GNL Engineering Consultancy

No. 24-1, Jalan Seri Bayan 7, Taman Seri Bayan, 76100 Durian Tunggal, Melaka.
Tel: 06-3359198 Fax: 06-3373198 Email: gnlconsult@gmail.com
____________________________________________________________________________________________________

WEEKLY PROGRESS MONITORING

FOR

MAXEON MALAYSIA

PERC NEW CDS SYSTEM

(WW 2.3 to WW 3.2)

Prepared by: Lee Zheng Hau & Yamuneshwary


GNL Engineering Consultancy
No. 24-1, Jalan Seri Bayan 7, Taman Seri Bayan, 76100 Durian Tunggal, Melaka.
Tel: 06-3359198 Fax: 06-3373198 Email: gnlconsult@gmail.com
____________________________________________________________________________________________________

TABLE OF CONTENTS

NO ITEM PAGE

1.0 PROJECT STATUS SUMMARY 1

2.0 MANPOWER DETAILS 2

3.0 PROJECT PROGRESS 3

4.0 SAFETY AND HEALTH ISSUE 5

4.1 SAFETY GOOD CATCH 5

5.0 UPCOMING ACITIVITES 6

6.0 PROJECT S-CURVE 7


GNL Engineering Consultancy
No. 24-1, Jalan Seri Bayan 7, Taman Seri Bayan, 76100 Durian Tunggal, Melaka.
Tel: 06-3359198 Fax: 06-3373198 Email: gnlconsult@gmail.com
____________________________________________________________________________________________________

1.0 PROJECT STATUS SUMMARY

PROPOSED NEW CHEMICAL DISPENSE SYSTEM FOR HF AND HCL IN EXISTING


“FAB 3’ ON LOT 14603, KAWASAN PERINDUSTRIAN MELAKA WORLD SOLAR
VALLEY, REMBIA, MUKIM SUNGEI PETAI, DAERAH ALOR GAJAH, MELAKA
BANDARAYA BERSEJARAH.

Client : Maxeon Malaysia


Contractor : Kinetics Systems Malaysia Sdn. Bhd.
Project Report Information
Progress Meeting : WW 3 22’
Period Ending : WW 3.2 22’ (18/01/2022)
Contract Commencement Date : WW 37.3 21’ (15/9/2021)
Contract Completion Date : WW 10.5 22’ (11/3/2022)
Original Contract Period : 128 days
Cumulative Working Day : 90 days
Delays :-
Overall Project Status
Target Progress : 66%
Actual Progress : 55%
Ahead / Delay : -11%
Highlights
1. Temporary skid overall progress on track. Handed-over at WW3.2.
Lowlights
1. Permanent skid progress behind schedule.
a. ATS exhaust ducting pending Maxeon side for RFQ.
b. Kinetics change plan to start M&E installation upon arrival of permanent skid.

1
GNL Engineering Consultancy
No. 24-1, Jalan Seri Bayan 7, Taman Seri Bayan, 76100 Durian Tunggal, Melaka.
Tel: 06-3359198 Fax: 06-3373198 Email: gnlconsult@gmail.com
____________________________________________________________________________________________________

2.0 MANPOWER DETAILS

Kinetics Manpower Chart


6

5 0 0 0

4 2 2 2 Scaffolder
Manpower

1
Elect
3 0 0 0 0
Mech

2 2 2 2 2 0 QA/QC
1 SSS
1 Engr.
1 1 1 1 1
0 0 0
2.3 2.4 2.5 2.6 2.7 3.1 3.2
Work Week, WW

GNL Manpower Chart


3.5

2.5
Manpower

2 2 2 2 2 2

1.5 SSS
CM
1

0.5 1 1 1 1 1

0 0 0
2.3 2.4 2.5 2.6 2.7 3.1 3.2
Work Week, WW

2
GNL Engineering Consultancy
No. 24-1, Jalan Seri Bayan 7, Taman Seri Bayan, 76100 Durian Tunggal, Melaka.
Tel: 06-3359198 Fax: 06-3373198 Email: gnlconsult@gmail.com
____________________________________________________________________________________________________

3.0 PROJECT PROGRESS

No Progress Picture and Description Status

1 Temporary Skid Chemical Supply to Production Target 20%


Installation of Dispense Head for Temporary Skid.
vs Actual

100%

Installation of Dispense head for temporary skid for HCL and HF in CDS
room 2.

