EDGE Assessment: v2.1.

5
Project Name: hotel panama Downloaded date & time: 2022-03-11 02:25
Subproject Name: hotel panama 37.07% | 33.19% | 56.95%

Project Details

Project Name Address Line1


hotel panama
Number of Distinct Buildings Address Line2
1
City
Number of EDGE Subproject(s) associated
1 panama city
State/ Province
Total Project Floor Area (m²)
7,845.7
Postal Code
Project Owner Name
Alejandro Ramirez
Country
Project Owner Email Panama
Project Number
Project Owner Phone
1000972604
Mobile -
Share with Investor(s) or Bank(s)?
No
Associated Subproject(s)
Total associated subprojects: 1
The complete list of Associated Subprojects is available in the last section of this document.

Subproject Details

Subproject Name Address Line1


hotel panama hotel panama, garden town, panama city, panama
Property Name Address Line2
garden town
Subproject Multiplier for the Project City
1 panama city
Certification Stage State/ Province
Preliminary
Status Postal Code
Self-Review
Auditor Country
Panama
Certifier Subproject Type
New Building

Created By: shaorya sood File Number: 22031110132157


01
Downloaded By: shaorya sood Project Number: 1000972604
EDGE Assessment: v2.1.5
Project Name: hotel panama Downloaded date & time: 2022-03-11 02:25
Subproject Name: hotel panama 37.07% | 33.19% | 56.95%

Location

Country City
Panama Panama City

Basic Parameters
Property Type* Irrigated Area (m²)
Hotel 900
Star Rating In-house Laundry
5-Star
Banquet/Conference Facility
Average Occupancy Rate* (%)
85 Breakfast Area Only (No Restaurant)

Health Spa

Swimming Pool

Created By: shaorya sood File Number: 22031110132157


02
Downloaded By: shaorya sood Project Number: 1000972604
EDGE Assessment: v2.1.5
Project Name: hotel panama Downloaded date & time: 2022-03-11 02:25
Subproject Name: hotel panama 37.07% | 33.19% | 56.95%

Building Data
Floors Above Ground (no.)
4
Floors Below Ground (no.)
1
Total Guest/Bed Rooms (no.)
135
Default User Entry

Guest Rooms/Apartment Area (m²)


5,670
Front of House (m²)
547
Corridors (m²)
783
Conference/Banquet (m²)
318
Back of House (m²)
527
Gross Internal Area (m²)
7,846

Building Systems
Does the building design include an AC system?
Yes
Does the building design include a space heating system?
No

Created By: shaorya sood File Number: 22031110132157


03
Downloaded By: shaorya sood Project Number: 1000972604
EDGE Assessment: v2.1.5
Project Name: hotel panama Downloaded date & time: 2022-03-11 02:25
Subproject Name: hotel panama 37.07% | 33.19% | 56.95%

Key Assumptions for the Base Case


Default User Entry
Fuel Used for Electric Generator
Diesel Diesel Default User Entry
Fuel Used for Hot Water Generation
Jan
Electricity Natural Gas
27.3
Fuel Used for Cooking
Electricity Natural Gas Feb
Fuel Used for Space Heating 27.8
Electricity Electricity Mar
% of Electricity Generation Using Diesel (% Ave. 28.1
Yrly)
5% 20 Apr
27.9
Cost of Electricity (PAB/kWh)
0.26 May
Cost of Diesel Fuel (PAB/L ) 27.5
0.99 Jun
Cost of Natural Gas (PAB/L ) 26.7
0.66
Jul
Cost of Water (PAB/kL) 27.2
1.6
Aug
CO₂ Emissions from Electricity Generation (g/kWh)
27.1
360.6
Window to Wall Ratio (%) Sep
50% 26.5
Roof U-value (W/m².K) Oct
0.59 26.8
Wall U-value (W/m².K)
Nov
2.00
26.2
Glass U-value (W/m².K)
4.30 Dec
Glass SHGC (Factor) 27.1
0.50 Latitude (Deg)
Cooling System 8.6
ASHRAE 90.1.2007 ASHRAE 90.1.2007
Average Annual Rainfall (Deg)
AC System Efficiency (COP) 1863.00
2.66
Heating System
ASHRAE 90.1.2007 ASHRAE 90.1.2007
Heating System Efficiency (COP)
2.66

Created By: shaorya sood File Number: 22031110132157


04
Downloaded By: shaorya sood Project Number: 1000972604
EDGE Assessment: v2.1.5
Project Name: hotel panama Downloaded date & time: 2022-03-11 02:25
Subproject Name: hotel panama 37.07% | 33.19% | 56.95%

