File No: 5039464 Inspection Report No.:-LUD/RU/58/2021
File No: 5039464 Inspection Report No.:-LUD/RU/58/2021
File No: 5039464 Inspection Report No.:-LUD/RU/58/2021
Inspection report
File No : 5039464 Inspection Report No. :- LUD/RU/58/2021
Place of inspection: Banmajra, (ROPAR). Date of inspection :11/03/2022
Time In : 10:10 Am Time Out : 5:40 Pm
Name of the Project ( if any ) CB-2077(SP 502), M/s JIGAWA RICE Ltd , NIGERIA
(15TPH/10.54 Kg/cm2(g) HYPAC)
Name of Client M/s Jigawa Rice Ltd, NIGERIA
Name Seller / Manufacturer / Vendor M/s Cheema Boilers Limited, Vill Banmajara, Kurali Dist.
Ropar pin 140103,
Client’s P/O No. & Date CBL 825 REV.04/SP:2020-21 DATE 17.05.2021
Date of last inspection -----
Inspection call reference E MAIL DATED 05.03.2022
Status of previous hold points / Deviation -----
P.O. Status: Completed / Balance / Hold BALANCE
Item # Quantity
Quantity Quantity
as per as per Quantity Quantity Quantity
Description & Size Previousl Now
Contra Contract Offered Rejected Balance
y passed Passed
ct/ / Order (Nos.) (Nos.) (Nos.)
(Nos.) (Nos.)
Order (Nos.)
15 TPH Rice Husk Fire Boiler: -
PO No. & Date: CBL 825 Scope: - As per Email dt 05.03.2022: - visual Annexure-A
REV.04/SP:2020-21 DATE inspection, dimensions check, quantity
17.05.2021 verification, review of inspection reports as
QAP / ITP No :N.A. applicable.
Revision :.
Status: -
Remarks:-
Inbed Tube Assy. Is not offered during inspection
Inspection carried out as per E-mail dated 05.03.2022
Enclosure Quantity Details of part (offer list). Joint inspection Report MTC Calibration T/C
Sr. No. Details of activity performed, findings and product marking Conclusion
- Scope: - As per Email dt 05.03.2022: - l for visual inspection, dimensions Satisfactory for
check, quantity verification, review of inspection reports as applicable. carried out
activities except
Status: - Inbed tube
assembly.
Quantity: - All the pcs. were physically counted & verified for Quantity.
Refer remarks
Visual Check:- All the above sampled pieces were checked visually column.
(General) for Finish /Paint Finish, Paint peel off, Dents, Flow of paint, Burr &
welding defects like pin holes, under cuts, porosity, spatters as applicable &
found satisfactory.
Inbed Tube Assy. Is not offered during inspection
Dimension Check: - All the sampled pieces were Random checked as per
Drawing/ Internal Dimension report & found satisfactory. Refer report attached.
Inspection Identification Location of identification Name and signature of SGS Name and signature of Manufacturer
(Actual Impression) representative / Vendor representative
Single Rubber
Stamped on sampled (Rahul uppal) (Mr. Vishal Garg)
pcs. 9466140040
Disclaimer:
This document does not have any Legal or Commercial value and hence cannot used for any commercial and legal purposes.
This is just a site report applicable at the time, date and place of inspection
Final Negotiable Document as agreed shall be obtained from SGS Office