Hook up CVB HF and HCL

Hook up for 3 CVB HF and 1 CVB HCL in Production area.

3
GNL Engineering Consultancy
No. 24-1, Jalan Seri Bayan 7, Taman Seri Bayan, 76100 Durian Tunggal, Melaka.
Tel: 06-3359198 Fax: 06-3373198 Email: gnlconsult@gmail.com
____________________________________________________________________________________________________

Commissioning of Chemical from IBC to Production by Operation


team

2 Temporary Skid SAT and Training for HF & HCL Target 100%

vs Actual

100%

4
GNL Engineering Consultancy
No. 24-1, Jalan Seri Bayan 7, Taman Seri Bayan, 76100 Durian Tunggal, Melaka.
Tel: 06-3359198 Fax: 06-3373198 Email: gnlconsult@gmail.com
____________________________________________________________________________________________________

4.0 SAFETY AND HEALTH ISSUE

No Item Remarks

Toolbox meeting was held in order to explain the hazards and


procedure before start work for fabrication, plenum access
procedure, working at height, manual handling tools and also
briefing regarding Covid-19 SOP.

4.1 SAFETY GOOD CATCH

No Issue Action Taken

1 -

5
GNL Engineering Consultancy
No. 24-1, Jalan Seri Bayan 7, Taman Seri Bayan, 76100 Durian Tunggal, Melaka.
Tel: 06-3359198 Fax: 06-3373198 Email: gnlconsult@gmail.com
____________________________________________________________________________________________________

5.0 UPCOMING ACTIVITIES

No Item Remarks

1 Erect Scaffolding for Electrical work

2 Preparation of lay cable for junction box.

6
PERC New CDS Project S-Curve
Target Actual

100%

90%

80%

70%

60%
Percentage

50%

40%

30%

20%

10%

0%
43.1 44.1 45.1 46.1 47.1 48.1 49.1 50.1 51.1 52.1 1.1 2.1 3.1 4.1 5.1 6.1 7.1 8.1 9.1 10.1
Work Week, WW
2.7
2.6
2.5
2.4
2.3
2.2
2.1
1.16
1.15
1.14
1.13
1.12
1.11
1.10
1.9
1.8
1.7
1.6
1.5
1.4
1.3
1.2
1.1
Date :

Actual % :
Target % :

SAT
SAT
55%
66%

1 Permanent CDS

2 Temporary Skid

QA/QC
QA/QC
Lay cable
CSA Work

Site Installation
Site installation

termination

PE Tank arrival
18/01/2022

FRP Tank arrival


Filter unit arrival

Erect scaffolding
Erect scaffolding

ATS duct installation

SCADA & programming

Exhaust duct installation


HCL IBC enclosure arrival

electrical & BB installation


Require shutdown for cable

installation & electrical work

Temporary skid mobilization


Permanent CDS mobilisation

Chemical supply to production


Chemical supply to production

PVC pipe, PFA installation, utilities,


Utilities (N2, CDA & DIW), drain pipe

PFA & double containment installation

1
3
2
2
5
5
2
3
5
2
2
2
2
2
5
3
1

10
39
10
10
10
14
(days)
Duration
Start

17/01/22
17/01/22
13/01/22
07/01/22
17/12/21
04/01/22
08/12/21
09/12/21
15/12/21
31/12/21
16/11/21
08/11/21
19/11/21
15/11/21
07/03/22
03/03/22
28/02/22
07/02/22
21/02/22
17/02/22
17/02/22
17/02/22
17/02/22
17/02/22
06/01/22
06/01/22
10/01/22
03/01/22
03/01/22
20/12/21
25/10/21
25/10/21
End

18/01/22
28/01/22
13/01/22
07/01/22
06/01/22
06/01/22
08/12/21
10/12/21
31/12/21
03/01/22
05/01/22
30/12/21
25/11/21
19/11/21
11/03/22
04/03/22
02/03/22
18/02/22
25/02/22
18/02/22
18/02/22
18/02/22
18/02/22
18/02/22
19/01/22
12/01/22
21/01/22
05/01/22
03/01/22
20/12/21
11/11/21
11/11/21

