REKAPITULASI TOTAL

RENCANA ANGGARAN BIAYA

PROGRAM : PEMBANGUNAN PRASARANA DAN FASILITAS PERHUBUNGAN


KEGIATAN : PEMBANGUNAN DERMAGA
PEKERJAAN : PEMBANGUNAN DERMAGA MATANGA
LOKASI : DESA MATANGA KEC. BANGGAI SELATAN
TAHUN ANGGARAN : 2017
SUMBER DANA : DAK
KABUPATEN : BANGGAI LAUT

JUMLAH HARGA
NO. PEKERJAAN URAIAN PEKERJAAN PEKERJAAN
( RUPIAH )

I. PEKERJAAN DERMAGA Err:509

II. PEKERJAAN AREAL PELABUHAN

III. PEKERJAAN RUANG TUNGGU

IV. PEKERJAAN POS JAGA

V. PEKERJAAN PENGADAAN DAN PEMASANGAN LPJ


TENAGA SURYA

(A) Jumlah Harga Pekerjaan ( Real Cost ) Err:509


(B) Pajak Pertambahan Nilai ( PPN ) = 10% x (A) Err:509
(C) JUMLAH TOTAL HARGA PEKERJAAN = (A) + (B) Err:509
(D) DIBULATKAN Err:509

SATU MILYAR ENAM PULUH LIMA JUTA DUA RATUS SEMBILAN BELAS RIBU
Terbilang :
DELAPAN RATUS RUPIAH

Banggai, Mei 2017

DI BUAT OLEH :
PEJABAT PEMBUAT KOMITMEN
(PPK)

ANWAR R. SAPPE, ST.


NIP. 19741028 200604 1 018
REKAPITULASI
RENCANA ANGGARAN BIAYA
…......................
PROGRAM : PEMBANGUNAN PRASARANA DAN FASILITAS PERHUBUNGAN
KEGIATAN : PEMBANGUNAN DERMAGA
PEKERJAAN : PEMBANGUNAN DEMAGA WISATA PANTAI TAIPA
LOKASI : ….................., Kab. Konawe Utara
TAHUN ANGGARAN : 2022
SUMBER DANA : APBD

Jumlah Harga
No Uraian Pekerjaan
(Rp)

I. PEKERJAAN PERSIAPAN 9,050,000.00

II. PEKERJAAN AREA SISI DARAT 8,215,738,112.16

III. PEKERJAAN TRESTLE 6,348,909,171.71

IV. PEKERJAAN DERMAGA 1,913,771,368.50

V. PEKERJAAN PEMANCANGAN 1,727,558,807.04

VI. PEKERJAAN AKHIR 4,000,000.00

(A) Jumlah Harga Pekerjaan ( Real Cost ) 18,219,027,459.41


(B) Pajak Pertambahan Nilai ( PPN ) = 10% x (A) 1,821,902,745.94
(C) JUMLAH TOTAL HARGA PEKERJAAN = (A) + (B) 20,040,930,205.35
(D) DIBULATKAN 20,040,930,000.00

Terbilang : Dua Puluh Milyar Empat Puluh Juta Sembilan Ratus Tiga Puluh Ribu Rupiah

Konawe Utara, Februari 2022


DI BUAT
KONSULTAN PERENCANA
…................

….................
…......................
RENCANA ANGGARAN BIAYA
PROGRAM : PEMBANGUNAN PRASARANA DAN FASILITAS PERHUBUNGAN
KEGIATAN : PEMBANGUNAN DERMAGA
PEKERJAAN : PEMBANGUNAN DEMAGA WISATA PANTAI TAIPA
LOKASI : ….................., Kab. Konawe Utara
TAHUN ANGGARAN : 2022
SUMBER DANA : APBD
KABUPATEN : KONAWE UTARA

PERKIRAAN HARGA SATUAN


NO URAIAN PEKERJAAN SATUAN
KUANTITAS (RUPIAH)

A B C D E

I PEKERJAAN PERSIAPAN
1 Papan Nama Proyek Ls 1.00 300,000.00
2 Pek. Pengukuran Ls 1.00 750,000.00
3 Pek. Mobilisasi Ls 1.00 5,000,000.00
4 Direksi Lapangan Ls 1.00 3,000,000.00

Jumlah Harga Pekerjaan Persiapan


II PEKERJAAN AREA SISI DARAT
1 Pek. Galian Tanah Biasa M3 406.80 136,562.50
2 Pek. Timbunan Tanah M 3
8,538.58 50,312.50
3 Pek. Pasir Urug Bawah Cor Beton t=5 cm M3 426.93 261,625.00
4 Pek. Pasangan Pondasi Batu Gunung 1 : 4 M3 2,694.37 1,338,887.50
5 Pek. Beton K-275 M3 1,707.72 1,787,078.64
6 Pek. Cor (K-275) Kepala Pondasi M 3
256.28 1,787,078.64
7 Pek. Acian beton M2 5,315.52 70,380.00
8 Pek. Pengecetan Cansteen M 2
5,315.52 23,987.08

Jumlah Harga Pekerjaan Talud Trestle


III PEKERJAAN TRESTLE
A Pekerjaan Tiang Beton
1 Pek. Bekesting Tiang Beton (25 x 25 cm) M2 144.00 419,186.50
2 Pek. Penulangan Tiang Beton Kg 1,313.30 192,383.50
3 Pek. Tiang Beton K-275 (25 x 25 cm) M 3
9.00 1,787,078.64
B Pekerjaan Balok Beton
1 Pek. Bekesting Balok Beton (20 x 30 cm ) M2 26.88 426,086.50
2 Pek. Penulangan Balok Beton Kg 276.75 192,383.50
3 Pek. Balok Beton K-275 (20 x 30 cm) M 3
2.02 1,787,078.64
C Pekerjaan Lantai Beton t = 15 cm
1 Pek. Bekesting Lantai Beton M2 16.86 451,386.50
2 Pek. Penulangan Lantai Beton Kg 221.84 192,383.50
3 Pek. Lantai Beton K-275 M3 2.70 1,787,078.64
D Pekerjaan Poer Trestle
1 Pek. Bekesting Poer Trestle M2 2.24 426,086.50
2 Pek. Penulangan Poer Trestle Kg 117.40 192,383.50
3 Pek. Poer Trestle Beton K-275 M3 1.08 1,787,078.64
E Pekerjaan Cansteen Beton Trestle
1 Pek. Bekesting Cansteen Beton M2 3.24 426,086.50
2 Pek. Penulangan Cansteen Beton Kg 1.68 192,383.50
3 Pek. Cor Cansteen Beton K-275 M3 4.86 1,787,078.64

Jumlah Harga Pekerjaan Trestle


Jumlah Harga Pekerjaan Trestle Untuk 13 Segmen
IV PEKERJAAN DERMAGA
A Pekerjaan Tiang Beton
1 Pek. Bekesting Tiang Beton (30 x 30 cm) M2 518.40 419,186.50
2 Pek. Penulangan Tiang Beton Kg 4,152.86 192,383.50
3 Pek. Tiang Beton K-275 (30 x 30 cm) M 3
38.88 1,787,078.64
B Pekerjaan Balok Beton
1 Pek. Bekesting Balok Beton (20 x 32 cm ) M2 68.88 426,086.50
2 Pek. Penulangan Balok Beton Kg 1,124.45 192,383.50
3 Pek. Balok Beton K-275 (20 x 32 cm) M 3
4.92 1,787,078.64
C Pekerjaan Lantai Beton t = 15 cm
1 Pek. Bekesting Lantai Beton M2 25.12 451,386.50
2 Pek. Penulangan Lantai Beton Kg 998.28 192,383.50
3 Pek. Lantai Beton K-275 M 3
12.15 1,787,078.64
D Pekerjaan Poer Dermaga
1 Pek. Bekesting Poer Dermaga M2 41.76 426,086.50
2 Pek. Penulangan Poer Dermaga Kg 585.08 192,383.50
3 Pek. Poer Dermaga Beton K-275 M 3
4.50 1,787,078.64
E Pekerjaan Cansteen Beton Dermaga
1 Pek. Bekesting Cansteen Beton M2 14.80 426,086.50
2 Pek. Penulangan Cansteen Beton Kg 137.90 192,383.50
3 Pek. Cor Cansteen Beton K-275 M 3
1.48 1,787,078.64
F Pekerjaan Tiang Beton / Bollard
1 Pek. Bekesting Tiang Beton/Bollard (30 x 30 cm) M2 3.24 419,186.50
2 Pek. Penulangan Tiang Beton / Bollard Kg 37.74 192,383.50
3 Pek. Tiang Beton K-275 / Bollard (30 x 30 cm) T = 40 cm M3 0.24 1,787,078.64
F Pekerjaan Plank Fender
1 Pek. Bekesting Tiang Beton/Bollard (25 x 25 cm) M2 20.00 426,086.50
2 Pek. Penulangan Tiang Beton / Bollard Kg 315.67 192,383.50
3 Pek. Tiang Beton K-275 / Bollard (25 x 25 cm) T = 40 cm M 3
2.40 1,787,078.64
4 Pengadaan dan Pemasangan Vender V bh 8.00 11,500,000.00

Jumlah Harga Pekerjaan Trestle


V PEKERJAAN PEMANCANGAN

1 Pemancangan Tiang Beton M' 2,304.00 749,808.51

Jumlah Harga Pekerjaan Pemancangan


VI PEKERJAAN AKHIR
1 Pembersihan Kembali Areal Tambatan/Dermaga Ls 1.00 2,000,000.00
2 Pembuatan Assbuild drawing Ls 1.00 2,000,000.00

Jumlah Harga Pekerjaan Akhir


NA ANGGARAN BIAYA

JUMLAH HARGA
(RUPIAH)

F = (D x E)

300,000.00
750,000.00
5,000,000.00
3,000,000.00

9,050,000.00

55,553,625.00
429,597,105.00
111,695,247.30
3,607,460,991.15
3,051,821,362.00
457,999,662.91
374,106,297.60
127,503,821.20

8,215,738,112.16

60,362,856.00
252,657,004.30
16,083,707.79

11,453,205.12
53,242,342.23
3,602,750.54

7,611,504.86
42,678,548.02
4,825,112.34

956,138.11
22,585,487.61
1,930,044.93

1,380,520.26
323,204.28
8,685,202.20

488,377,628.59
6,348,909,171.71
217,306,281.60
798,942,419.00
69,481,617.63

29,348,838.12
216,326,178.98
8,792,426.92

11,339,957.35
192,053,466.11
21,713,005.51

17,793,372.24
112,559,378.27
8,041,853.89

6,306,080.20
26,528,985.45
2,644,876.39

1,358,164.26
7,259,621.02
434,260.11

8,521,730.00
60,729,866.70
4,288,988.74
92,000,000.00

1,913,771,368.50

1,727,558,807.04

1,727,558,807.04

2,000,000.00
2,000,000.00

4,000,000.00
BACK UP DATA

PROGRAM : PEMBANGUNAN PRASARANA DAN FASILITAS PERHUBUNGAN


KEGIATAN : PEMBANGUNAN DERMAGA
PEKERJAAN : PEMBANGUNAN DERMAGA MATANGA
(PEKERJAAN DERMAGA)
LOKASI : DESA BUNGIN KEC. BOKAN KEPULAUAN
TAHUN ANGGARAN : 2017
SUMBER DANA : DAK
KABUPATEN : BANGGAI LAUT

PARAMETER PERHITUNGAN VOLUME


PERKIRAAN
NO URAIAN PEKERJAAN SATUAN
KUANTITAS JUMLAH JUMLAH BESI JENIS BESI KOEFISIEN PANJANG LEBAR

I PEKERJAAN PERSIAPAN
1 Papan Nama Proyek Ls 1.00
2 Pek. Pengukuran Ls 1.00
3 Pek. Mobilisasi Ls 1.00
4 Pek. Pembongkaran Kepala Dermaga Lama Ls 1.00
5 Direksi Lapangan Ls 1.00

II PEKERJAAN TANGGUL
1 Pek. Galian Tanah M3 -
2 Pas. Batu Kosong (Koporan) M3 - Pagu
3 Pas. Batu Gunung Camp 1:4 M3 -
4 Pek. Urugan Tanah M3 -
5 Pek. Bekesting Cansteen M2 -
6 Pek. Cansteen Beton M3 -
7 Pek. Plesteran M2 -
8 Pek. Rabat Beton M3 -

Jumlah Harga Pekerjaan Tanggul


II PEKERJAAN TALUD CASHWAY DAN AREAL DARAT
1 Pek. Galian Tanah Biasa M3 406.80 1 1356 1
2 Pek. Timbunan Tanah M3 8,538.58 1 8538.576 0
3 Pek. Pasir Urug Bawah Cor Beton t=5 cm M3 426.93 1 8538.576
2 Pek. Pasangan Pondasi Batu Gunung 1 : 4 M3 2,694.37 1 1356 1.987
2 Pek. Cor Kaki Pondasi M3 23.80 2 35 0.85
3 Pek. Cor Rabat Beton 1 : 3 : 5 t = 20 cm M3 1,707.72 1 8538.576 0
4 Pek. Bekesting Cansteen Beton M2 10,246.29 2 8538.576 0.2
5 Pek. Penulangan Cansteen Beton Talud Kg 63,645.33
Tulangan Memanjang Kg 42,093.47 2 4 0.01 0.616225 8538.576
Tulangan Melintang Kg 21,551.86 2 34154.304 0.008 0.394384 0.8
6 Pek. Cansteen Beton 1 : 3 : 5 M3 256.28 1 1356 0.63
7 Pek. Acian 1 : 4 t = 1,5 cm M2 5,315.52 1 1356 4.56

