Design of 500 MW Coal Fired Steam Power Plant 1 1
Design of 500 MW Coal Fired Steam Power Plant 1 1
In Partial Fulfilment
Of the Requirement
of PPDN01E
Submitted By:
Atienza, Ariel D.
Condenser
Bañas, Jezreel S.
Turbine
Diaz Jr., Danilo L.
Reheater
Garcia, Dexter Ivan S.
Pump
Hinayon, Guiller Lito L.
Cooling Tower
Llegue, Reneil H.
Boiler
Lulu, Jhoren Louis S.
Turbine
Mendiola, Adrian Q.
Boiler
Orqueza, Kristopher Abraham M.
Cooling Tower
Pilapil, Kenneth Roy P.
Condenser
Santoyo, John Marvin
Pump
M. Sarza, Ramoncito R.
Reheater
ME 401
4
5
5
7
8
9
9
10
11
12
13
13
14
15
15
16
16
17
17
18
19
19
20
20
21
22
22
23
24
25
27
3
FLOOR PLAN
4
Design of a 1-Unit Boiler of 500MW Coal Fired Steam Power Plant
in Barangay Capipisa, Tanza, Cavite
I. Schematic Diagram
5
II. Design Parameters
Parameters Value Unit
Inlet Temperature 46.51 ˚C
Inlet Pressure 17 MPa
Inlet Enthalpy 209.50 kJ/kg
Inlet Entropy 0.6493 kJ/kg K
t - t1
46.51 - 40
h= (h2 - h1) + h1 = (263.67-180.78 ) + 180.78
2t - t1 60 - 40
h = 207.76 kJ/kg
t - t1 46.51 - 40
h= (h2 - h1) + h1 = (265.76-182.96 ) + 182.96
2t - t1 60 - 40
h = 209.91 kJ/kg
p - p1
h= (h
- h ) + h 1 = 17 - 15 (209.91-207.76 ) + 207.76
p2 - p1 2 1 17.5 - 15
h = 209.50 kJ/kg
B. Efficiency of Boiler
kg kJ
ms(hs-hf) 281.20 s (3426.9-209.50)kg
ebo = = kg
mQ kJ = 69.26%
f h 55.56 (23,511.73 )
s kg
C. Heat Supplied by Fuel
kg kJ
Qs = mfQh = 55.56 (23,511.73 ) = 1,306.31 MW
s
kg
D. Developed Boiler Horsepower
kg kJ
ms(hs-hf) = 1,012,320hr(3426.9-209.50)kg
DBH = kJ kJ = 92,209.91 HP
35,322 35,322
hr hr
7
E. Factor of Evaporation
8
hs-hf 3426.9 - 209.50
FE = = = 1.43
2257 2257
F. Equivalent Evaporation
kg kg
EE = ms x FE = 281.20 x 1.43 = 402.12
s s
G. Boiler Economy
m s kg
281.20
Bo. Economy = s
mf = 55.56 kg = 5.06
s
H. Equivalent Specific Evaporation
ESE = Bo. Economy x FE = 5.06(1.43) = 7.24
9
V. References
Coal Fired Power Plant Boiler. (n.d.). Retrieved on October 3, 2021 from
https://www.zbgboiler.com/special/coal-fired-power-plant-boiler/
Vertical Tube Universal Pressure Boiler (VTUP™). (n.d.). Retrieved on October 3, 2021
from https://www.babcock.com/en/products/supercritical-boiler/vtup-boiler
10
Design of a 1-Unit Steam Turbine of 500MW Coal Fired Steam Power Plant
in Barangay Capipisa, Tanza, Cavite
I. Schematic Diagram
11
For Low Pressure Turbine
Parameters Value Unit
Inlet Temperature 550 ˚C
Inlet Pressure 1 MPa
Inlet Enthalpy 3587.5 kJ/kg
Inlet Entropy 7.89865 kJ/kg K
At Point 3 (Reheater)
P = 1 MPa
T = 550 C
Temperature (t in ˚C) Enthalpy (h in kJ/kg) Entropy (s in kJ/kg K)
150 2711.1 6.4342
151.1314985 2714.268196 6.4416
155 2725.1 6.4669
H3 = 3587.5 kJ/kg
S3 = 7.8965 kJ/kg K
12
At Point 4 (Low Pressure Turbine)
S4 = 7.8965 kJ/kg K
s4 - sf 7.8965 - 0.6493
x= sfg = 7.5009 =0.9664640243
13
V. References
14
Design of a 1-Unit Reheater of 500MW Coal Fired Steam Power Plant
in Barangay Capipisa, Tanza, Cavite
I. Schematic Diagram
15
III. Actual Computations
1-2 Constant Pressure resuperheating in the reheater
h - h1
2714.268196 - 2711.1
t= (t2 - t1) + t1= (155 - 150) + 150
h2 - h1 2725.1 - 2711.1
t = 151.1314985℃
h - h1 2714.268196 - 2711.1
s= (s2 - s1) + s1 = (6.4669 - 6.4342)+ 6.4342
h2 - h1 2725.1 - 2711.1
s = 6.4416 kJ
kg K
t - t1 550 - 540
h=
2t - t1 (h2 - h1) + h1 = 560 - 540 (3609.4 - 3565.6) + 3565.6
h = 3587.5 kJ/kg
t - t1 550 - 540
