Professional Documents
Culture Documents
Sop For Maintaining The Cooling Tower Basin
Sop For Maintaining The Cooling Tower Basin
MDV INDUSTRIES
SOP FOR MAINTAINING THE COOLING TOWER BASIN AND STAINLESS TANK
Number of people required: Three
Duration: 240mins.
PROCEDURE:
Note: The water in the Lower Tank could have been taken by Stainless tank when refilled, so,
immediate re-filling of the tank must happen after refilling the stainless tank.