III PEKERJAAN TRESTLE


A Pekerjaan Tiang Beton
1 Pek. Bekesting Tiang Beton (25 x 25cm) M2 144.00 12 12 0.25
2 Pek. Penulangan Tiang Beton Kg 1,313.30
Tulangan Utama Besi 14 1,043.54 12 6 0.014 1.207801 12
Tulangan Bagi Besi 8 269.76 12 48.0 0.01 0.616225 0.76
3 Pek. Cor Tiang Beton 25 x 25 cm) M3 9.00 12 12 0.25
B Pekerjaan Balok Beton
1 Pek. Bekesting Balok Beton (20 x 30 cm ) M2 26.88
Balok Memanjang M2 19.20 2 12 0.2
Balok Melintang M2 7.68 6 1.6 0.2
2 Pek. Penulangan Balok Beton Kg 276.75
Balok Memanjang Kg 189.90
Tulangan Utama Besi 14 Kg 144.94 2 5 0.014 1.207801 12
Tulangan Bagi Besi 10 Kg 44.96 2 48.0 0.01 0.616225 0.76
Balok Melintang Kg 86.86
Tulangan Utama Besi 14 Kg 72.47 6 5 0.014 1.207801 2
Tulangan Bagi Besi 8 Kg 14.39 6 8.0 0.008 0.394384 0.76
3 Pek. Cor Balok Beton (20 x 25 cm) 2.02
Balok Memanjang M3 1.44 2 12 0.2
Balok Melintang M3 0.58 6 1.6 0.2
C Pekerjaan Lantai Beton t = 15 cm
1 Pek. Bekesting Lantai Beton M2 16.86 27 0.15
Dinding Lantai M2 4.05 27 0.15
Plat Lantai M2 12.81
Bagian A M2 10.94 5 1.25
Bagian B M2 1.88 2 0.75
Bagian C M2 10 0.25
Bagian D M2 4 0.25
2 Pek. Penulangan Lantai Beton Kg 221.84
Tulangan Memanjang Kg 110.92 2 7.5 0.01 0.616225 12
Tulangan Melintang Kg 110.92 2 60 0.01 0.616225 1.5
3 Pek. Cor Lantai Beton M3 2.70 12 1.5
D Pekerjaan Poer Trestle
1 Pek. Bekesting Poer Trestle M2 2.24 12 0.3 0.3
Dinding Poer M2 0.32 12 0.3 0.3
Lantai Poer M2 1.92 12 0.16
2 Pek. Penulangan Poer Trestle Kg 117.40
Tulangan Memanjang Kg 36.96 12 3 0.014 1.207801 0.85
Tulangan Melintang Kg 36.96 12 3 0.014 1.207801 0.85
Tulangan Bagi Kg 43.48 12 3 0.014 1.207801 1
3 Pek. Cor Poer Trestle M3 1.08 12 0.3
E Pekerjaan Tiang Beton / Bollard
1 Pek. Bekesting Tiang Beton/Bollard (30 x 30 cm) M2 1.80 4 0.45 0.25
2 Pek. Penulangan Tiang Beton / Bollard Kg 57.38
Tulangan Utama Besi 14 Kg 19.32 4 8 0.014 1.207801 0.5
Tulangan Bagi Besi 10 Kg 7.76 4 3 0.01 0.616225 1.05
Dowel Bar Besi 32 Kg 30.29 4 2 0.032 6.310144 0.6
3 Pek. Tiang Beton / Bollard (25 x 25 cm) T = 40 cm M3 0.11 4 0.45 0.25
F Pekerjaan Lantai Kayu Trestle
1 Pek. Balok Lantai M3 0.46 4 12 0.08
2 Pek. Papan Lantai Dermaga M2 24.00 1 12 2

III PEKERJAAN DERMAGA


A Pekerjaan Tiang Beton
1 Pek. Bekesting Tiang Beton (30 x 30 cm) M2 518.40 36 12 0.3
2 Pek. Penulangan Tiang Beton Kg 4,152.86
Tulangan Utama Besi 14 3,130.62 36 6 0.014 1.207801 12
Tulangan Bagi Besi 8 1,022.24 36 48.0 0.01 0.616225 0.96
3 Pek. Cor Tiang Beton (30 x 30 cm) M3 38.88 36 12 0.3
B Pekerjaan Balok Beton
1 Pek. Bekesting Balok Beton (20 x 25 cm ) M2 68.88
Balok Memanjang M2 45.36 2 32.4 0.2
Balok Melintang M2 23.52 16 2.1 0.2
2 Pek. Penulangan Balok Beton Kg 1,124.45
Balok Memanjang Kg 719.38
Tulangan Utama Besi 14 Kg 549.55 2 7 0.014 1.207801 32.5
Tulangan Bagi Besi 10 Kg 169.83 2 130.0 0.01 0.616225 1.06
Balok Melintang Kg 405.07
Tulangan Utama Besi 14 Kg 338.18 16 7 0.014 1.207801 2.5
Tulangan Bagi Besi 8 Kg 66.89 16 10.0 0.008 0.394384 1.06
3 Pek. Cor Balok Beton (20 x 25 cm) 4.92
Balok Memanjang M3 3.24 2 32.4 0.2
Balok Melintang M3 1.68 16 2.1 0.2
C Pekerjaan Lantai Beton t = 15 cm
1 Pek. Bekesting Lantai Beton M2 25.12 32.4 0.15
Dinding Lantai M2 4.86 32.4 0.15
Plat Lantai M2 20.26
Bagian A M2 15.31 7 1.75
Bagian B M2 1.88 2 0.75
Bagian C M2 2.63 14 0.15
Bagian D M2 0.45 4 0.15
2 Pek. Penulangan Lantai Beton Kg 998.285
Tulangan Memanjang Kg 499.14 2 12.5 0.01 0.616225 32.4
Tulangan Melintang Kg 499.14 2 162 0.01 0.616225 2.5
3 Pek. Cor Lantai Beton M3 12.15 32.4 2.5
D Pekerjaan Poer Trestle
1 Pek. Bekesting Poer Trestle M2 41.76 36 0.5 0.5
Dinding Poer M2 36.00 36 0.5 0.5
Lantai Poer M2 5.76 36 0.16
2 Pek. Penulangan Poer Trestle Kg 585.08
Tulangan Memanjang Kg 165.23 36 4 0.014 1.207801 0.95
Tulangan Melintang Kg 165.23 36 4 0.014 1.207801 0.95
Tulangan Bagi Kg 254.62 36 4 0.014 1.207801 1.464
3 Pek. Cor Poer Trestle M3 4.50 36 0.5 0.5
E Pekerjaan Cansteen Beton Trestle
1 Pek. Bekesting Cansteen Beton M2 14.80 37 1 0.2
2 Pek. Penulangan Cansteen Beton Kg 137.90
Tulangan Memanjang Kg 91.20 37 4 0.01 0.616225 1
Tulangan Melintang Kg 46.70 37 4 0.008 0.394384 0.8
3 Pek. Cor Cansteen Beton M3 1.48 37 1 0.2
F Pekerjaan Plank fender
1 Pek. Bekesting Plank Fender M2 20.00 2 0.45 0.3
Sisi Depan M2 8.00 8 1
Sisi Samping M2 4.80 16 1
Sisi Belakang M2 7.20 8 1
2 Pek. Penulangan Plank Fender Kg 315.67
Tulangan Utama Besi 14 Kg -
Tulangan a Kg 15.91 1 6 0.014 1.207801 2.195
Tulangan b Kg 7.25 1 5 0.014 1.207801 1.2
Tulangan c Kg 16.31 1 15 0.014 1.207801 0.9
Tulangan angkur Kg 17.39 1 18 0.014 1.207801 0.8
3 Pek. Cor Plank Fender M3 2.40 8 1 1
E Pekerjaan Tiang Beton / Bollard
1 Pek. Bekesting Tiang Beton/Bollard (30 x 30 cm) M2 3.24 6 0.3 0.3
2 Pek. Penulangan Tiang Beton / Bollard Kg 37.74
Tulangan Utama Besi 14 Kg 26.09 6 8 0.014 1.207801 0.45
Tulangan Bagi Besi 10 Kg 11.65 6 3 0.01 0.616225 1.05
3 Pek. Tiang Beton / Bollard (25 x 25 cm) T = 40 cm M3 0.24 6 0.3 0.3

V PEKERJAAN PEMANCANGAN

1 Pemancangan Tiang Beton M' 2,304.00

VI PEKERJAAN AKHIR
1 Pembersihan Kembali Areal Tambatan/Dermaga Ls 1.00
2 Pembuatan Assbuild drawing Ls 1.00

Banggai, Mei 2017

DI BUAT OLEH :
PEJABAT PEMBUAT KOMITMEN
(PPK)

ANWAR SAPPE, ST.


NIP. 19741028 200604 1 018
0
0
0

###
PARAMETER PERHITUNGAN VOLUME

TINGGI

panjang talud
67
147
27
27
500
147
104
337
1356

0.3
1 Err:509
0.05 2.163
1.987 1.811
0.4 1.987
0.2
0.3

0.3
3.28

0.25 13

0.25

0.3
0.3

0.3
0.3

1.75
1.25
1.75
0.75

0.15

0.3
0.3
0.16

0.3

0.25

0.25

0.12

0.3

0.3

0.25
0.25

0.25
0.25

1.25
1.25
1.25
0.75

0.15

0.5
0.5
0.16

0.5

0.2
0.2

0.3
1
0.3
0.9

0.3

0.45

0.45
REKAPITULASI
RENCANA ANGGARAN BIAYA
#REF!
Program : Pembangunan Prasarana Dan Fasilitas Perhubungan
Kegiatan : Pembangunan Dermaga
Pekerjaan : Pembangunan Dermaga Bungin
(Areal Pelabuhan)
Lokasi : Desa Bungin, Kec. Bokan Kepulauan
Sumber Dana : DAK
Tahun Anggaran : 2017

Jumlah Harga
No Uraian Pekerjaan
(Rp)

I. PEKERJAAN TANAH #REF!

II. PEKERJAAN PAS BATU #REF!

III. PEKERJAANI AREAL PELABUHAN #REF!

IV. PEKERJAAN CANSTEEN BETON #REF!

B REAL COST #REF!

Banggai, Mei 2017

DI BUAT
PEJABAT PEMBUAT KOMITMEN
( PPK )

ANWAR R. SAPPE, ST.


NIP. 19741028 200604 1 018
RENCANA ANGGARAN BIAYA
PROGRAM : PEMBANGUNAN PRASARANA DAN FASILITAS PERHUBUNGAN
KEGIATAN : PEMBANGUNAN DERMAGA
PEKERJAAN : PEMBANGUNAN DERMAGA BUNGIN
(AREAL PELABUHAN)
LOKASI : DESA BUNGIN KEC. BOKAN KEPULAUAN
SUMBER DANA : DAK
TAHUN ANGGARAN : 2017
KABUPATEN : BANGGAI LAUT

HARGA SAT JML. HARGA


NO. URAIAN PEKERJAAN VOLUME SAT
(Rp) (Rp)
1 2 3 4 5 6

I. PEKERJAAN TANAH
1 Pek. Galian tanah Biasa 22.68 m3 #REF! #REF!
2 Pek. Urugan Tanah Biasa 130.47 m3 #REF! #REF!
3 Pek. Urugan Sirtu 59.77 m3 #REF! #REF!

Jumlah Harga Pekerjaan Tanah #REF!

II. PEKERJAAN PAS BATU


1 Pek. Pasangan Batu Gunung 1 : 4 36.96 m3 #REF! #REF!
2 Pek. Pesteran pada Pasangan batu 84.00 m2 #REF! #REF!
3 Pek. Acian 84.00 m2 11,752.72
Jumlah Harga Pekerjaan Pasangan Batu #REF!

III. PEKERJAANI AREAL PELABUHAN


1 Pek. Cor Lantai Beton Areal Pelabuhan 1 : 3 : 5 23.91 m3 #REF! #REF!
2 Pek. Bekisting Sloeff Pagar 42.00 m3 #NAME? #NAME?
3 Pek. Penulangan Sloeff Pagar 331.28 m3 #NAME? #NAME?
4 Pek. Cor Sloeff Pagar 4.20 m3 #REF! #REF!
5 1 Lmbr Memasang Pagar brc FP 150 EP 2,0 28.00 Lmbr #REF! #REF!
6 1 Buah Memasang Tiang Pagar P150 EP Ø 2,0” 30.00 Buah #REF! #REF!
7
1 Buah Memasang Pintu Pagar brc DG 175 T2 EP Lebar 1 M 2.00 Buah #REF! #REF!

Jumlah Harga Pekerjaan Cor Lantai #REF!

IV. PEKERJAAN CANSTEEN BETON


1 Pek. Bekisting Cansteen Beton 22.68 m2 #REF! #REF!
2 Pek. Pembesian 140.89 Kg #NAME? #NAME?
3 Pek. Cor Cansteen Beton 1 : 3 : 5 2.27 m3 #REF! #REF!

Jumlah Harga Pekerjaan Cansteen Beton #REF!

Banggai, Mei 2017


Mengetahui :
PENGGUNA ANGGARAN PEJABAT PEMBUAT KOMITMEN
DINAS PEKERJAAN UMUM DAN PERHUBUNGAN (PPK)
KABUPATEN BANGGAI LAUT

Drs,RUSLI UDAA ANWAR R. SAPPE, ST.


NIP. 19581204 198101 1 003 NIP. 19741028 200604 1 018
RENCANA ANGGARAN BIAYA
PROGRAM : PEMBANGUNAN PRASARANA DAN FASILITAS PERHUBUNGAN
KEGIATAN : PEMBANGUNAN DERMAGA
PEKERJAAN : PEMBANGUNAN DERMAGA BUNGIN
(AREAL PELABUHAN)
LOKASI : DESA BUNGIN KEC. BOKAN KEPULAUAN
SUMBER DANA : DAK
TAHUN ANGGARAN : 2017
KABUPATEN : BANGGAI LAUT

PARAMETER PERHITUNGAN VOLUME


NO. URAIAN PEKERJAAN VOLUME SAT
JUMLAH JUMLAH BESI JENIS BESI KOEFISIEN PANJANG LEBAR
atas bawah
1 2 3 4

I. PEKERJAAN TANAH
1 Pek. Galian tanah Biasa 22.68 m3 1 84 0.9 0.9
2 Pek. Urugan Tanah Biasa 130.47 m3 1 20 25
3 Pek. Urugan Sirtu 59.77 m3 1 119.53

Jumlah Harga Pekerjaan Tanah

II. PEKERJAAN PAS BATU


1 Pek. Pasangan Batu Gunung 1 : 4 36.96 m3 1 84 0.3 0.8
2 Pek. Pesteran pada Pasangan batu 84.00 m2 1 84
3 Pek. Acian 84.00 m2
Jumlah Harga Pekerjaan Pasangan Batu

III. PEKERJAAN LANTAI AREAL PELABUHAN


1 Pek. Cor Lantai Beton Areal Pelabuhan 1 : 3 : 5 23.91 m3 1 119.53
2 Pek. Bekisting Sloeff Pagar 42.00 m2 1 84
3 Pek. Penulangan Sloeff Pagar 331.28 Kg
Tulangan Utama Besi 14 207.0516 Kg 1.00 4 10 0.01 0.616225 84
Tulangan Bagi Besi 10 124.23096 Kg 1.00 420.0 8.0 0.008 0.394384 0.75
4 Pek. Cor Sloeff Pagar 4.20 m3 1 84 0.2
5 1 Lmbr Memasang Pagar brc FP 150 EP 2,0 28.00 Lmbr 1 84 3
5 1 Buah Memasang Tiang Pagar P150 EP Ø 2,0” 30.00 Buah 1 84 3

Jumlah Harga Pekerjaan Cor Lantai

IV. PEKERJAAN CANSTEEN BETON


1 Pek. Bekisting Cansteen Beton 22.68 m2 1 37.802 0.2 0.3
2 Pek. Pembesian 140.89 Kg
Tulangan Memanjang 93.18 Kg 1.00 4 1 0.01 0.616225 37.802
Tulangan Melintang 47.71 Kg 1.00 151.208 0.8 0.008 0.394384 0.8
3 Pek. Cor Cansteen Beton 1 : 3 : 5 2.27 m3 1 37.802 0.2 0.3

Jumlah Harga Pekerjaan Cansteen Beton

Mengetahui :
PENGGUNA ANGGARAN
DINAS PEKERJAAN UMUM DAN PERHUBUNGAN
KABUPATEN BANGGAI LAUT

Drs,RUSLI UDAA
NIP. 19581204 198101 1 003
PARAMETER PERHITUNGAN VOLUME

TINGGI

0.3
0.5
0.5

0.8
1

0.2
0.5

0.25
REKAPITULASI
RENCANA ANGGARAN BIAYA
#REF!
Program : Pembangunan Prasarana Dan Fasilitas Perhubungan
Kegiatan : Pembangunan Dermaga
Pekerjaan : Pembangunan Dermaga Matanga
(Ruang Tunggu)
Lokasi : Desa Bungin, Kec. Bokan Kepulauan
Sumber Dana : DAK
Tahun Anggaran : 2017

Jumlah Harga
No Uraian Pekerjaan
(Rp)

I. PEKERJAAN PERSIAPAN -

II. PEKERJAAN TANAH DAN PASIR #REF!

III. PEK. PONDASI #REF!

IV. PEKERJAAN BETON DAN DINDING #REF!

V. PEKERJAAN PLASTERAN DAN LANTAI #REF!

VI. PEKERJAAN ATAP DAN PLAFOND #REF!

VII. PEKERJAAN KUSEN PINTU DAN JENDELA #REF!

VIII. PEKERJAAN KUNCI DAN PENGGANTUNG #REF!

IX. PEKERJAAN INSTALASI AIR #NAME?

X. PEKERJAAN INSTALASI LISTRIK #REF!

XI. PEKERJAAN PENGECATAN #REF!

C REAL COST #REF!