s= (s2 - s1) + s1 = (7.9253 - 7.8720) + 7.8720
2t - t1 560 - 540
s = 7.8965 kJ
kg
K
16
IV. Design Summary
GE Steam Power’s Moisture Separator Reheater is used in the design of a
Coal-Fired Steam Power Plant as the heat exchanger for reheating the steam
output of the High-Pressure Turbine. The dimensions of this reheater are as
follows: Shell diameter = 4.3m, Straight length = 18.6m, and has a weight of 260
tons during operation and 520 tons when flooded, and is crafted using carbon
steel plate as the main material.
Getting the design parameters of the reheater, the computed value for
entropy (s = 6.4416 kJ/kg) was used as a standpoint for the following inlet
parameters. Through the interpolation of the given inlet parameters, the following
outlet values are computed: t = 550 ˚C, p = 1 MPa, h = 3587.5 kJ/kg, and s =
7.89865 kJ/kg K. Hence, the reheater reduces the moisture of the steam coming
the high pressure turbine at t = 151.13˚C by increasing the temperature of the
steam to t = 550˚C at constant pressure, giving more efficiency in the reheat
cycle.
GE Steam Power Moisture separator reheater was used for the following
reason:
1. Meets the necessary conditions for the dimension in which the reheater
will be placed (at the upper right part of the boiler of the boiler).
2. The adaptability of the GE Steam Power Moisture separator reheater
can be redesigned to different ranges of sizes arrangements, and system design
requirements and it meet output requirements up to 1900 MW.
3. GE Steam Power is a very trusted company which is operating for 40
years in the power plant industries.
V. Reference(s)
I. Schematic Diagram
18
Tube Outer Diameter 24 mm
Tube Inner Diameter 22.6 mm
Tube Length 8000 mm
Number of Passes 2 -
s4 - 7.8965 - 0.6493
sxf = = = 0.9664640243
sfg 7.5009
The surface condenser is the type most commonly used in modern power
plants and hence it will be the only one taken into consideration. The main heat
transfer occurs at the outside of the tube, cooling as opposed to condensing the
saturated steam and thus heating the CW inside the tube. The operating
temperature/pressure of the condenser is determined by the temperature,
45.81°C, of the water entering the condenser. As the temperature changes to
45.81°C, so does the condenser pressure and a drop in pressure increases the
plant's output and efficiency.
The steam enters from the exhaust Steam inlet and comes in contact with
the water carrying tubes. The water in the tubes has a circulating flow with the
19
values given from the steam table, with the inlet temperature of 45.81°C the
20
pressure at 10kPa with an enthalpy of 250.385117 kJ/kg and entropy of 7.89865.
As soon as the exhaust steam comes in contact with the water-cooled tubes, the
process of heat transfer begins, at the two horizontal ends of the cylindrical
vessel are two water storage tanks. Separation is provided by a baffle. The
exhaust steam intake feeds steam into the cylinder. Condensate can be removed
through a valve at the bottom of the condenser. Two perforated tubes run parallel
to the water transport tubes, making the outlet temperature at 45.81°C, with the
same pressure with an enthalpy of 191.86 kJ/kg and entropy of 0.6493 kJ/kg K.
V. References
Laskowski, R., Smyk, A., Rusowicz, A., & Grzebielec, A. (2016, October 1). entropy-18-
00444 . Warsaw, Poland.