Results

Final Energy Use (kWh/Month) Operational CO₂ Savings (tCO₂/Year)


70,157 152.45
Final Water Use (m³/Month) Embodied Energy Savings (MJ/m²)
1,361 1,193.12
Base Case Utility Cost (PAB/Month) Incremental Cost (PAB)
26,583.66 53,502.67
Utility Cost Reduction (PAB/Month) Payback in Years (Yrs.)
9,598.03 0.46
Energy Savings (MWh/Year) Water Savings (m³/Year)
495.95 4,835.21
Embodied Energy in Materials Savings (GJ) Total Subproject Floor Area (m²)
9,360.88 7,845.7
Carbon Emissions (tCO₂/Year) Number of People Impacted (No./Year)
251.42 73567

ENERGY SAVINGS

Energy Efficiency Measures 37.07% Meets EDGE Energy Standard

*Virtual energy is the amount of energy that will be required based on the assumption that the hotel will eventually install air conditioning or heating

Created By: shaorya sood File Number: 22031110132157


05
Downloaded By: shaorya sood Project Number: 1000972604
EDGE Assessment: v2.1.5
Project Name: hotel panama Downloaded date & time: 2022-03-11 02:25
Subproject Name: hotel panama 37.07% | 33.19% | 56.95%

Carbon Emissions: 251.42 tCO₂/Year

Created By: shaorya sood File Number: 22031110132157


06
Downloaded By: shaorya sood Project Number: 1000972604
EDGE Assessment: v2.1.5
Project Name: hotel panama Downloaded date & time: 2022-03-11 02:25
Subproject Name: hotel panama 37.07% | 33.19% | 56.95%

Energy Efficiency Measures 37.07%


HTE01 Reduced Window to Wall Ratio - WWR of 25%
WWR % 25
HTE19 High-Efficiency Boiler for Water Heating - Efficiency of 90%
HTE02 External Shading Devices - Annual Average Shading Factor
(AASF) of 0.3
HTE20 Variable Speed Hoods with Automated Fan Controls
AASF 0.3
HTE03 Insulation of Roof : U-value of 0.44
HTE21 Preheat Water Using Waste Heat from the Generator

HTE04 Insulation of External Walls : U-value of 0.45


HTE22 Heat Recovery from Grey Water - Efficiency of 30%
HTE05 Low-E Coated Glass : U-value of 3 W/m².K and SHGC of 0.45
HTE23 Heat Recovery from Laundry Waste Water - Efficiency of 30%
HTE06 Higher Thermal Performance Glass : U-value of 1.98 W/m².K and
HTE24 Heat Pump for Hot Water - COP of 3
SHGC of 0.28

HTE07 Natural Ventilation - Corridors HTE25 Energy-Saving Light Bulbs - Internal Spaces

HTE26 Energy-Saving Light Bulbs - External Spaces


HTE08 Natural Ventilation - Guest Rooms/Apartment Area with Auto
Controls
HTE27 Energy-Saving Light Bulbs - Back-of-House

HTE09 Variable Refrigerant Volume (VRV) Cooling System - COP of 3.5 HTE28 Lighting Controls for Corridors

HTE10 Air Conditioning with Air Cooled Screw Chiller - COP of 3.2 HTE29 Occupancy Sensors in Bathrooms

HTE11 Air Conditioning with Water Cooled Chiller - COP of 6.1 HTE30 Solar Hot Water Collectors - 50% of Hot Water Demand

COP 6.1
HTE12 Ground Source Heat Pump - COP of 4.1 HTE31 Solar Photovoltaics - 25% of Total Energy Use

HTE13 Absorption Chiller Powered by Waste Heat - COP of 0.7 HTE32 Other Renewable Energy for Electricity Generation

HTE33 Offsite Renewable Energy Procurement - Equal to 100% of total


HTE14 Recovery of Waste Heat from the Generator for Space Heating Operational CO2

HTE15 Variable Speed Drives on the Fans of Cooling Towers


HTE34 Carbon Offset - 100% of Total CO₂

HTE16 Variable Speed Drives Pumps


HTET3 Consumption Based Energy Meters For
HTE17 Sensible Heat Recovery from Exhaust Air - Efficiency of 60% Both Cooling and Heating Energy
HTET4 Smart Energy Meters for Electrical Energy
HTE18 High-Efficiency Condensing Boiler for Space Heating -
Efficiency of 90%

