Professional Documents
Culture Documents
Ruby Hall BAS Point Schedule v1
Ruby Hall BAS Point Schedule v1
Electrical Frequency
Off coil temperature
Pressure sensors
Damper actuator
Graphic display
Trench logging
Load shedding
Time schedule
Air flow switch
Current (Amp)
Running hour
On/Off status
CO2 sensor
VSD control
Sequencing
Filter alarm
Trip status
Remarks
Network
Voltage
Utility Outhouse:
360 RT Air-cooled chillers 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 BACnet high level interface
180 RT Air-cooled chillers 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 BACnet high level interface
Chilled water pumps 8 8 8 8 8 8 8 8 8 8
Chilled water return header 1 1 1 1 1
MCC 1 3 3
FANS:
EAF UB1-1 Fire pump room 1 1 1 1
EAF U1-1 Chilled water pump room 1 1 1 1
EAF U1-2 LT switch room 1 1 1
EAF U1-3 LT switch room 1 1 1
ELECTRICAL SYSTEM:
ATS # 1 1 7 7
ATS # 2 1 6 6
ATS # 3 1 11 11
EMSB 1 5 5
Generator #1 1 1 1
Generator #2 1 1 1
Generator #3 1 1 1
Generator #4 1 1 1
30m3 diesel oil tank 1 1 1
2.7 m3 daily oil tank 1 1 1
Oil transfer pumps 2 2 2
DB-UOH/PH 1 1 5
DB-UOH/SS 1 1 3
FANS:
FAF 1-1 AV Room 1 1 1
FAF 1-2 Fire Command Center FCC 1 1 1
FAF 1-3 AHU 1-7 to 1-10, IT Room 1 1 1 1
EAF 1-1 LT & UPS Batteries Room 1 1 1
EAF 1-2 Bin Center 1 1 1 1
ELECTRICAL SYSTEM:
LT Board LT #1 1 2 20
LT Board LT #2 1 2 20
DBs 8 48 8 8 48
OG box 4 8 4 4 8
FANS:
SEF R2-1/2/3 Atrium 4/ Back Entrance 3 3 3 3
SEF R2-4/5/6 Atrium 3 3 3 3 3
SEF R2-7/8/9 1st FL Lunch Dinner/ Tea Break, Media Center 3 3 3 3
SEF R2-10/11/12 2nd FL Lunch Dinner/ Tea Break & Atrium 2 3 3 3 3
SEF R2-13/14/15 Banquet 3 3 3 3
SEF R2-16/17/18 1st & 2nd FL North Corridor 3 3 3 3
SEF R2-19/20/21 1st & 2nd FL North Corridor 3 3 3 3
ELECTRICAL SYSTEM:
DBs 10 60 10 10 60
FANS:
FAF R3-1 Central Dishwashing at 2nd floor Kitchen 1 1 1
FAF R3-2 Staircase S02 1 1 1 1
FAF R3-3 AHU 1-12/14/16/17/18, FCU 1-1 1 1 1 1
FAF R3-4 AHU 1-13/15/27/28/29, FCU 1-1 1 1 1 1
FAF R3-5/6/7/8/9/10/11 Kitchen ceiling fresh air plenum 7 7 3
EAF R3-1 Toilets at 1st FL Grid E/23; 2nd FL Grid J/23; Stores
at 2nd FL Grid G/23 & K/23 1 1 1 1
EAF R3-2 Stores at 2nd FL Grid D/23 1 1 1 1
EAF R3-3 Atrium 4 1 1 1 1
EAF R3-4 Atrium 3 1 1 1 1
EAF R3-5 Toilets at 1st FL Staff Fac's; 1st FL Grid H/14; 2nd
FL Grid I/13 1 1 1 1
EAF R3-6 Banquet Stores at 2nd FL Grid M/12 1 1 1 1
EAF R3-7 Toilets at 3rd FL Staff Fac's Grid M/9 1 1 1 1
EAF R3-8 Water tank room 1 1 1 1
EAF R3-9/10/11 Banquet Stores at 3rd FL Grid T/5 3 3
EAF R3-12 Central Dishwashing at 2nd floor Kitchen 1 1 1 1
EAF R3-13 Pastry / Bakery hoods at 1st FL floor Commissary
1 1 1
EAF R3-14 Central Dish washing at 2nd floor Kitchen 1 1 1
EAF R3-15 Soiled dish collection at 1st FL Commissary 1 1 1
EAF R3-16 Atrium 2 1 1 1 1
EAF R3-17 Toilets at 1st FL Grid G'/4; 1st FL Grid G'/8; 2nd FL
Grid G'/4; 2nd FL Grid J'/7; 2nd FL J'/9; 3rd FL Grid
G'/4
1 1 1 1
EAF R3-18 Toilets at 1st FL Grid G'/24; 1st FL Grid G'/20; 2nd
FL Grid G'/24; 2nd FL Grid J'/21; 2nd FL J'/19; 3rd
FL Grid G'/24
1 1 1 1
KEF R3-1/2 Main Kitchen Hoods 2 2 2
KEF R3-3/4 Main Kitchen Hoods 2 2 2
KEF R3-5/6 Bulk cooking Hoods 2 2 2
KEF R3-7/8 Halal Kitchen Hoods 2 2 2
ELECTRICAL SYSTEM:
DBs 6 32 6 6 6 32