1.

5m Split set Wire mesh

Wire mesh

1.5m rebar bolt

GROUND_SUPPORT_VENT RAISE
1. Complete all the raise with wire mesh rebars and
split set bolts of 1.5m (as per standar)
2. Prior to connect, last round need release drilled, this
in order to reduce overbreack
3. Wire mesh need to be extend to cable bolts installed.
4. Split set need to pin wire on the collar, as dice
pattern.
5. 4" shotcrete needed to reinforce the collar
6. 3" Shotcrete support all the way of the raise.

APROBACION: FIRMA: FECHA:


Jefe Planeamiento: MINA CERRO DE MAIMON
Carretera El Copey-Los Martínez Km 3, Municipio Maimón, Provincia Monseñor Nouel,
República Dominicana
Superintendente UG:
NAME:
Superintendente GEOT: 01 10/06/2021 GROUND SUPPORT
GROUND_SUPPORT_VENT RAISE
CORMIDOM Chief Plannner: REV FECHA DESCRIPTION
COD: REV:
Corporación Minera Dominicana, S.A. Gerente Mina: Dibujante: LEONARDO MATOS UG-SS-D-001 01
SIST. ESC:
Ruta Servidor: V:\DEPARTAMENTO MINA\09 MINA
SUBTERRANEA\06-PLANNING\2018\08-2018\Shaft 20180802 COORDENADAS: UTM/NAD27 ZONE 19/ NORTE 1:25.000 A3