Created By: shaorya sood File Number: 22031110132157


07
Downloaded By: shaorya sood Project Number: 1000972604
EDGE Assessment: v2.1.5
Project Name: hotel panama Downloaded date & time: 2022-03-11 02:25
Subproject Name: hotel panama 37.07% | 33.19% | 56.95%

WATER SAVINGS

Water Efficiency Measures 33.19% Meets EDGE Water Standard

HTW01 Low-Flow Showerheads - 7 L/min HTW09 Pre-rinse Valve for Rinsing Operation - 2.1 L/min
L/min 7
HTW02 Low-Flow Faucets in Guest Rooms/Apartment Area - 2 L/min HTW10 Water-Efficient Kitchen Faucets - 2.5 L/min
L/min 2 L/min 2.5
HTW03 Dual Flush for Water Closets in Guest Rooms/Apartment Area - HTW11 Water-Efficient Landscaping - 4 L/m²/day
6 L/first flush and 3 L/second flush
High Volume Flush 6 Low Volume Flush 3
HTW12 Swimming Pool Cover
HTW04 Water-Efficient Front Loading Washing Machine - 6 L/kg. of
clothes HTW13 Condensate Water Recovery

HTW05 Water-Efficient Urinals in All Bathrooms - 0 L/flush HTW14 Rainwater Harvesting System - 50% of Roof Area Used for
L/flush 0 Rainwater Collection
HTW06 Dual Flush for Water Closets in All Other Bathrooms - 6 L/first
flush and 3 L/second flush HTW15 Grey Water Treatment and Recycling System
High Volume Flush 6 Low Volume Flush 3

HTW07 Aerators & Auto Shut-off Faucets in All Other Bathrooms -2 HTW16 Black Water Treatment and Recycling System
L/min
L/min 2
HTW08 Water-Efficient Dishwashers - 5.3 L/Rack

Created By: shaorya sood File Number: 22031110132157


08
Downloaded By: shaorya sood Project Number: 1000972604
EDGE Assessment: v2.1.5
Project Name: hotel panama Downloaded date & time: 2022-03-11 02:25
Subproject Name: hotel panama 37.07% | 33.19% | 56.95%

EMBODIED ENERGY SAVINGS

Materials Efficiency Measures 56.95% Meets EDGE Materials Standard

Proportion % Thickness (mm) Steel Rebar (kg/m²)

HTM01 Floor Slabs Concrete Filler Slab


In-Situ Reinforced Concrete
Slab
350 mm
Steel : 35 kg/m²
HTM02 Roof Construction Type 1 Concrete Filler Slab 100 %
In-Situ Reinforced Concrete
Slab
350 mm
Steel : 35 kg/m²
HTM03 External Walls Type 1 Solid Dense Concrete Blocks 100 %
Common Brick Wall with
Internal & External Plaster
200 mm
HTM04 Internal Walls Type 1 Solid Dense Concrete Blocks 100 %
Common Brick Wall with
Plaster on Both Sides
100 mm
HTM05 Flooring Type 1 Ceramic Tile 100 %
Ceramic Tile
HTM06 Window Frames Type 1 Timber 100 % Single Glazing
Aluminium
Single Glazing

Created By: shaorya sood File Number: 22031110132157


09
Downloaded By: shaorya sood Project Number: 1000972604
EDGE Assessment: v2.1.5
Project Name: hotel panama Downloaded date & time: 2022-03-11 02:25
Subproject Name: hotel panama 37.07% | 33.19% | 56.95%

EDGE Certification Checklist

Building Type Certification Stage Subproject Name

Hospitality Preliminary hotel panama

Energy Measures Preliminary Audit Requirements

HTE01 Reduced Window to Wall Ratio Calculation of “Glazing Area” and “Gross Exterior Wall Area” for each façade of the
building and the average building area weighted WWR using the WWR calculator

All façade eleva on drawin s showin lazin dimensions and eneral ildin
dimensions.

HTE02 External Shading Devices All façade eleva on drawin s hi hli h n the provision of horizontal and ver cal
shading devices.

Window details clearly showing the depth of the shading device and the calculation of
the proportion.

If vertical and horizontal shading are not provided on all windows, the design team will
need to provide the output from the solar shading design software.

HTE11 Air Conditioning with Water Cooled Mechanical drawings with air conditioning schematics for all floors.
Chiller

Manufacturer’s data sheets for the Water cooled chiller system specifying COP
information.

For systems including more than one chiller unit, the design team must provide the ton-
weighted average COP calculation.

Mechanical layout drawings/schematic showing the location of the external and internal
units.

HTE25 Energy-Saving Light Bulbs - Internal Lighting schedule listing type and number of bulbs specified.
Spaces

Electrical layout drawings showing the location and type of all installed bulbs.

