Bonifacio Estate Services Corporation

2nd Floor Bonifacio Technology Center


31st St. cor. 2nd Ave., Crescent Park West,
Bonifacio Global City, Taguig City
Tel No. 8816-2372

LIST OF REQUIREMENTS
APPLICABLE Temporary Use
TYPE OF ACTIVITIES
REQUIREMENTS
Infrastructure Works Sidewalk Usage A, G, H

Utility Tapping, Installation of Utility Lines A, B, D, G, H Road Usage and Closure A, C, D, G, H

Utility Maintenance and Manhole Opening A, G, H Site Maintenance

Construction/Repair of Road A, B, D, G, H Dewatering Works A, G, H

Construction/Repair of Sidewalk, Curb and Exterior Building Maintenance,


A, B, G, H A, C, G, H
Gutter Repair/Repainting Works

Demolition Works on Common Areas A, G, H Site Clearing Operations A, G, H

Drainage Maintenance A, H Annual Preventive Maintenance C, H

Clash Analysis for Utilities A, B, G, H Fumigation A, G, H

Special Activities Events

Concrete Pouring A, D, G, H Emergency Preparedness Drill A, C, D, G, H, I, J


A, B, C, D, G, H, I,
Driveway and Curb-cut Construction A, G, H Pyrotechnics
J
Erection of Temporary Facilities A, G, H A, B, C, D, G, H, I,
Commercial Shoot
J
Survey Works A, H Pre-nuptial Shoot A, B, C, I, J
Construction, Maintenance, Repair,
A, G, H Drone Shoot A, B, C, I, J
Improvements of Parking Facilities
Groundbreaking A A, B, C, D, G, H, I,
Corporate Events
J
Topping-off Event A A, B, C, D, G, H, I,
Fun Runs
J
Landscape/Easement Works A, G, H
Usage of Parks, Art Pieces and Other Areas in A, B, C, D, G, H, I,
Art Pieces A, B, G, H BGC for Events J

Removal of Trees and Shrubs A, G, H Others (Event) I


Emergency Works A, B, D, G, H
Signage
Building Signs A, C, G, H
DOCUMENTS ITEM
Retail Signage A, C, G, H
Approved Drawings, Layout, Location
Marketing and Board-up Signs A, G, H A
Plan/Key Plan
Project Information Directory A, G, H Clearances/Endorsement from
FBDC/BWC/Bonifacio Gas Corp./Bonifacio B
Vacant Lot Sign A, G, H Communication Corp./BAFI, as applicable
Lamp Post Banners A, G, H Conforme Letter from Building
C
Admin./adjacent properties/affected parties
Safety
Traffic Route Plan D
Overhead Street Protection A, D, G, H
Mechanical Permit (Certified True Copy -
Adjustment of Temporary Fence, Facility, E
A, G, H LGU)
Gantry, Gates, and Fence Canopy Certificate to Operate (Certified True Copy -
Removal of Safety Nets, Catch Platforms and F
A, G, H LGU)
Deflectors
Safety Methodology including safety
Mechanical G
precautions signages/TTC signs/advisory
Crane Permit to Install A, C, E, G, H Job Hazard Analysis H
Crane Permit to Operate A, E, F, H Event/Shoot details I
Gondola Permit to Install A, E, G, H LGU Permits (BFP/ PNP / Barangay Permit /
J
Special Events permit from LGU)
Gondola Permit to Operate A, E, F, H
Alimak/Construction Elevator Permit to Install A, E, G, H NOTE:
Mobilization, Demobilization and Use of
A, G, H Permit application shall be assessed by BESC
Equipment
Generator Set Load Testing A, G, H Representative before issuance of Order of Payment. Other
Placing Boom Permit to Install A, E, G, H requirements that may be deemed necessary shall be
communicated through your A-Commerce Account Message
Placing Boom Permit to Operate A, E, F, H
Box or through your registered email and contact information.
Alimak/Construction Elevator Permit to Operate A, E, F, H