Banggai, Mei 2017


DI BUAT
PEJABAT PEMBUAT KOMITMEN
( PPK )

ANWAR R. SAPPE, ST.


NIP. 19741028 200604 1 018
RENCANA ANGGARAN BIAYA (RAB)
Program : Pembangunan Prasarana Dan Fasilitas Perhubungan
Kegiatan : Pembangunan Dermaga
Pekerjaan : Pembangunan Dermaga Matanga
(Ruang Tunggu)
Lokasi : Desa Bungin, Kec. Bokan Kepulauan
Sumber Dana : DAK
Tahun Anggaran : 2017

No. Uraian Pekerjaan Volume Harga Satuan

I. PEKERJAAN PERSIAPAN
1. Pek. Pembersihan Lapangan 1.00 Ls Rp 1,000,000.00

II. PEKERJAAN TANAH DAN PASIR


1 Pek. Galian Tanah Biasa 41.25 m³ #REF!
2 Timbunan Tanah Kembali 10.31 m³ #REF!
3 Urugan Pasir Bawah Pondasi 3.75 m³ #REF!
4 Pek. Urugan Tanah Bawah Lantai 14.40 m³ #REF!
5 Pek. Urugan Pasir Bawah Lantai 4.80 m³ #REF!

III. PEK. PONDASI


1 Pek. Batu Kosong 5.63 m³
1 Pek. Pas. Batu Gunung 1 : 4 15.00 m³ #REF!
2 Pek. Plesteran Pondasi 5.20 m² #REF!
3 Pek. Plesteran Kolom m² #REF!
4 Pas. Acian Beton m² #REF!

IV. PEKERJAAN BETON DAN DINDING


1 Pek. Cor Beton Tumbuk Lantai Dasar T. 7 cm 2.40 m³ #REF!
2 Pek. Sloof Beton 15/20 1.69 m³ #REF!
3 Pek. Ring Balok Beton 15/20 1.69 m³ #REF!
4 Pek. Kolom Beton 20/20 0.79 m³ #REF!
5 Pek. Kolom Beton 15/15 0.32 m³ #REF!
6 Pekerjaan beton tempat duduk, H=40 cm, K.225 0.95 m³ #REF!

7 Pekerjaan Pas.Batu bata, camp. 1 : 4 (Kaki Tempat Duduk) 18.00 m2 #REF!

8 Pekerjaan pondasi batu merah, camp. 1 : 3 (Tempat Duduk) 18.00 m2 #REF!

9 Pekerjaan pondasi batu merah (tangga), camp. 1 : 3 14.40 m2 #REF!

10 Pekerjaan tangga batu merah, camp. 1 : 4 2.08 m2 #REF!


11 Pekerjaan dinding Transram, camp. 1 : 3 29.90 m2 #REF!
12 Pekerjaan dinding biasa, camp. 1 : 4 65.95 m 2
#REF!

13 Saluran Keliling Pasangan bata merah tebal 1/2 bata, 1 Pc : 3 Ps 21.00 m2 #REF!

14 Pasang Roster 8.00 BH

V. PEKERJAAN PLASTERAN DAN LANTAI


1 Pekerjaan plesteran tembok (camp. 1 : 3) 59.80 M2 #REF!
2 Pekerjaan plesteran tembok (camp. 1 : 4) 137.98 M2 #REF!
3 Pekerjaan acian semen portland 197.78 M2 #REF!
4 Pekerjaan Lantai Keramik 40 x 40 cm 64.21 M 2 #REF!
5 Pekerjaan Lantai Keramik KM 20 x 20 cm (unpolish) 3.75 M 2 #REF!
6 Pekerjaan Dinding Keramik 20 x 25 cm 16.04 M2 #REF!

VI. PEKERJAAN ATAP DAN PLAFOND


1 Pek. Kuda - Kuda, Nok, Kap Konstruksi Baja Ringan 122.95 m²
2 Pek. Pas. Atap Seng Soka Roof 122.95 m² #REF!
3 Pek. Pas. Bubungan Soka Roof 14.00 m1
#REF!
4 Pek. Listplank WoodPlank 57.78 m1 #REF!
5 Pek. Pas. Plafond Kalsiboard 109.24 m² #REF!
6 Pas. rangka langit-langit 60 x 60 cm Metal Furing 109.24 m² #REF!
7 Pasangan List Profil Pinggir/Plafond ( 4 x 5 cm ) 105.76 m 1
#REF!

VII. PEKERJAAN KUSEN PINTU DAN JENDELA


1 Pekerjaan Kusen Pintu/Jendela 0.25 M3 #REF!
2 Pasang Pintu PVC 2.00 Bh #REF!
3 Pekerjaan Daun Jendela 9.84 M2 #REF!
4 Pasang Kaca polos 5 mm 7.08 M2 #REF!

VIII. PEKERJAAN KUNCI DAN PENGGANTUNG


1 Pasang Engsel Jendela 16.00 Bh #REF!
2 Pasang Grendel Pintu/Jendela 8.00 Bh #REF!
3 Pasang kait angin 16.00 Bh #REF!

IX. PEKERJAAN INSTALASI AIR


1 Pasang Instalasi Air Bersih Pipa AW 3/4" 44.76 M' #NAME?
2 Pasang Instalasi Air Bersih Pipa AW 1/2" 5.12 M' #REF!
3 Pasang Kran Air 2.00 Bh #REF!
4 Pasang Pipa Air Kotor/Diasposal padat PVC ᴓ 3" 3.71 M' #NAME?
5 Pasang Pipa Air Kotor PVC ᴓ 3" 7.00 M' #NAME?
6 Pekerjaan Septiktank dan Peresapannya 1.00 Ls #REF!
7 Floor drain 2.00 Bh #REF!
8 Kloset Jongkok 2.00 Bh #REF!

X. PEKERJAAN INSTALASI LISTRIK


1 Pekerjaan Instalasi lampu titik penerangan (termasuk kabel dan titik
8.00 Ttk #REF!
lampu)
2 Pekerjaan Instalasi titik daya 1 Phase (termasuk Kabel dan stop
1.00 Bh #REF!
kontak)
3 Lampu SL 25 watt 8.00 bh #REF!
4 Panel Box 1.00 Ls #REF!
5 MCB 1.00 unit #REF!
6 Saklar Ganda 3.00 Bh #REF!
7 Saklar Tunggal 1.00 Bh #REF!
8
Pek. Instalasi Listrik dari Rumah Genset ke Gedung Terminal 42.50 M1 #REF!

XI. PEKERJAAN PENGECATAN


1 Pekerjaan Cat Tembok 197.78 M2 #REF!
2 Pekerjaan Cat Plafond 109.24 M2 #REF!
3 Pekerjaan Cat Kayu (Lisplank, kusen & daun pintu) 12.06 M2 #REF!
Banggai, Mei 2017
DI BUAT
PEJABAT PEMBUAT KOMITMEN
( PPK )

ANWAR R. SAPPE, ST.


NIP. 19741028 200604 1 018
ANGGARAN BIAYA (RAB)

Jumlah Harga

Rp -

#REF!
#REF!
#REF!
#REF!
#REF!
#REF!

#REF!
#REF!
#REF!
#REF!
#REF!

#REF!
#REF!
#REF!
#REF!
#REF!
#REF!

#REF!

#REF!

#REF!

#REF!
#REF!
#REF!

#REF!

Rp -
#REF!

#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!

Rp -
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!

#REF!
#REF!
#REF!
#REF!

#REF!

#REF!
#REF!
#REF!

#REF!

#NAME?
#REF!
#REF!
#NAME?
#NAME?
#REF!
#REF!

#NAME?

#REF!

#REF!

#REF!
#REF!
#REF!
#REF!
#REF!

#REF!

#REF!

#REF!
#REF!
#REF!
#REF!
Banggai, Mei 2017
DI BUAT
PEJABAT PEMBUAT KOMITMEN
( PPK )

ANWAR R. SAPPE, ST.


NIP. 19741028 200604 1 018
REKAPITULASI
RENCANA ANGGARAN BIAYA
#REF!
Program : Pembangunan Prasarana Dan Fasilitas Perhubungan
Kegiatan : Pembangunan Dermaga
Pekerjaan : Pembangunan Dermaga Bungin
(Pos Jaga)
Lokasi : Desa Bungin, Kec. Bokan Kepulauan
Sumber Dana : DAK
Tahun Anggaran : 2017

No Uraian Pekerjaan

I. PEKERJAAN TANAH DAN PASIR

II. PEK. PAS. BATU, DINDING DAN PLESTERAN

III. PEKERJAAN BETON

IV. PEKERJAAN LANTAI & PELAPIS DINDING

V. PEK. KUSEN, PINTU & JENDELA KACA

VI PEKERJAAN ATAP DAN PLAFOND

VII. PEKERJAAN PENGECATAN

D REAL COST

Banggai, Mei 2017


DI BUAT
PEJABAT PEMBUAT KOMITMEN
( PPK )

ANWAR R. SAPPE, ST.


NIP. 19741028 200604 1 018
REKAPITULASI
RENCANA ANGGARAN BIAYA
#REF!

Jumlah Harga

Rp 367,520.00

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

Banggai, Mei 2017


DI BUAT
PEJABAT PEMBUAT KOMITMEN
( PPK )

ANWAR R. SAPPE, ST.


NIP. 19741028 200604 1 018
RENCANA ANGGARAN BIAYA
Program : Pembangunan Prasarana Dan Fasilitas Perhubungan
Kegiatan : Pembangunan Dermaga
Pekerjaan : Pembangunan Dermaga Bungin
(Pos Jaga)
Lokasi : Desa Bungin, Kec. Bokan Kepulauan
Sumber Dana : DAK
Tahun Anggaran : 2017

No. Uraian Pekerjaan Volume Harga Satuan

I. PEKERJAAN TANAH DAN PASIR


1 Galian tanah pondasi 7.68 m³ Rp 34,000.00
2 Timbunan kembali 1.92 m³ Rp 19,541.67
3 Urugan pasir bawah pondasi 0.48
4 Urugan tanah timbunan bawah lantai 3.75
5 Urugan pasir bawah lantai 0.48 m³ Rp 143,500.00

II. PEK. PAS. BATU, DINDING DAN PLESTERAN


1 Pasangan batu kosong 1.44
1 Pek. Pas. Pondasi Batu Kali 1 : 4 4.32 m³ #REF!
2 Pek. Pas. Dinding 1/2 Batu Bata 1 : 5 27.72 m² #REF!
3 Pek. Plesteran Dinding 1 : 2 1.76 m² #REF!
4 Pek. Plesteran Dinding 1 : 4 55.44 m² #REF!
5 Pek. Plesteran Kaki Pondasi 1 : 3 4.68 m² #REF!
6 Pek. Acian Dinding 1 pc : 7 kapur 55.44 m² #REF!
7 Pas. Acian Beton 55.44 m² #REF!

III. PEKERJAAN BETON


1 Pek. Cor Beton Tumbuk Lantai Dasar T. 7 cm 0.75 m³ #REF!
2 Pek. Sloof Beton 15/20 0.36 m³ #REF!
3 Pek. Ring Balok Beton 12/20 0.36 m³ #REF!
4 Pek. Kolom Praktis Beton 12/12 0.41 m³ #REF!
5 Pek. Kolom Beton 15/20 0.17 m³ #REF!

IV. PEKERJAAN LANTAI & PELAPIS DINDING


1 Pek. Lantai Keramik 30 x 30 cm 6.00 m² #REF!
2 Pek. Plint Lantai 10 x 40 cm 5.00 m 1 #REF!
3 Pek. Lantai Keramik 20 x 20 cm Lantai KM/WC 2.50 m² #REF!
4 Pek. Dinding Keramik 20x25 cm Dinding KM/WC 5.00 m² #REF!
5 Pek. Les Stelo Dinding 8x20 cm Dinding KM/WC 3.00 m 1 Rp 159,485.50

V. PEK. KUSEN, PINTU & JENDELA KACA


LENGKAP DENGAN PENGGANTUNG DAN KUNCI
1 Pek. Kusen Pintu, Jendela dan Ventilasi Kayu 0.10 m³ #REF!
2 Pek. Pintu Panil Kayu 1.66 m² #REF!
3 Pas. Pintu Stainles WC 1.00 Set Rp 500,000.00
4 Pek. Pas. Jendela Bingkai Kaca Bening 5 mm 0.84 m² #REF!
5 Pek. Pas. Kunci Pintu 2 Slaag 1.00 Bh #REF!
6 Pek. Pas. Engsel Pintu (stainless) 3.00 Bh #REF!
7 Pek. Pas. Engsel Jendela (stainless) 2.00 Bh #REF!
8 Pek. Pas. Grendel Pintu Tanam (kuningan) 1.00 Bh #REF!
9 Pek. Pas. Grendel Jendela 1.00 Bh #REF!
10 Pek. Pas. Hak Kait Angin Jendela (stainless) 2.00 Bh #REF!
VI. PEKERJAAN ATAP DAN PLAFOND
1 Pek. Kuda - Kuda, Nok, Kap Konstruksi Baja Ringan 22.08 m² Rp 210,000.00
2 Pek. Pas. Atap Seng Soka Roof 22.08 m² #REF!
3 Pek. Pas. Bubungan Soka Roof 10.24 m1 #REF!
5 Pek. Listplank Kalsiplank 17.12 m1 #REF!
6 Pek. Pas. Plafond Kalsiboard 12.00 m² #REF!
7 Pas. rangka langit-langit 60 x 60 cm Metal Furing 12.00 m² #REF!
7 Pas. Lisprofil plafond 37.00 m 1
#REF!

