Estimate the quantities and cost of earthwork for portio

width of road is 10m. Side slope is 2:1 in filling and 1.5:


of cutting is Rs. 120 per cubic meter

Chainage 0 40 80

RL of GL 100.6 100.2 99.8

RL of FL 101.0 Raisi
hwork for portion of road from the following data. Formation
n filling and 1.5:1 in cutting. Cost of filling is Rs. 180 and Cost

120 160 200 240

100.2 100.8 101.9 102.4

Raising Gradient 1 in 400


data. Formation
Rs. 180 and Cost

280

102.5
Earthwotk Quantity Estimatio
Area
Depth (d) Bd + Sd2
Chainage RL of GL RL of FL
Filling Cutting Filling

0 100.6 101 0.4 4.32


40 100.2 101.1 0.9 10.62
80 99.8 101.2 1.4 17.92
120 100.2 101.3 1.1 13.42
160 100.8 101.4 0.6 6.72
200 101.9 101.5 0.4
240 102.4 101.6 0.8
280 102.5 101.7 0.8
TOTAL QUANTITY
Quantity Estimation for Road Work
Area
Bd + Sd2 Mean Area Length Volume

Cutting Filling Cutting Filling Cutting Filling

40
7.47 40 298.80
14.27 40 570.80
15.67 40 626.80
10.07 40 402.80
4.24 3.36 2.12 26.67 13.33 89.61
8.96 6.6 40
8.96 8.96 40
QUANTITY 1988.81
Volume

Cutting

28.26
264.00
358.40
650.66
Cost Abstract of Earthwork for Road

Sl. No. Particular Unit

1 Earth work in filling m3

2 Earth work in cutting m3

TOTAL COST

Rupees Four Lakh Thirty Six Thousand Sixty Five


bstract of Earthwork for Road

Quantity Rate Amount

1988.81 180.00 357985.80

650.66 120.00 78079.20

AL COST 436065.00

akh Thirty Six Thousand Sixty Five Only