Plan
Plan
Plan
Plan
Plan
Plan
Plan
Plan
Plan
Plan
Plan
Plan
Plan
Plan
Plan
Plan
Plan
Plan
Plan
Plan
Plan
Plan
Plan

Actual
Actual
Actual
Actual
Actual
Actual
Actual
Actual
Actual
Actual
Actual
Actual
Actual
Actual
Actual
Actual
Actual
Actual
Actual
Actual
Actual
Actual
Actual
%

100%
20%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
90%
100%
70%
100%
100%
100%
100%
100%

25/10/21 43.1
26/10/21 43.2
27/10/21 43.3
28/10/21 43.4
29/10/21 43.5
30/10/21 43.6
31/10/21 43.7
01/11/21 44.1
02/11/21 44.2
03/11/21 44.3
04/11/21 44.4
05/11/21 44.5
06/11/21 44.6
07/11/21 44.7
08/11/21 45.1
09/11/21 45.2
10/11/21 45.3
11/11/21 45.4
12/11/21 45.5
13/11/21 45.6
14/11/21 45.7
15/11/21 46.1
16/11/21 46.2
17/11/21 46.3
18/11/21 46.4
19/11/21 46.5
20/11/21 46.6
21/11/21 46.7
22/11/21 47.1
23/11/21 47.2
24/11/21 47.3
25/11/21 47.4
26/11/21 47.5
27/11/21 47.6
28/11/21 47.7
29/11/21 48.1
30/11/21 48.2
01/12/21 48.3
02/12/21 48.4
03/12/21 48.5
04/12/21 48.6
05/12/21 48.7
06/12/21 49.1
07/12/21 49.2
08/12/21 49.3
09/12/21 49.4
10/12/21 49.5
11/12/21 49.6
12/12/21 49.7
13/12/21 50.1
14/12/21 50.2
15/12/21 50.3
16/12/21 50.4
17/12/21 50.5
18/12/21 50.6
19/12/21 50.7
20/12/21 51.1
21/12/21 51.2
22/12/21 51.3
23/12/21 51.4
24/12/21 51.5
25/12/21 51.6
26/12/21 51.7
27/12/21 52.1
28/12/21 52.2
29/12/21 52.3
30/12/21 52.4
31/12/21 52.5
01/01/22 52.6
02/01/22 52.7
03/01/22 1.1
04/01/22 1.2
05/01/22 1.3
06/01/22 1.4
07/01/22 1.5
08/01/22 1.6
09/01/22 1.7
10/01/22 2.1
11/01/22 2.2
12/01/22 2.3
13/01/22 2.4
14/01/22 2.5
15/01/22 2.6
16/01/22 2.7
17/01/22 3.1
18/01/22 3.2
19/01/22 3.3
20/01/22 3.4
21/01/22 3.5
22/01/22 3.6
23/01/22 3.7
24/01/22 4.1
25/01/22 4.2
26/01/22 4.3
27/01/22 4.4
28/01/22 4.5
29/01/22 4.6
30/01/22 4.7
31/01/22 5.1
01/02/22 5.2
02/02/22 5.3
03/02/22 5.4
04/02/22 5.5
05/02/22 5.6
06/02/22 5.7
07/02/22 6.1
08/02/22 6.2
09/02/22 6.3
10/02/22 6.4
11/02/22 6.5
12/02/22 6.6
13/02/22 6.7
14/02/22 7.1
15/02/22 7.2
16/02/22 7.3
17/02/22 7.4
18/02/22 7.5
19/02/22 7.6
20/02/22 7.7
21/02/22 8.1
22/02/22 8.2
23/02/22 8.3
24/02/22 8.4
25/02/22 8.5
26/02/22 8.6
27/02/22 8.7
28/02/22 9.1
01/03/22 9.2
02/03/22 9.3
03/03/22 9.4
04/03/22 9.5
05/03/22 9.6
06/03/22 9.7
07/03/22 10.1
08/03/22 10.2
09/03/22 10.3
10/03/22 10.4
11/03/22 10.5