Professional Documents
Culture Documents
CORP-GEO-PR-005 Geotechnical Pit Slope Failure Report (RevB)
CORP-GEO-PR-005 Geotechnical Pit Slope Failure Report (RevB)
CORP-GEO-PR-005
PT Meares Soputan Mining Toka Tindung Gold Project
DOCUMENT CONTROL
CERTIFICATE OF ACCEPTANCE
RELEASED BY SIGNATURE DATE
Alistair Frowde
ACCEPTED BY SIGNATURE DATE
Dean Pontin
REVISION CONTROL
TABLE OF CONTENTS
584894040.doc 2
Date Updated: 3/29/2022
PT Meares Soputan Mining Toka Tindung Gold Project
1 INTRODUCTION.................................................................................................................4
2 SAFETY................................................................................................................................4
2.1 PPE Requirements.....................................................................................................................4
2.2 Hazard and Risk.........................................................................................................................4
3 PROCEDURE......................................................................................................................4
1 INTRODUCTION
584894040.doc 3
Date Updated: 3/29/2022
PT Meares Soputan Mining Toka Tindung Gold Project
The failures on the pit wall have potency of the next movement. Geotechnical
Engineering should investigate it and make a report.
This report is to record and define failures to the pit slopes, interpretation of the hazard
potency to protect people working in the open pit.
Scope of this procedure applies to all MSM/TTN staff and contractors completing pit wall
failure report.
2 SAFETY
The failure on the pit slope or wall has potentially dangerous mass movement. Always
be aware of overhanging rocks when working near any face. If a section of a wall
appears too dangerous, do not to work beneath it. An apparent dip and dip direction and
an approximate position will suffice in such situations. In some circumstances, it may be
possible to call the Production Supervisor and organise for the removal of the hazard.
3 PROCEDURE
Only personnel inducted for the Mine area may undertake these surveys.
Inform to Pit Supervisor before entering the failure zone.
The Geotechnical Engineer, Geologist or Geotechnical Technician should undertake
the description.
Complete the Pro-forma attached. CORP-GEO-FM-0001 Pit Slope Failure Report.
Photograph the failure with a digital camera and attach in jpg format to Pro-forma
Attach copy of survey plan prior to failure.
Enter copy into Geotechnical Management System.
Map all cracks and record sense of movement, survey the crest of the scarp and
undertake broad scale geological mapping.
584894040.doc 4
Date Updated: 3/29/2022
PT Meares Soputan Mining Toka Tindung Gold Project
584894040.doc 5
Date Updated: 3/29/2022