MODUL PRAKTIKUM MEKANIKA TANAH

JAKARTA GLOBAL UNIVERSITY No.FP/Mektan/02

LABORATORIUM MEKANIKA TANAH

BEARING RATIO TEST

Project :____________________________ Job No. :_________________________________


Location of Project :__________________ Boring No. :__________ Sample No. :_________
Description of Soil :______________________________________________________________
Tested by :_____________________________________ Date of Testing :_______________
CBR Test Load Data (soaked,unsoaked) (stike out as applicable)
Mold no :___________ Mold no :___________ Mold no :___________
Penetration, Surcharge :___________ Surcharge :__________ Surcharge :___________
mm Piston load dial Piston load dial Piston load dial
reading Load kPa reading Load kPa reading Load kPa
(__________) (__________) (__________)
0.000
0.5
1.0
1.5
2.0
2.5
3.0
4.0
5.0

Final water Top


content,10% Middle
(soaked,
unsoaked) Bottom
sample Averege
Wet Unit wt =___________ Dry Unit wt =_________
__________ _________
Note : Insert units in coloumn headings as necessary

Disetujui Oleh, Diperiksa Oleh,


Ketua Jurusan Teknik Sipil Dosen Koordinator Lab/Ass Lab

(…………………………) (……..………..………)
MODUL PRAKTIKUM MEKANIKA TANAH

JAKARTA GLOBAL UNIVERSITY No.FP/Mektan/03


LABORATORIUM MEKANIKA TANAH

BEARING RATIO TEST

Project :_____________________ Job No. :_______________________________________


Location of Project :____________ Boring No. :________ Sample No. :_______________
Description of Soil :_____________________________________________________________
Tested by :______________________________ Date of Testing :______________________
Compaction Energy: Hammer_____________N No.of Layers:_____ Blow/Layer:_______
w at compaction:___________% Mold diam:_________ Ht,of soil:________ Vol:____
Wt,wet soil:_______ Wt,dry soil, :______ :____________ :______________
Swell Data
Mold no :________ Mold no :________ Mold no :________
Starting
Elapsed Surcharge :________N Surcharge :______N Surcharge :______N
time and
time Dial reading % = S/H Dial reading % = S/H Dial reading % = S/H
date (x______) (100) (x______) (100) (x______) (100)
0h
1h
2h
4h

After soaking

Mold No
Surcharge,N
Initial wt, wet soil+mold+base plate
Final wt, wet soil+mold+base plate
Wt,of mold+base plate
Initial wt, of wet soil,
wt.of water absorbed,
% water absorbed=
Note :Insert units in column headings as necessary

Disetujui Oleh, Diperiksa Oleh,


Ketua Jurusan Teknik Sipil Dosen Koordinator Lab/Ass Lab

(…………………………) (…………………………)
MODUL PRAKTIKUM MEKANIKA TANAH

No.FP/Mektan/04
JAKARTA GLOBAL UNIVERSITY
LABORATORIUM MEKANIKA TANAH

CBR TEST
Proyek :__________________ Contoh No :___________________
Deskripsi
tanah :__________________
Lokasi :__________________
Test By :__________________ Metode Test :___________________

Pembacaan Beban )
Penurunan Pembacaan Arloji Beban )
(mm) Atas Bawah Atas Bawah
0.00
0.50
1.00
1.50
2.00
2.50
3.00
4.00
5.00

Kadar Air
Sebelum Direndam
Can No
Tnh Basah+Can
Tnh Kering+Can
Berat Can
Kadar Air,w %
Kadar Air
Sesudah Direndam
Can No
Tnh Basah+Can
Tnh Kering+Can
Berat Can
Kadar Air,w %
Harga CBR
Penurunan 0,1" 0,2"
Sebelum direndam
Sesudah direndam

Disetujui Oleh, Diperiksa Oleh,


Ketua Jurusan Teknik Sipil Dosen Koordinator Lab/Ass Lab

(…………………………) (…………………………)