Scope:
Scope of this document is to provide a guidance on the process of Inspectors Qualification through Computer
Based Testing (CBT).
Aramco have established a contract with Third Party Vendor “Pearson VUE” to provide service of Computer Based
Testing (CBT) for the qualification (Theory Exams) of Inspectors. These Inspectors must pass relevant Aramco
examinations before they are able to perform related inspection activities on behalf of Aramco. Pearson VUE will
facilitate in scheduling of exams for CBT in one of their authorized test centers worldwide.
Note: This Document in no mean will replace existing General inspection Service contract or Project Contract
obligations with regards to Inspectors Minimum Qualification Requirements. This document is to provide only a
guidance on the CBT process.
Quality Professionals who wish to be registered and qualified as Inspectors in Aramco system should enroll their
profile first with one of the Inspection agencies or Project Contractors.
Inspection agency or project contractor will submit a formal request for Inspector qualification exams to one of
the Aramco Regional offices (AOC, ASC, SAO, AAJ, or one of PID inspection offices). The inspection agency or
project contractor shall verify compliance of proposed inspector with minimum academic, certification, and
experience qualification criteria requirements set by Aramco. Request should include supporting documents
(such as list of QM codes to be examined, CV, certificates where applicable, correct personal details of the
candidates, Privacy notice signed by candidate, etc…).
Aramco will prescreen the received request from inspection agency or project contractor. Upon ensuring
compliance to minimum academic, certification, and experience qualification requirements, Aramco will reply
to the request with authorization confirmation and authorized examinations that can be registered by the
candidate in Pearson VUE website.
The authorization confirmation may include inspector’s unique registration number created by Aramco
(commonly called SAP number). The registration number is created to track inspector qualification process and
shall not be confused as indication of inspector approval.
The requesting inspection agency or project contractor shall ensure that information is only shared with the
candidate taking the exam.
Candidate shall ensure that all information provided to Aramco is matching with information registered in
Pearson VUE which also must match the candidate’s required photo ID(s) used to enter the exam.
Candidate will schedule appointment and make payment for the exam. Note: candidates shall ensure checking
the registration data and verify it is exactly matching the information provided in the authorization
confirmation by Aramco.
Candidate Takes Theory exam at Authorized test center.
Once exam is completed, the candidate will receive test completion receipt from Pearson VUE CBT facility.
Confirmation of exam completion and clear scan of the test completion
Receipt shall be submitted to the Aramco inspection office by e-mail as advised in the authorization
confirmation e-mail.
Aramco will review the test results and notifies of interview schedule. The inspection agency or project
contractor may request to change interview date and/or venue 2 days before the scheduled interview.
Candidate availability is important to be able to achieve the proposed target of 2 weeks between receiving of
candidate examination completion receipt and inspector final qualification results.
Final result Pass / Fail of each exam will be shared through candidates registered inspection agency or project
contractor upon completion of both theory and Interview.
Admissions, Re-Scheduling and Cancellation Policies
Admissions
We ask that Candidates arrive at the test center 30 minutes before their scheduled appointment time. This will
give candidate adequate time to complete the necessary sign-in procedures. If candidate arrive more than 15
minutes late from their appointment start time, candidates may be refused admission and will lose the exam
fees.
Candidates should be prepared to show two (2) valid forms of personal ID.
a) One form as a primary ID (with name, photo and signature)
b) One form as a secondary ID (with name and Photo)
Primary ID must:
c) Contain candidate photograph,
d) Contain candidate name in English or regional language where test center located.
e) Be valid (i.e. not expired).
The name on candidate ID must exactly match the name with which candidate registered for their exam. If
candidate are unsure whether their ID is acceptable, please contact Pearson VUE customer Service before the
day of their exam.
No personal items may be taken into the testing room. This includes all electronic devices, bags, books, notes,
phones, pagers, money, tissues, pens, watches and wallets.