HTE26 Energy-Saving Light Bulbs - External Lighting schedule listing type and number of bulbs specified.
Spaces

Electrical layout drawings showing the location and type of all installed bulbs.

HTE27 Energy-Saving Light Bulbs- Back-of- Lighting schedule listing type and number of bulbs specified.
House

Electrical layout drawings showing the location and type of all installed bulbs.

Water Measures Preliminary Audit Requirements

HTW01 Low-Flow Showerheads Plumbing drawings/specifications including make, model, and flow rate of the
showerhead(s).

Manufacturer’s data sheet for the showerhead(s) confirming the flow rate at 3 bar.

HTW02 Low-Flow Faucets in Guest Plumbing drawings/specifications including make, model, and flow rate of the washbasin
Rooms/Apartment Area faucet(s) or flow restrictor(s).

Created By: shaorya sood File Number: 22031110132157


10
Downloaded By: shaorya sood Project Number: 1000972604
EDGE Assessment: v2.1.5
Project Name: hotel panama Downloaded date & time: 2022-03-11 02:25
Subproject Name: hotel panama 37.07% | 33.19% | 56.95%
HTW02 Low-Flow Faucets in Guest Manufacturer’s data sheet for faucet(s)/flow restrictor(s) confirming the flow rate at 3
Rooms/Apartment Area bar.

HTW03 Efficient Flush for Water Closets in Plumbing drawings/specifications including make, model, and flush volumes of water
Guest Rooms/Apartment Area closet(s).

Manufacturer’s data sheet for water closet(s) with information on the flush volume of
the main and reduced flushes.

HTW05 Water-Efficient Urinals in all other Plumbing drawings/specifications including make, model, and flush volume of the urinal
Bathrooms (s).

Manufacturer’s data sheet for urinal(s) with information on the flush volume.

HTW06 Efficient Flush for Water Closets in all Plumbing drawings/specifications including make, model, and flush volumes of water
other Bathrooms closet(s).

Manufacturer’s data sheet for water closet(s) with information on the flush volume of
the main and reduced flushes.

HTW07 Aerators for Faucets & Auto Shut-Off Plumbing drawings/specifications including make, model, auto shut-off mechanism and
Faucets in all other Bathrooms flow rate of the washbasin faucet(s)

Manufacturer’s data sheet for faucet(s)/flow aerator(s) confirming the flow rate at 3 bar.

HTW10 Water Efficient Kitchen Faucets Plumbing drawings/specifications including make, model, and flow rate of kitchen(s)
faucet(s) or flow restrictor(s).

Manufacturer’s data sheet for faucet(s)/flow restrictor(s) confirming the flow rate at 3
bar.

Material Measures Preliminary Audit Requirements

HTM01 Floor Slabs Floor sections showing build-up of the floor; or

Manufacturer’s data sheet for specified building material if applicable; or

Bill of quantities with the floor slab specification clearly highlighted.

HTM02 Roof Construction A section drawing of roof showing the materials and thicknesses; or

Manufacturer’s data sheet for specified building material; or

Bill of quantities with the materials used for roof construction clearly highlighted.

HTM03 External Walls Façade drawin s clearly markin the external wall speci ca on selected and

Drawings of the external wall sections; or

Manufacturer’s data sheet for specified building material; or

Bill of quantities with the materials used for the external wall clearly highlighted.

HTM04 Internal Walls Drawings of the internal wall sections; or

Manufacturer’s data sheet for building materials used for internal wall specifications if
available; or

Bill of quantities with the materials used for the internal wall clearly highlighted.

Created By: shaorya sood File Number: 22031110132157


11
Downloaded By: shaorya sood Project Number: 1000972604
EDGE Assessment: v2.1.5
Project Name: hotel panama Downloaded date & time: 2022-03-11 02:25
Subproject Name: hotel panama 37.07% | 33.19% | 56.95%
HTM05 Flooring Drawings clearly marking the flooring specification selected; or

Manufacturer’s data sheet for building materials used for floor specifications; or

Bill of quantities with the materials used for the flooring clearly highlighted.

HTM06 Window Frames Façade drawin s clearly markin the window frame(s) speci ca on or

Manufacturer’s data sheet for glazing specified; or

Bill of quantities with the windows/window frames clearly highlighted.

Associated Subproject(s)

Sr No. Associated Subproject Name Country City

1 hotel panama Panama Panama City

Created By: shaorya sood File Number: 22031110132157


12
Downloaded By: shaorya sood Project Number: 1000972604