VII. PEKERJAAN PENGECATAN


1 Cat Dinding Luar / Exterior ( Weather Shield ) 27.72 m² #REF!
2 Cat Dinding Dalam / Interior (ICI pentalite) 27.72 m² #REF!
3 Cat Plafond 12.00 m² #REF!

Banggai, Mei 2017


DI BUAT
PEJABAT PEMBUAT KOMITMEN
( PPK )

ANWAR R. SAPPE, ST.


NIP. 19741028 200604 1 018
ANA ANGGARAN BIAYA

Jumlah

Rp 261,120.00
Rp 37,520.00

Rp 68,880.00
Rp 367,520.00

#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!

#REF!
#REF!
#REF!
#REF!
#REF!
#REF!

#REF!
#REF!
#REF!
#REF!
Rp 478,456.50
#REF!

#REF!
#REF!
Rp 500,000.00
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
Rp 4,636,800.00
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!

#REF!
#REF!
#REF!
#REF!

Banggai, Mei 2017


DI BUAT
PEJABAT PEMBUAT KOMITMEN
( PPK )

ANWAR R. SAPPE, ST.


NIP. 19741028 200604 1 018
A.2.3.1. HARGA SATUAN PEKERJAAN TANAH
A. 2.3.1.1 Penggalian 1 m3 tanah biasa sedalam 1 m
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koef.
Rp Rp
A TENAGA
Pekerja L.01 OH 0.750 150,000.00 112,500.00
Mandor L.04 OH 0.025 250,000.00 6,250.00
TOTAL UPAH TENAGA 118,750.00
B BAHAN
0.00
TOTAL BIAYA BAHAN 0.00
C PERALATAN
0.00
0.00
TOTAL BIAYA PERALATAN 0.00
D Total upah tanaga, biaya material dan peralatan (A + B + C) 118,750.00
E Overhead + profit 15 % x D 17,812.50
F Harga satuan pekerjaan (D + E) 136,562.50

A. 2.3.1.2 Penggalian 1 m3 tanah biasa sedalam 2 m


Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koef.
Rp Rp
A TENAGA
Pekerja L.01 OH 0.900 150,000.00 135,000.00
Mandor L.04 OH 0.045 250,000.00 11,250.00
TOTAL UPAH TENAGA 146,250.00
B BAHAN
0.00
TOTAL BIAYA BAHAN 0.00
C PERALATAN
0.00
0.00
TOTAL BIAYA PERALATAN 0.00
D Total upah tanaga, biaya material dan peralatan (A + B + C) 146,250.00
E Overhead + profit 15 % x D 21,937.50
F Harga satuan pekerjaan (D + E) 168,187.50

A. 2.3.1.3 Penggalian 1 m3 tanah biasa sedalam 3 m


Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koef.
Rp Rp
A TENAGA
Pekerja L.01 OH 1.050 150,000.00 157,500.00
Mandor L.04 OH 0.067 250,000.00 16,750.00
TOTAL UPAH TENAGA 174,250.00
B BAHAN
0.00
TOTAL BIAYA BAHAN 0.00
C PERALATAN
0.00
0.00
TOTAL BIAYA PERALATAN 0.00
D Total upah tanaga, biaya material dan peralatan (A + B + C) 174,250.00
E Overhead + profit 15 % x D 26,137.50
F Harga satuan pekerjaan (D + E) 200,387.50
A. 2.3.1.11. Pengurugan 1 m3 dengan pasir urug
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koef.
Rp Rp
A TENAGA
Pekerja L.01 OH 0.300 150,000.00 45,000.00
Mandor L.04 OH 0.010 250,000.00 2,500.00
TOTAL UPAH TENAGA 47,500.00
B BAHAN
Pasir urug 1.200 150,000.00 180,000.00
TOTAL BIAYA BAHAN 180,000.00
C PERALATAN
0.00
0.00
TOTAL BIAYA PERALATAN 0.00
D Total upah tanaga, biaya material dan peralatan (A + B + C) 227,500.00
E Overhead + profit 15 % x D 34,125.00
F Harga satuan pekerjaan (D + E) 261,625.00

A. 2.3.1.14. Pengurugan 1 m3 Tanah


Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koef.
Rp Rp
A TENAGA
Pekerja L.01 OH 0.250 150,000.00 37,500.00
Mandor L.04 OH 0.025 250,000.00 6,250.00
TOTAL UPAH TENAGA 43,750.00
B BAHAN
Tanah Urug m3 1.200 110,000.00
TOTAL BIAYA BAHAN 0.00
C PERALATAN
0.00
0.00
TOTAL BIAYA PERALATAN 0.00
D Total upah tanaga, biaya material dan peralatan (A + B + C) 43,750.00
E Overhead + profit 15 % x D 6,562.50
F Harga satuan pekerjaan (D + E) 50,312.50

A.3.2.1. HARGA SATUAN PEKERJAAN PONDASI


A.3.2.1.2 Pemasangan 1 m3 pondasi batu belah campuran 1 SP : 4PP
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koef.
Rp Rp
A TENAGA
Pekerja L.01 OH 1.500 150,000.00 225,000.00
Tukang batu L.02 OH 0.750 200,000.00 150,000.00
Kepala tukang L.03 OH 0.075 220,000.00 16,500.00
Mandor L.04 OH 0.075 250,000.00 18,750.00
TOTAL UPAH TENAGA 410,250.00
B BAHAN
Batu Kali/ Batu Gunung m3 1.200 270,000.00 324,000.00
Semen portland Kg 163.000 2,000.00 326,000.00
Pasir pasang m3 0.520 200,000.00 104,000.00
TOTAL BIAYA BAHAN 754,000.00
C PERALATAN
0.00
0.00
TOTAL BIAYA PERALATAN 0.00
D Total upah tanaga, biaya material dan peralatan (A + B + C) 1,164,250.00
E Overhead + profit 15 % x D 174,637.50
F Harga satuan pekerjaan (D + E) 1,338,887.50
A.4.1.1. HARGA SATUAN PEKERJAAN BETON
A.4.1.1.9. Membuat 1 m3 beton mutu f'c = 24 MPa (K-275)
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koef.
Rp Rp
A TENAGA
Pekerja L.01 OH 1.650 150,000.00 247,500.00
Tukang batu L.02 OH 0.275 200,000.00 55,000.00
Kepala tukang L.03 OH 0.028 220,000.00 6,160.00
Mandor L.04 OH 0.083 250,000.00 20,750.00
TOTAL UPAH TENAGA 329,410.00
B BAHAN
Semen portland Kg 406.000 2,000.00 812,000.00
Pasir beton m3 0.489 300,000.00 146,571.43
Kerikil m3 0.760 350,000.00 266,000.00
Air Liter 215.000 0.00
TOTAL BIAYA BAHAN 1,224,571.43
C PERALATAN
0.00
0.00
TOTAL BIAYA PERALATAN 0.00
D Total upah tanaga, biaya material dan peralatan (A + B + C) 1,553,981.43
E Overhead + profit 15 % x D 233,097.21
F Harga satuan pekerjaan (D + E) 1,787,078.64

A.4.1.1.17 Pembesian 10 Kg dengan besi polos


Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koef.
Rp Rp
A TENAGA
Pekerja L.01 OH 0.070 150,000.00 10,500.00
Tukang besi L.02 OH 0.070 200,000.00 14,000.00
Kepala tukang L.03 OH 0.007 220,000.00 1,540.00
Mandor L.04 OH 0.004 250,000.00 1,000.00
TOTAL UPAH TENAGA 27,040.00
B BAHAN
Besi beton (polos/ulir) kg 10.500 13,000.00 136,500.00
Kawat beton kg 0.150 25,000.00 3,750.00
TOTAL BIAYA BAHAN 140,250.00
C PERALATAN
0.00
0.00
TOTAL BIAYA PERALATAN 0.00
D Total upah tanaga, biaya material dan peralatan (A + B + C) 167,290.00
E Overhead + profit 15 % x D 25,093.50
F Harga satuan pekerjaan (D + E) 192,383.50
A.4.1.1.23. (K3) Pemasangan 1 m2 bekisting untuk balok
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koef.
Rp Rp
A TENAGA
Pekerja L.01 OH 0.660 150,000.00 99,000.00
Tukang kayu L.02 OH 0.330 200,000.00 66,000.00
Kepala tukang L.03 OH 0.033 220,000.00 7,260.00
Mandor L.04 OH 0.033 250,000.00 8,250.00
TOTAL UPAH TENAGA 180,510.00
B BAHAN
Kayu kelas III m3 0.040 2,000,000.00 80,000.00
Paku 5-12 cm kg 0.400 30,000.00 12,000.00
Minyak bekisting Liter 0.200 30,000.00 6,000.00
Balok kayu kelas III m3 0.018 2,000,000.00 36,000.00
Plywood tebal 9 mm Lbr 0.350 120,000.00 42,000.00
Dolken kayu Ø 8-10 panjang 400 cm Batang 2.000 7,000.00 14,000.00
TOTAL BIAYA BAHAN 190,000.00
C PERALATAN
0.00
0.00
TOTAL BIAYA PERALATAN 0.00
D Total upah tanaga, biaya material dan peralatan (A + B + C) 370,510.00
E Overhead + profit 15 % x D 55,576.50
F Harga satuan pekerjaan (D + E) 426,086.50

A.4.1.1.24. (K3) Pemasangan 1 m2 bekisting untuk lantai


Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koef.
Rp Rp
A TENAGA
Pekerja L.01 OH 0.660 150,000.00 99,000.00
Tukang kayu L.02 OH 0.330 200,000.00 66,000.00
Kepala tukang L.03 OH 0.033 220,000.00 7,260.00
Mandor L.04 OH 0.033 250,000.00 8,250.00
TOTAL UPAH TENAGA 180,510.00
B BAHAN
Kayu kelas III m3 0.040 2,000,000.00 80,000.00
Paku 5-12 cm kg 0.400 30,000.00 12,000.00
Minyak bekisting Liter 0.200 30,000.00 6,000.00
Balok kayu kelas III m3 0.015 2,000,000.00 30,000.00
Plywood tebal 9 mm Lbr 0.350 120,000.00 42,000.00
Dolken kayu Ø 8-10 panjang 400 cm Batang 6.000 7,000.00 42,000.00
TOTAL BIAYA BAHAN 212,000.00
C PERALATAN
0.00
0.00
TOTAL BIAYA PERALATAN 0.00
D Total upah tanaga, biaya material dan peralatan (A + B + C) 392,510.00
E Overhead + profit 15 % x D 58,876.50
F Harga satuan pekerjaan (D + E) 451,386.50
A.4.1.1.22. (K3) Pemasangan 1 m2 bekisting untuk Tiang Beton
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koef.
Rp Rp
A TENAGA
Pekerja L.01 OH 0.660 150,000.00 99,000.00
Tukang kayu L.02 OH 0.330 200,000.00 66,000.00
Kepala tukang L.03 OH 0.033 220,000.00 7,260.00
Mandor L.04 OH 0.033 250,000.00 8,250.00
TOTAL UPAH TENAGA 180,510.00
B BAHAN
Kayu kelas III m3 0.040 2,000,000.00 80,000.00
Paku 5-12 cm kg 0.400 30,000.00 12,000.00
Minyak bekisting Liter 0.200 30,000.00 6,000.00
Balok kayu kelas III m3 0.015 2,000,000.00 30,000.00
Plywood tebal 9 mm Lbr 0.350 120,000.00 42,000.00
Dolken kayu Ø 8-10 panjang 400 cm Batang 2.000 7,000.00 14,000.00
TOTAL BIAYA BAHAN 184,000.00
C PERALATAN
0.00
0.00
TOTAL BIAYA PERALATAN 0.00
D Total upah tanaga, biaya material dan peralatan (A + B + C) 364,510.00
E Overhead + profit 15 % x D 54,676.50
F Harga satuan pekerjaan (D + E) 419,186.50

Pemancangan 1 m' Tiang Beton


Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koef.
Rp Rp
A TENAGA
Pekerja L.01 OH 3.000 150,000.00 450,000.00
Tukang kayu L.02 OH 0.167 200,000.00 33,340.00
Kepala tukang L.03 OH 0.017 220,000.00 3,667.40
Mandor L.04 OH 0.300 250,000.00 75,000.00
TOTAL UPAH TENAGA 562,007.40
B BAHAN

TOTAL BIAYA BAHAN 0.00


C PERALATAN
Kompresor Unit 0.067 500,000.00 33,333.33
Tackel Unit 0.067 150,000.00 10,000.00
Alkon Unit 0.067 250,000.00 16,666.67
Alat Pancang 1 Set Set 0.067 250,000.00 16,666.67
Rakit Unit 0.067 200,000.00 13,333.33

TOTAL BIAYA PERALATAN 90,000.00


D Total upah tanaga, biaya material dan peralatan (A + B + C) 652,007.40
E Overhead + profit 15 % x D 97,801.11
F Harga satuan pekerjaan (D + E) 749,808.51
1 m2 Pekerjaan Pengecatan Dinding Luar (ICI weather shield)
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koef.
Rp Rp
A TENAGA

TOTAL UPAH TENAGA 0.00


B BAHAN
Alkali sealer Pail 0.004 250,000.00 1,041.67
Cat Tembok weather shield Pail 0.008 968,000.00 8,066.67
Upah m2 1.000 11,250.00 11,250.00
Angkutan m2 1.000 500.00 500.00
TOTAL BIAYA BAHAN 20,858.33
C PERALATAN

TOTAL BIAYA PERALATAN 0.00


D Total upah tanaga, biaya material dan peralatan (A + B + C) 20,858.33
E Overhead + profit 15 % x D 3,128.75
F Harga satuan pekerjaan (D + E) 23,987.08

