REQUIREMENTS


3.02 HIGHWAY REQUIREMENTS
3.03 NON-HIGHWAY AREAS
SECTION 02167 REINFORCED

EARTH

PART 3 EXECUTION

3.01 GENERAL
3.02 EXCAVATION
3.03 REINFORCED EARTH WALLS
3.04 REINFORCED EARTH GROUND STABILIZATION
3.05 TESTING
3.06 PRELOADING AND SETTLEMENT PERIOD

SECTION 02200 EARTHWORKS

PART 3 EXECUTION

3.01 GENERAL
3.02 CONTROL OF WATER
3.03 EXCAVATION
3.04 EXCAVATION NEAR EXISTING UTILITIES
3.05 EXCESS EXCAVATION
3.06 ADDITIONAL EXCAVATION
3.07 DISPOSAL OF SURPLUS MATERIAL
3.08 FILL
3.09 DUST AND NOISE CONTROL
SECTION 02210

COMPACTION AND TESTING OF EARTHWORK

PART 3 EXECUTION

3.01 COMPACTION REQUIREMENTS


3.02 TESTING REQUIREMENTS
SECTION 02220

STRUCTURAL EXCAVATION AND BACKFILL

PART 3 EXECUTION

3.01 GENERAL
3.02 CONTROL OF WATER
3.03 EXCAVATION
3.04 EXCAVATION NEAR EXISTING UTILITIES
3.05 EXCESS EXCAVATION
3.06 ADDITIONAL EXCAVATION
3.07 DISPOSAL OF SURPLUS MATERIAL
3.01 BACKFILL AND FILL
3.02 UNCLASSIFIED STRUCTURAL BACKFILL
3.03 SUPPORTING EXCAVATIONS
3.04 TOLERANCES
3.05 SETTLEMENT PERIOD
3.06 DUST AND NOISE CONTROL
SECTION 02221

TRENCHING, BACKFILLING, COMPACTION AND GENERAL GRADING

PART 3 EXCAVATION

3.01 EXCAVATION
3.02 COMPACTION
3.03 BACKFILL AND FILL
3.04 GRADING
3.05 FIELD QUALITY CONTROL
3.06 MAINTENANCE
3.01 DISPOSAL OF EXCESS AND WASTE MATERIALS
SECTION 02230 AGGREGATE OR

GRANULAR SUBBASE

PART 3 EXECUTION

3.01 QUALITY CONTROL PROCEDURES


3.02 SURFACE PREPARATION
3.03 PLACING AND SPREADING
3.04 COMPACTING
3.01 FINISHING
3.02 MAINTENANCE AND PROTECTION
3.03 COMPACTION TEST TRIALS
SECTION 02232 AGGREGATE BASE

COURSE

PART 3 EXECUTION

3.01 QUALITY CONTROL PROCEDURES


3.02 PREPARATION AND MAINTENANCE
3.03 MIXING
3.04 TRANSPORTING
3.01 PLACING AND SPREADING
3.02 COMPACTING
3.03 FINISHING
3.04 MAINTENANCE AND PROTECTION
3.05 COMPACTION TEST TRIALS
3.06 SURFACE TOLERANCES
SECTION 02513 PAVEMENTS -

ASPHALTIC CONCRETE

PART 3 EXECUTION

3.01 TRANSPORTATION, LAYING AND COMPACTION OF ASPHALT SURFACING


3.02 TESTING OF ASPHALT SURFACE MATERIALS
3.01 TOLERANCES
SECTION 02720

STORM WATER DRAINAGE SYSTEM

PART 3 EXECUTION

3.01 INSPECTION
3.02 GENERAL
3.03 TESTING
3.04 WATER TESTING OF PIPELINES
SECTION 02726 MANHOLE

COVERS AND FRAMES

PART 3 EXECUTION

3.01 INSTALLATION

SECTION 02832

CHAIN LINK FENCE AND GATES

PART 3 EXECUTION

3.01 ERECTION