Rao, A. (2021, April 13). Surface condenser: Definition, working principle, construction,
types, applications, advantages, and disadvantages [notes with PDF]. Learn
Mechanical. Retrieved October 6, 2021, from https://learnmechanical.com/surface-
condenser/.
21
Design of a 1-Unit Cooling Tower of 500MW Coal Fired Steam Power Plant
in Barangay Capipisa, Tanza, Cavite
I. Schematic Diagram
22
Range 7.612333 ˚C
Approach 10.877667 ˚C
Heat Dissipated 2 150 000 kJ/hr
Mass Flow Rate (m) 18.737654212 kg/s
Pump Capacity 18.87105101 L/s
24
as it passes through the cooling tower, which is drawn through the tower by an
electric motor-driven fan. Large fans are used in mechanical draft towers to push
or pull air through circulating water. The water falls downhill over the fill surfaces,
increasing the contact duration between the water and the air, allowing for
maximum heat transmission. The air in this case is has a dry-bulb temperature of
32˚C, a wet-bulb temperature at 27.32˚C at 70% RH.
With the cooling tower’s approximated heat dissipation of 2.15 M kHJ/hr it
has an efficiency of 41.17% with the range of cooling at 7.612333˚C, which is
within the ideal range of cooling at 5 C to 9˚C.
V. Reference(s)
Suvidha Cooling Towers Private Limited (2021). Cooling Tower. Retrieved: October 7,
2021, from https://www.suvidhacooling.in/cooling-tower.html#frp-square-cooling-
tower
25
Design of a 1-Unit Boiler Feed Pump of 500MW Coal Fired Steam Power Plant
in Barangay Capipisa, Tanza, Cavite
I. Schematic Diagram
Flowrate/Capacity: to 1,400 m3 /h
Total Head: 4,200 m
Operating Temp: 200 °C
Operating Pres: 36 MPa
Speed: 7,000 rpm
Size: 40 to 250 mm
26
FOR Boiler Feed Booster Pump
Vertical mixed-ow multistage pump
For CDM
with canister, Horizontal radially split
double-suction pump (CDM, CDKY)
For CDKY
Flowrate/Capacity: 2,800 m3 /h
Total Head: 300 m
Operating Temp: 200 °C
Operating Pres: 5 MPa
Speed: 3,600 rpm
Size: 200 to 450 mm
27
(Pressure relief valve PSI) X (2.31) X (1.03)
(Liquid Specific Gravity)
NPSHa = (absolute pressure in the feed water tank) +/- (elevation of minimum
water level in the tank above feed pump) – (Vapor Pressure) – (Suction line)
FOR Boiler Feed Pump Horizontal multistage ring section pump (MHG), can
accommodate to 200C
V. References
29
Figure 13. Brochure of Different Pumps
Torishima Pump Mfg. Co., Ltd. (2021) Retrieved from: https://www.torishima.co.jp/en/
Torishima Pump Mfg. Co., Ltd. “Innovative solutions coupled with expertise in pumping
technology” Retrieved from:https://www.torishima.co.jp/common/uploads/sites/2
/2018/12/company-profile.pdf
Torishima Pump Mfg. Co., Ltd. Chart for selecting Pumps by Application Retrieved from:
https://www.torishima.co.jp/common/uploads/GeneralCatalog-en201808-1.pdf
Torishima Pump Mfg. Co., Ltd. Retrieved from: “Power Generation and maim
Pumps”https://www.torishima.co.jp/en2/pdf/products/power.pdf
30
Gross Power Generation and Power Plant Efficiency
Parameter Value Unit
Mass Flow Rate 281.20 kg/s
Pump Work 17.67 kJ/kg
Net Work 1778.08 kJ/kg
Heat Added 4090.63 kJ/kg
Gross Power Generated 500 MW
Efficiency 43.47 %
Actual Computations
Pump Work
Wp = h6 – h5 = 209.4989735 - 191.83
Wp = 17.6689735 kJ/kg
Net Work
Wnet = h1 – h2 + h3 – h4 – Wp = 3426.9 - 2714.268196 + 3587.5 - 2504.385117 -
17.6689735
Wnet = 1778.077714 kJ/kg
Heat Added
QA = h1 – h2 + h3 – h5 – Wp = 3426.9 - 2714.268196 + 3587.5 - 191.83 - 17.6689735
QA = 4090.632831 kJ/kg
31