A.4.4.2.27. Pemasangan 1 m2 acian


Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koef.
Rp Rp
A TENAGA
Pekerja L.01 OH 0.200 150,000.00 30,000.00
Tukang batu L.02 OH 0.100 200,000.00 20,000.00
Kepala tukang L.03 OH 0.010 220,000.00 2,200.00
Mandor L.04 OH 0.010 250,000.00 2,500.00
TOTAL UPAH TENAGA 54,700.00
B BAHAN
PC (Portland cemen) Kg 3.250 2,000.00 6,500.00
TOTAL BIAYA BAHAN 6,500.00
C PERALATAN
0.00
0.00
TOTAL BIAYA PERALATAN 0.00
D Total upah tanaga, biaya material dan peralatan (A + B + C) 61,200.00
E Overhead + profit 15 % x D 9,180.00
F Harga satuan pekerjaan (D + E) 70,380.00
DAFTAR HARGA BAHAN BANGUNAN DAN UPAH KERJA
TAHUN ANGGARAN 2021
KONAWE UTARA

NO BAHAN/MATERIAL SATUAN HARGA


1 2 3 4
A BAHAN DASAR
1 Kayu Klas I
Balok m3 @ Rp 4,000,000.00
Papan m3 @ Rp 3,000,000.00
2 Kayu Klas II
Balok m3 @ Rp 2,500,000.00
Papan m3 @ Rp 2,500,000.00
3 Kayu Klas III
Balok m3 @ Rp 2,000,000.00
Papan m3 @ Rp 2,000,000.00
Bambu Batang @ Rp @ Rp
Dolken kayu galam diameter @8-10/4 m Batang @ Rp 7,000.00
4 BAHAN BANGUNAN
Pasir Beton m3 @ Rp 300,000.00
Pasir Pasang m3 @ Rp 200,000.00
Pasir Urug m3 @ Rp 150,000.00
Kerikil Sungai m3 @ Rp 350,000.00
Batu Kali/Batu Gunung m3 @ Rp 270,000.00
Tanah Timbunan m3 @ Rp 110,000.00
Semen 40 Kg Zak @ Rp 80,000.00
5 BAHAN BESI, ALUMINIUM DAN PAKU-PAKUAN
Besi Kg @ Rp 13,000.00
Kawat Beton kg @ Rp 25,000.00
Paku Biasa kg @ Rp 30,000.00
6 Mour Baut D. 16 mm
* Panjang 15 cm Bj @ Rp 7,000.00
* Panjang 20 cm Bj @ Rp 8,000.00
* Panjang 25 cm Bj @ Rp 9,000.00
* Panjang 30 cm Bj @ Rp 12,000.00
* Panjang 35 cm Bj @ Rp 15,000.00
B UPAH KERJA
Pekerja Org/Hr @ Rp 150,000.00
Tukang Org/Hr @ Rp 200,000.00
Kepala Tukang Org/Hr @ Rp 220,000.00
Mandor Org/Hr @ Rp 250,000.00

C PERALATAN
Tackel (Derek Manual) Set @ Rp 150,000.00
Kompresor Set @ Rp 500,000.00
Rakit Set @ Rp 200,000.00
Alat Pancang Set @ Rp 250,000.00
Allkon Set @ Rp 250,000.00
PERINGATAN
Dilarang keras !!!! Mengunakan file ini
tanpa seizin dr PT. Halim Group

