CORP-GEO-PR-002
PT Meares Soputan Mining Toka Tindung Gold Project
DOCUMENT CONTROL
CERTIFICATE OF ACCEPTANCE
RELEASED BY SIGNATURE DATE
Sutarno
ACCEPTED BY SIGNATURE DATE
Dean Pontin
REVISION CONTROL
584893662.doc 2
Date Updated: 29-Mar-22
PT Meares Soputan Mining Toka Tindung Gold Project
TABLE OF CONTENTS
1 INTRODUCTION.................................................................................................................4
2 SAFETY................................................................................................................................4
2.1 PPE Requirements.....................................................................................................................4
2.2 Hazard and Risk.........................................................................................................................4
LIST OF FIGURES
584893662.doc 3
Date Updated: 29-Mar-22
PT Meares Soputan Mining Toka Tindung Gold Project
1 INTRODUCTION
All Grade Control manipulation and processing data will use Surpac Vision software that
able to associate with Microsoft Access 2003 software.
Coding will be applied for all Grade Control activities to have consistencies and
continuity.
Grade Control will have active files those will be used for daily data manipulation until
final process, those files are called temporary files. When the data processing
completed, the files will be appended to the appropriate master file. The Master File
should not be modified, so the temporary files should be checked and validated before
appended to avoid duplicated files.
Grade Control will supply data that can be used by other section such as survey, mine
planning and mine engineer. Also, Grade Control will receive coordinate pick up files
from survey and assay from laboratory. There are ‘share folders” that can be accessed
by those sections.
In order to avoid deleting file and provide easier tracking and accessing in the active
directory GC create the procedures.
2 SAFETY
Coding will consist of activities and location. Activities will cover to sampling types and
location will identify the deposit and bench.
584893662.doc 4
Date Updated: 29-Mar-22
PT Meares Soputan Mining Toka Tindung Gold Project
This procedure details the manipulation and processing data, saving temporary files,
appending files to the master files, using files on transfer directories.
584893662.doc 5
Date Updated: 29-Mar-22
PT Meares Soputan Mining Toka Tindung Gold Project
584893662.doc 6
Date Updated: 29-Mar-22
PT Meares Soputan Mining Toka Tindung Gold Project
Temporary Geology data is entered onto spread sheet, check and validated then
appended to Geology Master file.
Appending process for Survey, Assay and Geology files into Geology Master file is done
in Access software.
Geology Master file is consist of Collar Master file, Assay Master file and Geology
Master file.
584893662.doc 7
Date Updated: 29-Mar-22