Attachment – A
Candidates Tutorial
Body of Knowledge
Steel Structures Painting Council (SSPC) PA 1, Shop, Field and Maintenance Painting
Steel Structures Painting Council (SSPC) PA 4, Guide to Maintenance Repainting with Oil Base or Alkyd
Painting Systems
Steel Structures Painting Council (SSPC) Vis-1 Guide, Pictorial Surface Standard Dry Blast Cleaning
American Society of Testing and Materials (ASTM) D 1400-94,Test Method for Nondestructive
Measurement of Dry Film
American Society of Testing and Materials (ASTM) G62, Standard Test Methods for Holiday Detection in
Pipeline Coatings
American Society of Testing and Materials (ASTM) D 3359, Standard Test Methods for. Measuring Adhesion
by Tape
American Society of Testing and Materials (ASTM) E 337, Standard Test Method for Measuring Humidity
with a Psychometer (the Measurement of Wet- and Dry-Bulb Temperatures)
Sample questions for CBT:
Ans: Corrosion is the deterioration of a material, usually a metal reaction with environment
2) Surface preparation includes a) Solvent cleaning, b) flame cleaning, c) chemical cleaning, d)
brushing, e) abrasive blasting, e) water blasting, e) sanding d) ALL (CLICK whichever applicable)
Ans: Temperature have significant (Important) impact on the surface preparation and Coating Operations
5) What is the meaning of
(A) Must describe with reasonable particularity each item or category of items to be inspected;
(B) Must specify a reasonable time, place, and manner for the inspection and for performing the related
acts
23) SSPC PA – 2 : Stands for Measurement of Dry coating thickness gauge with a magnetic
Coatings with an average dry film thickness of 20 mils (500 microns) or less
Coatings with an average dry film thickness greater than 20 mils (500 microns)
26) Solvents and coating shall not be applied to surface warmer than……………80…………°C if
practical alternative exists.
27) Respirable air fed hoods shall be worn by all personal inside confined space when solvent cleaning
or brush painting is in progress in a confined space having volume of less than ……………
16…………….M3
28) Air receiver used between compressor and blasting pot shall be manufactured and stamped in
accordance with …ASME SEC VIII D1……… and/or shall have hydro-tested at … 1.73 Mpa (250 .psi)
29) Grounding wire for blasting and coating equipment shall be AWG 4g or larger
30) Coating crew shall have worn : (1-Safety shoes, 2-safety helmet, 3-goggles, 4-ear plug, 5-half sleeve
shirt, 6-half pant, 7-leather hand gloves, 8-disposable full cover cloth) - Tick whichever applicable.
31) Blasting shall be equipped with Remote control shutoff of the DEADMAN type: Yes/NO
32) Airless spray guns shall be pointed at any one or part of his body : Yes / No
34) Sigma paint’s primer - base can be mixed with Jotun paint’s primer catalyst: YES/NO
35) Maximum working pressure on paint hose, machine shall be less than……5000 psi
36) Solvents shall not be flushed out into container warmer than ……50……….. °C
37) Coating shall not be applied if the steel temperature is less than 10 °C
38) Substrate temperature shall be at least 3 °C above the dew point temperature.
39) Coating materials temporarily can be stored at site under cover/tarpaulin for not exceeding 14. days
44) How dew point temperature defects coating? Dew-point temperature. Failure to consider these
parameters can result in severe coating defects
45) Plotter test shall be carried out at 50 (psi) pressure; the distance between blotting paper and nozzle
pressure shall be 45 to 60 cm. The test should be run for 1 minute after running compressor idle for 5
minutes.
47) Blasted surface shall be painted within -----4-------- hrs after blasting.
48) Spent abrasives normally shall be re-used. Yes/NO. If YES, which APCS allows for it?
49) Blasting profile can be measured by: Dial micro meter with replica tape, Surface profile needle
gauge.
53) Sling Psychometer is used for measuring wet bulb dry bulb temperature
57) Due point (diaphragm) calculator is used for calculating dew point, relative humidity
58) Coating activities shall not be carried out if the following occurs:
1………………………………. 2…………………………………
3……………………………………
59) Coating skins shall be cut and removed from already opened paint container. Yes/no
60) If sludge formed in bottom of paint container, it shall be continuously stirred until fully homogenous
mix: Yes/No
61) Thinner can be added to paint If paint data sheet does not specify for that … Y/N
62) Paint brush size will be-------5---------inch (maximum)
63) Wet sponge holiday detector is checked with 67.5/ 90 DC volts for DFT not exceeding 500 µ
64) Some buried coatings shall not be 100% holiday checked prior to burial : YES/NO
65) Bare cast iron pipe shall be coated prior to burial in subcase area or other frequently wetted ground.