- Rupiah - Sen
1 Satu 10.00 Sepuluh 0.01 Satu
2 Dua 20.00 Dua Puluh 0.01 Satu
3 Tiga 30.00 Tiga Puluh 0.01 Satu
4 Empat 40.00 Empat Puluh 0.01 Satu
5 Lima 50.00 Lima Puluh 0.01 Satu
6 Enam 60.00 Enam Puluh 0.02 Dua
7 Tujuh 70.00 Tujuh Puluh 0.02 Dua
8 Delapan 80.00 Delapan Puluh 0.02 Dua
9 Sembilan 90.00 Sembilan Puluh 0.02 Dua
10 Sepuluh 100.00 Seratus 0.02 Dua
11 Sebelas 200.00 Dua Ratus 0.02 Dua
12 Dua Belas 300.00 Tiga Ratus 0.02 Dua
13 Tiga Belas 400.00 Empat Ratus 0.02 Dua
14 Empat Belas 500.00 Lima Ratus 0.02 Dua
15 Lima Belas 600.00 Enam Ratus 0.02 Dua
16 Enam Belas 700.00 Tujuh Ratus 0.03 Tiga
17 Tujuh Belas 800.00 Delapan Ratus 0.03 Tiga
18 Delapan Belas 900.00 Sembilan Ratus 0.03 Tiga
19 Sembilan Belas 1,000.00 Seribu 0.03 Tiga
20 Dua Puluh 2,000.00 Dua Ribu 0.03 Tiga
21 Dua Puluh Sat 3,000.00 Tiga Ribu 0.03 Tiga
22 Dua Puluh Dua 4,000.00 Empat Ribu 0.03 Tiga
23 Dua Puluh Tiga 5,000.00 Lima Ribu 0.03 Tiga
24 Dua Puluh Emp 6,000.00 Enam Ribu 0.03 Tiga
25 Dua Puluh Lim 7,000.00 Tujuh Ribu 0.03 Tiga
26 Dua Puluh Ena 8,000.00 Delapan Ribu 0.04 Empat
27 Dua Puluh Tuju 9,000.00 Sembilan Ribu 0.04 Empat
28 Dua Puluh Del 10,000.00 Sepuluh Ribu 0.04 Empat
29 Dua Puluh Sem 11,000.00 Sebelas Ribu 0.04 Empat
30 Tiga Puluh 12,000.00 Dua Belas Ribu 0.04 Empat
31 Tiga Puluh Sat 13,000.00 Tiga Belas Ribu 0.04 Empat
32 Tiga Puluh Dua 14,000.00 Empat Belas Ri 0.04 Empat
33 Tiga Puluh Tig 15,000.00 Lima Belas Rib 0.04 Empat
34 Tiga Puluh Emp 16,000.00 Enam Belas Rib 0.04 Empat
35 Tiga Puluh Lim 17,000.00 Tujuh Belas Rib 0.04 Empat
36 Tiga Puluh En 18,000.00 Delapan Belas 0.05 Lima
37 Tiga Puluh Tuj 19,000.00 Sembilan Belas 0.05 Lima
38 Tiga Puluh Del 20,000.00 Dua Puluh Ribu 0.05 Lima
39 Tiga Puluh Sem 21,000.00 Dua Puluh Satu 0.05 Lima
40 Empat Puluh 22,000.00 Dua Puluh Dua 0.05 Lima
41 Empat Puluh S 23,000.00 Dua Puluh Tiga 0.05 Lima
42 Empat Puluh D 24,000.00 Dua Puluh Empa 0.05 Lima
43 Empat Puluh Ti 25,000.00 Dua Puluh Lima 0.05 Lima
44 Empat Puluh E 26,000.00 Dua Puluh Ena 0.05 Lima
45 Empat Puluh L 27,000.00 Dua Puluh Tuju 0.05 Lima
46 Empat Puluh E 28,000.00 Dua Puluh Dela 0.06 Enam
47 Empat Puluh T 29,000.00 Dua Puluh Semb 0.06 Enam
48 Empat Puluh D 30,000.00 Tiga Puluh Ribu 0.06 Enam
49 Empat Puluh S 31,000.00 Tiga Puluh Satu 0.06 Enam
50 Lima Puluh 32,000.00 Tiga Puluh Dua 0.06 Enam
51 Lima Puluh Sat 33,000.00 Tiga Puluh Tiga 0.06 Enam
52 Lima Puluh Du 34,000.00 Tiga Puluh Emp 0.06 Enam
53 Lima Puluh Tig 35,000.00 Tiga Puluh Lim 0.06 Enam
54 Lima Puluh Em 36,000.00 Tiga Puluh Ena 0.06 Enam
55 Lima Puluh Lim 37,000.00 Tiga Puluh Tuju 0.06 Enam
56 Lima Puluh En 38,000.00 Tiga Puluh Del 0.07 Tujuh
57 Lima Puluh Tuj 39,000.00 Tiga Puluh Sem 0.07 Tujuh
58 Lima Puluh De 40,000.00 Empat Puluh Ri 0.07 Tujuh
59 Lima Puluh Sem 41,000.00 Empat Puluh Sa 0.07 Tujuh
60 Enam Puluh 42,000.00 Empat Puluh Du 0.07 Tujuh
61 Enam Puluh Sa 43,000.00 Empat Puluh Ti 0.07 Tujuh
62 Enam Puluh Du 44,000.00 Empat Puluh E 0.07 Tujuh
63 Enam Puluh Ti 45,000.00 Empat Puluh Li 0.07 Tujuh
64 Enam Puluh Em 46,000.00 Empat Puluh E 0.07 Tujuh
65 Enam Puluh Li 47,000.00 Empat Puluh Tu 0.07 Tujuh
66 Enam Puluh E 48,000.00 Empat Puluh De 0.08 Delapan
67 Enam Puluh Tu 49,000.00 Empat Puluh Se 0.08 Delapan
68 Enam Puluh De 50,000.00 Lima Puluh Rib 0.08 Delapan
69 Enam Puluh Se 51,000.00 Lima Puluh Sat 0.08 Delapan
70 Tujuh Puluh 52,000.00 Lima Puluh Dua 0.08 Delapan
71 Tujuh Puluh Sa 53,000.00 Lima Puluh Tig 0.08 Delapan
72 Tujuh Puluh Du 54,000.00 Lima Puluh Emp 0.08 Delapan
73 Tujuh Puluh Ti 55,000.00 Lima Puluh Lim 0.08 Delapan
74 Tujuh Puluh E 56,000.00 Lima Puluh Ena 0.08 Delapan
75 Tujuh Puluh Li 57,000.00 Lima Puluh Tuj 0.08 Delapan
76 Tujuh Puluh E 58,000.00 Lima Puluh Del 0.09 Sembilan
77 Tujuh Puluh Tu 59,000.00 Lima Puluh Sem 0.09 Sembilan
78 Tujuh Puluh De 60,000.00 Enam Puluh Ri 0.09 Sembilan
79 Tujuh Puluh Se 61,000.00 Enam Puluh Sat 0.09 Sembilan
80 Delapan Puluh 62,000.00 Enam Puluh Du 0.09 Sembilan
81 Delapan Puluh 63,000.00 Enam Puluh Tig 0.09 Sembilan
82 Delapan Puluh 64,000.00 Enam Puluh Em 0.09 Sembilan
83 Delapan Puluh 65,000.00 Enam Puluh Lim 0.09 Sembilan
84 Delapan Puluh 66,000.00 Enam Puluh En 0.09 Sembilan
85 Delapan Puluh 67,000.00 Enam Puluh Tuj 0.09 Sembilan
86 Delapan Puluh 68,000.00 Enam Puluh De 0.10 Sepuluh
87 Delapan Puluh 69,000.00 Enam Puluh Sem 0.10 Sepuluh
88 Delapan Puluh 70,000.00 Tujuh Puluh Ri 0.10 Sepuluh
89 Delapan Puluh 71,000.00 Tujuh Puluh Sa 0.10 Sepuluh
90 Sembilan Pulu 72,000.00 Tujuh Puluh Du 0.10 Sepuluh
91 Sembilan Puluh 73,000.00 Tujuh Puluh Tig 0.10 Sepuluh
92 Sembilan Pulu 74,000.00 Tujuh Puluh Em 0.10 Sepuluh
93 Sembilan Puluh 75,000.00 Tujuh Puluh Li 0.10 Sepuluh
94 Sembilan Pulu 76,000.00 Tujuh Puluh En 0.10 Sepuluh
95 Sembilan Puluh 77,000.00 Tujuh Puluh Tu 0.10 Sepuluh
96 Sembilan Pulu 78,000.00 Tujuh Puluh De 0.11 Sebelas
97 Sembilan Puluh 79,000.00 Tujuh Puluh Se 0.11 Sebelas
98 Sembilan Pulu 80,000.00 Delapan Puluh 0.11 Sebelas
99 Sembilan Puluh 81,000.00 Delapan Puluh 0.11 Sebelas
82,000.00 Delapan Puluh 0.11 Sebelas
83,000.00 Delapan Puluh 0.11 Sebelas
84,000.00 Delapan Puluh 0.11 Sebelas
85,000.00 Delapan Puluh 0.11 Sebelas
86,000.00 Delapan Puluh 0.11 Sebelas
87,000.00 Delapan Puluh 0.11 Sebelas
88,000.00 Delapan Puluh 0.12 Dua Belas
89,000.00 Delapan Puluh 0.12 Dua Belas
90,000.00 Sembilan Puluh 0.12 Dua Belas
91,000.00 Sembilan Puluh 0.12 Dua Belas
92,000.00 Sembilan Puluh 0.12 Dua Belas
93,000.00 Sembilan Puluh 0.12 Dua Belas
94,000.00 Sembilan Puluh 0.12 Dua Belas
95,000.00 Sembilan Puluh 0.12 Dua Belas
96,000.00 Sembilan Puluh 0.12 Dua Belas
97,000.00 Sembilan Puluh 0.12 Dua Belas
98,000.00 Sembilan Puluh 0.13 Tiga Belas
99,000.00 Sembilan Puluh 0.13 Tiga Belas
100,000.00 Seratus 0.13 Tiga Belas
200,000.00 Dua Ratus 0.13 Tiga Belas
300,000.00 Tiga Ratus 0.13 Tiga Belas
400,000.00 Empat Ratus 0.13 Tiga Belas
500,000.00 Lima Ratus 0.13 Tiga Belas
600,000.00 Enam Ratus 0.13 Tiga Belas
700,000.00 Tujuh Ratus 0.13 Tiga Belas
800,000.00 Delapan Ratus 0.13 Tiga Belas
900,000.00 Sembilan Ratus 0.14 Empat Belas
1,000,000.00 Satu Juta 0.14 Empat Belas
2,000,000.00 Dua Juta 0.14 Empat Belas
3,000,000.00 Tiga Juta 0.14 Empat Belas
4,000,000.00 Empat Juta 0.14 Empat Belas
5,000,000.00 Lima Juta 0.14 Empat Belas
6,000,000.00 Enam Juta 0.14 Empat Belas
7,000,000.00 Tujuh Juta 0.14 Empat Belas
8,000,000.00 Delapan Juta 0.14 Empat Belas
9,000,000.00 Sembilan Juta 0.14 Empat Belas
10,000,000.00 Sepuluh Juta 0.15 Lima Belas
11,000,000.00 Sebelas Juta 0.15 Lima Belas
12,000,000.00 Dua Belas Juta 0.15 Lima Belas
13,000,000.00 Tiga Belas Juta 0.15 Lima Belas
14,000,000.00 Empat Belas Ju 0.15 Lima Belas
15,000,000.00 Lima Belas Juta 0.15 Lima Belas
16,000,000.00 Enam Belas Jut 0.15 Lima Belas
17,000,000.00 Tujuh Belas Jut 0.15 Lima Belas
18,000,000.00 Delapan Belas 0.15 Lima Belas
19,000,000.00 Sembilan Belas 0.15 Lima Belas
20,000,000.00 Dua Puluh Juta 0.16 Enam Belas
21,000,000.00 Dua Puluh Satu 0.16 Enam Belas
22,000,000.00 Dua Puluh Dua 0.16 Enam Belas
23,000,000.00 Dua Puluh Tiga 0.16 Enam Belas
24,000,000.00 Dua Puluh Empa 0.16 Enam Belas
25,000,000.00 Dua Puluh Lima 0.16 Enam Belas
26,000,000.00 Dua Puluh Ena 0.16 Enam Belas
27,000,000.00 Dua Puluh Tuju 0.16 Enam Belas
28,000,000.00 Dua Puluh Dela 0.16 Enam Belas
29,000,000.00 Dua Puluh Semb 0.16 Enam Belas
30,000,000.00 Tiga Puluh Juta 0.17 Tujuh Belas
31,000,000.00 Tiga Puluh Satu 0.17 Tujuh Belas
32,000,000.00 Tiga Puluh Dua 0.17 Tujuh Belas
33,000,000.00 Tiga Puluh Tiga 0.17 Tujuh Belas
34,000,000.00 Tiga Puluh Emp 0.17 Tujuh Belas
35,000,000.00 Tiga Puluh Lima 0.17 Tujuh Belas
36,000,000.00 Tiga Puluh Ena 0.17 Tujuh Belas
37,000,000.00 Tiga Puluh Tuju 0.17 Tujuh Belas
38,000,000.00 Tiga Puluh Del 0.17 Tujuh Belas
39,000,000.00 Tiga Puluh Sem 0.17 Tujuh Belas
40,000,000.00 Empat Puluh Ju 0.18 Delapan Belas
41,000,000.00 Empat Puluh Sa 0.18 Delapan Belas
42,000,000.00 Empat Puluh Du 0.18 Delapan Belas
43,000,000.00 Empat Puluh Ti 0.18 Delapan Belas
44,000,000.00 Empat Puluh Em 0.18 Delapan Belas
45,000,000.00 Empat Puluh Li 0.18 Delapan Belas
46,000,000.00 Empat Puluh E 0.18 Delapan Belas
47,000,000.00 Empat Puluh Tu 0.18 Delapan Belas
48,000,000.00 Empat Puluh De 0.18 Delapan Belas
49,000,000.00 Empat Puluh Se 0.18 Delapan Belas
50,000,000.00 Lima Puluh Jut 0.19 Sembilan Belas
51,000,000.00 Lima Puluh Sat 0.19 Sembilan Belas
52,000,000.00 Lima Puluh Dua 0.19 Sembilan Belas
53,000,000.00 Lima Puluh Tiga 0.19 Sembilan Belas
54,000,000.00 Lima Puluh Emp 0.19 Sembilan Belas
55,000,000.00 Lima Puluh Lim 0.19 Sembilan Belas
56,000,000.00 Lima Puluh Ena 0.19 Sembilan Belas
57,000,000.00 Lima Puluh Tuj 0.19 Sembilan Belas
58,000,000.00 Lima Puluh Del 0.19 Sembilan Belas
59,000,000.00 Lima Puluh Sem 0.19 Sembilan Belas
60,000,000.00 Enam Puluh Jut 0.20 Dua Puluh
61,000,000.00 Enam Puluh Sat 0.20 Dua Puluh
62,000,000.00 Enam Puluh Du 0.20 Dua Puluh
63,000,000.00 Enam Puluh Tig 0.20 Dua Puluh
64,000,000.00 Enam Puluh Em 0.20 Dua Puluh
65,000,000.00 Enam Puluh Lim 0.20 Dua Puluh
66,000,000.00 Enam Puluh En 0.20 Dua Puluh
67,000,000.00 Enam Puluh Tuj 0.20 Dua Puluh
68,000,000.00 Enam Puluh Del 0.20 Dua Puluh
69,000,000.00 Enam Puluh Sem 0.20 Dua Puluh
70,000,000.00 Tujuh Puluh Jut 0.21 Dua Puluh Satu
71,000,000.00 Tujuh Puluh Sat 0.21 Dua Puluh Satu
72,000,000.00 Tujuh Puluh Du 0.21 Dua Puluh Satu
73,000,000.00 Tujuh Puluh Tig 0.21 Dua Puluh Satu
74,000,000.00 Tujuh Puluh Em 0.21 Dua Puluh Satu
75,000,000.00 Tujuh Puluh Li 0.21 Dua Puluh Satu
76,000,000.00 Tujuh Puluh En 0.21 Dua Puluh Satu
77,000,000.00 Tujuh Puluh Tuj 0.21 Dua Puluh Satu
78,000,000.00 Tujuh Puluh De 0.21 Dua Puluh Satu
79,000,000.00 Tujuh Puluh Se 0.21 Dua Puluh Satu
80,000,000.00 Delapan Puluh 0.22 Dua Puluh Dua
81,000,000.00 Delapan Puluh 0.22 Dua Puluh Dua
82,000,000.00 Delapan Puluh 0.22 Dua Puluh Dua
83,000,000.00 Delapan Puluh 0.22 Dua Puluh Dua
84,000,000.00 Delapan Puluh 0.22 Dua Puluh Dua
85,000,000.00 Delapan Puluh 0.22 Dua Puluh Dua
86,000,000.00 Delapan Puluh 0.22 Dua Puluh Dua
87,000,000.00 Delapan Puluh 0.22 Dua Puluh Dua
88,000,000.00 Delapan Puluh 0.22 Dua Puluh Dua
89,000,000.00 Delapan Puluh 0.22 Dua Puluh Dua
90,000,000.00 Sembilan Puluh 0.23 Dua Puluh Tiga
91,000,000.00 Sembilan Puluh 0.23 Dua Puluh Tiga
92,000,000.00 Sembilan Puluh 0.23 Dua Puluh Tiga
93,000,000.00 Sembilan Puluh 0.23 Dua Puluh Tiga
94,000,000.00 Sembilan Puluh 0.23 Dua Puluh Tiga
95,000,000.00 Sembilan Puluh 0.23 Dua Puluh Tiga
96,000,000.00 Sembilan Puluh 0.23 Dua Puluh Tiga
97,000,000.00 Sembilan Puluh 0.23 Dua Puluh Tiga
98,000,000.00 Sembilan Puluh 0.23 Dua Puluh Tiga
99,000,000.00 Sembilan Puluh 0.23 Dua Puluh Tiga
100,000,000.00 Seratus 0.24 Dua Puluh Empat
200,000,000.00 Dua Ratus 0.24 Dua Puluh Empat
300,000,000.00 Tiga Ratus 0.24 Dua Puluh Empat
400,000,000.00 Empat Ratus 0.24 Dua Puluh Empat
500,000,000.00 Lima Ratus 0.24 Dua Puluh Empat
600,000,000.00 Enam Ratus 0.24 Dua Puluh Empat
700,000,000.00 Tujuh Ratus 0.24 Dua Puluh Empat
800,000,000.00 Delapan Ratus 0.24 Dua Puluh Empat
900,000,000.00 Sembilan Ratus 0.24 Dua Puluh Empat
### Satu Milyar 0.24 Dua Puluh Empat
### Dua Milyar 0.25 Dua Puluh Lima
### Tiga Milyar 0.25 Dua Puluh Lima
### Empat Milyar 0.25 Dua Puluh Lima
### Lima Milyar 0.25 Dua Puluh Lima
### Enam Milyar 0.25 Dua Puluh Lima
### Tujuh Milyar 0.25 Dua Puluh Lima
### Delapan Milyar 0.25 Dua Puluh Lima
### Sembilan Milyar 0.25 Dua Puluh Lima
### Sepuluh Milyar 0.25 Dua Puluh Lima
### Sebelas Milyar 0.25 Dua Puluh Lima
### Dua Belas Milya 0.26 Dua Puluh Enam
### Tiga Belas Mily 0.26 Dua Puluh Enam
### Empat Belas Mi 0.26 Dua Puluh Enam
### Lima Belas Mily 0.26 Dua Puluh Enam
### Enam Belas Mil 0.26 Dua Puluh Enam
### Tujuh Belas Mil 0.26 Dua Puluh Enam
### Delapan Belas M 0.26 Dua Puluh Enam
### Sembilan Belas 0.26 Dua Puluh Enam
### Dua Puluh Milya 0.26 Dua Puluh Enam
### Dua Puluh Satu 0.26 Dua Puluh Enam
### Dua Puluh Dua 0.27 Dua Puluh Tujuh
### Dua Puluh Tiga 0.27 Dua Puluh Tujuh
### Dua Puluh Empa 0.27 Dua Puluh Tujuh
### Dua Puluh Lima 0.27 Dua Puluh Tujuh
### Dua Puluh Enam 0.27 Dua Puluh Tujuh
### Dua Puluh Tujuh 0.27 Dua Puluh Tujuh
### Dua Puluh Dela 0.27 Dua Puluh Tujuh
### Dua Puluh Semb 0.27 Dua Puluh Tujuh
### Tiga Puluh Mily 0.27 Dua Puluh Tujuh
### Tiga Puluh Satu 0.27 Dua Puluh Tujuh
### Tiga Puluh Dua 0.28 Dua Puluh Delapan
### Tiga Puluh Tiga 0.28 Dua Puluh Delapan
### Tiga Puluh Emp 0.28 Dua Puluh Delapan
### Tiga Puluh Lima 0.28 Dua Puluh Delapan
### Tiga Puluh Ena 0.28 Dua Puluh Delapan
### Tiga Puluh Tuju 0.28 Dua Puluh Delapan
### Tiga Puluh Dela 0.28 Dua Puluh Delapan
### Tiga Puluh Semb 0.28 Dua Puluh Delapan
### Empat Puluh Mi 0.28 Dua Puluh Delapan
### Empat Puluh Sa 0.28 Dua Puluh Delapan
### Empat Puluh Du 0.29 Dua Puluh Sembilan
### Empat Puluh Ti 0.29 Dua Puluh Sembilan
### Empat Puluh Em 0.29 Dua Puluh Sembilan
### Empat Puluh Li 0.29 Dua Puluh Sembilan
### Empat Puluh En 0.29 Dua Puluh Sembilan
### Empat Puluh Tu 0.29 Dua Puluh Sembilan
### Empat Puluh De 0.29 Dua Puluh Sembilan
### Empat Puluh Se 0.29 Dua Puluh Sembilan
### Lima Puluh Mily 0.29 Dua Puluh Sembilan
### Lima Puluh Satu 0.29 Dua Puluh Sembilan
### Lima Puluh Dua 0.30 Tiga Puluh
### Lima Puluh Tiga 0.30 Tiga Puluh
### Lima Puluh Emp 0.30 Tiga Puluh
### Lima Puluh Lima 0.30 Tiga Puluh
### Lima Puluh Ena 0.30 Tiga Puluh
### Lima Puluh Tuju 0.30 Tiga Puluh
### Lima Puluh Del 0.30 Tiga Puluh
### Lima Puluh Sem 0.30 Tiga Puluh
### Enam Puluh Mil 0.30 Tiga Puluh
### Enam Puluh Sat 0.30 Tiga Puluh
### Enam Puluh Dua 0.31 Tiga Puluh Satu
### Enam Puluh Tig 0.31 Tiga Puluh Satu
### Enam Puluh Emp 0.31 Tiga Puluh Satu
### Enam Puluh Lim 0.31 Tiga Puluh Satu
### Enam Puluh En 0.31 Tiga Puluh Satu
### Enam Puluh Tuj 0.31 Tiga Puluh Satu
### Enam Puluh Del 0.31 Tiga Puluh Satu
### Enam Puluh Sem 0.31 Tiga Puluh Satu
### Tujuh Puluh Mil 0.31 Tiga Puluh Satu
### Tujuh Puluh Sat 0.31 Tiga Puluh Satu
### Tujuh Puluh Dua 0.32 Tiga Puluh Dua
### Tujuh Puluh Tig 0.32 Tiga Puluh Dua
### Tujuh Puluh Em 0.32 Tiga Puluh Dua
### Tujuh Puluh Lim 0.32 Tiga Puluh Dua
### Tujuh Puluh En 0.32 Tiga Puluh Dua
### Tujuh Puluh Tuj 0.32 Tiga Puluh Dua
### Tujuh Puluh De 0.32 Tiga Puluh Dua
### Tujuh Puluh Sem 0.32 Tiga Puluh Dua
### Delapan Puluh 0.32 Tiga Puluh Dua
### Delapan Puluh 0.32 Tiga Puluh Dua
### Delapan Puluh 0.33 Tiga Puluh Tiga
### Delapan Puluh T 0.33 Tiga Puluh Tiga
### Delapan Puluh 0.33 Tiga Puluh Tiga
### Delapan Puluh 0.33 Tiga Puluh Tiga
### Delapan Puluh 0.33 Tiga Puluh Tiga
### Delapan Puluh 0.33 Tiga Puluh Tiga
### Delapan Puluh 0.33 Tiga Puluh Tiga
### Delapan Puluh 0.33 Tiga Puluh Tiga
### Sembilan Puluh 0.33 Tiga Puluh Tiga
### Sembilan Puluh 0.33 Tiga Puluh Tiga
### Sembilan Puluh 0.34 Tiga Puluh Empat
### Sembilan Puluh 0.34 Tiga Puluh Empat
### Sembilan Puluh 0.34 Tiga Puluh Empat
### Sembilan Puluh 0.34 Tiga Puluh Empat
### Sembilan Puluh 0.34 Tiga Puluh Empat
### Sembilan Puluh 0.34 Tiga Puluh Empat
### Sembilan Puluh 0.34 Tiga Puluh Empat
### Sembilan Puluh 0.34 Tiga Puluh Empat
### Seratus 0.34 Tiga Puluh Empat
### Dua Ratus 0.34 Tiga Puluh Empat
### Tiga Ratus 0.35 Tiga Puluh Lima
### Empat Ratus 0.35 Tiga Puluh Lima
### Lima Ratus 0.35 Tiga Puluh Lima
### Enam Ratus 0.35 Tiga Puluh Lima
### Tujuh Ratus 0.35 Tiga Puluh Lima
### Delapan Ratus 0.35 Tiga Puluh Lima
### Sembilan Ratus 0.35 Tiga Puluh Lima
### Satu Trilyun 0.35 Tiga Puluh Lima
### Dua Trilyun 0.35 Tiga Puluh Lima
### Tiga Trilyun 0.35 Tiga Puluh Lima
### Empat Trilyun 0.36 Tiga Puluh Enam
### Lima Trilyun 0.36 Tiga Puluh Enam
### Enam Trilyun 0.36 Tiga Puluh Enam
### Tujuh Trilyun 0.36 Tiga Puluh Enam
### Delapan Trilyun 0.36 Tiga Puluh Enam
### Sembilan Trilyu 0.36 Tiga Puluh Enam
### Sepuluh Trilyun 0.36 Tiga Puluh Enam
0.36 Tiga Puluh Enam
