Division 2 - Site Construction/Site Works
Division 2 - Site Construction/Site Works
SITE CONSTRUCTION - THE CONSTRUCTION OF BUILDINGS AND OTHER STRUCTURES ON A SITE, AS WELL
AS RENOVATIONS TO REAL ESTATE, IS REFERRED TO AS SITE CONSTRUCTION. LAND PREPARATION, NEW
CONSTRUCTION, RECONSTRUCTION, REMODELING, RENOVATION, REPAIR, UPGRADING, AND MAKING
CHANGES AND ADDITIONS TO REAL PROPERTY ARE ALL INCLUDED IN THIS TERM, WHETHER THE WORK IS
DONE BY THE MANUFACTURER OR BY OTHER FIRMS.
EXECUTION
3.01 GENERAL
C. PROVIDE FULL DAILY RECORDS OF ALL BOREHOLES GIVING ALL DETAILS RELATING
TO THE DRILLING OF THE HOLE, THE STRATA ENCOUNTERED, SAMPLES AND TESTS
TAKEN.
H. WHEN THE ANALYSIS OF THE TEST RESULTS SHOWS THAT THE SOIL PROPERTIES ARE
INADEQUATE TO MEET THE DESIGN LOADS, MAKE RECOMMENDATIONS FOR THE
IMPROVEMENT OF THE SOIL PROPERTIES OR ALTERNATIVE DESIGN CONFIGURATIONS
FOR CONSIDERATION BY THE ENGINEER. CARRY OUT ANY REDESIGN WORK NEEDED,
SUBJECT TO THE APPROVAL OF THE ENGINEER WITHOUT ANY EXTRA COST.
02060 - DEMOLITION
PART 3 EXECUTION
3.01 DEMOLITION AND SALVAGE
3.02 ELECTRICAL AND TELECOMMUNICATIONS INSTALLATIONS
3.03 WATER AND SEWERAGE INSTALLATION
3.04 DIVERSION AND SEALING OF DRAINS AND SERVICES
3.01 OIL PIPELINE INSTALLATIONS
3.02 DISPOSAL OF DEMOLISHED MATERIALS
3.03 BLASTING
3.04 BURNING OF REFUSE MATERIALS
3.05 RELICS AND ANTIQUES
SECTION 02072
PART 3 EXECUTION
3.01 EXAMINATION
3.02 PREPARATION
3.03 DEMOLITION
SECTION 02110
PART 3 EXECUTION
EARTH
PART 3 EXECUTION
3.01 GENERAL
3.02 EXCAVATION
3.03 REINFORCED EARTH WALLS
3.04 REINFORCED EARTH GROUND STABILIZATION
3.05 TESTING
3.06 PRELOADING AND SETTLEMENT PERIOD
PART 3 EXECUTION
3.01 GENERAL
3.02 CONTROL OF WATER
3.03 EXCAVATION
3.04 EXCAVATION NEAR EXISTING UTILITIES
3.05 EXCESS EXCAVATION
3.06 ADDITIONAL EXCAVATION
3.07 DISPOSAL OF SURPLUS MATERIAL
3.08 FILL
3.09 DUST AND NOISE CONTROL
SECTION 02210
PART 3 EXECUTION
PART 3 EXECUTION
3.01 GENERAL
3.02 CONTROL OF WATER
3.03 EXCAVATION
3.04 EXCAVATION NEAR EXISTING UTILITIES
3.05 EXCESS EXCAVATION
3.06 ADDITIONAL EXCAVATION
3.07 DISPOSAL OF SURPLUS MATERIAL
3.01 BACKFILL AND FILL
3.02 UNCLASSIFIED STRUCTURAL BACKFILL
3.03 SUPPORTING EXCAVATIONS
3.04 TOLERANCES
3.05 SETTLEMENT PERIOD
3.06 DUST AND NOISE CONTROL
SECTION 02221
PART 3 EXCAVATION
3.01 EXCAVATION
3.02 COMPACTION
3.03 BACKFILL AND FILL
3.04 GRADING
3.05 FIELD QUALITY CONTROL
3.06 MAINTENANCE
3.01 DISPOSAL OF EXCESS AND WASTE MATERIALS
SECTION 02230 AGGREGATE OR
GRANULAR SUBBASE
PART 3 EXECUTION
COURSE
PART 3 EXECUTION
ASPHALTIC CONCRETE
PART 3 EXECUTION
PART 3 EXECUTION
3.01 INSPECTION
3.02 GENERAL
3.03 TESTING
3.04 WATER TESTING OF PIPELINES
SECTION 02726 MANHOLE
PART 3 EXECUTION
3.01 INSTALLATION
SECTION 02832
PART 3 EXECUTION
3.01 ERECTION