YES/NO
66) Buried Stainless Steel lines shall have external coated : YES/ NO
70) Find out DFT, if WFT – 150 micron and Volume Solid -50%
71) Find out WFT, if DFT – 75micron and Volume Solid – 50%
74) Pre-blast inspections carried out to find: a) OIL/CREASE b) Sharp edges, c) weld spatters, d)
Rust grade, e) Adhesion test f) blasting profile g) DFT ( √ as applicable)
75) Paints exceeded shelf life shall be used for painting : YES/NO
76) Paints which have gelled can be used for painting: YES/NO
77) For quantities less than 5 litres of paint, Power stirrer is required: YES/NO
78) If steel temperature is below 10 deg Celsius, paint can be applied: YES/NO
79) If steel temperature is less than 3 °C above the dew point, paint can be applied: YES/NO
80) Coating can be with dry spray, sagging, pinhole and blisters. YES/NO
81) What is the minimum requirement of airless spray machine raising ratio ……45:1/ 68:1……
82) In repair, below 0.1M2 damage of paint, spot cleaning to be by using …hand power tool and paint
application will be by ….…brush.
83) In repair above 0.1M2 damage of paint, Surface preparation to be by abrasive blasting method and
paint application will be by…………. Spray
84) The maximum length of field girth weld coating on pipeline shall be11 inch or 280.mm
85) The fully remote controlled crawling machine with 2 cameras shall be used for checking of internal
cleaning & coating of piping from …10…… inch dia to ……20…. Inch dia pipe.
86) The weld cap or internal root protrusion shall not be more than ……13 .mm
87) For cleaning of internal surface, sand can be used as abrasives. YES/NO
88) How many readings of DFT shall be taken for one field weld joints? 6 Readings
89) Curing test on FBE can also be checked by MEK…. Soaked pad in contact with coated surface for 1
minute followed by vigorous rubbing for 30 seconds.
Fusion bonded epoxy (FBE) coating is a powder coating broadly used to provide
protection to pipelines, steel pipes
4) Vendor shall maintain samples of FBE powder with relevant certificate till 1 year. YES/NO
7) What is the DC volt range for Holiday testing of FBE coating? 2400 volts
92) Coated pipes checked for cracks by using 10X magnificent glass. YES/NO
95) Damages exceeded the area of 1860 CM2 shall be totally …recoated (discarded/recoated)
96) Feathering of coating damage edge shall be ………50………… mm from bare metal.
97) Steel cables can be used for handling of coated pipes. YES/NO
98) Coated pipes can be dragged and rolled to any extent. YES/NO
99) 12 meter length coated pipe shall have 3… nos of full encirclement separation pad/rope.
100) 24 meter length coated pipe shall have 5 nos of full encirclement separation pad/rope.
101) SAES -H - 100 covers the minimum mandatory coating requirements for the internal &
external protection of industrial facilities inside plants – YES/NO
102) What ASTM Standard Test Methods for Chloride Ion in Water -…STM D 512
103) What ASTM D Standard Test Method for Sulfate Ion in Water – ASTM D 516
104) In which Aramco standards have safety requirements in Industrial coating SPES–H- 102
105) What is minimum Nozzle air pressure required for Abrasive blasting ……90 PSI
106) What is the maximum DFT can be used for Low voltage/ Sponge type holiday test; Below
500 microns
107) Inspector shall check and approve the air quality twice per shift of 8 Hours period. YES/NO
Convertible coatings cure by one of several polymerization mechanisms, even when solvent
evaporation is also involved.
111) If coating is too thick, the coating will ….… to crack as it dries,
In damp weather, a small quantity of water vapor is absorbed into the paint structure
and is then evaporated again in dry conditions (osmosis).
Over application of paint, excessive thinners, wrong (lack) of curing agent or just poor
workmanship. Could, in extreme circumstances, be a formulation problem.