0.36 Tiga Puluh Enam
0.36 Tiga Puluh Enam
0.37 Tiga Puluh Tujuh
0.37 Tiga Puluh Tujuh
0.37 Tiga Puluh Tujuh
0.37 Tiga Puluh Tujuh
0.37 Tiga Puluh Tujuh
0.37 Tiga Puluh Tujuh
0.37 Tiga Puluh Tujuh
0.37 Tiga Puluh Tujuh
0.37 Tiga Puluh Tujuh
0.37 Tiga Puluh Tujuh
0.38 Tiga Puluh Delapan
0.38 Tiga Puluh Delapan
0.38 Tiga Puluh Delapan
0.38 Tiga Puluh Delapan
0.38 Tiga Puluh Delapan
0.38 Tiga Puluh Delapan
0.38 Tiga Puluh Delapan
0.38 Tiga Puluh Delapan
0.38 Tiga Puluh Delapan
0.38 Tiga Puluh Delapan
0.39 Tiga Puluh Sembilan
0.39 Tiga Puluh Sembilan
0.39 Tiga Puluh Sembilan
0.39 Tiga Puluh Sembilan
0.39 Tiga Puluh Sembilan
0.39 Tiga Puluh Sembilan
0.39 Tiga Puluh Sembilan
0.39 Tiga Puluh Sembilan
0.39 Tiga Puluh Sembilan
0.39 Tiga Puluh Sembilan
0.40 Empat Puluh
0.40 Empat Puluh
0.40 Empat Puluh
0.40 Empat Puluh
0.40 Empat Puluh
0.40 Empat Puluh
0.40 Empat Puluh
0.40 Empat Puluh
0.40 Empat Puluh
0.40 Empat Puluh
0.41 Empat Puluh Satu
0.41 Empat Puluh Satu
0.41 Empat Puluh Satu
0.41 Empat Puluh Satu
0.41 Empat Puluh Satu
0.41 Empat Puluh Satu
0.41 Empat Puluh Satu
0.41 Empat Puluh Satu
0.41 Empat Puluh Satu
0.41 Empat Puluh Satu
0.42 Empat Puluh Dua
0.42 Empat Puluh Dua
0.42 Empat Puluh Dua
0.42 Empat Puluh Dua
0.42 Empat Puluh Dua
0.42 Empat Puluh Dua
0.42 Empat Puluh Dua
0.42 Empat Puluh Dua
0.42 Empat Puluh Dua
0.42 Empat Puluh Dua
0.43 Empat Puluh Tiga
0.43 Empat Puluh Tiga
0.43 Empat Puluh Tiga
0.43 Empat Puluh Tiga
0.43 Empat Puluh Tiga
0.43 Empat Puluh Tiga
0.43 Empat Puluh Tiga
0.43 Empat Puluh Tiga
0.43 Empat Puluh Tiga
0.43 Empat Puluh Tiga
0.44 Empat Puluh Empat
0.44 Empat Puluh Empat
0.44 Empat Puluh Empat
0.44 Empat Puluh Empat
0.44 Empat Puluh Empat
0.44 Empat Puluh Empat
0.44 Empat Puluh Empat
0.44 Empat Puluh Empat
0.44 Empat Puluh Empat
0.44 Empat Puluh Empat
0.45 Empat Puluh Lima
0.45 Empat Puluh Lima
0.45 Empat Puluh Lima
0.45 Empat Puluh Lima
0.45 Empat Puluh Lima
0.45 Empat Puluh Lima
0.45 Empat Puluh Lima
0.45 Empat Puluh Lima
0.45 Empat Puluh Lima
0.45 Empat Puluh Lima
0.46 Empat Puluh Enam
0.46 Empat Puluh Enam
0.46 Empat Puluh Enam
0.46 Empat Puluh Enam
0.46 Empat Puluh Enam
0.46 Empat Puluh Enam
0.46 Empat Puluh Enam
0.46 Empat Puluh Enam
0.46 Empat Puluh Enam
0.46 Empat Puluh Enam
0.47 Empat Puluh Tujuh
0.47 Empat Puluh Tujuh
0.47 Empat Puluh Tujuh
0.47 Empat Puluh Tujuh
0.47 Empat Puluh Tujuh
0.47 Empat Puluh Tujuh
0.47 Empat Puluh Tujuh
0.47 Empat Puluh Tujuh
0.47 Empat Puluh Tujuh
0.47 Empat Puluh Tujuh
0.48 Empat Puluh Delapan
0.48 Empat Puluh Delapan
0.48 Empat Puluh Delapan
0.48 Empat Puluh Delapan
0.48 Empat Puluh Delapan
0.48 Empat Puluh Delapan
0.48 Empat Puluh Delapan
0.48 Empat Puluh Delapan
0.48 Empat Puluh Delapan
0.48 Empat Puluh Delapan
0.49 Empat Puluh Sembilan
0.49 Empat Puluh Sembilan
0.49 Empat Puluh Sembilan
0.49 Empat Puluh Sembilan
0.49 Empat Puluh Sembilan
0.49 Empat Puluh Sembilan
0.49 Empat Puluh Sembilan
0.49 Empat Puluh Sembilan
0.49 Empat Puluh Sembilan
0.49 Empat Puluh Sembilan
0.50 Lima Puluh
0.50 Lima Puluh
0.50 Lima Puluh
0.50 Lima Puluh
0.50 Lima Puluh
0.50 Lima Puluh
0.50 Lima Puluh
0.50 Lima Puluh
0.50 Lima Puluh
0.50 Lima Puluh
0.51 Lima Puluh Satu
0.51 Lima Puluh Satu
0.51 Lima Puluh Satu
0.51 Lima Puluh Satu
0.51 Lima Puluh Satu
0.51 Lima Puluh Satu
0.51 Lima Puluh Satu
0.51 Lima Puluh Satu
0.51 Lima Puluh Satu
0.51 Lima Puluh Satu
0.52 Lima Puluh Dua
0.52 Lima Puluh Dua
0.52 Lima Puluh Dua
0.52 Lima Puluh Dua
0.52 Lima Puluh Dua
0.52 Lima Puluh Dua
0.52 Lima Puluh Dua
0.52 Lima Puluh Dua
0.52 Lima Puluh Dua
0.52 Lima Puluh Dua
0.53 Lima Puluh Tiga
0.53 Lima Puluh Tiga
0.53 Lima Puluh Tiga
0.53 Lima Puluh Tiga
0.53 Lima Puluh Tiga
0.53 Lima Puluh Tiga
0.53 Lima Puluh Tiga
0.53 Lima Puluh Tiga
0.53 Lima Puluh Tiga
0.53 Lima Puluh Tiga
0.54 Lima Puluh Empat
0.54 Lima Puluh Empat
0.54 Lima Puluh Empat
0.54 Lima Puluh Empat
0.54 Lima Puluh Empat
0.54 Lima Puluh Empat
0.54 Lima Puluh Empat
0.54 Lima Puluh Empat
0.54 Lima Puluh Empat
0.54 Lima Puluh Empat
0.55 Lima Puluh Lima
0.55 Lima Puluh Lima
0.55 Lima Puluh Lima
0.55 Lima Puluh Lima
0.55 Lima Puluh Lima
0.55 Lima Puluh Lima
0.55 Lima Puluh Lima
0.55 Lima Puluh Lima
0.55 Lima Puluh Lima
0.55 Lima Puluh Lima
0.56 Lima Puluh Enam
0.56 Lima Puluh Enam
0.56 Lima Puluh Enam
0.56 Lima Puluh Enam
0.56 Lima Puluh Enam
0.56 Lima Puluh Enam
0.56 Lima Puluh Enam
0.56 Lima Puluh Enam
0.56 Lima Puluh Enam
0.56 Lima Puluh Enam
0.57 Lima Puluh Tujuh
0.57 Lima Puluh Tujuh
0.57 Lima Puluh Tujuh
0.57 Lima Puluh Tujuh
0.57 Lima Puluh Tujuh
0.57 Lima Puluh Tujuh
0.57 Lima Puluh Tujuh
0.57 Lima Puluh Tujuh
0.57 Lima Puluh Tujuh
0.57 Lima Puluh Tujuh
0.58 Lima Puluh Delapan
0.58 Lima Puluh Delapan
0.58 Lima Puluh Delapan
0.58 Lima Puluh Delapan
0.58 Lima Puluh Delapan
0.58 Lima Puluh Delapan
0.58 Lima Puluh Delapan
0.58 Lima Puluh Delapan
0.58 Lima Puluh Delapan
0.58 Lima Puluh Delapan
0.59 Lima Puluh Sembilan
0.59 Lima Puluh Sembilan
0.59 Lima Puluh Sembilan
0.59 Lima Puluh Sembilan
0.59 Lima Puluh Sembilan
0.59 Lima Puluh Sembilan
0.59 Lima Puluh Sembilan
0.59 Lima Puluh Sembilan
0.59 Lima Puluh Sembilan
0.59 Lima Puluh Sembilan
0.60 Enam Puluh
0.60 Enam Puluh
0.60 Enam Puluh
0.60 Enam Puluh
0.60 Enam Puluh
0.60 Enam Puluh
0.60 Enam Puluh
0.60 Enam Puluh
0.60 Enam Puluh
0.60 Enam Puluh
0.61 Enam Puluh Satu
0.61 Enam Puluh Satu
0.61 Enam Puluh Satu
0.61 Enam Puluh Satu
0.61 Enam Puluh Satu
0.61 Enam Puluh Satu
0.61 Enam Puluh Satu
0.61 Enam Puluh Satu
0.61 Enam Puluh Satu
0.61 Enam Puluh Satu
0.62 Enam Puluh Dua
0.62 Enam Puluh Dua
0.62 Enam Puluh Dua
0.62 Enam Puluh Dua
0.62 Enam Puluh Dua
0.62 Enam Puluh Dua
0.62 Enam Puluh Dua
0.62 Enam Puluh Dua
0.62 Enam Puluh Dua
0.62 Enam Puluh Dua
0.63 Enam Puluh Tiga
0.63 Enam Puluh Tiga
0.63 Enam Puluh Tiga
0.63 Enam Puluh Tiga
0.63 Enam Puluh Tiga
0.63 Enam Puluh Tiga
0.63 Enam Puluh Tiga
0.63 Enam Puluh Tiga
0.63 Enam Puluh Tiga
0.63 Enam Puluh Tiga
0.64 Enam Puluh Empat
0.64 Enam Puluh Empat
0.64 Enam Puluh Empat
0.64 Enam Puluh Empat
0.64 Enam Puluh Empat
0.64 Enam Puluh Empat
0.64 Enam Puluh Empat
0.64 Enam Puluh Empat
0.64 Enam Puluh Empat
0.64 Enam Puluh Empat
0.65 Enam Puluh Lima
0.65 Enam Puluh Lima
0.65 Enam Puluh Lima
0.65 Enam Puluh Lima
0.65 Enam Puluh Lima
0.65 Enam Puluh Lima
0.65 Enam Puluh Lima
0.65 Enam Puluh Lima
0.65 Enam Puluh Lima
0.65 Enam Puluh Lima
0.66 Enam Puluh Enam
0.66 Enam Puluh Enam
0.66 Enam Puluh Enam
0.66 Enam Puluh Enam
0.66 Enam Puluh Enam
0.66 Enam Puluh Enam
0.66 Enam Puluh Enam
0.66 Enam Puluh Enam
0.66 Enam Puluh Enam
0.66 Enam Puluh Enam
0.67 Enam Puluh Tujuh
0.67 Enam Puluh Tujuh
0.67 Enam Puluh Tujuh
0.67 Enam Puluh Tujuh
0.67 Enam Puluh Tujuh
0.67 Enam Puluh Tujuh
0.67 Enam Puluh Tujuh
0.67 Enam Puluh Tujuh
0.67 Enam Puluh Tujuh
0.67 Enam Puluh Tujuh
0.68 Enam Puluh Delapan
0.68 Enam Puluh Delapan
0.68 Enam Puluh Delapan
0.68 Enam Puluh Delapan
0.68 Enam Puluh Delapan
0.68 Enam Puluh Delapan
0.68 Enam Puluh Delapan
0.68 Enam Puluh Delapan
0.68 Enam Puluh Delapan
0.68 Enam Puluh Delapan
0.69 Enam Puluh Sembilan
0.69 Enam Puluh Sembilan
0.69 Enam Puluh Sembilan
0.69 Enam Puluh Sembilan
0.69 Enam Puluh Sembilan
0.69 Enam Puluh Sembilan
0.69 Enam Puluh Sembilan
0.69 Enam Puluh Sembilan
0.69 Enam Puluh Sembilan
0.69 Enam Puluh Sembilan
0.70 Tujuh Puluh
0.70 Tujuh Puluh
0.70 Tujuh Puluh
0.70 Tujuh Puluh
0.70 Tujuh Puluh
0.70 Tujuh Puluh
0.70 Tujuh Puluh
0.70 Tujuh Puluh
0.70 Tujuh Puluh
0.70 Tujuh Puluh
0.71 Tujuh Puluh Satu
0.71 Tujuh Puluh Satu
0.71 Tujuh Puluh Satu
0.71 Tujuh Puluh Satu
0.71 Tujuh Puluh Satu
0.71 Tujuh Puluh Satu
0.71 Tujuh Puluh Satu
0.71 Tujuh Puluh Satu
0.71 Tujuh Puluh Satu
0.71 Tujuh Puluh Satu
0.72 Tujuh Puluh Dua
0.72 Tujuh Puluh Dua
0.72 Tujuh Puluh Dua
0.72 Tujuh Puluh Dua
0.72 Tujuh Puluh Dua
0.72 Tujuh Puluh Dua
0.72 Tujuh Puluh Dua
0.72 Tujuh Puluh Dua
0.72 Tujuh Puluh Dua
0.72 Tujuh Puluh Dua
0.73 Tujuh Puluh Tiga
0.73 Tujuh Puluh Tiga
0.73 Tujuh Puluh Tiga
0.73 Tujuh Puluh Tiga
0.73 Tujuh Puluh Tiga
0.73 Tujuh Puluh Tiga
0.73 Tujuh Puluh Tiga
0.73 Tujuh Puluh Tiga
0.73 Tujuh Puluh Tiga
0.73 Tujuh Puluh Tiga
0.74 Tujuh Puluh Empat
0.74 Tujuh Puluh Empat
0.74 Tujuh Puluh Empat
0.74 Tujuh Puluh Empat
0.74 Tujuh Puluh Empat
0.74 Tujuh Puluh Empat
0.74 Tujuh Puluh Empat
0.74 Tujuh Puluh Empat
0.74 Tujuh Puluh Empat
0.74 Tujuh Puluh Empat
0.75 Tujuh Puluh Lima
0.75 Tujuh Puluh Lima
0.75 Tujuh Puluh Lima
0.75 Tujuh Puluh Lima
0.75 Tujuh Puluh Lima
0.75 Tujuh Puluh Lima
0.75 Tujuh Puluh Lima
0.75 Tujuh Puluh Lima
0.75 Tujuh Puluh Lima
0.75 Tujuh Puluh Lima
0.76 Tujuh Puluh Enam
0.76 Tujuh Puluh Enam
0.76 Tujuh Puluh Enam
0.76 Tujuh Puluh Enam
0.76 Tujuh Puluh Enam
0.76 Tujuh Puluh Enam
0.76 Tujuh Puluh Enam
0.76 Tujuh Puluh Enam
0.76 Tujuh Puluh Enam
0.76 Tujuh Puluh Enam
0.77 Tujuh Puluh Tujuh
0.77 Tujuh Puluh Tujuh
0.77 Tujuh Puluh Tujuh
0.77 Tujuh Puluh Tujuh
0.77 Tujuh Puluh Tujuh
0.77 Tujuh Puluh Tujuh
0.77 Tujuh Puluh Tujuh
0.77 Tujuh Puluh Tujuh
0.77 Tujuh Puluh Tujuh
0.77 Tujuh Puluh Tujuh
0.78 Tujuh Puluh Delapan
0.78 Tujuh Puluh Delapan
0.78 Tujuh Puluh Delapan
0.78 Tujuh Puluh Delapan
0.78 Tujuh Puluh Delapan
0.78 Tujuh Puluh Delapan
0.78 Tujuh Puluh Delapan
0.78 Tujuh Puluh Delapan
0.78 Tujuh Puluh Delapan
0.78 Tujuh Puluh Delapan
0.79 Tujuh Puluh Sembilan
0.79 Tujuh Puluh Sembilan
0.79 Tujuh Puluh Sembilan
0.79 Tujuh Puluh Sembilan
0.79 Tujuh Puluh Sembilan
0.79 Tujuh Puluh Sembilan
0.79 Tujuh Puluh Sembilan
0.79 Tujuh Puluh Sembilan
0.79 Tujuh Puluh Sembilan
0.79 Tujuh Puluh Sembilan
0.80 Delapan Puluh
0.80 Delapan Puluh
0.80 Delapan Puluh
0.80 Delapan Puluh
0.80 Delapan Puluh
0.80 Delapan Puluh
0.80 Delapan Puluh
0.80 Delapan Puluh
0.80 Delapan Puluh
0.80 Delapan Puluh
0.81 Delapan Puluh Satu
0.81 Delapan Puluh Satu
0.81 Delapan Puluh Satu
0.81 Delapan Puluh Satu
0.81 Delapan Puluh Satu
0.81 Delapan Puluh Satu
0.81 Delapan Puluh Satu
0.81 Delapan Puluh Satu
0.81 Delapan Puluh Satu
0.81 Delapan Puluh Satu
0.82 Delapan Puluh Dua
0.82 Delapan Puluh Dua
0.82 Delapan Puluh Dua
0.82 Delapan Puluh Dua
0.82 Delapan Puluh Dua
0.82 Delapan Puluh Dua
0.82 Delapan Puluh Dua
0.82 Delapan Puluh Dua
0.82 Delapan Puluh Dua
0.82 Delapan Puluh Dua
0.83 Delapan Puluh Tiga
0.83 Delapan Puluh Tiga
0.83 Delapan Puluh Tiga
0.83 Delapan Puluh Tiga
0.83 Delapan Puluh Tiga
0.83 Delapan Puluh Tiga
0.83 Delapan Puluh Tiga
0.83 Delapan Puluh Tiga
0.83 Delapan Puluh Tiga
0.83 Delapan Puluh Tiga
0.84 Delapan Puluh Empat
0.84 Delapan Puluh Empat
0.84 Delapan Puluh Empat
0.84 Delapan Puluh Empat
0.84 Delapan Puluh Empat
0.84 Delapan Puluh Empat
0.84 Delapan Puluh Empat
0.84 Delapan Puluh Empat
0.84 Delapan Puluh Empat
0.84 Delapan Puluh Empat
0.85 Delapan Puluh Lima
0.85 Delapan Puluh Lima
0.85 Delapan Puluh Lima
0.85 Delapan Puluh Lima
0.85 Delapan Puluh Lima
0.85 Delapan Puluh Lima
0.85 Delapan Puluh Lima
0.85 Delapan Puluh Lima
0.85 Delapan Puluh Lima
0.85 Delapan Puluh Lima
0.86 Delapan Puluh Enam
0.86 Delapan Puluh Enam
0.86 Delapan Puluh Enam
0.86 Delapan Puluh Enam
0.86 Delapan Puluh Enam
0.86 Delapan Puluh Enam
0.86 Delapan Puluh Enam
0.86 Delapan Puluh Enam
0.86 Delapan Puluh Enam
0.86 Delapan Puluh Enam
0.87 Delapan Puluh Tujuh
0.87 Delapan Puluh Tujuh
0.87 Delapan Puluh Tujuh
0.87 Delapan Puluh Tujuh
0.87 Delapan Puluh Tujuh
0.87 Delapan Puluh Tujuh
0.87 Delapan Puluh Tujuh
0.87 Delapan Puluh Tujuh
0.87 Delapan Puluh Tujuh
0.87 Delapan Puluh Tujuh
0.88 Delapan Puluh Delapan
0.88 Delapan Puluh Delapan
0.88 Delapan Puluh Delapan
0.88 Delapan Puluh Delapan
0.88 Delapan Puluh Delapan
0.88 Delapan Puluh Delapan
0.88 Delapan Puluh Delapan
0.88 Delapan Puluh Delapan
0.88 Delapan Puluh Delapan
0.88 Delapan Puluh Delapan
0.89 Delapan Puluh Sembilan
0.89 Delapan Puluh Sembilan
0.89 Delapan Puluh Sembilan
0.89 Delapan Puluh Sembilan
0.89 Delapan Puluh Sembilan
0.89 Delapan Puluh Sembilan
0.89 Delapan Puluh Sembilan
0.89 Delapan Puluh Sembilan
0.89 Delapan Puluh Sembilan
0.89 Delapan Puluh Sembilan
0.90 Sembilan Puluh
0.90 Sembilan Puluh
0.90 Sembilan Puluh
0.90 Sembilan Puluh
0.90 Sembilan Puluh
0.90 Sembilan Puluh
0.90 Sembilan Puluh
0.90 Sembilan Puluh
0.90 Sembilan Puluh
0.90 Sembilan Puluh
0.91 Sembilan Puluh Satu
0.91 Sembilan Puluh Satu
0.91 Sembilan Puluh Satu
0.91 Sembilan Puluh Satu
0.91 Sembilan Puluh Satu
0.91 Sembilan Puluh Satu
0.91 Sembilan Puluh Satu
0.91 Sembilan Puluh Satu
0.91 Sembilan Puluh Satu
0.91 Sembilan Puluh Satu
0.92 Sembilan Puluh Dua
0.92 Sembilan Puluh Dua
0.92 Sembilan Puluh Dua
0.92 Sembilan Puluh Dua
0.92 Sembilan Puluh Dua
0.92 Sembilan Puluh Dua
0.92 Sembilan Puluh Dua
0.92 Sembilan Puluh Dua
0.92 Sembilan Puluh Dua
0.92 Sembilan Puluh Dua
0.93 Sembilan Puluh Tiga
0.93 Sembilan Puluh Tiga
0.93 Sembilan Puluh Tiga
0.93 Sembilan Puluh Tiga
0.93 Sembilan Puluh Tiga
0.93 Sembilan Puluh Tiga
0.93 Sembilan Puluh Tiga
0.93 Sembilan Puluh Tiga
0.93 Sembilan Puluh Tiga
0.93 Sembilan Puluh Tiga
0.94 Sembilan Puluh Empat
0.94 Sembilan Puluh Empat
0.94 Sembilan Puluh Empat
0.94 Sembilan Puluh Empat
0.94 Sembilan Puluh Empat
0.94 Sembilan Puluh Empat
0.94 Sembilan Puluh Empat
0.94 Sembilan Puluh Empat
0.94 Sembilan Puluh Empat
0.94 Sembilan Puluh Empat
0.95 Sembilan Puluh Lima
0.95 Sembilan Puluh Lima
0.95 Sembilan Puluh Lima
0.95 Sembilan Puluh Lima
0.95 Sembilan Puluh Lima
0.95 Sembilan Puluh Lima
0.95 Sembilan Puluh Lima
0.95 Sembilan Puluh Lima
0.95 Sembilan Puluh Lima
0.95 Sembilan Puluh Lima
0.96 Sembilan Puluh Enam
0.96 Sembilan Puluh Enam
0.96 Sembilan Puluh Enam
0.96 Sembilan Puluh Enam
0.96 Sembilan Puluh Enam
0.96 Sembilan Puluh Enam
0.96 Sembilan Puluh Enam
0.96 Sembilan Puluh Enam
0.96 Sembilan Puluh Enam
0.96 Sembilan Puluh Enam
0.97 Sembilan Puluh Tujuh
0.97 Sembilan Puluh Tujuh
0.97 Sembilan Puluh Tujuh
0.97 Sembilan Puluh Tujuh
0.97 Sembilan Puluh Tujuh
0.97 Sembilan Puluh Tujuh
0.97 Sembilan Puluh Tujuh
0.97 Sembilan Puluh Tujuh
0.97 Sembilan Puluh Tujuh
0.97 Sembilan Puluh Tujuh
0.98 Sembilan Puluh Delapan
0.98 Sembilan Puluh Delapan
0.98 Sembilan Puluh Delapan
0.98 Sembilan Puluh Delapan
0.98 Sembilan Puluh Delapan
0.98 Sembilan Puluh Delapan
0.98 Sembilan Puluh Delapan
0.98 Sembilan Puluh Delapan
0.98 Sembilan Puluh Delapan
0.98 Sembilan Puluh Delapan
0.99 Sembilan Puluh Sembilan
0.99 Sembilan Puluh Sembilan
0.99 Sembilan Puluh Sembilan
0.99 Sembilan Puluh Sembilan
0.99 Sembilan Puluh Sembilan
0.99 Sembilan Puluh Sembilan
0.99 Sembilan Puluh Sembilan
0.99 Sembilan Puluh Sembilan
0.99 Sembilan Puluh Sembilan
0.99 Sembilan Puluh Sembilan
1.00
1.00
1.00
1.00
1.00
PROGRAM TERBILANG
PT. HALIM GROUP
TERNATE - INDONESIA

