Professional Documents
Culture Documents
7.5m Air Rider Material Paint
7.5m Air Rider Material Paint
Surface Preparations
Where necessary remove all weld splatter, smooth weld seams and sharp edges. Fresh water wash to remove all dirt and contamination, as necessary. Degrease according to SSPC-SP1 solvent cleaning.
Ensure area is clean and dry prior to application.Full Blast damaged/corroded areas to Sa2 ISO 8501-1 or SSPC SP6. Apply the material before visible oxidation occurs. If oxidation does occur, the entire
oxidised surface should be re-blasted to the standard specified above.Feather or chip back surrounding area to a sound edge. Overlap onto existing sound coatings by 2-3 cms.
Total
Dry Film Theoretical Practical
International Volume Loss Factor Consumpti Unit Price
COATS Colour Thickness Coverage Coverage AREA (M2) Price/m2 (SGD) Total Price (SGD)
Paint Solids % (%) on Round (SGD/Lt)
microns (m2/lt) (m2/lt)
Up (Lt)
128.68
1st Intergard 5600 Red 68 175 3.89 30 2.72 35.00 12.87 10.00 3.68
GTA 220 1.93 4.00 0.15 7.72
65.79
2nd Intergard 263 Light Grey 57 75 7.60 30 5.32 35.00 6.58 10.00 1.88
GTA 220 0.66 4.00 0.08 2.63
633.33
3rd Interpseed 376 Black 45 150 3.00 30 2.10 35.00 16.67 38.00 18.10
GTA 007 1.67 4.00 0.19 6.67
TOTAL 400 40.37 24.08 844.82
INTEGRATED PAINT SOLUTIONS PTE LTD
140 Paya Lebar Road #10-09 AZ@Paya
Lebar Singapoe 409015
Tel: [+65 ]6702 3226 Fax: [+65] 67023038
Email : integratedpspl@gmail.com
Surface Preparations
Where necessary remove all weld splatter, smooth weld seams and sharp edges. Fresh water wash to remove all dirt and contamination, as necessary. Degrease according to SSPC-SP1 solvent cleaning.
Ensure area is clean and dry prior to application.Full Blast damaged/corroded areas to Sa2 ISO 8501-1 or SSPC SP6. Apply the material before visible oxidation occurs. If oxidation does occur, the entire
oxidised surface should be re-blasted to the standard specified above.Feather or chip back surrounding area to a sound edge. Overlap onto existing sound coatings by 2-3 cms.
Total
Dry Film Theoretical Practical
International Volume Loss Factor Consumpti Unit Price
COATS Colour Thickness Coverage Coverage AREA (M2) Price/m2 (SGD) Total Price (SGD)
Paint Solids % (%) on Round (SGD/Lt)
microns (m2/lt) (m2/lt)
Up (Lt)
128.68
1st Intergard 5600 Red 68 175 3.89 30 2.72 35.00 12.87 10.00 3.68
GTA 220 1.93 4.00 0.15 7.72
110.53
2nd Interthane 990 Grey 57 60 9.50 40 5.70 35.00 6.14 18.00 3.16
GTA733 0.61 5.00 0.09 3.07
TOTAL 235 21.55 7.08 250.00
INTEGRATED PAINT SOLUTIONS PTE LTD
140 Paya Lebar Road #10-09 AZ@Paya
Lebar Singapoe 409015
Tel: [+65 ]6702 3226 Fax: [+65] 67023038
Email : integratedpspl@gmail.com
Surface Preparations
Where necessary remove all weld splatter, smooth weld seams and sharp edges. Fresh water wash to remove all dirt and contamination, as necessary. Degrease according to SSPC-SP1 solvent cleaning.
Ensure area is clean and dry prior to application.Full Blast damaged/corroded areas to Sa2 ISO 8501-1 or SSPC SP6. Apply the material before visible oxidation occurs. If oxidation does occur, the entire
oxidised surface should be re-blasted to the standard specified above.Feather or chip back surrounding area to a sound edge. Overlap onto existing sound coatings by 2-3 cms.
Total
Dry Film Theoretical Practical
International Volume Loss Factor Consumpti Unit Price
COATS Colour Thickness Coverage Coverage AREA (M2) Price/m2 (SGD) Total Price (SGD)
Paint Solids % (%) on Round (SGD/Lt)
microns (m2/lt) (m2/lt)
Up (Lt)
73.53
1st Intergard 5600 Red 68 175 3.89 30 2.72 20.00 7.35 10.00 3.68
GTA 220 1.10 4.00 0.15 4.41
35.09
2nd Interthane 990 Grey 57 60 9.50 40 5.70 20.00 3.51 10.00 1.75
GTA733 0.53 4.00 0.07 2.11
TOTAL 235 12.49 5.65 115.14
INTEGRATED PAINT SOLUTIONS PTE LTD
140 Paya Lebar Road #10-09 AZ@Paya
Lebar Singapoe 409015
Tel: [+65 ]6702 3226 Fax: [+65] 67023038
Email : integratedpspl@gmail.com
Surface Preparations
Where necessary remove all weld splatter, smooth weld seams and sharp edges. Fresh water wash to remove all dirt and contamination, as necessary. Degrease according to SSPC-SP1 solvent cleaning.
Ensure area is clean and dry prior to application.Full Blast damaged/corroded areas to Sa2 ISO 8501-1 or SSPC SP6. Apply the material before visible oxidation occurs. If oxidation does occur, the entire
oxidised surface should be re-blasted to the standard specified above.Feather or chip back surrounding area to a sound edge. Overlap onto existing sound coatings by 2-3 cms.
Total
Dry Film Theoretical Practical
International Volume Loss Factor Consumpti Unit Price
COATS Colour Thickness Coverage Coverage AREA (M2) Price/m2 (SGD) Total Price (SGD)
Paint Solids % (%) on Round (SGD/Lt)
microns (m2/lt) (m2/lt)
Up (Lt)
147.06
1st Intergard 5600 Red 68 175 3.89 30 2.72 40.00 14.71 10.00 3.68
GTA 220 2.21 4.00 0.15 8.82
70.18
2nd Interthane 990 White 57 60 9.50 40 5.70 40.00 7.02 10.00 1.75
GTA733 1.05 4.00 0.07 4.21
TOTAL 235 24.98 5.65 230.27
INTEGRATED PAINT SOLUTIONS PTE LTD
140 Paya Lebar Road #10-09 AZ@Paya
Lebar Singapoe 409015
Tel: [+65 ]6702 3226 Fax: [+65] 67023038
Email : integratedpspl@gmail.com