114) What is pinhole?
Peel off: Loss of adhesion between paint and substrate - topcoat to primer and/or old finish,
or primer to substrate.
Lifting: Surface distortion or shriveling, while the topcoat is being applied or while drying
122) SAES-H-001 refers to Coating Selection and application requirements for Industrial Plants
and
Equipment.
123) SAES-H-002 refers to Internal and External coatings for steel pipelines and piping
124) SAES-H-002V refers to coating material & application requirement for industrial facilities
126) SAES-H-101 refers to Approval protective coating systems for industrial plants and
equipment
128) SAES-H-200 refers to Storage handling and installation of externally coated pipe
129) SAES-H-201 refers to general Specification for over the ditch external and internal FBE
coating of field weld girth.
130) What is the SATIP reference for “Paint application of liquid coating system for Industrial
facilities”?
132) For blasting nozzle size of 1/2”, what shall be the minimum CFM of compressor?
135) A mist coat application cannot be used on inorganic zinc to displace the air before over-
coating – TRUE/FALSE :
136) For Girth Weld Applications, Visco-Elastic Coatings Shall Cover 1.5 times the width of the
girth weld bare area for pipe diameter up to 12" and 2 times the width of the girth weld bare area for pipe
diameter greater than 12" – TRUE/FALSE :
Sa 2 Thorough blast cleaning. Almost all mill scale, rust and foreign matter shall be removed.
Finally, the surface is cleaned with a vacuum cleaner, clean dry Compressed air or a clean
brush. It shall be greyish in color and correspond in Appearance to the prints designated Sa 2.
Sa 2½ Very thorough blast cleaning. Mill scale, rust and foreign matter shall be removed to
the extent that the only traces remaining are slight stains in the forms of spots or stripes.
Finally, the surface is cleaned with a vacuum cleaner, clean dry compressed air or a clean
brush. It shall the correspond in appearance to the prints designated Sa 2½.
138) What SAES to be referred for “Safety Requirements for Coating Applications”
SAES – H- 102
139) What is minimum Nozzle air pressure required for Abrasive blasting as per SAES-H-100,
90 psi
141) Polyamide Epoxy based paint can be over coated on enamel based paints: YES/NO
142) What SAES to be referred for Blotter test, briefly explain the test method?
144) Inspector shall check and approve the air quality at start and Mid-Point of each _8__ Hours
Period as per Saudi Aramco Engineering Standards.
147) What is the Voltage requirement for Holiday Detection Test for field applied Girth Weld
Coating on H.V.S liquid epoxy (APCS 113A), _________
148) What is the Min-Max .Voltage requirement for Holiday Detection Test on Hand Applied
Tape Wrap of (APCS 113 C), Min…………………. Volts, Max. ………………………….. Volts
149) What is the surface preparation requirement for stopaq (wrapping) application?
150) How many type of cutting angle of TOOK GAUGE blades are used : Define the type , angle
and applicable dry film thickness –
The breakup of a liquid into small particles to produce a fine mist. Paint guns use
compressed air to atomize paint for spraying.
a. Linear polymers,
b. Branched polymers
c. Cross linked polymers
158) Define the Visco-Elastic & adhesive Tape wrap overlapping system for APCS 113C.
160) While repair on touch up of Galvanized steel surface, what generic paint used as primer
Normally
161) What shall be the sizes of hose for compressor to pot, pot to nozzle, and breathing air filter to
blaster’s hood?
163) Can Zinc Rich Epoxy can be applied to Austenitic Stainless Steel surface? Why?
164) While surface preparation inspection, what are the test can be carried out?
165) On FBE shop application, what are the coating tests to be carried out?
167) Calculate the size of compressor for following a) 1 Blast nozzle, b) 1 Blast nozzle + 1 Blast
Hood, c) 1 Blast nozzle + 1 Blast hood + 1 Exhaust fan.
169) Can we measure 155 microns profile with Replica Tape Method?
170) What is the min & max distance of airless spray gun from the surface?
171) Air Temperature is 32 degree and Relative humidity is 70%. What is Dew point?
a) 26 b) 20 c) 31