Masukkan nilai angka yang


Bilangan Yang Dimaksud 20,040,930,000.00 dimaksud (akan diterjemahkan
Trilyun dalam huruf) -
Ratus Milyar -
Puluhan Milyar 20,000,000,000.00
Ratus Juta -
Puluhan Juta 40,000,000.00
Ratus Ribu 900,000.00
Puluhan Ribu 30,000.00
Ratusan -
Puluhan -
Rupiah -
Sen -
-

Cek Bilangan 20,040,930,000.00


Terbilang:
Hasil (akan keluar otomatis).
Dua Puluh Milyar Empat Puluh Juta Sembilan Ratus Tiga Puluh Ribu Rupiah

Note: Don't change any thing without confirmation. It could be dangerous !!!

How to Use 1. Hubungkan cell yang akan diterjemahkan pada worksheet rekapitulasi pada "cell G2"
2. Hubungkan hasil di "cell F14" ke tempat "terbilang" pada worksheet rekapitulasi
3. Have a nice season

Masukkan nilai angka yang


Bilangan Yang Dimaksud #REF! dimaksud (akan diterjemahkan
Trilyun dalam huruf) #REF!
Ratus Milyar #REF!
Puluhan Milyar #REF!
Ratus Juta #REF!
Puluhan Juta #REF!
Ratus Ribu #REF!
Puluhan Ribu #REF!
Ratusan #REF!
Puluhan #REF!
Rupiah -
Sen #REF!
-

Cek Bilangan #REF!


Terbilang:
Hasil (akan keluar otomatis).
#REF!
Hasil (akan keluar otomatis).

Masukkan nilai angka yang


Bilangan Yang Dimaksud #REF! dimaksud (akan diterjemahkan
Trilyun dalam huruf) #REF!
Ratus Milyar #REF!
Puluhan Milyar #REF!
Ratus Juta #REF!
Puluhan Juta #REF!
Ratus Ribu #REF!
Puluhan Ribu #REF!
Ratusan #REF!
Puluhan #REF!
Rupiah -
Sen #REF!
-

Cek Bilangan #REF!


Terbilang:
Hasil (akan keluar otomatis).
#REF!

Masukkan nilai angka yang


Bilangan Yang Dimaksud #REF! dimaksud (akan diterjemahkan
Trilyun dalam huruf) #REF!
Ratus Milyar #REF!
Puluhan Milyar #REF!
Ratus Juta #REF!
Puluhan Juta #REF!
Ratus Ribu #REF!
Puluhan Ribu #REF!
Ratusan #REF!
Puluhan #REF!
Rupiah -
Sen #REF!
-

Cek Bilangan #REF!


Terbilang:
Hasil (akan keluar otomatis).
#REF!

Masukkan nilai angka yang


Bilangan Yang Dimaksud 3,024,000,000.00 dimaksud (akan diterjemahkan
Trilyun dalam huruf) -
Ratus Milyar -
Puluhan Milyar 3,000,000,000.00
Ratus Juta -
Puluhan Juta 24,000,000.00
Ratus Ribu -
Puluhan Ribu -
Ratusan -
Puluhan -
Rupiah -
Sen -
-

Cek Bilangan 3,024,000,000.00


Terbilang:
Hasil (akan keluar otomatis).
Tiga Milyar Dua Puluh Empat Juta Rupiah

Masukkan nilai angka yang


Bilangan Yang Dimaksud - dimaksud (akan diterjemahkan
Trilyun dalam huruf) -
Ratus Milyar -
Puluhan Milyar -
Ratus Juta -
Puluhan Juta -
Ratus Ribu -
Puluhan Ribu -
Ratusan -
Puluhan -
Rupiah -
Sen -
-

Cek Bilangan -
Terbilang:
Hasil (akan keluar otomatis).
NG
P
SIA

nilai angka yang


(akan diterjemahkan
uf)

Dua Puluh Milyar

Empat Puluh Juta


Sembilan Ratus
Tiga Puluh Ribu

Rupiah
0.01
0.01
0.01
ok!

could be dangerous !!!

ada worksheet rekapitulasi pada "cell G2"


rbilang" pada worksheet rekapitulasi

nilai angka yang


(akan diterjemahkan
uf) #REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!

#REF!
nilai angka yang
(akan diterjemahkan
uf) #REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!

#REF!

nilai angka yang


(akan diterjemahkan
uf) #REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!

#REF!

nilai angka yang


(akan diterjemahkan
uf)

Tiga Milyar

Dua Puluh Empat Juta


Rupiah

ok!

nilai angka yang


(akan diterjemahkan
uf)

ok!